KR100817627B1 - preceding tension type lock bolt and construction method by using it - Google Patents

preceding tension type lock bolt and construction method by using it Download PDF

Info

Publication number
KR100817627B1
KR100817627B1 KR1020060067740A KR20060067740A KR100817627B1 KR 100817627 B1 KR100817627 B1 KR 100817627B1 KR 1020060067740 A KR1020060067740 A KR 1020060067740A KR 20060067740 A KR20060067740 A KR 20060067740A KR 100817627 B1 KR100817627 B1 KR 100817627B1
Authority
KR
South Korea
Prior art keywords
tension
hole
wedge
lock bolt
tension member
Prior art date
Application number
KR1020060067740A
Other languages
Korean (ko)
Other versions
KR20070016944A (en
Inventor
신종덕
Original Assignee
신종덕
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신종덕 filed Critical 신종덕
Priority to KR1020060067740A priority Critical patent/KR100817627B1/en
Priority to PCT/KR2006/003008 priority patent/WO2007015614A1/en
Publication of KR20070016944A publication Critical patent/KR20070016944A/en
Application granted granted Critical
Publication of KR100817627B1 publication Critical patent/KR100817627B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 파이프(10)와; 상기 파이프(10)의 한쪽끝단에 분리가능하게 설치되되, 2개 이상의 부채꼴로 균등 분할되고 이렇게 분할된 경계면을 중심으로 하여 인장재공(21)과 추형홀(22)이 형성된 확장부재(20)와; 상기 파이프(10)와 확장부재(20)를 관통하여 설치되되 파이프(10)와 확장부재(20)가 조립된 양쪽단부에서 돌출되게 설치되는 인장재(30); 상기 인장재(30)의 한쪽끝단에 체결 고정되며 확장부재(20)를 확장시킬 수 있도록 확장부재(20)의 추형홀(22)에 삽입 설치되는 쐐기(40)를 포함하는 선행인장타입 록 볼트에 관한 것이다.

본 발명의 선행인장타입 록 볼트는 인장재의 끝단에 장착된 쐐기가 당겨지면 확장부재를 그 외측, 즉 방사상으로 확장시키면서 인장재와 파이프가 완전 분리된 후 천공구멍의 내주면에 견고하게 고정되며, 상기 확장부재가 천공구멍의 내면에 고정된 상태에서 인장재에 가했던 인장하중을 해제한 후 파이프를 빼내어 분리한 다음 인장재에 인장력을 부여하여 유지시킴으로써 그라우팅재를 주입하기 전에 확장부재와 인장재를 이용하여 암반에 선행하중을 먼저 재하할 수 있으며, 이로 인하여 별도의 그라우팅 작업을 생략하고 계속하여 추가 천공작업을 수행하거나 주입된 그라우팅재의 양생기간 없이 바로 추가적인 굴착작업을 진행할 수 있음에 따라 공사기간이 단축되는 것이다.

Figure R1020060067740

선행인장, 록 볼트, 확장부재, 인장재, 그라우팅

The present invention is a pipe (10); The expansion member 20 is detachably installed at one end of the pipe 10 and is equally divided into two or more fan shapes, and the tension member 21 and the conical hole 22 are formed around the divided interface. ; A tension member 30 installed through the pipe 10 and the expansion member 20 to protrude from both ends of the pipe 10 and the expansion member 20 assembled; Fastened to one end of the tension member 30 to the pre-tension type lock bolt including a wedge 40 is inserted into the weight hole 22 of the expansion member 20 to expand the expansion member 20 It is about.

The pre-tension type lock bolt of the present invention is firmly fixed to the inner circumferential surface of the perforation hole after the tension member and the pipe are completely separated while the wedge mounted at the end of the tension member is pulled out, ie, the extension member is extended radially. Release the tensile load applied to the tension member while the member is fixed to the inner surface of the drilled hole, remove the pipe, separate it, and apply tension to the tension member to maintain it. The preceding load can be loaded first, and thus the construction period can be shortened by omitting a separate grouting operation and continuing to perform additional drilling work or proceeding additional excavation work without curing period of the injected grouting material.

Figure R1020060067740

Leading tension, lock bolt, extension member, tension member, grouting

Description

선행인장타입 록 볼트 및 이를 이용한 시공방법{preceding tension type lock bolt and construction method by using it}Preceding tension type lock bolt and construction method by using it}

도 1은 본 발명에 따른 일 실시예의 선행인장타입 록 볼트를 개략적으로 나타낸 구성도,1 is a configuration diagram schematically showing a pre-tension type lock bolt of an embodiment according to the present invention,

도 2a는 본 발명에 따른 선행인장타입 록 볼트에서 천공구멍 내의 매립정착부분을 발췌하여 나타낸 분해 사시도,Figure 2a is an exploded perspective view showing an extract of the buried fixing portion in the drilling hole in the pre-tension type lock bolt according to the present invention;

도 2b는 도 2a의 조립 단면도,FIG. 2B is a cross sectional view of FIG. 2A;

도 2c는 도 2b에서 웨지캡을 분리제거한 상태의 측면도, Figure 2c is a side view of the wedge cap removed in Figure 2b,

도 3a는 본 발명에 따른 선행인장타입 록 볼트에서 천공구멍의 입구에 장착되는 외측장착부분을 발췌하여 나타낸 분해 사시도,Figure 3a is an exploded perspective view showing an extract of the outer mounting portion mounted to the inlet of the drilling hole in the pre-tension type lock bolt according to the present invention,

도 3b는 도 3a의 조립 단면도,3B is an assembled cross sectional view of FIG. 3A;

도 4a 내지 4e는 본 발명에 따른 선행인장타입 록 볼트를 이용하여 시공하는 과정을 나타낸 공정도,4a to 4e is a process diagram showing the process of construction using the pre-tension type lock bolt according to the present invention,

도 5a와 도 5b는 본 발명의 선행인장타입 록 볼트에서 매립정착부분에 대한 다른 실시 예를 나타낸 단면도,5a and 5b is a cross-sectional view showing another embodiment of the buried fixing portion of the pre-tension type lock bolt of the present invention,

도 6a, 도 6b와 도 7a, 도 7b는 본 발명의 선행인장타입 록 볼트에서 매립정착부분의 쐐기에 대한 또 다른 실시 예들을 나타낸 단면도,Figures 6a, 6b and 7a, 7b is a cross-sectional view showing another embodiment of the wedge of the buried anchoring portion in the pre-tension type lock bolt of the present invention,

도 8은 본 발명의 선행인장타입 록 볼트에서 외측장착파트에 대한 다른 실시 예를 나타낸 단면도이다.Figure 8 is a cross-sectional view showing another embodiment of the outer mounting part in the pre-tension type lock bolt of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10: 파이프 12: 플랜지10: pipe 12: flange

14: 볼트 20: 확장부재14: bolt 20: expansion member

21,46: 인장재공 22,45: 추형홀21,46: Tension material 22,45: Conical hole

24: 스냅링 25: 이음부24: snap ring 25: joint

30: 인장재 40,40a,40b: 쐐기30: tension member 40, 40a, 40b: wedge

41: 라이너 42,42a: 추체웨지41: liner 42, 42a: vertebra wedge

43: 웨지캡 43a: 라이너캡43: wedge cap 43a: liner cap

43b: 추체캡 50: 외측정착부재43b: weight cap 50: outer fixing member

51: 지압판재 52: 인장재공51: acupressure plate 52: tension member

53,62: 호스구멍 55: 인장유지부재53, 62: hose hole 55: tension holding member

56: 고정몸체 57: 외측웨지56: fixed body 57: outer wedge

58: 몸체캡 60: 패커58: body cap 60: packer

본 발명은 터널 굴착공사시나 암반 공사시에 불연속적인 암반의 지지력을 강 화하기 위하여 사용되는 선행인장타입 록 볼트 및 이를 이용한 시공방법에 관한 것으로서, 더욱 상세하게는, 먼저 확장부재를 확장시켜 천공구멍의 내면에 정착 고정시킨 후 파이프를 제거하고 인장재에 인장력을 부여 유지, 선행하중을 재하(在荷)하여 암반의 불연속면이 구속되어 사면의 안전성이 강화되므로 그라우팅재의 양생기간 없이 바로 추가 굴착작업이 가능하여 공사기간을 단축할 수 있는 선행인장타입 록 볼트 및 이를 이용한 시공방법에 관한 것이다.The present invention relates to a pre-tension type lock bolt and a construction method using the same, which is used to strengthen the support capacity of discontinuous rock at the time of tunnel excavation or rock construction, and more specifically, the expansion member is first expanded by drilling holes After fixing and fixing the inner surface of the pipe, the pipe is removed and tension is applied to the tension member, and the preceding load is reloaded. The discontinuous surface of the rock is constrained to increase the safety of the slope, so additional excavation work is possible without the curing period of the grouting material. The present invention relates to a pre-tension type lock bolt capable of shortening the construction period and a construction method using the same.

일반적으로, 록 볼트는 지하구조물, 터널 등의 지반보강공법(地盤補强工法)의 일종, 또는 이에 사용되는 볼트 또는 록 볼트라고 하는 것으로, 이는 터널 주위의 암반에 소정의 지름으로 소정깊이만큼 천공을 하고 그 천공구멍에 볼트를 끼워 고정시키는 공법이다.In general, the lock bolt is a kind of ground reinforcement method such as underground structure, tunnel, or the like, or a bolt or lock bolt used therein, which drills a predetermined depth to a rock around the tunnel by a predetermined diameter. It is a method of fixing bolts in the drilled holes.

이러한 록 볼트는 토목건축공사, 특히 터널공사 등에 있어서는 산의 암반을 포함하는 지중에 구멍을 천공하게 된다. 이와 같이 천공된 구멍에 소정의 폭발물, 예를 들어 다이너마이트와 같은 폭발물을 터뜨려 암반을 깨면서 터널의 기초구멍을 넓혀 나아가게 되는 것으로, 일정한 높이와 넓이로 기초터널을 뚫고 난 후, 이 기초터널의 붕괴를 방지하기 위하여 기초터널의 안쪽 면에 무수히 많은 록 볼트(기초볼트)를 박고 격자형상의 망을 설치한 다음, 최종적으로 콘크리트를 타설하여 보강막 공사를 수행하게 된다.Such a lock bolt drills a hole in the ground including mountain rock in civil construction work, especially in tunnel work. The explosives, such as dynamite, for example, explode in the perforated holes to break the rock and widen the tunnel's foundation hole. After drilling the foundation tunnel at a certain height and width, the foundation tunnel collapses. In order to prevent this, a lot of rock bolts (base bolts) are put on the inner side of the foundation tunnel, a grid mesh is installed, and concrete is finally poured to perform reinforcement film construction.

