KR102459769B1 - System for providing energy saving guide to target building - Google Patents

System for providing energy saving guide to target building Download PDF

Info

Publication number
KR102459769B1
KR102459769B1 KR1020180023141A KR20180023141A KR102459769B1 KR 102459769 B1 KR102459769 B1 KR 102459769B1 KR 1020180023141 A KR1020180023141 A KR 1020180023141A KR 20180023141 A KR20180023141 A KR 20180023141A KR 102459769 B1 KR102459769 B1 KR 102459769B1
Authority
KR
South Korea
Prior art keywords
unit
load
target building
amount
electricity
Prior art date
Application number
KR1020180023141A
Other languages
Korean (ko)
Other versions
KR20180098179A (en
Inventor
김종헌
김선미
유승호
한자경
Original Assignee
주식회사 케이티
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 케이티 filed Critical 주식회사 케이티
Publication of KR20180098179A publication Critical patent/KR20180098179A/en
Application granted granted Critical
Publication of KR102459769B1 publication Critical patent/KR102459769B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F15/00Digital computers in general; Data processing equipment in general
    • G06F15/16Combinations of two or more digital computers each having at least an arithmetic unit, a program unit and a register, e.g. for a simultaneous processing of several programs
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Computer Hardware Design (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

대상 건물에 대한 에너지 절감 가이드를 제공하는 에너지 절감 컨설팅 시스템은 외부 서버 및 미터기 중 적어도 하나로부터 전력 데이터를 수집하는 전력 데이터 수집부, 전력 데이터를 대상 건물의 부하별로 분리하는 부하 분리 수행부, 대상 건물의 특정 기간의 예측 전력량 및 특정 기간에 대한 실측 전력량 중 적어도 하나에 기초하여 에너지 절감 가이드를 생성하는 절감 가이드 생성부 및 대상 건물에서의 부하별로 분리된 일단위 전력량과 대상 건물과 특성이 유사한 벤치마킹 건물에서의 일단위 전력량을 비교하거나 대상 건물에서의 특정 기간의 일단위 전력량과 대상 건물에서의 특정 기간 이외의 기간 중 특정 기간과 외기 조건이 동일한 기간에서의 일단위 전력량을 비교하여 잠재절감량을 산정하는 잠재절감량 산정부를 포함할 수 있다. An energy saving consulting system that provides an energy saving guide for a target building includes a power data collection unit that collects power data from at least one of an external server and a meter, a load separation performing unit that separates power data by load of the target building, and the target building A reduction guide generating unit that generates an energy saving guide based on at least one of the predicted power amount for a specific period of , and the actual power amount for a specific period of It is a method to calculate potential savings by comparing the unit electricity quantity in It may include a potential savings calculation unit.

Description

대상 건물에 대한 에너지 절감 가이드를 제공하는 시스템{SYSTEM FOR PROVIDING ENERGY SAVING GUIDE TO TARGET BUILDING}SYSTEM FOR PROVIDING ENERGY SAVING GUIDE TO TARGET BUILDING

본 발명은 대상 건물에 대한 에너지 절감 가이드를 제공하는 시스템에 관한 것이다. The present invention relates to a system for providing an energy saving guide for a target building.

최근 들어, 빌딩, 공장 등 건물의 에너지를 절감하기 위한 노력이 활발히 이루어지고 있다. 하지만, 절감을 위해서는 세부적인 계측이 필요하며, 이를 바탕으로 어떻게 절감해야 하는지를 해석하는 것에 어려움이 있다. In recent years, efforts to save energy in buildings such as buildings and factories have been actively made. However, detailed measurement is required for saving, and it is difficult to interpret how to save based on this.

구체적으로, 소비 에너지에 대한 계측에는 비용(초기투자비 및 컨설팅 비용 등)이 발생하며, 에너지 절감을 제시하기 위해서는 진단사의 컨설팅이 필요하다. 따라서, 비용과 수동화의 문제로 인해, 건물의 에너지 절감의 확산을 저해되고 있다. Specifically, there is a cost (initial investment cost and consulting cost, etc.) for measuring energy consumption, and consulting by a diagnostician is required to suggest energy savings. Therefore, the spread of energy saving in buildings is inhibited due to problems of cost and manual operation.

에너지관리시스템의 확산은 초기 설치비에 따른 설치 부담과 계측된 데이터를 분석하여 행동으로 연계되는 부분에 대한 구체적인 방법에 어려움을 겪고 있다.The spread of the energy management system is experiencing difficulties in specific methods for the part connected to the action by analyzing the installation burden according to the initial installation cost and the measured data.

한국등록특허공보 제10-1800310호 (2017.11.16. 등록)Korean Patent Publication No. 10-1800310 (registered on November 16, 2017)

본 발명은 종래의 문제점을 해결하기 위한 것으로, 전력 데이터를 대상 건물의 부하별로 분리하고, 대상 건물의 에너지 절감 가이드를 생성하고, 부하별 잠재절감량을 산정함으로써 대상 건물에 대한 에너지 절감 가이드를 대상 건물로 제공하고자 한다. 다만, 본 실시예가 이루고자 하는 기술적 과제는 상기된 바와 같은 기술적 과제들로 한정되지 않으며, 또 다른 기술적 과제들이 존재할 수 있다. The present invention is to solve the problems of the prior art, by dividing the power data by load of the target building, generating an energy saving guide of the target building, and calculating the potential reduction amount for each load, the energy saving guide for the target building would like to provide However, the technical problems to be achieved by the present embodiment are not limited to the technical problems described above, and other technical problems may exist.

