KR101325384B1 - A Revetment Structure - Google Patents

A Revetment Structure Download PDF

Info

Publication number
KR101325384B1
KR101325384B1 KR1020120017785A KR20120017785A KR101325384B1 KR 101325384 B1 KR101325384 B1 KR 101325384B1 KR 1020120017785 A KR1020120017785 A KR 1020120017785A KR 20120017785 A KR20120017785 A KR 20120017785A KR 101325384 B1 KR101325384 B1 KR 101325384B1
Authority
KR
South Korea
Prior art keywords
unit
retaining wall
wall structure
panel
panels
Prior art date
Application number
KR1020120017785A
Other languages
Korean (ko)
Other versions
KR20130096383A (en
Inventor
조영현
Original Assignee
조영현
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조영현 filed Critical 조영현
Priority to KR1020120017785A priority Critical patent/KR101325384B1/en
Publication of KR20130096383A publication Critical patent/KR20130096383A/en
Application granted granted Critical
Publication of KR101325384B1 publication Critical patent/KR101325384B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 옹벽구조에 관한 것으로, 이러한 본 발명은 다수의 단위 조립패널을 조립하여 하나의 옹벽 구조물을 구성하되, 조립패널의 전면에 돌, 나무, 플라스틱, 타일 등 다양한 소재로 이루어지는 장식패널을 구성하여, 계단식으로 이루어지는 옹벽 구조물의 표면이 항상 수려함을 유지함은 물론, 계단식으로 이루어진 옹벽 구조물의 하측에 화단 구조물을 구성하여 옹벽 구조물에 대한 식상함을 없애면서 다양한 볼거리를 제공하고, 특히 계단식으로 이루어진 다단의 옹벽 구조물의 각 층별로 집수정과 배수관을 구성하여 빗물 등을 손쉽게 배수시키도록 한 것이다.The present invention relates to a retaining wall structure. The present invention assembles a plurality of unit assembly panels to form a single retaining wall structure, and comprises a decorative panel made of various materials such as stone, wood, plastic, and tiles on the front of the assembly panel. Thus, the surface of the stepped retaining wall structure is always kept beautiful, as well as forming a flower bed structure on the lower side of the stepped retaining wall structure to provide a variety of attractions while eliminating the erosion of the retaining wall structure, in particular stepped multi-stage Each floor of the retaining wall structure of the drainage pipe and drainage pipe was configured to drain rainwater easily.

Description

단위패널 조립식 옹벽구조 및 그 시공방법{A Revetment Structure}Unit panel prefabricated retaining wall structure and construction method {A Revetment Structure}

본 발명은 옹벽구조에 관한 것으로, 더욱 상세하게는 조립패널로 이루어진 옹벽 구조물에 장식패널이나 화단을 간편하게 시공하여 수려한 미관을 제공함은 물론, 다단으로 이루어지는 각각의 옹벽 구조물에 집수정과 배수관을 상호 연결되도록 설치하여 옹벽 구조물의 배수 성능을 향상시킬 수 있도록 하는 단위패널 조립식 옹벽구조 및 그 시공방법에 관한 것이다.The present invention relates to a retaining wall structure, and more particularly, to provide a beautiful aesthetic by simply constructing a decorative panel or flower bed in a retaining wall structure composed of an assembly panel, as well as interconnecting the sump well and the drain pipe to each retaining wall structure composed of multiple stages. The present invention relates to a unit panel assembled retaining wall structure and a construction method thereof, which are installed to improve the drainage performance of the retaining wall structure.

일반적으로 구조역학적인 견실함이 요구되는 곳에는 철근콘크리트 구조물의 옹벽이 주로 시공되고 있으며, 철근콘크리트 옹벽의 설계는 수평토압이 옹벽의 수직벽부를 전도시키려는 전도모멘트보다 옹벽 바닥판 부위에서 흙 자중에 의해 발생하는 저항모멘트를 크게 하여 수평토압에 의해 옹벽이 전도되지 않도록 방법이 사용되어 왔다.In general, the retaining wall of reinforced concrete structures is mainly constructed where structural dynamics are required, and the design of the reinforced concrete retaining wall is caused by the soil weight in the retaining wall bottom plate rather than the conduction moment where horizontal earth pressure tries to conduct the vertical wall of the retaining wall. The method has been used so that the retaining wall is not conducted by the horizontal earth pressure by increasing the generated moment of resistance.

이러한 방식으로 설계되는 철근콘크리트 옹벽구조물은 구조역학적 측면에서는 어떠한 결함도 발견되지 않으나, 바닥판부에 의한 저항모멘트를 크게 하기 위하여 옹벽의 바닥판부를 크게 설계해야 하는 까닭에 철근콘크리트 구조물의 성형 및 양생에 막대한 비용 및 시간이 소모될 뿐 아니라, 굴토 및 성토작업에도 막대한 공사비가 소요되는 문제점이 지적되어 왔다.Reinforced concrete retaining wall structure designed in this way does not find any defects in terms of structural mechanics, but it is necessary to design the bottom plate of the retaining wall largely in order to increase the resistance moment caused by the bottom plate part. In addition to the enormous cost and time consumed, the problem of the huge construction cost has also been pointed out in the excavation and fill work.

이러한 결함을 보완하고 철근콘크리트 구조물의 성형 및 양생에 소요되는 비용과 시간을 절감하기 위하여 해당 지면을 굴착하면서 옹벽구조물을 시공한 후, 상기 옹벽구조물에 어스앵커를 정착하는 방법이 도입되었다.In order to compensate for these defects and to reduce the cost and time required for forming and curing the reinforced concrete structure, after constructing the retaining wall structure while excavating the ground, a method of anchoring the earth anchor to the retaining wall structure was introduced.

즉, 상기 어스앵커는 지반에 매립되어 표면으로부터의 인장력을 지반에 전달하는 것으로, 이는 옹벽구조물을 시공할 때 그 옹벽구조물에 마련된 홀을 관통하여 지면으로 매설하는 것으로서, 이때, 옹벽 구조물에 마련된 홀을 관통하여 지반에 매립되는 어스앵커의 머리부는 별도의 덮개(예; 누름형 너트)를 사용하여 덮혀지도록 하여 어스앵커의 머리부가 외부로 노출되는 것을 차단하도록 하였다.That is, the earth anchor is buried in the ground to transfer the tensile force from the surface to the ground, which is to bury the ground through the holes provided in the retaining wall structure when constructing the retaining wall structure, at this time, the hole provided in the retaining wall structure The head of the earth anchor embedded in the ground through the cover is covered with a separate cover (for example, a push nut) to prevent the head of the earth anchor from being exposed to the outside.

그러나, 상기와 같이 덮개를 통해 어스앵커의 머리부가 외부로 노출되는 것을 차단하는 방식은 옹벽구조물에 덮개가 돌출되는 형태로서 미관이 수려하지 못함은 물론, 덮개가 장기간 외부에 노출될 경우 덮개와 어스앵커의 머리부에 대한 결합력이 약해지면서 덮개가 어스앵커의 머리부에서 이탈되는 문제가 초래되고 있음은 물론, 상기 덮개와 어스앵커의 틈새로 수분이 침투되면서 어스앵커의 머리부에 녹에 의한 부식이 초래되었고, 이는 곧 어스앵커의 기능 즉, 지반에 매립되어 표면으로부터의 인장력을 지반에 전달하는 기능을 상실하는 문제점이 있었다. However, as described above, the method of blocking the exposure of the head of the earth anchor to the outside through the cover is a form in which the cover protrudes from the retaining wall structure, which is not beautiful, and the cover and the earth when the cover is exposed to the outside for a long time. As a result of the weakening of the anchoring force of the anchor, the cover may be detached from the head of the earth anchor, as well as moisture penetrating into the gap between the cover and the earth anchor. This resulted in the loss of the function of the earth anchor, i.e., the ability to transfer the tensile force from the surface to the ground.

이에 종래에는 어스앵커가 관통되는 옹벽구조물의 홀 주변에 홈을 마련한 후 이에 어스앵커의 머리부를 덮개로 덮어준 다음, 상기 덮개의 주변 즉, 옹벽구조물의 홀 주변에 덮개의 이탈을 방지하는 시멘트 모르타르 등을 체워 양생시키는 방식이 제안되기에 이르렀다.In the conventional art, a groove is formed around the hole of the retaining wall structure through which the earth anchor passes, and then the head of the earth anchor is covered with the cover, and then the cement mortar prevents the cover from being separated around the cover, that is, around the hole of the retaining wall structure. It was proposed to cure the back.

그러나, 상기의 방식은 옹벽 구조물에 마련된 홈에 시멘트 모르타르를 채워 양생시킬 때, 상기의 양생부분은 어스앵커의 미세한 움직임에 의해 균열이 발생하는 단점이 있고, 이러한 균열은 곧 수분 등이 어스앵커의 머리부로 침투하는 것을 제대로 차단하지 못하면서, 결국 앞서의 설명에서와 같이 어스앵커가 녹에 의한 부식이 초래되면서 그 본래의 기능을 상실하는 문제점이 있었다.However, in the above method, when the cement mortar is filled and cured in the grooves provided in the retaining wall structure, the curing part has a disadvantage in that cracks are generated by the fine movement of the earth anchor. Failure to properly infiltrate the head, there was a problem that the earth anchor loses its original function as a result of the corrosion caused by rust as described above.

또한, 종래에는 옹벽 구조물을 시공함에 있어, 옹벽 구조물이 하나의 구조체인 관계로 표면 가공에 상당한 어려움이 따랐으며, 이에 따라 종래의 옹벽 구조물은 그 표면이 상당히 거칠어질 수밖에 없었고, 이는 곧 옹벽 구조물의 시공이 완료된 상태에서 외관에 대한 수려함을 기대할 수는 없었다.In addition, in the conventional construction of the retaining wall structure, since the retaining wall structure is a structure, a considerable difficulty was involved, and accordingly, the retaining wall structure of the conventional retaining wall structure had to have a rough surface, which is why When construction was completed, it could not be expected to be beautiful in appearance.

