KR100638679B1 - System for controlling on time crossing in the train using the radio communication - Google Patents
System for controlling on time crossing in the train using the radio communication Download PDFInfo
- Publication number
- KR100638679B1 KR100638679B1 KR1020040059387A KR20040059387A KR100638679B1 KR 100638679 B1 KR100638679 B1 KR 100638679B1 KR 1020040059387 A KR1020040059387 A KR 1020040059387A KR 20040059387 A KR20040059387 A KR 20040059387A KR 100638679 B1 KR100638679 B1 KR 100638679B1
- Authority
- KR
- South Korea
- Prior art keywords
- crossing
- railroad
- vehicle
- time
- control device
- Prior art date
Links
- 238000004891 communication Methods 0.000 title claims abstract description 11
- 230000001133 acceleration Effects 0.000 claims abstract description 15
- 230000000903 blocking effect Effects 0.000 claims abstract description 14
- 230000002159 abnormal effect Effects 0.000 claims abstract description 8
- 230000005540 biological transmission Effects 0.000 claims abstract description 7
- 230000008054 signal transmission Effects 0.000 claims 1
- 230000005856 abnormality Effects 0.000 abstract description 4
- 238000013459 approach Methods 0.000 description 12
- 238000000034 method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 4
- 238000001514 detection method Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000007257 malfunction Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L29/00—Safety means for rail/road crossing traffic
- B61L29/24—Means for warning road traffic that a gate is closed or closing, or that rail traffic is approaching, e.g. for visible or audible warning
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L15/00—Indicators provided on the vehicle or train for signalling purposes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L15/00—Indicators provided on the vehicle or train for signalling purposes
- B61L15/0018—Communication with or on the vehicle or train
- B61L15/0027—Radio-based, e.g. using GSM-R
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or trains
- B61L25/021—Measuring and recording of train speed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L29/00—Safety means for rail/road crossing traffic
- B61L29/08—Operation of gates; Combined operation of gates and signals
- B61L29/18—Operation by approaching rail vehicle or train
- B61L29/22—Operation by approaching rail vehicle or train electrically
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2201/00—Control methods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2205/00—Communication or navigation systems for railway traffic
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F13/00—Arrangements for obstructing or restricting traffic, e.g. gates, barricades ; Preventing passage of vehicles of selected category or dimensions
- E01F13/04—Arrangements for obstructing or restricting traffic, e.g. gates, barricades ; Preventing passage of vehicles of selected category or dimensions movable to allow or prevent passage
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
본 발명은 철도 차량의 건널목 신호 제어에 관한 것으로, 특히 입체화되지 않은 건널목에 있어 접근하는 철도 차량으로부터 건널목을 안전하게 차단하도록 경보 수단 및 차단 수단의 동작을 제어하는 건널목 제어장치를 정시간으로 제어하는 무선 통신을 이용한 철도 차량의 건널목 정시간 제어 시스템에 관한 것이다.The present invention relates to the control of the crossing signal of a railroad vehicle, and more particularly, to wirelessly control the crossing control device that controls the operation of the alarm means and the blocking means so as to safely block the crossing from an approaching railway vehicle in a non-dimensionalized crosswalk. The present invention relates to a railroad crossing crossing time control system using communication.
철도 차량과의 데이터 송수신을 수행하며 전송된 실시간 정보에 따라 경보 수단 및 차단 수단을 제어하는 건널목 제어장치와, 철도 차량에 건널목 접근을 알려주는 접근 구간 알림 수단을 포함하는 지상부와, 건널목 제어장치와 데이터 송수신을 수행하는 무선 송수신부와, 철도 차량에 장착된 타코메타로부터 검출된 값에 의해 가/감 속도를 계산하는 가/감 속도 계산부와, 지상부의 건널목 제어장치의 고장 또는 이상 신호에 따라 철도 차량의 비상 제동을 제어하는 비상 제동 출력부와, 철도 차량의 건널목 접근 구간 진입 정보를 건널목 제어장치로 전송하는 접근 구간 알림 응동 안테나를 포함하는 차상부로 구성되는 철도 차량의 건널목 정시간 제어 시스템을 제공함에 있다.Cross section control device for performing the data transmission and reception with the railroad vehicle and controlling the alarm means and the blocking means according to the transmitted real-time information, and the ground section including an access section notification means for informing the railroad vehicle access to the railroad crossing, A radio transceiver for performing data transmission and reception, an acceleration / deceleration calculation unit that calculates acceleration / deceleration rate based on a value detected from a tachometer installed in a railway vehicle, and a railway according to a failure or abnormal signal of a crossing controller of the ground part. An emergency braking time control system of a railroad vehicle comprising an emergency braking output unit for controlling emergency braking of a vehicle and a vehicle upper part including an access section notification active antenna that transmits information of a railroad crossing access section entry to a crossing controller. In providing.
