KR100828161B1 - Clamp for a scaffold pipe - Google Patents

Clamp for a scaffold pipe Download PDF

Info

Publication number
KR100828161B1
KR100828161B1 KR1020070060981A KR20070060981A KR100828161B1 KR 100828161 B1 KR100828161 B1 KR 100828161B1 KR 1020070060981 A KR1020070060981 A KR 1020070060981A KR 20070060981 A KR20070060981 A KR 20070060981A KR 100828161 B1 KR100828161 B1 KR 100828161B1
Authority
KR
South Korea
Prior art keywords
clamp
scaffold
pipes
main body
coupled
Prior art date
Application number
KR1020070060981A
Other languages
Korean (ko)
Inventor
김환수
Original Assignee
주식회사 세미코
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 세미코 filed Critical 주식회사 세미코
Priority to KR1020070060981A priority Critical patent/KR100828161B1/en
Application granted granted Critical
Publication of KR100828161B1 publication Critical patent/KR100828161B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/062Consoles; Brackets specially adapted for attachment to building walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape

Abstract

A clamp for installing a scaffold pipe is provided to prevent accidents by installing a scaffold strongly and stably and to shorten the time required for installing a scaffold. A clamp(30) for installing a scaffold pipe includes a clamp main body(31) having the radius of curvature on the inner circumferential surface correspondingly to scaffold pipes to insert scaffold pipes installed closely to a wall of a building, a clamp cover(32) hinged to one end of the clamp main body to be movable and having the radius of curvature correspondingly to the scaffold pipes to cover the scaffold pipes inserted to the clamp main body, and a fastener(33) hinged to the other end of the clamp main body and fastened to the clamp cover to fix the scaffold pipes, wherein the wall is formed by placing and curing concrete in a Euro-form coupled by a tie bar, and the tie bar is buried by concrete to make an end having a fastening hole exposed, a bracket(38) extended toward the tie bar of the wall is coupled to one end of the clamp main body, and a coupling piece(39) fitted and coupled to the fastening hole is formed on the front end of the bracket.

Description

비계파이프 설치용 클램프{Clamp for a scaffold pipe}Clamp for a scaffold pipe}

도 1은 본 발명의 일실시예를 도시한 사시도1 is a perspective view showing one embodiment of the present invention

도 2는 본 발명의 설치상태를 도시한 단면도Figure 2 is a cross-sectional view showing an installation state of the present invention

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

30 : 클램프 31 : 클램프본체30 clamp 31 clamp body

32 : 클램프덮개 33 : 조임수단32: clamp cover 33: tightening means

38 : 브라켓 39 : 결합편 38: bracket 39: coupling piece

40 : 타이바 41 : 체결공40: tie bar 41: fastener

본 발명은 비계파이프 설치용 클램프에 관한 것으로, 보다 상세하게는 건물의 시공시에 가설되는 비계파이프를 보다 용이하게 서로 연결할 수 있을 뿐만 아니라 보다 견고하게 결합할 수 있도록 구비된 비계파이프 설치용 클램프에 관한 것이다. The present invention relates to a scaffolding pipe mounting clamp, and more particularly, to a scaffolding pipe mounting clamp provided to be able to more easily connect the scaffolding pipes installed at the time of construction of the building, and to be more firmly coupled. .

일반적으로 비계는 건물의 시공시에 높은 곳에서 일할 수 있도록 설치하는 가설물로서, 건축용 재료의 운반이나 작업자의 통로 및 작업을 위한 발판이 되는 것이다. 이러한 비계는 대개 수직 및 수평방향으로 파이프를 서로 얽어 프레임을 형성한 후에, 그 사이에 이동 또는 작업을 위한 발판 등을 설치하게 되며, 프레임을 형성하는 비계파이프는 포스트용 파이프를 규정된 간격으로 지중에 박아 수직으로 설치하고, 이 포스트용 파이프에 빔용 파이프를 수평방향으로 결합하게 된다. 이때에, 상기 포스트용 파이프와 빔용 파이프는 서로 결합시키는 방법은 와이어를 사용하여 묶는 방법을 사용하거나 또는 별도로 제작된 클램프를 사용하여 결합시키는 방법 등이 사용되고 있는데, 이와 같은 종래의 클램프와 비계파이프의 설치상태를 간략하게 설명하면 다음과 같다. In general, scaffolding is a temporary installation to be able to work at a high place during construction of a building, and is a scaffold for transporting construction materials or for a worker's passage and work. Such scaffolding usually forms a frame by intertwining the pipes in the vertical and horizontal directions, and then installs a scaffold for moving or working therebetween. It is installed vertically, and the beam pipe is horizontally coupled to the post pipe. In this case, the post pipe and the beam pipe may be combined with each other by using a wire binding method or by using a separately manufactured clamp. Such a clamp and a scaffolding pipe may be used. Briefly, the installation state is as follows.

