KR101350921B1 - Temporary Girder Bridge Bracket - Google Patents

Temporary Girder Bridge Bracket Download PDF

Info

Publication number
KR101350921B1
KR101350921B1 KR1020120000154A KR20120000154A KR101350921B1 KR 101350921 B1 KR101350921 B1 KR 101350921B1 KR 1020120000154 A KR1020120000154 A KR 1020120000154A KR 20120000154 A KR20120000154 A KR 20120000154A KR 101350921 B1 KR101350921 B1 KR 101350921B1
Authority
KR
South Korea
Prior art keywords
main
pipe
bracket
girder
assembly
Prior art date
Application number
KR1020120000154A
Other languages
Korean (ko)
Other versions
KR20130078962A (en
Inventor
이상식
Original Assignee
이상식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이상식 filed Critical 이상식
Priority to KR1020120000154A priority Critical patent/KR101350921B1/en
Publication of KR20130078962A publication Critical patent/KR20130078962A/en
Application granted granted Critical
Publication of KR101350921B1 publication Critical patent/KR101350921B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

본 발명은 교량의 거더에 설치되는 가설작업용 브래킷에 관한 것으로서, 보다 상세히는 거더에 거치되는 수평부(110)와 상기 수평부(110)의 일측 단부에서 하향 연장된 수직부(120)로 구성되어 전체적으로 'ㄱ'자 형상을 가지는 한 쌍의 메인브래킷(100); 상기 메인브래킷(100) 각각에 결합되는 제1조임철물(210); 및, 상기 메인브래킷(100) 각각의 수평부(110)와 나란한 방향으로 배열되며 상기 메인브래킷(100) 각각의 제1조임철물(210)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이의 거리가 조절되며 상기 제1조임철물(210)의 조임에 의하여 상기 메인브래킷(100) 각각에 고정되는 제1조립파이프(310);를 포함하여 구성되는 것을 특징으로 한다.The present invention relates to a construction work bracket to be installed on the girder of the bridge, in more detail consists of a horizontal portion 110 mounted on the girder and a vertical portion 120 extending downward from one end of the horizontal portion 110 A pair of main brackets having a '-' shape as a whole; A first clamping iron 210 coupled to each of the main brackets 100; And a pair of main brackets 100 arranged in parallel with the horizontal portions 110 of each of the main brackets 100 and facing through the first fastening hardware 210 of each of the main brackets 100. The first assembly pipe 310 is fixed to each of the main bracket 100 by the tightening of the first fastening hardware 210 is adjusted; characterized in that it comprises a.

Description

거더교 가설작업용 브래킷{Temporary Girder Bridge Bracket}Girder bridge construction brackets {Temporary Girder Bridge Bracket}

본 발명은 거더교의 거더 사이에 설치하는 것으로서, 동바리, 안전망 또는 작업발판을 설치할 수 있는 가설작업용 브래킷에 관한 것이다.
The present invention is installed between the girders of the girder bridge, and relates to a construction work bracket that can install a copper bar, safety net or work scaffold.

교량 공사시에는 교각의 상부 공간에 동바리, 안전망 또는 작업발판 등을 설치하여 작업의 편의성 및 안전성을 도모하게 되는데, 이러한 작업발판 등을 설치하기 위하여 미리 가설하는 가설작업용 브래킷을 이용하게 된다.At the time of bridge construction, it installs a copper bar, safety net, or work scaffold in the upper space of the bridge to promote the convenience and safety of work. In order to install such work scaffold, a temporary work bracket for temporary work is used.

종래의 가설작업용 조립체의 구체적 실시예를 보면 도1과 같다.Looking at a specific embodiment of a conventional assembly assembly for work as shown in FIG.

도1에 도시된 종래의 가설작업용 조립체는 수평 방향으로 배열된 2개의 강관파이프와 수직 방향으로 배열된 2개의 강관파이프를 조임철물(강관 고정용 클램프)을 이용하여 교차결합(전체적으로 '井' 형태)하고, 상부의 수평 방향 강관파이프를 거더 사이에 거치하는 구조이다.The conventional assembly for temporary work shown in Figure 1 is a cross-linking of the two steel pipe pipes arranged in the horizontal direction and two steel pipe pipes arranged in the vertical direction using a fastening iron (steel pipe fixing clamp) (total '井' shape) ), And the horizontal steel pipe of the upper part is mounted between the girders.

이러한 종래의 가설작업용 조립체는 수직 하중이 모두 조임철물에 작용하는데, 조임철물은 압착력만으로 강관파이프를 붙잡는 구조이므로 수직으로 배열된 강관파이프에 작용하는 수직 하중이 조임철물의 압착력을 초과하면 강관파이프가 미끌어져 내려가는 문제점이 있다. 특히 조임철물이 제대로 조여지지 않았을 경우 수직 방향으로 배열된 강관파이프가 순간적으로 미끄러져 내려가 추락사고를 유발하는 문제점이 있으며, 설치 및 해체 작업시에도 이러한 위험이 상존하여 작업이 번거롭고 많은 작업시간이 소요된다는 문제점이 있다.In the conventional assembly for temporary work, all the vertical loads act on the fastening steel, but the fastening steel is a structure that catches the steel pipe with only the pressing force, so when the vertical load acting on the vertically arranged steel pipe pipe exceeds the pressing force of the fastening steel, There is a problem of sliding down. In particular, if the fastening hardware is not properly tightened, there is a problem that the steel pipes arranged in the vertical direction slide down momentarily and cause a fall accident, and such a risk exists even during installation and dismantling work, which is cumbersome and takes a lot of time. There is a problem.

