KR200260977Y1 - Electronic electric power system - Google Patents

Electronic electric power system Download PDF

Info

Publication number
KR200260977Y1
KR200260977Y1 KR2020010033042U KR20010033042U KR200260977Y1 KR 200260977 Y1 KR200260977 Y1 KR 200260977Y1 KR 2020010033042 U KR2020010033042 U KR 2020010033042U KR 20010033042 U KR20010033042 U KR 20010033042U KR 200260977 Y1 KR200260977 Y1 KR 200260977Y1
Authority
KR
South Korea
Prior art keywords
power
circuit unit
current
power supply
voltage
Prior art date
Application number
KR2020010033042U
Other languages
Korean (ko)
Inventor
김건수
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR2020010033042U priority Critical patent/KR200260977Y1/en
Application granted granted Critical
Publication of KR200260977Y1 publication Critical patent/KR200260977Y1/en

Links

Landscapes

  • Measurement Of Current Or Voltage (AREA)

Abstract

본 고안은 전자식 전력량계에 관한 것으로, 오결선, 미결선 및 자연적, 인위적인 결상 상태를 파악할 수 있도록 전원측과 일반부하 사이에 연결되어 각 회로부에 동작 전원을 공급하는 전원회로부와; 전원측과 일반부하 사이에 연결되어, 공급되는 일반용 전력을 수볼트의 전압 및 전류로 변환한 후, 이를 승산하여 펄스폭 변조를 하고, 또한 상기 펄스폭 변조신호에 의해 전력량에 비례하는 주파수로 변환하여 출력하는 전력/주파수 변환부와; 상기 전력/주파수 변환부로부터의 출력 신호에 의해 사용된 전력량을 연산 및 계량함과 동시에, 전압과 전류의 위상각 및 센싱값을 읽어 오결선 및 미결선 상태를 판단하며, 부설 이후 자연적, 인위적 결상이 발생하게 된 시점을 기록 및 출력하는 디지털회로부와; 상기 디지털회로부로부터의 출력 신호에 의해 사용자에게 표시할 전력량, 오결선 및 미결선 상태, 결상 시점 등을 표시하는 자료표시부를 포함하여 이루어진 것을 특징으로 함.The present invention relates to an electronic power meter, comprising: a power supply circuit unit connected between a power supply side and a general load to supply operating power to each circuit unit so as to identify a faulty connection, an unconnected connection, and a natural and artificial open phase; Connected between the power supply side and the general load, converts the supplied general-purpose power into voltage and current of several volts, multiplies it, and modulates the pulse width, and also converts the frequency into a frequency proportional to the amount of power by the pulse width modulated signal. An output power / frequency converter; Calculates and measures the amount of power used by the output signal from the power / frequency converter, and reads the phase angle and sensing values of voltage and current to determine incorrect and unconnected status. A digital circuit unit for recording and outputting a time point at which this occurs; And a data display unit for displaying the amount of power to be displayed to the user by the output signal from the digital circuit unit, a miswired and unconnected state, and an imaging point.

Description

전자식 전력량계{Electronic electric power system}Electronic electric power system

본 고안은 전자식 전력량계에 관한 것으로, 더욱 상세하게 설명하면 공장, 상가 등 대규모 수용 시설의 사용 전력량을 계량하기 위하여 필요한 CT,PT, 전력량계를 조합하여 결선하는 경우 오결선 및 미결선으로 인한 착오 계량 방지 및 그에 따른 여타 문제를 해결하기 위해 오결선 및 미결선 상태를 전력량계의 자료표시부에 표시하며, 자연적, 인위적으로 결상될 경우 결상된 시점의 시간을 저장하여 필요시 데이터 값을 표시할 수 있는 전자식 전력량계에 관한 것이다.The present invention relates to an electronic electricity meter, and in more detail, when connecting a combination of CT, PT, and electricity meters required to measure the amount of power used in a large-scale accommodation facility such as a factory and a shopping mall, it prevents error metering due to incorrect or incomplete wiring. And to solve the other problems accordingly, the miswired and unconnected status is displayed on the data display part of the electricity meter, and when the natural and artificial phases are lost, the electronic electricity meter can store the time of the missing phase and display the data value if necessary. It is about.

