KR101170290B1 - The technology evaluating system using evaluation information by professional reviewers and the method using the same - Google Patents

The technology evaluating system using evaluation information by professional reviewers and the method using the same Download PDF

Info

Publication number
KR101170290B1
KR101170290B1 KR1020120014939A KR20120014939A KR101170290B1 KR 101170290 B1 KR101170290 B1 KR 101170290B1 KR 1020120014939 A KR1020120014939 A KR 1020120014939A KR 20120014939 A KR20120014939 A KR 20120014939A KR 101170290 B1 KR101170290 B1 KR 101170290B1
Authority
KR
South Korea
Prior art keywords
evaluation
information
technology development
project
development project
Prior art date
Application number
KR1020120014939A
Other languages
Korean (ko)
Inventor
하석호
김세진
최새봄
Original Assignee
한국산업기술평가관리원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국산업기술평가관리원 filed Critical 한국산업기술평가관리원
Priority to KR1020120014939A priority Critical patent/KR101170290B1/en
Application granted granted Critical
Publication of KR101170290B1 publication Critical patent/KR101170290B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE: A technical development business electronic evaluation system using the evaluation information of a specialized appraiser and method are provided to objectively and rapidly evaluate technical development businesses by enabling an expert who includes reliability and expertise to input evaluation information to the online. CONSTITUTION: A business applicant terminal(100) applies technical development support to the online. The application information is transmitted to an unified information system(10). A plurality of evaluation committee terminals(300) controls a technical development business evaluation system(500) in order to transmit evaluation information to a comprehensive project management system(600). The comprehensive project management system stores information for technical development businesses.

Description

온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템 및 그 방법 {the technology evaluating system using evaluation information by professional reviewers and the method using the same}Electronic evaluation system and method of technology development project using online evaluation information of expert evaluator {the technology evaluating system using evaluation information by professional reviewers and the method using the same}

본 발명은 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템 및 그 방법에 관한 것으로, 더욱 세부적으로는 신뢰성과 전문성을 갖춘 전문가가 중소기업기술개발을 지원하기 위하여 신청된 사업을 평가하고 그 평가정보는 온라인으로 입력되어 활용됨으로써 상기 기술개발사업을 객관적이고 신속하게 평가하기 위한 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템 및 그 방법에 관한 것이다.The present invention relates to an electronic evaluation system and method for a technology development project using evaluation information of a professional evaluator input online, and more specifically, a professional with reliability and expertise evaluates a project applied for supporting SME technology development. And the evaluation information is input and utilized online, and relates to an electronic evaluation system and method for a technology development project using evaluation information of a professional evaluator input online to objectively and quickly evaluate the technology development project.

일반적으로 중소기업이 기술개발사업을 독자적으로 진행하는 것은 자금과 인력의 부족으로 어려움이 많아 제대로 투자가 이루어지지 않으므로 정부의 지원을 필요로 하게 된다.In general, small and medium-sized businesses are in charge of technology development projects independently due to lack of funds and manpower.

이러한 중소기업 기술개발사업에 대한 정부의 지원이 공정하게 이루어지려면 해당 기술사업에 대한 객관적이고도 신속한 평가가 요구되며, 특히 해당 기술분야의 전문성과 신뢰성을 갖춘 전문가의 평가가 반영되는 것이 바람직할 것이다.In order for the government's support for the SME technology development project to be fair, an objective and rapid evaluation of the technology project is required, and in particular, it is desirable to reflect the evaluation of experts with expertise and reliability in the technology field.

그러나, 기술개발사업에 대한 정부의 지원을 원하는 중소기업체는 수없이 많지만 현실적으로 모든 업체에 지원을 한다는 것은 불가능하고, 업체가 제시하는 기술개발사업과제에 대한 기술분야 또한 제각각이어서, 제한된 시간 안에서 한정된 몇몇의 평가자들이 해당 기술개발사업과제에 대하여 신속한 평가와 선정을 하기에는 쉽지 않은 문제점이 있다.However, there are many small and medium companies that want government support for technology development projects, but in reality, it is impossible to apply to all companies, and the technology fields for the technology development projects presented by the companies are also different. It is not easy for the evaluators to quickly evaluate and select the technology development project.

대한민국 공개특허공보 제10-2011-0083183호(2011.07.20)Republic of Korea Patent Publication No. 10-2011-0083183 (2011.07.20)

상술한 바와 같은 문제점을 해결하기 위하여, 본 발명에서는 다양한 분야의 기술개발사업과제에 대해 해당 분야의 전문가들이 평가위원이 되어 네트워크를 통해 평가를 할 수 있는 전자평가시스템을 구축하여 객관적이고도 신속한 평가가 이루어지도록 하고 신뢰성과 전문성을 갖춘 평가가 될 수 있도록 하는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템 및 그 방법을 제공하는데 그 목적이 있다.In order to solve the problems described above, in the present invention, objective and rapid evaluation by building an electronic evaluation system that can be evaluated through the network of experts in the relevant field to the evaluation committee for technical development projects in various fields The purpose of the present invention is to provide an electronic evaluation system and method for a technology development project using the evaluation information of a professional evaluator, which enables the evaluation to be made and a reliable and professional evaluation.

또한, 평가위원을 신청하고 승인하는 시스템을 갖춰 객관적이고도 공정하게 평가자를 선정할 수 있도록 함으로써 신뢰성 있는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템 및 그 방법을 제공하는데 그 목적이 있다.In addition, the objective of the present invention is to provide an electronic evaluation system and method for technology development project using the evaluation information of a reliable professional evaluator by having an system for applying and approving the evaluator so that the evaluator can be objectively and fairly.

상기 목적을 달성하기 위한 본 발명의 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템의 구성은, 기술개발 사업지원을 온라인으로 신청하도록 하고 그 신청정보를 기술개발사업 평가시스템에 전송하는 사업신청자 단말과, 상기 온라인으로 신청되어 전송된 기술개발사업과 평가위원의 평가를 기술개발사업평가시스템을 통해 온라인으로 종합적으로 관리하도록 할 수 있는 담당간사 단말과, 상기 온라인으로 신청된 기술개발사업을 과제별로 평가하여 그 평가정보를 온라인을 통하여 기술개발사업평가시스템에 전송할 수 있는 복수의 평가위원 단말과, 상기 복수의 평가위원에 의하여 평가되고 전송된 평가결과를 관리할 수 있도록 하고 종합의견을 작성하여 상기 기술개발사업평가시스템으로 전송할 수 있도록 할 수 있는 평가위원장 단말과, 상기 전송되는 기술개발 사업에 대한 정보를 저장하고, 상기 정보를 담당간사 단말, 평가위원 단말 및 평가위원장 단말로 전송하고, 또한, 상기 기술개발 사업에 대해 입력되는 평가정보를 다시 전송받아 저장하고 관리하는 종합과제관리시스템(600)과 상기 기술개발 사업에 대한 평가를 관리하는 기술개발사업 평가시스템(500)을 포함하는 통합정보시스템 및 네트워크를 포함한다.In order to achieve the above object, the configuration of the electronic evaluation system for the technical development project using the evaluation information of the expert evaluator of the present invention is to apply for the technical development project support online and transmit the application information to the technical development project evaluation system. A terminal, a secretary terminal capable of comprehensively managing the technology development project and evaluation member's evaluation applied online and submitted through the technology development project evaluation system, and the technology development project applied online. By evaluating the results of the evaluation and managing the evaluation results transmitted and evaluated by the plurality of evaluators and the evaluation information transmitted by the evaluators. Evaluation member who can transmit to the technology development project evaluation system A terminal, and stores information about the technology development project to be transmitted, transmits the information to the secretary terminal, the evaluation member terminal and the evaluation chairman terminal, and receives the evaluation information input for the technology development project again. An integrated information system and network including a comprehensive task management system 600 for storing and managing a technology development project evaluation system 500 for managing an evaluation of the technology development project.

상기와 같은 목적을 달성하기 위한 본 발명의 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가 방법은, 담당간사 단말과 담당간사 모듈에 의해 해당 기술개발사업의 평가가 관리되되, 신청받은 기술개발지원사업에 대한 사업분과와 사업과제를 배정하고 평가위원을 배정하는 분과구성 단계와, 상기 선정된 분과에 대한 정보를 조회하고 평가위원들의 위원회를 시작하는 전자평가위원회 단계와, 평가위원들을 조회하고, 서명을 받아 등록하며, 불참여부를 등록하며, 평가위원들을 추가할 수 있도록 하고, 평가위원장을 선정하는 분과개최준비 단계와, 상기 평가위원들과 평가위원장의 각 과제의 평가 완료 및 확정유무를 평가하는 평가결과를 모니터링하는 분과개최 단계와, 상기 입력되는 평가결과를 저장하는 평가결과 저장 단계 및 상기 평가결과에 대한 확정을 취소할 수 있도록 하며, 확정취소가 없으면 과정을 종료하게 되는 위원회 확정 단계를 포함한다.Technical development project evaluation method using the evaluation information of a professional evaluator input online of the present invention for achieving the above object, the evaluation of the corresponding technology development project by the secretary terminal and the secretary module in charge, but received The sub-composition phase of assigning business divisions and project tasks to the technology development support project, assigning evaluators, the electronic evaluation committee stage to inquire information on the selected divisions, and start the committee of evaluators; Inquiry, signature registration, registration of non-participation, addition of reviewers, preparation of the stage of subcommittee selection, selection and completion of evaluation of each assignment of the reviewers and the chairman Division holding stage to monitor the evaluation result evaluating the presence and absence of the evaluation result storage to store the evaluation result entered Steps and the finalizing of the evaluation results can be canceled, and if there is no cancellation of the decision includes the process of finalizing the committee.

본 발명의 또 다른 특징으로 상기 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가 방법은, 평가위원 단말과 평가 모듈에 의해 신청된 해당 기술개발사업이 평가되되, 평가위원의 자필서명 이미지파일이 담당간사 단말에 등록 및 저장되는 서명등록 단계와, 평가위원 단말에 생성된 창에 아이디와 패스워드가 입력된 후 기술개발사업 평가시스템에 로그인 되는 사업평가시스템 로그인 단계와, 평가대상 분과목록과 평과목록에 대한 상세화면이 생성되는 평가목록 확인 단계와, 과제기본정보, 참여연구원, 신청사업비, 참여기업정보, 이의신청 및 검토안건에 대한 목록의 과제기본정보화면과 과제문서목록화면이 생성되고, 과제중심화면, 평가표 중심화면 및 PDF중심화면이 생성된 후, 각 항목에 대한 평가정보가 입력 및 전송되는 평가정보 입력 단계와, 상기 입력된 평가정보가 평가위원 단말로부터 전송되어 기술개발 사업 평가시스템에 저장되는 평가결과저장 단계와, 상기의 평가결과에 대하여 확정한다는 확정정보가 전송되어 저장되는 평가결과 확정 단계 및 평가가 종료된 해당 사업과제 이외에 다른 과제를 선택하는 정보가 전송되면 다시 평가정보입력 단계로 돌아가고, 그렇지 않은 선택정보가 전송되면 종료되는 다음과제 단계를 포함한다.According to another aspect of the present invention, a method for evaluating a technology development project using the evaluation information of a professional evaluator input online is evaluated by the evaluator's terminal and the corresponding technology development project applied by the evaluation module, and the autographed signature image of the evaluator The signature registration step in which the file is registered and stored in the secretary's terminal, the project evaluation system login step in which the ID and password are entered in the window created on the evaluator's terminal, and logged in to the technology development project evaluation system; The evaluation list check step that generates detailed screens of the evaluation list, the basic project information screen and the project document list screen of the task basic information, participating researchers, the applicant project cost, participating company information, objection and review items After the task center screen, evaluation table center screen and PDF center screen are generated, the evaluation information for each item is input and transmitted. Is an evaluation information input step, an evaluation result storage step in which the input evaluation information is transmitted from an evaluation member terminal and stored in a technology development project evaluation system, and evaluation results in which confirmation information for determining the evaluation result is transmitted is stored. When the information for selecting a task other than the determined project and the project in which the evaluation is completed is transmitted, the process returns to the evaluation information input step, and the next task step ends when the selection information is not transmitted.

본 발명의 또 다른 특징으로 상기 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가 방법은, 평가위원장 단말과 평가 모듈에 의해 신청된 해당 기술개발사업이 평가되되, 평가위원장의 자필서명 이미지파일이 담당간사 단말에 등록 및 저장되는 서명등록 단계와, 평가위원장 단말에 생성된 창에 아이디와 패스워드가 입력된 후 기술개발사업 평가시스템에 로그인 되는 사업평가시스템 로그인 단계와, 평가대상 분과목록과 평과목록에 대한 상세화면이 생성되는 평가목록 확인 단계와, 상기 평가위원 단말로부터 전송되는 평가위원의 평가결과 확정 정보가 전송되어 저장되지 않으면 상기 평가목록 확인 단계 이전으로 되돌아 가고, 상기 확정 정보가 전송되어 저장되면 다음 종합의견 작성 단계로 넘어가는 전체위원 평가확정 단계와, 과제정보중심화면, 평가표 중심화면, PDF중심화면, 평가위원별 최종점수결과와 최종평가의견평가 화면이 생성되고 평가대상과제목록과 과제문서목록의 화면이 생상되어 위원별 확정된 평가결과를 취합하여 종합의견이 작성되어 전송되는 종합의견 작성 단계와, 상기 입력된 평가정보가 평가위원장 단말로부터 전송되어 기술개발 사업 평가시스템에 저장되는 평가결과저장 단계와, 상기의 평가결과에 대하여 확정한다는 확정정보가 전송되어 저장되는 위원장 확정 단계 및 상기 위원장 확정시 평가정보가 더 이상 입력되지 않고 평가가 종료된 해당 사업과제에 대한 입력된 평가표 결과를 생성하고 종료되되, 위원장확정 취소를 선택하는 정보가 전송되면 다시 평가목록확인 단계 이전으로 돌아가는 위원장 확정취소 단계를 포함한다. According to another aspect of the present invention, a method for evaluating a technology development project using the evaluation information of a professional evaluator input online is evaluated by the evaluation chairman and the corresponding technology development project applied by the evaluation module. The signature registration step in which the file is registered and stored in the secretary's terminal, the ID and password entered in the window created in the evaluation chairman's terminal, and the login phase of the project evaluation system logged in to the technology development project evaluation system; If the evaluation list confirmation step of generating a detailed screen for the evaluation list and the evaluation result confirmation information of the evaluation member transmitted from the evaluation member terminal is not transmitted and stored, return to the previous evaluation list confirmation step, the determination information is transmitted And evaluation of all committee members who proceed to the next comprehensive opinion Final scores, task information center screen, evaluation table center screen, PDF center screen, final score result and final evaluation opinion evaluation screen are created, and screen of task list and task document list is created. A comprehensive opinion preparation step in which a comprehensive opinion is prepared and transmitted, an evaluation result storage step in which the inputted evaluation information is transmitted from the evaluation chairman terminal and stored in the technology development project evaluation system, and the evaluation result is confirmed. The information on selecting the chairperson's decision to cancel the chairperson's decision and the stage of determining the chairperson's confirmation and the evaluation result is no longer entered and the evaluation result is completed. If sent, it includes a revocation of the chairman to return to the previous stage of the checklist.