상기 보강막 공사는 먼저 착암기나 파쇄기를 이용하여 암반에 록 볼트가 삽입될 구멍을 천공한 다음, 이 천공구멍에 시멘트몰탈을 타설하고 록 볼트를 삽입하거나 록 볼트를 삽입한 후 시멘트몰탈을 타설하는 것으로, 상기 시멘트몰탈이 양생 되면 록 볼트는 암반 속에 견고하게 고정된다. 여기서 록 볼트는 소정간격마다 설치되므로 망에 분사된 콘크리트 하중을 충분히 견디면서 견고하게 고정 상태를 유지하게 된다.The reinforcement film construction first drills a hole into which the rock bolt is to be inserted into the rock using a rock drill or a crusher, and then casts the cement mortar into the drill hole and then inserts the lock bolt or inserts the lock bolt into the cement mortar. When the cement mortar is cured, the lock bolt is firmly fixed in the rock. In this case, the lock bolt is installed at predetermined intervals so that the lock bolt is sufficiently endured while maintaining the fixed load.

그러나 이러한 종래의 록 볼트는, 천공구멍에 시멘트몰탈을 타설하여 이 시멘트몰탈이 양생될 때까지 기다렸다가 지압판을 대고 견고하게 록 볼트를 체결하고, 2-3주후에 시멘트몰탈이 완전히 굳게 되면 일정 하중 이상을 지탱할 수 있는지를 인발실험을 통하여 확인한 다음, 각종 자재나 구조물 등을 설치하므로 공사기간이 오래 걸릴 뿐만 아니라 지지력의 향상을 위하여 다수의 록 볼트를 설치하여야 하는 문제점이 있었다.However, such a conventional lock bolt is to wait until the cement mortar is cured by placing cement mortar in the drilled hole, and then tighten the lock bolt firmly with the pressure plate, and after 2-3 weeks, the cement mortar is completely hardened. After confirming whether the bearing can be supported through the drawing test, various materials or structures are installed, and thus the construction period is long, and there is a problem that a plurality of lock bolts must be installed to improve the bearing capacity.

이러한 록 볼트를 이용하여 보강하는 장치라든가 그 공법들이 지속적으로 제안 개발되고 있는 실정이며, 일예로, 대한민국 특허 제108419호의 '갱도암반용 고정용 록 볼트'가 제시되어 있다.A device for reinforcing using such a lock bolt or the construction methods are continuously being developed and developed, for example, 'locking bolt for the rock rock' of Korean Patent No. 108419 is presented.

상기 특허의 특징은 그 청구범위에 의해 알 수 있듯이, 선단에 테이퍼형의 제1쐐기부재를 가지고 후단에 너트가 체결되는 나사부를 갖는 볼트동체와, 쐐기부재에 의하여 확장 가능한 확장부싱을 포함하는 갱도암반층 고정용 록 볼트에 있어서, 상기 확장부싱은 내부양측에 테이퍼형 쐐기접속면이 형성된 관상이고 양단외면에 일측 방향으로 경사진 나선형의 톱니링이 형성되면서 길이방향으로 절결되어 수개의 확장편으로 구성되는 톱니관을 가지며, 상기 볼트동체에 삽입된 확장부싱의 후단 측에는 제1쐐기부재에 대향된 테이퍼형의 제2쐐기부재가 삽입되며, 상기 제2쐐기부재를 확장부싱 측으로 전진시키는 가압관이 삽입되는 것이었다.The features of the patent, as can be seen by the claims, include a bolt body having a tapered first wedge member at its tip and a threaded portion to which a nut is fastened at its rear end, and a tunnel including an expandable bushing expandable by the wedge member. In the rock layer fixing rock bolt, the expansion bushing is a tubular tapered wedge connection surface formed on both sides of the inner side and a spiral toothing ring inclined in one direction on both outer surfaces thereof is cut in the longitudinal direction and composed of several extension pieces. It has a sawtooth pipe which is inserted, the tapered second wedge member opposite to the first wedge member is inserted into the rear end side of the expansion bushing inserted into the bolt body, the pressure pipe for advancing the second wedge member to the expansion bushing side is inserted It was to be.

상기와 같은 구성의 특허에 있어서는 볼트동체에 제1쐐기부재가 일체로 마련되어 제작이 어렵고, 별도로 마련한다하여도 나사체결방식이나 용접에 의해 일체화시켜야 하는 등의 제작이 공정이 많고 번거롭다는 문제점이 있었다.In the patent of the above-described configuration, the first wedge member is integrally formed on the bolt body, which makes it difficult to manufacture, and even if it is provided separately, the manufacturing process such as the screw fastening method or the need to integrate by welding is complicated and cumbersome. there was.

또한, 너트를 조일수록 볼트동체는 당겨지고 가압관은 밀리면서 볼트동체 끝단의 제1쐐기부재와, 제2쐐기부재가 확장부싱의 양쪽에 방사상으로 절개된 다수의 확장편을 외곽의 방사상으로 확장시키는 것이나 확장부싱의 확장편이 확장될수록 볼트동체와 가압관에 걸리는 부하가 급격하게 증대되는 과부하로 인해 너트를 죌 수 없고, 이로 인하여 확장부싱의 확장편을 제대로 확장시킬 수 없어 록 볼트 조립체가 천공구멍에 견고하게 고정되지 않는다는 문제점이 있었다.Further, as the nut is tightened, the bolt body is pulled and the pressure tube is pushed, and the first wedge member at the end of the bolt body and the second wedge member are radially extended to the outer side of the plurality of extension pieces cut radially at both sides of the expansion bushing. As the extension part of the extension bushing is expanded, the nut can not be removed due to the overload which causes the load on the bolt fuselage and the pressure tube to increase rapidly. There was a problem that it is not fixed firmly.

특히, 볼트동체 끝단의 제1쐐기부재와, 가압관에 의해 밀리는 제2쐐기부재가 확장편을 외곽의 방사상으로 확장시키나 확장부싱의 양쪽에 방사상으로 절개된 다수의 조각편인 확장편이 일체로 마련되어 있기 때문에 쐐기와 같이 확장되어 천공구멍의 내주면과 확장편 전체가 면 접촉되지 않고 이로 인하여 고정력이 다소 약하므로 볼트동체에 인장력을 부여함에 제약이 따른다는 문제점이 있었다.In particular, the first wedge member at the end of the bolt body and the second wedge member pushed by the pressure tube expand the extension piece radially outwardly, but an extension piece which is a plurality of pieces cut radially in both sides of the expansion bushing is integrally provided. Therefore, the inner circumferential surface of the perforated hole and the entire extension piece do not come into contact with the surface because of this, and thus the fixing force is somewhat weak. Therefore, there is a problem in that the tension is applied to the bolt body.

본 발명은 종래 터널 굴착공사시나 암반 공사시에 시공되는 록 볼트가 지닌 문제점을 해결하기 위해 연구개발한 것으로서, 그 목적은 확장부재를 인장재 끝단의 쐐기로 확장시켜 천공구멍의 내면에 정착 고정시킨 후, 파이프를 제거하고 인장재에 인장력을 부여 유지, 즉 선행하중을 재하(在荷)함으로써 암반의 불연속면이 구속되어 사면의 안전성이 강화되게 되며, 이로 인하여 그라우팅재의 양생기간 없이 바로 추가 굴착작업이 가능하여 공사기간을 단축할 수 있도록 한 선행인장타입 록 볼트 및 이를 이용한 시공방법을 제공하는데 있다.The present invention has been researched and developed in order to solve the problems of the conventional rock bolt construction in tunnel excavation or rock construction, the purpose of the expansion member is fixed to the inner surface of the drilling hole by extending the wedge of the tension member end By removing the pipes and applying the tensile force to the tension member, that is, by reloading the preceding load, the discontinuity of the rock is constrained to enhance the safety of the slope, which allows additional excavation work immediately without the curing period of the grouting material. To provide a pre-tension type lock bolt and a construction method using the same to shorten the construction period.

또한 본 발명의 다른 목적은 확장부재를 확장시켜 천공구멍에 정착 고정시킨 후 파이프를 빼내어 제거함으로써 그 시공현장에서 곧바로 재조립하여 고가의 자재인 파이프를 다시 활용할 수 있으며, 이로 인하여 갈수록 심각하게 대두되고 있는 고가의 원자재로 인한 부담을 ⅓이상 줄일 수 있도록 한 선행인장타입 록 볼트 및 이를 이용한 시공방법을 제공하는데 있다.In addition, another object of the present invention is to expand the expansion member to fix the fixed hole in the perforated hole and then remove the pipe to remove the re-assembly immediately in the construction site to reuse the expensive material pipe, which is due to the more serious The present invention provides a pre-tension type lock bolt and construction method using the same to reduce the burden of expensive raw materials.

상기 목적을 달성하기 위하여 본 발명에 따른 선행인장타입 록 볼트는, 파이프; 상기 파이프의 한쪽끝단에 분리가능하게 설치되되, 2개 이상의 부채꼴로 균등 분할되고 이렇게 분할된 경계면을 중심으로 하여 인장재공과 추형홀이 형성된 확장부재; 상기 파이프와 확장부재를 관통하여 설치되되 파이프와 확장부재가 조립된 양쪽단부에서 돌출되게 설치되는 인장재; 상기 인장재의 끝단에 체결 고정되며 확장부재를 확장시킬 수 있도록 확장부재의 추형홀에 삽입 설치되는 쐐기를 포함하는 것을 특징으로 한다.In order to achieve the above object, the pre-tension type lock bolt according to the present invention includes a pipe; An expansion member detachably installed at one end of the pipe, the extension member being equally divided into two or more fan shapes and having a tension hole and a conical hole around the divided interface; A tension member installed through the pipe and the expansion member, the tension member being installed to protrude from both ends of the assembled pipe and the expansion member; It is characterized in that it comprises a wedge is fastened and fixed to the end of the tension member is inserted into the weight hole of the expansion member to expand the expansion member.

본 발명에 따른 선행인장타입 록 볼트에서 확장부재는 완전 분리되지 않고 연결된 이음부에 의해 하나로 마련할 수 있으며, 상기 확장부재의 추형홀에는 그 단부에 링홈을 형성하고 이 링홈에는 추형홀에 삽입 설치되는 쐐기의 분리 이탈이 방지되도록 스냅링을 끼워 조립할 수 있다. 이 경우에는 인장재와 그 끝단의 쐐기가 확장부재와 파이프에서 분리 이탈되지 않아 운반 및 시공이 가능하므로 인장재에 외부정착부재를 조립하지 않은 상태로 출하가 가능하고 작업현장에서 시공할 때 조립하여 사용하면 된다.In the pre-tension type lock bolt according to the present invention, the expansion member may be provided as one by a connected joint part without being completely separated, and the ring hole of the expansion member is formed with a ring groove at its end, and the ring groove is inserted into the ball hole. It can be assembled by inserting a snap ring to prevent separation and separation of the wedge to be. In this case, the tension member and its wedges can be transported and installed because they are not separated and separated from the expansion member and the pipe. Therefore, the tension member and its wedge can be shipped without assembling the external fixing member to the tension member. do.

상기 확장부재의 인장재공과 추형홀은 확장부재의 중심선상에 마련할 수 있고, 상기 확장부재를 3개 이상으로 균등 분할한 경우엔 그 분할개수만큼 서로 이웃하는 확장부재 사이의 분할경계면을 중심으로 하여 형성할 수도 있다. The tension member hole and the conical hole of the expansion member may be provided on the center line of the expansion member, and when the expansion member is equally divided into three or more, the division boundary surface between neighboring expansion members is divided by the number of divisions. It may be formed.