임의의 대규모 수용가에 CT, CP와 전력량계를 조합하여 부설할 경우 오결선 및 미결선이 되어도 전력량계에는 아무런 표시가 없어 부설 당시에는 부설자의 과실로 인한 오결선 및 미결선을 파악하지 못하고, 부설후에도 자연적 또는 인위적으로 발생한 결상을 표시하거나 정보를 저장하지 못하는 문제가 있다.In case of installing CT, CP and electricity meter in combination with any large customer, there is no indication on electricity meter even if it is wrong or unwired. Or, there is a problem in that it is not possible to display an artificially generated image or to store information.

즉, CT, CP와 전력량계 결선은 복잡하여 많은 오결선 및 미결선을 초래하고 그것을 파악하기가 매우 어렵다. 또한 오결선 및 미결선으로 인한 전기요금 과소 청구 사례가 발생하며, 오결선 발견시점에 요금 재산정 청구시 고객과의 마찰이 발생한다.In other words, the connection of CT, CP and power meter is complicated, resulting in many incorrect and unconnected wires and it is very difficult to identify them. In addition, there is a case of under-billing electricity charges due to incorrect and unwired wires, and friction with customers occurs when charges are reclaimed at the time of incorrect wires are found.

또한, 자연적(낙뢰, 과부하등), 인위적으로 결상이 되었을 경우 발생 시점을 확인할 없어 미계량된 사용전력량의 과학적인 산정이 곤란하다.In addition, natural (lightning, overload, etc.), if the artificial phase is missing, it is difficult to determine the time of occurrence, it is difficult to scientifically calculate the unmetered power consumption.

또한, 오결선 및 결상여부를 확인하기 위하여 주기적으로 현장을 방문하여 시험을 해야 하는 등 많은 인력과 시간이 소모되며, 현장시험주기가 장기간인 경우에는 미계량 전력량이 상당하여 수용가측 반발로 요금회수가 곤란한 사례가 발생한다.In addition, it requires a lot of manpower and time, such as the need to visit the site periodically to check for incorrect wiring and open phase.If the site test cycle is long, the unmetered power amount is considerable and the charge is recovered by the customer's reaction. A difficult case arises.

더불어, 전기요금을 면탈하기 위하여 수용가측에서 일정기간 인위적인 결상을 발생시키고 원상회복조치를 할 경우 이의 인지가 불가능한 문제가 있다.In addition, in order to get rid of electric charges, there is a problem in that it is impossible to recognize when an artificial phase loss occurs at a consumer side for a certain period of time and a recovery action is made.

따라서 본 고안은 상기와 같은 종래의 문제점을 해결하기 위해 안출한 것으로, CT, CP와 전력량계를 조합하여 부설시 오결선 및 미결선이 발생하더라도 이를 바로 검출할 수 있고, 부설된 이후 자연적 또는 인위적으로 발생한 결상을 검출하여 결상된 시간을 저장하고 필요시 데이터를 표시하여 문제를 해결하도록, 전자식 전력량계의 구성품 중의 하나인 자료 표시부에 오결선 및 미결선, 결상(전압,전류) 여부를 표시하는 기능과 정보저장기능을 구비한 전자식 전력량계를 제공하는데 있다.Therefore, the present invention has been devised to solve the conventional problems as described above. Even when incorrect wiring and unconnected wires occur when laying by combining CT, CP and power meter, it can be detected immediately, and after laying The function of displaying whether there is a faulty or unconnected or missing (voltage, current) in the data display, which is one of the components of the electronic watt-hour meter, to solve the problem by detecting the missing phase and storing the lost time and displaying the data if necessary. It is to provide an electronic electricity meter with an information storage function.

도1은 본 고안에 의한 전자식 전력량계의 구성을 도시한 블럭도이다.1 is a block diagram showing the configuration of an electronic electricity meter according to the present invention.