종래의 클램프는 내주면에 파이프가 삽입되도록 파이프에 대응된 곡률반경이 형성된 본체와, 이 본체의 일단에 회전 가능하도록 힌지결합되어 상기 본체와 더블 어 파이프를 감싸도록 파이프에 대응된 곡률반경이 형성된 덮개가 구비되어 있으며, 상기 본체의 타단에는 상기 덮개에 체결되어 삽입된 파이프를 조여 고정시키는 조임볼트가 힌지결합되어 있다. 이와 같은 구성에 의한 클램프는 파이프를 수직 또는 수평방향으로 결합시키기 위해 다수개가 서로 결합되거나 또는 본체의 일면에 체결공을 형성하고 이 체결공에 와이어를 삽입하여 클램프를 고정하여 사용하고 있으며, 이와 같은 클램프에 의해 설치된 파이프는 건물의 벽체에 별도의 와이어에 의해 지지되도록 되어 있다.Conventional clamps have a cover having a curvature radius corresponding to the pipe to be inserted into the inner circumferential surface and a curvature radius corresponding to the pipe so as to be hinged rotatably to one end of the body to surround the body and the double a pipe. Is provided, and the other end of the main body is hinged to the tightening bolt for tightening and fixing the pipe is fastened to the cover inserted. The clamp according to the above configuration is used to fix the clamp by coupling a plurality of pipes to each other or forming a fastening hole on one surface of the main body and inserting a wire into the fastening hole to couple the pipe in the vertical or horizontal direction. The pipe installed by the clamp is to be supported by a separate wire on the wall of the building.

하지만, 이와 같은 종래의 클램프를 사용하여 파이프를 서로 결합한 후에 별도로 이 파이프를 와이어에 의해 벽체에 지지되도록 할 경우에는 파이프를 클램프에 의해 결합시키는 작업과 파이프를 와이어로 벽체에 고정하는 작업을 행해야 하므로 비계의 설치작업이 번거로울 뿐만 아니라 상기 와이어에 의해 고정되는 파이프의 결합력을 보강하기 위해 버팀목이 되는 포스트용 파이프는 안전성을 고려하여 지중에 상당한 깊이로 세워야 하므로 비계를 설치하는데 소요되는 시간이 대폭적으로 늘어나게 되는 요인이 될 뿐만 아니라 파이프를 벽체에 고정시키는 와이어의 고정이 견고하지 못하여 파이프가 무너져 안전사고의 위험이 발생될 우려가 있다. However, if the pipes are to be supported on the wall by wires after joining the pipes together using such a conventional clamp, the work of joining the pipes by the clamps and the fixing of the pipes to the walls by wires must be performed. Not only is the installation work of the scaffolding difficult, but the post pipes, which are the supporting columns to reinforce the coupling force of the pipes fixed by the wires, have to be built at a considerable depth in the ground in consideration of safety, thus greatly increasing the time required for installing the scaffolding. In addition to being a factor, there is a risk that the pipe may be broken due to the inability of fixing the wire to fix the pipe to the wall, resulting in a safety accident.

본 발명은 전술한 바와 같은 문제점을 해결하기 위한 것으로, 본 발명의 목적은 건물의 시공시에 콘크리트에 미리 매립 설치되는 거푸집의 타이바를 이용하여 비계파이프를 수직 또는 수평방향으로 결합하도록 구비되며, 이에 의해 비계를 보 다 견고하고 안정적으로 설치하여 안전사고를 예방할 수 있을 뿐만 아니라 비계를 설치하는데 소요되는 시간을 대폭적으로 줄일 수 있는 비계파이프 설치용 클램프를 제공하는 것이다. The present invention is to solve the problems as described above, an object of the present invention is provided to combine the scaffolding pipe in the vertical or horizontal direction by using a tie bar of the formwork pre-installed in the concrete during the construction of the building, By providing a more robust and stable installation of scaffolding, it is possible to prevent safety accidents, and to provide a clamp for scaffolding pipe installation that can greatly reduce the time required to install the scaffold.