상술한 기술적 과제를 달성하기 위한 기술적 수단으로서, 본 발명에 따른 대상 건물에 대한 에너지 절감 가이드를 제공하는 에너지 절감 컨설팅 시스템은 외부 서버 및 미터기 중 적어도 하나로부터 전력 데이터를 수집하는 전력 데이터 수집부; 상기 전력 데이터를 상기 대상 건물의 부하별로 분리하는 부하 분리 수행부; 상기 대상 건물의 특정 기간의 예측 전력량 및 상기 특정 기간에 대한 실측 전력량 중 적어도 하나에 기초하여 에너지 절감 가이드를 생성하는 절감 가이드 생성부; 및 상기 대상 건물에서의 부하별로 분리된 일단위 전력량과 상기 대상 건물과 특성이 유사한 벤치마킹 건물에서의 일단위 전력량을 비교하거나 상기 대상 건물에서의 상기 특정 기간의 일단위 전력량과 상기 대상 건물에서의 상기 특정 기간 이외의 기간 중 상기 특정 기간과 외기 조건이 동일한 기간에서의 일단위 전력량을 비교하여 잠재절감량을 산정하는 잠재절감량 산정부를 포함할 수 있다. As a technical means for achieving the above-described technical problem, an energy saving consulting system that provides an energy saving guide for a target building according to the present invention includes: a power data collection unit for collecting power data from at least one of an external server and a meter; a load separation performing unit that separates the power data for each load of the target building; a saving guide generating unit for generating an energy saving guide based on at least one of a predicted power amount of the target building for a specific period and an actual power amount for the specific period; and comparing the unit-unit electricity quantity separated by load in the target building with the unit-unit electricity quantity in a benchmarking building having similar characteristics to the target building, or comparing the unit-unit electricity quantity for the specific period in the target building and the unit electricity quantity in the target building It may include a potential savings calculation unit for calculating the amount of potential savings by comparing the amount of electricity per unit in a period in which the specific period and the outdoor air condition are the same among the periods other than the specific period.

상술한 과제 해결 수단은 단지 예시적인 것으로서, 본 발명을 제한하려는 의도로 해석되지 않아야 한다. 상술한 예시적인 실시예 외에도, 도면 및 발명의 상세한 설명에 기재된 추가적인 실시예가 존재할 수 있다.The above-described problem solving means are merely exemplary, and should not be construed as limiting the present invention. In addition to the exemplary embodiments described above, there may be additional embodiments described in the drawings and detailed description.

전술한 본 발명의 과제 해결 수단 중 어느 하나에 의하면, 본 발명은 전력 데이터를 대상 건물의 부하별로 분리하고, 대상 건물의 에너지 절감 가이드를 생성하고, 부하별 잠재절감량을 산정함으로써 대상 건물에 대한 에너지 절감 가이드를 대상 건물로 제공할 수 있다. 이를 통해 본 발명은 별도의 에너지 관리 시스템의 설치 부담이 없을 뿐 아니라, 대상 건물의 에너지 절감 가이드를 대상 건물로 제공하기 때문에 대상 건물의 관리자는 에너지 절감 가이드를 통해 대상 건물의 에너지 효율화를 위해 어떻게 행동해야 하는지를 쉽게 알 수 있다. According to any one of the above-described problem solving means of the present invention, the present invention divides the power data by load of the target building, generates an energy saving guide of the target building, and calculates the potential savings for each load. A savings guide can be provided to the target building. Through this, the present invention not only does not have the burden of installing a separate energy management system, but also provides an energy saving guide of the target building as the target building, so the manager of the target building can act to improve energy efficiency of the target building through the energy saving guide. It's easy to see what needs to be done.

도 1은 본 발명의 일 실시예에 따른, 에너지 절감 컨설팅 시스템의 블록도이다.
도 2는 본 발명의 일 실시예에 따른, 대상 건물에 대한 에너지 절감 가이드를 제공하는 방법을 나타낸 흐름도이다.
1 is a block diagram of an energy saving consulting system according to an embodiment of the present invention.
2 is a flowchart illustrating a method of providing an energy saving guide for a target building according to an embodiment of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the present invention. However, the present invention may be embodied in several different forms and is not limited to the embodiments described herein. And in order to clearly explain the present invention in the drawings, parts irrelevant to the description are omitted, and similar reference numerals are attached to similar parts throughout the specification.

명세서 전체에서, 어떤 부분이 다른 부분과 "연결"되어 있다고 할 때, 이는 "직접적으로 연결"되어 있는 경우뿐 아니라, 그 중간에 다른 소자를 사이에 두고 "전기적으로 연결"되어 있는 경우도 포함한다. 또한 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. Throughout the specification, when a part is "connected" with another part, this includes not only the case of being "directly connected" but also the case of being "electrically connected" with another element interposed therebetween. . Also, when a part "includes" a certain component, it means that other components may be further included, rather than excluding other components, unless otherwise stated.

본 명세서에 있어서 '부(部)'란, 하드웨어에 의해 실현되는 유닛(unit), 소프트웨어에 의해 실현되는 유닛, 양방을 이용하여 실현되는 유닛을 포함한다. 또한, 1 개의 유닛이 2 개 이상의 하드웨어를 이용하여 실현되어도 되고, 2 개 이상의 유닛이 1 개의 하드웨어에 의해 실현되어도 된다. In this specification, a "part" includes a unit realized by hardware, a unit realized by software, and a unit realized using both. In addition, one unit may be implemented using two or more hardware, and two or more units may be implemented by one hardware.