또한 거더와 거더 사이의 간격이 달라지는 경우 이에 맞추어 가설작업용 조립체를 조절하는 작업이 어려우며, 가설작업용 조립체를 교량의 크기나 형태에 따라 별도로 제작하게 되는 경우에는 비용 증가의 요인이 되고 있다.
In addition, when the gap between the girder and the girder is different, it is difficult to adjust the assembly for the temporary work according to this, and if the assembly for the temporary work according to the size or shape of the bridge is a factor of increased cost.

상기한 문제점을 해결하기 위하여 창작된 본 발명은 거더 사이의 거리에 맞추어 범용적으로 사용할 수 있는 새로운 구조의 가설작업용 브래킷을 제공하여 작업의 편의성과 경제성을 도모함과 동시에 작업의 안전성을 확보함을 목적으로 한다.
The present invention created to solve the above problems is to provide a new construction of the construction work bracket that can be used universally in accordance with the distance between the girder aims to ensure the convenience and economical efficiency of the work and at the same time secure the safety of the work. It is done.

상기한 목적을 달성하기 위하여 창작된 본 발명의 기술적 구성은 다음과 같다.Technical features of the present invention are as follows.

본 발명은 교량의 거더에 설치되는 가설작업용 브래킷에 관한 것으로서, 거더에 거치되는 수평부(110)와 상기 수평부(110)의 일측 단부에서 하향 연장된 수직부(120)로 구성되어 전체적으로 'ㄱ'자 형상을 가지는 한 쌍의 메인브래킷(100); 상기 메인브래킷(100) 각각에 결합되는 제1조임철물(210); 및, 상기 메인브래킷(100) 각각의 수평부(110)와 나란한 방향으로 배열되며 상기 메인브래킷(100) 각각의 제1조임철물(210)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이의 거리가 조절되며 상기 제1조임철물(210)의 조임에 의하여 상기 메인브래킷(100) 각각에 고정되는 제1조립파이프(310);를 포함하여 구성되는 것을 특징으로 한다.The present invention relates to a construction work bracket installed on the girder of the bridge, consisting of a horizontal portion 110 mounted on the girder and a vertical portion 120 extending downward from one side end of the horizontal portion 110 as a whole 'a 'A pair of main brackets 100 having a shape of a; A first clamping iron 210 coupled to each of the main brackets 100; And a pair of main brackets 100 arranged in parallel with the horizontal portions 110 of each of the main brackets 100 and facing through the first fastening hardware 210 of each of the main brackets 100. The first assembly pipe 310 is fixed to each of the main bracket 100 by the tightening of the first fastening hardware 210 is adjusted; characterized in that it comprises a.

아울러 본 발명은 교량의 거더에 설치되는 가설작업용 브래킷에 관한 것으로서, 거더에 거치되는 수평부(110)와 상기 수평부(110)의 일측 단부에서 하향 연장된 수직부(120)로 구성되어 전체적으로 'ㄱ'자 형상을 가지는 한 쌍의 메인브래킷(100); 상기 메인브래킷(100) 각각에 구비된 조립파이프통과공(130)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이의 거리가 조절되는 제2조립파이프(320); 및, 상기 제2조립파이프(320)의 양측에 결합되는 제2조임철물(220);을 포함하여 구성되고, 교량의 거더 사이에 거치된 상기 메인브래킷(100) 각각이 거더에 밀착되도록 벌린 상태에서 상기 제2조임철물(220)을 조여 상기 메인브래킷(100) 사이의 거리가 좁혀지지 않도록 고정하는 것을 특징으로 한다.
In addition, the present invention relates to a construction work bracket installed on the girder of the bridge, consisting of a horizontal portion 110 mounted on the girder and a vertical portion 120 extending downward from one end of the horizontal portion 110 as a whole ' A pair of main brackets 100 having a 'shape'shape; A second assembly pipe 320 for controlling a distance between the pair of main brackets 100 facing each other by passing through the assembly pipe passing holes 130 provided in the main brackets 100; And a second clamping iron 220 coupled to both sides of the second assembly pipe 320; and each of the main brackets 100 mounted between the girder of the bridge is in close contact with the girder. In the tightening the second fastening hardware 220 is characterized in that the fixing so as not to narrow the distance between the main bracket (100).

본 발명의 구성에 따르면 다음과 같은 기술적 효과를 도모할 수 있다.According to the configuration of the present invention, the following technical effects can be achieved.

첫째, 거더 사이의 간격에 맞추어 범용적으로 사용할 수 있는 새로운 구조의 가설작업용 브래킷을 제공하여 작업의 편의성과 경제성을 도모함과 동시에 작업의 안전성을 확보할 수 있다.First, by providing a new construction of the construction work bracket that can be used universally in accordance with the gap between the girders to improve the convenience and economical efficiency of the work and ensure the safety of the work.