상기 문제점을 해결하고자 본 출원인은 특허 제0650392호 옹벽구조 및 그 시공방법(이하, 선행발명 1 이라함)을 제안하였지만, 이는 조립패널에 스톱퍼가 구비된 덮개를 결합 및 고정하여야 하는 것인데, 각 조립패널의 중앙에 위치하는 안착홈과 이에 조립되는 덮개가 비교적 작은 칫수를 이루는 까닭에 그 결합 및 고정위치가 정확히 일치하지 아니하는 경우 그 내벽면을 따라 마련되는 스톱퍼 걸림홈이 상하 어긋나게 되면서 스토퍼가 정위치에 안정적으로 조립되지 못하게 되는 문제점이 있었다. In order to solve the above problems, the present applicant has proposed the Patent No. 0650392 retaining wall structure and its construction method (hereinafter, referred to as Prior Invention 1), but this is to assemble and fix the cover provided with a stopper on the assembly panel. Since the seating groove located in the center of the panel and the cover assembled to it have a relatively small dimension, the stopper locking groove provided along the inner wall of the stopper is fixed up and down when the coupling and fixing positions are not exactly matched. There was a problem that can not be reliably assembled in position.

이에, 본 출원인은 상기 선행발명 1의 문제점을 해결하기 위해 등록특허 제1021110호 단위패널 조립식 옹벽구조 및 그 시공방법(이하 선행발명 2 이라함)을 제안하였으며, 본 특허출원은 상기 선행발명 2를 개량한 것이다.Accordingly, the present applicant has proposed the Patent No. 1021110 unit panel assembled retaining wall structure and its construction method (hereinafter referred to as Prior Inventive 2) to solve the problems of the Invention 1, and the present patent application claims It is an improvement.

본 발명은 다수의 단위 조립패널을 조립하여 하나의 옹벽 구조물을 구성하되, 조립패널의 전면에 돌, 나무, 플라스틱, 타일 등 다양한 소재로 이루어지는 장식패널을 구성함으로써, 계단식으로 이루어지는 옹벽 구조물의 표면이 항상 수려함을 유지할 수 있도록 하는 단위패널 조립식 옹벽구조 및 그 시공방법을 제공하는데 그 주된 목적이 있다. The present invention assembles a plurality of unit assembly panels to form one retaining wall structure, by constructing a decorative panel made of various materials such as stone, wood, plastic, tiles on the front of the assembly panel, the surface of the retaining wall structure is stepped The main purpose is to provide a unit panel prefabricated retaining wall structure and its construction method that can keep the beauty at all times.

본 발명의 다른 목적은, 계단식으로 이루어진 옹벽 구조물의 하측에 화단 구조물을 구성하여, 옹벽 구조물에 대한 식상함을 없애면서 다양한 볼거리를 제공하려는 것이다.Another object of the present invention is to provide a variety of attractions while constructing a flower bed structure on the lower side of the stepped retaining wall structure, eliminating the erosion of the retaining wall structure.

본 발명의 또 다른 목적은, 계단식으로 이루어진 다단의 옹벽 구조물의 각 층별로 집수정과 배수관을 구성하여, 빗물 등을 손쉽게 배수시킬 수 있도록 하는 등 옹벽 구조물의 배수 성능을 향상시키는데 있다.Another object of the present invention is to improve the drainage performance of the retaining wall structure, such as by constructing a water collecting well and a drain pipe for each floor of the multi-stage retaining wall structure, which can be easily drained rainwater.

상기와 같은 목적을 달성하기 위한 본 발명은, 중앙에 경사진 안착홈과 앵커 삽입공이 형성되고, 상하 좌우 테두리면에는 다단 적층이 가능하도록 삽입돌기와 삽입홈이 선택적으로 형성되는 단위 조립패널의 복수 조합으로 구성된 옹벽구조물; 절토면에 몸체부를 소정 깊이로 삽입되어 고정되며, 그 노출된 선단이 상기 단위 조립패널의 앵커 삽입공을 관통하여 너트와 지지판으로 조립되는 어스앵커; 상기 안착홈을 가리우도록 안착홈의 면적보다 넓은 단위면적으로 가지며 안착홈 전방에 부착되는 적어도 하나 이상의 단위조각들로 이루어지고, 안착홈 전방에 위치하는 상기 단위조각에는 몰탈주입공을 형성한 체 상기 옹벽구조물을 이루는 단위 조립패널의 전면에 결합되는 복수의 단위 장식패널; 및 다단을 이루는 상기 옹벽 구조물의 절토면 상단에 각각 형성되는 집수정; 상기 집수정에 연결되어 빗물 등을 상기 집수정으로 배수시키는 수평배수관; 그리고, 상기 집수정으로 배수되는 빗물 등을 하단측의 집수정으로 배수시키도록 절토면을 수직 관통하는 수직배수관; 을 포함하여 이루어지는 단위패널 조립식 옹벽구조에 의해 달성된다.The present invention for achieving the above object, a plurality of combination of the unit assembly panel in which the inclined seating groove and the anchor insertion hole is formed in the center, the insertion protrusion and the insertion groove is selectively formed to enable the multi-stage stacking on the upper and lower left and right edges. Retaining wall structure consisting of; An earth anchor that is inserted into the cut surface at a predetermined depth and fixed to the cut surface, the exposed end of which is assembled with a nut and a support plate through the anchor insertion hole of the unit assembly panel; A sieve having a unit area wider than the area of the seating groove to cover the seating groove, and having at least one unit piece attached to the front of the seating groove, wherein the unit piece positioned in front of the seating groove forms a mortar injection hole. A plurality of unit decoration panels coupled to a front surface of the unit assembly panel forming the retaining wall structure; And water collecting wells formed on tops of cut surfaces of the retaining wall structures forming a plurality of stages. A horizontal drain pipe connected to the sump to drain rainwater or the like into the sump; And, the vertical drainage pipe vertically penetrates the cut surface to drain the rainwater, etc. drained to the sump well to the bottom of the sump; It is achieved by a unit panel assembly retaining wall structure comprising a.

본 발명의 일면에 따라, 상기 복수의 단위 장식패널을 이루는 단위조각들은 복수 조합으로 일체형 구조를 이루도록 하나의 단위조각 연결망에 결합 구성되는 것이다.According to an aspect of the present invention, the unit pieces constituting the plurality of unit decoration panels are coupled to one unit piece network to form an integrated structure in a plurality of combinations.

본 발명의 다른 일면에 따라, 상기 안착홈의 주변에는 제 1 체결공을 형성하고, 상기 복수의 단위 장식패널을 이루는 단위조각에는 제 2 체결공을 형성하며, 상기 단위 조립패널과 상기 복수의 단위 장식패널은 상기 안착홈 주위를 접착제로 감싸이게 도포하여 밀봉 부착하고, 상기 복수의 단위 장식패널은 상기 제 1,2 체결공을 관통하는 체결부재로 부착하는 한편, 상기 체결부재는 조임보조재를 삽입하여 긴밀하게 고정되도록 구성되는 것이다.According to another aspect of the present invention, a first fastening hole is formed around the seating groove, and a second fastening hole is formed in the unit pieces forming the plurality of unit decoration panels, and the unit assembly panel and the plurality of units The decorative panel is applied by sealingly enclosing the surroundings of the seating groove with an adhesive, and the plurality of unit decorative panels are attached by fastening members penetrating the first and second fastening holes, while the fastening members insert the tightening aids. It will be configured to be tightly fixed.

본 발명의 다른 일면에 따라, 상기 복수의 단위 장식패널에 형성되는 몰탈주입공을 통해 산화방지용 몰탈을 주입하여, 상기 안착홈의 내부공간에 몰탈충진층을 형성한다.According to another aspect of the present invention, through the mortar injection hole formed in the plurality of unit decorative panels by injecting the anti-oxidation mortar to form a mortar filling layer in the inner space of the seating groove.

다른 한편으로, 본 발명은 중앙에 경사진 안착홈과 앵커 삽입공이 형성되고, 상하 좌우 테두리면에는 다단 적층이 가능하도록 삽입돌기와 삽입홈이 선택적으로 형성되는 단위 조립패널의 복수 조합으로 구성된 옹벽구조물; 절토면에 몸체부를 소정 깊이로 삽입되어 고정되며, 그 노출된 선단이 상기 단위 조립패널의 앵커 삽입공을 관통하여 너트와 지지판으로 조립되는 어스앵커; 상기 단위 조립패널이 결합되는 옹벽구조물의 최하단측에 결합되는 화단형성용 포켓구조물; 및 다단을 이루는 상기 옹벽 구조물의 절토면 상단에 각각 형성되는 집수정; 상기 집수정에 연결되어 빗물 등을 상기 집수정으로 배수시키는 수평배수관; 그리고, 상기 집수정으로 배수되는 빗물 등을 하단측의 집수정으로 배수시키도록 절토면을 수직 관통하는 수직배수관; 을 포함하여 구성할 수도 있는 것이다.On the other hand, the present invention is a retaining wall structure consisting of a plurality of combinations of unit assembly panel in which the inclined seating groove and the anchor insertion hole is formed in the center, the insertion protrusion and the insertion groove is selectively formed to enable multi-stage stacking on the upper and lower left and right edges; An earth anchor that is inserted into the cut surface at a predetermined depth and fixed to the cut surface, the exposed end of which is assembled with a nut and a support plate through the anchor insertion hole of the unit assembly panel; A flower bed forming pocket structure coupled to the lowermost side of the retaining wall structure to which the unit assembly panel is coupled; And water collecting wells formed on tops of cut surfaces of the retaining wall structures forming a plurality of stages. A horizontal drain pipe connected to the sump to drain rainwater or the like into the sump; And, the vertical drainage pipe vertically penetrates the cut surface to drain the rainwater, etc. drained to the sump well to the bottom of the sump; It can also be configured to include.