본 발명의 특징에 따르면, 건물의 벽체(1)에 근접 설치되는 비계파이프(2,3)가 삽입되도록 내주면에 비계파이프(2,3)에 대응된 곡률반경이 형성된 클램프본체(31)와, 이 클램프본체(31)의 일단에 회동 가능하도록 힌지결합되며 상기 클램프본체(31)에 삽입된 비계파이프(2,3)를 감싸도록 비계파이프(2,3)에 대응된 곡률반경이 형성된 클램프덮개(32)와, 상기 클램프본체(31)의 타단에 힌지결합되며 상기 클램프덮개(32)에 체결되어 삽입된 비계파이프(2,3)를 고정시키는 조임수단(33)을 포함하여 이루어지는 비계파이프 설치용 클램프에 있어서, 상기 벽체(1)는 타이바(50)에 의해 결합된 유로폼 거푸집의 내부에 콘크리트가 타설 및 양생된 후 형성되고, 상기 타이바(50)는 체결공(51)이 형성된 단부가 노출되도록 콘크리트에 의해 매립 설치되며, 상기 클램프본체(31)의 일면에는 상기 벽체(1)의 타이바(50) 측으로 연장되는 브라켓(38)이 결합되고, 이 브라켓(38)의 선단부에는 상기 체결공(51)에 끼움결합되는 결합편(39)이 형성되는 것을 특징으로 하는 비계파이프 설치용 클램프가 제공된다.According to a feature of the present invention, the clamp main body 31 has a curvature radius corresponding to the scaffolding pipes 2 and 3 formed on the inner circumferential surface to insert the scaffolding pipes 2 and 3 to be installed close to the wall 1 of the building, Clamp cover hinged to one end of the clamp body 31 so as to be rotatable and a radius of curvature corresponding to the scaffold pipes 2 and 3 is formed to surround the scaffold pipes 2 and 3 inserted into the clamp body 31. And a fastening means 33 which is hinged to the other end of the clamp body 31 and fastened to the clamp cover 32 to fix the scaffold pipes 2 and 3 inserted therein. In the clamp, the wall (1) is formed after the concrete is poured and cured in the interior of the euro-form formwork coupled by the tie bar (50), the tie bar (50) has an end formed with a fastening hole (51) Buried by concrete to be exposed, the clamp body (31) of A bracket 38 extending toward the tie bar 50 side of the wall 1 is coupled to a surface thereof, and a coupling piece 39 fitted to the coupling hole 51 is formed at a tip end of the bracket 38. Scaffolding pipe installation clamps are provided.

본 발명의 다른 특징에 따르면, 상기 브라켓(38)은 상기 비계파이프(2,3)가 지면에 수직 또는 수평방향으로 설치 가능하도록 상기 클램프본체(31)에 고정핀(40) 또는 용접에 의해 결합되는 것을 특징으로 하는 비계파이프 설치용 클램프가 제공된다.According to another feature of the invention, the bracket 38 is coupled to the clamp body 31 by a fixing pin 40 or welding so that the scaffold pipes 2 and 3 can be installed vertically or horizontally on the ground. Scaffolding pipe installation clamp is provided, characterized in that.