본 발명을 통해 철도 차량의 선로 내의 인접 구간 진입에 따른 정확한 경보 시간을 유지하며, 건널목 제어장치의 고장 및 이상이 발생했을 때 인접 구간 내에 진입하는 상기 철도 차량에 상기 고장 및 이상에 대한 신호를 전송하여 비상 제동을 수행하도록 하여 충돌에 대한 대형 사고를 예방하며, 무선 통신을 통해 기존의 철도 차량 감지를 위해 투입되는 케이블과 같은 물리적 자원을 절감하여 경제적인 비용을 절감하는 효과가 있다.The present invention maintains an accurate alarm time according to the entry of the adjacent section in the track of the railroad vehicle, and transmits a signal for the failure and the abnormality to the railroad vehicle entering the adjacent section when a failure and abnormality of the crossing control device occurs. Emergency braking can be performed to prevent large accidents in collisions, and economical cost can be saved by reducing physical resources such as cables input for detecting existing railroad cars through wireless communication.
철도 차량, 무선 송수신부, 건널목 제어장치, 비상 제동 신호, 가/감 속도 계산부Railway vehicles, radio transceivers, crossing controls, emergency braking signals, acceleration / deceleration calculation units
Description
도 1은 종래 기술에 따른 제어자 방식의 건널목 제어 구성도1 is a cross-sectional control block diagram of the controller method according to the prior art
도 2는 종래 기술에 따른 궤도회로 방식의 건널목 제어 구성도2 is a cross-sectional view of the railroad crossing control method according to the prior art
도 3은 종래 기술에 따른 차축 검지기 방식의 건널목 제어 구성도Figure 3 is a cross-sectional control block diagram of the axle detector according to the prior art
도 4는 본 발명에 따른 무선 통신을 이용한 정시간 건널목 제어 구성도4 is a block diagram of a timed crossing control using wireless communication according to the present invention
도 5는 본 발명에 따른 무선 통신을 이용한 지상부와 차상부의 건널목 제어 시스템5 is a railroad crossing control system using the ground and the vehicle using wireless communication according to the present invention
* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10 : 무선 송수신부 20 : 건널목 제어장치 10: wireless transceiver 20: crossing control device
21 : 경보 수단 22 : 차단 수단 21: alarm means 22: blocking means
23 : 접근 구간 알림 수단 30 : 가/감 속도 계산부 23: access section notification means 30: acceleration / deceleration calculation unit
31 : 타코메타 32 : 비상 제동 출력부 31 tachometer 32: emergency braking output
40 : 접근 구간 알림 응동 안테나 50 : 철도 차량 40: approach section notification response antenna 50: railroad car
본 발명은 철도 차량의 건널목 신호 제어에 관한 것으로, 특히 입체화되지 않은 건널목에 있어 접근하는 철도 차량으로부터 건널목을 안전하게 차단하도록 경보 수단 및 차단 수단의 동작을 제어하는 건널목 제어장치를 정시간으로 제어하는 무선 통신을 이용한 철도 차량의 건널목 정시간 제어 시스템에 관한 것이다.The present invention relates to the control of the crossing signal of a railroad vehicle, and more particularly, to wirelessly control the crossing control device that controls the operation of the alarm means and the blocking means so as to safely block the crossing from an approaching railway vehicle in a non-dimensionalized crosswalk. The present invention relates to a railroad crossing crossing time control system using communication.
일반적으로 건널목 제어라 함은 접근하는 철도 차량에 반응하여 경보등, 경보종, 차단기 및 접근방향 표시기 등을 동작시켜 상기 철도 차량이 건널목을 안전하게 통과시키기 위한 제어이다.In general, the crossing control is a control for allowing the railway vehicle to safely pass the crossing by operating an alarm light, an alarm bell, a breaker, and an approach direction indicator in response to the approaching railway vehicle.