본 명세서에 있어서 단말 또는 디바이스가 수행하는 것으로 기술된 동작이나 기능 중 일부는 해당 단말 또는 디바이스와 연결된 서버에서 대신 수행될 수도 있다. 이와 마찬가지로, 서버가 수행하는 것으로 기술된 동작이나 기능 중 일부도 해당 서버와 연결된 단말 또는 디바이스에서 수행될 수도 있다. Some of the operations or functions described as being performed by the terminal or device in this specification may be instead performed by a server connected to the terminal or device. Similarly, some of the operations or functions described as being performed by the server may also be performed in a terminal or device connected to the corresponding server.

이하, 첨부된 구성도 또는 처리 흐름도를 참고하여, 본 발명의 실시를 위한 구체적인 내용을 설명하도록 한다. Hereinafter, detailed contents for carrying out the present invention will be described with reference to the accompanying configuration diagram or process flow diagram.

도 1은 본 발명의 일 실시예에 따른, 에너지 절감 컨설팅 시스템(10)의 블록도이다. 1 is a block diagram of an energy saving consulting system 10 according to an embodiment of the present invention.

도 1을 참조하면, 에너지 절감 컨설팅 시스템(10)은 전력 데이터 수집부(100), 부하 분리 수행부(110), 벤치 마킹 건물 생성부(120), 절감 가이드 생성부(130), 잠재 절감량 산정부(140) 및 절감 가이드 제공부(150)를 포함할 수 있다. 다만, 도 1에 도시된 에너지 절감 컨설팅 시스템(10)은 본 발명의 하나의 구현 예에 불과하며, 도 1에 도시된 구성요소들을 기초로 하여 여러 가지 변형이 가능하다. Referring to FIG. 1 , the energy saving consulting system 10 includes a power data collection unit 100 , a load separation performing unit 110 , a benchmarking building generation unit 120 , a reduction guide generation unit 130 , and a potential savings calculation It may include the government 140 and the reduction guide providing unit 150 . However, the energy saving consulting system 10 shown in FIG. 1 is only one embodiment of the present invention, and various modifications are possible based on the components shown in FIG. 1 .

전력 데이터 수집부(100)는 외부 서버 및 미터기 중 적어도 하나로부터 전력 데이터를 수집할 수 있다. The power data collection unit 100 may collect power data from at least one of an external server and a meter.

전력 데이터 수집부(100)는 외부 서버로부터 기설정된 제 1 단위 시간마다 공공 전력 데이터를 수집하고, 미터기로부터 기설정된 제 2 단위 시간마다 개인 전력 데이터를 수집할 수 있다. The power data collection unit 100 may collect public power data every first unit time preset from the external server, and collect personal power data every second unit time preset from the meter.

예를 들면, 전력 데이터 수집부(100)는 외부 서버(예컨대, 전력 회사의 서버)로부터 제 1 단위 시간(예컨대, 15분) 단위마다 대상 건물에 대한 공공 전력 데이터(개인 전력 데이터 포함)을 수집하고, 대상 건물에 설치된 미터기로부터 제 2 단위 시간(예컨대, 5분, 1분) 단위마다 개인 전력 데이터를 수집할 수 있다. For example, the power data collection unit 100 collects public power data (including personal power data) for the target building every first unit time (eg, 15 minutes) from an external server (eg, a server of a power company) and collect personal power data every second unit time (eg, 5 minutes, 1 minute) from the meter installed in the target building.

이 때, 5분 단위로 수집된 개인 전력 데이터는 데이터의 종류에 따라 합 또는 평균값으로 처리될 수 있고, 1분 단위로 수집된 개인 전력 데이터는 15분 단위로 합 또는 평균값으로 처리하여 15분 단위의 개인 전력 데이터로 가공될 수 있다. At this time, the personal power data collected in units of 5 minutes may be processed as a sum or average value depending on the type of data, and personal power data collected in units of 1 minute may be processed as a sum or average value in units of 15 minutes, in units of 15 minutes. of personal power data.

전력 데이터 수집부(100)는 기상 서버로부터 실시간으로 외기 정보(기상 정보)를 수집할 수 있다. The power data collection unit 100 may collect outdoor air information (weather information) from a weather server in real time.

부하 분리 수행부(110)는 수집된 전력 데이터를 대상 건물의 부하별로 분리할 수 있다. 예를 들면, 부하 분리 수행부(110)는 대상 건물의 부하별(예컨대, 냉난방 부하, 조명 부하, 전열 부하, 전열 부하, 기저 부하 등)로 수집된 전력 데이터를 세분화할 수 있다. The load separation performing unit 110 may separate the collected power data for each load of the target building. For example, the load separation performing unit 110 may subdivide the collected power data for each load of the target building (eg, heating/cooling load, lighting load, electrothermal load, electrothermal load, base load, etc.).

벤치 마킹 건물 생성부(120)는 복수의 기준 정보의 조건에 기초하여 복수의 벤치 마킹 건물을 군집화할 수 있다. 예를 들면, 벤치 마킹 건물 생성부(120)는 복수의 벤치 마킹 건물의 위치 정보, 연면적 정보, 건물 용도 정보 준공년도, 전력 데이터 수집 기간 등에 기초하여 동일 특성의 건물끼리 그룹핑되도록 복수의 벤치 마킹 건물을 군집화할 수 있다. 복수의 벤치 마킹 건물을 군집화하는 이유는 건물별로 에너지 사용 패턴이 상이하기 때문에 건물마다 적합한 최적의 절감가이드 및 잠재 절감량을 제공하기 위함이다.The benchmarking building generation unit 120 may group a plurality of benchmarking buildings based on the conditions of the plurality of reference information. For example, the benchmarking building generation unit 120 is a plurality of benchmarking buildings so that buildings of the same characteristics are grouped together based on location information, total floor area information, building use information, year of completion, power data collection period, etc. of a plurality of benchmarking buildings. can be clustered. The reason for clustering a plurality of benchmarking buildings is to provide optimal reduction guides and potential savings suitable for each building because energy use patterns are different for each building.