본 발명의 선행인장타입 록 볼트에서 상기 쐐기는 확장부재의 추형홀로 삽입되어 인장재의 외면을 파지하며 적어도 2개 이상으로 분할되면서 속이 빈 형상의 추체웨지; 이 추체웨지가 이탈되지 않도록 직경이 큰 외면에 체결되는 웨지캡으로 구성된다.In the pre-tension type lock bolt of the present invention, the wedge is inserted into the weight hole of the expansion member to grip the outer surface of the tension member and divided into at least two or more hollow shape weight wedge; It is composed of a wedge cap that is fastened to the outer diameter of the large diameter so that the weight wedge is not separated.

또한, 상기 쐐기는 확장부재의 추형홀로 삽입되며 내면이 추형홀이고 이 추형홀에 대하여 거의 일정한 두께의 추형외면을 갖는 원추통형의 라이너; 이 라이너의 추형홀로 삽입되어 인장재의 외면을 파지하며 적어도 2개 이상으로 분할되면서 속이 빈 형상의 추체웨지; 상기 라이너의 한쪽인 직경이 큰 외면에 체결되어 추체웨지가 이탈되지 않도록 씌워지는 라이너캡으로 구성된다.In addition, the wedge is inserted into the conical hole of the expansion member and the inner surface is a conical liner having a conical outer surface of a substantially constant thickness with respect to the conical hole; A hollow shape weight wedge inserted into a weight hole of the liner to hold an outer surface of the tension member and divided into at least two or more; It is composed of a liner cap that is fastened to the outer surface of a large diameter that is one side of the liner so as not to escape the vertebrae wedge.

또한 본 발명의 선행인장타입 록 볼트에서 상기 쐐기는 확장부재의 추형홀과 상응하는 형상으로 형성되되, 3개 이상으로 등분된 위치에 추형홀이 형성되고 이 추형홀에서 3개 이상의 인장재가 하나의 원을 이루도록 모아주는 인장재공을 갖는 원추통형의 추체와, 이 추체의 각 추형홀 내에 설치되어 그 내부로 관통하는 인장 재를 의 외면을 파지하며 적어도 2개 이상으로 분할되면서 속이 빈 형상의 추체웨지 및 상기 추체에 씌워져 추체웨지가 분리 이탈되지 않도록 하는 추체캡으로 구성될 수 있다.In addition, in the pre-tension type lock bolt of the present invention, the wedge is formed in a shape corresponding to the weight hole of the expansion member, the weight hole is formed in three or more equal positions and three or more tension members in this weight hole A hollow cylindrical weight wedge having a conical hole that gathers to form a circle, and a hollow weight that is installed in each of the corrugated holes, and which is divided into at least two or more by holding the outer surface of the tension material that penetrates therein. And it may be composed of a cap cap to be covered on the bolus so that the bolus wedge is separated and separated.

상기 인장재가 인장되는 쪽의 추체 끝단부분의 인장재공은 3개 이상의 인장재가 모아져 통과될 때 그 길이방향으로 인장재의 꺾임이 발생되지 않도록 곡면(라운딩 처리)으로 마련됨이 바람직하다.The tension member hole at the end of the vertebral body at which the tension member is tensioned is preferably provided with a curved surface (rounding treatment) so that bending of the tension member in the longitudinal direction does not occur when three or more tension members are collected and passed.

상기 쐐기의 각 실시 예에서 웨지캡, 라이너캡 및 추체캡들은 모두 인장재가 추체웨지의 후방으로 더 돌출되어 씌워지도록 인장재수용부가 마련될 수 있다. In each embodiment of the wedge, the wedge cap, liner cap and the cone cap may all be provided with a tension receptacle so that the tension member is further protruded to cover the rear of the wedge.

본 발명의 선행인장타입 록 볼트에서 상기 확장부재는 파이프 끝단의 플랜지에 각각 분할된 확장부재마다 하나이상의 볼트로 체결되며, 상기 볼트는 쐐기에 의해 확장부재를 방사상으로 밀어내는 힘(추력)에 의해 보다 원활한 확장이 이뤄지도록 확장부재와 플랜지가 만나는 부위에 볼트의 호칭지름보다 작은 지름의 목부를 마련할 수 있다.In the pre-tension type lock bolt of the present invention, the expansion member is fastened with one or more bolts for each expansion member divided into a flange of the pipe end, and the bolt is driven by a force (thrust) for radially pushing the expansion member by a wedge. A neck of diameter smaller than the nominal diameter of the bolt may be provided at the point where the expansion member and the flange meet to facilitate a smooth expansion.

본 발명의 선행인장타입 록 볼트에서 인장재의 다른 한쪽끝단에는 인장재를 인장하중을 부여한 상태로 유지시킬 수 있는 외측정착부재가 부가 설치될 수 있다. 상기 외측정착부재는 인장재가 관통되는 인장재공을 가진 지압판재와, 이 지압판재를 관통하여 인출된 인장재의 끝단에 설치되어 인장재를 인장한 상태로 유지시키는 인장유지부재로 마련하거나, 천공구멍 내에 충진되는 그라우팅재의 누출을 방지하기 위해 천공구멍 입구에 설치되는 패커를 부가할 수도 있다. 이때, 상기 패커와 지압판재에는 천공구멍으로 그라우팅재를 주입하고 이물질제거를 위한 2개의 호스 구멍을 마련하여야 한다.At the other end of the tension member in the pre-tension type lock bolt of the present invention, an outer fixing member that can maintain the tension member in a state in which a tension load is applied may be additionally installed. The outer fixing member is provided with a pressure plate member having a tension hole through which the tension member penetrates, and a tension holding member installed at the end of the tension member drawn through the pressure plate member to maintain the tension member in a tensioned state, or filled in the perforated hole. It is also possible to add a packer installed at the inlet of the drilled hole to prevent leakage of grouting material. At this time, the packer and the pressure plate material should be provided with two hose holes for injecting grouting material into the drilling holes and removing foreign substances.

상기 인장유지부재는 인장재공과 추형홀이 형성되어 있는 고정몸체와, 이 고정몸체의 추형홀에 삽입되어 인장재를 파지 고정하는 2개 이상의 외측웨지 및 이 외측웨지와 인장재의 끝단을 덮어씌우도록 상기 고정몸체에 체결되는 몸체캡으로 구성된다.The tension holding member includes a fixing body having a tension material hole and a vertebral hole, two or more outer wedges inserted into the vertebral hole of the fixing body to grip and hold the tension member, and to fix the outer wedge and the ends of the tension member. Consists of a body cap fastened to the body.

또한 본 발명에 따른 선행인장타입 록 볼트를 이용한 시공방법은, 암면에 구멍을 천공하는 천공단계; 이 천공단계에 의해 천공된 구멍으로 록 볼트의 매립정착파트를 장입하는 록 볼트 장입단계; 이 장입단계에 의해 장입된 록 볼트에서 파이프를 지지하면서 인장재를 당겨 인장하는 인장단계; 이 인장단계에 의해 인장되는 인장재 끝단부분의 쐐기가 확장부재를 확장시키고 이렇게 확장되면서 볼트가 절단되어 확장부재와 파이프가 분리된 후 확장부재가 더욱 확장되어 천공구멍의 내주면에 밀착 고정되는 내부고정단계; 이 내부고정단계에 의해 확장부재를 천공구멍에 고정한 인장재에 가했던 인장력을 해제한 후 파이프를 천공구멍으로 빼내어 제거하는 파이프제거단계; 이후에 천공구멍의 입구에서 지지되도록 인장재의 끝단에 지압판과 인장유지부재를 끼워 설치한 후 인장재를 당겨 인장재에 인장력이 걸린 인장상태를 그대로 유지하면서 고정하는 외부고정단계가 포함되어 이루어진 것을 특징으로 한다.In addition, the construction method using the pre-tension type lock bolt according to the present invention, the drilling step of drilling a hole in the rock surface; A lock bolt charging step of charging a buried fixing part of the lock bolt into the hole drilled by the drilling step; A tensioning step of pulling and pulling the tension member while supporting the pipe in the lock bolt charged by the charging step; An internal fixing step in which the wedge of the end portion of the tension member tensioned by this tensioning step expands the expansion member, and the bolt is cut so that the extension member and the pipe are separated, and the expansion member is further extended to be tightly fixed to the inner circumferential surface of the drilled hole. ; A pipe removing step of releasing the tensile force applied to the tension member fixed to the drilling hole by the internal fixing step, and then removing the pipe by removing the pipe into the drilling hole; After the insertion of the pressure plate and the tension holding member at the end of the tension member so as to be supported at the inlet of the drilling hole, characterized in that it comprises an external fixing step for pulling and holding the tension member to maintain the tension state is applied to the tension member intact .

상기와 같은 특징으로 이루어진 본 발명인 선행인장타입 록 볼트 및 이를 이용한 시공방법은, 확장부재를 인장재 끝단의 쐐기로 확장시켜 천공구멍의 내면에 정착 고정시킨 후, 파이프를 제거하고 인장재에 인장력을 부여 유지, 즉 선행하중 을 재하(在荷)함으로써 암반의 불연속면이 구속되어 사면의 안전성이 강화되게 되며, 이로 인하여 그라우팅재의 양생기간 없이 바로 추가 굴착작업이 가능하여 공사기간을 단축할 수 있기 때문에 공사비용의 감소는 물론 작업효율성이 향상된다.According to the present invention, the pre-tension type lock bolt and the construction method using the same are expanded by extending the extension member with the wedge of the tension member end, and fixed to the inner surface of the perforation hole, and then removes the pipe and maintains tension applied to the tension member. In other words, by loading the preceding load, the discontinuity of the rock is constrained and the safety of the slope is strengthened. Therefore, additional excavation work can be performed immediately without curing period of grouting material, which shortens the construction period. In addition to reducing work efficiency.

이하, 본 발명에 따른 선행인장타입 록 볼트의 구성 및 작용을 첨부된 도면에 의거하여 보다 구체적으로 설명하고자 한다.Hereinafter, the configuration and operation of the pre-tension type lock bolt according to the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 일 실시예의 선행인장타입 록 볼트를 개략적으로 나타낸 구성도이고, 도 2a 내지 도 2c는 본 발명에 따른 선행인장타입 록 볼트에서 천공구멍 내의 매립정착파트를 나타낸 도면이며, 도 3a는 본 발명에 따른 선행인장타입 록 볼트에서 천공구멍의 입구에 장착되는 외측장착부분을 발췌하여 나타낸 분해 사시도이고, 도 3b는 도 3a의 조립 단면도이다.1 is a schematic view showing a pre-tension type lock bolt of an embodiment according to the present invention, Figures 2a to 2c is a view showing a buried fixing part in the perforation hole in the pre-tension type lock bolt according to the present invention, Figure 3a is an exploded perspective view showing an external mounting portion mounted to the inlet of the drilling hole in the pre-tension type lock bolt according to the present invention, Figure 3b is an assembled cross-sectional view of Figure 3a.