상기한 바와 같이, 본 발명은 기술개발지원사업을 객관적이고 신속하게 수행하기 위하여 다양한 분야의 기술개발사업과제에 대해 해당 분야의 전문가들이 평가위원이 되어 네트워크를 통해 상기 신청된 사업을 평가할 수 있는 전자평가시스템을 갖추고, 전문가들이 네트워크를 통한 온라인으로 체계적인 평가절차에 참여하도록 함으로써 신뢰성과 전문성을 갖춘 기술개발지원사업에 대한 체계적이고도 신속한 평가가 가능한 효과가 있다.As described above, the present invention provides an electronic device capable of evaluating the applied business through a network, in which experts in the relevant fields become evaluators for technical development project tasks in various fields in order to perform the technical development support project objectively and promptly. By establishing an evaluation system and having experts participate in the systematic evaluation process online through the network, it is effective to systematically and quickly evaluate a technology development support project with reliability and expertise.

또한, 평가위원이 되고자 하는 신청자는 상기 기술개발 평가시스템이 인터넷을 통해 제공하는 신청화면에 의하여 신청 및 승인하는 시스템을 갖춰 객관적이고도 공정하게 평가위원들을 선정할 수 있도록 함으로써 절차에 대한 투명성으로 인하여 평가위원 승인에 대한 결과뿐만 아니라 상기 평가위원에 의한 평가에도 신뢰도를 고양하는 효과가 있다.In addition, applicants who wish to become evaluators have the system to apply and approve according to the application screen provided by the technology development evaluation system so that the evaluators can be selected objectively and fairly, due to the transparency of the procedure. In addition to the results of the evaluation of the appraiser, the evaluation by the appraiser has the effect of enhancing the reliability.

도 1은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가시스템의 연결 관계를 도시한 도면이다.
도 2는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가시스템의 종합과제관리시스템과 기술개발사업 평가시스템의 세부 구성도이다.
도 3은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가방법의 통합정보시스템(10)에 의해 수행되는 전체적인 과제관리 방법을 설명하기 위한 순서도이다.
도 4는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가방법의 통합정보시스템(10)에 의해 수행되는 전체적인 과제관리 방법에서 협약체결을 설명하기 위한 순서도이다.
도 5는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가방법의 담당간사 단말에 의해 수행되는 평가방법을 설명하기 위한 순서도이다.
도 6은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가방법의 평가위원 단말에 의해 수행되는 평가방법을 설명하기 위한 순서도이다.
도 7은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가방법의 평가위원장 단말에 의해 수행되는 평가방법을 설명하기 위한 순서도이다.
도 8은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가시스템과 단말기 간의 평가 방법을 설명하기 흐름도이다.
도 9는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가방법의 평가위원을 승인하는 방법을 설명하기 위한 순서도이다.
도 10 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 담당간사 단말에 생성되는 모니터링 화면의 일 예이다.
도 11은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 화면의 일 예이다.
도 12는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 평가정보 입력화면의 일 예이다.
도 13은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 평가정보 입력화면의 다른 일 예이다.
도 14는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 평가정보 입력화면의 또 다른 일 예이다.
도 15는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 화면의 일 예이다.
도 16은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 일 예이다.
도 17은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 다른 일 예이다.
도 18은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 또 다른 일 예이다.
도 19는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 또 다른 일 예이다.
도 20은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 자동선정에서 생성되는 화면의 일 예이다.
도 21은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 특별선정에서 생성되는 화면의 일 예이다.
1 is a diagram illustrating a connection relationship between an electronic evaluation system for a technology development project using evaluation information of a professional evaluator input online according to an embodiment of the present invention.
2 is a detailed configuration diagram of a comprehensive project management system and a technology development project evaluation system of a technology development project electronic evaluation system using evaluation information of a professional evaluator input online according to an embodiment of the present invention.
3 is a flowchart illustrating an overall task management method performed by the integrated information system 10 of the electronic evaluation method of a technology development project using evaluation information of a professional evaluator input online according to an embodiment of the present invention.
4 is for explaining the conclusion of the agreement in the overall task management method performed by the integrated information system 10 of the electronic evaluation method of the technology development project using the evaluation information of the professional evaluator input online according to an embodiment of the present invention Flowchart.
5 is a flowchart illustrating an evaluation method performed by the secretary terminal of the technology development project evaluation method using the evaluation information of a professional evaluator input online according to an embodiment of the present invention.
6 is a flowchart illustrating an evaluation method performed by the evaluator terminal of the technology development project evaluation method using the evaluation information of a professional evaluator input online according to an embodiment of the present invention.
FIG. 7 is a flowchart illustrating an evaluation method performed by an evaluation chairman terminal of a technology development project evaluation method using evaluation information of a professional evaluator input online according to an embodiment of the present invention.
8 is a flowchart illustrating a technology development project evaluation system using an evaluation information of a professional evaluator input online according to an embodiment of the present invention, and an evaluation method between an evaluation system and a terminal of the method.
9 is a flowchart illustrating a method for approving an evaluation member of a method for evaluating a technology development project using evaluation information of a professional evaluator input online according to an embodiment of the present invention.
10 is an example of a monitoring screen generated in the technical development project evaluation system using the evaluation information of the professional evaluator input online according to an embodiment of the present invention and the secretary terminal of the method.
FIG. 11 is an example of a screen generated on a system for evaluating a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a evaluator terminal of the method.
12 is an example of an evaluation information input screen generated in an evaluation system of a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluator terminal of the method.
FIG. 13 is another example of an evaluation information input screen generated in an evaluation system of a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a evaluator terminal of the method.
14 is yet another example of an evaluation information input screen generated in an evaluation system of a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a evaluator terminal of the method.
FIG. 15 is an example of a screen generated in an evaluation system for a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluating a chairperson of the method.
16 is an example of an evaluation information input screen generated in an evaluation system for a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention, and the evaluation chairman terminal of the method.
17 is another example of an evaluation information input screen generated in an evaluation system for a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a chairperson of an evaluation chair of the method.
18 is another example of an evaluation information input screen generated in an evaluation system for a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluating the chairperson of the method.
19 is another example of an evaluation information input screen generated in an evaluation system for a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluating the chairperson of the method.
20 is an example of a screen generated by an automatic evaluation of a technology development project evaluation system and a method using the evaluation information of a professional evaluator input online according to an embodiment of the present invention.
FIG. 21 is an example of a screen generated by a technical development project evaluation system using evaluation information of a professional evaluator input online according to an embodiment of the present invention and a special selection of evaluators of the method.

이하, 첨부한 도면을 참조하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present invention, and like reference numerals designate like parts throughout the specification.

이하, 도 1 내지 도 21을 참고로 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법을 설명한다.Hereinafter, a technology development business evaluation system using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method thereof will be described with reference to FIGS. 1 to 21.

도 1은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템의 연결 관계를 도시한 도면이다.1 is a diagram illustrating a connection relationship of a technology development project evaluation system using evaluation information of a professional evaluator input online according to an embodiment of the present invention.

도 1을 참조하면, 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 통합정보시스템(10)은 사업신청자 단말(100), 담당간사 단말(200), 평가위원 단말(300), 평가위원장(400), 기술개발사업 평가시스템(500) , 종합과제관리시스템(600) 및 네트워크(700)를 포함한다.Referring to FIG. 1, the integrated information system 10 using the evaluation information of a professional evaluator input online according to an embodiment of the present invention is a project applicant terminal 100, a secretary terminal 200, and an evaluation member terminal ( 300), the evaluation chairman 400, the technology development project evaluation system 500, the comprehensive project management system 600 and the network 700.

사업신청자 단말(100)은 네트워크(700)를 통하여 중소기업기술개발에 대한 지원을 받고자 하는 사업자가 온라인으로 기술개발사업 평가시스템(500)에 접속하여 해당 기술개발사업지원을 신청하되, 그 사업신청자 단말(100)에는 지원양식에 따르는 신청화면이 생성되어 각 항목에 적합한 정보를 입력하여 기술개발 사업지원을 신청하도록 하고 그 신청정보는 사업신청자 단말(100)에서 네트워크(700)를 통하여 기술개발사업평가시스템(500)에 전송된다. The project applicant terminal 100 requests a corresponding technology development project support by accessing the technology development project evaluation system 500 online to a business operator who wants to receive support for SME technology development through the network 700. An application screen according to the support form is generated at 100 to input the appropriate information for each item to apply for technical development project support, and the application information is evaluated through the network 700 in the project applicant terminal 100 through the network 700. Sent to system 500.

상기 사업신청자 단말(100)에서 제공되는 화면은 예를 들어 월드와이드웹(WWW)과 같은 웹페이지로 생성될 수 있으며, 사업신청자 단말(100)은 웹 브라우저가 탑재된 노트북, 데스크톱 또는 일반 PC뿐만 아니라 스마트폰 또는 무선통신용 노트북과 같은 무선 이동 통신 장치가 포함된다.The screen provided by the business applicant terminal 100 may be generated as a web page such as, for example, the World Wide Web, and the business applicant terminal 100 may be a laptop, desktop or general PC equipped with a web browser. But also include wireless mobile communication devices such as smartphones or notebooks for wireless communication.

상기 담당간사 단말(200)은 기술개발사업 평가시스템(500)을 관리하는 관리자에 준하는 통합정보시스템(10)에 대하여 시스템관리자의 권한을 가진 자가 평가위원들의 평가과정을 실시간으로 상기 네트워크(700)를 통하여 실시간으로 모니터링하면서 평가결과들을 설정하고 취소할 수 있어 상기 온라인으로 신청되어 전송된 기술개발사업과 평가위원의 평가를 온라인으로 종합적으로 관리할 수 있다. 또한 담당간사 단말(200)은 사업신청자 단말(100)과 같이 상기 서술된 여러 장치가 포함된다.The secretary terminal 200 is a network 700 in real time to evaluate the evaluation process of the self-evaluator having the authority of the system administrator with respect to the integrated information system 10 corresponding to the manager who manages the technology development project evaluation system 500 Through the real-time monitoring through the evaluation results can be set and canceled, it is possible to comprehensively manage the evaluation of the technology development project and the evaluation members applied and sent online. In addition, the secretary terminal 200 includes a variety of devices described above, such as the project applicant terminal (100).

상기 평가위원 단말(300)은 미리 해당 기술개발사업에 있어 해당 사업분과나 사업과제에 선정된 복수의 평가위원들이 상기 네트워크(700)를 통해 기술개발사업 평가시스템(500)에 접속하여 온라인으로 신청된 기술개발사업에 대한 정보를 전송받아 해당 사업을 과제별로 평가하고 그 평가결과를 입력하면 그 평가정보는 온라인을 통하여 기술개발사업평가시스템(500)에 전송된다. 또한 평가위원 단말(200)은 사업신청자 단말(100)과 같이 상기 서술된 여러 장치가 포함된다.The evaluator terminal 300 is applied in advance by a plurality of evaluators selected in the relevant business subdivision or project in the technology development project in advance by accessing the technology development project evaluation system 500 through the network 700 When the information about the technology development project is received, the project is evaluated for each task and the evaluation result is input. The evaluation information is transmitted to the technology development project evaluation system 500 through online. In addition, the evaluator terminal 200 includes various devices described above, such as the project applicant terminal 100.

상기 평가위원장 단말(400)은 상기 네트워크(700)에 접속되어 상기 서술된 평가위원 단말(200)에서 전송되어 저장된 평가결과를 기술개발사업 평가시스템(500)으로부터 전송받아 검토하고 확정하여 종합의견을 작성하되, 상기 입력된 종합의견은 상기 네트워크(700)를 통하여 종합과제관리시스템(600)에 저장된다. The evaluation chairman terminal 400 is connected to the network 700 and the evaluation result transmitted from the evaluation member terminal 200 described above is received from the technology development project evaluation system 500, reviewed and confirmed to obtain a comprehensive opinion. Compose, but the input comprehensive opinion is stored in the comprehensive task management system 600 through the network 700.

상기 통합정보시스템(500)은 상기 네트워크(600)를 통하여 상기 서술된 다수의 단말 들을 연결하여 상기 전송되는 기술개발 사업에 대한 정보를 저장및 처리하는데, 이렇게 저장되고 처리된 정보들은 접속된 담당간사 단말(200), 평가위원 단말(300) 및 평가위원장 단말(400)의 요청에 따라 전송하고, 이에 대응하는 상기 기술개발 사업에 대해 입력되는 평가정보를 다시 전송받아 저장하고 관리한다. 즉, 상기 기술개발사업평가시스템(500)은 기술개발 사업에 대한 평가를 관리하고, 상기 종합과제관리시스템(600)은 상기 전송되는 기술개발 사업에 대한 정보를 저장하고, 상기 정보를 담당간사 단말(200), 평가위원 단말(300) 및 평가위원장 단말(400)로 전송하고, 또한, 상기 기술개발 사업에 대해 입력되는 평가정보를 다시 전송받아 저장하고 관리한다. The integrated information system 500 stores and processes the information on the technology development project transmitted by connecting the plurality of terminals described above through the network 600. The stored secreted information is connected to the manager in charge. The terminal 200 is transmitted at the request of the evaluation member terminal 300 and the evaluation chairman terminal 400, and receives and stores the evaluation information input for the technology development project corresponding thereto again. That is, the technology development project evaluation system 500 manages the evaluation of the technology development project, the comprehensive task management system 600 stores the information about the technology development project is transmitted, and the secretary terminal in charge of the information (200), and the evaluation member terminal 300 and the evaluation chairman terminal 400, and also receives and stores the evaluation information input for the technology development project again and stored.

상기 네트워크(700)는 근거리 통신망, 광역 통신망 또는 부가가치통신망과 같은 유선 네트워크나 이동통신망 또는 위성 통신망과 같은 모든 종류의 무선 네트워크로 구현될 수 있다. The network 700 may be implemented as a wired network such as a local area network, a wide area network, or a value added communication network, or any kind of wireless network such as a mobile communication network or a satellite communication network.

도 2는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가시스템의 종합과제관리시스템과 기술개발사업 평가시스템의 세부 구성도이다. 2 is a detailed configuration diagram of a comprehensive project management system and a technology development project evaluation system of a technology development project electronic evaluation system using evaluation information of a professional evaluator input online according to an embodiment of the present invention.

도 2를 참조하면 통합정보시스템(10)은 기술개발사업 평가시스템(500)과 종합과제관리시스템(600)으로 이루어진다.Referring to FIG. 2, the integrated information system 10 includes a technology development project evaluation system 500 and a comprehensive task management system 600.

도 2a를 참조하면, 상기 기술개발사업 평가시스템(500)은 평가위원선정모듈(510), 담당간사 모듈(520), 통보 모듈(530) 및 평가 모듈(540)로 이루어지고, 상기 평가 모듈(540)은 신규평가모듈(541), 서면평가모듈(542), 대면평가모듈(543), 특별평가모듈(544) 및 최종평가모듈(545)을 더 포함한다.Referring to FIG. 2A, the technology development project evaluation system 500 includes an evaluation member selection module 510, a responsible secretary module 520, a notification module 530, and an evaluation module 540. 540 further includes a new evaluation module 541, a written evaluation module 542, a face evaluation module 543, a special evaluation module 544 and a final evaluation module 545.