절감 가이드 생성부(130)는 대상 건물의 특정 기간의 예측 전력량 및 특정 기간에 대한 실측 전력량 중 적어도 하나에 기초하여 에너지 절감 가이드를 생성할 수 있다. The reduction guide generating unit 130 may generate an energy saving guide based on at least one of a predicted amount of electricity for a specific period of a target building and an actual amount of electricity for a specific period.

절감 가이드 생성부(130)는 대상 건물의 특정 기간의 예측 전력량이 기설정된 임계치를 초과하는 경우, 현재 시간으로부터 임계치가 초과되는 시각을 계산하고, 계산된 시각(대상 건물의 전력량을 절감 관리할 수 있는 시각)을 포함하는 경고 메시지를 생성할 수 있다. The reduction guide generation unit 130 calculates the time when the threshold value is exceeded from the current time when the predicted amount of electricity for a specific period of the target building exceeds a preset threshold, and the calculated time (the amount of electricity in the target building can be saved and managed time) can be generated.

예를 들면, 절감 가이드 생성부(130)는 대상 건물의 특정 기간의 예측 전력량이 기설정된 임계치를 초과하면, 기설정된 색상(예컨대, 빨간색)으로 경고 표시가 포함된 경고 메시지를 생성할 수 있다. For example, when the amount of electricity predicted for a specific period of the target building exceeds a preset threshold, the reduction guide generator 130 may generate a warning message including a warning display in a preset color (eg, red).

절감 가이드 생성부(130)는 대상 건물의 특정 기간의 예측 전력량이 특정 기간에 대한 실측 전력량보다 적은 경우, 과거 평균 전력량과 특정 기간에 대한 실측 전력량을 비교할 수 있다. 이후, 특정 기간에 대한 실측 전력량이 과거 평균 전력량보다 큰 경우, 절감 가이드 생성부(130)는 부하별 전력량 중 기설정된 범위를 초과하는 부하의 전력량을 추출하고, 추출된 부하의 전력량에 기초하여 부하의 용도에 대한 정보를 포함하는 경고 메시지를 생성할 수 있다. When the predicted power amount of the target building for a specific period is less than the actual power amount for the specific period, the reduction guide generation unit 130 may compare the average amount of power in the past with the actual power amount for the specific period. Thereafter, when the actual power amount for a specific period is greater than the average amount of power in the past, the saving guide generating unit 130 extracts the power amount of the load exceeding a preset range among the power amounts for each load, and based on the extracted power amount of the load, the load You can create a warning message that includes information about its intended use.

절감 가이드 생성부(130)는 기설정된 범위를 초과하는 전력량을 갖는 부하에 대하여 해당 부하의 에너지 사용을 우선적으로 관리하기 위한 컨설팅을 제공하기 위해 해당 부하에 대한 경고 메시지를 생성할 수 있다. 이 때, 절감 가이드 생성부(130)는 기설정된 범위를 초과하는 전력량을 갖는 부하에 대한 경고 표시 및 부하의 전력량에 대한 정보를 포함하는 경고 메시지를 생성할 수 있다. The reduction guide generating unit 130 may generate a warning message for the load in order to provide consulting for preferentially managing the energy use of the load with respect to the load having an amount of power exceeding a preset range. In this case, the saving guide generating unit 130 may generate a warning message including a warning display for a load having an amount of power exceeding a preset range and information about the amount of power of the load.

절감 가이드 생성부(130)는 대상 건물의 부하 분리에 대한 전력량 및 대상 건물과 특성이 유사한 벤치마킹 건물의 부하 분리에 대한 전력량에 기초하여 대상 건물의 특성에 맞는 맞춤형 절감 가이드를 생성할 수 있다. The reduction guide generation unit 130 may generate a customized reduction guide suitable for the characteristics of the target building based on the amount of power for load separation of the target building and the amount of power for load separation of a benchmarking building having similar characteristics to the target building.

잠재 절감량 산정부(140)는 대상 건물에서의 부하별로 분리된 일단위 전력량과 해당 대상 건물과 특성이 유사한 벤치마킹 건물에서의 일단위 전력량을 비교하여 잠재절감량을 산정할 수 있다. The potential reduction amount calculating unit 140 may calculate the potential savings by comparing the unit-unit amount of electricity separated by load in the target building with the unit-unit amount of electricity in the benchmarking building having similar characteristics to the target building.

예를 들면, 잠재 절감량 산정부(140)는 복수의 벤치마킹 건물 중 대상 건물과 특성이 유사한 건물을 선정할 수 있다(예를 들어, 유사도 순으로 나열된 벤치마킹 건물 중 상위 30% 이내의 건물을 선정)For example, the potential savings calculation unit 140 may select a building having similar characteristics to a target building among a plurality of benchmarking buildings (eg, selecting a building within the top 30% of benchmarking buildings listed in order of similarity)

잠재 절감량 산정부(140)는 선정된 벤치마킹 건물에서의 일단위 전력량에 대한 평균을 계산하고, 계산된 평균 일단위 전력량보다 대상 건물에서의 부하별 일단위 전력량이 작지 여부를 판단할 수 있다.The potential saving amount calculating unit 140 may calculate an average of the unit-unit electricity quantity in the selected benchmarking building, and determine whether the unit-unit electricity quantity for each load in the target building is smaller than the calculated average unit unit electricity quantity.