이러한 건널목 제어를 위한 장치는 초기에는 계전기 회로로 구현되어 궤도 회로나 제어자로부터 입력되는 접점값이 일정한 조건을 만족함에 따라 차단을 시작 또는 해제하였다.The device for controlling the crosswalk was initially implemented as a relay circuit, and started or released the block as the contact value input from the track circuit or the controller satisfies a certain condition.
정시간 건널목 제어는 접근하는 철도 차량의 속도에 따라 경보 개시 후 30초 이후에 상기 철도 차량이 건널목을 진입하는 개념으로써 정시간 제어를 위한 방법으로는 제어자를 이용한 방법, 궤도회로를 이용한 방법, 차축 검지기를 이용한 방법이 기존에 사용되고 있다.Timed crossing control is a concept that the railway vehicle enters the crossing after 30 seconds after the start of the alarm according to the speed of the approaching railway vehicle. The method using a detector is conventionally used.
도 1은 종래 기술 중 제어자를 이용한 건널목 제어 방법에 관한 것으로, 제어자(100)를 건널목의 진입부와 진출부에 각각 설치하고 상기 진출부에 설치된 제어자(100)에 의해 철도 차량(50)이 감지되면 경보 수단(21)에서는 경보를 시작한다.1 is a cross-sectional control method using a controller in the prior art, the controller 100 is installed in the entrance and exit of the crossing, respectively, the
상기 철도 차량이 건널목 진출부에 설치된 제어자(100)를 통과하면 철도 차량(50)이 완전히 빠져나간 것으로 판단하고 경보 수단(21) 및 차단 수단(22)이 해 제되도록 한다.When the railroad car passes through the controller 100 installed at the exit of the railroad crossing, it is determined that the
도 2는 종래 기술 중 궤도회로를 이용한 건널목 제어 방법에 관한 것으로, 궤도회로(200)를 건널목에서 일정 거리만큼 선로까지 각각 설치한 후 철도 차량(50)이 상기 궤도회로(200) 구간 내로 진입하게 되면 경보 수단(21) 및 차단 수단(22)이 동작을 시작해서 궤도회로(200) 구간을 완전히 빠져나가게 되면 상기 경보 수단(21) 및 차단 수단(22)이 해제되도록 한다.2 is related to a railroad crossing control method using a track circuit in the prior art, the
상기 도 1과 도 2의 건널목 제어 방법은 철도 차량(50)이 각각 감지 수단이 설치된 접근 구간 내에 들어오게 되면 속도에 관계없이 경보 수단(21)의 동작이 시작되므로 고속의 철도 차량(50)의 경우 정시간 예를 들면 30초를 유지하지만, 저속의 철도 차량(50)인 경우 경보 수단(21)이 동작을 수행 후 수 분이 초과하여도 상기 철도 차량(50)이 건널목에 진입하지 않아 상기 건널목에 대기하고 있는 보행자 및 일반 차량이 자의적인 판단에 따라 상기 건널목을 침입, 횡단하여 사고를 초래하게 된다.In the crossing control method of FIG. 1 and FIG. 2, when the
즉, 제어자(100)와 궤도회로(200)에 설치된 신호 계전기가 낙하하게 되면 경보 수단(21)이 시작되거나 설정에 따라 일정 시간 후에 경보 수단(21)이 시작되는데, 이런 동작은 접근하는 철도 차량(50)에 관계없이 수행되기 때문에 상기 제어자(100)와 궤도회로(200)가 설치된 구간 내 최대 통과 속도에 설정된 건널목 경보 수단 시작 시간이 저속 철도 차량(50)이 진입하는 경우 불필요하게 차단을 오래 지속하는 문제점이 있다.That is, when the signal relay installed in the controller 100 and the
상기 도 1과 도 2의 개선 방법으로 도 3과 같은 차축 검지기를 이용한 건널 목 제어 방법이 사용되고 있다.As a method for improving the above-described FIG. 1 and FIG. 2, a crossing neck control method using the axle detector as shown in FIG.