상기 평가위원선정모듈(510)은 신청된 기술개발사업을 평가하는 평가위원과 상기 평가위원 중에서 선정되고 종합의견을 작성할 평가위원장을 선정하고 승인하는 절차를 처리하되, 평가위원이 되고자 하는 평가위원들의 신청정보가 네트워크(700)를 통하여 온라인으로 종합과제관리시스템(600)에 전송되면 신청자의 정보를 보여주고 승인되면 그 승인된 평가위원들의 정보를 전송받아 저장한다. 또한, 상기 평가위원선정모듈(510)은, 평가위원에 대한 신청을 네트워크(700)와 인터넷을 통하여 신청받되, 상기 평가위원에 대한 신청자가 인터넷과 네트워크(700)로 접속된 단말기를 통하여 온라인으로 입력하는 신청자의 신상정보, 평가가능분야, 보유기술, 분야핵심키워드, 학력 및 겸임활동, 기타경력사항에 대한 정보를 저장하고 담당간사단말(200)로 전송하여 해당 신청자의 정보를 조회하고 승인할 수 있도록 하며, 승인되는 정보를 입력받아 평가위원이력과 임명장을 생성, 조회 및 출력할 수 있다. The evaluator selection module 510 processes the process of selecting and approving an evaluator evaluating the applied technology development project and an evaluator who is selected from the evaluator and writes a comprehensive opinion. When the application information is transmitted to the comprehensive task management system 600 online through the network 700, the information of the applicant is displayed and, when approved, the information of the approved evaluators is received and stored. In addition, the evaluation member selection module 510 receives an application for the evaluation member through the network 700 and the Internet, and the applicant for the evaluation member is online through a terminal connected to the Internet and the network 700. Information about the applicant's personal information, evaluable field, possessed technology, field key keywords, educational background, and combined careers, and other careers can be stored and sent to the secretary's terminal (200) for inquiry and approval of the applicant's information. It is possible to generate, inquire and print evaluator's history and appointment letter by inputting approved information.

또한, 상기 승인된 평가위원들을 해당 사업분과와 사업과제에 선정하는 방법은, 입력받은 특정의 조건에 부합하는 승인된 평가위원들은 자동으로 평가위원으로 선정되도록 하는 자동선정과 수의에 의하여 수동으로 선정되도록 하는 특별선정의 방법으로 선정된다.In addition, the method of selecting the approved evaluators in the relevant business division and project is to be manually selected by the automatic selection and the veterinary selection so that the approved evaluators meeting the specific conditions entered are automatically selected as the evaluators. Selection is made by means of a special selection.

상기 담당간사 모듈(520)은 상기 신청된 기술개발 사업의 정보를 담당간사 단말(200)로 전송하고 상기 정보가 생성된 화면에 해당 사업분과와 사업과제의 배정정보가 입력되어 전송되면 종합과제관리시스템(600)에 저장하며, 상기 평가위원들의 평가과정 또한 모니터링 할 수 있도록 평가과정을 담당간사 단말(200)로 전송한다. 즉, 상기 담당간사모듈(520)은, 신청된 상기 기술개발지원사업에 대한 정보를 담당간사단말(200)로 전송하여 해당정보를 조회하여 사업분과와 사업과제를 입력받고 승인된 평가위원들을 상기 사업분과와 사업과제에 배정하는 정보를 전송받고, 승인된 평가위원들이 담당간사단말(200)을 통해 서명된 자필서명을 그래픽이미지파일로 전송받고, 상기 평가위원들의 불참여부의 정보를 전송받고, 상기 평가위원들 중에 평가위원장의 선정정보를 전송받고, 상기 평가위원들의 평가과정을 모니터링 하되, 평가현황중심화면 또는 과제중심화면을 생성하여 상기 담당간사 단말(200)로 전송하고, 평가위원에 의해 평가된 평가결과를 설정, 저장, 취소 및 확정에 대한 정보를 입력받아 전송 및 저장한다. The executive secretary module 520 transmits the information on the applied technology development project to the responsible secretary terminal 200 and when the assignment information of the corresponding business division and the project is input and transmitted to the screen on which the information is generated, the comprehensive task management. Stored in the system 600, and transmits the evaluation process to the secretary terminal 200 to monitor the evaluation process of the evaluators. That is, the responsible secretary module 520 sends the information about the applied technology development support project to the responsible secretary terminal 200, inquires the corresponding information, receives the business division and the project task, and receives the approved evaluation members. Received information to be assigned to the business division and project tasks, approved judges received the signed autograph signature through the secretary terminal 200 as a graphic image file, the information of the non-participation of the evaluation members received, Receive the selection information of the evaluation chairman among the evaluation members, and monitor the evaluation process of the evaluation members, generate the evaluation status center screen or task-centered screen and transmit to the responsible staff terminal 200, by the evaluator It receives and transmits and stores information on setting, storing, canceling and confirming the evaluation result.

상기 통보모듈(530)은 종합과제관리시스템(600)의 통합정보DB(660)에 저장된 해당 업체나 대상자의 정보를 이용하여 평가결과를 해당업체나 대상자에게 휴대폰 등과 같은 무선단말기나 인터넷 등을 이용한 유선단말기로 전송하여 통보한다.The notification module 530 uses the information of the company or the subject stored in the integrated information DB 660 of the comprehensive task management system 600 to transmit the evaluation result to the company or the subject using a wireless terminal such as a mobile phone or the Internet. Notify by wired terminal.

상기 평가모듈(540)은, 선정된 평가위원과 평가위원장이 상기 배정된 해당 사업분과와 사업과제를 평가할 수 있도록 해당 정보를 평가위원 단말(300)과 평가위원장 단말(400)로 전송하고 입력되는 평가결과를 전송받는다. 즉, 상기 평가위원모듈(540)은, 네트워크(600)에 접속된 평가위원 단말(200)과 평가위원장 단말(400)에 의하여 평가위원들이 온라인으로 로그인할 수 있도록 하며, 평가할 기술개발사업에 대한 평가목록을 상기 단말로 전송하며, 입력되는 평가정보를 전송받아 저장하고, 평가결과에 대한 확정 정보를 입력받아 저장하고, 상기 평가위원장의 종합의견을 입력받아 저장한다.The evaluation module 540 transmits the information to the evaluator terminal 300 and the evaluator chair terminal 400 so that the selected evaluator and the evaluator can evaluate the assigned business division and the project task. Receive evaluation results. That is, the evaluator module 540 allows the evaluators to log in online by the evaluator terminal 200 and the evaluator chair terminal 400 connected to the network 600, and for the technology development project to be evaluated. The evaluation list is transmitted to the terminal, the received evaluation information is received and stored, the confirmation information about the evaluation result is received and stored, and the comprehensive opinion of the evaluation chairman is received and stored.

또한, 상기 평가위원과 평가위원장의 평가가 진행됨에 따라 기술개발사업 평가시스템(500)의 평가모듈(540)은 새로 신청된 기술개발사업에 대하여 평가하는 신규평가모듈(541)과, 상기 신규 기술개발사업에 대하여 서면으로 평가하는 서면평가모듈(542)과, 상기 서면평가가 끝나고 신청자와의 대면에서 이루어진 평가정보가 입력되는 대면평가모듈(543)과, 진행되는 기술개발사업에 대하여 진도관리에 의하여 단계평가가 이루어지는 특별평가모듈(544) 및 상기 기술개발사업에 대한 일련의 과정이 종료되었을 때 이루어지는 최종평가모듈(545)을 적용하여 상기의 평가과정들을 수행하고 평가정보를 종합과제관리시스템(600)으로 송수신하게 된다. In addition, the evaluation module 540 of the technology development project evaluation system 500 includes a new evaluation module 541 for evaluating a newly applied technology development project as the evaluation member and the evaluation chairman are evaluated. A written evaluation module (542) for evaluating the development project in writing, a face-to-face evaluation module (543) for inputting evaluation information made in the face of the applicant after the written evaluation is completed, and progress management for the ongoing technology development project. The evaluation process is performed by applying the special evaluation module 544 in which the step evaluation is performed by the step and the final evaluation module 545 when the series of processes for the technology development project are completed, and the evaluation information is integrated into the comprehensive task management system ( 600).

도 2b를 참조하면, 상기 종합과제관리시스템(600)은 수요조사공고모듈(610), 과제신청접수모듈(611), 과제평가모듈(612), 협약체결모듈(613), 진도관리모듈(614), 최종평가모듈(615), 사후관리모듈(616) 및 성과관리모듈(617)로 이루어지고, 또한, 사업 및 공고 디비(DB)(620), 구성원 디비(DB)(630), 사업 및 과제 관리 디비(DB)(640), 평가결과 디비(DB)(650) 및 통합정보 디비(DB)(660)를 더 포함한다.Referring to FIG. 2B, the comprehensive task management system 600 includes a demand research notification module 610, a task application reception module 611, a task evaluation module 612, an agreement conclusion module 613, and a progress management module 614. ), Final evaluation module (615), after-sales management module (616) and performance management module (617), and also the business and announcement DB (620), member DB (630), business and It further includes a task management DB (640), an evaluation result DB (650) and an integrated information DB (660).

상기 수요조사공고모듈(610)은 상기 기술개발 사업지원을 온라인으로 공고하고 해당 사업에 대한 수요를 온라인으로 조사하여 사업 및 공고 DB(620)에 저장한다.The demand survey notification module 610 announces the technology development project support online and investigates the demand for the project online and stores the project and the announcement DB 620.

상기 과제신청접수모듈(611)은 종합과제관리시스템(600)이 네트워크(700)를 통하여 중소기업기술개발지원에 대한 지원신청의 공고를 웹 사이트 등을 통하여 온라인으로 게재하면 신청자는 상기 게재된 공고에서 요구하는 형식에 맞추어 정보를 입력함으로써 온라인으로 신청이 가능하게 되고, 상기 사업신청자 단말(100)로부터 입력되는 기술개발사업에 대한 신청정보는 다시 상기 네트워크(700)를 통하여 종합과제관리시스템(600)으로 전송되어 저장된다. 즉, 상기 과제신청접수모듈(611)은, 네트워크(700)와 인터넷을 통하여 중소기업기술개발지원사업에 대한 신청공고를 전송하고, 다시 신청자가 인터넷과 네트워크(700)에 접속된 사업신청자단말(100)을 통하여 온라인으로 상기 중소기업기술개발지원사업에 대한 신청을 할 수 있도록 한다.In the assignment application module 611, if the comprehensive task management system 600 publishes a notification of a support application for SME technology development support through the network 700, online through a website, etc. Application can be made online by inputting information in accordance with the required format, and the application information for the technology development project inputted from the project applicant terminal 100 is again integrated through the network 700. Is sent to and stored. That is, the task application reception module 611 transmits an application notice for SME technology development support project through the network 700 and the Internet, and the applicant is connected to the Internet and the network 700. Through)) to apply for the SME technology development support project online.

상기 과제평가모듈(612)은 기술개발사업 평가시스템(500)으로부터 온라인으로 송수신되는 관련정보를 관리하는데, 상기 기술개발사업 평가시스템(500)의 평가모듈(540)의 각각의 단계별 평가 모듈들이 송수신하는 평가 자료, 사업 및 과제, 구성원 정보 등을 각각의 해당되는 디비(DB)에 저장하고 필요한 정보를 전송한다. The task evaluation module 612 manages related information transmitted and received online from the technology development project evaluation system 500, and the evaluation modules of each stage of the evaluation module 540 of the technology development project evaluation system 500 transmit and receive. The evaluation materials, projects, tasks, and member information are stored in the respective DBs and the necessary information is transmitted.

협약체결모듈(613)은 상기 신청된 기술개발 사업에 대한 지원이 확정되어 업체와 과제진행과 관련 지원금액에 대한 협약을 온라인으로 체결하고, 진도관리모듈(614)은 상기 체결된 기술개발 사업에 대한 진행과정을 검사하고 평가하고, 최종평가모듈(615)은 상기 진행된 기술개발 사업이 종료되면 최종적으로 결과를 평가하고, 사후관리모듈(616)은 상기 최종평가된 기술개발 사업에 대하여 발생된 문제를 관리하고, 성과관리모듈(617)은 상기 완료된 기술개발 사업에 대한 성과를 관리한다. The agreement conclusion module 613 is confirmed that the support for the applied technology development project is concluded online with the company for the progress of the project and the amount of support associated with the progress, the progress management module 614 to the entered technology development project Examine and evaluate the progress of the process, and the final evaluation module 615 finally evaluates the result when the advanced technology development project is completed, and the post-management module 616 issues arising out of the final evaluated technology development project. And, the performance management module 617 manages the performance for the completed technology development project.

또한, 사업 및 공고 디비(DB)(620)는 상기 사업신청자 단말(100)로부터 입력되고 상기 과제신청접수모듈(611)이 전송하는 기술개발사업에 대한 공고 및 신청정보를 상기 네트워크(700)를 통하여 전송받아 저장한다. 또한, 상기 수요조사공고모듈(610)이 송수신하는 해당 기술개발사업에 대한 정보가 저장된다.In addition, the project and announcement DB (620) is input from the project applicant terminal 100 and the announcement and application information for the technology development project transmitted by the project application receiving module 611 to the network 700 Receive and save through. In addition, the information on the corresponding technology development project transmitted and received by the demand survey notification module 610 is stored.

구성원 디비(DB)(630)에는 상기 평가위원 선정모듈(510)이 송수신하는 승인된 평가위원들의 정보와 사용자의 정보가 저장되는데, 네트워크(700)를 통하여 평가위원에 대한 신청자의 신청정보를 입력받아 저장하고 평가위원 선정모듈(510)이 송수신하는 승인된 평가위원들의 정보를 저장한다. The member DB (630) stores the information of the approved members and the user's information is transmitted and received by the evaluation member selection module 510, inputting the applicant's application information for the evaluation member through the network 700 Receives and stores the information of the approved members of the evaluation member selection module 510 transmits and receives.

사업 및 과제 관리 디비(DB)(640)에는 상기 담당간사모듈(520)이 상기 담당간사 단말(200)로 송수신하는 기술개발사업에 대한 해당 사업분과와 사업과제에 대한 정보가 저장되는데, 상기 담당간사모듈(520)이 상기 담당간사 단말(200)로 신청된 기술개발사업에 대한 정보를 전송하고 상기 담당간사 단말(200)은 기술개발사업에 대한 해당 사업분과와 사업과제에 대한 정보를 다시 전송하면 상기 정보를 저장한다. The project and task management DB (640) stores information on a corresponding business division and a business task for a technology development project transmitted and received by the responsible secretary module 520 to the responsible secretary terminal 200. The secretary module 520 transmits information on the technology development project applied to the responsible secretary terminal 200, and the secretary secretary terminal 200 transmits information on the corresponding business division and the project task for the technology development project. Store the information.