도면에 나타낸 바와 같이, 본 발명의 선행인장타입 록 볼트는, 한쪽끝단에 플랜지(12)가 장착된 긴 파이프(10), 이 파이프(10)의 플랜지(12)에는 볼트(14)를 통해 고정된 확장부재(20), 이 확장부재(20)에는 이 확장부재(20)를 확장시키기 위해 마련된 쐐기(40), 이 쐐기(40)에 한쪽끝단이 고정되어 파이프(10)를 관통하여 마련된 인장재(30) 및 이 인장재(30)의 끝단에 파이프(10)끝단과 접하도록 마련된 외부정착부재(50)를 포함하여 구성된다.As shown in the figure, the pre-tension type lock bolt of the present invention is a long pipe 10 having a flange 12 mounted at one end thereof, and fixed to the flange 12 of the pipe 10 via a bolt 14. The expansion member 20, the expansion member 20 is a wedge 40 provided to expand the expansion member 20, one end is fixed to the wedge 40, the tension member provided through the pipe 10 30 and an external fixing member 50 provided at the end of the tension member 30 to be in contact with the end of the pipe 10.

상기 확장부재(20)는 그 중심선상에 동심을 이루고 인장재공(21)과 추형홀(22)이 형성되고 상기 인장재공(21)을 중심으로 하여 균등 분할되되 3개의 부채꼴형상으로 분할되어 있다. 상기 확장부재(20)는 분할된 각각의 확장부재(20)마다 볼트(14)를 통해 플랜지(12)에 하나의 원을 이루도록 장착되어야 한다. The expansion member 20 is concentric on the center line thereof, and the tension member hole 21 and the conical hole 22 are formed, and the extension member 20 is divided evenly around the tension member hole 21 and divided into three fan shapes. The expansion member 20 must be mounted to form a circle on the flange 12 through the bolt 14 for each of the divided expansion member 20.

상기 확장부재(20)는 3개의 부채꼴형상으로 균등 분할된 것으로 도시하였으나, 직경이 작은 경우엔 2개의 반원형으로 균등 분할할 수도 있고 직경이 큰 경우엔 4개 이상의 부채꼴형상으로 균등 분할하여도 무방하다. The expansion member 20 is shown to be divided equally into three sectors, but if the diameter is small may be divided equally into two semi-circular, if the diameter is large may be divided evenly into four or more sectors. .

상기 인장재(30)는 상기 파이프(10)와 그 한쪽끝단에 설치된 확장부재(20)를 관통하여 설치되되, 상기 파이프(10)와 확장부재(20)의 양쪽끝단에서 돌출되게 마련되어야 하며, 상기 인장재(30)는 중앙에 하나의 강선이 위치되고 그 주위에 6개의 강선이 배열된 상태로 꼬아져 있다. 또한 상기 인장재(30)는 강으로 된 봉으로 대체하여 사용할 수도 있다.The tension member 30 is installed through the pipe 10 and the expansion member 20 installed at one end thereof, and should be provided to protrude from both ends of the pipe 10 and the expansion member 20. The tension member 30 is twisted with one steel wire positioned at the center and six steel wires arranged around it. In addition, the tension member 30 may be used by replacing with a rod made of steel.

상기 쐐기(40)는 인장재(30)의 한쪽끝단에 고정되어 확장부재(20)의 추형홀(22)에 삽입 설치되는 것으로, 인장재(30)와 함께 당겨짐에 따라 인장재(30)의 인장방향인 확장부재(20)의 추형홀(22) 내측으로 삽입될수록 확장부재(20)를 확장시킬 수 있어야 한다. The wedge 40 is fixed to one end of the tension member 30 is inserted into the conical hole 22 of the expansion member 20, the tension direction of the tension member 30 as pulled together with the tension member 30 The expansion member 20 should be able to expand as it is inserted into the weight hole 22 of the expansion member 20.

상기 쐐기(40)는 확장부재(20)의 추형홀(22)로 삽입되어 인장재(30)의 외면을 파지하며 적어도 3개로 균등 분할됨과 동시에 속이 빈 형상의 추체웨지(42)와, 이 추체웨지(42)의 직경이 큰 외면에 체결되어 추체웨지(42)가 이탈되지 않도록 씌워지는 웨지캡(43)으로 구성된다. 상기 추체웨지(42)의 내면은 인장재(30)의 외면을 파지하는 주면이므로 미끄럼 없이 확실한 파지가 이뤄지도록 다수의 톱니가 형성된다.The wedge 40 is inserted into the weight hole 22 of the expansion member 20 to grip the outer surface of the tension member 30 and is equally divided into at least three and at the same time hollow hollow weight wedge 42 and the weight wedge It consists of a wedge cap 43 is fastened to the outer surface of the large diameter of the 42 to be covered so that the vertebrae wedge 42 is not separated. Since the inner surface of the vertebrae wedge 42 is a main surface for gripping the outer surface of the tension member 30, a plurality of teeth are formed so that a certain gripping is performed without slipping.

상기 쐐기(40)는 확장부재(20)를 외측으로 확장시킬 수 있는 것이면 어떠한 방식이라도 무방하므로, 인장재(20)의 끝단에 직접 고정하거나 간접적으로 나사 체 결하여 고정할 수도 있다. The wedge 40 may be any method as long as it can extend the expansion member 20 to the outside, and may be fixed directly to the end of the tension member 20 or indirectly by screwing.

상기 볼트(14)는 쐐기(40)에 의해 확장부재(20)를 방사상으로 밀어내는 힘(추력)에 의해 볼트(14)가 용이하게 절단되어 보다 원활한 확장이 이뤄지도록 확장부재(20)와 플랜지(12)가 만나는 부위에 볼트(14)의 호칭지름보다 작은 지름의 목부를 마련할 수 있다.The bolt 14 is flanged to the expansion member 20 and the flange so that the bolt 14 is easily cut by the force (thrust) pushing radially the expansion member 20 by the wedge 40 to achieve a more smooth expansion. The neck of diameter smaller than the nominal diameter of the bolt 14 can be provided in the site | part which (12) meets.

상기 외측정착부재(50)는 인장재(30)가 관통되는 인장재공(52)을 갖는 지압판재(51)가 마련되고, 이 지압판재(51)를 관통하여 인출된 인장재(30)의 끝단에는 상기 인장재(30)에 인장력을 부여한 상태로 유지하기 위한 인장유지부재(55)가 마련되어 있다. 상기 인장유지부재(55)는 인장재공(56a)과 추형홀(56b)을 형성시킨 고정몸체(56)가 마련되어 있고, 이 고정몸체(56)의 추형홀(56b)에는 인장재공(56a)을 통해 관통되는 인장재(30)를 고정하기 위한 3개의 외측웨지(57)가 삽입 설치되어 있으며, 상기 고정몸체(56)에는 상기 외측웨지(57)가 이탈되지 않도록 인장재(30)의 끝단을 덮어씌우도록 몸체캡(58)이 체결되어 있다.The outer fixing member 50 is provided with a pressure plate material 51 having a tension material hole 52 through which the tension material 30 penetrates, and at the end of the tension material 30 drawn out through the pressure plate material 51, A tension holding member 55 is provided to hold the tension member 30 in a state in which tension is applied. The tension holding member 55 is provided with a fixing body 56 formed with a tension material hole 56a and a conical hole 56b. A tension material 56a is provided in the weight hole 56b of the fixed body 56. Three outer wedges 57 are installed to fix the tension member 30 penetrated through the cover, and the fixing body 56 covers the ends of the tension member 30 so that the outer wedge 57 is not separated. The body cap 58 is fastened.

도면 중 미설명 부호 80은 암면의 불연속면을 보강하기 위해 암면에 천공된 천공구멍이고, 82는 인장재(30)에 인장력을 부여하기 위해 인장하는 인장재인장기구이며, 84는 외부정착부재(50)의 외측웨지(57)를 삽입하기 위한 외측웨지삽입기구이다.In the drawings, reference numeral 80 denotes a perforated hole drilled in the rock surface to reinforce the discontinuous surface of the rock surface, 82 is a tension material tensioning mechanism for tensioning to impart a tensile force to the tension member 30, 84 is the outer fixing member 50 It is an outer wedge insertion mechanism for inserting the outer wedge 57.

상기와 같이 구성된 본 발명에 따른 선행인장타입 록 볼트를 이용하여 시공하는 방법을 상세하게 설명하고자 한다.It will be described in detail the construction method using the pre-tension type lock bolt according to the present invention configured as described above.

먼저, 터널굴착공사나 암반 공사 등의 불연속적인 암면에 본 발명의 선행인 장타입 록 볼트가 장입될 수 있는 천공구멍(80)을 천공하고, 이 천공구멍(80)의 내측에 록 볼트의 매립정착부분이 위치되게 도 4a와 같이 장입한다.First, the boring hole 80 into which the long type lock bolt of the present invention can be inserted is drilled into a discontinuous rock surface such as a tunnel excavation work or a rock work, and the rock bolt is embedded inside the drilling hole 80. Charge as shown in Figure 4a so that the fixing portion is located.

이와 같이 본 발명의 선행인장타입 록 볼트를 장입한 후, 외부정착부재(50)중의 인장유지부재(55)를 분리시켜 제거하고 인장재(30)의 끝단부분에 인장재인장기구(82)를 설치한다. 이때, 상기 인장재인장기구(82)는 파이프(10) 끝단이나 지압판재(51)에 지지되어야 한다. In this way, after loading the pre-tension type lock bolt of the present invention, the tension holding member 55 in the external fixing member 50 is separated and removed, and the tension member tensioning mechanism 82 is installed at the end of the tension member 30. . At this time, the tension member tensioning mechanism 82 should be supported at the end of the pipe (10) or the pressure plate (51).

이러한 상태에서 상기 인장재인장기구(82)를 작동시키면 인장재인장기구(82)의 웨지가 인장재(30)를 파지하고 난 후 잡아당김으로써 인장재(30)와 함께 그 끝단의 쐐기(40)만이 당겨지게 되고, 이러한 인장재인장기구(82)의 인장하중이 더욱 세게 부여될수록 인장재(30)만을 지속적으로 당기게 된다. 이와 같이 인장재(30)가 당겨질수록 그 끝단의 쐐기(40)가 확장부재(20)의 추형홀(22)을 파고들어가 그 외측으로 밀어 확장시키는 힘에 의해 확장부재(20)를 체결하고 있는 볼트(14)가 절단되면서 확장되므로 천공구멍(80)의 내면에 견고하게 고정된다(도 4b참조). 이때, 확장부재(20)를 체결하고 있는 볼트(14)가 절단되면 파이프(10)와 별도로 분리된 상태이다.When the tension member tensioning mechanism 82 is operated in this state, the wedge of the tension tension member 82 is gripped after pulling the tension member 30 so that only the wedge 40 at its end together with the tension member 30 is pulled out. As the tensile load of the tension member tensioning mechanism 82 is increased, only the tension member 30 is continuously drawn. As the tension member 30 is pulled as described above, the wedge 40 at the end thereof penetrates the conical hole 22 of the expansion member 20, and pushes the expansion member 20 by the force to expand the bolt. 14 is expanded while being cut, so that it is firmly fixed to the inner surface of the drilling hole 80 (see FIG. 4B). At this time, when the bolt 14 fastening the expansion member 20 is separated from the pipe 10.