즉, 선로에 철도 차량(50)의 속도를 산출하기 위한 차축 검지기(300)를 일정 간격으로 설치하고 상기 차축 검지기(300)가 설치된 구간을 철도 차량(50)이 접근함에 따라 차륜을 검지하여 상기 철도 차량(50)의 속도를 계산하고 건널목에 설치된 경보 수단(21)의 개시 시간을 조절하도록 한다.That is, the
그러나 상기에서 제안된 건널목 제어 방법에 있어, 선로에 설치된 차축 검지기(300)를 통과한 후 상기 차축 검지기(300)와 건널목 사이에서 발생하는 철도 차량(50)의 가속 내지 감속이 고려되지 않아 상기 차축 검지기(300)를 통과한 후의 철도 차량(50)의 가속에 의해 즉, 예상 건널목 도달 시간에 큰 오차가 생겨 경보 수단이 동작되기 전에 상기 철도 차량(50)이 진입하게 되는 위험한 상황이 발생할 수 있다.However, in the proposed crossing control method, since the acceleration or deceleration of the
따라서 본 발명은 상기와 같은 종래 기술의 문제점을 감안하여 안출한 것으로서, 선로에 설치된 접근 구간 알림 수단에 의해 철도 차량과 건널목의 무선 송수신부를 통해 실시간으로 연속 제어되며 건널목에 도달하는 철도 차량의 정시간(30초)을 정밀하게 예측하여 건널목을 안전하게 차단하고, 건널목의 이상 또는 고장 신호에 따라 상기 철도 차량의 비상 제동을 수행하는 무선 통신을 이용한 철도 차량의 건널목 정시간 제어 시스템을 제공함에 있다.Therefore, the present invention has been made in view of the problems of the prior art as described above, by the access section notification means installed on the track is continuously controlled in real time through the radio transmission and reception of the railroad car and the railroad crossings of the railroad car to reach the crossing The present invention provides a railroad crossing crossing time control system using wireless communication that accurately blocks (30 seconds) and safely crosses a railroad crossing and performs emergency braking of the railroad vehicle according to an abnormality or failure signal of the railroad crossing.
상기된 목적을 달성하기 위하여 첨부된 도면을 참조하여 설명하면 다음과 같 다.When described with reference to the accompanying drawings to achieve the above object is as follows.
도 4와 도 5는 본 발명에 따른 무선 통신을 이용한 건널목 및 철도 차량에 설치된 제어 시스템 구성도로서, 접근 구간 알림 수단과, 건널목 제어장치의 지상부와, 무선 송수신부와, 가/감 속도 계산부와, 비상 제동 출력부, 접근 구간 알림 응동 안테나를 포함하는 차상부로 구성된다.4 and 5 is a block diagram of a control system installed in a railroad crossing and a railroad vehicle using wireless communication according to the present invention, the access section notification means, the ground section of the crossing control device, the wireless transmission and reception unit, acceleration / deceleration calculation unit And, the emergency braking output unit, the access section notification vehicle comprises a warning antenna.
지상부는 철도 선로에 설치되며 철도 차량(50)에게 건널목 인접을 알려주는 접근 구간 알림 수단(23)과, 철도 차량(50)과의 데이터 송수신을 수행하며 상기 철도 차량(50)의 가/감 속도 계산에 따른 철도 차량의 건널목 도달 시간 변경 값을 실시간으로 전송 받아 건널목 진입 시간에 따른 경보 수단 및 차단 수단의 동작을 제어하는 건널목 제어장치(20)로 구성된다.The ground portion is installed on the railroad track and the access section notification means 23 for notifying the