둘째, 지지파이프통과공은 메인브래킷 각각의 수직부에 전후 방향(제1조립파이프의 배열 방향과 직교하는 방향) 및 좌우 방향(제1조립파이프의 배열 방향과 나란한 방향)으로 구비됨으로써, 작업의 용도 및 작업 환경에 맞추어 지지파이프의 설치 방향을 선택할 수 있으며, 이러한 지지파이프 상부에 작업발판이 거치되도록 설치함으로써 종래의 가설작업용 조립체와는 달리 작업하중이나 충격하중에 의한 추락을 방지할 수 있다.Second, the support pipe through hole is provided in the vertical portion of each of the main brackets in the front-rear direction (the direction orthogonal to the arrangement direction of the first assembly pipe) and the left-right direction (the direction parallel to the arrangement direction of the first assembly pipe). The installation direction of the support pipe can be selected according to the use and the working environment, and by installing the work scaffold mounted on the upper support pipe, it is possible to prevent the fall due to the work load or the impact load unlike the conventional assembly for temporary work.

셋째, 작업발판을 현장 조건에 따라 다양한 형태로 설치할 수 있다.Third, the working scaffold can be installed in various forms according to the site conditions.

넷째, 토우보드(toe board)를 간편하게 설치할 수 있다.Fourth, the toe board can be easily installed.

도1은 종래의 가설작업용 조립체의 구조를 간략하게 도시한다.
도2는 본 발명의 구체적 실시예로서, 제1조립파이프(310)가 사용되는 경우이다.
도3은 본 발명의 다른 구체적 실시예로서, 제2조립파이프(320)가 사용되는 경우이다.
도4는 메인브래킷(100)이 거더 사이에 조립되어 설치된 상태를 도시하는데, (a) 제1조립파이프(310)와 제1조임철물(210)을 이용한 경우이고, (b) 제2조립파이프(320)와 제2조임철물(220)을 이용한 경우이다.
도5는 본 발명의 또 다른 구체적 실시예로서, 지지파이프(410)가 사용되는 경우로서, (a) 지지파이프(410)가 제1조립파이프(310)와 나란하게 배열되는 경우, (b) 지지파이프(410)가 제1조립파이프(310)와 직교하도록 배열되는 경우를 각각 도시한다.
도6는 거더의 하부 공간에 전체적으로 장선파이프(510) 및 작업발판(520)을 설치한 경우를 도시한다.
도7은 거더 사이의 하부 공간에만 별도의 장선파이프 없이 거치형 안전발판(530)을 설치한 경우를 도시한다.
도8은 거더 사이의 하부 공간에만 장선파이프(510)와 작업발판(520)을 설치한 경우를 도시한다.
도9은 수직 방향으로 세워진 토우보드(540)를 설치한 경우를 도시한다.
1 shows a simplified structure of a conventional temporary working assembly.
2 illustrates a case in which the first assembly pipe 310 is used as a specific embodiment of the present invention.
3 illustrates a case in which the second assembly pipe 320 is used as another specific embodiment of the present invention.
4 shows a state in which the main bracket 100 is assembled and installed between the girders, (a) when the first assembly pipe 310 and the first fastening hardware 210 are used, and (b) the second assembly pipe is installed. This is the case using the 320 and the second fastening iron 220.
FIG. 5 illustrates another embodiment of the present invention, in which the support pipe 410 is used, and (a) the support pipe 410 is arranged in parallel with the first assembly pipe 310. The case where the support pipe 410 is arrange | positioned so that it may orthogonally cross the 1st assembly pipe 310 is shown, respectively.
FIG. 6 shows a case where the joist pipe 510 and the working scaffold 520 are installed in the lower space of the girder as a whole.
FIG. 7 illustrates a case where the mounted safety scaffold 530 is installed without a separate joist pipe only in the lower space between the girders.
FIG. 8 illustrates a case in which the joist pipe 510 and the working scaffold 520 are installed only in the lower space between the girders.
9 shows a case where the tow board 540 is installed in the vertical direction.

이하에서는 본 발명의 구체적 실시예를 첨부도면을 참조하여 보다 상세히 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Reference will now be made in detail to the preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings.

도2는 본 발명의 구체적 실시예로서 제1조립파이프(310)가 사용되는 경우를 도시한다.2 illustrates a case in which the first assembly pipe 310 is used as a specific embodiment of the present invention.

메인브래킷(100)은 수평부(110)와 수직부(120)로 구성되어 전체적으로 'ㄱ'자 형상을 하고 있으며 수평부(110)가 거더에 거치된다.The main bracket 100 is composed of a horizontal portion 110 and a vertical portion 120 has a '-' shape as a whole, the horizontal portion 110 is mounted on the girder.