이러한 상태에서 인장재(30)에 부여했던 인장력을 해제하고 도 4c와 같이, 상기 인장재(30)로부터 파이프(10), 지압판재(51) 및 인장재인장기구(82)를 빼내어 제거한다. 이렇게 빼내어 제거한 파이프(10)는 그 시공현장에서 곧바로 재조립하여 다시 활용할 수 있으며, 이로 인하여 갈수록 심각하게 대두되고 있는 고가의 원자재로 인한 부담을 ⅓이상 줄일 수 있다.In this state, the tension force applied to the tension member 30 is released, and as shown in FIG. 4C, the pipe 10, the pressure plate member 51, and the tension member tension mechanism 82 are removed from the tension member 30. The pipe 10 removed and removed can be immediately reassembled and reused at the construction site, thereby reducing the burden caused by expensive raw materials that are increasingly serious.

이렇게 파이프(10)를 제거한 인장재(30)에는 도 4d와 같이, 외측정작부재(50)와 외측웨지삽입기구(84) 및 인장재인장기구(82)를 순차적으로 설치하고, 상기 인장재인장기구(82)를 작동시켜 인장재(30)를 당겨서 인장재(30)에 소정의 인장력이 부여되도록 한다. 이와 같이 인장재(30)를 인장할 때에는 외부정착부재(50)의 외측웨지(57)를 누르지 않도록 하여야 한다. 이러한 상태에서 외측웨지삽입기구(84)를 일시적으로 작동시키면, 고정몸체(56)의 추형홀(56b)에 외측웨지(57)를 밀어 넣어 넣음으로써 외측웨지(57)가 인장재(30)를 파지하게 되고 이로 인하여 인장재(30)에 인장력이 부여된 상태로 유지되게 된다.Thus, as shown in FIG. 4D, the tension member 30, the outer wedge inserting mechanism 84, and the tension member tensioning mechanism 82 are sequentially installed on the tension member 30 in which the pipe 10 is removed. ) To pull the tension member 30 so that a predetermined tensile force is applied to the tension member 30. As such, when tensioning the tension member 30, the outer wedge 57 of the external fixing member 50 should not be pressed. In this state, when the outer wedge insertion mechanism 84 is temporarily operated, the outer wedge 57 grasps the tension member 30 by pushing the outer wedge 57 into the weight hole 56b of the fixed body 56. This is to be maintained in the tension force is given to the tension member (30).

이때, 인장재(30)가 당겨질수록 인장재(30)끝단의 쐐기(40)에 의해 파이프(10)끝단의 확장부재(20)가 더욱 확장되므로 천공구멍(80)의 내면에 더욱 견고하게 고정되면서 인장재(30)에 선행인장하중이 재하될 수 있는 것이며, 이로 인하여 암반의 불연속면을 가압하는 등의 강도보강이 이뤄지기 때문에, 암면에 대한 하중을 지지함은 물론 그라우팅재를 주입하여 양생시키기 전에도 또 다른 굴착작업을 지속적으로 진행할 수 있는 것이다.At this time, as the tension member 30 is pulled, the extension member 20 at the end of the pipe 10 is further extended by the wedge 40 at the end of the tension member 30, so that the tension member is more firmly fixed to the inner surface of the drilling hole 80. (30) can be loaded with the preceding tensile load, this is because the strength reinforcement, such as pressing the discontinuous surface of the rock is achieved, not only to support the load on the rock surface, but also before injecting and curing the grouting material The excavation work can continue.

이후에 인장재(30)에 인장력을 인가하고 있는 인장재인장기구(82)의 작동을 정지시킨 후 인장재인장기구(82)와 외측웨지삽입기구(84)를 빼내어 제거하고, 고정몸체(56)에서 노출된 인장재(30)를 잘라낸 다음, 도 4e와 같이, 고정몸체(56)에 몸체캡(58)을 씌워 외측웨지(57)가 이탈되지 않도록 한다.After stopping the operation of the tension member tensioning mechanism 82 applying the tensile force to the tension member 30, the tension tension member 82 and the outer wedge insertion mechanism 84 is pulled out and removed, and exposed from the fixed body 56 After cutting the tension member 30, as shown in Figure 4e, to cover the body cap 58 to the fixed body 56 so that the outer wedge 57 is not separated.

상기 본 발명의 선행인장타입 록 볼트에 선행하중이 재하되는 과정을 좀 더 구체적으로 설명하여 본다. 인장재(30)의 인장방향, 즉 천공구멍(80)의 입구 쪽으 로 당겨질수록 인장재(30)의 끝단에 쐐기(40)를 이루는 추체웨지(42)가 자연스럽게 확장부재(20)의 추형홀(22)내측으로 삽입되게 되고, 이로 인하여 상기 확장부재(20)는 그 외측방향, 즉 천공구멍(80)의 내면을 향하여 확장시키게 된다.The process of loading the preceding load on the preceding tension type lock bolt of the present invention will be described in more detail. As the pulley wedge 42 forming the wedge 40 at the end of the tension member 30 is pulled toward the tension direction of the tension member 30, that is, toward the inlet of the drilling hole 80, the borehole 22 of the expansion member 20 naturally. It is inserted into the inner side, thereby expanding the expansion member 20 toward its outer direction, that is, toward the inner surface of the drilling hole (80).

상기 확장부재(20)가 확장되게 되면 확장부재(20)의 외주면이 상기 천공구멍(80)의 내면과 접촉되고 이후에는 확장부재(20)가 더욱 확장될수록 상기 인장재(30)를 인장하는 과정에서 천공구멍(80)의 내면을 파고들어가 박히게 되면서 상기 확장부재(20)가 천공구멍(80)의 내면에 견고하게 고정되는 것이다.When the expansion member 20 is expanded, the outer circumferential surface of the expansion member 20 is in contact with the inner surface of the perforation hole 80 and thereafter in the process of tensioning the tension member 30 as the expansion member 20 is further expanded. The expansion member 20 is firmly fixed to the inner surface of the drilling hole 80 while being drilled into the inner surface of the drilling hole 80.

상기와 같이 확장부재(20)를 천공구멍(80)의 내면에 고정하고 인장재(30)를 인장시켜 선행인장하중을 재하 함으로써, 그라우팅재를 주입하기 이전에 불연속면의 암면에 걸리는 하중을 지지하게 되며, 이로 인하여 천공구멍에 그라우팅을 수행하지 않거나 선택적으로 그라우팅을 행하였다 하더라도 그라우팅재가 양생되지 않은 상태에서 또 다른 굴착작업을 진행할 수 있어 작업능률의 향상과 공기를 획기적으로 단축할 수 있는 것이다.As described above, the expansion member 20 is fixed to the inner surface of the perforation hole 80 and the tension member 30 is tensioned to carry the pre-tension load, thereby supporting the load on the rock surface of the discontinuous surface before injecting the grouting material. Therefore, even if grouting is not performed or selectively grouting is performed in the perforation hole, another excavation work can be performed in a state where the grouting material is not cured, thereby improving work efficiency and drastically shortening the air.

도 5a 및 도 5b는 본 발명의 선행인장타입 록 볼트에서 다른 실시예의 매립정착부분을 나타낸 도면이다. 여기에서, 확장부재(20)는 완전 분리되지 않도록 부분적으로 연결된 이음부(25)에 의해 하나로 마련되어 있으며, 상기 추형홀(22)에는 그 단부에 링홈(23)을 형성하고 이 링홈(23)에는 추형홀(22)에 삽입 설치되는 쐐기(40)의 이탈 분리되지 않도록 스냅링(24)을 끼워 조립한 것이다. Figures 5a and 5b is a view showing a buried fixing portion of another embodiment in the pre-tension type lock bolt of the present invention. Here, the expansion member 20 is provided as one by the joint portion 25 which is partly connected so as not to be completely separated, and the ring hole 22 has a ring groove 23 formed at its end and the ring groove 23 is The snap ring 24 is assembled by fitting so that the wedge 40 inserted into and installed in the weight hole 22 is not separated.

상기 이음부(25)는 쐐기(40)에 의해 외력이 가해지면 쉽게 절단되어야 하며, 따라서 이음부(25)의 두께는 1~3㎜정도가 바람직하다. 이렇게 이음부(25)의 두께가 1㎜미만이면 작은 충돌에도 변형 내지 절단될 수 있어 바람직하지 못하고, 3㎜이상이면 시공시 확장부재(20)가 방사상으로 확장시키기 위한 과다한 초기외력이 필요하여 바람직하지 못하다.The joint portion 25 should be easily cut when an external force is applied by the wedge 40, so the thickness of the joint portion 25 is preferably about 1 to 3 mm. If the thickness of the joint 25 is less than 1 mm, it may not be desirable to be deformed or cut even in small collisions. If the thickness of the joint 25 is greater than 3 mm, an excessive initial external force for radial expansion of the expansion member 20 is preferable. I can't.

상기와 같은 실시예의 구성에 의하면, 확장부재(20)가 이음부(25)에 의해 일체로 된 것이어서 파이프(10)의 플랜지(12)에 확장부재(20)를 볼트(14)로 체결할 때 조립작업이 용이하게 이뤄지며, 인장재(30)의 끝단에 고정된 쐐기(40)가 확장부재(20)의 추형홀(22)내에 유동되지 않게 고정되어 인장재와 그 끝단의 쐐기가 확장부재(20)와 파이프(10)에서 분리 이탈되지 않으므로 인장재(30)에 외부정착부재(50)를 조립하지 않은 상태로 출하가 가능하고 작업현장에서 시공할 때 조립하여 사용할 수 있는 것이다.According to the configuration of the embodiment as described above, when the expansion member 20 is integrally formed by the joint 25 to fasten the expansion member 20 to the flange 12 of the pipe 10 with the bolt 14. The assembly work is easily performed, and the wedge 40 fixed to the end of the tension member 30 is fixed so as not to flow in the conical hole 22 of the extension member 20 so that the tension member and the wedge of the end thereof are extended to the extension member 20. Since it is not separated and separated from the pipe 10, it is possible to ship the assembly without the external fixing member 50 in the tension member 30, and it can be used when assembled at the construction site.

