RU2399753C2 - Development method of deposit of high-viscosity oil or bitumen - Google Patents

Development method of deposit of high-viscosity oil or bitumen Download PDF

Info

Publication number
RU2399753C2
RU2399753C2 RU2007128512/03A RU2007128512A RU2399753C2 RU 2399753 C2 RU2399753 C2 RU 2399753C2 RU 2007128512/03 A RU2007128512/03 A RU 2007128512/03A RU 2007128512 A RU2007128512 A RU 2007128512A RU 2399753 C2 RU2399753 C2 RU 2399753C2
Authority
RU
Russia
Prior art keywords
well
frequency electromagnetic
horizontal
bitumen
tubing
Prior art date
Application number
RU2007128512/03A
Other languages
Russian (ru)
Other versions
RU2007128512A (en
Inventor
Лиана Ароновна Ковалева (RU)
Лиана Ароновна Ковалева
Нур Мутагарович Насыров (RU)
Нур Мутагарович Насыров
Расул Рашитович Зиннатуллин (RU)
Расул Рашитович Зиннатуллин
Азат Маратович Хайдар (RU)
Азат Маратович Хайдар
Альфред Ядгарович Давлетбаев (RU)
Альфред Ядгарович Давлетбаев
Original Assignee
ГОУ ВПО Башкирский государственный университет, БашГУ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ГОУ ВПО Башкирский государственный университет, БашГУ filed Critical ГОУ ВПО Башкирский государственный университет, БашГУ
Priority to RU2007128512/03A priority Critical patent/RU2399753C2/en
Publication of RU2007128512A publication Critical patent/RU2007128512A/en
Application granted granted Critical
Publication of RU2399753C2 publication Critical patent/RU2399753C2/en

Links

Images

Abstract

FIELD: oil and gas industry.
SUBSTANCE: method consists in high frequency electromagnetic action on the formation drilled at least with one production well through mutually insulated casing string and tubing string. At that, high frequency electromagnetic action is performed through horizontal well. Horizontal part of the well bore is electrically insulated from its vertical part by cutting some part of casing string with further sealing. Horizontal part of the well bore is electrically connected to tubing string.
EFFECT: increasing oil recovery factor of formation and well flow rate.
1 dwg

Description

Изобретение относится к нефтедобывающей промышленности, в частности к способам разработки залежей высоковязкой нефти или битума горизонтальной скважиной.The invention relates to the oil industry, in particular to methods for developing deposits of high viscosity oil or bitumen by a horizontal well.

Известны способы разработки залежи высоковязкой нефти и битума воздействием на них высокочастотного электромагнитного поля, в том числе включающие одновременно закачку смешивающих агентов, например растворителей (а.с. СССР 1723314, кл. Е21В 43/24, 43/22).Known methods for developing deposits of high viscosity oil and bitumen by exposure to a high-frequency electromagnetic field, including including the simultaneous injection of mixing agents, such as solvents (AS USSR 1723314, class E21B 43/24, 43/22).

Недостатком этого способа является невысокий коэффициент нефтеотдачи из-за небольшого объема прогреваемой зоны пласта.The disadvantage of this method is the low oil recovery coefficient due to the small volume of the heated zone of the formation.

Наиболее близким к предлагаемому является способ, предусматривающий высокочастотный электромагнитный нагрев пласта посредством эксплуатационной скважины (патент США №2757738, Е21В 43/00).Closest to the proposed one is a method involving high-frequency electromagnetic heating of a formation by means of a production well (US patent No. 2757738, EV 43/00).

Недостатками этого способа являются недостаточно высокие коэффициент нефтеотдачи пласта и дебит скважины.The disadvantages of this method are not sufficiently high oil recovery coefficient and well production rate.

Техническим результатом изобретения является увеличение коэффициента нефтеотдачи пласта и дебита скважины.The technical result of the invention is to increase the coefficient of oil recovery and production rate of the well.

Технический результат достигается тем, что при разработке залежи высоковязкой нефти или битума, заключающейся в высокочастотным электромагнитном воздействии на пласт, вскрытый по крайней мере одной эксплуатационной скважиной через взаимно изолированные обсадную колонну и насосно-компрессорную трубу, высокочастотное электромагнитное воздействие осуществляют через горизонтальную скважину, при этом горизонтальную часть ствола скважины электрически изолируют от ее вертикальной части, например, путем вырезания части обсадной колонны с последующей герметизацией, причем горизонтальную часть ствола скважины электрически соединяют с насосно-компрессорной трубой.The technical result is achieved by the fact that when developing a deposit of highly viscous oil or bitumen, which consists in high-frequency electromagnetic impact on the formation, opened by at least one production well through mutually isolated casing and tubing, the high-frequency electromagnetic effect is carried out through a horizontal well, the horizontal part of the wellbore is electrically isolated from its vertical part, for example, by cutting out part of the casing followed by sealing, and the horizontal part of the wellbore is electrically connected to the tubing.