또 다른 한편으로, 본 발명은 중앙에 경사진 안착홈과 앵커 삽입공이 형성되고, 상하 좌우 테두리면에는 다단 적층이 가능하도록 삽입돌기와 삽입홈이 선택적으로 형성되는 단위 조립패널의 복수 조합으로 구성된 옹벽구조물; 절토면에 몸체부를 소정 깊이로 삽입되어 고정되며, 그 노출된 선단이 상기 단위 조립패널의 앵커 삽입공을 관통하여 너트와 지지판으로 조립되는 어스앵커; 다단을 이루는 상기 옹벽 구조물의 절토면 상단에 각각 형성되는 집수정; 상기 집수정에 연결되어 빗물 등을 상기 집수정으로 배수시키는 수평배수관; 및, 상기 집수정으로 배수되는 빗물 등을 하단측의 집수정으로 배수시키도록 절토면을 수직 관통하는 수직배수관; 을 포함하여 구성할 수도 있는 것이다.On the other hand, the present invention is a retaining wall structure consisting of a plurality of combinations of unit assembly panel in which the inclined seating groove and the anchor insertion hole is formed in the center, the insertion protrusion and the insertion groove is selectively formed to enable the multi-stage stacking on the upper and lower left and right edges. ; An earth anchor that is inserted into the cut surface at a predetermined depth and fixed to the cut surface, the exposed end of which is assembled with a nut and a support plate through the anchor insertion hole of the unit assembly panel; Water collection wells formed on top of cut surfaces of the retaining wall structure forming a plurality of stages; A horizontal drain pipe connected to the sump to drain rainwater or the like into the sump; And a vertical drainage pipe vertically penetrating the cut surface to drain rainwater, etc. drained by the sump, to the sump of the lower side. It can also be configured to include.

상기와 같은 목적을 달성하기 위한 본 발명의 옹벽 시공방법은, 단위 조립패널을 적층 조립하여 옹벽을 구축하는 옹벽 시공방법에 있어서, 설치하고자 하는 옹벽의 위치와 토사의 안식각에 따라 경사면이 형성되도록 원 지반을 절토하는 절토사면 형성단계; 절토사면에 복수개의 어스앵커를 다단으로 설치하되 어스앵커의 선단 일부가 외부로 노출되도록 설치하고 이를 고정하는 어스앵커 설치 및 고정단계; 조립패널을 지지하기 위한 기초부를 형성하는 기초부 설치단계; 기초부 위에 복수의 단위 조립패널을 다단 적층시켜 조립하되, 조립패널 중앙부를 관통하는 어스앵커 머리부에 지지판을 삽입한 후 너트를 결합하여 상기 조립패널과 어스앵커를 고정하는 조립패널 설치단계; 상기 조립패널에 실리콘 접착제를 이용하여 적어도 하나 이상의 단위조각들로 이루어지는 복수의 단위 장식패널을 고정한 후, 안착홈의 내부에 몰탈충진층을 형성하는 장식패널 설치 및 몰탈 충진단계; 상기 기초부로부터 상단방향으로 토사가 채워지는 공간에 수직배수관을 설치하고, 상기 수직배수관의 상단에 집수정과 수평배수관을 설치하는 배수로 설치단계; 및, 복수 적층 조립되는 상기 조립패널들과 절토사면 사이의 배수로 설치공간에 토사를 채우고, 이를 다짐하는 토사 메우기 단계; 를 포함하여 이루어진 것을 특징으로 한다.In the retaining wall construction method of the present invention for achieving the above object, in the retaining wall construction method of building the retaining wall by stacking the unit assembly panel, the inclined surface is formed according to the position of the retaining wall to be installed and the angle of repose of the soil. Cut slope forming step of cutting ground; An earth anchor installation and fixing step of installing a plurality of earth anchors on the cut surface in multiple stages, but installing and fixing a portion of the front end of the earth anchors to the outside; A foundation installation step of forming a foundation for supporting the assembly panel; An assembly panel installation step of assembling by assembling a plurality of unit assembly panels stacked on a base portion, inserting a support plate into an earth anchor head passing through the center portion of the assembly panel, and then coupling a nut to fix the assembly panel and the earth anchor; A decorative panel installation and mortar filling step of fixing a plurality of unit decoration panels made of at least one unit piece to the assembly panel by using a silicone adhesive, and then forming a mortar filling layer in the seating groove; Installing a vertical drainage pipe in a space in which the soil is filled from the base portion in the upper direction, and installing a drainage pipe and a horizontal drainage pipe at an upper end of the vertical drainage pipe; And, the soil filling step of filling the soil in the drainage installation space between the plurality of assembly panels and the cut slope to be assembled by stacking, and compacting it; And a control unit.

본 발명의 일면에 따라, 상기 장식패널 설치 및 몰탈 충진단계는, 상기 단위 조립패널을 구성하는 안착홈의 주면 외측면에 실리콘 접착제를 도포하는 실리콘 도포단계; 상기 실리콘 접착제를 통해 상기 조립패널의 전면에 부착되도록 적어도 하나 이상의 단위조각들로 이루어지는 복수의 단위 장식패널을 1차 고정시킨 후, 상기 복수의 단위 장식패널과 단위 조립패널을 체결부재로 2차 고정시키는 장식패널 고정단계; 상기 복수의 단위 장식패널에 경사지게 몰탈주입공을 형성하는 몰탈주입공 형성단계; 상기 몰탈주입공을 통해 산화방지용 몰탈을 안착홈의 내부 공간에 충진하는 몰탈충진층 형성단계; 로 이루어진다.According to one aspect of the invention, the decorative panel installation and mortar filling step, the silicone coating step of applying a silicone adhesive on the outer surface of the main surface of the seating groove constituting the unit assembly panel; After fixing a plurality of unit decorative panel consisting of at least one unit piece to be attached to the front surface of the assembly panel through the silicone adhesive, the second plurality of unit decorative panel and the unit assembly panel fixed by a fastening member Decorative panel fixing step of making; A mortar injection hole forming step of forming a mortar injection hole inclined in the plurality of unit decoration panels; Mortar filling layer forming step of filling the internal space of the anti-mortar mortar for the oxidation through the mortar injection hole; .

본 발명의 다른 일면에 따라, 상기 기초부 설치단계는, 기초부를 관통하는 지중파일을 삽입하고 그라우팅하는 지중파일 설치단계; 를 더 포함한다.According to another aspect of the invention, the base portion installation step, the underground file installation step of inserting and grouting the underground file passing through the base portion; .

본 발명의 또 다른 일면에 따라, 토사 메우기 단계가 종료되어 1단계의 옹벽구조물이 완성되고 나면, 기초부 하부에 외측을 향하도록 하향 절토사면을 형성하고, 이어지는 제2, 또는 제3 단계의 옹벽구조물을 순차적으로 시공할 수 있음은 물론이다.In accordance with another aspect of the present invention, after the soil filling step is completed and the retaining wall structure of the first step is completed, a downward cut slope is formed in the lower part of the foundation to face the outer side, and the retaining wall of the second or third step follows. Of course, the structure can be constructed sequentially.

본 발명의 또 다른 일면에 따라, 상기 제 1 내지 제 3 단계의 옹벽구조물이 순차적으로 시공될 때, 상기 제 1 단계의 옹벽구조물에는 화단 형성용 포켓구조물을 시공하는 화단형성단계; 를 더 포함할 수 있는 것이다.According to still another aspect of the present invention, when the retaining wall structures of the first to third steps are sequentially installed, the flower bed forming step of constructing a pocket structure for forming a flower bed in the retaining wall structure of the first step; It may include more.

본 발명에 따르면, 다수의 단위 조립패널을 조립하여 하나의 옹벽 구조물을 구성하되, 조립패널의 전면에 돌, 나무, 플라스틱, 타일 등 다양한 소재로 이루어지는 장식패널을 구성하여, 계단식으로 이루어지는 옹벽 구조물의 표면이 항상 수려함을 유지함은 물론, 계단식으로 이루어진 옹벽 구조물의 하측에 화단 구조물을 구성하여 옹벽 구조물에 대한 식상함을 없애면서 다양한 볼거리를 제공하고, 특히 계단식으로 이루어진 다단의 옹벽 구조물의 각 층별로 집수정과 배수관을 구성하여, 빗물 등을 손쉽게 배수시키는 효과를 기대할 수 있는 것이다.According to the present invention, a plurality of unit assembly panels are assembled to form one retaining wall structure, and a decorative panel made of various materials such as stone, wood, plastic, tiles, etc. is formed on the front surface of the assembly panel to form a stepped retaining wall structure. The surface is always beautiful, and the flowerbed structure is formed under the stepped retaining wall structure to provide various sights while eliminating the erosion of the retaining wall structure, and in particular, each floor of the stepped retaining wall structure By constructing the crystal and drain pipe, it can be expected to easily drain rainwater.

도 1은 본 발명의 실시예로 옹벽구조를 보인 단면도.
도 2는 본 발명의 화단형성용 포켓구조물이 시공되는 옹벽구조의 단면도.
도 3은 본 발명의 단위 조립패널과 단위 장식패널의 분해사시도.
도 4는 본 발명의 옹벽구조에 집수정과 배수로를 형성시킨 상태의 단면도.
도 5는 본 발명의 옹벽구조에 집수정과 배수로를 형성시킨 상태의 사시도.
도 6 및 도 7은 본 발명의 단위패널 조립식 옹벽 시공방법을 나타낸 순서도.
1 is a cross-sectional view showing a retaining wall structure in an embodiment of the present invention.
Figure 2 is a cross-sectional view of the retaining wall structure is a pocket structure for forming a flower bed of the present invention.
3 is an exploded perspective view of a unit assembly panel and a unit decoration panel of the present invention.
4 is a cross-sectional view of a state in which a collecting well and a drainage path are formed in the retaining wall structure of the present invention.
5 is a perspective view of a state in which a collecting well and a drainage path are formed in a retaining wall structure of the present invention;
6 and 7 is a flow chart showing a unit panel assembled retaining wall construction method of the present invention.