- 도면중 주요 부호에 대한 설명 --Description of the main symbols in the drawings-

1S,2S,3S; 전원측 1L,2L,3L; 일반부하1S, 2S, 3S; Power supply side 1L, 2L, 3L; General load

110; 전원 회로부 111; 전원트랜스110; A power supply circuit 111; Power transformer

112; 전원회로 113; 정전보상부112; Power supply circuit 113; Power failure compensation department

120; 전력/주파수 변환부 121; 계기용 변압기120; Power / frequency converter 121; Instrument transformer

122; 변류기 123; 승산기122; Current transformer 123; Multiplier

124; 주파수 변환기 130; 디지털회로부124; Frequency converter 130; Digital circuit part

131; CPU 132; RTC131; CPU 132; RTC

133; Crystal 134; EEPROM133; Crystal 134; EEPROM

135; RAM/ROM 136; 밧데리 감시부135; RAM / ROM 136; Battery watch

137; 조작스위치 140; 자료표시부137; Operation switch 140; Data display part

141; LCD141; LCD

상기한 목적을 달성하기 위해 본 고안에 의한 전자식 전력량계는 전원측과 일반부하 사이에 연결되어 각 회로부에 동작 전원을 공급하는 전원회로부와; 전원측과 일반부하 사이에 연결되어, 공급되는 일반용 전력을 수볼트의 전압 및 전류로 변환한 후, 이를 승산하여 펄스폭 변조를 하고, 또한 상기 펄스폭 변조신호에 의해 전력량에 비례하는 주파수로 변환하여 출력하는 전력/주파수 변환부와; 상기 전력/주파수 변환부로부터의 출력 신호에 의해 사용된 전력량을 연산 및 계량함과 동시에, 전압과 전류의 위상각 및 센싱값을 읽어 오결선 및 미결선 상태를 판단하며, 부설 이후 자연적, 인위적 결상이 발생하게 된 시점을 기록 및 출력하는 디지털회로부와; 상기 디지털회로부로부터의 출력 신호에 의해 사용자에게 표시할 전력량,오결선 및 미결선 상태, 결상 시점 등을 표시하는 자료표시부를 포함하여 이루어진 것을 특징으로 한다.In order to achieve the above object, the electronic watt hour meter according to the present invention includes a power supply circuit unit connected between a power supply side and a general load to supply operating power to each circuit unit; Connected between the power supply side and the general load, converts the supplied general-purpose power into voltage and current of several volts, multiplies it, and modulates the pulse width, and also converts the frequency into a frequency proportional to the amount of power by the pulse width modulated signal. An output power / frequency converter; Calculates and measures the amount of power used by the output signal from the power / frequency converter, and reads the phase angle and sensing values of voltage and current to determine incorrect and unconnected status. A digital circuit unit for recording and outputting a time point at which this occurs; It characterized in that it comprises a data display unit for displaying the amount of power to be displayed to the user by the output signal from the digital circuit unit, the mis-wiring and un-connected state, the time of phase loss and the like.

상기와 같이 하여 본 고안에 의한 전자식 전력량계에 의하면, CT, CP와 전력량계를 조합하여 부설시 발생하는 오결선 및 미결선의 여부를 부설시에 즉시 파악할 수 있게 된다.According to the electronic watt-hour meter according to the present invention as described above, it is possible to immediately determine at the time of the installation of the mis-wiring and unconnected when the combination of CT, CP and the wattmeter.

또한, 자연적, 인위적인 방법으로 결상(전압,전류) 되었을 경우 현장 검침시 LCD 표시부에서 확인할 수 있게 된다.In addition, when a phase (voltage, current) is formed by a natural or artificial method, it can be checked on the LCD display during the field reading.

또한, 원격검침 시스템의 경우 현장을 방문하지 않고도 오결선, 결상 여부를 확인할 수 있으므로, 정기적인 현장 시험을 생략할 수 있어 인력과 비용을 절감할 수 있게 된다.In addition, in the case of a remote meter reading system can check whether there is a miswiring or missing phase without visiting the site, it is possible to omit the regular site test to save manpower and cost.

또한, 저장기능을 통하여 과거 일정기간의 오결선, 결상 정보를 취득할 있어 계기조작 등의 도전 행위를 파악하고 예방할 수 있으며, 또한 저장정보를 활용하여 미계량된 전력량을 보다 정확하게 산정할 수 있어 요금 정산 시비를 줄일 수 있게 된다.In addition, through the storage function, it is possible to acquire incorrect wiring and phase loss information for a certain period of time, thereby identifying and preventing challenging behaviors such as instrument operation, and also to accurately calculate the unmetered amount of power by using the storage information. Settlement costs can be reduced.