На чертеже представлен разрез скважины.The drawing shows a section of a well.

Способ осуществляется следующим образом.The method is as follows.

Высокочастотное электромагнитное воздействие на пласт осуществляют через устройство ввода электромагнитной энергии 1 скважины 2 и взаимно изолированные обсадную колонну 3 и насосно-компрессорную трубу 4, электрически соединенную через устройство соединения насосно-компрессорной трубы и обсадной колонны 5 с горизонтальной частью ствола скважины 6. Причем горизонтальную часть ствола скважины 6 электрически изолируют от ее вертикальной части, например, путем вырезания части 7 обсадной колонны 3 с последующей герметизацией. Горизонтальная часть ствола скважины 6 является излучателем высокочастотных электромагнитных волн. Реализация способа высокочастотного электромагнитного воздействия на пласт осуществлялась на эксплуатационной горизонтальной скважине. Длина вертикальной части 1152 м, длина горизонтальной части 250 м. Текущий коэффициент нефтеотдачи пласта 35%. Текучий дебит скважины 7 м/сутки. Электрическая изоляция ствола осуществлялась на глубине 1145 м. Электрическое соединение обсадной колонны с насосно-компрессорной трубой производилось через подпружиненные контакты на глубине 1147 м. Высокочастотное электромагнитное воздействие осуществлялось высокочастотным генератором ВЧГ 13,56/60 мощностью 60 киловатт. После высокочастотного электромагнитного воздействия на пласт в течение 50 часов коэффициент нефтеотдачи пласта возрос до 45%. Дебит скважины возрос до 9,7 м/сутки.High-frequency electromagnetic action on the formation is carried out through the electromagnetic energy input device 1 of the well 2 and mutually isolated casing 3 and the tubing 4, electrically connected through the connecting device of the tubing and casing 5 to the horizontal part of the wellbore 6. Moreover, the horizontal part the borehole 6 is electrically isolated from its vertical part, for example, by cutting out part 7 of the casing 3 with subsequent sealing. The horizontal part of the wellbore 6 is a radiator of high-frequency electromagnetic waves. The implementation of the method of high-frequency electromagnetic impact on the reservoir was carried out on a production horizontal well. The length of the vertical part is 1152 m, the length of the horizontal part is 250 m. The current oil recovery factor is 35%. Fluid flow rate of the well 7 m / day. The borehole was electrically insulated at a depth of 1145 m. The casing and the tubing were electrically connected through spring-loaded contacts at a depth of 1147 m. High-frequency electromagnetic radiation was carried out by a high-frequency generator VChG 13.56 / 60 with a power of 60 kilowatts. After a high-frequency electromagnetic impact on the formation for 50 hours, the oil recovery coefficient increased to 45%. Well production increased to 9.7 m / day.

Таким образом, использование предлагаемого способа позволяет повысить коэффициент нефтеотдачи пласта и дебит скважины при добыче углеводородов.Thus, the use of the proposed method allows to increase the coefficient of oil recovery and well production during hydrocarbon production.

Claims (1)

Способ разработки залежи высоковязкой нефти или битума, заключающийся в высокочастотном электромагнитном воздействии на пласт, вскрытый, по крайней мере, одной эксплуатационной скважиной через взаимно изолированные обсадную колонну и насосно-компрессорную трубу, отличающийся тем, что высокочастотное электромагнитное воздействие осуществляют через горизонтальную скважину, при этом горизонтальную часть ствола скважины электрически изолируют от ее вертикальной части, например, путем вырезания части обсадной колонны с последующей герметизацией, причем горизонтальную часть ствола скважины электрически соединяют с насосно-компрессорной трубой. The method of developing deposits of high viscosity oil or bitumen, which consists in a high-frequency electromagnetic impact on the reservoir, opened by at least one production well through a mutually isolated casing and tubing, characterized in that the high-frequency electromagnetic effect is carried out through a horizontal well, the horizontal part of the wellbore is electrically isolated from its vertical part, for example, by cutting out part of the casing string followed by cross-breeding, the horizontal portion of the wellbore is electrically connected to the tubing.
RU2007128512/03A 2007-07-24 2007-07-24 Development method of deposit of high-viscosity oil or bitumen RU2399753C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2007128512/03A RU2399753C2 (en) 2007-07-24 2007-07-24 Development method of deposit of high-viscosity oil or bitumen