이러한 메인브래킷(100)은 2개가 한 조를 이루어 이웃하는 거더 각각에 거치되는데, 첨부도면에 도시된 바와 같이 대칭 형상으로 제작된 메인브래킷(100) 2개가 한 조를 이룰 수도 있고, 도면에 별도로 도시하지 않았으나 동일한 형상으로 제작된 메인브래킷(100) 2개가 한 조를 이룰 수도 있다. 동일한 형상으로 제작된 메인브래킷(100) 2개가 한 조를 이룰 경우에는 그 중 하나를 돌려서 '┐┌' 형태로 마주보도록 설치하면 된다.The main bracket 100 is a pair of two is mounted on each neighboring girders, as shown in the accompanying drawings, two main brackets 100 made of a symmetrical shape may form a pair, separately in the drawings Although not shown, two main brackets 100 having the same shape may form a pair. When two main brackets 100 having the same shape form a pair, one of them may be installed to face each other by turning one of them.

메인브래킷(100)은 도2에 도시된 바와 같이 'ㄴ'단면의 앵글 부재로 제작될 수도 있고, 별도 도면으로 첨부하지 않았으나 'ㄷ'단면의 채널 부재나 'ㅁ'단면의 튜브 부재로 제작될 수도 있다.The main bracket 100 may be made of an angle member of the 'b' cross-section as shown in FIG. It may be.

이러한 메인브래킷(100)에는 도2에 도시된 바와 같이 제1조임철물(210)이 설치되는데, 이러한 제1조임철물(210)은 일반적으로 시판되는 파이프 고정용 싱글클램프가 사용될 수 있다.As shown in FIG. 2, the main bracket 100 is provided with a first clamping iron 210. The first clamping iron 210 may be a single clamp for fixing a pipe generally available on the market.

제1조임철물(210)은 메인브래킷(100)에 결합되고 제1조립파이프(310)가 통과하게 된다.The first fastening hardware 210 is coupled to the main bracket 100 and the first assembly pipe 310 is passed through.

제1조립파이프(310)는 메인브래킷(100) 각각의 수평부(110)와 나란한 방향(좌우 방향)으로 배열되며 메인브래킷(100) 각각의 제1조임철물(210)을 통과하도록 설치되어 마주보는 한 쌍의 메인브래킷(100) 사이의 거리가 조절되며 제1조임철물(210)의 조임에 의하여 메인브래킷(100) 각각에 고정된다.The first assembly pipe 310 is arranged in parallel with the horizontal portion 110 of each of the main brackets 100 (left and right directions) and is installed so as to pass through the first fastening hardware 210 of each of the main brackets 100. The distance between the pair of main brackets 100 is adjusted and is fixed to each of the main brackets 100 by tightening the first fastening hardware 210.

즉 한 조를 이루는 메인브래킷(100)과 제1조립파이프(310)가 하나로 연결된 상태에서 메인브래킷(100) 각각을 거더에 거치하여 밀착시킨 후 제1조임철물(210)을 조이면 제1조임철물(210)이 메인브래킷(100)에 일체로 고정되면서 이웃하는 거더 사이에서 안정적인 거치상태를 유지할 수 있다.In other words, the main bracket 100 and the first assembly pipe 310 forming a group is connected to each other by mounting the main bracket 100 in close contact with the girder, and then tighten the first fastening hardware 210 to tighten the first fastening hardware 210 is fixed to the main bracket 100 integrally while maintaining a stable mounting state between neighboring girders.

제1조립파이프(310)와 메인브래킷(100)을 일체로 고정하는 제1조임철물(210)은 도2에 도시된 바와 같이 2개가 서로 다른 높이에 설치되어 제1조립파이프(310)와 메인브래킷(100)의 고정 위치를 작업자의 필요에 따라 선택할 수 있다.As shown in FIG. 2, the first prefabricated steel 310 integrally fixing the first prefabricated pipe 310 and the main bracket 100 is installed at different heights so that the first prefabricated pipe 310 and the main bracket 100 are integrally formed. The fixing position of the bracket 100 can be selected according to the needs of the operator.

경우에 따라서는 일정 간격으로 설치된 3개 이상의 제1조임철물(210)이 사용될 수도 있다.In some cases, three or more first fastenings 210 installed at regular intervals may be used.

도3은 본 발명의 다른 구체적 실시예로서, 제2조립파이프(320)가 사용되는 경우이다.3 illustrates a case in which the second assembly pipe 320 is used as another specific embodiment of the present invention.

도3의 경우 메인브래킷(100)에는 조립파이프통과공(130)이 구비되고 제2조립파이프(320)는 메인브래킷(100) 각각에 구비된 조립파이프통과공(130)을 통과하도록 설치되어 마주보는 한 쌍의 메인브래킷(100) 사이의 거리가 조절된다.In the case of Figure 3, the main bracket 100 is provided with an assembly pipe passing hole 130 and the second assembly pipe 320 is installed to pass through the assembly pipe passing hole 130 provided in each of the main bracket 100 facing each other. The distance between the pair of main brackets 100 is adjusted.

제2조임철물(220)은 도2와는 달리 메인브래킷(100)에 설치되는 것이 아니라 제2조립파이프(320)의 양측에 결합된다.Unlike the FIG. 2, the second fastening iron 220 is coupled to both sides of the second assembly pipe 320 instead of being installed in the main bracket 100.