더불어, 현장 검침시에도 자료표시부를 통하여 오결선, 결상 유무를 확인할 수 있으므로 비정상 상태가 장시간 방치되지 않아 종래보다 신속하게 미계량 전기요금을 회수할 수 있게 된다.In addition, even during field meter reading, it is possible to check whether there is a miswiring or missing phase through the data display unit, so that the abnormal state is not left for a long time, thereby recovering the unmetered electricity rate more quickly than before.

이하 본 고안이 속한 기술분야에서 통상의 지식을 가진 자가 본 고안을 용이하게 실시할 수 있을 정도로 본 고안의 바람직한 실시예를 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention.

도1은 본 고안에 의한 전자식 전력량계의 구성을 도시한 블럭도이다.1 is a block diagram showing the configuration of an electronic electricity meter according to the present invention.

도시된 바와 같이 본 고안은 크게 전원 회로부(110), 전력/주파수 변환부(120), 디지털회로부(130) 및 자료표시부(140)의 4개 블록으로 이루어져 있으며, 이를 순차적으로 설명한다.As shown, the present invention is largely composed of four blocks of the power circuit unit 110, the power / frequency conversion unit 120, the digital circuit unit 130 and the data display unit 140, it will be described sequentially.

먼저 전원측(1S,2S,3S)과 일반부하(1L,2L,3L) 사이에 전원 회로부(110)가 연결되어 있다. 상기 전원 회로부(110)는 전원트랜스(111), 전원회로(112), 정전보상부(113) 등으로 이루어져 있으며, 상기 전원트랜스(111)는 1차측이 전원측(1S,2S,3S)에 연결되고, 그 출력은 전원회로(112)에 직렬로 연결되어 있다. 또한 전원회로(112)의 출력은 각 회로부의 동작 전원으로 공급된다. 정전보상부(113)는 정전시에 계량기의 각종 데이터 및 전자시계를 유지하기 위해 공급되는 보조 동작 전원 회로이다.First, the power supply circuit unit 110 is connected between the power supply sides 1S, 2S, and 3S and the general loads 1L, 2L, and 3L. The power circuit unit 110 is composed of a power transformer 111, a power circuit 112, the power failure compensation unit 113, the power transformer 111 is connected to the power supply side (1S, 2S, 3S) on the primary side. The output is connected in series to the power supply circuit 112. In addition, the output of the power supply circuit 112 is supplied to the operating power of each circuit portion. The power failure compensator 113 is an auxiliary operation power supply circuit which is supplied to maintain various data of the meter and the electronic clock at the time of power failure.

계속해서, 상기 전원측(1S,2S,3S)과 일반부하(1L,2L,3L) 사이에 전력/주파수 변환부(120)가 연결되어 있다. 상기 전력/주파수 변환부(120)는 계기용 변압기(121), 변류기(122), 승산기(123) 및 주파수 변환기(124)로 이루어져 있다. 상기 계기용 변압기(121)는 전원측(1S,2S,3S)과 병렬로 연결되어 입력을 받고, 상기 일반용 변류기(122)는 전원측(1S,2S,3S)과 직렬로 연결되어 입력을 받는다. 상기 계기용 변압기(121) 및 변류기(122)로부터 출력되는 각각의 전압, 전류신호는 승산기(123)에 입력되며, 상기 승산기(123)는 전류 및 전압을 승산하여 주파수 변환기(124)에 출력한다. 또한 상기 주파수 변환기(124)는 전력에 비례하는 주파수를 하기할 디지털회로부(130)에 출력한다.Subsequently, a power / frequency converting unit 120 is connected between the power supply side 1S, 2S, 3S and the normal loads 1L, 2L, 3L. The power / frequency converter 120 includes an instrument transformer 121, a current transformer 122, a multiplier 123, and a frequency converter 124. The instrument transformer 121 is connected in parallel with the power supply side (1S, 2S, 3S) receives an input, the general current transformer 122 is connected in series with the power supply side (1S, 2S, 3S) receives an input. Each voltage and current signal output from the instrument transformer 121 and the current transformer 122 are input to the multiplier 123, and the multiplier 123 multiplies the current and the voltage to output the frequency converter 124. . In addition, the frequency converter 124 outputs a frequency proportional to power to the digital circuit unit 130 to be described below.