평가결과 디비(DB)(650)에는 상기 평가 모듈(540)이 평가위원 단말(300)과 평가위원장 단말(400)로부터 전송받아 해당 기술개발사업의 과제에 대한 평가결과 및 종합의견이 저장되는데, 상기 평가위원들이 신청된 기술개발사업에 대하여 평가를 하여 그 평가결과를 입력하면 상기 평가 모듈(540)이 평가위원 단말(300)과 평가위원장 단말(400)로부터 그 정보를 전송받아 해당 기술개발사업의 과제에 대한 평가위원의 평가결과 및 평가위원장의 종합의견을 저장한다.In the evaluation result DB (650), the evaluation module 540 is received from the evaluator terminal 300 and the evaluation chairman terminal 400, and stores the evaluation result and the overall opinion on the task of the technology development project. When the evaluators evaluate the applied technology development project and input the evaluation result, the evaluation module 540 receives the information from the evaluator terminal 300 and the evaluator chair terminal 400 and receives the corresponding technology development project. The evaluation result of the evaluator and the comprehensive opinion of the evaluator's opinion on the task of the member shall be saved.

통합정보 디비(DB)(660)에는 상기 평가정보와 관련정보를 전송받는 해당업체와 대상자에 대한 정보와 기타 관리정보가 저장된다.In the integrated information database (DB) 660, information about the corresponding company and the subject who receive the evaluation information and related information and other management information are stored.

도 3은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가방법의 통합정보시스템(10)에 의해 수행되는 전체적인 과제관리 방법을 설명하기 위한 순서도이다.3 is a flowchart illustrating an overall task management method performed by the integrated information system 10 of the electronic evaluation method of a technology development project using evaluation information of a professional evaluator input online according to an embodiment of the present invention.

상기 통합정보시스템(10)에 의하여 기술개발 지원사업의 일련의 단계가 진행되는 과정을 살펴보면,Looking at the process of a series of steps of the technology development support project by the integrated information system 10,

먼저, 과제신청접수단계(S100)에는 사업신청자단말(100)에 의하여 온라인으로 기술개발 지원사업에 대한 신청이 접수되어 해당 정보가 상기 종합과제관리시스템(600)에 전송되고, 서면평가단계(S101)에는 상기 신청된 기술개발 지원사업에 대한 평가위원들의 서면 평가정보는 기술개발사업 평가시스템(500)의 서면평가모듈(542)에 의하여 서면으로 평가되어 상기 종합과제관리시스템(600)에 저장되고, 대면평가단계(S102)에는 상기 기술개발 사업을 신청한 신청자와 평가위원들의 대면평가정보는 상기 기술개발사업 평가시스템(500)의 대면평가모듈(543)에 의하여 상기 종합과제관리시스템(600)에 저장되고, 현장평가단계(S103)에는 상기 대면평가가 끝난 해당 기술개발사업에 대하여 평가위원들이 현장에서 평가한 평가정보는 상기 기술개발사업 평가시스템(500)을 통하여 온라인으로 상기 종합과제관리시스템(600)에 전송되고, 심의확정단계(S104)에는 상기 일련의 평가가 이루어진 해당 기술개발사업에 대하여 평가위원들의 심의 확정이 이루어지면 다음 단계로 진행되고 그렇지 않으면 상기 과제신청접수단계(S100)로 되돌아가고, 업체통보단계(S105)에는 상기 심의 확정이 이루어진 해당 기술개발사업에 대하여 상기 종합과제관리시스템(600)의 통합정보 디비(DB)(660)에 저장된 업체 또는 대상자의 정보를 이용하여 통보모듈(530)이 신청결과를 온라인 및 무선으로 전송하여 통보되고, 협약체결 단계(S106)에는 상기 심의 확정된 업체와 온라인으로 제공되는 협약에 의하여 협약이 체결되고 상기 체결정보는 협약체결모듈(613)에 의하여 종합과제관리시스템(600)에 전송되고, 진도관리단계(S107)에는 상기 협약이 체결된 기술개발사업에 대하여 단계별 평가가 이루어지고 그 평가정보는 특별평가모듈(544)에 의하여 종합과제관리시스템(600)에 전송되며, 최종평가단계(S108)에는 상기 진도관리단계(S107)가 종료된 해당 기술개발사업에 대해 최종적으로 평가를 실시하여 발생 된 문제와 성과를 관리한다.First, in the task application receiving step (S100), the application for the technology development support project is received online by the project applicant terminal 100, and the corresponding information is transmitted to the comprehensive task management system 600, and the written evaluation step (S101). ), The written evaluation information of the evaluators for the applied technology development support project is evaluated in writing by the written evaluation module 542 of the technology development project evaluation system 500 and stored in the comprehensive project management system 600. , Face-to-face evaluation step (S102), the face-to-face evaluation information of the applicant and the evaluation members who applied for the technology development project is the comprehensive task management system 600 by the face-to-face evaluation module 543 of the technology development project evaluation system 500 In the on-site evaluation step (S103), the evaluation information evaluated in the field by the evaluators for the technology development project after the face-to-face evaluation is performed on the technology development project evaluation system 500. The online project is transmitted to the comprehensive task management system 600, and the deliberation confirmation step (S104) proceeds to the next step when the deliberation of the evaluators is made for the corresponding technology development project in which the series of evaluations are made. Return to the task application acceptance step (S100), and in the company notification step (S105) the company stored in the integrated information DB (660) of the integrated project management system 600 for the technology development project in which the deliberation is confirmed Alternatively, using the information of the subject, the notification module 530 is notified by sending an application result online and wirelessly, and in the conclusion of the agreement (S106), the agreement is concluded by an agreement provided online with the company deliberated by the deliberation. The conclusion information is transmitted to the comprehensive task management system 600 by the agreement conclusion module 613, and the technology for which the agreement is concluded in the progress management step (S107). The evaluation is carried out step by step for the project and the evaluation information is transmitted to the comprehensive task management system 600 by a special evaluation module 544, the final evaluation step (S108) is the progress management step (S107) is completed The final evaluation of the technology development project is conducted to manage the problems and performance.

도 4는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가방법의 통합정보시스템(10)에 의해 수행되는 전체적인 과제관리 방법에서 협약체결을 설명하기 위한 순서도이다.4 is for explaining the conclusion of the agreement in the overall task management method performed by the integrated information system 10 of the electronic evaluation method of the technology development project using the evaluation information of the professional evaluator input online according to an embodiment of the present invention Flowchart.

상기 통합정보시스템(10)에서 수행되는 과제관리 방법에서 상기 협약체결단계(S106)는, 협약 준비 사항 단계(S110)에서 기술개발사업 신청자가 범용공인인증서, 사업비 관리계좌, 사업비카드 및 기업신용평가를 준비하고, 협약서작성 및 제출단계(111)에서 상기 준비된 준비사항에 의하여 상기 종합과제관리시스템(600)의 협약 체결모듈(613)이 온라인으로 제공하는 입출력화면으로 수정사업계획서 작성, 시스템 등록 및 전자인증 날인의 정보를 입력하고, 민간부담금입금단계(112)에서 상기 통합정보시스템(10)은 입금전용가상계좌에 대한 정보를 화면으로 출력하고 상기 협약체결모듈(613)은 민간부담금이 입금되도록 하고, 협약체결단계(113)에서 과제별 전문기관 담장자에 대한 정보가 종합과제관리시스템(600)으로 전송되고 상기 전문기관 담당자는 종합과제관리시스템(600)으로 전송된 협약서류를 검토하여 전자인증을 하고, 사업비지급단계(114)에서 상기 해당 기술개발사업의 해당업체에 출연금 지급과 회계처리 정보가 상기 협약체결모듈(613)에 의하여 종합관리시스템(600)에 전송되면 포인트집행권한의 개방을 허락하는 정보를 제공한다.In the task management method performed in the integrated information system 10, the agreement conclusion step (S106), in the preparation of the agreement step (S110), the applicant for the technology development project, the general public certificate, the project cost management account, the project cost card and corporate credit evaluation And prepare the revised business plan, register the system, and enter the input / output screen provided online by the agreement conclusion module 613 of the integrated project management system 600 according to the prepared preparations in the agreement writing and submitting step 111. Input the information of the electronic authentication stamp, in the private payment deposit step 112, the integrated information system 10 outputs information on the deposit-only virtual account on the screen and the agreement conclusion module 613 to deposit private payments And, in the conclusion of the agreement (113), information on the professional agency managers for each task is transmitted to the comprehensive task management system (600), and the person in charge of the specialized agency Review the agreement documents sent to the resource system 600 and perform electronic certification, and the contribution payment and accounting information to the relevant company of the technology development project in the project cost payment step 114 by the agreement conclusion module 613 When transmitted to the comprehensive management system 600 provides information allowing the opening of the point execution authority.

도 5는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가방법의 담당간사 단말에 의해 수행되는 평가방법을 설명하기 위한 순서도이다.5 is a flowchart illustrating an evaluation method performed by the secretary terminal of the technology development project evaluation method using the evaluation information of a professional evaluator input online according to an embodiment of the present invention.

도 10은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 담당간사 단말에 생성되는 모니터링 화면의 일 예이다.10 is an example of a monitoring screen generated in the technical development project evaluation system using the evaluation information of the professional evaluator input online according to an embodiment of the present invention and the secretary terminal of the method.

도 20은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 자동선정에서 생성되는 화면의 일 예이다.20 is an example of a screen generated by an automatic evaluation of a technology development project evaluation system and a method using the evaluation information of a professional evaluator input online according to an embodiment of the present invention.

도 21은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 특별선정에서 생성되는 화면의 일 예이다.FIG. 21 is an example of a screen generated by a technical development project evaluation system using evaluation information of a professional evaluator input online according to an embodiment of the present invention and a special selection of evaluators of the method.

도 5, 도 10 및 도 20 내지 도 21을 참조하면, 담당간사 단말(200)과 담당간사 모듈(520)에 의해 해당 기술개발사업의 평가위원과 평가위원장의 평가가 관리되는 절차의 흐름을 도시한다.5, 10, and 20 to 21, the flow of a procedure in which the evaluation of the evaluator and the evaluation chairman of the relevant technology development project by the secretary terminal 200 and the secretary module 520 is managed. do.

분과 구성단계는 담당간사 단말(200)에 담당간사에 의하여 신청받은 기술개발지원사업에 대한 사업분과와 사업과제를 배정하는 정보와 평가위원을 배정하는 정보가 입력된다.In the divisional configuration step, the information is assigned to the division and the project assignment for the project division and the project for the technology development support project received by the responsible secretary in the responsible secretary terminal (200) is input.

즉, 상기 분과구성 단계는, 신청된 해당 기술개발사업에 대한 분과를 조회하는 분과조회 단계(S201)와, 분과명, 평가일자, 사업분류, 전자평가여부, 평가장소 및 평가지여부를 입력할 수 있도록 화면이 생성되고 상기 정보가 입력되는 분과정보입력 단계(S202)와, 상기 해당 기술개발사업분과에 대한 과제목록이 팝업창으로 생성되고 생성된 팝업창을 통하여 과제를 검색하는 과제조회 단계(S203)와, 상기 검색된 과제를 일괄적으로 보여주는 화면이 생성되어 상기 기술개발사업분과에 적합한 과제를 선정하는 해당분과 과제배정 단계(S204)와, 평가위원을 추가시 자동선정과 특별선정의 팝업창이 생성되는 평가위원추가 단계(S205)와, 상기 자동선정과 특별선을 선택하는 자동 및 특별선정 단계(S206)와, 자동으로 평가위원을 선정하는 평가위원 자동선정 단계(S207)와, 수동으로 임으로 평가위원을 선정하는 평가위원특별선정 단계(S208); 및 상기 선정된 평가위원들을 해당 사업분과 및 사업과제에 배정하는 평가위원배정 단계(S209)를 포함한다. That is, the sub-composition step, the sub-query inquiry step (S201) for inquiring the sub-section for the technology development project applied for, the name of the sub-committee, the evaluation date, business classification, electronic evaluation, evaluation place and evaluation whether or not input Sub-information information input step (S202) that the screen is generated and the information is input so that the task list for the corresponding technology development project division is generated as a pop-up window and the task inquiry step (S203) for searching the task through the generated pop-up window; In addition, a screen is displayed that collectively shows the searched tasks, and a task assignment step (S204) for selecting a task suitable for the technology development business division and an evaluation popup window for automatic selection and special selection are generated when an evaluation member is added. Member addition step (S205), the automatic selection and special selection step (S206) for selecting the automatic selection and the special line, and the evaluation member automatic selection step for automatically selecting the evaluation member (S2) 07), and a special selection step of evaluator to manually select the evaluator (S208); And assigning the evaluator to the selected project division and project task (S209).

전자평가위원회 단계는 상기 신청되고 선정된 사업분과에 대한 정보를 나타내는 화면이 생성되고 조회되어 상기 담당간사 단말(200)로 전송됨으로써 전자평가위원회가 개시된다. 즉, 상기 전자평가위원회 단계는, 평가하게 될 해당 사업에 대한 분과 및 과제 정보를 하나의 화면에 생성하되, 상기 해당 과제정보와 과제별 관리대장을 팝업창으로 생성하는 선정분과 정보조회 단계(210)와, 해당분과에 대한 상세정보를 화면에 생성하여 시작준비화면으로 이동할 수 있도록 하는 위원회 시작 단계(S211)를 포함한다. In the electronic evaluation committee stage, the electronic evaluation committee is started by generating and inquiring a screen indicating information on the applied and selected business division and transmitting the screen to the responsible secretary terminal 200. That is, the electronic evaluation committee step, the branch and task information for the project to be evaluated on one screen, but the selected section and information search step for generating the task information and the management ledger for each task in a pop-up window 210 And a commissioning start step S211 for generating detailed information on the corresponding section on the screen and moving to the start preparation screen.

분과개최준비 단계는 상기 담당간사 단말(200)에 의해 평가위원들을 조회하고, 서명을 받아 등록하며, 불참여부를 등록하며, 평가위원들을 추가할 수 있도록 하고, 평가위원장을 선정한다. In the stage of preparing for the division, the staff members in charge of the staff 200 can search for evaluation members, register with a signature, register the absence of participation, add evaluation members, and select the evaluation chairman.