이하, 본 발명의 구성을 첨부된 도면을 참조로 설명하면 다음과 같다. Hereinafter, the configuration of the present invention will be described with reference to the accompanying drawings.

첨부한 도면 도 1 내지 도 5는 본 발명에 따른 옹벽구조물의 설치상태 및 단위 조립패널과 적어도 하나 이상의 단위조각들로 이루어지는 복수의 단위 장식패널, 그리고 배수로와 화단형성용 포켓구조물의 단면도와 사시도를 각각 도시하고 있다.1 to 5 are a cross-sectional view and a perspective view of the installation state of the retaining wall structure according to the present invention, the unit assembly panel and the plurality of unit decorative panels made up of at least one unit piece, and the drainage channel and the flower bed forming pocket structure. Each is shown.

본 발명에 따른 옹벽구조는, 단위모양을 가지는 조립패널(30)의 복수 조합으로 적층 구성되는 옹벽구조물(20)과, 상기 옹벽구조물(20)의 단위 조립패널(30) 중앙을 관통하며 그 선단 일부를 제외한 몸체부가 지반에 매설되는 어스앵커(40)와, 상기 단위 조립패널(30)의 전면에 장착되어 상기 어스앵커(40)를 가리우게 되는 적어도 하나 이상의 단위조각(50)들로 이루어지는 복수의 단위 장식패널(50')로 구성된다.The retaining wall structure according to the present invention penetrates through the center of the retaining wall structure 20 and the unit assembly panel 30 of the retaining wall structure 20, which are laminated in a plurality of combinations of the assembly panel 30 having a unit shape. A plurality of body parts excluding a portion of the earth anchor 40 embedded in the ground, and at least one or more unit pieces 50 mounted on the front of the unit assembly panel 30 to cover the earth anchor 40 It consists of the unit decoration panel 50 '.

이때, 상기 복수의 단위 장식패널(50')은 안착홈(31)을 가리우도록 안착홈(31)의 면적보다 넓은 단위면적으로 가지면서 안착홈(31)의 전방에 부착되는 적어도 하나 이상의 단위조각(50)들로 이루어지는 한편, 상기 안착홈(31)의 전방에 위치하는 상기 단위조각(50)에는 몰탈주입공(51)을 형성하면서, 상기 옹벽구조물(20)을 이루는 단위 조립패널(30)의 전면에 결합되는 것이다.In this case, the plurality of unit decorative panels 50 ′ have at least one unit area larger than the area of the seating recess 31 to cover the seating recess 31, and at least one unit attached to the front of the seating recess 31. The unit assembly panel 30 constituting the retaining wall structure 20 while forming a mortar injection hole 51 in the unit piece 50 which is formed of pieces 50 and positioned in front of the seating groove 31. ) Is coupled to the front.

여기서, 상기 복수의 단위 장식패널(50')을 이루는 단위조각(50)들은 단위조각 연결망(90)을 통해 다수가 일체형 구조로 결합 구성되는 것이다.Here, the unit pieces 50 constituting the plurality of unit decoration panels 50 ′ are coupled to a plurality of unitary structures through a unit piece connection network 90.

상기 옹벽구조물(20)을 형성하는 단위 조립패널(30)은 소정의 높이와 두께를 가지고 형성되고, 중앙에는 경사진 안착홈(31)과 앵커 삽입공(32)이 형성되며, 상기 안착홈(31)의 주변에는 제 1 체결공(33)이 형성된다. The unit assembly panel 30 forming the retaining wall structure 20 is formed to have a predetermined height and thickness, and an inclined seating groove 31 and an anchor insertion hole 32 are formed in the center thereof. The first fastening hole 33 is formed around the 31.

즉, 상기 단위 조립패널(30)은 둘레면에 단턱부(33)가 형성된 중앙 안착홈(31)을 가지고 있고, 상기 안착홈(31)의 중앙에는 상기 어스앵커(40)가 삽입되는 앵커 삽입공(32)을 형성하는 것이다. That is, the unit assembly panel 30 has a central seating groove 31 having a stepped portion 33 formed on a circumferential surface thereof, and an anchor insert into which the earth anchor 40 is inserted in the center of the seating groove 31. To form a ball (32).

그리고, 상기 단위 조립패널(30)의 외측 둘레면에는 단위 조립패널(30)이 다단 적층 가능하도록 삽입돌기(34)와 삽입홈(35)이 형성된다.In addition, an insertion protrusion 34 and an insertion groove 35 are formed on the outer circumferential surface of the unit assembly panel 30 so that the unit assembly panel 30 can be stacked in multiple stages.

다시말해, 상기 단위 조립패널(30)의 상측 둘레면에는 양측면이 경사지게 형성되는 삽입돌기(34)가 돌출 형성되고, 하측 둘레면에는 양측면이 경사지게 형성되는 삽입홈(35)이 함몰 형성되어, 상기 단위 조립패널(30)의 삽입돌기(34)에 또 다른 단위 조립패널(30)의 삽입홈(35)이 끼움 결합되는 구조로 적층되는 것이다. In other words, the upper peripheral surface of the unit assembly panel 30 is formed with an insertion protrusion 34 protrudingly formed on both sides is inclined, the lower peripheral surface is formed recessed insertion groove 35 is formed on both sides inclined, The insertion grooves 34 of the other unit assembly panel 30 are laminated to the insertion protrusion 34 of the unit assembly panel 30 in a structure in which they are fitted.

상기 옹벽구조물(20)의 단위 조립패널(30)을 관통하여 지반에 매설되는 어스앵커(40)는 소정의 길이를 가지고 상기 앵커 삽입공(32)을 관통하여 지반에 매설되면서 너트(42)와 지지판(44)으로 단위 조립패널(30)에 고정되는 것으로서, 단위 조립패널(30)의 측면과 밀착되는 부분에는 산화방지용 테이프(미도시)가 테이핑 된다.The earth anchor 40, which is embedded in the ground through the unit assembly panel 30 of the retaining wall structure 20, has a predetermined length and is embedded in the ground through the anchor insertion hole 32, and the nut 42 and It is fixed to the unit assembly panel 30 by the support plate 44, the anti-oxidation tape (not shown) is taped to the part in close contact with the side of the unit assembly panel 30.

상기 단위 조립패널(30)의 전면에 결합되는 상기 복수의 단위 장식패널(50')은 적어도 하나 이상의 단위조각(50)들이 조합되는 것으로, 상기 단위조각(50)들은 단위조각 연결망(90)에 의해 일체형 구조를 이루면서 소정의 두께로 형성되는 것으로, 이러한 복수의 단위 장식패널(50')은 돌(예; 대리석), 나무, 플라스틱, 타일 등 다양한 소재로 구성할 수 있는 것이며, 이를 통해 다양한 질감과 환경을 연출할 수 있도록 한 것이다.The plurality of unit decoration panels 50 ′ coupled to the front of the unit assembly panel 30 are combined with at least one unit piece 50, and the unit pieces 50 are connected to the unit piece network 90. It is formed to a predetermined thickness while forming an integrated structure, the plurality of unit decorative panels 50 'can be composed of a variety of materials such as stone (for example, marble), wood, plastic, tiles, through which a variety of texture And to create the environment.

상기 단위 조립패널(30)의 안착홈(31)에 고정 장착되는 상기 복수의 단위 장식패널(50')을 이루는 단위조각(50)에는 몰탈주입공(51)과 제 2 체결공(52)이 각각 하나 이상 가공되는 것인데, 본 발명의 시공방법에서는 상기 몰탈주입공(51)을 단위조각(50)의 상부와 하부에 각각 하나씩 형성하는 방법으로 가공하고 이들 중 어느 하나를 통해 몰탈을 안착홈(31) 내부로 충진하게 된다.The mortar injection hole 51 and the second fastening hole 52 are formed in the unit pieces 50 constituting the plurality of unit decoration panels 50 ′ fixedly mounted to the seating grooves 31 of the unit assembly panel 30. Each one or more are to be processed, in the construction method of the present invention is processed by forming the mortar injection hole 51 one by one each in the upper and lower portions of the unit piece 50 and the mortar through any one of them seating groove ( 31) It is filled inside.

즉, 상기 단위 조립패널(30)과 상기 복수의 단위 장식패널(50')을 이루는 단위조각(50)은 안착홈(31)의 주위를 접착제로 감싸이게 도포하여 밀봉 부착하고, 상기 복수의 단위 장식패널(50')을 이루는 단위조각(50)은 제 1,2 체결공(33)(52)을 관통하는 체결부재(100)로 부착하는 한편, 상기 체결부재(100)를 조임보조재(53)에 삽입 체결하여 긴밀한 고정이 이루어지도록 한 상태에서, 상기 복수의 단위 장식패널(50')을 이루는 단위조각(50)의 상부와 하부에 각각 몰탈주입공(51)을 경사지게 형성한 다음, 상기 몰탈주입공(51)을 통해 산화방지용 몰탈을 주입할 수 있도록 한 것이다.That is, the unit pieces 50 forming the unit assembly panel 30 and the plurality of unit decoration panels 50 'are coated by sealing the adhesive around the seating groove 31 to be sealed and attached to each other. The unit piece 50 constituting the decorative panel 50 'is attached to the fastening member 100 penetrating the first and second fastening holes 33 and 52, while the fastening auxiliary member 53 is fastened to the fastening member 100. In the state in which the fastening is made to be inserted into and tightened), the mortar injection holes 51 are formed to be inclined at the upper and lower portions of the unit pieces 50 constituting the plurality of unit decoration panels 50 ', and then Mortar injection hole 51 to inject the anti-mortar mortar.