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2007128512/03A RU2399753C2 (en) 2007-07-24 2007-07-24 Development method of deposit of high-viscosity oil or bitumen

Publications (2)

Publication Number Publication Date
RU2007128512A RU2007128512A (en) 2009-01-27
RU2399753C2 true RU2399753C2 (en) 2010-09-20

Family

ID=40543831

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2007128512/03A RU2399753C2 (en) 2007-07-24 2007-07-24 Development method of deposit of high-viscosity oil or bitumen

Country Status (1)

Country Link
RU (1) RU2399753C2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2454532C1 (en) * 2010-12-13 2012-06-27 Государственное образовательное учреждение высшего профессионального образования "Башкирский государственный университет", ГОУ ВПО БашГУ Development method of high-viscous oil deposit
RU2648411C1 (en) * 2017-05-11 2018-03-26 Федеральное государственное бюджетное образовательное учреждение высшего образования "Волгоградский государственный технический университет" (ВолгГТУ) Method of increasing coefficient of extraction of oil on hard-to-recover and depleted fields

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2454532C1 (en) * 2010-12-13 2012-06-27 Государственное образовательное учреждение высшего профессионального образования "Башкирский государственный университет", ГОУ ВПО БашГУ Development method of high-viscous oil deposit
RU2648411C1 (en) * 2017-05-11 2018-03-26 Федеральное государственное бюджетное образовательное учреждение высшего образования "Волгоградский государственный технический университет" (ВолгГТУ) Method of increasing coefficient of extraction of oil on hard-to-recover and depleted fields

Also Published As

Publication number Publication date
RU2007128512A (en) 2009-01-27

Similar Documents

Publication Publication Date Title
US9963959B2 (en) Hydrocarbon resource heating apparatus including upper and lower wellbore RF radiators and related methods
Mukhametshina et al. Electromagnetic heating of heavy oil and bitumen: a review of experimental studies and field applications
CA2707283C (en) Viscous oil recovery using electric heating and solvent injection
CA2807713C (en) Inline rf heating for sagd operations
US8689865B2 (en) Process for enhanced production of heavy oil using microwaves
US10508524B2 (en) Radio frequency antenna assembly for hydrocarbon resource recovery including adjustable shorting plug and related methods
US11306570B2 (en) Fishbones, electric heaters and proppant to produce oil
US9581002B2 (en) Method of heating a hydrocarbon resource including slidably positioning an RF transmission line and related apparatus
CA2911108C (en) Hydrocarbon resource heating system including choke fluid dispenser and related methods
RU2696740C1 (en) Method and device of complex action for heavy oil and bitumen production by means of wave technology
RU2399753C2 (en) Development method of deposit of high-viscosity oil or bitumen
US9822622B2 (en) Hydrocarbon resource heating system including choke fluid dispensers and related methods
CA3062672C (en) Hydrocarbon resource heating system including internal fluidic choke and related methods
RU2626482C1 (en) Recovery method of high-viscosity oil or bitumen deposit, using hydraulic fractures
RU2564311C1 (en) Method of production of high viscous oil and bitumen
WO2021005383A1 (en) Method for enhancing oil recovery
RU2560016C1 (en) Method to produce high-viscosity oil and bitumen
RU2537456C1 (en) Development method of deposit of high-viscosity and heavy crude oil with thermal impact
RU2698927C1 (en) Method of action on oil-saturated interval of formation in horizontal section of oil well shaft
CA2984002C (en) Hydrocarbon resource heating system including choke fluid dispenser and related methods
Amieibibama et al. Electric Submersible pump (ESP), A Better solution to Heavy Oil Production in Nigeria: Case Study of Enuma 3T in Niger Delta
RU2325516C1 (en) Petroleum deposit development process
CA2777790C (en) Process for enhanced production of heavy oil using microwaves
RU2241118C1 (en) Method for extracting an oil deposit

Legal Events

Date Code Title Description
FA94 Acknowledgement of application withdrawn (non-payment of fees)

Effective date: 20091225

FZ9A Application not withdrawn (correction of the notice of withdrawal)

Effective date: 20100126

MM4A The patent is invalid due to non-payment of fees

Effective date: 20090725