상기 디지털회로부(130)는 CPU(131), RTC(132), Crystal(133), EEPROM(134), RAM/ROM(135), 밧데리 감시부(136), 조작스위치(137) 등으로 이루어져 있다. 상기 전력/주파수 변환부(120)의 주파수 변환기(124)로부터 출력되는 주파수는 상기 CPU(131)에 인가된다. 상기 RTC(132)는 초단위의 데이터를 CPU(131)에 입력하고, 상기 Crystal(133)은 주파수 변환기(124)의 주파수를 분주하기 위한 분주 주기 신호를 상기 CPU(131)에 입력한다. 상기 EEPROM(134)은 상기 CPU(131)에 계량된 데이터를 비휘발성 메모리에 저장하기 위한 수단으로 제공되고, 상기 RAM/ROM(135)은 상기 CPU(131)에서 계량된 자료 및 누적 정보를 저장하거나 읽어오기 위한 수단으로 제공된다. 상기 밧데리 감시부(136)는 밧데리 저전압을 감지하여 상기 CPU(131)에 입력한다. 또한, 상기 CPU(131)는 각종 데이터의 연산 및 내용을 사용자에게 알려주기 위해 소정 신호를 하기할 자료표시부(140)에 출력한다.The digital circuit unit 130 includes a CPU 131, an RTC 132, a crystal 133, an EEPROM 134, a RAM / ROM 135, a battery monitoring unit 136, an operation switch 137, and the like. . The frequency output from the frequency converter 124 of the power / frequency converter 120 is applied to the CPU 131. The RTC 132 inputs data in seconds to the CPU 131, and the Crystal 133 inputs a division period signal for dividing a frequency of the frequency converter 124 into the CPU 131. The EEPROM 134 is provided as a means for storing data quantified in the CPU 131 in a nonvolatile memory, and the RAM / ROM 135 stores data and cumulative information quantified in the CPU 131. Or as a means of reading. The battery monitoring unit 136 detects a battery low voltage and inputs it to the CPU 131. In addition, the CPU 131 outputs a predetermined signal to the data display unit 140 to inform the user of the operation and contents of various data.

상기 자료표시부(140)는 상기 CPU(131)가 사용자에게 표시할 내용들을 표시하는 LCD(141)로 이루어져 있다. 상기 LCD(141)의 입력은 상기 CPU(131)에서 표시 내용들을 출력한 데이터이다.The data display unit 140 includes an LCD 141 that displays contents to be displayed to the user by the CPU 131. The input of the LCD 141 is data outputted by the CPU 131.

이러한 구성의 본 고안에 의한 전자식 전력량계의 작동 및 작용을 설명하면 다음과 같다.Referring to the operation and operation of the electronic electricity meter according to the present invention of such a configuration as follows.

먼저, 전원 회로부(110)는 각 회로부에 동작 전원을 공급하기 위한 수단으로서 상술한 바와 같이 전원트랜스(111), 전원회로(112), 정전보상부(113)로 이루어져 있다.First, the power circuit unit 110 is a means for supplying the operating power to each circuit portion, as described above, the power transformer 111, the power circuit 112, the power failure compensation unit 113.

상기 전원트랜스(111)는 1차측이 전원측(1S,2S,3S)에 연결되어 사용되며, 직류로 변환된 상기 전원회로(112)의 출력은 각 회로부의 전원으로 공급된다. 물론, 상기 정전보상부(113)는 정전시에 디지털회로부(130)의 CPU(131), RAM/ROM(135)에 저장된 각종 데이터를 유지하고, 또한 RTC(132)의 시간 동작이 유지되도록 한다.The power transformer 111 has a primary side connected to the power sides 1S, 2S, and 3S, and the output of the power circuit 112 converted to direct current is supplied to the power of each circuit unit. Of course, the power failure compensation unit 113 maintains various data stored in the CPU 131 and the RAM / ROM 135 of the digital circuit unit 130 at the time of power failure, and also maintains the time operation of the RTC 132. .

이어서, 상기 전력/주파수 변환부(120)는 전력 공급 회사로부터 공급되는 일반용 전력을 계기용 변압기(121) 및 변류기(122)를 이용하여 수 볼트의 전압 및 전류로 변환한다.Subsequently, the power / frequency converting unit 120 converts general-purpose power supplied from a power supply company into voltage and current of several volts using the instrument transformer 121 and the current transformer 122.