조립파이프통과공(130)을 통하여 제2조립파이프(320)와 연결된 메인브래킷(100)을 교량의 거더 사이에 거치하여 거더측으로 밀착시킨 후 제2조임철물(220)이 제2조립파이프(320)에 삽입된 상태에서 제2조임철물(220)을 조립파이프통과공(130)에 밀착되도록 밀어 붙인 후 제2조임철물(220)을 조이면 메인브래킷(100)을 제2조임철물(220)과 거더 사이에 고정시킬 수 있다. 즉 메인브래킷(100) 사이의 거리가 좁혀지지 않도록 메인브래킷(100)을 고정하여 메인브래킷(100)이 이웃하는 거더 사이에서 안정적인 거치상태를 유지할 수 있다.The main bracket 100 connected to the second assembly pipe 320 through the assembly pipe passing hole 130 is mounted between the girders of the bridge to closely adhere to the girder side, and then the second fastening hardware 220 is connected to the second assembly pipe 320. The second fastening hardware 220 in the state inserted in the state to be pressed in close contact with the assembly pipe through hole 130, and then tighten the second fastening hardware 220, the main bracket 100 and the second fastening hardware 220 and Can be fixed between girders. That is, by fixing the main bracket 100 so that the distance between the main brackets 100 is not narrowed, the main bracket 100 may maintain a stable mounting state between neighboring girders.

조립파이프통과공(130)은 도3에 도시된 바와 같이 2개가 서로 다른 높이에 구비되어 제2조립파이프(320)와 메인브래킷(100)의 고정 위치를 선택할 수 있으며, 경우에 따라서는 메인브래킷(100)마다 3개 이상의 조립파이프통과공(130)이 구비될 수도 있다.As shown in Figure 3, the assembly pipe passing hole 130 is provided at two different heights to select the fixing position of the second assembly pipe 320 and the main bracket 100, in some cases the main bracket Three or more assembly pipe passing holes 130 may be provided for each 100.

도4는 메인브래킷(100)이 거더 사이에 조립되어 설치된 상태를 도시하는데, 이미 설명한 바와 같이 도4(a)의 경우 제1조립파이프(310)와 제1조임철물(210)을 이용하여 메인브래킷(100)을 거더 사이에 설치한 것이고, 도4(b)의 경우 제2조립파이프(320)와 제2조임철물(220)을 이용하여 메인브래킷(100)을 거더 사이에 설치한 것이다.4 illustrates a state in which the main bracket 100 is assembled and installed between girders. As described above, in the case of FIG. 4 (a), the main assembly 100 is installed using the first assembly pipe 310 and the first clamping iron 210. FIG. The bracket 100 is installed between the girders, and in the case of FIG. 4 (b), the main bracket 100 is installed between the girders using the second assembly pipe 320 and the second fastening hardware 220.

도5는 본 발명의 또 다른 구체적 실시예로서, 지지파이프(410)가 사용되는 경우로서, (a) 지지파이프(410)가 제1조립파이프(310)와 나란하게 배열되는 경우, (b) 지지파이프(410)가 제1조립파이프(310)와 직교하도록 배열되는 경우를 각각 도시한다.FIG. 5 illustrates another embodiment of the present invention, in which the support pipe 410 is used, and (a) the support pipe 410 is arranged in parallel with the first assembly pipe 310. The case where the support pipe 410 is arrange | positioned so that it may orthogonally cross the 1st assembly pipe 310 is shown, respectively.

지지파이프통과공(140)은 메인브래킷(100) 각각의 수직부(120)에 전후 방향(제1조립파이프(310)의 배열 방향과 직교하는 방향) 및 좌우 방향(제1조립파이프(310)의 배열 방향과 나란한 방향)으로 구비된다.The support pipe through hole 140 has a front and rear direction (a direction orthogonal to the direction in which the first assembly pipe 310 is arranged) and a left and right direction (the first assembly pipe 310) in the vertical portion 120 of each of the main brackets 100. In the direction parallel to the arrangement direction).

지지파이프(410)는 도5(a)와 같이 메인브래킷(100) 각각의 좌우 방향 지지파이프통과공(140)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이에 거치되어 제1조립파이프(310)와 나란한 방향으로 배열되도록 설치할 수도 있고, 도5(b)와 같이 메인브래킷(100) 각각의 전후 방향 지지파이프통과공(140)을 통과한 후 이웃하는 거더교 가설작업용 브래킷의 메인브래킷(100) 각각의 전후 지지파이프통과공(140)을 통과하여 제1조립파이프(310)와 직교하는 방향으로 배열되도록 설치할 수도 있다.The support pipe 410 is mounted between a pair of main brackets 100 facing each other through the left and right support pipe passing holes 140 of the main brackets 100 as shown in FIG. It may be installed so as to be arranged in parallel with the 310, the main bracket of the girder bridge construction work brackets after passing through the front and rear support pipe through hole 140 of each of the main bracket 100 as shown in Figure 5 (b) ( 100) It may be installed so as to be arranged in a direction orthogonal to the first assembly pipe 310 through each of the front and rear support pipe passing holes (140).

이러한 지지파이프통과공(140)은 다수 개가 서로 다른 높이에 일정 간격으로 설치되어 지지파이프(410)가 설치되는 높이를 작업자가 절절히 선택할 수 있다.The support pipe through-hole 140 is a number of dogs are installed at different heights at regular intervals, the operator can select the height at which the support pipe 410 is installed.