잠재 절감량 산정부(140)는 계산된 평균 일단위 전력량보다 대상 건물에서의 부하별 일단위 전력량이 작은 경우, 벤치마킹 건물에서의 평균 일단위 전련량과 대상 건물에서의 부하별 일단위 전력량 간의 차이에 대응하는 안전율 가중치를 대상 건물에서의 부하별 일단위 전력량에 곱하여 잠재절감량을 산정할 수 있다. Potential savings calculation unit 140 is less than the calculated average unit unit of electricity amount per load in the target building, the difference between the average unit unit electricity amount in the benchmarking building and the unit unit electricity amount by load in the target building Potential savings can be calculated by multiplying the corresponding safety factor weight by the unit power amount for each load in the target building.

절감 가이드 생성부(130)는 대상 건물과 특성이 유사한 벤치마칭 건물과 비교하여 해당 대상 건물의 부하별 잠재절감량이 산정된 경우, 부하별 행동 가이드를 생성할 수 있다. 예를 들면, 절감 가이드 생성부(130)는 기저 부하에 대한 잠재 절감량이 산정된 경우, 해당 기저 부하에 대한 행동 가이드(예컨대, "기저 부하의 증가로 인해 잠재절감량이 파악되었습니다. 조명을 LED로 교체하여 기저 부하를 줄이는 것을 추천드립니다.")를 생성할 수 있다. The reduction guide generation unit 130 may generate an action guide for each load when the potential reduction amount for each load of the target building is calculated as compared with a benchmarking building having similar characteristics to the target building. For example, when the potential savings for the base load is calculated, the reduction guide generating unit 130 provides an action guide for the corresponding base load (eg, "The potential savings due to the increase in the base load has been identified. It is recommended to replace them to reduce the base load.").

잠재 절감량 산정부(140)는 대상 건물에서의 특정 기간의 일단위 부하별 전력량과 대상 건물에서의 특정 기간 이외의 기간 중 특정 기간과 외기 조건이 동일한 기간에서의 일단위 부하별 전력량을 비교하여 잠재절감량을 산정할 수 있다. The potential savings calculation unit 140 compares the amount of electricity per unit load in a specific period in the target building with the amount of electricity per unit load in the period other than the specific period in the target building in the same period with the external air condition savings can be calculated.

예를 들면, 잠재 절감량 산정부(140)는 대상 건물에서의 특정 기간의 일단위 부하별 전력량이 대상 건물에서의 특정 기간 이외의 기간 중 특정 기간과 외기 조건이 동일한 기간에서의 일단위 부하별 전력량보다 작은지 여부를 판단할 수 있다.For example, the potential reduction amount calculation unit 140 may determine that the amount of electricity per unit load for a specific period in the target building is the amount of electricity per unit load in a period in which the external air condition is the same as the specific period during a period other than the specific period in the target building. It can be determined whether it is smaller or not.

잠재 절감량 산정부(140)는 대상 건물에서의 특정 기간의 일단위 부하별 전력량이 외기 조건이 동일한 기간에서의 일단위 부하별 전력량보다 작은 경우, 대상 건물에서의 특정 기간의 일단위 부하별 전력량에 안전율 가중치(즉, 대상 건물에서의 특정 기간의 일단위 부하별 전력량과 대상 건물에서의 특정 기간 이외의 기간 중 특정 기간과 외기 조건이 동일한 기간에서의 일단위 부하별 전력량 간의 차이)를 곱하여 대상 건물의 부하별 잠재절감량을 산정할 수 있다. When the amount of electricity per unit load for a specific period in the target building is smaller than the amount of electricity per unit load for the same period under the same outdoor conditions, the potential savings calculation unit 140 is calculated as the amount of electricity per unit load for a specific period in the target building. The target building is multiplied by the safety factor weight (that is, the difference between the amount of electricity per unit load for a specific period in the target building and the amount of electricity per unit load in the period other than a specific period in the target building and the period with the same outdoor air condition) It is possible to calculate the potential savings for each load of

절감 가이드 생성부(130)는 과거 동일 외기 조건과 비교하여 해당 대상 건물의 부하별 잠재절감량이 산정된 경우, 부하별 행동 가이드를 생성할 수 있다. The reduction guide generating unit 130 may generate an action guide for each load when the potential reduction amount for each load of the target building is calculated as compared with the same outdoor air condition in the past.

절감 가이드 생성부(130)는 대상 건물의 냉방 부하에 대한 잠재 절감량이 산정된 경우, 해당 냉방 부하에 대한 행동 가이드(예컨대, "냉방 소비량이 과거에 비해 상승하여 잠재 절감량이 파악되었습니다. 설비 운영 효율화, 냉방 운영 변경, 냉방 기기 교체 등의 행동을 취하십시요")를 생성할 수 있다. When the potential reduction amount for the cooling load of the target building is calculated, the reduction guide generation unit 130 provides an action guide for the corresponding cooling load (eg, “The amount of potential savings has been identified because the amount of cooling consumption has increased compared to the past. , change the cooling operation, replace the cooling device, etc.").

절감 가이드 제공부(150)는 대상 건물의 에너지 절감 가이드 및 대상 건물의 부하별 행동 가이드를 대상 건물로 전송할 수 있다. The reduction guide providing unit 150 may transmit an energy saving guide of the target building and an action guide for each load of the target building to the target building.