도 6a 및 도 6b는 본 발명의 선행인장타입 록 볼트에서 다른 실시예의 매립정착부분을 나타낸 도면이다. 여기에서, 쐐기(40a)는 내면이 추형홀(41a)이고 이 추형홀(41a)에 대하여 거의 일정한 두께의 추형외면(41b)을 갖는 원추통형의 라이너(41)가 마련되고, 이 라이너(41) 내면의 추형홀(41a)에는 인장재(30)의 외면을 파지하도록 적어도 3개로 균등 분할되어 속이 빈 형상의 추체웨지(42)가 삽입 설치되며, 상기 라이너(41)의 한쪽인 직경이 큰 외면에 체결되어 추체웨지(42)가 이탈되지 않도록 씌워지는 라이너캡(43a)으로 구성되어 있다. 상기 라이너캡(43a)은 인장재(30)가 추체웨지(42)의 후방으로 더 돌출되어 씌워지도록 인장재수용부(431)를 마련할 수 있다. Figures 6a and 6b is a view showing a buried fixing portion of another embodiment in the pre-tension type lock bolt of the present invention. Here, the wedge 40a is provided with a conical cylindrical liner 41 having an inner surface of the wedge hole 41a and an outer surface 41b of a substantially constant thickness with respect to the cone hole 41a. At least three equally divided hollow hollow weight wedges 42 are inserted into the inner conical hole 41a so as to grasp the outer surface of the tension member 30, and the outer surface having a large diameter, which is one side of the liner 41, is inserted. It consists of a liner cap 43a fastened to the cover wedge 42 so as not to be separated. The liner cap 43a may be provided with a tension receiving portion 431 such that the tension member 30 protrudes further from the rear of the vertebral wedge 42.

상기와 같은 다른 실시예의 구성에 의하면, 라이너(41)의 추형홀(41a) 내에 추체웨지(42)가 삽입되어 라이너캡(43a)에 의해 이탈이 방지되게 마련되므로, 확장부재(20)의 추형홀(22)에 조립하거나 본원발명의 록 볼트를 암반 등의 천공구멍에 삽입하여 인장재를 인장하기까지 발생될 수 있는 추체웨지(42)의 분리이탈을 확실하게 방지할 수 있다.According to the configuration of the other embodiment as described above, since the weight wedge 42 is inserted into the weight hole 41a of the liner 41 is provided to prevent the departure by the liner cap 43a, the weight of the expansion member 20 It is possible to reliably prevent separation and separation of the vertebral wedges 42, which may occur until the tension member is assembled by inserting the lock bolt of the present invention into the hole 22 or by inserting the lock bolt of the present invention into a boring hole such as a rock.

또한 상기 라이너캡(43a)에 인장재수용부(431)를 마련한 경우에는 추체웨지(42)가 라이너(41)의 추형홀(41a)에 삽입될수록 인장재(30)를 더욱 강력하게 파지함에 따라 추체웨지(42)후방의 인장재(30)인 와이어들이 풀려 인장재(30)의 직경이 확장되는 효과를 얻을 수 있고 이와 같이 인장재(30)의 직경이 확장되면 인장재(30)가 추체웨지(42)에 걸려 더욱 확실한 파지가 이뤄지게 된다.In addition, when the tension member accommodating part 431 is provided in the liner cap 43a, as the weight wedge 42 is inserted into the weight hole 41a of the liner 41, the weight wedge is more strongly gripped. (42) It is possible to obtain the effect of extending the diameter of the tension member 30 by loosening the wires of the tension member 30 in the rear, and when the diameter of the tension member 30 is expanded in this way, the tension member 30 is caught in the vertebral wedge 42. More certain grasping is achieved.

도 7a 및 도 7b는 본 발명의 선행인장타입 록 볼트에서 또 다른 실시예의 매립정착부분을 나타낸 도면이다. 여기에서, 쐐기(40b)는 확장부재(20)의 추형홀(22)과 상응하는 형상으로 형성되되 3개로 등분된 위치에 추형홀(45)이 형성되고 이 추형홀(45)에서 3개의 인장재(30)를 하나의 원을 이루도록 모아주는 인장재공(46)을 갖는 원추통형의 추체(44)가 마련되어 있으며, 이 추체(44)의 각 추형홀(45) 내에는 그 내부로 관통하는 인장재(30)의 외면을 파지하며 적어도 2개 이상으로 분할되면서 속이 빈 형상의 추체웨지(42)가 설치되고, 상기 추체(44)에는 추체웨지(42)가 분리 이탈되지 않도록 하는 추체캡(43b)이 씌워져 있다.Figures 7a and 7b is a view showing a buried fixing portion of another embodiment in the pre-tension type lock bolt of the present invention. Here, the wedge 40b is formed in a shape corresponding to the weight hole 22 of the expansion member 20, but the weight hole 45 is formed at three equally divided positions and the three tension members in the weight hole 45. A conical cylindrical body 44 having a tension hole 46 for gathering 30 to form a circle is provided, and in each of the corrugated holes 45 of the weight 44, a tension member penetrating into the inside thereof ( The hollow surface of the 30 and is divided into at least two or more hollow hollow wedge 42 is installed, the vertebrae cap 43b for preventing the separation of the vertebrae wedge 42 is separated It is covered.

상기 인장재(30)가 모아지는 쪽, 즉 인장되는 쪽의 추체(20) 끝단부분의 인장재공(46)은 3개의 인장재가 통과될 때 그 길이방향으로 인장재의 꺾임이 발생되지 않도록 곡면(라운딩 처리)으로 마련되어야 한다. 상기 인장재(30)에 꺾임이 발 생되면 인장재를 인장할 때 국부적으로 집중적인 하중이 걸리므로 인장재의 절단이 초래될 수 있기 때문이다.The tension member hole 46 at the end of the body 20 at the side where the tension member 30 is collected, that is, tensioned, is curved to prevent bending of the tension member in the longitudinal direction when three tension members are passed. Should be prepared. This is because, when the bending occurs in the tension member 30, a local intensive load is applied when the tension member is tensioned, which may result in cutting of the tension member.

상기와 같은 다른 실시 예의 선행인장타입 록 볼트에 의하면, 확장부재(20a)의 중심선상에 1개의 쐐기(40b)를 마련하되 이 쐐기(40b)는 추체(44)에 3개의 인장재(30)를 관통시켜 각각의 추체웨지(42)로 파지 고정시킨 것이므로 일실시 예와 같이 1개의 쐐기(40a)가 마련되는 확장부재(20)보다 확장부재(20a)가 대략 1.3배로 대형화되며, 이로 인하여 천공홀의 직경이 105㎜~140㎜에 적용할 수 있고 3개의 인장재(30)로 보다 큰 인장력을 부여할 수 있어 록 볼트간의 유격을 넓힐 수 있음은 물론 록 볼트설치용 천공홀의 개수를 줄여 공사비의 절감을 꾀할 수 있는 것이다.According to the preceding tension type lock bolt of another embodiment as described above, one wedge 40b is provided on the center line of the expansion member 20a, and the wedge 40b has three tension members 30 on the vertebrae 44. Since the penetrating and fixing by each of the vertebrae wedges (42), as shown in one embodiment, the expansion member (20a) is approximately 1.3 times larger than the expansion member 20 is provided with one wedge (40a), thereby causing the hole of the hole It can be applied to 105mm ~ 140mm in diameter and can be given more tensile force with three tension members 30 to increase the clearance between lock bolts and reduce the cost of construction by reducing the number of boring holes for rock bolt installation. It can be.

도 8은 본 발명에 따른 선행인장타입 록 볼트에서 천공구멍의 입구에 장착되는 외측장착부재의 다른 실시 예를 나타낸 도면이다. 여기서는, 천공구멍(80)의 입구를 인장재구멍(61)과 호스구멍(62)이 형성된 패커(60)로 막고 그 외측에 지압판재(51)를 마련한 것이며, 이 패커(60)와 지압판재(51)에는 천공구멍으로 그라우팅재를 주입하고 이물질제거를 위한 2개의 호스구멍(61)(53)이 형성된 것이다.8 is a view showing another embodiment of the outer mounting member mounted to the inlet of the drilling hole in the pre-tension type lock bolt according to the present invention. Here, the inlet of the punching hole 80 is blocked by the packer 60 in which the tension material hole 61 and the hose hole 62 were formed, and the pressure plate material 51 was provided outside, and this packer 60 and the pressure plate material ( 51, two hose holes 61 and 53 are formed to inject the grouting material into the drilling holes and remove foreign substances.

상기와 같이 구성된 다른 실시예의 구성에 의하면, 천공구멍(80)의 입구부분이 패커(60)에 의해 긴밀하게 폐쇄되므로, 위에서 설명한 바와 같은 방법에 의해 확장부재(20)를 천공구멍(80)의 내면에 고정시킨 후 인장재(30)에 인장력을 부여하여 선행하중을 재하하고, 상기 패커(60)와 지압판재(50)의 호스구멍(62,53)중 한쪽의 호스구멍을 통해 그라우팅재인 시멘트몰탈을 주입하되 다른 한쪽의 호스구멍으로는 천공구멍 내의 공기나 이물질을 빼내면서 가압그라우팅을 시행할 수 있는 것 이다. 이때, 불연속면의 암반 사이에도 시멘트몰탈이 확실하게 침투된 상태로 양생이 이루어지게 된다.According to the configuration of the other embodiment configured as described above, since the inlet portion of the drilling hole 80 is tightly closed by the packer 60, the expansion member 20 of the drilling hole 80 by the above-described method. After fixing to the inner surface, the tensile force is applied to the tension member 30 to load the preceding load, and cement mortar as a grouting material through one of the hose holes 62 and 53 of the packer 60 and the pressure plate 50. The pressure grouting can be carried out while injecting air or foreign matter from the drilled hole into the other hose hole. At this time, the curing is made in a state where the cement mortar is reliably penetrated between the rock of the discontinuous surface.

이와 같이 그라우팅재인 시멘트몰탈이 양생되고 나면 불연속면의 암반 사이에도 시멘트몰탈이 침투하여 양생되기 때문에 더욱 암반에의 강도보강이 이뤄지는 것이다.Thus, after the cement mortar, which is a grouting material, is cured, cement mortar penetrates and cures between the rocks of the discontinuous surface, thereby further strengthening the strength of the rock.

또한, 본 발명에 따른 선행인장타입 록 볼트를 이용한 시공방법에서는 확장부재(20)가 장착되지 않은 파이프(10) 끝단의 인장재(30)에 외측장착파트를 임시로 설치한 록 볼트를 천공구멍(80)으로 삽입하고, 위에서 설명한 바와 같이 인장재인장기구를 이용하여 인장재(30)를 당김에 따라 인장재(30)끝단의 쐐기(40)가 파이프(10)끝단의 확장부재(20)를 확장시키므로 천공구멍(80)의 내면에 매립정착파트가 견고하게 고정된다. In addition, in the construction method using the pre-tension type lock bolt according to the present invention, the lock bolt in which the outer mounting part is temporarily installed in the tension member 30 at the end of the pipe 10 on which the expansion member 20 is not mounted is drilled ( 80) and the wedge 40 at the end of the tension member 30 extends the expansion member 20 at the end of the pipe 10 as the tension member 30 is pulled using the tension tensioning device as described above. The buried fixing part is firmly fixed to the inner surface of the hole 80.