도6 내지 도9은 본 발명을 이용한 다양한 실시예들을 도시하고 있다.6-9 illustrate various embodiments using the present invention.

도6는 는 거더의 하부 공간에 전체적으로 장선파이프(510) 및 작업발판(520)을 설치한 경우를 도시하는데, 지지파이프(410) 상부에 장선파이프(510)를 일정한 간격으로 배치한 후 그 상부에 작업발판(520)을 연속적으로 설치하여 거더의 하부 공간 전체에 작업발판(520)을 설치한다.FIG. 6 illustrates a case where the joist pipe 510 and the working scaffold 520 are installed in the lower space of the girder as a whole. Work scaffold 520 is continuously installed in the work scaffold 520 is installed in the entire lower space of the girder.

도7은 거더 사이의 하부 공간에만 별도의 장선파이프 없이 거치형 안전발판(530)을 설치한 경우를 도시하는데, 거치형 안전발판(530)의 양측 단부에 구비된 걸림부(531)를 지지파이프(410)에 끼워서 거치한다. 필요에 따라서는 도7에 도시된 바와 같이 제1조립파이프(310)에 거치하여 거치형 안전발판(530)을 다양한 높이에 설치할 수도 있다.FIG. 7 illustrates a case in which the mounted safety scaffold 530 is installed without a separate joist pipe only in the lower space between the girders, and supports the catching portions 531 provided at both ends of the mounted safety scaffold 530. ) And mount it. If necessary, as shown in FIG. 7, the mounted safety scaffold 530 may be installed at various heights by being mounted on the first assembly pipe 310.

도8은 거더 사이의 하부 공간에만 장선파이프(510)와 작업발판(520)을 설치한 경우를 도시하는데, 지지파이프(410) 상부에 장선파이프(510)를 일정한 간격으로 배치한 후 그 상부에 작업발판(520)을 설치하여 거더의 하부 공간에만 작업발판(520)을 연속적으로 설치한다. 필요한 경우에는 도8에 도시된 바와 같이 제1조립파이프(310)의 상부에 작업발판(520)을 설치하여 작업발판(520)의 설치 높이를 다양하게 할 수도 있다.FIG. 8 illustrates a case in which the joist pipe 510 and the work scaffold 520 are installed only in the lower space between the girders. The working scaffold 520 is installed to continuously install the working scaffold 520 only in the lower space of the girder. If necessary, as shown in FIG. 8, the installation scaffold 520 may be installed on the first assembly pipe 310 to vary the installation height of the working scaffold 520.

도9은 수직 방향으로 세워진 토우보드(540)를 설치한 경우를 도시하는데, 토우보드(toe board)란 수직으로 세워지도록 설치되어 작업자의 안전을 확보함과 동시에 부산물의 낙하를 방지하는 역할을 한다. 토우보드(540)는 작업발판(520)의 설치가 완료된 후 토우보드(540) 역할을 하는 판재를 조립파이프(310)의 상부에 위치하는 지지파이프(410)와 거더 사이의 공간으로 끼워 넣으면 된다.9 illustrates a case in which a tow board 540 installed in a vertical direction is installed, and a toe board is installed to stand vertically, thereby ensuring safety of the worker and preventing fall of by-products. . The tow board 540 may be inserted into the space between the support pipe 410 and the girder positioned on the upper portion of the assembly pipe 310 after the installation of the work platform 520 is completed, the tow board 540. .

상기한 바와 같이 첨부도면을 참조하여 본 발명의 구체적 실시예들을 설명하였으나 본 발명의 보호범위가 반드시 이러한 실시예나 첨부도면에 도시된 형태만으로 한정되는 것은 아니며 본 발명의 기술적 요지를 변경하지 않는 범위 내에서 다양한 설계변경, 공지기술의 부가나 삭제, 단순한 수치한정 등의 경우에도 본 발명의 보호범위에 속함을 분명히 한다.
Although specific embodiments of the present invention have been described with reference to the accompanying drawings as described above, the protection scope of the present invention is not necessarily limited to the embodiments or the forms shown in the accompanying drawings, and does not change the technical gist of the present invention. In the case of various design changes, addition or deletion of known technology, simple numerical limitations, etc., it is obvious that the scope of the present invention is included.

100:메인브래킷
110:수평부
120:수직부
130:조립파이프통과공
140:지지파이프통과공
210:제1조임철물
220:제2조임철물
310:제1조립파이프
320:제2조립파이프
410:지지파이프
510:장선파이프
520:작업발판
530:거치형 안전발판
540:토우보드(toe board)
100: main bracket
110: The horizontal part
120: vertical
130: Assembly pipe passing through
140: support pipe through hole
210: first tightening hardware
220: second tightening hardware
310: first assembly pipe
320: second assembly pipe
410: support pipe
510: joist pipe
520: scaffolding
530: mounting safety footrest
540: toe board

Claims (6)