상술한 본 발명의 목적, 특징들 및 장점은 다음의 상세한 설명을 통하여 보다 분명해질 것이다. 이하, 본 발명의 바람직한 실시예를 첨부한 도면에 의거하여 설명하면 다음과 같다.The objects, features and advantages of the present invention described above will become more apparent from the following detailed description. Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 일실시예에 따른 클램프를 도시한 사시도이고, 도 2는 설치상태를 도시한 단면도이다. 도 1에 도시된 바와 같이, 본 발명의 클램프(30)는 내주면에 비계파이프(2,3)에 대응된 곡률반경이 형성된 클램프본체(31)가 구비되어 있으며, 이 클램프본체(31)의 일단에는 힌지(34)에 의해 결합된 클램프덮개(32)가 회동 가능하게 결합되어 있다. 상기 클램프덮개(32)는 상기 클램프본체(31)와 유사하게 곡률반경이 형성되어 상기 클램프본체(31)와 더블어 비계파이프(2,3)를 감싸도록 되어 있다. 또한 상기 클램프본체(31)의 타단에는 일단이 힌지(35)에 의해 결합된 볼트체(36)와 이 볼트체(36)에 나사결합되는 너트체(37)로 구비된 조임수단(33)이 구비되어 있으며, 상기 조임수단(33)은 비계파이프(2,3)가 클램프본체(31)에 삽입된 후에 클램프덮개(32)로 비계파이프(2,3)를 감싸 고정하도록 되어 있는데, 이와 같은 구성은 종래와 유사한 것이다.1 is a perspective view showing a clamp according to an embodiment of the present invention, Figure 2 is a cross-sectional view showing an installation state. As shown in FIG. 1, the clamp 30 of the present invention includes a clamp body 31 having a radius of curvature corresponding to the scaffolding pipes 2 and 3 on an inner circumferential surface thereof, and one end of the clamp body 31. The clamp cover 32 coupled by the hinge 34 is rotatably coupled. The clamp cover 32 has a radius of curvature similar to that of the clamp body 31 to surround the clamp body 31 and the double scaffold pipes 2 and 3. In addition, at the other end of the clamp body 31, a tightening means 33 having a bolt body 36, one end of which is coupled by a hinge 35, and a nut body 37 screwed to the bolt body 36, is provided. It is provided, the fastening means 33 is to wrap and fix the scaffold pipe (2, 3) with a clamp cover 32 after the scaffold pipe (2, 3) is inserted into the clamp body 31, such as The configuration is similar to the conventional one.

또한 상기 클램프본체(31)에는 일측으로 연장된 판형상의 브라켓(38)이 결합 되어 있으며, 상기 브라켓(38)의 선단부에는 하향 절곡된 결합편(39)이 구비되어 있는데, 상기 브라켓(38)은 비계파이프(2,3)가 지면에 수직 또는 수평방향으로 설치 가능하도록 상기 클램프본체(31)에 고정핀(40)에 의해 결합되거나 또는 용접에 의해 결합되는 것으로, 상기 고정핀(40)에 의해 결합될 경우에는 고정핀(40)을 상기 클램프본체(31)와 브라켓(38)을 관통시켜 결합한 후에 상기 고정핀(40)의 단부를 압착시켜 고정하게 된다. 이와 같이 결합된 결합봉(38)은 비계파이프(2,3)가 지면에 수직 또는 수평방향으로 설치 가능하도록 상기 클램프본체(31)에 위치되는 것이 바람직하고, 이에 의해 지면에 수직 설치되는 포스트용 비계파이프(2) 및 이 포스트용 비계파이프(2)에 직교되도록 지면에 수평 설치되는 빔용 비계파이프(3) 각각에 결합 가능하게 된다.In addition, the clamp body 31 is coupled to the plate-shaped bracket 38 extending to one side, the front end of the bracket 38 is provided with a coupling piece 39 bent downward, the bracket 38 is The scaffold pipes 2 and 3 are coupled to the clamp body 31 by a fixing pin 40 or by welding so that the scaffold pipes 2 and 3 can be installed in a vertical or horizontal direction on the ground, and by the fixing pin 40. When combined, the fixing pin 40 passes through the clamp body 31 and the bracket 38 to be coupled, and then the end of the fixing pin 40 is compressed to be fixed. The coupling rod 38 coupled as described above is preferably positioned on the clamp main body 31 so that the scaffold pipes 2 and 3 can be installed in the vertical or horizontal direction on the ground, whereby the post is installed vertically on the ground. It is possible to couple to the scaffolding pipe 2 and the beam scaffolding pipe 3 installed horizontally on the ground so as to be orthogonal to the post scaffolding pipe 2.