그런 후, 상기 전압 및 전류 신호를 승산기(123)에 출력하며, 상기 승산기(123)는 승산 작용에 의해 펄스폭 변조를 수행한다.Thereafter, the voltage and current signals are output to the multiplier 123, and the multiplier 123 performs pulse width modulation by a multiplication operation.

또한 주파수 변환기(124)에서는 상기 승산기(123)에 의한 팔스폭 변조신호를 주파수로 변환하여 출력한다.In addition, the frequency converter 124 converts the pulse width modulated signal by the multiplier 123 into a frequency and outputs the frequency.

여기서, 상기 주파수 변환기(124)는 전압, 전류의 오결선, 미결선을 감지하게 된다. 즉, 오결선의 경우 전압과 전류의 위상각을 이용하여 정상 결선의 위상각과 비교하여 판별하고, 미결선의 경우 전압, 전류의 센싱값이 없을 경우 디지털회로부(130)의 CPU(131)에 에러 발생을 통보한다.Here, the frequency converter 124 detects an incorrect connection or an unconnected voltage or current. That is, in the case of a wrong connection, the phase angle of voltage and current is compared using the phase angle of a normal connection, and in case of an unconnected connection, an error occurs in the CPU 131 of the digital circuit unit 130 when there is no sensing value of voltage and current. Be notified.

또한, 부설 이후 자연적, 인위적으로 결상이 발생하게 되면 결상이 발생한 시점의 시간을 EEPROM(134)에 저장하여 필요시 데이터를 표시 및 확인할 수 있도록 한다.In addition, when the imaging occurs naturally and artificially after laying, the time at which the imaging occurs is stored in the EEPROM 134 so that the data can be displayed and checked when necessary.

계속해서, 디지털회로부(130)의 CPU(131)는 상기 주파수 변환기(124)에서 출력된 주파수 신호를 일정한 분주 주기를 발생시키는 Crystal(133)에 의해 분주되어사용 전력량(kWh)을 연산 및 계량한다.Subsequently, the CPU 131 of the digital circuit unit 130 is divided by the crystal 133 which generates a constant division period of the frequency signal output from the frequency converter 124 to calculate and measure the amount of used power kWh. .

또한, 전압과 전류의 위상각을 측정하고 전압, 전류의 센싱값을 읽어 전압, 전류의 오결선 및 미결선 상태를 파악한다.In addition, the phase angles of voltage and current are measured, and the sensing values of voltage and current are read to determine the erroneous and unconnected states of voltage and current.

한편, 누적 사용 전력량은 정전시에도 계량 자료를 저장하며 또한 부설 이후 자연적, 인위적으로 결상이 발생하게 된 시점의 시간을 EEPROM(134)에 기록한다. 물론, 전월 및 전전월 사용 전력량 자료를 기록하기 위해 RAM/ROM(135)을 이용한다.On the other hand, the cumulative amount of power used to store the measurement data even in the event of a power outage, and also records the time at which the natural phase artificially occurred after installation in the EEPROM (134). Of course, the RAM / ROM 135 is used to record the previous month and the previous month power consumption data.

또한, 장치의 정상적인 동작 중 항상 잔여 밧데리를 감시하는 밧데리 감시QN(136)는 잔여 밧데리 전압이 일정 수준 이하로 떨어지는 경우 CPU(131)에 밧데리 저전압 신호(Battery Low Voltage)를 입력하고, 상기 CPU(131)는 자료표시부(140)의 LCD(141)에 밧데리 저전압 오류 표시 신호를 출력하게 된다.In addition, the battery monitoring QN 136, which always monitors the remaining battery during the normal operation of the device, inputs a battery low voltage signal (Battery Low Voltage) to the CPU 131 when the remaining battery voltage falls below a predetermined level, and the CPU ( 131 outputs a battery low voltage error indication signal to the LCD 141 of the data display unit 140.

또한, RTC(132)는 상기 CPU(131)에 정확한 현재 시간 정보를 제공하며, CPU(131)는 현재 시간을 계속적으로 기록한다.In addition, the RTC 132 provides accurate current time information to the CPU 131, and the CPU 131 continuously records the current time.

또한 조작스위치(137)는 각종 설정치 및 시간을 자유롭게 설정할 수 있도록 한다.In addition, the operation switch 137 allows to set various set values and time freely.