이때, 상기 몰탈주입공(51)을 단위조각(50)에 간격을 두고 상, 하부에 각각 형성한 것은 상부에 형성되는 몰탈주입공(51)을 통해 산화방지용 몰탈을 충진하면 내부를 채우고 하부에 형성되는 몰탈주입공(51)을 통해 배출되는 산화방지용 몰탈을 육안으로 확인하여 안착홈(31)의 내부 공간에 몰탈충진층(60)이 충분히 채워졌는지의 여부를 용이하게 확인할 수 있도록 하기 위함이다.At this time, the mortar injection hole 51 is formed in the upper and lower portions at intervals in the unit pieces 50, respectively, filling the inside and filling the inside of the mortar for preventing oxidation through the mortar injection hole 51 formed in the upper portion This is to make it easy to check whether the mortar filling layer 60 is sufficiently filled in the inner space of the seating groove 31 by visually checking the anti-mortar mortar discharged through the mortar injection hole 51 to be formed. .

또한, 상기와 같은 옹벽 구조를 시공함에 있어, 빗물 등의 배수로를 구성하게 되며, 상기 배수로는 다단을 이루는 옹벽 구조의 절토면 상단에 각각 집수정(81)을 형성하고, 상기 집수정(81)에 각각 빗물 등을 상기 집수정(81)으로 배수시키는 수평배수관(82), 그리고 상기 집수정(81)으로 배수되는 빗물 등을 하단측의 집수정(81)으로 배수시키도록 절토면을 수직 관통하는 수직배수관(83)을 연결 구성하게 되며, 이때 상기 수직배수관(83)의 끝단은 기초부에 고정시키도록 구성한 것이다.In addition, in constructing the retaining wall structure as described above, it constitutes a drainage channel such as rainwater, the drainage channel is formed on each of the top of the cut surface of the retaining wall structure forming a multi-stage, respectively, Vertical drains vertically penetrating the cut surface so as to drain rainwater and the like drained to the sump 81, and rainwater drained to the sump 81, respectively to the bottom of the sump (81). It is configured to connect the drain pipe 83, the end of the vertical drain pipe 83 is configured to be fixed to the base.

첨부된 도 6 및 도 7은 본 발명의 단위패널 조립식 옹벽 시공방법의 구체적인 시공순서에 대하여 살펴보면, 우선 본 발명의 단위패널 조립식 옹벽 시공방법은, 설치하고자 하는 옹벽의 위치와 토사의 안식각에 따라 기초 바닥까지 경사면이 형성되도록 원 지반을 절토하는 절토사면 형성단계(S100)를 진행하게 된다.6 and 7 are a detailed description of the construction procedure of the unit panel assembled retaining wall construction method of the present invention, first, the unit panel assembled retaining wall construction method of the present invention, based on the position of the retaining wall to be installed and the angle of repose of the earth and sand The cut slope forming step (S100) of cutting the original ground to form a slope to the bottom is performed.

옹벽을 구성하기 위한 기초 바닥까지 절토사면이 완성되고 나면, 절토사면에 복수개의 어스앵커를 다단으로 설치하게 되는 것으로서, 이때 어스앵커의 설치위치는 조립될 패널의 위치를 고려하여 결정되는 것이며, 레벨기 또는 수직 수평기 등을 이용하여 정밀하게 천공되는 천공부에 어스앵커를 그 선단 일부가 외부로 노출되는 상태로 설치하고 나서 그라우팅함으로서 어스앵커 설치 및 고정단계(S200)를 완료하게 된다. After the cut slope is completed to the foundation floor for constructing the retaining wall, a plurality of earth anchors are installed in the cut slope in multiple stages, and the installation position of the earth anchor is determined in consideration of the position of the panel to be assembled, and the level The ground anchor installation and fixing step (S200) is completed by installing the ground anchor in a state in which a part of its tip is exposed to the outside and then grouting the drilled portion precisely drilled using a plane or a vertical leveler.

이어서, 절토사면의 기초 바닥부에는 조립패널을 지지하기 위한 기초부를 형성하는 기초부 설치단계(S300)를 진행한다. 그리고, 기초부를 관통하는 지중파일을 삽입하고 그라우팅하는 것이다.Subsequently, a foundation installation step S300 of forming a foundation for supporting the assembly panel is performed at the foundation bottom of the cut slope. Then, the underground file penetrating the base portion is inserted and grouted.

기초부가 지중파일에 의해 견고한 조립위치를 확보하게 되면, 상기 기초부 위에 복수의 단위 조립패널을 다단 적층시켜 조립하게 되는 것인데, 이때 조립패널 중앙부를 관통하는 어스앵커 머리부에 지지판을 삽입한 다음 이를 너트로 결합하여 상기 조립패널과 어스앵커가 견고하고도 안정적인 옹벽 구조물로서의 설치상태를 유지하게 되는 것이다.(S400) When the base portion secures a solid assembly position by underground piles, a plurality of unit assembly panels are stacked and assembled on the base portion, wherein the support plate is inserted into the earth anchor head passing through the center portion of the assembly panel. The assembly panel and the earth anchor are coupled to the nut to maintain the installation state as a solid and stable retaining wall structure. (S400)

이 같이 소망하는 옹벽 구조물의 모습을 갖추며 상기 조립패널과 어스앵커가 조립되고 나면, 상기 조립패널의 전면에 실리콘 접착제와 체결부재를 이용하여 적어도 하나 이상의 단위조각들로 이루어지는 복수의 단위 장식패널을 고정 고정한 후, 상기 안착홈의 내부에 몰탈충진층을 형성하는 장식패널 설치 및 몰탈 충진단계(S500)를 진행한다.After the assembling panel and the earth anchor are assembled with the desired retaining wall structure as described above, a plurality of unit decorative panels including at least one unit piece are fixed to the front of the assembly panel by using a silicone adhesive and a fastening member. After fixing, the decorative panel is installed and mortar filling step (S500) to form a mortar filling layer inside the seating groove.

이 같은 상기 덮개 설치 및 몰탈 충진단계(S500)는. 더욱 구체적으로, 상기 단위 조립패널의 전면에 실리콘을 도포하는 실리콘 도포단계(S510)와; 상기 조립패널의 전면에 상기 도포되는 실리콘 접착제를 통해 복수의 단위 장식패널을 1차 고정 결합시킨 후, 체결부재와 조임보조재를 이용하여 상기 단위 조립패널의 전면에 복수의 단위 장식패널을 2차 고정 결합시키는 장식패널 고정단계(S520)와; 상기 조립패널의 전면에 고정된 복수의 단위 장식패널의 상부와 하부에 경사지게 몰탈주입공을 형성하는 몰탈주입공 형성단계(S530); 그리고 상기 몰탈주입공을 통해 산화방지용 몰탈을 안착홈의 내부 공간에 충진하는 몰탈충진층 형성단계(S540);를 순차적으로 진행하며 이루어지는 것이다.Such a cover installation and mortar filling step (S500). More specifically, the silicon coating step (S510) for applying the silicon on the front of the unit assembly panel; After first fixing the plurality of unit decoration panels by the silicone adhesive applied to the front surface of the assembly panel, and fixing the plurality of unit decoration panels on the front of the unit assembly panel by using a fastening member and a fastening aid. Fixing the decorative panel to be combined (S520); Mortar injection hole forming step of forming a mortar injection hole inclined in the upper and lower portions of the plurality of unit decorative panels fixed to the front of the assembly panel (S530); And the mortar filling layer forming step (S540) of filling the internal space of the anti-mortar mortar for oxidation through the mortar injection hole; is to proceed sequentially.

그리고 이어서, 복수 적층 조립되는 상기 조립패널들과 절토사면 사이에 집수정과 수평 및 수직배수관을 시공시킨 상태에서, 상기 수직배수관을 기초부에 결합되도록 한 후(S600), 상기 조립패널들과 절토사면 사이에 토사를 체우고 다짐하는 토사 메우기 단계(S700)를 진행한다.Subsequently, in a state in which water collecting wells and horizontal and vertical drainage pipes are installed between the assembly panels and the cut slopes to be assembled in a plurality of layers, the vertical drainage pipes are coupled to the foundation (S600), and the assembly panels and cuts To fill the soil between the slopes and proceeds to fill the soil to fill up (S700).

토사 메우기 단계(S700)가 종료되어 1단계의 옹벽구조물이 완성되고 나면, 기초부 하부에 외측을 향하도록 하향 절토사면을 형성하고, 이어지는 제2, 또는 제3 단계의 옹벽구조물을 순차적으로 시공하는 단계(S800)를 진행하는 한편, 상기 제 1 내지 제 3 단계의 옹벽구조물이 순차적으로 시공될 때, 상기 제 1 단계의 옹벽구조물에는 화단 형성용 포켓 구조물(70)을 시공하는 화단형성단계(S800)를 더 포함하여 진행할 수도 있는 것이다.After the soil filling step (S700) is completed and the first retaining wall structure is completed, a downward cut slope is formed in the lower portion of the foundation to face the outer side, and the second or third retaining wall structure is sequentially constructed. While proceeding to step S800, when the retaining wall structures of the first to third steps are sequentially installed, the flower bed forming step of constructing a flower bed forming pocket structure 70 in the retaining wall structure of the first step is performed (S800). You can also proceed with more).