이상과 같은 본 발명의 클램프(30)가 설치상태를 보다 상세하게 설명하면 다음과 같다. 도 2에 도시된 바와 같이, 본 발명의 클램프(30)는 콘크리트에 미리 매립 설치된 타이바(50)에 결합 가능하도록 창출된 것으로, 상기 타이바(50)는 건물의 벽체(1)를 형성하기 위해 콘크리트가 타설되도록 유로폼 거푸집을 서로 연결시키는 것이다. 이와 같은 타이바(50)는 대개 콘크리트가 타설된 후에 거푸집이 제거된 후에도 그 단부가 노출된 상태로 콘크리트에 매립 설치되며, 타이바(50)의 단부에는 유로폼을 서로 결합시키기 위한 핀이 삽입되도록 체결공(51)이 형성되어 있다. 본 발명은 이와 같은 타이바(50)를 이용하여 비계파이프(2,3)를 설치하는 것이며, 상기 타이바(50)의 체결공(51)에 끼움결합되도록 전술된 바와 같이 결합편(39)이 형성된 브라켓(38)이 상기 클램프본체(31)의 일면에 결합되어 있는 것이다. 상 기 타이바(50)에 끼움결합되는 클램프(30)는 비계파이프(2,3)를 지면의 수직 또는 수평방향으로 결합 가능하도록 클램프본체(31)와 브라켓(38)의 결합방향으로 선택적으로 할 수 있음을 물론이며, 필요에 따라서는 결합편(39)의 절곡된 방향을 변화시킨다거나 또는 브라켓(38)의 일측을 절곡시킬 수 있음은 당연한 것이다. 또한 설명되지 않은 부호는 상기 체결공(51)이 형성된 타이바(50)의 단부는 콘크리트가 완전히 양생된 후에 제거하기 편리하도록 콘크리트가 매립되는 지점에 노치부(52)가 형성되어 있다.The clamp 30 of the present invention as described above will be described in more detail as follows. As shown in Figure 2, the clamp 30 of the present invention is created to be coupled to the tie bar 50 pre-embedded in concrete, the tie bar 50 is to form a wall (1) of the building This is to connect the Eurofoam formwork with each other so that concrete can be poured. Such a tie bar 50 is usually embedded in concrete with its end exposed after the formwork is removed after the concrete is poured, and pins for coupling the euroforms are inserted into the end of the tie bar 50. The fastening hole 51 is formed. The present invention is to install the scaffolding pipe (2, 3) using the tie bar 50 as described above, the coupling piece 39 as described above to be fitted to the fastening hole 51 of the tie bar 50. The formed bracket 38 is coupled to one surface of the clamp body 31. The clamp 30 fitted to the tie bar 50 is selectively in the coupling direction of the clamp main body 31 and the bracket 38 so that the scaffold pipes 2 and 3 can be coupled in the vertical or horizontal direction of the ground. Of course, if necessary, it is natural that the bending direction of the coupling piece 39 can be changed or one side of the bracket 38 can be bent. In addition, the reference numeral is not described, the end of the tie bar 50 in which the fastening hole 51 is formed, the notch portion 52 is formed at the point where the concrete is embedded to facilitate the removal after the concrete is completely cured.

이상과 같은 본 발명에 의하면, 건물의 시공중에 콘크리트에 매립 설치되는 타이바(50)를 이용하여 비계파이프(2,3)를 설치할 수 있도록 클램프본체(31)의 일면에 상기 타이바(50) 측으로 연장되는 브라켓(38)을 결합하고, 이 브라켓(38)의 선단부에는 타이바(50)의 노출된 단부에 형성된 체결공(51)에 끼움결합되도록 결합편(39)이 형성되어 비계파이프(2,3)를 보다 안정적이고 견고하게 설치할 수 있을 뿐만 아니라 비계를 설치하는데 소요되는 시간을 대폭적으로 줄일 수 있는 것이다. According to the present invention as described above, the tie bar 50 on one surface of the clamp body 31 so that the scaffolding pipes 2 and 3 can be installed using the tie bar 50 embedded in concrete during construction of the building. The bracket 38 extending to the side is coupled, and the engaging piece 39 is formed at the distal end of the bracket 38 so as to fit into the fastening hole 51 formed at the exposed end of the tie bar 50, and thus the scaffolding pipe ( In addition to the more stable and robust installation of 2,3), the time required to install the scaffold can be greatly reduced.

이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능함은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명백할 것이다.The present invention described above is not limited to the above-described embodiment and the accompanying drawings, and various substitutions, modifications, and changes are possible within the scope without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.