계속해서, 자료표시부(140)는 상기 CPU(131)가 사용자에게 표시할 내용들을 표시하는 LCD(141)로 구성된다. 상기 LCD(141)에 표시되는 내용은 현월/전월 누적 사용량 항목, 밧데리 전압 오류 및 전압, 전류 오결선 및 미결선 상태, 그리고 결상이 일어난 시점의 시간 등이다.Subsequently, the data display unit 140 includes an LCD 141 which displays the contents to be displayed to the user by the CPU 131. The contents displayed on the LCD 141 include the current month / month cumulative usage items, battery voltage error and voltage, current misconnection and non-connection status, and time at which an imaging occurs.

이상에서와 같이 본 고안은 비록 상기의 실시예에 한하여 설명하였지만 여기에만 한정되지 않으며, 본 고안의 범주 및 사상을 벗어나지 않는 범위내에서 여러가지로 변형된 실시예도 가능할 것이다.As described above, although the present invention has been described with reference to the above embodiments, the present invention is not limited thereto, and various modified embodiments may be possible without departing from the scope and spirit of the present invention.

따라서, 본 고안에 의한 전자식 전력량계에 의하면 다음과 같은 효과가 있다.Therefore, the electronic wattmeter according to the present invention has the following effects.

첫째, CT, CP와 전력량계를 조합하여 부설시 발생하는 오결선 및 미결선의 여부를 부설시에 즉시 파악할 수 있는 효과가 있다.First, the combination of CT, CP and the electricity meter has an effect that can immediately determine whether the wiring is wrong or unwired when laying.

둘째, 자연적, 인위적인 방법으로 결상(전압,전류) 되었을 경우 현장 검침시 LCD 표시부에서 확인할 수 있는 효과가 있다.Second, when the phase (voltage, current) is formed by a natural or artificial method, there is an effect that can be confirmed on the LCD display during the meter reading.

셋째, 원격검침 시스템의 경우 현장을 방문하지 않고도 오결선, 결상 여부를 확인할 수 있으므로, 정기적인 현장 시험을 생략할 수 있어 인력과 비용을 절감할 수 있는 효과가 있다.Third, in the case of the remote meter reading system, it is possible to check the wiring or the absence of missing phases without visiting the site, and thus it is possible to omit regular field tests, thereby reducing the manpower and cost.

넷째, 저장기능을 통하여 과거 일정기간의 오결선, 결상 정보를 취득할 있어 계기조작 등의 도전 행위를 파악하고 예방할 수 있으며, 또한 저장정보를 활용하여 미계량된 전력량을 보다 정확하게 산정할 수 있어 요금 정산 시비를 줄일 수 있는 효과가 있다.Fourth, through the storage function, you can acquire wrong wiring and phase loss information for a certain period of time, so that you can identify and prevent challenging behavior such as instrument operation, and you can calculate the amount of unmetered power more accurately by using the storage information. It is effective to reduce settlement costs.

다섯째, 현장 검침시에도 자료표시부를 통하여 오결선, 결상 유무를 확인할 수 있으므로 비정상 상태가 장시간 방치되지 않아 종래보다 신속하게 미계량 전기요금을 회수할 수 있는 효과가 있다.Fifth, since the presence of incorrect wiring and phase loss can be confirmed through the data display unit during the field reading, the abnormal state is not left for a long time, so that the unmetered electric charge can be recovered more quickly than before.

Claims (1)

전원측과 일반부하 사이에 연결되어 각 회로부에 동작 전원을 공급하는 전원회로부와;A power supply circuit portion connected between the power supply side and the general load to supply operation power to each circuit portion; 전원측과 일반부하 사이에 연결되어, 공급되는 일반용 전력을 수볼트의 전압 및 전류로 변환한 후, 이를 승산하여 펄스폭 변조를 하고, 또한 상기 펄스폭 변조신호에 의해 전력량에 비례하는 주파수로 변환하여 출력하는 전력/주파수 변환부와;Connected between the power supply side and the general load, converts the supplied general-purpose power into voltage and current of several volts, multiplies it, and modulates the pulse width, and also converts the frequency into a frequency proportional to the amount of power by the pulse width modulated signal. An output power / frequency converter; 상기 전력/주파수 변환부로부터의 출력 신호에 의해 사용된 전력량을 연산 및 계량함과 동시에, 전압과 전류의 위상각 및 센싱값을 읽어 오결선 및 미결선 상태를 판단하며, 부설 이후 자연적, 인위적 결상이 발생하게 된 시점을 기록 및 출력하는 디지털회로부와;Calculates and measures the amount of power used by the output signal from the power / frequency converter, and reads the phase angle and sensing values of voltage and current to determine incorrect and unconnected status. A digital circuit unit for recording and outputting a time point at which this occurs; 상기 디지털회로부로부터의 출력 신호에 의해 사용자에게 표시할 전력량, 오결선 및 미결선 상태, 결상 시점 등을 표시하는 자료표시부를 포함하여 이루어진 전자식 전력량계.And a data display unit for displaying the amount of power to be displayed to the user, the status of the wrong and unconnected states, the time of the phase loss, etc. by the output signal from the digital circuit unit.
KR2020010033042U 2001-10-29 2001-10-29 Electronic electric power system KR200260977Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010033042U KR200260977Y1 (en) 2001-10-29 2001-10-29 Electronic electric power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010033042U KR200260977Y1 (en) 2001-10-29 2001-10-29 Electronic electric power system