절감 가이드 제공부(150)는 대상 건물의 특정 기간의 예측 전력량이 기설정된 임계치를 초과하는 경우, 경고 메시지를 대상 건물로 전송할 수 있다. The reduction guide providing unit 150 may transmit a warning message to the target building when the predicted amount of power for a specific period of the target building exceeds a preset threshold.

절감 가이드 제공부(150)는 기설정된 범위를 초과하는 전력량을 갖는 부하가 있는 경우, 해당 부하에 대한 경고 메시지를 대상 건물로 전송할 수 있다. When there is a load having an amount of power exceeding a preset range, the reduction guide providing unit 150 may transmit a warning message for the corresponding load to the target building.

한편, 당업자라면, 벤치 마킹 건물 생성부(120), 절감 가이드 생성부(130), 잠재 절감량 산정부(140) 및 절감 가이드 제공부(150) 각각이 분리되어 구현되거나, 이 중 하나 이상이 통합되어 구현될 수 있음을 충분히 이해할 것이다. Meanwhile, for those skilled in the art, each of the benchmarking building generating unit 120, the saving guide generating unit 130, the potential saving amount calculating unit 140 and the saving guide providing unit 150 is implemented separately, or at least one of them is integrated It will be fully understood that it can be implemented.

도 2는 본 발명의 일 실시예에 따른, 대상 건물에 대한 에너지 절감 가이드를 제공하는 방법을 나타낸 흐름도이다. 2 is a flowchart illustrating a method of providing an energy saving guide for a target building according to an embodiment of the present invention.

도 2를 참조하면, 단계 S201에서 에너지 절감 컨설팅 시스템(10)은 외부 서버 및 미터기 중 적어도 하나로부터 전력 데이터를 수집할 수 있다. Referring to FIG. 2 , in step S201 , the energy saving consulting system 10 may collect power data from at least one of an external server and a meter.

단계 S203에서 에너지 절감 컨설팅 시스템(10)은 전력 데이터를 대상 건물의 부하별로 분리할 수 있다. In step S203, the energy saving consulting system 10 may separate power data for each load of the target building.

단계 S205에서 에너지 절감 컨설팅 시스템(10)은 대상 건물의 특정 기간의 예측 전력량 및 특정 기간에 대한 실측 전력량 중 적어도 하나에 기초하여 에너지 절감 가이드를 생성할 수 있다. In step S205 , the energy saving consulting system 10 may generate an energy saving guide based on at least one of a predicted power amount for a specific period of a target building and an actual power amount for a specific period.

단계 S207에서 에너지 절감 컨설팅 시스템(10)은 대상 건물에서의 부하별로 분리된 일단위 전력량과 대상 건물과 특성이 유사한 벤치마킹 건물에서의 일단위 전력량을 비교하거나 대상 건물에서의 특정 기간의 일단위 전력량과 대상 건물에서의 특정 기간 이외의 기간 중 특정 기간과 외기 조건이 동일한 기간에서의 일단위 전력량을 비교하여 잠재절감량을 산정할 수 있다. In step S207, the energy saving consulting system 10 compares the unit-unit electricity quantity separated by load in the target building with the unit-unit electricity quantity in the benchmarking building having similar characteristics to the target building, or compares the unit-unit electricity quantity in the target building for a specific period and Potential savings can be calculated by comparing the amount of electricity per unit during a period other than a specific period in the target building with the same outdoor air condition.

상술한 설명에서, 단계 S201 내지 S207은 본 발명의 구현예에 따라서, 추가적인 단계들로 더 분할되거나, 더 적은 단계들로 조합될 수 있다. 또한, 일부 단계는 필요에 따라 생략될 수도 있고, 단계 간의 순서가 변경될 수도 있다. In the above description, steps S201 to S207 may be further divided into additional steps or combined into fewer steps, according to an embodiment of the present invention. In addition, some steps may be omitted if necessary, and the order between the steps may be changed.

본 발명의 일 실시예는 컴퓨터에 의해 실행되는 프로그램 모듈과 같은 컴퓨터에 의해 실행 가능한 명령어를 포함하는 기록 매체의 형태로도 구현될 수 있다. 컴퓨터 판독 가능 매체는 컴퓨터에 의해 액세스될 수 있는 임의의 가용 매체일 수 있고, 휘발성 및 비휘발성 매체, 분리형 및 비분리형 매체를 모두 포함한다. 또한, 컴퓨터 판독가능 매체는 컴퓨터 저장 매체를 모두 포함할 수 있다. 컴퓨터 저장 매체는 컴퓨터 판독가능 명령어, 데이터 구조, 프로그램 모듈 또는 기타 데이터와 같은 정보의 저장을 위한 임의의 방법 또는 기술로 구현된 휘발성 및 비휘발성, 분리형 및 비분리형 매체를 모두 포함한다. An embodiment of the present invention may also be implemented in the form of a recording medium including instructions executable by a computer, such as a program module executed by a computer. Computer-readable media can be any available media that can be accessed by a computer and includes both volatile and nonvolatile media, removable and non-removable media. Also, computer-readable media may include all computer storage media. Computer storage media includes both volatile and nonvolatile, removable and non-removable media implemented in any method or technology for storage of information such as computer readable instructions, data structures, program modules or other data.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다. The above description of the present invention is for illustration, and those of ordinary skill in the art to which the present invention pertains can understand that it can be easily modified into other specific forms without changing the technical spirit or essential features of the present invention. will be. Therefore, it should be understood that the embodiments described above are illustrative in all respects and not restrictive. For example, each component described as a single type may be implemented in a dispersed form, and likewise components described as distributed may be implemented in a combined form.