이상에서와 같이 본 발명에 의하면, 건물의 시공중에 콘크리트에 매립 설치되는 타이바(50)를 이용하여 비계파이프(2,3)를 설치할 수 있도록 클램프본체(31)의 일면에 상기 타이바(50) 측으로 연장되는 브라켓(38)을 결합하고, 이 브라켓(38)의 선단부에는 타이바(50)의 노출된 단부에 형성된 체결공(51)에 끼움결합되도록 결합편(39)이 형성되어 비계파이프(2,3)를 보다 안정적이고 견고하게 설치할 수 있어 종래처럼 벽체에 견고하게 고정되지 못한 비계파이프가 무너져 발생할 수 있는 안전사고의 위험을 대폭적으로 줄일 수 있을 뿐만 아니라 비계를 설치하는데 소요되는 시간을 대폭적으로 줄일 수 있는 장점이 있다. As described above, according to the present invention, the tie bar 50 is provided on one surface of the clamp main body 31 so that the scaffold pipes 2 and 3 can be installed using the tie bar 50 embedded in concrete during construction of the building. ) Coupled to the bracket 38 extending to the side, and the coupling piece 39 is formed at the distal end of the bracket 38 so as to fit into the fastening hole 51 formed in the exposed end of the tie bar 50, the scaffolding pipe (2,3) can be installed more stably and firmly, which greatly reduces the risk of safety accidents caused by collapse of scaffolding pipes, which are not securely fixed to the wall, as well as the time required to install the scaffold. There is an advantage that can be greatly reduced.

또한 상기 브라켓(38)은 비계파이프(2,3)가 지면의 수직 또는 수평방향으로 설치 가능하도록 클램프본체(31)에 고정핀(40) 또는 용접에 의해 결합되어 종래처럼 포스트용 파이프(2)에 빔용 파이프(3)가 결합되는 것이 아니라 건물의 벽체(1)에 포스트용 비계파이프(2)와 빔용 비계파이프(3)가 각각 결합되어 보다 견고한 결합력을 가질 수 있는 장점이 있으며, 이에 의해 종래처럼 포스트용 비계파이프(2)를 지중에 상당한 깊이로 매립해야 하는 불편함을 줄일 수 있을 뿐만 아니라 그에 따른 작업시간을 단축시킬 수 있는 장점이 있다. In addition, the bracket 38 is coupled to the clamp body 31 by a fixing pin 40 or welding so that the scaffold pipes 2 and 3 can be installed in the vertical or horizontal direction of the ground, so that the pipe 2 for the post is conventional. E-beam pipe (3) is not coupled to the building wall (1) of the post scaffolding pipe (2) and beam scaffolding pipe (3) has the advantage that each can have a more robust coupling force, thereby Like the post scaffold pipe (2) to reduce the inconvenience of having to be buried in the ground to a considerable depth, there is an advantage that can reduce the work time accordingly.

Claims (2)

건물의 벽체(1)에 근접 설치되는 비계파이프(2,3)가 삽입되도록 내주면에 비계파이프(2,3)에 대응된 곡률반경이 형성된 클램프본체(31)와, 이 클램프본체(31)의 일단에 회동 가능하도록 힌지결합되며 상기 클램프본체(31)에 삽입된 비계파이프(2,3)를 감싸도록 비계파이프(2,3)에 대응된 곡률반경이 형성된 클램프덮개(32)와, 상기 클램프본체(31)의 타단에 힌지결합되며 상기 클램프덮개(32)에 체결되어 삽입된 비계파이프(2,3)를 고정시키는 조임수단(33)을 포함하여 이루어지는 비계파이프 설치용 클램프에 있어서, 상기 벽체(1)는 타이바(50)에 의해 결합된 유로폼 거푸집의 내부에 콘크리트가 타설 및 양생된 후 형성되고, 상기 타이바(50)는 체결공(51)이 형성된 단부가 노출되도록 콘크리트에 의해 매립 설치되며, 상기 클램프본체(31)의 일면에는 상기 벽체(1)의 타이바(50) 측으로 연장되는 브라켓(38)이 결합되고, 이 브라켓(38)의 선단부에는 상기 체결공(51)에 끼움결합되는 결합편(39)이 형성되는 것을 특징으로 하는 비계파이프 설치용 클램프.A clamp main body 31 having a curvature radius corresponding to the scaffolding pipes 2 and 3 formed on an inner circumferential surface thereof so that the scaffold pipes 2 and 3 which are installed in close proximity to the wall 1 of the building are inserted; A clamp cover 32 hinged to one end to be rotatable and having a radius of curvature corresponding to the scaffold pipes 2 and 3 so as to surround the scaffold pipes 2 and 3 inserted into the clamp main body 31, and the clamp In the clamp for scaffolding pipe installation comprising a fastening means 33 hinged to the other end of the main body 31 and fastened to the clamp cover 32 to secure the inserted scaffold pipes (2,3), the wall ( 1) is formed after the concrete is poured and cured inside the euro-form formwork coupled by the tie bar 50, the tie bar 50 is installed by embedding the concrete so that the end formed with the fastening hole 51 is exposed The other surface of the wall (1) on one surface of the clamp body (31) A bracket (38) extending to the side of the bar (50) is coupled, the end portion of the bracket (38) is a clamp for mounting a scaffold pipe, characterized in that the engaging piece 39 is fitted to the fastening hole 51 is formed. 제1항에 있어서, 상기 브라켓(38)은 상기 비계파이프(2,3)가 지면에 수직 또는 수평방향으로 설치 가능하도록 상기 클램프본체(31)에 고정핀(40) 또는 용접에 의해 결합되는 것을 특징으로 하는 비계파이프 설치용 클램프.The method of claim 1, wherein the bracket 38 is coupled to the clamp body 31 by a fixing pin 40 or welding so that the scaffold pipes (2, 3) can be installed in the vertical or horizontal direction on the ground. Scaffolding pipe mounting clamp.
KR1020070060981A 2007-06-21 2007-06-21 Clamp for a scaffold pipe KR100828161B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070060981A KR100828161B1 (en) 2007-06-21 2007-06-21 Clamp for a scaffold pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070060981A KR100828161B1 (en) 2007-06-21 2007-06-21 Clamp for a scaffold pipe