즉, 상기 분과개최준비 단계는, 해당 사업에 대한 분과상세정보에 대한 목록과 선정된 평가위원들의 목록을 담당간사 단말(200)의 창으로 생성하는 선정분과 정보조회 단계(S212)와, 각각의 해당 평가위원들의 서명을 이미지파일로 전송 및 저장하는 서명등록 단계(S213)와, 평가위원들의 불참여부에 대한 정보를 선택하여 전송 및 저장하는 불참 등록 단계(S214)와, 평가위원들을 추가할 것인지의 여부에 대한 정보를 선택하여 전송하는 평가위원추가 단계(S215)와, 추가될 평가위원들을 자동선정과 특별선정으로 선정할지에 대한 선택정보를 전송하는 자동 및 특별선정 단계(S216)와, 자동선정의 선택정보가 전송되면 자동선정에 대한 팝업창을 생성하는 평가위원 자동선정 단계(S217)와, 특별선정의 선택정보가 전송되면 특별선정에 대한 팝업창을 생성하는 평가위원 특별선정 단계(S218)와, 상기 선정된 평가위원들 중에 위원장이 선정되고 그 선정 정보가 전송되는 위원장 선정 단계(S219)를 포함한다. That is, the division preparation preparation step, the selection section and information inquiry step (S212) for generating a list of the detailed information on the division and the list of the selected evaluation members in the window of the secretary terminal 200, each of the Signature registration step (S213) for transmitting and storing the signatures of the evaluators as an image file, non-registration step (S214) for selecting and transmitting and storing information about the non-participation of the evaluators, and whether to add evaluators. Selecting and adding information on whether or not to add the evaluation member step (S215), the automatic and special selection step (S216) for transmitting the selection information on whether to select the evaluation member to be added to the automatic selection and special selection, automatic Evaluation member automatic selection step of generating a pop-up window for automatic selection when the selection information of the selection is transmitted, and a rating for generating a pop-up window for the special selection when the selection information of the special selection is transmitted. And members special selection step (S218), and a rating above a predetermined member of the chair and the chair is selected in the selection is the selection information transmitting step (S219).

분과개최 단계는 상기 평가위원들과 평가위원장의 각 과제의 평가 완료 및 확정유무를 평가하는 평가결과를 모니터링한다. 즉, 상기 분과개최 단계는, 과제중심화면, 평가현황중심화면, PDF문서중심화면, 기본화면 및 메모화면을 생성하고 평가위원과 평가위원장의 평가완료와 평가확정에 대한 정보를 전송하여 담당간사 단말(200)에 생성하는 과제평가 모니터링 단계(S220)를 포함한다.The division stage monitors the evaluation results for evaluating the completion and confirmation of evaluation of each task by the evaluators and the chairperson. That is, the division holding step, the task center screen, evaluation status center screen, PDF document center screen, basic screen and memo screen to generate and transmit the information on the evaluation completion and evaluation of the evaluation committee and the evaluation chairman terminal manager in charge It includes a task evaluation monitoring step (S220) to generate in (200).

평가결과 저장 단계는 상기 입력되는 평가결과를 저장한다. 즉, 상기 평가결과 저장 단계는, 평가위원 및 평가위원장의 평가가 확정되었다는 확정정보가 전송되어 담당간산 단말(200)에 생성된 후, 평가결과가 저장된다.The evaluation result storage step stores the input evaluation result. That is, in the evaluation result storage step, after the confirmation information that the evaluation of the evaluation member and the evaluation chairman is confirmed is generated and generated in the responsible mountain terminal 200, the evaluation result is stored.

위원회 확정 단계는 상기 평가결과에 대한 확정을 취소할 수 있도록 하며, 확정취소가 없으면 과정을 종료하게 된다. 즉, 상기 위원회 확정 단계는, 위원회를 종료하고 확정하는 정보가 전송되는 위원회 종료 및 확정 단계(S222)와, 확정된 평가위원장 결과를 취소하는 정보를 전송하는 위원장 확정취소 단계(S223)와, 확정된 평가위원의 결과를 취소하는 정보를 전송하는 평가위원확정취소 단계(S224) 및 상기 위원회 종료 및 확정을 취소하는 정보를 전송하는 분과확정취소 단계(S225)를 포함한다.The committee confirmation step allows the confirmation of the evaluation result to be canceled and the process is terminated if there is no cancellation decision. In other words, the committee finalizing step, the committee finalization and finalization step (S222), which transmits the information for closing and finalizing the committee, and the chairperson finalization cancellation step (S223) for transmitting the information for canceling the result of the confirmed evaluation chairperson, and the finalization. Determination of the evaluation member confirmation step (S224) for transmitting the information for canceling the result of the evaluation member and subcommittee cancellation step (S225) for transmitting the information for canceling the termination and confirmation of the committee.

도 6은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가방법의 평가위원 단말에 의해 수행되는 평가방법을 설명하기 위한 순서도이다.6 is a flowchart illustrating an evaluation method performed by the evaluator terminal of the technology development project evaluation method using the evaluation information of a professional evaluator input online according to an embodiment of the present invention.

도 11은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 화면의 일 예이다.FIG. 11 is an example of a screen generated on a system for evaluating a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a evaluator terminal of the method.

도 12는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 평가정보 입력화면의 일 예이다.12 is an example of an evaluation information input screen generated in an evaluation system of a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluator terminal of the method.

도 13은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 평가정보 입력화면의 다른 일 예이다.FIG. 13 is another example of an evaluation information input screen generated in an evaluation system of a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a evaluator terminal of the method.

도 14는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원 단말에 생성되는 평가정보 입력화면의 또 다른 일 예이다.14 is yet another example of an evaluation information input screen generated in an evaluation system of a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a evaluator terminal of the method.

도 6과 도 11 내지 도 14를 참조하면, 평가위원 단말(300)과 평가 모듈(540)에 의해 신청된 해당 기술개발사업이 평가되는 신규평가, 서면평가, 대면평가, 특별평가 및 최종평가의 단계별 공통된 과정은 다음과 같다.6 and 11 to 14, the new evaluation, written evaluation, face-to-face evaluation, special evaluation and final evaluation of the corresponding technology development project applied by the evaluator terminal 300 and the evaluation module 540 is evaluated. The common steps are as follows.

서명등록 단계(S301)에서 평가위원의 자필서명 이미지파일이 담당간사 단말(200)에 등록 및 저장된다.In the signature registration step (S301), the self-signed signature image file of the evaluator is registered and stored in the secretary terminal 200.

사업평가시스템 로그인 단계(S302)에서 평가위원 단말(300)에 생성된 창에 아이디와 패스워드가 입력된 후 기술개발사업 평가시스템(500)에 로그인 된다. After the ID and password are input to the window generated in the evaluation member terminal 300 in the business evaluation system login step (S302), the technical development project evaluation system 500 is logged in.

평가목록 확인 단계(S303)에서 평가대상 분과목록과 평과목록에 대한 상세화면이 생성된다. In the evaluation list check step (S303), detailed screens of the evaluation target sub-category list and the evaluation list are generated.

평가정보 입력 단계(S304)에서 과제기본정보, 참여연구원, 신청사업비, 참여기업정보, 이의신청 및 검토안건에 대한 목록의 과제기본정보화면과 과제문서목록화면이 생성되고, 과제중심화면, 평가표 중심화면 및 PDF중심화면이 생성된 후, 각 항목에 대한 평가정보가 입력 및 전송된다. In the evaluation information input step (S304), the task basic information screen and task document list screen of the task basic information, the participating researcher, the applied project cost, the participating company information, the objection and the review item are generated, and the task center screen and the evaluation table are centered. After the screen and the PDF center screen are generated, evaluation information for each item is input and transmitted.

평가결과저장 단계(S305)에서 상기 입력된 평가정보가 평가위원 단말(300)로부터 전송되어 기술개발 사업 평가시스템(500)에 저장된다. In the evaluation result storage step (S305) the input evaluation information is transmitted from the evaluation member terminal 300 is stored in the technology development project evaluation system 500.

평가결과 확정 단계(S306)에서 상기의 평가결과에 대하여 확정한다는 확정정보가 전송되어 저장된다. In the evaluation result determination step (S306), the confirmation information to confirm the above evaluation result is transmitted and stored.

다음과제 단계(S307)에서 평가가 종료된 해당 사업과제 이외에 다른 과제를 선택하는 정보가 전송되면 다시 평가정보입력 단계(S304)로 돌아가고, 그렇지 않은 선택정보가 전송되면 종료된다.If information for selecting a task other than the corresponding project in which the evaluation is completed in the next task step (S307) is transmitted, it returns to the evaluation information input step (S304) again.

도 7은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 전자평가정보를 이용한 기술개발사업 평가방법의 평가위원장 단말에 의해 수행되는 평가방법을 설명하기 위한 순서도이다.7 is a flowchart illustrating an evaluation method performed by an evaluation chairman terminal of a technology development project evaluation method using electronic evaluation information of a professional evaluator input online according to an embodiment of the present invention.

도 15는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 화면의 일 예이다.FIG. 15 is an example of a screen generated in an evaluation system for a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluating a chairperson of the method.

도 16은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 일 예이다.16 is an example of an evaluation information input screen generated in an evaluation system for a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention, and the evaluation chairman terminal of the method.

도 17은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 다른 일 예이다.17 is another example of an evaluation information input screen generated in an evaluation system for a technology development project using an evaluation information of a professional evaluator input online according to an embodiment of the present invention and a chairperson of an evaluation chair of the method.

도 18은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 또 다른 일 예이다.18 is another example of an evaluation information input screen generated in an evaluation system for a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluating the chairperson of the method.

도 19는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가위원장 단말에 생성되는 평가정보 입력화면의 또 다른 일 예이다.19 is another example of an evaluation information input screen generated in an evaluation system for a technology development project using the evaluation information of a professional evaluator input online according to an embodiment of the present invention and a method of evaluating the chairperson of the method.

도 7과 도 15 내지 도 19를 참조하면, 평가위원장 단말(400)과 평가 모듈(540)에 의해 신청된 해당 기술개발사업이 평가된다.Referring to FIGS. 7 and 15 to 19, the corresponding technology development project applied by the chairman of the evaluation terminal 400 and the evaluation module 540 is evaluated.

서명등록 단계(S401)는 평가위원장의 자필서명 이미지파일이 담당간사 단말(200)에 등록 및 저장된다. Signature registration step (S401) is registered and stored in the secretary terminal 200, the handwritten signature image file of the evaluation chairperson.

사업평가시스템 로그인 단계(S402)에서 평가위원장 단말(400)에 생성된 창에 아이디와 패스워드가 입력된 후 기술개발사업 평가시스템(500)에 로그인 된다. After the ID and password are input to the window created in the evaluation chairman terminal 400 in the business evaluation system login step (S402), the technical development project evaluation system 500 is logged in.

평가목록 확인 단계(S403)에서 평가대상 분과목록과 평과목록에 대한 상세화면이 생성된다.In the evaluation list check step (S403), detailed screens of the evaluation target sub-category list and the evaluation list are generated.

전체위원 평가확정 단계(S404)에서 상기 평가위원 단말(300)로부터 전송되는 평가위원의 평가결과 확정 정보가 전송되어 저장되지 않으면 상기 평가목록 확인 단계(S403) 이전으로 되돌아 가고, 상기 확정 정보가 전송되어 저장되면 다음 종합의견 작성 단계(S405)로 넘어간다. If the evaluation result confirmation information of the evaluation member transmitted from the evaluation member terminal 300 is not transmitted and stored in the all committee evaluation determination step (S404), the process returns to the previous evaluation list checking step (S403), and the determination information is transmitted. After the storage is completed, the process goes to the next comprehensive opinion preparation step (S405).

종합의견 작성 단계(S405)에서 과제정보중심화면, 평가표 중심화면, PDF중심화면, 평가위원별 최종점수결과와 최종평가의견평가 화면이 생성되고 평가대상과제목록과 과제문서목록의 화면이 생상되어 위원별 확정된 평가결과를 취합하여 종합의견이 작성되어 전송된다. The task information center screen, the evaluation table center screen, the PDF center screen, the final score result for each evaluator and the final evaluation opinion evaluation screen are generated in the comprehensive opinion preparation step (S405), and the screen of the task list and the task document list is generated. Comprehensive opinions are prepared and sent by collecting the evaluation results.

평가결과저장 단계(S406)에서 상기 입력된 평가정보가 평가위원장 단말(400)로부터 전송되어 기술개발 사업 평가시스템(500)에 저장된다.In the evaluation result storage step (S406), the input evaluation information is transmitted from the evaluation chairman terminal 400 and stored in the technology development project evaluation system 500.

위원장 확정 단계(S407)에서 상기의 평가결과에 대하여 확정한다는 확정정보가 전송되어 저장된다. In the confirmation of the chairman step (S407), the confirmation information to confirm the above evaluation result is transmitted and stored.

위원장 확정취소 단계(S408)에서 상기 위원장 확정시 평가정보가 더 이상 입력되지 않고 평가가 종료된 해당 사업과제에 대한 입력된 평가표 결과를 생성하고 종료되되, 위원장확정 취소를 선택하는 정보가 전송되면 다시 평가목록확인 단계(S403) 이전으로 돌아간다.When the chairperson is canceled in the stage of finalizing the chairman (S408), the evaluation information is no longer entered, and the evaluation result is generated and the end of the evaluation is completed. The information is selected when the chairperson is canceled. Return to the evaluation list check step (S403) before.

도 8은 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가시스템 및 그 방법의 평가시스템과 단말기 간의 평가 방법을 설명하기 흐름도이다.8 is a flowchart illustrating a technology development project evaluation system using an evaluation information of a professional evaluator input online according to an embodiment of the present invention, and an evaluation method between an evaluation system and a terminal of the method.

도 8을 참조하면, 기술개발사업 평가시스템(500), 담당간사 단말(200), 평가위원 단말(300) 및 평가위원장 단말(400)에 의한 해당기술개발사업 평가가 수행되는 상기의 과정들의 연결관계가 도시된다.Referring to FIG. 8, connection of the above processes in which the technology development project evaluation is performed by the technology development project evaluation system 500, the manager's terminal 200, the evaluation member terminal 300, and the evaluation chairman terminal 400 are performed. The relationship is shown.

평가시스템로그인 단계(S501)에서 평가위원 단말(300)에서 기술개발사업 평가시스템(500)에 로그인 된다. In the evaluation system login step (S501), the evaluation member terminal 300 is logged in to the technology development project evaluation system 500.

평가시스템로그인 단계(S502)에서 평가위원장 단말(400)에서 기술개발사업 평가시스템(500)에 로그인 된다.In the evaluation system login step (S502), the evaluation chairman terminal 400 is logged in to the technology development project evaluation system 500.

모니터링 시작 단계(S503)에서 담당간사 단말(200)에 해당 기술개발사업 평가과정의 화면이 생성된다. In the monitoring start step (S503), the screen of the technology development project evaluation process is generated on the secretary terminal 200.

평가정보 입력 단계(S504)에서 평가위원 단말(300)에 해당 기술개발사업 평가정보가 입력된다. In the evaluation information input step (S504), the corresponding technology development project evaluation information is input to the evaluation member terminal (300).

평가정보 저장 단계(S505)에서 상기 평가정보가 기술개발사업 평가시스템(500)에 저장된다. In the evaluation information storage step (S505), the evaluation information is stored in the technology development project evaluation system 500.

평가결과확정 단계(S506)에서 평가위원 단말(300)에서 평가 결과가 확정되었다는 정보가 입력된다. In the evaluation result confirmation step (S506), the information that the evaluation result is confirmed in the evaluator terminal 300 is input.

평가결과 확정 저장 단계(S507)에서 기술개발사업 평가시스템(500)에 상기 평가결과 확정정보가 저장된다. In the evaluation result confirmation storage step (S507), the evaluation result confirmation information is stored in the technology development project evaluation system 500.

전체위원확정 확인 단계(S508)에서 평가위원장 단말(400)에서 상기 평가위원의 평가결과 확정정보를 기술개발사업 평가시스템(500)에 요구한다. In the confirmation of the entire committee confirmation step (S508), the evaluation chairman terminal 400 requests the evaluation result determination information of the evaluation member to the technology development project evaluation system 500.