본 발명의 범위는 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the following claims rather than the detailed description, and all changes or modifications derived from the meaning and scope of the claims and their equivalent concepts should be construed as being included in the scope of the present invention. .

10: 축열 제어 시스템
100: 전력 데이터 수집부
110: 부하 분리 수행부
120: 벤치 마킹 건물 생성부
130: 절감 가이드 생성부
140: 잠재 절감량 산정부
150: 절감 가이드 제공부
10: heat storage control system
100: power data collection unit
110: load separation performing unit
120: Benchmark building creation unit
130: reduction guide generation unit
140: Potential savings estimator
150: reduction guide providing unit

Claims (5)

대상 건물에 대한 에너지 절감 가이드를 제공하는 에너지 절감 컨설팅 시스템에 있어서,
외부 서버 및 미터기 중 적어도 하나로부터 전력 데이터를 수집하는 전력 데이터 수집부;
상기 전력 데이터를 상기 대상 건물의 부하별로 분리하는 부하 분리 수행부;
상기 대상 건물의 특정 기간의 예측 전력량 및 기설정된 임계치를 비교하거나, 상기 예측 전력량 및 상기 특정 기간에 대한 실측 전력량을 비교하여 부하의 전력량에 대한 경고 메시지를 포함하는 에너지 절감 가이드를 생성하는 절감 가이드 생성부; 및
상기 대상 건물에서의 부하별로 분리된 일단위 전력량과 상기 대상 건물과 특성이 유사한 벤치마킹 건물에서의 일단위 전력량을 비교하거나 상기 대상 건물에서의 상기 특정 기간의 일단위 전력량과 상기 대상 건물에서의 상기 특정 기간 이외의 기간 중 상기 특정 기간과 외기 조건이 동일한 기간에서의 일단위 전력량을 비교하여 상기 대상 건물의 부하별 잠재절감량을 산정하는 잠재절감량 산정부
를 포함하되,
상기 잠재절감량 산정부는 상기 벤치마킹 건물에서의 평균 일단위 전력량 및 상기 대상 건물에서의 부하별 일단위 전력량을 비교하여 상기 벤치마킹 건물에서의 평균 일단위 전력량과 상기 대상 건물에서의 부하별 일단위 전력량 간의 차이에 해당하는 안전율 가중치를 상기 대상 건물에서의 부하별 일단위 전력량에 곱함으로써 상기 잠재절감량을 산정하는 에너지 절감 컨설팅 시스템.
In an energy saving consulting system that provides an energy saving guide for a target building,
a power data collection unit for collecting power data from at least one of an external server and a meter;
a load separation performing unit that separates the power data for each load of the target building;
Saving guide generation to generate an energy saving guide including a warning message about the amount of electricity in the load by comparing the predicted amount of electricity for a specific period of the target building and a preset threshold, or comparing the predicted amount of electricity and the actual amount of electricity for the specific period wealth; and
Comparing the unit-unit electricity quantity separated by load in the target building with the unit-unit electricity quantity in a benchmarking building having similar characteristics to the target building, or comparing the unit-unit electricity quantity in the target building for the specific period with the specific unit power quantity in the target building Potential savings calculation unit that calculates the potential savings by load of the target building by comparing the unit-unit amount of electricity in the period with the same external air condition as the specific period during the period other than the period
including,
The potential savings calculation unit compares the average unit-unit electricity quantity in the benchmarking building and the unit-unit electricity quantity by load in the target building, and the difference between the average unit unit electricity quantity in the benchmarking building and the unit unit electricity quantity by load in the target building An energy saving consulting system that calculates the potential savings by multiplying the weight of the safety factor corresponding to , by the amount of electricity per load for each load in the target building.
제 1 항에 있어서,
상기 전력 데이터 수집부는
상기 외부 서버로부터 기설정된 제 1 단위 시간마다 공공 전력 데이터를 수집하고, 상기 미터기로부터 기설정된 제 2 단위 시간마다 개인 전력 데이터를 수집하는 것인, 에너지 절감 컨설팅 시스템.
The method of claim 1,
The power data collection unit
Collecting public power data every first unit time preset from the external server, and collecting personal power data every second unit time preset from the meter, energy saving consulting system.
제 1 항에 있어서,
상기 절감 가이드 생성부는
상기 대상 건물의 특정 기간의 예측 전력량이 기설정된 임계치를 초과하는 경우, 현재 시간으로부터 상기 임계치가 초과되는 시각을 계산하고, 상기 계산된 시각을 포함하는 경고 메시지를 생성하는 것인, 에너지 절감 컨설팅 시스템.
The method of claim 1,
The saving guide generating unit
When the predicted amount of electricity for a specific period of the target building exceeds a preset threshold, calculating the time when the threshold exceeds the threshold from the current time, and generating a warning message including the calculated time, energy saving consulting system .
제 1 항에 있어서,
상기 절감 가이드 생성부는 상기 대상 건물의 특정 기간의 예측 전력량이 상기 특정 기간에 대한 실측 전력량보다 적은 경우, 과거 평균 전력량과 상기 특정 기간에 대한 실측 전력량을 비교하고,
상기 특정 기간에 대한 실측 전력량이 상기 과거 평균 전력량보다 큰 경우, 상기 부하별 전력량 중 기설정된 범위를 초과하는 부하의 전력량을 추출하고,
상기 추출된 부하의 전력량에 기초하여 상기 부하의 용도에 대한 정보를 포함하는 경고 메시지를 생성하는 것인, 에너지 절감 컨설팅 시스템.
The method of claim 1,
The saving guide generation unit compares the average amount of electricity in the past with the actual amount of electricity for the specific period when the predicted amount of electricity for a specific period of the target building is less than the actual amount of electricity for the specific period,
When the actual amount of power for the specific period is greater than the average amount of power in the past, extracting the amount of power of the load exceeding a preset range among the amount of power for each load,
Based on the extracted power amount of the load to generate a warning message including information on the use of the load, energy saving consulting system.
제 1 항에 있어서,
상기 절감 가이드 생성부는 상기 산정된 잠재절감량이 포함된 상기 대상 건물의 부하별 행동 가이드를 생성하는 것인, 에너지 절감 컨설팅 시스템.
The method of claim 1,
The energy saving consulting system, wherein the reduction guide generation unit generates an action guide for each load of the target building including the calculated potential savings.
KR1020180023141A 2017-02-24 2018-02-26 System for providing energy saving guide to target building KR102459769B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20170024913 2017-02-24
KR1020170024913 2017-02-24