상기와 같이 구성되는 옹벽구조 및 그 시공방법의 실시예를 첨부된 도 1 내지 7은 참조하여 설명하면, 우선 옹벽을 시공하고자 하는 경계선을 따라 지반을 수평 정리하고 절토사면을 형성한 후, 상기 절토사면에 복수의 단위 조립패널(30)로 이루어진 옹벽구조물(20)을 시공한다. 즉, 중앙에 경사진 안착홈(31)과 앵커 삽입공(32)이 형성되면서 상기 안착홈(31)의 주변에 제 1 체결공(33)이 형성되고, 상하면에는 다단 적층이 가능하도록 삽입돌기(34)와 삽입홈(35)이 동일선상에 수직 형성되는 단위 조립패널(30)를 수직방향으로 다수개수 적층하여 옹벽구조물(20)을 형성하게 되는 것이다. 1 to 7 with reference to the embodiment of the retaining wall structure and the construction method configured as described above with reference to, first, after the ground is laid horizontally along the boundary line to install the retaining wall to form a cut slope, the cut A retaining wall structure 20 composed of a plurality of unit assembly panels 30 is constructed on a slope. That is, while the inclined seating groove 31 and the anchor insertion hole 32 are formed in the center, the first fastening hole 33 is formed around the seating groove 31, and the upper and lower surface of the insertion protrusion to enable multi-stage stacking. The retaining wall structure 20 is formed by stacking a plurality of unit assembly panels 30 in which the 34 and the insertion grooves 35 are vertically formed on the same line in the vertical direction.

여기서, 상기 단위 조립패널(30)은 삽입돌기(34)와 삽입홈(35)의 결합을 통해서 슬립이 발생하는 것을 최소화할 수 있을 뿐만 아니라 사각형 형상으로 형성되는 안착홈(31)을 통해 상기 마감덮개(50)와 결합이 용이하면서도 움직임은 제한할 수 있는 장점이 얻을 수 있다.Here, the unit assembly panel 30 can minimize the occurrence of slip through the combination of the insertion protrusion 34 and the insertion groove 35, as well as the finish through the mounting groove 31 formed in a rectangular shape The cover 50 can be easily combined with the advantage that the movement can be limited.

그리고 상기 단위 조립패널(30)를 구성하는 앵커 삽입공(32)에 산화방지용 테이프가 테이핑 된 어스앵커(40)를 관통시켜 지반에 삽입한 후, 지반을 다져 어스앵커(40)를 고정한 다음, 상기 안착홈(31)의 내부공간에 위치하는 어스앵커(40)의 머리부를 너트(42)와 지지판(44)을 이용하여 고정한다. Then, through the earth anchor 40 with the anti-oxidation tape taped to the anchor insertion hole 32 constituting the unit assembly panel 30 is inserted into the ground, the ground is fixed by fixing the earth anchor 40, The head of the earth anchor 40 positioned in the inner space of the seating groove 31 is fixed using the nut 42 and the support plate 44.

다음으로 상기 단위 조립패널(30)의 일면에 실리콘 접착제를 도포한 후, 상기 단위 조립패널(30)의 일면에 소정 두께를 가지고 형성되는 적어도 하나 이상의 단위조각(50)들로 이루어지면서 단위조각 연결망(90)에 의해 일체형 구조물을 이루는 복수 의 단위 장식패널(50')을 1차 고정 결합시킨 후, 상기 제 1,2 체결공(33)(52)에 체결부재(100)를 체결시키는 한편, 상기 제 1 체결공(33)에 조임보조재(53)를 삽입하여, 상기 체결부재(100)가 이탈되지 않도록 하면, 상기 조립패널(30)과 복수의 단위 장식패널(50')의 고정이 완료된다.Next, after applying a silicone adhesive on one surface of the unit assembly panel 30, the unit assembly network consisting of at least one or more unit pieces (50) formed with a predetermined thickness on one surface of the unit assembly panel (30) After the first fixed coupling of the plurality of unit decorative panels 50 'constituting the unitary structure by 90, and fastening the fastening member 100 to the first and second fastening holes 33, 52, When the fastening auxiliary member 53 is inserted into the first fastening hole 33 to prevent the fastening member 100 from being separated, fixing of the assembly panel 30 and the plurality of unit decoration panels 50 'is completed. do.

그리고 상기 복수의 단위 장식패널(50')을 이루는 단위조각(50)들 하나의 단위조각(50)의 상, 하부에 경사지게 몰탈주입공(51)을 형성한 후, 상기 상부 몰탈주입공(51)에 산화방지용 몰탈을 공급하여 안착홈(31)의 내부 공간에 몰탈충진층(60)을 형성하면서 상기 하부 몰탈주입공(51)을 통해 산화방지용 몰탈이 배출되면 하부 몰탈주입공(51)을 차단하고 계속해서 공급하여 안착홈(31)의 내부에 몰탈충진층(60)을 형성하게 되는 것이다. In addition, after the mortar injection hole 51 is formed to be inclined on the upper and lower portions of one of the unit pieces 50 constituting the plurality of unit decoration panels 50 ′, the upper mortar injection hole 51 is formed. When the anti-mortal mortar injection hole 51 is discharged through the lower mortar injection hole 51 while forming a mortar filling layer 60 in the inner space of the seating groove 31 by supplying an anti-oxidation mortar to the lower mortar injection hole 51 Blocking and continuing supply is to form a mortar filling layer 60 in the seating groove (31).

이때, 상기 안착홈(31)의 내부에 형성되는 몰탈충진층(60)은 상기 단위 조립패널(30)과 복수의 단위 장식패널(50')을 고정할 뿐만 아니라 상기 어스앵커(40)의 머리부에 수분 침투에 의한 녹이 발생되는 산화현상을 방지하게 되는 것이다.At this time, the mortar filling layer 60 formed in the seating groove 31 not only fixes the unit assembly panel 30 and the plurality of unit decoration panels 50 ', but also the head of the earth anchor 40. It is to prevent the oxidation phenomenon caused by rust caused by water infiltration into the part.

다음으로, 상기와 같은 옹벽 구조를 시공함에 있어, 우선 다단을 이루는 옹벽 구조의 절토면 상단에 각각 집수정(81)을 형성하되, 상기 절토면의 상단에는 상기 집수정(81)에 연결되어 빗물 등을 상기 집수정(81)으로 배수시키는 수평배수관(82)을 연결 구성하는 한편, 상기 집수정(81)으로부터 기초부로는 상기 집수정(81)으로 배수되는 빗물 등을 하단측의 집수정(81)으로 배수시키도록 절토면을 수직 관통하는 수직배수관(83)을 연결 구성하여, 계단식으로 이루어진 다단의 옹벽 구조에서 빗물 등이 고이지 않고 배수시킬 수 있는 것이다.Next, in constructing the retaining wall structure as described above, first, each of the water collecting wells 81 is formed on the top of the cut surface of the retaining wall structure forming the multi-stage, and the rainwater is connected to the water collecting well 81 at the upper end of the cut surface. While connecting the horizontal drain pipe 82 to drain to the sump (81), while the rain from the sump (81) to the basin 81 drained to the sump 81, the bottom of the sump (81) By connecting the vertical drainage pipe 83 vertically penetrating the cut surface so as to drain the water, it is possible to drain the rainwater and the like in the stepped multi-stage retaining wall structure.

여기서, 상기 다단의 옹벽 구조에서, 상기 각각의 옹벽 구조층에 화단 형성용 포컷 구조물(70)을 시공할 수도 있으며, 이러한 포켓 구조물(70)내에 돌, 나무, 흙 등을 채운 화단을 형성하게 되면, 옹벽 구조의 수려함을 한층 높이는 효과를 기대할 수 있음은 물론, 시각적으로 단조로운 옹벽 구조를 보다 수려하게 구성할 수 있게 되면서, 휴식처 또는 산책로와 같은 효과를 기대할 수 있는 것이다.Here, in the multi-stage retaining wall structure, a flower bed forming fork structure 70 may be constructed in each retaining wall structure layer, and when the flower bed filled with stones, trees, soil, etc. is formed in the pocket structure 70, In addition, it is possible to expect the effect of further enhancing the beautifulness of the retaining wall structure, as well as to construct the visually monotonous retaining wall structure more beautifully, and to expect an effect such as a resting place or a walkway.

이상에서 첨부된 도면을 참조하여 본 발명인 옹벽구조 및 그 시공방법을 설명함에 있어 특정형상 및 방향을 위주로 설명하였으나, 본 발명은 당업자에 의하여 다양한 변형 및 변경이 가능하고, 이러한 변형 및 변경은 본 발명의 권리범위에 포함되는 것으로 해석되어야 한다.In describing the retaining wall structure and the construction method of the present invention with reference to the accompanying drawings, the present invention has been described based on a specific shape and direction, but the present invention can be variously modified and changed by those skilled in the art, and such modifications and changes are the present invention. It should be construed as being included in the scope of the right.