Publications (1)

Publication Number Publication Date
KR100828161B1 true KR100828161B1 (en) 2008-05-08

Family

ID=39649960

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070060981A KR100828161B1 (en) 2007-06-21 2007-06-21 Clamp for a scaffold pipe

Country Status (1)

Country Link
KR (1) KR100828161B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225392A (en) * 2013-04-17 2013-07-31 中国十七冶集团有限公司 Method for setting novel fastener type steel pipe external scaffold wall connection piece
CN110821141A (en) * 2019-10-31 2020-02-21 上海建工七建集团有限公司 Scaffold wall connecting piece and using method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070010720A (en) 2005-07-19 2007-01-24 김동영 Euro-form mold for exposed concreate and method for constructing the exposed concreate using the same

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070010720A (en) 2005-07-19 2007-01-24 김동영 Euro-form mold for exposed concreate and method for constructing the exposed concreate using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225392A (en) * 2013-04-17 2013-07-31 中国十七冶集团有限公司 Method for setting novel fastener type steel pipe external scaffold wall connection piece
CN110821141A (en) * 2019-10-31 2020-02-21 上海建工七建集团有限公司 Scaffold wall connecting piece and using method thereof

Similar Documents

Publication Publication Date Title
KR100895381B1 (en) Form safety balustrade pole
KR100828161B1 (en) Clamp for a scaffold pipe
KR20100009385U (en) Improvement connecting clamp of h beam
JP2007120039A (en) Void form arrangement implement and void form arrangement method
US20110302880A1 (en) Rebar Sleeve Unit
KR100865991B1 (en) Clamp for a scaffold pipe
JP2020165232A (en) Anchor member and installation method
KR100952991B1 (en) Sleeve pipe holder
KR200205940Y1 (en) Supporter for form construction
KR100737841B1 (en) Clamp for fixing a concrete form
KR200442013Y1 (en) A structure of penetration sleeve
KR20130129151A (en) Clamp of system support for construction
JP4949183B2 (en) Parallel clevis
JP3862707B2 (en) Construction method of overpass slab and precast concrete plate for overhang slab
KR101526200B1 (en) Cd pipe supporting apparatus and weight fixing method and wall installing method
KR101263484B1 (en) Apparatus for supporting structure & combining clip used in the same
KR20110108902A (en) Exterior fixing device of building
KR101141786B1 (en) Bracket connecting apparatus and installing method thereof
CN205804922U (en) A kind of novel embedded tool formula scaffold wall connecting piece
KR200430669Y1 (en) Apparatus for fixing a terminal box to a wall of building
US20060284025A1 (en) Conduit spacer
KR101429752B1 (en) A support jig of concrete trust anchor module
KR102254430B1 (en) Firefighting earthquake-resistant shaking prevention struting supporter concrete fixing structure of anchor bolt protrusion type with increased detachment prevention function
KR100704387B1 (en) Fixing Structure of Outside water pipe
KR20120128341A (en) Bracket for installing a safety net of a steel frame construction

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130327

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140221

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150217

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160212

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170222

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20190226

Year of fee payment: 12