전체위원확정 단계(S509)에서 기술개발사업 평가 시스템(500)에서 상기 평가위원의 평가결과가 확정 정보가 확인되면 다음 단계를 수행하고 그렇지 않으면 상기 전체위원확정 확인 단계(S508)에서 요구를 받기 이전으로 돌아간다.If the evaluation result of the evaluation member is confirmed in the technical development project evaluation system 500 in the confirmation of the overall committee confirmation step (S509), the next step is performed. Return to

종합의견 작성 단계(S510)에서 상기 전체위원확정정보가 평가위원장 단말(400)로 전송되면 종합의견 작성이 입력된다. In the overall opinion preparation step (S510), when the entire committee decision information is transmitted to the evaluation chairman terminal 400, a comprehensive opinion preparation is input.

평가결과 저장 단계(S511)에서 상기 전송된 종합의견 작성 정보가 기술개발사업 평가시스템(500)에 저장된다.In the evaluation result storage step S511, the transmitted comprehensive opinion preparation information is stored in the technology development project evaluation system 500.

평가확정 및 취소여부입력 단계(S512)에서 담당간사 단말(200)에 상기 평가에 대한 확정 및 취소 여부에 대한 정보가 입력된다. In the evaluation confirmation and cancellation input step (S512), information about the confirmation and cancellation of the evaluation is input to the manager in charge 200.

확정취소 단계(S513)에서 상기 평가확정이 취소정보가 기술개발사업 평가시스템(500)에 전송되면 평가정보저장 단계(S505) 이전으로 돌아가고 그렇지 않으면 다음 단계를 진행한다. If the evaluation decision is canceled in the confirmation cancellation step (S513) is transmitted to the technology development project evaluation system 500, the process returns to the previous evaluation information storage step (S505), otherwise proceeds to the next step.

위원회 종료 단계(S514)에서 담당간사 단말(200)에서 위원회 종료에 대한 정보가 입력된다. In the committee termination step (S514), the information on the committee termination is input from the secretary terminal 200.

위원회 확정저장 단계(S515)에서 상기 기술개발사업 평가시스템(500)에 상기 위원회 종료정보가 저장된다.The committee end information is stored in the technology development project evaluation system 500 in the committee confirm storage step (S515).

도 9는 본 발명의 일 실시예에 따른 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 평가방법의 평가위원을 승인하는 방법을 설명하기 위한 순서도이다.9 is a flowchart illustrating a method for approving an evaluation member of a method for evaluating a technology development project using evaluation information of a professional evaluator input online according to an embodiment of the present invention.

도 9를 참조하면, 네트워크(700)와 인터넷으로 기술개발사업 평가시스템(500)에 평가위원의 신청정보가 전송되어 평가위원의 승인절차가 수행된다.9, the application information of the evaluation member is transmitted to the technology development project evaluation system 500 through the network 700 and the Internet, and the approval procedure of the evaluation member is performed.

평가위원 신청화면 단계(S601)에서 네트워크(200)와 인터넷을 통하여 기술개발사업 평가시스템(500)의 평가위원 신청화면이 생성된다.In the evaluation member application screen step S601, the evaluation member application screen of the technology development project evaluation system 500 is generated through the network 200 and the Internet.

신상정보 입력 단계(S602)에서 평가위원 신청자의 신상정보가 입력되어 기술개발사업 평가시스템(500)에 저장된다. In the personal information input step (S602), the personal information of the applicant for the evaluation member is input and stored in the technology development project evaluation system 500.

평가가능분야 입력 단계(S603)에서 평가위원 신청자의 평가가능분야정보가 입력되어 기술개발사업 평가시스템(500)에 저장된다. In the evaluable field input step (S603), the evaluator's applicability field information is input and stored in the technology development project evaluation system 500.

보유기술 및 키워드 입력 단계(S604)에서 평가위원 신청자의 보유기술 및 분야 핵심 키워드정보가 입력되어 기술개발사업 평가시스템(500)에 저장된다. In the holding technology and keyword input step (S604), key technology information of the holding technology and field of the evaluator applicant is input and stored in the technology development project evaluation system 500.

학력 및 겸임활동 입력 단계(S605)에서 평가위원 신청자의 학력 또는 경력 및 겸임활동정보가 입력되어 기술개발사업 평가시스템(500)에 저장된다. In the education and adjunct activity input step (S605), the applicant's education or career and adjunct activity information is input and stored in the technology development project evaluation system 500.

기타 경력사항 입력 단계(S606)에서 평가위원 신청자의 기타 경력사항정보가 입력되어 기술개발사업 평가시스템(500)에 저장된다. Other career information input step (S606), the other career information of the appraisal applicant is input and stored in the technology development project evaluation system (500).

신청완료 단계(S607)에서 상기 저장된 신청자의 정보가 저장되어 신청완료에 대한 화면이 생성된다. In the application completion step (S607) the information of the stored applicant is stored to generate a screen for the completion of the application.

평가위원 조회 단계(S608)에서 평가위원 신청자의 목록을 보여주는 화면을 생성한다. In the evaluator inquiry step (S608), a screen showing a list of evaluator applicants is generated.

평가위원 상세조회 단계(S609)에서 평가위원 신청자의 평가위원신상정보, 평가가능분야, 학력 및 겸임활동, 연구논문 및 저서, 자격증 및 포상, 학회 및 협회 활동 및 지적재산권에 대한 상세정보를 보여주는 창을 생성한다.In the detailed inquiry stage of the evaluator (S609), a window showing the evaluator's personal information, evaluable field, academic background and adjunct activity, research papers and books, certifications and awards, academic and association activities, and intellectual property rights Create

평가위원 승인 단계(S610)에서 평가위원 신청자에 대한 승인에 대한 정보가 입력되어 전송되면 다음 단계의 절차가 진행되고, 반려에 대한 정보가 입력되어 전송되면 반려 단계(S611)의 단계로 진행된다. When the information on the approval of the appraiser is input and transmitted in the appraiser approval step (S610), the procedure of the next step is progressed, and when the information on the companion is input and transmitted, the process proceeds to the step of the return step (S611).

반려 단계(S611)에서 상기 반려되는 정보가 전송되면 결과확인 단계(S614)를 수행한다. When the returned information is transmitted in the returning step (S611), a result checking step (S614) is performed.

평가위원 이력출력 단계(S612)에서 상기 승인된 평가위원 신청자에 대한 이력서 화면이 생성된다. In the evaluation member history output step (S612), the resume screen for the approved evaluation member applicant is generated.

평가위원 임명장출력 단계(S612)에서 상기 승인된 평가위원 신청자에 대한 평가위원 임명장 화면이 생성된다. In the evaluator appointment book output step (S612), the evaluator appointment letter screen for the approved evaluator applicant is generated.

결과확인 단계(S607)에서 상기 평가위원에 대한 승인절차의 결과에 대한 정보가 전송되어 신청결과에 대한 화면이 생성된다.In the result confirming step (S607), information on the result of the approval procedure for the evaluator is transmitted to generate a screen for the application result.

본 발명은 특정의 실시 예와 관련하여 도시 및 설명하였지만, 첨부된 특허청구범위에 의해 나타난 발명의 사상 및 영역으로부터 벗어나지 않는 한도 내에서 다양한 개조 및 변화가 가능하다는 것을 당업계에서 통상의 지식을 가진 자라면 누구나 쉽게 알 수 있을 것이다.Although the present invention has been shown and described with respect to specific embodiments thereof, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention as defined by the appended claims. Anyone who can afford it will know.

10 : 통합정보시스템 100 : 사업신청자 단말
200 : 담당간사 단말 300 : 평가위원 단말
400 : 평가위원장 단말 500 : 기술개발사업 평가시스템
600 : 종합과제관리시스템 700 : 네트워크
10: integrated information system 100: terminal of the applicant
200: Officer in charge 300: Evaluation member terminal
400: evaluation chairman terminal 500: technology development project evaluation system
600: Integrated Project Management System 700: Network

Claims (10)