이와 같이 확장되는 확장부재(20)는 쐐기(40)에 의해 확장되면서 파이프(10)와 확장부재(20)를 체결하고 있는 볼트(14)를 절단하게 되며, 이렇게 볼트(14)가 절단됨에 따라 별도로 분리된 파이프(10)를 제거하지 않고 그대로 남겨둔 채로 시공을 마무리하거나 이후에 천공구멍(80)내부에 그라우팅재인 시멘트몰탈을 주입할 수도 있는 것이다.The expansion member 20 which is expanded in this way is cut by the wedge 40 while cutting the bolt 14 which fastens the pipe 10 and the expansion member 20. As the bolt 14 is cut in this way, The construction may be finished without leaving the pipe 10 separately removed, or afterwards, cement mortar as a grouting material may be injected into the drilling hole 80.

이러한 시공방법은 파이프(10)의 제거에 따른 인장재인장기구를 제거하고 파이프를 빼내어 제거한 후에 다시 인장재인장기구를 설치하여야 하는 번거로움을 해소할 수 있어 작업이 수월하며, 상기에서 언급한 인장재(30)에 그대로 선행인장하중을 부여할 수 있어 추가 굴착작업을 연속적으로 수행할 수 있어 시공기간을 단축 할 수 있음은 물론이고 천공구멍(80)내의 파이프(10)가 보강재로서의 기능을 수행하므로 보다 강도보강이 이루어져 록 볼트의 시공간격을 넓히거나 안전도를 향상시킬 수 있는 것이다.This construction method can eliminate the trouble of having to remove the tension member tensioning device according to the removal of the pipe 10, remove the pipe and then install the tension member tensioning device again, it is easy to work, the tension member (30) Pre-tension load can be given as it is, so that additional excavation work can be performed continuously and construction time can be shortened, as well as the pipe 10 in the drilling hole 80 functions as a reinforcement material. Reinforcement can be made to increase the space-time spacing of lock bolts or to improve safety.

본 발명에 따른 선행인장타입 록 볼트는 도시하고 설명한 것 이외에도 다양하게 변형실시 가능한 것인바, 본 발명의 목적범위를 이탈하지 않는 한 변형되는 실시 예들은 모두 본 발명의 권리범위에 포함되어 해석되어야 한다.The pre-tension type lock bolt according to the present invention is capable of various modifications in addition to those shown and described, all modifications should be interpreted as being included in the scope of the present invention without departing from the scope of the present invention. .

상술한 바와 같이 본 발명에 따른 선행인장타입 록 볼트 및 이를 이용한 시공방법에 의하면, 확장부재를 인장재 끝단의 쐐기로 확장시켜 천공구멍의 내면에 정착 고정시킨 후, 파이프를 제거하고 인장재에 인장력을 부여 유지, 즉 선행하중을 재하(在荷)함으로써 암반의 불연속면이 구속되어 사면의 안전성이 강화되게 되며, 이로 인하여 그라우팅재의 양생기간 없이 바로 추가 굴착작업이 가능하여 공사기간을 단축할 수 있는 특유한 효과가 기대된다.As described above, according to the pre-tension type lock bolt according to the present invention and a construction method using the same, the extension member is extended with a wedge at the end of the tension member to be fixed to the inner surface of the perforation hole, and then the pipe is removed and the tension force is applied to the tension member. The maintenance, that is, loading the preceding load, constrains the discontinuity of the rock and enhances the safety of the slope.This enables additional excavation work without the curing period of the grouting material, thus shortening the construction period. It is expected.

또한 본 발명은 확장부재를 확장시켜 천공구멍에 정착 고정시킨 후 파이프를 빼내어 제거함으로써 그 시공현장에서 곧바로 재조립하여 고가의 자재인 파이프를 다시 활용할 수 있으며, 이로 인하여 갈수록 심각하게 대두되고 있는 고가의 원자재로 인한 부담을 ⅓이상 줄일 수 있는 효과가 기대된다.In addition, the present invention by expanding the expansion member to fix the fixed hole in the perforations and then remove the pipe to remove the re-assembly immediately in the construction site to reuse the expensive material pipes, thereby increasing the cost of the more serious It is expected to reduce the burden on raw materials.

Claims (19)

일단부에 플랜지(12)가 마련된 파이프(10);A pipe 10 having a flange 12 provided at one end thereof; 상기 파이프(10)의 플랜지(12)에 분리 가능하게 결합되고, 중심축선을 기준으로 2개 이상의 부채꼴기둥 형상으로 균등 분할되되 분할된 각각의 분할부위 사이로 축 방향을 따라 인장재공(21)이 형성되며 그 후단부에 연속해서 추형홀(22)이 관통 형성된 확장부재(20);It is separably coupled to the flange 12 of the pipe 10 and is divided equally into two or more fan-shaped pillars based on a central axis, and a tension member hole 21 is formed along the axial direction between each divided portion. An extension member 20 having a penetrating hole 22 penetrating through the rear end thereof; 상기 파이프(10)와 확장부재(20)를 관통하여 설치되되 파이프(10)와 확장부재(20)가 조립된 양쪽단부에서 돌출되게 설치되는 인장재(30);A tension member 30 installed through the pipe 10 and the expansion member 20 to protrude from both ends of the pipe 10 and the expansion member 20 assembled; 상기 인장재(30)의 한쪽끝단에 체결 고정되며 확장부재(20)를 확장시킬 수 있도록 확장부재(20)의 추형홀(22)에 삽입 설치되는 쐐기(40,40a,40b); 및Wedges 40, 40a, and 40b which are fastened and fixed to one end of the tension member 30 and inserted into the vertebral holes 22 of the expansion member 20 to expand the expansion member 20; And 상기 플랜지(12)와 이에 대응되어 각각 분할된 확장부재(20)를 체결되고 이 확장부재(20)와 플랜지(12)가 만나는 부위에 호칭지름보다 작은 지름의 목부가 마련된 하나 이상의 볼트(14);One or more bolts 14 provided with a neck having a diameter smaller than the nominal diameter is fastened to the flange 12 and the expansion member 20 respectively corresponding thereto, and the extension member 20 and the flange 12 meet each other. ; 를 포함하여 구성되는 선행인장타입 록 볼트.Presisting type lock bolt configured to include. 제1항에 있어서, The method of claim 1, 상기 추형홀(22)에는 그 단부에 링홈(23)을 형성하고 이 링홈(23)에는 추형홀(22)에 삽입 설치되는 쐐기(40)가 이탈 분리되지 않도록 스냅링(24)을 끼워 조립한 것을 특징으로 하는 선행인장타입 록 볼트.A ring groove 23 is formed at an end thereof in the cone hole 22, and a snap ring 24 is assembled in the ring groove 23 so that the wedge 40 inserted into the cone hole 22 is not separated. A leading tension type lock bolt characterized by the above. 제1항에 있어서, The method of claim 1, 상기 확장부재(20)는 완전 분리되지 않고 연결되는 이음부(25)에 의해 하나로 마련되는 것을 특징으로 하는 선행인장타입 록 볼트.The expansion member 20 is a pre-tension type lock bolt, characterized in that provided by one by the joint portion 25 is not completely separated. 제1항에 있어서, The method of claim 1, 상기 확장부재(20)의 인장재공(21)과 추형홀(22)이 확장부재(20)의 중심선상에 형성되어 있는 것을 특징으로 하는 선행인장타입 록 볼트.The tension member hole 21 and the conical hole 22 of the expansion member 20 is formed on the center line of the expansion member 20, the pre-tension type lock bolt. 제1항에 있어서, The method of claim 1, 상기 확장부재(20)의 인장재공(21)과 추형홀(22)이 상기 확장부재(20)를 3개 이상으로 균등 분할한 경우 그 분할개수만큼 서로 이웃하는 확장부재(20) 사이의 분할경계면을 중심으로 하여 형성되는 것을 특징으로 하는 선행인장타입 록 볼트.In the case where the tension member hole 21 and the weight hole 22 of the expansion member 20 divide the expansion member 20 evenly into three or more, the partition boundary surface between the expansion member 20 adjacent to each other by the number of divisions. Pre-tension type lock bolt, characterized in that formed around the. 제1항에 있어서,The method of claim 1, 상기 쐐기(40)는 확장부재(20)의 추형홀로 삽입되어 인장재(30)의 외면을 파지하며 적어도 2개 이상으로 분할된 속이 빈 형상의 추체웨지(42); 이 추체웨지(42)가 이탈되지 않도록 직경이 큰 외면에 체결되는 웨지캡(43)으로 구성된 것을 특징으로 하는 선행인장타입 록 볼트.The wedge 40 is inserted into the vertebral hole of the expansion member 20 to grip the outer surface of the tension member 30 and divided into at least two hollow vertebral weight wedge 42; Pre-tension type lock bolt, characterized in that consisting of a wedge cap 43 is fastened to the outer diameter of the large diameter so that the weight wedge (42). 제6항에 있어서, The method of claim 6, 상기 웨지캡(43)은 인장재(30)가 추체웨지(42)의 후방으로 더 돌출되어 씌워지도록 인장재수용부(431)가 마련되는 것을 특징으로 하는 선행인장타입 록 볼트.The wedge cap 43 is a pre-tension type lock bolt, characterized in that the tension member receiving portion 431 is provided so that the tension member 30 is protruded to cover the rear of the vertebrae wedge (42). 제1항에 있어서,The method of claim 1, 상기 쐐기(40a)는 확장부재(20)의 추형홀(22)로 삽입되며 내면이 추형홀(41a)이고 이 추형홀(41a)의 외측에 추형외면(41b)을 갖는 원추통형의 라이너(41); 이 라이너(41)의 추형홀로 삽입되어 인장재(30)의 외면을 파지하며 적어도 2개 이상으로 분할되면서 속이 빈 형상의 추체웨지(42a); 상기 라이너(41)의 한쪽인 직경이 큰 외면에 체결되어 추체웨지(42a)가 이탈되지 않도록 씌워지는 라이너캡(43a)으로 구성된 것을 특징으로 하는 선행인장타입 록 볼트.The wedge 40a is inserted into the cone hole 22 of the expansion member 20 and has an inner surface of the cone hole 41a and a cone-shaped liner 41 having a cone outer surface 41b on the outside of the cone hole 41a. ); A hollow shape weight wedge 42a inserted into the weight hole of the liner 41 to grip the outer surface of the tension member 30 and divided into at least two or more; The pre-tension type lock bolt, characterized in that the liner cap (43a) is fastened to the outer diameter of one side of the liner 41 is covered so that the weight wedge (42a) is not separated. 제8항에 있어서, The method of claim 8, 상기 라이너캡(43a)은 인장재(30)가 추체웨지(42)의 후방으로 더 돌출되어 씌워지도록 인장재수용부(431)가 마련되는 것을 특징으로 하는 선행인장타입 록 볼트.The liner cap (43a) is a pre-tension type lock bolt, characterized in that the tension member 30 is provided so that the tension member 30 is protruded to cover the rear of the vertebrae wedge (42). 삭제delete 삭제delete 제1항에 있어서, The method of claim 1, 상기 쐐기(40b)는 3개 이상으로 등분된 위치에 추형홀(45)이 형성되고 이 추형홀(45)에서 3개 이상의 인장재(30)가 하나의 원을 이루도록 모아지는 인장재공(46)을 갖는 원추통형의 추체(44)와, 이 추체(44)의 각 추형홀(45) 내에 설치되어 그 내부로 관통하는 인장재(30)를 파지 고정하는 추체웨지(42a) 및 상기 추체(44)에 씌워져 추체웨지(42a)가 분리 이탈되지 않도록 하는 추체캡(43b)으로 구성된 것을 특징으로 하는 선행인장타입 록 볼트.The wedge (40b) is formed in the hole hole 45 is divided into three or more equal to the tension member hole 46 is formed so that the three or more tension members 30 are formed in one circle in this cone hole (45) In the conical cylindrical body 44 and the weight wedge 42a and the weight 44 which are provided in each of the corrugated holes 45 of this body 44 and hold and fix the tension member 30 which penetrates therein. A pre-tension type lock bolt, characterized in that consisting of a bolster cap (43b) to be covered so that the vertebrae wedge (42a) is not separated. 제12항에 있어서, The method of claim 12, 상기 인장재(30)가 인장되는 쪽의 추체(44) 끝단부분의 인장재공(46)은 3개 이상의 인장재(30)가 통과될 때 그 길이방향으로 인장재의 꺾임이 발생되지 않도록 곡면으로 마련되어 있는 것을 특징으로 하는 선행인장타입 록 볼트.The tension member hole 46 at the end of the weight 44 of the tension member 30 is tensioned is provided with a curved surface so that bending of the tension member in the longitudinal direction when three or more tension members 30 are passed through A leading tension type lock bolt characterized by the above. 제12항에 있어서, The method of claim 12, 상기 추체캡(43b)은 인장재(30)가 추체웨지(42)의 후방으로 더 돌출되어 씌워지도록 인장재수용부(431)가 마련되는 것을 특징으로 하는 선행인장타입 록 볼트.The tension cap (43b) is a pre-tension type lock bolt, characterized in that the tension member receiving portion 431 is provided so that the tension member 30 is protruded to cover the rear of the weight wedge (42). 제1항에 있어서, The method of claim 1, 상기 인장재(30)의 다른 한쪽끝단에는 인장재(30)에 인장하중을 부여한 상태로 유지시킬 수 있는 외측정착부재(50)가 부가 설치된 것을 특징으로 하는 선행인장타입 록 볼트.The other end of the tension member 30, the pre-tension type lock bolt, characterized in that the outer fixing member 50 is installed that can be maintained in a state in which the tension load is applied to the tension member (30). 제15항에 있어서, The method of claim 15, 상기 외측정착부재(50)는 인장재(30)의 다른 한쪽끝단인 천공구멍의 입구부분에 인장재(30)가 관통되는 인장재공(52)을 가진 지압판재(51)가 설치되고 이 지압판재(51)를 관통하여 인출된 인장재(30)의 끝단에 설치되어 인장재를 인장한 상태로 유지하기 위한 인장유지부재(55)가 부가 설치된 것을 특징으로 하는 선행인장타입 록 볼트.The outer fixing member 50 is provided with a pressure plate member 51 having a tension member hole 52 through which the tension member 30 penetrates at the inlet portion of the punching hole, which is the other end of the tension member 30, and the pressure plate member 51. Pre-tension type lock bolt, characterized in that the tension holding member 55 is installed at the end of the tension member (30) drawn out through) is installed to maintain the tension member in the tensioned state. 제15항 또는 제16항에 있어서, The method according to claim 15 or 16, 상기 외부정착부재(50)의 전방에는 천공구멍의 입구를 기밀이 유지되게 막는 패커(60)가 부가 설치된 것을 특징으로 하는 선행인장타입 록 볼트. Pre-tension type lock bolt, characterized in that the front of the outer fixing member 50, the packer 60 is installed to block the inlet of the drilling hole to maintain the airtight. 암면에 구멍을 천공하는 천공단계; 이 천공단계에 의해 천공된 구멍으로 록 볼트의 매립정착파트를 장입하는 록 볼트 장입단계; 이 장입단계에 의해 장입된 록 볼트에서 파이프를 지지하면서 인장재를 당겨 인장하는 인장단계; 이후에 천공구멍의 입구에서 지지되도록 인장재의 끝단에 지압판과 인장유지부재를 끼워 설치한 후 인장재를 당겨 인장재에 인장력이 걸린 인장상태를 그대로 유지하면서 고정하는 외부고정단계를 포함하는 선행인장타입 록 볼트를 이용한 시공방법에 있어서, Drilling a hole in the rock surface; A lock bolt charging step of charging a buried fixing part of the lock bolt into the hole drilled by the drilling step; A tensioning step of pulling and pulling the tension member while supporting the pipe in the lock bolt charged by the charging step; Pre-tension type lock bolt including an external fixing step of installing a shiatsu plate and a tension holding member at the end of the tension member so as to be supported at the inlet of the punched hole, and then pulling the tension member to fix the tension member while maintaining the tensioned state. In the construction method using 상기 인장단계는 인장재가 인장되면서 그 끝단부분의 쐐기가 확장부재를 확장시키고 이렇게 확장되면서 볼트가 절단되어 확장부재와 파이프가 분리된 후 확장부재가 더욱 확장되어 천공구멍의 내주면에 밀착 고정되는 내부고정단계를 포함하며, 이 내부고정단계에서 확장부재를 천공구멍에 고정하기 위해 인장재에 가했던 인장력을 해제한 후 파이프를 천공구멍으로 빼내어 제거하는 파이프제거단계가 부가되어 이루어진 것을 특징으로 하는 선행인장타입 록 볼트를 이용한 시공방법.In the tensioning step, as the tension member is tensioned, the wedge at its end portion expands the expansion member. As the extension is performed, the bolt is cut and the expansion member and the pipe are separated, and then the expansion member is further expanded to fix the inner circumferential surface of the perforated hole. And a pipe removing step of releasing the tension applied to the tension member to fix the expansion member to the drilling hole in the inner fixing step, and then removing the pipe by removing the pipe into the drilling hole. Construction method using lock bolts. 제18항에 있어서, The method of claim 18, 상기 외부고정단계에서 천공구멍의 입구부분을 패커로 긴밀하게 폐쇄시킨 후, 패커와 지압판재의 호스구멍 중 한쪽의 호스구멍을 통해 그라우팅재인 시멘트몰탈을 주입하고 다른 한쪽의 호스구멍으로는 천공구멍 내의 공기나 이물질을 빼내면서 가압그라우팅을 시행하는 것을 특징으로 하는 선행인장타입 록 볼트를 이용한 시공방법.In the external fixing step, the inlet portion of the perforation hole is closed tightly with a packer, and then cement cement mortar, which is grouting material, is injected through one of the hose holes of the packer and the pressure plate material, and the other hole in the perforation hole is used. Construction method using the pre-tension type lock bolt, characterized in that the pressure grouting while removing the air or foreign matter.
KR1020060067740A 2005-08-03 2006-07-20 preceding tension type lock bolt and construction method by using it KR100817627B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020060067740A KR100817627B1 (en) 2005-08-03 2006-07-20 preceding tension type lock bolt and construction method by using it
PCT/KR2006/003008 WO2007015614A1 (en) 2005-08-03 2006-07-31 Preceding tension type lock bolt and construction method using the same