20 : 옹벽구조물 30 : 단위 조립패널
31 : 안착홈 32 : 앵커 삽입공
33 : 제 1 체결공 34 : 삽입돌기
35 : 삽입홈 40 : 어스앵커
50 : 단위조각 50; 복수의 단위 장식패널
60 ; 몰탈충진층 70 ; 포켓구조물
81 ; 집수정 82 ; 수평배수관
83 ; 수직배수관 90 ; 단위조각 연결망
20: retaining wall structure 30: unit assembly panel
31: mounting groove 32: anchor insertion hole
33: first fastening hole 34: insertion protrusion
35: insertion groove 40: earth anchor
50: unit piece 50; Multiple unit decoration panel
60; Mortar-packed layer 70; Pocket Structure
81; Catchment 82; Horizontal drain pipe
83; Vertical drainage pipe 90; Unit network

Claims (11)

중앙에 경사진 안착홈과 앵커 삽입공이 형성되고, 상하 좌우 테두리면에는 다단 적층이 가능하도록 삽입돌기와 삽입홈이 선택적으로 형성되는 단위 조립패널의 복수 조합으로 구성된 옹벽구조물;
절토면에 몸체부를 소정 깊이로 삽입되어 고정되며, 그 노출된 선단이 상기 단위 조립패널의 앵커 삽입공을 관통하여 너트와 지지판으로 조립되는 어스앵커;
상기 안착홈을 가리우도록 안착홈의 면적보다 넓은 단위면적으로 가지며 안착홈 전방에 부착되는 적어도 하나 이상의 단위조각들로 이루어지고, 안착홈 전방에 위치하는 상기 단위조각에는 몰탈주입공을 형성한 체 상기 단위 조립패널의 전면에 결합되는 복수의 단위 장식패널; 및
다단을 이루는 상기 옹벽 구조물의 절토면 상단에 각각 형성되는 집수정;
상기 집수정에 연결되어 빗물 등을 상기 집수정으로 배수시키는 수평배수관; 그리고,
상기 집수정으로 배수되는 빗물 등을 하단측의 집수정으로 배수시키도록 절토면을 수직 관통하는 수직배수관; 을 포함하여 이루어지는 것을 특징으로 하는 단위패널 조립식 옹벽구조.
A retaining wall structure including a plurality of combinations of unit assembly panels in which an inclined seating groove and an anchor insertion hole are formed in the center, and an insertion protrusion and an insertion groove are selectively formed on the upper and lower left and right edges to enable multi-stage stacking;
An earth anchor that is inserted into the cut surface at a predetermined depth and fixed to the cut surface, the exposed end of which is assembled with a nut and a support plate through the anchor insertion hole of the unit assembly panel;
A sieve having a unit area wider than the area of the seating groove to cover the seating groove, and having at least one unit piece attached to the front of the seating groove, wherein the unit piece positioned in front of the seating groove forms a mortar injection hole. A plurality of unit decoration panels coupled to the front surface of the unit assembly panel; And
Water collection wells formed on top of cut surfaces of the retaining wall structure forming a plurality of stages;
A horizontal drain pipe connected to the sump to drain rainwater or the like into the sump; And,
A vertical drainage pipe vertically penetrating the cut surface to drain rainwater, etc. drained into the sump well to the sump of the lower side; Unit panel prefabricated retaining wall structure comprising a.
제 1 항에 있어서,
상기 복수의 단위 장식패널을 이루는 단위조각들은 복수 조합으로 일체형 구조를 이루도록 하나의 단위조각 연결망에 결합 구성하는 것을 특징으로 하는 단위패널 조립식 옹벽구조.
The method of claim 1,
Unit pieces constituting the retaining wall structure, characterized in that the unit pieces constituting the plurality of unit decorative panels are coupled to one unit piece connecting network to form an integrated structure in a plurality of combinations.
제 2 항에 있어서,
상기 안착홈의 주변에는 제 1 체결공을 형성하고, 상기 복수의 단위 장식패널에는 제 2 체결공을 형성하며, 상기 단위 조립패널과 상기 복수의 단위 장식패널은 상기 안착홈 주위를 접착제로 감싸이게 도포하여 밀봉 부착하고, 상기 복수의 단위 장식패널은 상기 제 1,2 체결공을 관통하는 체결부재로 부착하는 한편, 상기 체결부재는 조임보조재를 삽입하여 긴밀하게 고정되도록 구성하는 것을 특징으로 하는 단위패널 조립식 옹벽구조.
3. The method of claim 2,
A first fastening hole is formed around the seating groove, and a second fastening hole is formed in the plurality of unit decoration panels, and the unit assembly panel and the plurality of unit decoration panels are wrapped with adhesive around the seating groove. It is applied and sealed, and the plurality of unit decorative panel is attached to the fastening member penetrating the first and second fastening holes, while the fastening member is configured to be tightly fixed by inserting a fastener auxiliary material Panel prefabricated retaining wall structure.
제 1 항에 있어서, 상기 복수의 단위 장식패널에 형성되는 몰탈주입공을 통해 산화방지용 몰탈을 주입하여, 상기 안착홈의 내부공간에 몰탈충진층을 형성하는 것을 특징으로 하는 단위패널 조립식 옹벽구조.The unit panel assembly retaining wall structure of claim 1, wherein an anti-oxidation mortar is injected through a mortar injection hole formed in the plurality of unit decoration panels to form a mortar filling layer in an inner space of the seating groove. 중앙에 경사진 안착홈과 앵커 삽입공이 형성되고, 상하 좌우 테두리면에는 다단 적층이 가능하도록 삽입돌기와 삽입홈이 선택적으로 형성되는 단위 조립패널의 복수 조합으로 구성된 옹벽구조물;
절토면에 몸체부를 소정 깊이로 삽입되어 고정되며, 그 노출된 선단이 상기 단위 조립패널의 앵커 삽입공을 관통하여 너트와 지지판으로 조립되는 어스앵커;
상기 단위 조립패널이 결합되는 옹벽구조물의 최하단측에 결합되는 화단형성용 포켓구조물; 및
다단을 이루는 상기 옹벽 구조물의 절토면 상단에 각각 형성되는 집수정;
상기 집수정에 연결되어 빗물 등을 상기 집수정으로 배수시키는 수평배수관; 그리고,
상기 집수정으로 배수되는 빗물 등을 하단측의 집수정으로 배수시키도록 절토면을 수직 관통하는 수직배수관; 을 포함하여 구성하는 것을 특징으로 하는 단위패널 조립식 옹벽구조.
A retaining wall structure including a plurality of combinations of unit assembly panels in which an inclined seating groove and an anchor insertion hole are formed in the center, and an insertion protrusion and an insertion groove are selectively formed on the upper and lower left and right edges to enable multi-stage stacking;
An earth anchor that is inserted into the cut surface at a predetermined depth and fixed to the cut surface, the exposed end of which is assembled with a nut and a support plate through the anchor insertion hole of the unit assembly panel;
A flower bed forming pocket structure coupled to the lowermost side of the retaining wall structure to which the unit assembly panel is coupled; And
Water collection wells formed on top of cut surfaces of the retaining wall structure forming a plurality of stages;
A horizontal drain pipe connected to the sump to drain rainwater or the like into the sump; And,
A vertical drainage pipe vertically penetrating the cut surface to drain rainwater, etc. drained into the sump well to the sump of the lower side; Unit panel prefabricated retaining wall structure, characterized in that comprising a.
중앙에 경사진 안착홈과 앵커 삽입공이 형성되고, 상하 좌우 테두리면에는 다단 적층이 가능하도록 삽입돌기와 삽입홈이 선택적으로 형성되는 단위 조립패널의 복수 조합으로 구성된 옹벽구조물;
절토면에 몸체부를 소정 깊이로 삽입되어 고정되며, 그 노출된 선단이 상기 단위 조립패널의 앵커 삽입공을 관통하여 너트와 지지판으로 조립되는 어스앵커;
다단을 이루는 상기 옹벽 구조물의 절토면 상단에 각각 형성되는 집수정;
상기 집수정에 연결되어 빗물 등을 상기 집수정으로 배수시키는 수평배수관; 및,
상기 집수정으로 배수되는 빗물 등을 하단측의 집수정으로 배수시키도록 절토면을 수직 관통하는 수직배수관; 을 포함하여 구성하는 것을 특징으로 하는 단위패널 조립식 옹벽구조.
A retaining wall structure including a plurality of combinations of unit assembly panels in which an inclined seating groove and an anchor insertion hole are formed in the center, and an insertion protrusion and an insertion groove are selectively formed on the upper and lower left and right edges to enable multi-stage stacking;
An earth anchor that is inserted into the cut surface at a predetermined depth and fixed to the cut surface, the exposed end of which is assembled with a nut and a support plate through the anchor insertion hole of the unit assembly panel;
Water collection wells formed on top of cut surfaces of the retaining wall structure forming a plurality of stages;
A horizontal drain pipe connected to the sump to drain rainwater or the like into the sump; And
A vertical drainage pipe vertically penetrating the cut surface to drain rainwater, etc. drained into the sump well to the sump of the lower side; Unit panel prefabricated retaining wall structure, characterized in that comprising a.
단위 조립패널을 적층 조립하여 옹벽을 구축하는 옹벽 시공방법에 있어서,
설치하고자 하는 옹벽의 위치와 토사의 안식각에 따라 경사면이 형성되도록 원 지반을 절토하는 절토사면 형성단계(S100);
절토사면에 복수개의 어스앵커를 다단으로 설치하되 어스앵커의 선단 일부가 외부로 노출되도록 설치하고 이를 고정하는 어스앵커 설치 및 고정단계(S200);
조립패널을 지지하기 위한 기초부를 형성하는 기초부 설치단계(S300);
기초부 위에 복수의 단위 조립패널을 다단 적층시켜 조립하되, 조립패널 중앙부를 관통하는 어스앵커 머리부에 지지판을 삽입한 후 너트를 결합하여 상기 조립패널과 어스앵커를 고정하는 조립패널 설치단계(S400);
상기 조립패널에 실리콘 접착제를 이용하여 적어도 하나 이상의 단위조각들로 이루어지는 복수의 단위 장식패널을 고정한 후, 안착홈의 내부에 몰탈충진층을 형성하는 장식패널 설치 및 몰탈 충진단계(S500);
상기 기초부로부터 상단방향으로 토사가 채워지는 공간에 수직배수관을 설치하고, 상기 수직배수관의 상단에 집수정과 수평배수관을 설치하는 배수로 설치단계(S600); 및,
복수 적층 조립되는 상기 조립패널들과 절토사면 사이의 배수로 설치공간에 토사를 채우고, 이를 다짐하는 토사 메우기 단계(S700); 를 포함하여 이루어진 것을 특징으로 하는 단위패널 조립식 옹벽구조 시공방법.
In the retaining wall construction method of stacking unit assembly panels to build a retaining wall,
A cut slope forming step of cutting the original ground to form a slope according to the position of the retaining wall to be installed and the angle of repose of the soil;
An earth anchor installation and fixing step of installing a plurality of earth anchors on the cut slope in multiple stages so that a part of the tip of the earth anchor is exposed to the outside and fixing them;
A foundation installation step (S300) for forming a foundation for supporting the assembly panel;
Assembling by assembling a plurality of unit assembly panels stacked on the base portion, the assembly panel installation step of fixing the assembly panel and the earth anchor by inserting a support plate into the earth anchor head penetrating the center of the assembly panel and then coupling the nuts (S400) );
Fixing the plurality of unit decoration panels formed of at least one unit piece to the assembly panel by using at least one unit piece, and installing and decorating a mortar filling layer to form a mortar filling layer inside the seating groove (S500);
Installing a vertical drainage pipe in a space in which the soil is filled in the upper direction from the base portion, and installing a drainage pipe and a horizontal drainage pipe at an upper end of the vertical drainage pipe (S600); And
A soil filling step (S700) for filling earth soil in a drainage installation space between the assembly panels and the cut slopes assembled in a plurality of layers, and compacting them; Unit panel prefabricated retaining wall structure construction method comprising a.
제 7 항에 있어서, 상기 장식패널 설치 및 몰탈 충진단계(S500)는,
상기 단위 조립패널을 구성하는 안착홈의 주면 외측면에 실리콘 접착제를 도포하는 실리콘 도포단계(S510);
상기 실리콘 접착제를 통해 상기 조립패널의 전면에 부착되도록 적어도 하나 이상의 단위조각들로 이루어지는 복수의 단위 장식패널을 1차 고정시킨 후, 상기 복수의 단위 장식패널과 조립패널을 체결부재로 2차 고정시키는 장식패널 고정단계(S520);
상기 복수의 단위 장식패널에 경사지게 몰탈주입공을 형성하는 몰탈주입공 형성단계(S530);
상기 몰탈주입공을 통해 산화방지용 몰탈을 안착홈의 내부 공간에 충진하는 몰탈충진층 형성단계(S540); 로 이루어지는 것을 특징으로 하는 단위패널 조립식 옹벽구조 시공방법.
The method of claim 7, wherein the decorative panel installation and mortar filling step (S500),
Silicon application step (S510) for applying a silicone adhesive on the outer surface of the main surface of the mounting groove constituting the unit assembly panel;
After fixing a plurality of unit decorative panels consisting of at least one unit piece to be attached to the front of the assembly panel through the silicone adhesive, the second unit fixing the plurality of unit decorative panels and the assembly panel with a fastening member Decorative panel fixing step (S520);
Mortar injection hole forming step of forming a mortar injection hole inclined in the plurality of unit decorative panels (S530);
Mortar filling layer forming step of filling the internal space of the anti-mortar mortar for oxidation through the mortar injection hole (S540); Unit panel prefabricated retaining wall structure construction method comprising a.
제 8 항에 있어서, 상기 기초부 설치단계(S300)는,
기초부를 관통하는 지중파일을 삽입하고 그라우팅하는 지중파일 설치단계; 를 더 포함하는 것을 특징으로 하는 단위패널 조립식 옹벽구조 시공방법.
The method of claim 8, wherein the base installation step (S300),
Underground file installation step of inserting and grouting the underground file passing through the base; Unit panel prefabricated retaining wall structure construction method further comprising a.
제 8 항에 있어서,
상기 토사 메우기 단계(S700)가 종료되어 1단계의 옹벽구조물이 완성되고 나면, 기초부 하부에 외측을 향하도록 하향 절토사면을 형성하고, 이어지는 제2, 또는 제3 단계의 옹벽구조물을 순차적으로 시공하는 것을 특징으로 하는 단위패널 조립식 옹벽구조 시공방법.
The method of claim 8,
After the soil filling step (S700) is completed and the first retaining wall structure is completed, a downward cut surface is formed in the lower portion of the foundation to face the outer side, and then the second or third retaining wall structure is sequentially constructed. Unit panel prefabricated retaining wall structure construction method characterized in that.
제 10 항에 있어서,
상기 제 1 내지 제 3 단계의 옹벽구조물이 순차적으로 시공될 때, 상기 제 1 단계의 옹벽구조물에는 화단 형성용 포켓구조물을 시공하는 화단형성단계(S800); 를 더 포함하는 것을 특징으로 하는 단위패널 조립식 옹벽구조 시공방법.
11. The method of claim 10,
When the retaining wall structures of the first to third steps are sequentially installed, the flower bed forming step of constructing a flower bed forming pocket structure in the retaining wall structure of the first step (S800); Unit panel prefabricated retaining wall structure construction method further comprising a.
KR1020120017785A 2012-02-22 2012-02-22 A Revetment Structure KR101325384B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120017785A KR101325384B1 (en) 2012-02-22 2012-02-22 A Revetment Structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120017785A KR101325384B1 (en) 2012-02-22 2012-02-22 A Revetment Structure