차상부는 철도 차량(50)의 각종 데이터를 건널목 제어장치(20)로 전송하기 위한 수단의 무선 송수신부(10)와, 철도 차량(50)에 설치된 타코메타(31)로부터 검출된 값에 따라 가/감 속도를 계산하고 상기 철도 차량의 건널목 도달 시간 변경값을 실시간으로 건널목 제어장치(20)로 전송하는 가/감 속도 계산부(30)와, 상기 건널목 제어장치(20)에서 전송된 고장 또는 이상 신호에 따라 철도 차량(50)의 비상 제동을 제어하는 비상 제동 출력부(32)와, 상기 철도 차량(50)의 건널목 인접 구간 진입 정보를 건널목 제어장치(20)로 전송하는 접근 구간 알림 응동 안테나(40)로 구성된다.The on-vehicle portion is based on the values detected from the
무선 송수신부(10)는 각각 철도 차량(50)과 건널목 제어장치(20)에 설치되어 철도 차량(50)의 진입속도, 가/감 속도의 속도 정보와 건널목 제어장치(20)의 경보 수단(21), 차단 수단(22)의 동작 상태와 고장 및 이상 신호를 실시간으로 서로 전송하도록 구성된다.The
건널목 제어장치(20)는 상기 무선 송수신부(10)를 통해 철도 차량(50)으로부터 전송된 속도 정보를 수신하여 각종 경보 수단(21), 차단 수단(22)을 동작시키고 건널목의 고장이나 이상 신호를 철도 차량(50)의 무선 송수신부(10)에 전송하도록 구성된다.The
상기 건널목 제어장치(20)의 경보 수단(21)은 경보등, 경보종 및 방향 표시기를 포함하며, 상기 건널목 제어장치(20)의 제어를 통해 동작하도록 구성된다.The alarm means 21 of the crossing
또한 상기 건널목 제어장치(20)의 차단 수단(22)은 차단기를 포함하며, 상기 건널목 제어장치(20)의 제어를 통해 동작하도록 구성된다.In addition, the blocking means 22 of the crossing
접근 구간 알림 수단(23)은 선로에 설치되어 철도 차량에게 건널목 접근 구간 인접을 알려주도록 구성된다.Approaching section notification means 23 is installed on the track is configured to notify the railroad vehicle crossing the approaching section adjacent.
가/감 속도 계산부(30)는 철도 차량(50)이 접근 구간을 통과한 후 건널목에 접근할 때까지의 가/감 속도를 타코메타(31)로부터 검출된 값에 따라 계산하고 계산된 건널목 도달 시간 변경값을 실시간으로 건널목 제어장치(20)로 전송하도록 구성된다.The acceleration / deceleration calculation unit 30 calculates the acceleration / deceleration speed from the
비상 제동 출력부(32)는 지상부의 건널목 제어장치(20)로부터 전송된 고장 및 이상 신호에 따라 철도 차량(50) 비상 제동 신호를 출력하고 철도 차량(50)의 안전한 제동을 수행하도록 구성된다.The emergency
접근 구간 알림 응동 안테나(40)는 철도 차량(50)이 선로에 설치된 접근 구 간 알림 수단(23)을 감지하고 철도 차량(50)이 건널목 접근 구간에 인접하였음을 건널목 제어장치(20)에 전송하도록 구성된다.Approaching section notification The
상기 구성에 따른 동작 설명은 다음과 같다.The operation description according to the above configuration is as follows.
철도 차량(50)이 선로 상에 설치된 접근 구간 알림 수단(23)에 인접함에 따라 철도 차량(50)에 설치된 접근 구간 알림 응동 안테나(40)가 동작한다.As the
지상부의 건널목 제어장치(20)는 상기 접근 구간 알림 응동 안테나(40)에 의해 상기 철도 차량(50)이 건널목과 일정 거리에 인접하였음을 인지한다.The
아울러 상기 철도 차량(50)의 무선 송수신부(10)는 지상부의 무선 송수신부(10)와 통신을 시도한다.In addition, the
이때 철도 차량(50)의 무선 송수신부(10)에서는 기본적으로 상기 철도 차량(50)의 접근 구간 진입 속도 및 건널목 도달 시간이 함께 전송한다.At this time, the
상기 철도 차량(50)이 선로상의 접근 구간 알림 수단(23)을 통과한 후 지상부의 건널목에 접근할 때까지의 가/감 속도를 상기 철도 차량(50)에 부착된 타코메타(tachometer)로부터 검출된 값에 따라 계산하고 계산된 건널목 도달 시간 변경값을 실시간으로 건널목 제어장치(20)로 전송한다.The acceleration / deceleration speed of the
즉, 상기 타코메타를 통한 검출은 회전수에 따르는데, 회전수가 빨라짐에 따라 코일로 감겨진 스테이트(고정자)안의 자석으로 된 로터(회전자)가 회전하게 되고 이때 상기 스테이트에 전기가 발생하게 된다.That is, the detection through the tachometer depends on the rotational speed. As the rotational speed increases, a rotor (rotor) made of magnets in a coil wound in a state (stator) is rotated, and electricity is generated in the state.