교량의 거더에 설치되는 가설작업용 브래킷에 관한 것으로서,
거더에 거치되는 수평부(110)와 상기 수평부(110)의 일측 단부에서 하향 연장된 수직부(120)로 구성되어 전체적으로 'ㄱ'자 형상을 가지는 한 쌍의 부재로서 각각의 수직부(120)에 지지파이프통과공(140)이 전후 방향 및 좌우 방향으로 구비되는 메인브래킷(100);
상기 메인브래킷(100) 각각에 결합되는 제1조임철물(210);
상기 메인브래킷(100) 각각의 수평부(110)와 나란한 방향으로 배열되며 상기 메인브래킷(100) 각각의 제1조임철물(210)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이의 거리가 조절되며 상기 제1조임철물(210)의 조임에 의하여 상기 메인브래킷(100) 각각에 고정되는 제1조립파이프(310);
상기 메인브래킷(100) 각각의 전후 방향 지지파이프통과공(140)을 통과한 후 이웃하는 거더교 가설작업용 브래킷의 메인브래킷(100) 각각의 전후 지지파이프통과공(140)을 통과하여 상기 제2조립파이프(320)와 직교하거나, 상기 메인브래킷(100) 각각의 좌우 방향 지지파이프통과공(140)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이에 거치되어 상기 제2조립파이프(320)와 나란한 방향으로 배열되는 지지파이프(410);
를 포함하여 구성되는 것을 특징으로 하는 거더교 가설작업용 브래킷.
As for the temporary work bracket installed in the girder of the bridge,
It is composed of a horizontal portion 110 mounted on the girder and a vertical portion 120 extending downward from one end of the horizontal portion 110, each of the vertical portion 120 as a pair of members having an overall 'b' shape Main bracket 100 is provided in the support pipe passing hole 140 in the front and rear and left and right directions;
A first clamping iron 210 coupled to each of the main brackets 100;
Distance between the pair of main brackets 100 which are arranged in parallel with the horizontal portion 110 of each of the main brackets 100 and face each other through the first fastening hardware 210 of each of the main brackets 100. A first assembly pipe 310 which is adjusted and fixed to each of the main brackets 100 by tightening the first fastening hardware 210;
After passing through the front and rear support pipe through hole 140 of each of the main bracket 100 through the front and rear support pipe through hole 140 of each of the main bracket 100 of the neighboring girder bridge construction work bracket, the second assembly The second assembly pipe 320 is orthogonal to the pipe 320 or mounted between the pair of main brackets 100 facing each other through the left and right support pipe passing holes 140 of the main brackets 100. A support pipe 410 arranged in parallel with the support pipe;
Girder bridge construction work bracket, characterized in that comprising a.
교량의 거더에 설치되는 가설작업용 브래킷에 관한 것으로서,
거더에 거치되는 수평부(110)와 상기 수평부(110)의 일측 단부에서 하향 연장된 수직부(120)로 구성되어 전체적으로 'ㄱ'자 형상을 가지는 한 쌍의 메인브래킷(100);
상기 메인브래킷(100) 각각에 구비된 조립파이프통과공(130)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이의 거리가 조절되는 제2조립파이프(320); 및,
상기 제2조립파이프(320)의 양측에 결합되는 제2조임철물(220);
을 포함하여 구성되고,
교량의 거더 사이에 거치된 상기 메인브래킷(100) 각각이 거더에 밀착되도록 벌린 상태에서 상기 제2조임철물(220)을 조여 상기 메인브래킷(100) 사이의 거리가 좁혀지지 않도록 고정하는 것을 특징으로 하는 거더교 가설작업용 브래킷.
As for the temporary work bracket installed in the girder of the bridge,
A pair of main brackets 100 having a horizontal portion 110 mounted on a girder and a vertical portion 120 extending downward from one end of the horizontal portion 110 and having a '-'shape;
A second assembly pipe 320 for controlling a distance between the pair of main brackets 100 facing each other by passing through the assembly pipe passing holes 130 provided in the main brackets 100; And
A second clamping iron 220 coupled to both sides of the second assembly pipe 320;
It is configured to include,
Each of the main brackets 100 mounted between the girder of a bridge is tightened to fix the second fastening hardware 220 in a state in which the main bracket 100 is in close contact with the girder, so that the distance between the main brackets 100 is not narrowed. Girder bridge construction work bracket.
제2항에서,
상기 메인브래킷(100) 각각의 수직부(120)에 지지파이프통과공(140)이 전후 방향 및 좌우 방향으로 구비되고,
상기 메인브래킷(100) 각각의 전후 방향 지지파이프통과공(140)을 통과한 후 이웃하는 거더교 가설작업용 브래킷의 메인브래킷(100) 각각의 전후 지지파이프통과공(140)을 통과하여 상기 제2조립파이프(320)와 직교하거나, 상기 메인브래킷(100) 각각의 좌우 방향 지지파이프통과공(140)을 통과하여 마주보는 한 쌍의 메인브래킷(100) 사이에 거치되어 상기 제2조립파이프(320)와 나란한 방향으로 배열되는 지지파이프(410);
가 더 포함되는 것을 특징으로 하는 거더교 가설작업용 브래킷.
3. The method of claim 2,
The support pipe passing hole 140 is provided in the vertical direction 120 of each of the main brackets 100 in the front-rear direction and the left-right direction,
After passing through the front and rear support pipe through hole 140 of each of the main bracket 100 through the front and rear support pipe through hole 140 of each of the main bracket 100 of the neighboring girder bridge construction work bracket, the second assembly The second assembly pipe 320 is orthogonal to the pipe 320 or mounted between the pair of main brackets 100 facing each other through the left and right support pipe passing holes 140 of the main brackets 100. A support pipe 410 arranged in parallel with the support pipe;
Girder bridge construction work bracket characterized in that it further comprises.
제1항에서,
상기 제1조임철물(210)은 다수 개가 서로 다른 높이에 일정 간격으로 설치되어 상기 제1조립파이프(310)와 상기 메인브래킷(100)의 고정 위치를 선택할 수 있는 것을 특징으로 하는 거더교 가설작업용 브래킷.
In claim 1,
The first fastening hardware 210 is a plurality of girder bridge installation work brackets, characterized in that can be installed at a predetermined interval at different heights to select a fixed position of the first assembly pipe 310 and the main bracket 100. .
제2항에서,
상기 조립파이프통과공(130)은 다수 개가 서로 다른 높이에 일정 간격으로 구비되어 상기 제2조립파이프(320)와 상기 메인브래킷(100)의 고정 위치를 선택할 수 있는 것을 특징으로 하는 거더교 가설작업용 브래킷.
3. The method of claim 2,
The assembly pipe passing hole 130 is a plurality of girder bridge construction work bracket, characterized in that the fixed position of the second assembly pipe 320 and the main bracket 100 is provided at a predetermined interval at different heights. .
제1항, 제3항 또는 제4항 가운데 어느 한 항에서,
상기 지지파이프통과공(140)은 다수 개가 서로 다른 높이에 일정 간격으로 설치되어 상기 지지파이프(410)가 설치되는 높이를 선택할 수 있는 것을 특징으로 하는 거더교 가설작업용 브래킷.
The method according to any one of claims 1, 3 or 4,
The support pipe passing hole 140 is a girder bridge construction work bracket, characterized in that a plurality of pieces are installed at different heights at predetermined intervals to select the height of the support pipe 410 is installed.
KR1020120000154A 2012-01-02 2012-01-02 Temporary Girder Bridge Bracket KR101350921B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120000154A KR101350921B1 (en) 2012-01-02 2012-01-02 Temporary Girder Bridge Bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120000154A KR101350921B1 (en) 2012-01-02 2012-01-02 Temporary Girder Bridge Bracket