Publications (2)

Publication Number Publication Date
KR20130096383A KR20130096383A (en) 2013-08-30
KR101325384B1 true KR101325384B1 (en) 2013-11-08

Family

ID=49219264

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120017785A KR101325384B1 (en) 2012-02-22 2012-02-22 A Revetment Structure

Country Status (1)

Country Link
KR (1) KR101325384B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101502055B1 (en) * 2014-08-06 2015-03-12 김정태 Retaining Wall system for Planting and the construction method
KR101866102B1 (en) * 2016-12-28 2018-06-08 공학봉 Finishing block for reinforced earth retaining wall using preserved wood
KR101944344B1 (en) 2018-11-19 2019-01-31 휘성개발(주) Decorative panel unitary retaining wall unit block and its manufacturing method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200481730Y1 (en) 2014-10-31 2016-11-03 김태열 Panel for Cutting Area
KR101531811B1 (en) * 2015-02-12 2015-06-25 주식회사 제이에이치 Retaining wall panel with decorating panel installing member and method for consturcting retaining wall using the same
KR102112388B1 (en) * 2017-10-24 2020-06-04 공학봉 Concrete panel for Cutting retaining wall that is Cutting retaining wall by the Concrete panel
KR102499791B1 (en) * 2022-07-19 2023-02-14 류현미 Fixing Apparatus and Construction Method Of Decorative Plate and Mounting Panel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177211A (en) * 1995-12-26 1997-07-08 Iwamoto:Kk Stone wall panel
JP2006169764A (en) * 2004-12-14 2006-06-29 Yamaichi Ps Concrete Kk Foamed resin block with plate member for banking, and lightweight banking structure using the same
KR101021110B1 (en) * 2010-09-06 2011-03-14 조영현 A revetment structure
KR101079737B1 (en) * 2009-02-23 2011-11-04 강명석 Retaing wall for planting having water tank and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177211A (en) * 1995-12-26 1997-07-08 Iwamoto:Kk Stone wall panel
JP2006169764A (en) * 2004-12-14 2006-06-29 Yamaichi Ps Concrete Kk Foamed resin block with plate member for banking, and lightweight banking structure using the same
KR101079737B1 (en) * 2009-02-23 2011-11-04 강명석 Retaing wall for planting having water tank and construction method thereof
KR101021110B1 (en) * 2010-09-06 2011-03-14 조영현 A revetment structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101502055B1 (en) * 2014-08-06 2015-03-12 김정태 Retaining Wall system for Planting and the construction method
KR101866102B1 (en) * 2016-12-28 2018-06-08 공학봉 Finishing block for reinforced earth retaining wall using preserved wood
KR101944344B1 (en) 2018-11-19 2019-01-31 휘성개발(주) Decorative panel unitary retaining wall unit block and its manufacturing method

Also Published As

Publication number Publication date
KR20130096383A (en) 2013-08-30

Similar Documents

Publication Publication Date Title
KR101325384B1 (en) A Revetment Structure
US20140270990A1 (en) Precast concrete retaining wall
US20080134615A1 (en) Combination of a structural block and a facing element attached thereto
KR100650392B1 (en) A Revetment Structure
US11536027B2 (en) Composite foam and concrete foundation, composite foam and concrete wall and method of mounting composite foam and cement wall to the foundation
KR101105092B1 (en) A precast retaining panel and construction method of the same with half pc type backfill
KR101021110B1 (en) A revetment structure
US20240125120A1 (en) Modular Slab, Slab System, Piles and Methods of Use Thereof
KR102131653B1 (en) Retaining wall structure and the construction method using eco-friendly retaining wall panel
US10267011B2 (en) Pre-cast decorative retaining wall system
KR101022009B1 (en) Construction method for Retaining wall by soil-nailing method and Retaining block thereof
KR101996133B1 (en) Top topping construction method of underground tunnel structure
NZ511899A (en) Foundation and wall assembly with pre-cast wall received in foundation pad, typically via groove
KR102240949B1 (en) Mounting structure for decorating of wall
CN206859429U (en) With height adjustable sealing pier and its water sealing structure
CN112144569A (en) Prefabricated base of assembled retaining wall and assembled retaining wall
JP2012251292A (en) Pile foundation structure of outdoor facility and construction method for the same
KR100400170B1 (en) Revetment structure using natural stones
JPS601458B2 (en) Precast concrete basement construction method
KR20130096384A (en) A revetment structure
US11697946B2 (en) Pool or other below grade fluid containment
CZ30042U1 (en) Reinforced concrete prefabricated block of underground vented building skin wall
CN115262588B (en) Assembled self-adaptive slope surface protection structure and construction method thereof
KR100842034B1 (en) Retaining wall using natural stone and construction method thereof
JP4807627B2 (en) Structure and construction method of internal bearing wall and waterproof layer in basement

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161026

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20171025

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180919

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190926

Year of fee payment: 7