Publications (1)

Publication Number Publication Date
KR200260977Y1 true KR200260977Y1 (en) 2002-01-17

Family

ID=73070296

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010033042U KR200260977Y1 (en) 2001-10-29 2001-10-29 Electronic electric power system

Country Status (1)

Country Link
KR (1) KR200260977Y1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100947342B1 (en) 2008-01-28 2010-03-15 한국전력공사 Wrong wiring measurement method for digital Watt-Hour Meter
KR200449054Y1 (en) * 2008-03-03 2010-06-09 한국전력공사 Electronic watt-hour meter with a function of short circuit protection
KR101158309B1 (en) 2011-05-20 2012-06-19 한국전력공사 Electronic watt hour meter being possible to test error detection using optical communication port
KR101372179B1 (en) 2010-03-17 2014-03-10 엘에스산전 주식회사 Selective Ground Relay with Function of Wiring Mismatch Compensation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100947342B1 (en) 2008-01-28 2010-03-15 한국전력공사 Wrong wiring measurement method for digital Watt-Hour Meter
KR200449054Y1 (en) * 2008-03-03 2010-06-09 한국전력공사 Electronic watt-hour meter with a function of short circuit protection
KR101372179B1 (en) 2010-03-17 2014-03-10 엘에스산전 주식회사 Selective Ground Relay with Function of Wiring Mismatch Compensation
KR101158309B1 (en) 2011-05-20 2012-06-19 한국전력공사 Electronic watt hour meter being possible to test error detection using optical communication port

Similar Documents

Publication Publication Date Title
US7639000B2 (en) Apparatus for electronically measuring or distributing electrical energy
US5469049A (en) System checking and troubleshooting package for an electronic metering device
JP4663377B2 (en) Electronic energy meter
US20020186000A1 (en) Electronic revenue meter with automatic service sensing
JP5102569B2 (en) Electricity meter
JP2006234643A (en) Watthour meter
KR200260977Y1 (en) Electronic electric power system
JP4208617B2 (en) Electricity meter
US7638998B2 (en) Electronic tamper detection circuit for an electricity meter
KR100550106B1 (en) Mornitoring system with electronic watthours-meter
CA2201104C (en) Electronic metering device including automatic service sensing
EP1012608B1 (en) Electronic revenue meter with automatic service sensing
KR100443825B1 (en) Electronic watt-hour meter that having perceiving function of surreptitious use of electricity
JP2005233804A (en) Charging system for electrical energy, and watt-hour meter thereof
JP4690680B2 (en) Electricity meter
JP4685438B2 (en) Electricity meter
KR100443824B1 (en) Watt-hour meter that having electronic and mechanical display device
KR100305961B1 (en) Integrated Electronic Electronic Meter
KR100447427B1 (en) Electronic type Watthour Meter
KR100637627B1 (en) Both transformer power load monitoring and watt meter reading remote control system
KR20000026161A (en) Method for recovering automatic error data in electronic watt-hour meter
AU725096B2 (en) Electronic metering device including automatic service sensing
JP2004138494A (en) Electronic watt-hour meter
KR20090097032A (en) Static electricity meter
KR20000037894A (en) Material maintenance method after initializing electronic watt-hour meter

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
LAPS Lapse due to unpaid annual fee
T601 Decision to invalidate utility model after technical evaluation