상기에서 회전이 빠를수록 많은 전기가 발생하며 상기 타코메타에 연결된 전압계에 공급되어 게이지가 비례해서 움직이며 이를 통해 철도 차량(50)의 건널목에 도달 시간의 변경값 등이 전송되는 것이다.The faster the rotation, the more electricity is generated and supplied to the voltmeter connected to the tachometer and the gauge moves in proportion, through which the change value of the arrival time, etc. are transmitted to the crossing of the
한편, 지상부의 무선 송수신부(10)에서는 상기 철도 차량(50)의 예상 건널목 진입 시간을 수신한다.On the other hand, the
즉, 상기 철도 차량(50)의 통과 정시간(30초) 이전에 예상 건널목 진입 시간이 건널목 제어장치(20)에 전송되어 경보종, 경보등 및 방향 표시기의 경보 수단(21)의 동작과 차단기의 차단수단(22) 동작을 제어한다.That is, the estimated crossing entry time is transmitted to the crossing
이때, 건널목 제어장치(20)에서 오동작이나 철도 차량(50)으로부터 입력값이 통과하는 철도 차량(50)과 건널목 이용자의 안전에 직접적인 영향을 미치는 요인이 발생하게 되면 선별하여 고장 및 이상 신호를 지상부의 무선 송수신부(10)를 통해 상기 철도 차량(50)의 무선 송수신부(10)로 송신한다.At this time, if a factor that directly affects the safety of the
상기 지상부의 건널목 제어장치(20)로부터 전송된 고장 및 이상 신호를 수신한 철도 차량(50)은 제동 장치와의 인터페이스(interface)를 통해 비상 제동 출력부(32)에서 비상 제동 신호를 출력하고 그에 따라 상기 철도 차량(50)을 비상 제동시켜 안전하게 정지시킨다.The
상기 본 발명을 통해 철도 차량의 선로 내의 인접 구간 진입에 따른 정확한 경보 시간(30초)을 유지하며, 건널목 제어장치의 고장 및 이상에 대해 인접 구간 내에 진입하는 상기 철도 차량에 상기 고장 및 이상에 대한 신호를 전송하여 비상 제동을 수행하도록 하여 충돌에 대한 대형 사고를 예방하며, 무선 통신을 통해 기존의 철도 차량 감지를 위해 투입되는 케이블과 같은 물리적 자원을 절감하여 경제 적인 비용을 절감하는 효과가 있다.The present invention maintains the accurate alarm time (30 seconds) according to the entry of the adjacent section in the track of the railway vehicle, and the railway vehicle entering the adjacent section with respect to the failure and abnormality of the crossing control device. By transmitting a signal to perform emergency braking to prevent large accidents in the collision, it is possible to reduce the economic cost by reducing the physical resources such as the cable input for the existing rail vehicle detection through wireless communication.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040059387A KR100638679B1 (en) | 2004-07-28 | 2004-07-28 | System for controlling on time crossing in the train using the radio communication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040059387A KR100638679B1 (en) | 2004-07-28 | 2004-07-28 | System for controlling on time crossing in the train using the radio communication |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060010620A KR20060010620A (en) | 2006-02-02 |
KR100638679B1 true KR100638679B1 (en) | 2006-10-25 |
Family
ID=37120915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040059387A KR100638679B1 (en) | 2004-07-28 | 2004-07-28 | System for controlling on time crossing in the train using the radio communication |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100638679B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101065164B1 (en) * | 2009-06-29 | 2011-09-19 | 한국철도기술연구원 | Point Machine control Device using radio communication in low density section and Method thereof |
KR102517060B1 (en) * | 2021-03-10 | 2023-04-05 | 한국철도기술연구원 | Apparatus and method for warning in the mixed section of mountain railroad and roadway |
KR102498585B1 (en) * | 2022-06-27 | 2023-02-14 | 주식회사 제이경성 | Train signal system for preventing accident of railway vehicle |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5699986A (en) * | 1996-07-15 | 1997-12-23 | Alternative Safety Technologies | Railway crossing collision avoidance system |
KR19980072880A (en) * | 1997-03-10 | 1998-11-05 | 안병조 | Control device of railroad crossing breaker and its control method |
JPH1120702A (en) * | 1997-06-30 | 1999-01-26 | Nippon Signal Co Ltd:The | Railroad crossing control device |
KR20000008324A (en) * | 1998-07-13 | 2000-02-07 | 김봉택 | Automatic control device and method for railway crossing section operation |
KR20000075021A (en) * | 1999-05-27 | 2000-12-15 | 김봉택 | Safety system of a railroad crossing gate |
KR200311414Y1 (en) * | 2002-12-20 | 2003-04-26 | 지동환 | A Crossing equipment is Controlled by GPS |