온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템에 있어서,
기술개발 사업지원을 온라인으로 신청하도록 하고 그 신청정보를 통합정보시스템(10)에 전송하는 사업신청자 단말(100)과;
상기 온라인으로 신청되어 전송된 해당 기술개발 사업정보와 평가위원의 평가를 상기 통합정보 시스템(10)의 종합과제관리시스템(600)과 기술개발사업평가시스템(500)을 통해 온라인으로 종합적으로 관리하도록 할 수 있는 담당간사 단말(200)과;
상기 온라인으로 신청된 기술개발 사업정보가 화면으로 조회되고 과제별로 평가된 평가정보가 온라인을 통하여 입력되어 상기 기술개발사업평가시스템(500)이 종합과제관리시스템(600)에 전송할 수 있도록 하는 복수의 평가위원 단말(300)과;
상기 복수의 평가위원에 의하여 평가되고 전송된 평가결과를 관리할 수 있도록 하고 작성된 종합의견을 상기 기술개발사업평가시스템(500)이 종합과제관리시스템(600)에 전송할 수 있도록 하는 평가위원장 단말(400);
상기 전송되는 기술개발 사업에 대한 정보를 저장하고, 상기 정보를 담당간사 단말(200), 평가위원 단말(300) 및 평가위원장 단말(400)로 전송하고, 또한, 상기 기술개발 사업에 대해 입력되는 평가정보를 다시 전송받아 저장하고 관리하는 종합과제관리시스템(600)과 상기 기술개발 사업에 대한 평가를 관리하는 기술개발사업 평가시스템(500)을 포함하는 통합정보시스템(10); 및 네트워크(700);를 포함하는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템.
In the electronic evaluation system of technology development project using the evaluation information of the professional evaluator input online,
A project applicant terminal 100 for applying for technical development project support online and transmitting the application information to the integrated information system 10;
Comprehensive management of the relevant technology development project information and evaluation of the evaluation members submitted and applied online through the comprehensive task management system 600 and the technology development project evaluation system 500 of the integrated information system 10. A chief care officer terminal 200 that can;
The technology development business information applied online is searched on the screen, and the evaluation information evaluated for each task is input through the online so that the technology development business evaluation system 500 can transmit the comprehensive task management system 600 to the plurality of tasks. Evaluator terminal 300;
Evaluation chair terminal 400 to manage the evaluation results evaluated and transmitted by the plurality of evaluators and to allow the technical development project evaluation system 500 to transmit the comprehensive opinions to the comprehensive task management system 600. );
Store the information about the technology development project is transmitted, and transmits the information to the secretary terminal 200, the evaluation member terminal 300 and the evaluation chairman terminal 400, and is input for the technology development project An integrated information system 10 including a comprehensive task management system 600 for receiving and storing evaluation information again and a technology development project evaluation system 500 for managing evaluation of the technology development project; And a network 700; an electronic evaluation system for a technology development project using evaluation information of a professional evaluator input online.
제1항에 있어서,
상기 통합정보시스템(10)은,
신청된 기술개발사업을 평가하고 종합의견을 작성하는 평가위원 및 평가위원장을 온라인으로 신청받아 승인하되 승인된 평가위원들의 평가위원정보를 송수신하는 평가위원 선정모듈(510)과, 상기 신청된 기술개발 사업의 정보를 전송하여 해당 사업분과와 사업과제의 배정정보를 전송받고 상기 평가위원들의 평가과정을 모니터링 할 수 있도록 평가과정을 담당간사 단말(200)로 전송하는 담당간사모듈(520)과 평가결과를 해당업체나 대상자에게 통보하는 통보모듈(530) 및 선정된 평가위원과 평가위원장이 상기 배정된 해당 사업분과와 사업과제를 평가할 수 있도록 해당 정보를 평가위원 단말(300)과 평가위원장 단말(400)로 전송하고 입력되는 평가결과를 전송받는 평가위원모듈(540)을 포함하는 기술개발사업 평가시스템(500)과,
상기 기술개발 사업지원을 온라인으로 공고하고 해당 사업에 대한 수요를 온라인으로 조사하는 수요조사공고모듈(610)과, 상기 기술개발 사업지원에 대한 과제신청을 사업신청자 단말(100)로부터 접수받아 해당 기술개발사업에 대한 신청정보를 온라인으로 송수신하는 과제신청접수모듈(611)과, 상기 기술개발사업 평가시스템(500)으로부터 온라인으로 송수신되는 관련정보를 관리하는 과제평가모듈(612)과, 상기 신청된 기술개발 사업에 대한 지원이 확정되어 업체와 과제진행과 관련 지원금액에 대한 협약을 온라인으로 체결하는 협약체결모듈(613)과, 상기 체결된 기술개발 사업에 대한 진행과정을 검사하고 평가하는 진도관리모듈(614)과 상기 진행된 기술개발 사업이 종료되면 최종적으로 결과를 평가하는 최종평가모듈(615) 및 상기 최종평가된 기술개발 사업에 대하여 발생된 문제를 관리하는 사후관리모듈(616)과 상기 완료된 기술개발 사업에 대한 성과를 관리하는 성과관리모듈(617)을 포함하는 종합과제관리시스템(600)으로 이루어지는 것을 더욱 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템.
The method of claim 1,
The integrated information system 10,
Evaluation member selection module (510) for receiving and approving the evaluation member and the evaluation chairman who evaluates the applied technology development project and writes a comprehensive opinion, and sends and receives evaluation member information of the approved evaluation members, and the applied technology development The secretary module 520 and the evaluation result for transmitting the evaluation process to the secretary terminal 200 so that the evaluation information of the evaluators can be monitored by receiving the project information and the assignment information of the project task by transmitting the information of the project. The notification module 530 for notifying the relevant company or the target person and the selected evaluator and the evaluator to evaluate the corresponding business division and the project assignment. And a technology development project evaluation system 500 including an evaluation member module 540 which transmits the evaluation result and the inputted evaluation result.
The demand research notification module 610 for notifying the technology development project support online and investigating the demand for the project online, and receiving the project application for the technology development project support from the project applicant terminal 100 A task application reception module 611 for transmitting and receiving application information on a development project online, a task evaluation module 612 for managing related information transmitted and received online from the technology development project evaluation system 500, and the applied The agreement management module 613, which concludes an agreement on the progress of the project and the related support amount with the company after the support for the technology development project is confirmed, and the progress management for inspecting and evaluating the progress of the technology development project. The final evaluation module 615 and the final evaluated technology development for finally evaluating the result when the module 614 and the advanced technology development project are completed. It is further characterized by consisting of a comprehensive project management system 600 including a post-management module 616 for managing problems caused to the project and a performance management module 617 for managing the performance of the completed technology development project. Electronic evaluation system for technology development projects using evaluation information of expert evaluators entered online.
제1항 또는 제2항에 있어서,
상기 기술개발사업 평가시스템(500)의 평가모듈(540)은,
네트워크(700)에 접속된 평가위원 단말(200)과 평가위원장 단말(400)에 의하여 평가위원들이 온라인으로 로그인할 수 있도록 하며, 평가할 기술개발사업에 대한 평가목록을 상기 단말로 전송하며, 입력되는 평가정보를 전송받아 저장하고, 평가결과에 대한 확정 정보를 입력받아 저장하고, 상기 평가위원장의 종합의견을 입력받아 저장하되,
새로 신청된 기술개발사업에 대하여 평가하는 신규평가모듈(541)과, 상기 신규 기술개발사업에 대하여 서면으로 평가하는 서면평가모듈(542)과, 상기 서면평가가 끝나고 신청자와의 대면에서 이루어진 평가정보가 입력되는 대면평가모듈(543)과, 진행되는 기술개발사업에 대하여 진도관리에 의하여 단계평가가 이루어지는 특별평가모듈(544) 및 상기 기술개발사업에 대한 일련의 과정이 종료되었을 때 이루어지는 최종평가모듈(545)을 포함하고,
상기 종합과제관리시스템(600)은,
상기 수요조사공고모듈(610)과 과제신청접수모듈(611)이 송수신하는 해당 기술개발사업에 대한 정보를 저장하는 사업 및 공고 디비(DB)(620)와, 상기 평가위원 선정모듈(510)이 송수신하는 승인된 평가위원들의 정보와 사용자의 정보를 저장하는 구성원 디비(DB)(630)와, 상기 담당간사모듈(520)이 상기 담당간사 단말(200)로 송수신하는 기술개발사업에 대한 해당 사업분과와 사업과제에 대한 정보를 저장하는 사업 및 과제 관리 디비(DB)(640)와, 상기 평가 모듈(540)이 평가위원 단말(300)과 평가위원장 단말(400)로부터 전송받아 해당 기술개발사업의 과제에 대한 평가결과 및 종합의견을 저장하는 평가결과 디비(DB)(650) 및 상기 평가정보와 관련정보를 전송받는 해당업체와 대상자에 대한 정보와 기타 관리정보가 저장된 통합정보 디비(DB)(660)를 포함하는 것을 더욱 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템.
The method according to claim 1 or 2,
Evaluation module 540 of the technology development project evaluation system 500,
The evaluator terminal 200 and the evaluator terminal 400 connected to the network 700 enable the evaluators to log in online, and transmit the evaluation list for the technology development project to be evaluated to the terminal. Receive and store the evaluation information, receive and store the confirmation information about the evaluation results, and receive and store the comprehensive opinion of the chairman of the evaluation,
A new evaluation module 541 for evaluating newly applied technology development projects, a written evaluation module 542 for evaluating the new technology development projects in writing, and evaluation information made in the face of the applicant after the written evaluation is completed. Is entered into a face-to-face evaluation module (543), a special evaluation module (544) is a stage evaluation by the progress management for the ongoing technology development project and the final evaluation module that is made when a series of processes for the technology development project is completed 545, and
The comprehensive task management system 600,
The project and notification DB (620) for storing information on the corresponding technology development project transmitted and received by the demand survey notification module 610 and the project application reception module 611, and the evaluation member selection module 510 is Member DB (630) for storing the information of the approved members and the information to be transmitted and received, and the corresponding project for the technology development project that the secretary module 520 transmits and receives to the secretary terminal 200 Project and project management DB (640) for storing information on the division and project tasks, and the evaluation module 540 is received from the evaluator terminal 300 and the evaluation chairman terminal 400, the corresponding technology development project Evaluation result database (DB) 650 for storing the evaluation results and comprehensive opinion of the project, and integrated information database (DB) in which information on the relevant companies and subjects receiving the evaluation information and related information and other management information are stored. More to include 660 Electronic Technology Development Evaluation System Using a professional evaluator of information input online as Jing.
제2항에 있어서,
상기 평가위원선정모듈(510)은,
평가위원에 대한 신청을 네트워크(700)와 인터넷을 통하여 신청받되, 상기 평가위원에 대한 신청자가 인터넷과 네트워크(700)로 접속된 단말기를 통하여 온라인으로 입력하는 신청자의 신상정보, 평가가능분야, 보유기술, 분야핵심키워드, 학력 및 겸임활동, 기타경력사항에 대한 정보를 저장하고 담당간사단말(200)로 전송하여 해당 신청자의 정보를 조회하고 승인할 수 있도록 하며, 승인되는 정보를 입력받아 평가위원이력과 임명장을 생성, 조회 및 출력할 수 있는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템.
The method of claim 2,
The evaluation member selection module 510,
Applicants for the evaluator are applied through the network 700 and the Internet, and the applicant's personal information, evaluable field, and retention are entered online by the applicant for the evaluator through a terminal connected to the Internet and the network 700. Information about technology, field key keywords, educational background, adjunct activities, and other careers is stored and sent to the secretary's terminal (200) for inquiry and approval of the applicant's information. An electronic evaluation system for a technology development project using online evaluation information of a professional evaluator, which can generate, inquire and print a history and a letter of appointment.
제2항에 있어서,
상기 담당간사모듈(520)은,
신청된 상기 기술개발지원사업에 대한 정보를 담당간사단말(200)로 전송하여 해당정보를 조회하여 사업분과와 사업과제를 입력받고 승인된 평가위원들을 상기 사업분과와 사업과제에 배정하는 정보를 전송받고, 승인된 평가위원들이 담당간사단말(200)을 통해 서명된 자필서명을 그래픽이미지파일로 전송받고, 상기 평가위원들의 불참여부의 정보를 전송받고, 상기 평가위원들 중에 평가위원장의 선정정보를 전송받고, 상기 평가위원들의 평가과정 모니터링은 평가현황중심화면 또는 과제중심화면을 생성하여 상기 담당간사단말(200)로 전송하고, 평가위원에 의해 평가된 평가결과를 설정, 저장, 취소 및 확정에 대한 정보를 입력받아 전송 및 저장하는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 시스템.
The method of claim 2,
The responsible staff module 520,
Send the information on the applied technology development support project to the responsible secretary terminal (200), search for the corresponding information, input the business division and the project, and transmit the information to assign the approved evaluators to the business division and the project. Received, approved judges are sent via the secretary terminal 200, the signed autograph signed as a graphic image file, receiving information of the non-participation of the judges, and the selection of the evaluation chairman among the judges Received, the evaluation process of the evaluator is generated by the evaluation status center screen or task-centered screen and sent to the secretary terminal 200 in charge, to set, save, cancel and confirm the evaluation results evaluated by the evaluator Electronic evaluation of technology development projects using evaluation information of expert evaluators inputted online characterized in that the information is received, transmitted and stored. system.
온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법에 있어서,
통합정보시스템(10)에 의하여 기술개발 지원사업의 일련의 단계가 진행되되,
사업신청자단말(100)에 의하여 온라인으로 기술개발 지원사업에 대한 신청이 접수되어 해당 정보가 종합과제관리시스템(600)에 전송되는 과제신청접수단계(S100);
상기 신청된 기술개발 지원사업에 대한 평가위원들의 서면 평가정보는 기술개발사업 평가시스템(500)의 서면평가모듈(542)에 의하여 서면으로 평가되어 상기 종합과제관리시스템(600)에 저장되는 서면평가단계(S101);
상기 기술개발 사업을 신청한 신청자와 평가위원들의 대면평가정보는 상기 기술개발사업 평가시스템(500)의 대면평가모듈(543)에 의하여 상기 종합과제관리시스템(600)에 저장되는 대면평가단계(S102);
상기 대면평가가 끝난 해당 기술개발사업에 대하여 평가위원들이 현장에서 평가한 평가정보는 상기 기술개발사업 평가시스템(500)을 통하여 온라인으로 상기 종합과제관리시스템(600)에 전송되는 현장평가단계(S103);
상기 일련의 평가가 이루어진 해당 기술개발사업에 대하여 평가위원들의 심의 확정이 이루어지면 다음 단계로 진행되고 그렇지 않으면 상기 과제신청접수단계(S100)로 되돌아가는 심의확정단계(S104);
상기 심의 확정이 이루어진 해당 기술개발사업에 대하여 상기 종합과제관리시스템(600)의 통합정보 디비(DB)(660)에 저장된 업체 또는 대상자의 정보를 이용하여 통보모듈(530)이 신청결과를 온라인 및 무선으로 전송하여 통보하는 업체통보단계(S105);
상기 심의 확정된 업체와 온라인으로 제공되는 협약에 의하여 협약이 체결되고 상기 체결정보는 협약체결모듈(613)에 의하여 종합과제관리시스템(600)에 전송되는 협약체결 단계(S106);
상기 협약이 체결된 기술개발사업에 대하여 단계별 평가가 이루어지고 그 평가정보는 특별평가모듈(544)에 의하여 종합과제관리시스템(600)에 전송되는 진도관리단계(S107); 및
상기 진도관리단계(S107)가 종료된 해당 기술개발사업에 대해 최종적으로 평가를 실시하여 발생 된 문제와 성과를 관리하는 최종평가단계(S108);로 이루어지는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법.
In the electronic evaluation method of the technology development project using the evaluation information of the professional evaluator input online,
The integrated information system (10) is a series of steps of technology development support projects,
A project application receiving step in which an application for a technology development support project is received online by the project applicant terminal 100 and the corresponding information is transmitted to the comprehensive task management system 600 (S100);
The written evaluation information of the evaluators on the applied technology development support project is evaluated in writing by the written evaluation module 542 of the technology development project evaluation system 500 and stored in the comprehensive project management system 600. Step S101;
The face-to-face evaluation information of the applicant and the evaluator who applied for the technology development project is face-to-face evaluation step (S102) stored in the comprehensive task management system 600 by the face-to-face evaluation module 543 of the technology development project evaluation system 500 );
Evaluation information evaluated by the evaluators in the field about the technology development project after the face-to-face evaluation is transmitted to the comprehensive project management system 600 through the technology development project evaluation system 500 (S103) );
Deliberation confirmation step (S104) proceeds to the next step if the deliberation of the evaluation member is made for the technology development project that the series of evaluation is made, otherwise return to the task application acceptance step (S100);
The notification module 530 sends the application result online and using the information of the company or the target person stored in the integrated information DB (660) of the integrated project management system 600 for the technology development project in which the deliberation was confirmed. Company notification step of transmitting by wireless notification (S105);
An agreement conclusion step (S106) in which an agreement is concluded by an agreement provided online with the deliberated firm and the conclusion information is transmitted to the comprehensive task management system 600 by the agreement conclusion module 613;
A step-by-step evaluation of the technology development project to which the agreement is concluded, and the evaluation information of which is transmitted to the comprehensive task management system 600 by a special evaluation module 544 (S107); And
The final evaluation step (S108) of managing the problems and performance generated by performing the final evaluation of the technology development project, the progress management step (S107) is completed; Electronic evaluation method of technology development project using evaluation information.
온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법에 있어서,
담당간사 단말(200)과 담당간사 모듈(530)에 의해 해당 기술개발사업의 평가가 관리되되,
신청받은 기술개발지원사업에 대한 사업분과와 사업과제를 배정하고 평가위원을 배정하는 분과구성 단계;
상기 선정된 분과에 대한 정보를 조회하고 평가위원들의 위원회를 시작하는 전자평가위원회 단계;
평가위원들을 조회하고, 서명을 받아 등록하며, 불참여부를 등록하며, 평가위원들을 추가할 수 있도록 하고, 평가위원장을 선정하는 분과개최준비 단계;
상기 평가위원들과 평가위원장의 각 과제의 평가 완료 및 확정유무를 평가하는 평가결과를 모니터링하는 분과개최 단계;
상기 입력되는 평가결과를 저장하는 평가결과 저장 단계; 및
상기 평가결과에 대한 확정을 취소할 수 있도록 하며, 확정취소가 없으면 과정을 종료하게 되는 위원회 확정 단계를 포함하는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법.

In the electronic evaluation method of the technology development project using the evaluation information of the professional evaluator input online,
Evaluation of the corresponding technology development project is managed by the secretary terminal 200 and the secretary module 530,
A sub-organization stage of allocating project divisions and projects for the technology development support projects received and assigning evaluators;
An electronic evaluation committee step of inquiring information on the selected division and starting a committee of evaluation members;
A stage for organizing the subcommittee for referencing the judges, obtaining a signature, registering a non-participation, adding the judges, and selecting a moderator;
A subcommittee holding step of monitoring evaluation results for evaluating the completion and determination of evaluation of each task of the evaluators and the evaluation chairman;
An evaluation result storage step of storing the input evaluation result; And
The electronic evaluation method of the technical development project using the evaluation information of the expert evaluator inputted online, characterized in that it is possible to cancel the determination of the evaluation result, and if the decision is not canceled, the process of determining the committee.