Publications (2)

Publication Number Publication Date
KR20180098179A KR20180098179A (en) 2018-09-03
KR102459769B1 true KR102459769B1 (en) 2022-10-28

Family

ID=63600911

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180023141A KR102459769B1 (en) 2017-02-24 2018-02-26 System for providing energy saving guide to target building

Country Status (1)

Country Link
KR (1) KR102459769B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102293466B1 (en) * 2020-07-07 2021-08-24 한국동서발전(주) Energy management apparatus and method thereof
KR102594798B1 (en) 2022-01-28 2023-10-26 한국전기연구원 Cloud-based building energy consulting system and method
KR102470671B1 (en) 2022-04-13 2022-11-25 엔컴주식회사 Compensation Platform Service Provision System According to Blockchain-based Smart Lighting Energy Saving

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101448683B1 (en) * 2013-08-12 2014-10-08 주식회사 인코어드 테크놀로지스 Apparatus and system for providing an information of energy
KR101448453B1 (en) * 2014-03-31 2014-10-14 주식회사 나라컨트롤 The Integrated solution system for Building-energy according to Predictive control, Real-time control, Operation and Management
KR101570144B1 (en) * 2014-07-28 2015-11-18 한국전력공사 Apparatus and method for analyzing metering information
KR101698224B1 (en) * 2009-05-08 2017-01-19 액센츄어 글로벌 서비시즈 리미티드 Building energy consumption analysis system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101800286B1 (en) * 2014-11-27 2017-11-23 주식회사 케이티 Method and system for managing energy usage with using big date of energy usage
KR101800310B1 (en) 2016-06-17 2017-11-23 주식회사 케이티 Cloud energy management system system and method for providing energy saving guide

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101698224B1 (en) * 2009-05-08 2017-01-19 액센츄어 글로벌 서비시즈 리미티드 Building energy consumption analysis system
KR101448683B1 (en) * 2013-08-12 2014-10-08 주식회사 인코어드 테크놀로지스 Apparatus and system for providing an information of energy
KR101448453B1 (en) * 2014-03-31 2014-10-14 주식회사 나라컨트롤 The Integrated solution system for Building-energy according to Predictive control, Real-time control, Operation and Management
KR101570144B1 (en) * 2014-07-28 2015-11-18 한국전력공사 Apparatus and method for analyzing metering information

Also Published As

Publication number Publication date
KR20180098179A (en) 2018-09-03

Similar Documents

Publication Publication Date Title
KR102459769B1 (en) System for providing energy saving guide to target building
US20160187864A1 (en) Apparatus and System for Providing Energy Information
US8571720B2 (en) Supply-demand balance controller
US10175709B2 (en) Consumer electric power control system and consumer electric power control method
US20160018835A1 (en) System and method for virtual energy assessment of facilities
JP6298465B2 (en) Power management apparatus, power management system, server, power management method, program
Dar et al. Influence of occupant’s behavior on heating needs and energy system performance: A case of well-insulated detached houses in cold climates
KR20150128163A (en) System and method for analyzing building energy consumption information
US9711987B2 (en) Apparatus and method for managing energy in building based on state of health of energy storage system
KR101800286B1 (en) Method and system for managing energy usage with using big date of energy usage
CN101572410A (en) Method for identifying element participation factors in transient safe and stable mode of power system
KR20190119467A (en) Server, method and system for providing energy efficiency diagnosis service of target building
KR20190079124A (en) Apparatus and method for predicting lifecycle of power equipment
JP5710324B2 (en) ENVIRONMENTAL INFORMATION MANAGEMENT DEVICE, ENVIRONMENTAL INFORMATION MANAGEMENT METHOD, AND ENVIRONMENTAL INFORMATION MANAGEMENT PROGRAM
CN103944263B (en) There is management-control method and the system of the electrical network of diversity load equipment
CN106680574B (en) A kind of perception of substation equipment overvoltage and data processing method
KR101541484B1 (en) Evaluation method of facilities and building via efficiency analysis based on power consumption and system thereof
CN106356994B (en) A kind of grid stability method of discrimination based on power grid PMU big datas
Ly et al. Assessing the bulk power system's resource resilience to future extreme winter weather events
CN110210676A (en) The long-term prediction of situation method and system of transmission line forest fire
KR102635460B1 (en) Method and apparatus for analyzing abnormal production based on phothovoltaic remote monitoring
Chen et al. Modeling the power system resilience in China under different natural disasters
JP2016127622A (en) Power demand prediction system
KR102594798B1 (en) Cloud-based building energy consulting system and method
Pannier et al. Stochastic comparative LCA of smart buildings

Legal Events