Publications (2)

Publication Number Publication Date
KR20130078962A KR20130078962A (en) 2013-07-10
KR101350921B1 true KR101350921B1 (en) 2014-01-23

Family

ID=48991805

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120000154A KR101350921B1 (en) 2012-01-02 2012-01-02 Temporary Girder Bridge Bracket

Country Status (1)

Country Link
KR (1) KR101350921B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210045866A (en) * 2019-10-17 2021-04-27 한국전력공사 Pipeline for distribution of electricity installing to bridge and bridge having the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241723B (en) * 2019-06-12 2021-02-19 咸宁职业技术学院 Inspection vehicle with adjustable gravity center

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100696677B1 (en) * 2006-03-06 2007-03-19 김진곤 With work construction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100696677B1 (en) * 2006-03-06 2007-03-19 김진곤 With work construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210045866A (en) * 2019-10-17 2021-04-27 한국전력공사 Pipeline for distribution of electricity installing to bridge and bridge having the same
KR102245441B1 (en) * 2019-10-17 2021-04-29 한국전력공사 Pipeline for distribution of electricity installing to bridge and bridge having the same

Also Published As

Publication number Publication date
KR20130078962A (en) 2013-07-10

Similar Documents

Publication Publication Date Title
KR101291298B1 (en) Cable tray
KR101328969B1 (en) Stanchion bar
GB2537065A (en) Suspended platform system
KR101350921B1 (en) Temporary Girder Bridge Bracket
JP5888796B2 (en) Gantry
KR20140008830A (en) Form device
JP2017040113A (en) Overhanging passage of steel structure
JP5773469B1 (en) Suspended scaffolding
KR20120097839A (en) Device for protecting a falling accident of opening
KR101276658B1 (en) Safety fence device
KR101138805B1 (en) Safety working table unit
KR101596939B1 (en) Manufacturing method for install bracket of dropping prevention net
KR20130065941A (en) Arch type system scaffolding and the construction method of the same
KR20140041001A (en) Grating tread coaming device and its installing method
KR101715298B1 (en) Supporting apparatus of temporary handrail
KR100433700B1 (en) Mold system for slab concrete of bridge
KR20150015699A (en) Assembly road expanding apparatus
JP5409955B1 (en) Steel bridge structure
KR102583454B1 (en) Scaffolding system for construction works with improved safety
JP5794461B1 (en) Suspended scaffolding
JP7347452B2 (en) Support fixing structure and support fixing method
CN214402672U (en) Platform device
JP5851315B2 (en) Scaffolding bracket and its mounting method
KR102331326B1 (en) Connecting bridge for scaffolding scaffold
KR101353089B1 (en) Connection method of foothold in temporary briddge

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170105

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180108

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190107

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200107

Year of fee payment: 7