온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법에 있어서,
평가위원 단말(300)과 평가위원 모듈(540)에 의해 신청된 해당 기술개발사업이 평가되되,
평가위원의 자필서명 이미지파일이 담당간사 단말(200)에 등록 및 저장되는 서명등록 단계(S301);
평가위원 단말(300)에 생성된 창에 아이디와 패스워드가 입력된 후 기술개발사업 평가시스템(500)에 로그인 되는 사업평가시스템 로그인 단계(S302);
평가대상 분과목록과 평과목록에 대한 상세화면이 생성되는 평가목록 확인 단계(S303);
과제기본정보, 참여연구원, 신청사업비, 참여기업정보, 이의신청 및 검토안건에 대한 목록의 과제기본정보화면과 과제문서목록화면이 생성되고, 과제중심화면, 평가표 중심화면 및 PDF중심화면이 생성된 후, 각 항목에 대한 평가정보가 입력 및 전송되는 평가정보 입력 단계(S304);
상기 입력된 평가정보가 평가위원 단말(300)로부터 전송되어 기술개발 사업 평가시스템(500)에 저장되는 평가결과저장 단계(S305);
상기의 평가결과에 대하여 확정한다는 확정정보가 전송되어 저장되는 평가결과 확정 단계(S306); 및
평가가 종료된 해당 사업과제 이외에 다른 과제를 선택하는 정보가 전송되면 다시 평가정보입력 단계(S304)로 돌아가고, 그렇지 않은 선택정보가 전송되면 종료되는 다음과제 단계(S307)를 포함하는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법.
In the electronic evaluation method of the technology development project using the evaluation information of the professional evaluator input online,
Applicable technology development projects applied by the evaluator terminal 300 and the evaluator module 540 are evaluated,
A signature registration step of registering and storing the autographed signature image file of the evaluator in the manager's terminal 200 (S301);
A business evaluation system login step (S302) of logging in to the technology development project evaluation system 500 after an ID and a password are input to a window generated in the evaluation member terminal 300;
An evaluation list checking step of generating detailed screens of the evaluation target division list and the evaluation list (S303);
The project basic information screen and the project document list screen of the list of basic project information, participating researchers, application costs, participating company information, objections and review items are generated, and the project center screen, evaluation table center screen, and PDF center screen are generated. After that, the evaluation information input step (S304) in which the evaluation information for each item is input and transmitted;
An evaluation result storage step (S305) in which the input evaluation information is transmitted from the evaluation member terminal 300 and stored in the technology development project evaluation system 500;
An evaluation result determination step (S306) in which confirmation information to confirm the evaluation result is transmitted and stored; And
When the information to select other tasks in addition to the project is completed, the evaluation is sent back to the evaluation information input step (S304), and if the other selection information is transmitted, the next task step (S307) is terminated. Electronic evaluation method of technology development business using evaluation information of expert evaluator input online.
온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법에 있어서,
평가위원장 단말(400)과 평가위원 모듈(540)에 의해 신청된 해당 기술개발사업이 평가되되,
평가위원장의 자필서명 이미지파일이 담당간사 단말(200)에 등록 및 저장되는 서명등록 단계(S401);
평가위원장 단말(400)에 생성된 창에 아이디와 패스워드가 입력된 후 기술개발사업 평가시스템(500)에 로그인 되는 사업평가시스템 로그인 단계(S402);
평가대상 분과목록과 평과목록에 대한 상세화면이 생성되는 평가목록 확인 단계(S403);
상기 평가위원 단말(300)로부터 전송되는 평가위원의 평가결과 확정 정보가 전송되어 저장되지 않으면 상기 평가목록 확인 단계(S403) 이전으로 되돌아 가고, 상기 확정 정보가 전송되어 저장되면 다음 종합의견 작성 단계(S405)로 넘어가는 전체위원 평가확정 단계(S404);
과제정보중심화면, 평가표 중심화면, PDF중심화면, 평가위원별 최종점수결과와 최종평가의견평가 화면이 생성되고 평가대상과제목록과 과제문서목록의 화면이 생상되어 위원별 확정된 평가결과를 취합하여 종합의견이 작성되어 전송되는 종합의견 작성 단계(S405);
상기 입력된 평가정보가 평가위원장 단말(400)로부터 전송되어 기술개발 사업 평가시스템(500)에 저장되는 평가결과저장 단계(S406);
상기의 평가결과에 대하여 확정한다는 확정정보가 전송되어 저장되는 위원장 확정 단계(S407); 및
상기 위원장 확정시 평가정보가 더 이상 입력되지 않고 평가가 종료된 해당 사업과제에 대한 입력된 평가표 결과를 생성하고 종료되되, 위원장확정 취소를 선택하는 정보가 전송되면 다시 평가목록확인 단계(S403) 이전으로 돌아가는 위원장 확정취소 단계(S408)를 포함하는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법.
In the electronic evaluation method of the technology development project using the evaluation information of the professional evaluator input online,
Applicable technology development projects applied by the evaluation chairman terminal 400 and the evaluation member module 540 are evaluated,
A signature registration step of registering and storing the autographed signature image file of the evaluation chairman in the manager's terminal 200 (S401);
A business evaluation system login step of logging in to the technology development project evaluation system 500 after an ID and a password are input to a window generated in the evaluation chairman terminal 400;
An evaluation list checking step of generating detailed screens of the evaluation target division list and the evaluation list (S403);
If the evaluation result determination information of the evaluation member transmitted from the evaluation member terminal 300 is not transmitted and stored, the evaluation list check step (S403) is returned to the previous step. S405) to determine the overall committee member evaluation step (S404);
The task information center screen, the evaluation table center screen, the PDF center screen, the final score result and the final evaluation opinion evaluation screen are generated by the evaluator, and the screen of the task list and the task document list is generated. Comprehensive opinion creation step (S405) that a comprehensive opinion is created and transmitted;
An evaluation result storage step (S406) in which the input evaluation information is transmitted from the evaluation chairman terminal 400 and stored in the technology development project evaluation system 500;
Determining the chairperson step (S407) is transmitted and stored to confirm the determination result for the evaluation result; And
Upon confirmation of the chairman, the evaluation information is no longer input and the evaluation result is generated and the completed evaluation table results for the corresponding project task is ended. The electronic evaluation method of the technology development project using the evaluation information of the expert evaluator inputted online, characterized in that it comprises a cancellation cancellation step (S408).
온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법에 있어서,
네트워크(200)와 인터넷으로 기술개발사업 평가시스템(500)에 평가위원의 신청정보가 전송되어 평가위원의 승인절차가 수행되되,
네트워크(200)와 인터넷을 통하여 기술개발사업 평가시스템(500)의 평가위원 신청화면이 생성되는 평가위원 신청화면 단계(S601);
평가위원 신청자의 신상정보가 입력되어 기술개발사업 평가시스템(500)에 저장되는 신상정보 입력 단계(S602);
평가위원 신청자의 평가가능분야정보가 입력되어 기술개발사업 평가시스템(500)에 저장되는 평가가능분야 입력 단계(S603);
평가위원 신청자의 보유기술 및 분야 핵심 키워드정보가 입력되어 기술개발사업 평가시스템(500)에 저장되는 보유기술 및 키워드 입력 단계(S604);
평가위원 신청자의 학력 또는 경력 및 겸임활동정보가 입력되어 기술개발사업 평가시스템(500)에 저장되는 학력 및 겸임활동 입력 단계(S605);
평가위원 신청자의 기타 경력사항정보가 입력되어 기술개발사업 평가시스템(500)에 저장되는 기타 경력사항 입력 단계(S606);
상기 저장된 신청자의 정보가 저장되어 신청완료에 대한 화면이 생성되는 신청완료 단계(S607);
평가위원 신청자의 목록을 보여주는 화면을 생성하는 평가위원 조회 단계(S608);
평가위원 신청자의 평가위원신상정보, 평가가능분야, 학력 및 겸임활동, 연구논문 및 저서, 자격증 및 포상, 학회 및 협회 활동 및 지적재산권에 대한 상세정보를 보여주는 창을 생성하는 평가위원 상세조회 단계(S609);
평가위원 신청자에 대한 승인에 대한 정보가 입력되어 전송되면 다음 단계의 절차가 진행되고, 반려에 대한 정보가 입력되어 전송되면 반려 단계(S611)의 단계로 진행되는 평가위원 승인 단계(S610);
상기 반려되는 정보가 전송되면 결과확인 단계(S614)를 수행하는 반려 단계(S611);)
상기 승인된 평가위원 신청자에 대한 이력서 화면이 생성되는 평가위원 이력출력 단계(S612);
상기 승인된 평가위원 신청자에 대한 평가위원 임명장 화면이 생성되는 평가위원 임명장출력 단계(S612); 및
상기 평가위원에 대한 승인절차의 결과에 대한 정보가 전송되어 신청결과에 대한 화면이 생성되는 결과확인 단계(S607);를 포함하는 것을 특징으로 하는 온라인으로 입력되는 전문평가자의 평가정보를 이용한 기술개발사업 전자평가 방법.
In the electronic evaluation method of the technology development project using the evaluation information of the professional evaluator input online,
The application information of the evaluator is transmitted to the technology development project evaluation system 500 through the network 200 and the Internet, and the approval process of the evaluator is performed.
An evaluation member application screen step S601 of generating an evaluation member application screen of the technology development project evaluation system 500 through the network 200 and the Internet;
Personal information input step of inputting personal information of the evaluation member applicant is stored in the technology development project evaluation system 500 (S602);
An evaluable field input step (S603) in which the evaluator's applicable field information is input and stored in the technology development project evaluation system 500;
The technology and keyword input step of the technology and field key information of the applicant for the evaluation member is input and stored in the technology development project evaluation system 500 (S604);
Education and adjunct activity input step of inputting the education or career and adjunct information of the evaluator applicant and stored in the technology development project evaluation system 500 (S605);
Other experience information input step of the evaluation member applicant is stored in the technology development project evaluation system 500 is input (S606);
An application completion step (S607) in which the stored information of the applicant is stored to generate a screen for application completion;
An evaluation member inquiry step of generating a screen showing a list of evaluation applicants (S608);
Reviewer's detailed inquiry phase, which creates a window that shows the applicant's information on evaluator's status, evaluable field, academic and adjunct activity, research papers and books, certificates and awards, academic and association activities and intellectual property rights ( S609);
When the information on the approval of the appraiser applicant is input and transmitted, a procedure of the next step is performed, and when the information about the companion is input and transmitted, the appraiser approval step (S610) proceeds to the step of returning (S611);
Return step (S611) for performing a result checking step (S614) when the returned information is transmitted;
An evaluation member history output step (S612) of generating a resume screen for the approved evaluation member applicant;
An evaluation member appointment letter output step of generating an evaluation member appointment letter screen for the approved evaluation member applicant (S612); And
Technical development using the evaluation information of a professional evaluator input online, comprising: a result confirming step (S607) in which information on the result of the approval procedure for the evaluator is transmitted to generate a screen for the application result. Business e-valuation method.
KR1020120014939A 2012-02-14 2012-02-14 The technology evaluating system using evaluation information by professional reviewers and the method using the same KR101170290B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120014939A KR101170290B1 (en) 2012-02-14 2012-02-14 The technology evaluating system using evaluation information by professional reviewers and the method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120014939A KR101170290B1 (en) 2012-02-14 2012-02-14 The technology evaluating system using evaluation information by professional reviewers and the method using the same

Publications (1)

Publication Number Publication Date
KR101170290B1 true KR101170290B1 (en) 2012-08-07

Family

ID=46886838

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120014939A KR101170290B1 (en) 2012-02-14 2012-02-14 The technology evaluating system using evaluation information by professional reviewers and the method using the same

Country Status (1)

Country Link
KR (1) KR101170290B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101736955B1 (en) * 2016-01-13 2017-05-17 (주)이스웨이 Manuscript management method considering division extensibility and manuscript management system
KR101769498B1 (en) * 2016-01-13 2017-08-18 (주)이스웨이 Manuscript management method supporting contents management system and manuscript management system
KR101769507B1 (en) * 2016-01-13 2017-08-30 (주)이스웨이 Manuscript management method including manuscript correnction and publication editing process and manuscript management system
KR101791782B1 (en) * 2016-03-04 2017-10-30 서강대학교산학협력단 Method of supporting joint commercialization for new business ideas of profit corporation led non-profit corporation
KR101804960B1 (en) * 2017-06-08 2017-12-06 윤성민 Collective intelligence convergence system and method thereof
WO2019156445A1 (en) * 2018-02-12 2019-08-15 윤성민 Business execution system and method therefor
WO2020045884A1 (en) * 2018-08-28 2020-03-05 윤성민 System for creating employment through working type configured by collection of collective intelligence, and method therefor
KR20200121517A (en) 2019-04-16 2020-10-26 윤성민 Decision support system and method thereof
EP3945474A1 (en) 2020-07-28 2022-02-02 Seong Min Yoon A decision support system and method thereof
KR102569661B1 (en) * 2023-02-15 2023-08-24 주식회사 빅테크놀로지 System for providing beneficiary company management service for invigorating local specialized industry
KR102633809B1 (en) * 2023-08-31 2024-02-06 주식회사 디온컴즈 Corporate Rating Management System

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100802579B1 (en) 2007-06-21 2008-02-13 (주) 에코센스 Pre-feasibility assessment system for r&d project commercialization by internet and method thereof
KR101005254B1 (en) 2010-08-17 2011-01-04 한국산업기술평가관리원 System for implementing reserch and development management and client service to national reserch and development plan, evaluation, completion and performance management

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100802579B1 (en) 2007-06-21 2008-02-13 (주) 에코센스 Pre-feasibility assessment system for r&d project commercialization by internet and method thereof
KR101005254B1 (en) 2010-08-17 2011-01-04 한국산업기술평가관리원 System for implementing reserch and development management and client service to national reserch and development plan, evaluation, completion and performance management

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101736955B1 (en) * 2016-01-13 2017-05-17 (주)이스웨이 Manuscript management method considering division extensibility and manuscript management system
KR101769498B1 (en) * 2016-01-13 2017-08-18 (주)이스웨이 Manuscript management method supporting contents management system and manuscript management system
KR101769507B1 (en) * 2016-01-13 2017-08-30 (주)이스웨이 Manuscript management method including manuscript correnction and publication editing process and manuscript management system
KR101791782B1 (en) * 2016-03-04 2017-10-30 서강대학교산학협력단 Method of supporting joint commercialization for new business ideas of profit corporation led non-profit corporation
KR101804960B1 (en) * 2017-06-08 2017-12-06 윤성민 Collective intelligence convergence system and method thereof
WO2018225942A1 (en) * 2017-06-08 2018-12-13 윤성민 Collective intelligence gathering system and method therefor
WO2019156445A1 (en) * 2018-02-12 2019-08-15 윤성민 Business execution system and method therefor
KR20190097349A (en) * 2018-02-12 2019-08-21 윤성민 Business execution system and method thereof
KR102126612B1 (en) * 2018-02-12 2020-06-24 윤성민 Business execution system and method thereof
WO2020045884A1 (en) * 2018-08-28 2020-03-05 윤성민 System for creating employment through working type configured by collection of collective intelligence, and method therefor
KR20200121517A (en) 2019-04-16 2020-10-26 윤성민 Decision support system and method thereof
EP3945474A1 (en) 2020-07-28 2022-02-02 Seong Min Yoon A decision support system and method thereof
KR102569661B1 (en) * 2023-02-15 2023-08-24 주식회사 빅테크놀로지 System for providing beneficiary company management service for invigorating local specialized industry
KR102633809B1 (en) * 2023-08-31 2024-02-06 주식회사 디온컴즈 Corporate Rating Management System

Similar Documents

Publication Publication Date Title
KR101170290B1 (en) The technology evaluating system using evaluation information by professional reviewers and the method using the same
Mahmood et al. The influence of transformed government on citizen trust: Insights from Bahrain
McLeod et al. A perspective‐based understanding of project success
Karunasena et al. Measuring the public value of e‐government: a case study from Sri Lanka
Ki Fiona Cheung et al. Supply chain sustainability: a relationship management approach
Sparkling et al. Research synthesis connecting trends in architecture, engineering, and construction project partnering
Bhuiyan Public sector eService development in Bangladesh: Status, prospects and challenges
Supriyanto et al. E-gov readiness assessment to determine E-government maturity phase
US20200082484A1 (en) Integrated scholarship management system and scholarship operation method using same
KR101793053B1 (en) The internship management system and method thereof
Choudhry Appointing the design consultant as supervision consultant on construction projects
JP2022516160A (en) Smart contract-based paper review system
Lim et al. E-government and e-governance concepts and constructs in the context of service delivery
Ouma Impediments to interagency statistical information sharing amongst government agencies in Uganda: A G2G adoption
de Paula et al. Sustainability in management processes: Case studies in architectural design firms
Kalja et al. Modernization of the e-government in Estonia
Emiri et al. VIRTUAL PROJECT MANAGEMENT IN NIGERIA’S CONSTRUCTION INDUSTRY
Hajialikhani A systematic stakeholders management approach for protecting the spirit of cultural heritage sites
Mahmoud E-Government in Iraq
Deegan et al. BIM: Building Information Management (not Modelling)
Huang An evaluation framework to support development of virtual enterprises
KR20060085232A (en) The method and system for outsourcing administration on web-server provided for member-clients in an industrial or social community organization
Muazansyah APPLICATION OF ONLINE SINGLE SUBMISSION (OSS) INNOVATION IN THE INTEGRATED INVESTMENT AND SERVICE OF BULUNGAN DISTRICT
Sirait et al. The Implementation of TOGAF for Enterprise System Planning on XYZ Campus
Sousa et al. Improving project management practices in architecture & design offices

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150724

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160720

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170601

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180524

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190522

Year of fee payment: 8