KR200361170Y1 (en) * | 2004-06-19 | 2004-09-07 | 김종무 | Image processing alarm system for automatically sensing unexpected accident at railroad crossing |
-
2004
- 2004-07-28 KR KR1020040059387A patent/KR100638679B1/en not_active IP Right Cessation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5699986A (en) * | 1996-07-15 | 1997-12-23 | Alternative Safety Technologies | Railway crossing collision avoidance system |
KR19980072880A (en) * | 1997-03-10 | 1998-11-05 | 안병조 | Control device of railroad crossing breaker and its control method |
JPH1120702A (en) * | 1997-06-30 | 1999-01-26 | Nippon Signal Co Ltd:The | Railroad crossing control device |
KR20000008324A (en) * | 1998-07-13 | 2000-02-07 | 김봉택 | Automatic control device and method for railway crossing section operation |
KR20000075021A (en) * | 1999-05-27 | 2000-12-15 | 김봉택 | Safety system of a railroad crossing gate |
KR200311414Y1 (en) * | 2002-12-20 | 2003-04-26 | 지동환 | A Crossing equipment is Controlled by GPS |
KR200361170Y1 (en) * | 2004-06-19 | 2004-09-07 | 김종무 | Image processing alarm system for automatically sensing unexpected accident at railroad crossing |
Also Published As
Publication number | Publication date |
---|---|
KR20060010620A (en) | 2006-02-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105857277A (en) | Traffic light control device for electric vehicle and use method of traffic light control device | |
CN111267917A (en) | Control method for preventing motor train unit from going out of station in shunting mode under train approach | |
CA2874345A1 (en) | Guided ground vehicle including a device for managing a derailment of the vehicle, and associated derailment management method | |
KR100977727B1 (en) | Train collision alert unit and method using ldts data | |
JPH1120702A (en) | Railroad crossing control device | |
JP5307184B2 (en) | In-vehicle signal type automatic train control system and in-vehicle signal type automatic train control method | |
KR100873322B1 (en) | Train occupation detection system and method | |
KR101128978B1 (en) | Intelligence System for Accident Prevention at Railway Level Crossing and Train Brake Method | |
EP3228521A1 (en) | Method for controlling a railway level crossing | |
JP6951127B2 (en) | Automatic train protection system | |
KR100638679B1 (en) | System for controlling on time crossing in the train using the radio communication | |
KR100809880B1 (en) | Safety accident preventing system for railroad platform | |
JP3488913B2 (en) | Information provision, warning and control method for meeting head collision prevention support | |
JP2001128302A (en) | Safety method of train operation | |
JP6105239B2 (en) | ATS equipment | |
JPH04201678A (en) | Security control method and device coping with failure of railway crossing gate and alarm | |
CN114604298B (en) | Train safety protection method and device in RM mode, vehicle-mounted equipment and medium | |
KR101318350B1 (en) | Devices of railway vehicles preventing signal violations and its control method | |
KR101370413B1 (en) | System and method for preventing train from over-going in ATC mode | |
KR102498589B1 (en) | Railroad safety system using IoT | |
KR101447739B1 (en) | Signal to prevent breaking unit | |
KR100580870B1 (en) | An apparatus for state?information of railway crossing transmitting by ATP?system and the method thereof | |
JP2004136730A (en) | Failure monitoring system | |
CN108706020B (en) | Safety device, rail vehicle, method for maintaining the safety of a vehicle and computer program | |
JPH0678147U (en) | Overrun protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110915 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20120920 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20151006 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20160922 Year of fee payment: 11 |
|
LAPS | Lapse due to unpaid annual fee |