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR1020050071025 2005-08-03
KR1020050102887 2005-10-31
KR1020060067740A KR100817627B1 (en) 2005-08-03 2006-07-20 preceding tension type lock bolt and construction method by using it

Publications (2)

Publication Number Publication Date
KR20070016944A KR20070016944A (en) 2007-02-08
KR100817627B1 true KR100817627B1 (en) 2008-03-27

Family

ID=41640736

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060067740A KR100817627B1 (en) 2005-08-03 2006-07-20 preceding tension type lock bolt and construction method by using it

Country Status (1)

Country Link
KR (1) KR100817627B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101232823B1 (en) 2011-07-06 2013-02-13 주식회사 티에스테크노 Rockbolt
CN109958232A (en) * 2019-03-11 2019-07-02 中国建筑第八工程局有限公司 Prestressed anchor clamp device and its application method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100821223B1 (en) * 2007-02-13 2008-04-11 권진오 Anchorbolt for tunnel construction
CN113740164B (en) * 2021-07-29 2024-05-10 北京铁研建设监理有限责任公司 Anchor rod drawing equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5599140A (en) * 1995-09-13 1997-02-04 The Eastern Company Mine roof support system including an expansion anchor with means assisting resin component mixing and method of installation thereof
JP2001164899A (en) * 2000-04-12 2001-06-19 Kamishimagumi:Kk Rock bolt

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5599140A (en) * 1995-09-13 1997-02-04 The Eastern Company Mine roof support system including an expansion anchor with means assisting resin component mixing and method of installation thereof
JP2001164899A (en) * 2000-04-12 2001-06-19 Kamishimagumi:Kk Rock bolt

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101232823B1 (en) 2011-07-06 2013-02-13 주식회사 티에스테크노 Rockbolt
CN109958232A (en) * 2019-03-11 2019-07-02 中国建筑第八工程局有限公司 Prestressed anchor clamp device and its application method
CN109958232B (en) * 2019-03-11 2021-05-25 中国建筑第八工程局有限公司 Prestressed anchorage device fastening device and use method thereof

Also Published As

Publication number Publication date
KR20070016944A (en) 2007-02-08

Similar Documents

Publication Publication Date Title
EP2318659B1 (en) Rock anchor cable
KR101750273B1 (en) Tunnel Reinforcement structure and Tunnel Reinforcement methods using the same
KR100817627B1 (en) preceding tension type lock bolt and construction method by using it
WO2017034152A1 (en) Front mounting anchor for permanent anchor method, having improved structure
KR100861938B1 (en) The earth anchor and construction method for use of that
RU2278941C2 (en) Method and device for well drilling and anchor support fastening in borehole
JP2007530824A (en) Method and apparatus for drilling holes and forming anchors in soil or rock material
KR20090101045A (en) Pre-tension soil nail and method of soil nail construction using the same
JP2001503486A (en) Method and apparatus for simultaneous drilling and hole lining
KR100766450B1 (en) The anchor construction method in soft ground of gaving used the foundation fixing anchor and this shich consisted of fixing supporter
JP2002505724A (en) Method and apparatus for perforating
US7320371B2 (en) Method and device for producing pretensioned anchorings
KR101178043B1 (en) Construction method using cable bolt and cable bolt
KR101041362B1 (en) Earth anchor for reinforcing and stabilizing slopes and the ground stabilization method using the same
KR100721786B1 (en) Anchor.nail execution method for the soft ground
KR100586176B1 (en) Multi-blade high strength anchor, mhs anchor
KR100671927B1 (en) Device for prestressing and soil nailing method using the same
KR200404562Y1 (en) preceding tension type lock bolt unit
KR100908085B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR100896963B1 (en) Rock bolt
KR101066641B1 (en) Pre-stressing tunneling method using presupport concept and thereof apparatus
KR100783139B1 (en) Lock bolt apparatus
KR100872145B1 (en) Removable earth anchor with double injection pipe for softground and construction method thereof
WO2007015614A1 (en) Preceding tension type lock bolt and construction method using the same
KR102054994B1 (en) Cylindrical wedge anchor for reinforcing the ground and method for constructing this same

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee