JPH10240699A - Automatic resource assigning system - Google Patents

Automatic resource assigning system

Info

Publication number
JPH10240699A
JPH10240699A JP6189997A JP6189997A JPH10240699A JP H10240699 A JPH10240699 A JP H10240699A JP 6189997 A JP6189997 A JP 6189997A JP 6189997 A JP6189997 A JP 6189997A JP H10240699 A JPH10240699 A JP H10240699A
Authority
JP
Japan
Prior art keywords
resource
rate
cpu
unit
common
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6189997A
Other languages
Japanese (ja)
Other versions
JP3031278B2 (en
Inventor
Satoko Nomura
さと子 野村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP6189997A priority Critical patent/JP3031278B2/en
Publication of JPH10240699A publication Critical patent/JPH10240699A/en
Application granted granted Critical
Publication of JP3031278B2 publication Critical patent/JP3031278B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

PROBLEM TO BE SOLVED: To unnecessitate resource setting change based on service specification and to unnecessitate a complicated resource calculation means based on the collection of traffic or the like by automatically assigning a common resource used for various services based on demand/supply. SOLUTION: A resource use situation and a CPU occupation rate for using the resource are monitored for the common resource used for various services. The damand/supply of the resource are judged by a resource increase starting resource use rate and a resource dacrease starting resource use rate through a timing control processing and the common resource is automatically assigned. A CPU use rate monitoring part 22 monitors the occupation rate of the CPU by a service provider. When the CPU occupation rate changes, the shift of the occupation rate is reported to a resource automatic calculation part 24. The resource use rate monitoring part 23 monitors the use situation of the resource by a resource management part 21 and reports the shift of the resource use rate to the resource automatic calculation part 24.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、様々なサービスで
使用される共通プラットフォームの自動リソースアサイ
ン方式に関する。
[0001] 1. Field of the Invention [0002] The present invention relates to an automatic resource assignment method for a common platform used in various services.

【0002】[0002]

【従来の技術】従来、共通のプラットフォームとして動
作しているサービスプロバイダーが使用するリソース
は、サービスの保留時間などによって左右されるととも
に、様々なサービスで使用された場合、そのリソースの
増設・減設の算出が困難である。
2. Description of the Related Art Conventionally, the resources used by a service provider operating as a common platform are influenced by the suspension time of the service and the like, and when used for various services, the resources are increased or decreased. Is difficult to calculate.

【0003】また、上位サービス仕様が変動(例えばサ
ービスシナリオの変動による共通リソースの保留時間の
変移等)した場合、この変動に応じたリソースをアサイ
ンすることも非常に難しい。
[0003] In addition, when the higher-level service specification changes (for example, a change in the holding time of the common resource due to a change in the service scenario), it is very difficult to assign resources according to the change.

【0004】[0004]

【発明が解決しようとする課題】上記したように、従来
のリソースアサイン方法では、様々なサービスを考慮し
ながらのサービス仕様の変動に伴うリソースの変更が困
難であり、またそのリソース変更のための複雑な算出手
順が必要とされる等の問題点を有している。
As described above, in the conventional resource assignment method, it is difficult to change resources according to a change in service specifications while considering various services. There is a problem that a complicated calculation procedure is required.

【0005】したがって、本発明は、上記問題点に鑑み
てなされたものであって、その目的は、サービスによる
リソースの需要と供給を監視し、その変化に応じて自動
でリソースの増設・減設を実行するリソースアサイン方
式を提供することにある。
Accordingly, the present invention has been made in view of the above problems, and an object of the present invention is to monitor the demand and supply of resources by a service, and to automatically add or reduce resources according to the change. To provide a resource assignment method for executing

【0006】[0006]

【課題を解決するための手段】前記目的を達成するた
め、本発明は、サービス提供手段を含むサービスプロバ
イダー部と、共通リソースを供給するリソース管理手段
と、CPU占有率を監視するCPU占有率監視手段と、
リソース使用率を監視するリソース使用率監視手段と、
共通リソースの増設・減設を算出するリソース自動算出
手段と、を備えた自動リソースアサイン方式であって、
前記サービスプロバイダー部は、前記リソース管理部か
ら供給された共通リソースを使用してサービスを提供
し、前記リソース管理部は、前記リソース自動算出部か
らの共通リソースの増設・減設要求に基づき共通リソー
スの増設・減設を行なうと共に、前記サービスプロバイ
ダー部に対して共通リソースを提供する手段を含み、前
記リソース自動算出部は、所定のリソース算出測定時間
内での前記CPU占有率監視部からのCPU占有率遷移
報告と、前記リソース使用率監視部からのリソース使用
率遷移報告と、共通リソースの増設・減設を決定するた
めの予め定められた所定のリソース使用率と所定のCP
U占有率と、に基づき、共通リソースの増設・減設要求
を、前記リソース管理部に対して通知する手段を含み、
前記CPU占有率監視部は、前記サービスプロバイダー
部によるCPUの占有率を監視し、該CPUの占有率が
変化した場合、該CPUの占有率の遷移を、CPU占有
率遷移報告として前記リソース自動算出部に通知する手
段を含み、前記リソース使用率監視部は、前記リソース
管理部によるリソースの使用状況を監視し、該リソース
使用率が変化した場合、該リソース使用率の遷移を、リ
ソース使用率遷移報告として、前記リソース自動算出部
に通知する手段を含む、ことを特徴とする。
In order to achieve the above object, the present invention provides a service provider unit including a service providing unit, a resource managing unit for supplying common resources, and a CPU occupancy monitoring for monitoring a CPU occupancy. Means,
Resource usage monitoring means for monitoring resource usage;
An automatic resource assignment method comprising: a resource automatic calculation means for calculating addition / reduction of a common resource,
The service provider unit provides a service using a common resource supplied from the resource management unit, and the resource management unit uses a common resource based on a common resource addition / reduction request from the automatic resource calculation unit. And means for providing a common resource to the service provider unit, wherein the automatic resource calculation unit includes a CPU from the CPU occupancy monitoring unit within a predetermined resource calculation measurement time. Occupancy rate transition report, resource usage rate transition report from the resource usage rate monitoring unit, and a predetermined resource usage rate and a predetermined CP for determining addition / reduction of a common resource
U occupancy rate, based on, based on the common resource expansion request, including means for notifying the resource management unit,
The CPU occupancy monitoring unit monitors the occupancy of the CPU by the service provider unit. If the occupancy of the CPU changes, the CPU occupancy transition is automatically calculated as a CPU occupancy transition report. A resource use monitoring unit, wherein the resource use monitoring unit monitors a resource use state by the resource management unit, and when the resource use ratio changes, the resource use ratio transition is performed. The report includes means for notifying the automatic resource calculation unit.

【0007】[0007]

【発明の実施の形態】本発明の実施の形態について以下
に説明する。本発明の好ましい実施の形態においては、
サービス提供手段を含むサービスプロバイダー部(図1
の20)と、共通リソースを供給する手段を含むリソー
ス管理部(図1の21)と、CPU占有率の監視手段を
含むCPU占有率監視部(図1の22)と、リソース使
用率の監視手段を含むリソース使用率監視部(図1の2
3)と、共通リソースの増設・減設を算出する手段を含
むリソース自動算出部(図1の24)と、を備えて構成
されている。
Embodiments of the present invention will be described below. In a preferred embodiment of the present invention,
Service provider section including service providing means (Fig. 1
20), a resource management unit (21 in FIG. 1) including a unit for supplying a common resource, a CPU occupancy monitoring unit (22 in FIG. 1) including a CPU occupancy monitoring unit, and a resource usage monitoring Resource usage monitoring unit including means (2 in FIG. 1)
3) and an automatic resource calculation unit (24 in FIG. 1) including means for calculating the addition / reduction of the common resource.

【0008】サービスプロバイダー部(図1の20)
は、リソース管理部(図1の21)から供給された共通
リソースを使用してサービスを提供する手段を含む。
[0008] Service provider section (20 in FIG. 1)
Includes means for providing a service using the common resource supplied from the resource management unit (21 in FIG. 1).

【0009】リソース管理部は、前記リソース自動算出
部からの共通リソースの増設・減設要求に基づき共通リ
ソース(共通リソース・共通I/Oリソース)の増設・
減設を行ない、サービスプロバイダー部に対して共通リ
ソースを提供する手段を含む。
[0009] The resource management unit is configured to add / reduce common resources (common resources / common I / O resources) based on the request for adding / removing common resources from the automatic resource calculation unit.
Includes means for reducing resources and providing common resources to service provider departments.

【0010】リソース自動算出部(図1の24)は、リ
ソース算出測定時間内にCPU占有率監視部(図1の2
2)からのCPU占有率遷移報告を受けた時、そのCP
U占有率がCPUシステム許容率を超えた場合、共通リ
ソース(共通リソース・共通I/Oリソース)の使用率
がリソース減設起動リソース使用率よりも低い時、リソ
ース減設フラグをONに設定し、リソース算出測定時間
終了時に、そのリソース減設フラグがONの状態なら
ば、リソースの減設をリソース管理部(図1の21)に
通知する手段と、リソース使用率監視部(図1の23)
からリソース使用率遷移報告を受けた時、そのリソース
使用率がリソース増設起動リソース使用率を超えた場
合、一般的にシステム内の処理に使用される共通リソー
スならば、リソースビジー回数(図2の29)を加算
し、特に、CPUの入出力(I/O)処理に使用され共
通I/Oリソースならば、CPU占有率がCPUシステ
ム許容率の範囲内であればリソースビジー回数を加算
し、リソース算出測定時間内でのリソースビジー回数を
計測し、リソース算出測定時間終了時に、このリソース
ビジー回数がリソース増設起動回数を超えた場合、リソ
ースの増設をリソース管理部に通知する手段を含む。
The automatic resource calculation unit (24 in FIG. 1) monitors the CPU occupancy ratio (2 in FIG. 1) within the resource calculation measurement time.
When receiving the CPU occupancy transition report from 2), the CP
When the U occupancy exceeds the CPU system permissible rate, when the usage rate of the common resource (common resource / common I / O resource) is lower than the resource reduction activation resource usage rate, the resource reduction flag is set to ON. If the resource reduction flag is ON at the end of the resource calculation measurement time, means for notifying the resource management unit (21 in FIG. 1) of the resource reduction and a resource usage monitoring unit (23 in FIG. 1) )
When the resource usage rate exceeds the resource expansion activation resource usage rate when the resource usage rate transition report is received from, the resource busy count (common in FIG. 29), and particularly, if the resource is a common I / O resource used for CPU input / output (I / O) processing and the CPU occupancy is within the range of the CPU system allowable rate, the resource busy count is added. It includes means for measuring the number of resource busyes within the resource calculation measurement time, and notifying the resource management unit of resource addition when the resource busy number exceeds the number of resource expansion activations at the end of the resource calculation measurement time.

【0011】CPU使用率監視部(図1の22)は、サ
ービスプロバイダーによるCPUの占有率を監視し、そ
のCPU占有率が変化した場合、CPU占有率の遷移を
前記リソース自動算出部(図1の24)に報告する手段
を含む。
The CPU utilization monitoring unit (22 in FIG. 1) monitors the occupancy of the CPU by the service provider. If the CPU occupancy changes, the CPU occupancy transition is determined by the automatic resource calculation unit (FIG. 1). 24) means for reporting.

【0012】リソース使用率監視部(図1の23)は、
リソース管理部によるリソースの使用状況を監視し、そ
のリソース使用率の遷移を前記リソース自動算出部(図
1の24)に報告する。
The resource usage monitoring unit (23 in FIG. 1)
The resource management unit monitors the resource usage status, and reports the transition of the resource usage rate to the automatic resource calculation unit (24 in FIG. 1).

【0013】本発明の実施の形態においては、様々なサ
ービスで使用する共通リソースに対して、リソース使用
状況とそのリソースを使用するCPU占有率を監視し、
タイミング制御処理によりリソース増設起動リソース使
用率、リソース減設起動リソース使用率によりリソース
の需要と供給を判断し、共通リソースの自動アサインを
可能とする。
In an embodiment of the present invention, for a common resource used in various services, a resource use status and a CPU occupancy rate using the resource are monitored.
The timing control processing determines resource demand and supply based on the resource expansion activation resource usage rate and the resource reduction activation resource usage rate, and enables automatic assignment of common resources.

【0014】[0014]

【実施例】上記した本発明の実施の形態について更に詳
細に説明すべく、本発明の実施例について図面を参照し
て説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing an embodiment of the present invention;

【0015】図1は、本発明の一実施例の自動リソース
アサイン方式の構成を機能ブロック図にて示したもので
ある。
FIG. 1 is a functional block diagram showing a configuration of an automatic resource assignment system according to one embodiment of the present invention.

【0016】図1を参照して、本実施例に係る自動リソ
ースアサイン方式は、サービスを提供するサービスプロ
バイダー部20と、共通リソースを供給するリソース管
理部21と、CPU占有率の監視するCPU占有率監視
部22と、リソース使用率の監視するリソース使用率監
視部23と、共通リソースの増設・減設を算出するリソ
ース自動算出部24と、を備えて構成されている。
Referring to FIG. 1, the automatic resource assignment system according to the present embodiment employs a service provider unit 20 for providing a service, a resource management unit 21 for supplying a common resource, and a CPU occupancy monitoring CPU occupancy rate. The configuration includes a rate monitoring unit 22, a resource usage monitoring unit 23 that monitors a resource usage rate, and an automatic resource calculation unit 24 that calculates addition / reduction of a common resource.

【0017】サービスプロバイダー部20は、リソース
管理部21から供給された共通リソース80を用いてサ
ービスを提供する。
The service provider unit 20 provides a service using the common resource 80 supplied from the resource management unit 21.

【0018】リソース管理部21は、リソース自動算出
部24からのリソースの増設・減設要求85に基づき、
共通リソース(共通リソース・共通I/Oリソース)の
増設・減設を行ない、サービスプロバイダー部20に、
共通リソースを提供する。
The resource management unit 21 receives a request 85 for adding or removing a resource from the automatic resource calculating unit 24,
Add / remove common resources (common resources / common I / O resources)
Provide common resources.

【0019】リソース自動算出部24は、リソース算出
測定時間T1(図3のリソース使用率遷移図参照)内
に、CPU占有率監視部22からCPU占有率遷移報告
83を受けた時、そのCPU占有率がCPUシステム許
容率L3(図4のCPU占有率遷移図参照)を超えた場
合、共通リソース(共通リソース・共通I/Oリソー
ス)の使用率がリソース減設起動リソース使用率L2
(図3参照)よりも低い時、リソース減設フラグ28
(図2参照)をONに設定し、リソース算出測定時間T
1終了時に、このリソース減設フラグ28がONの状態
ならば、リソースの減設85をリソース管理部21に通
知する。
When the automatic resource calculating unit 24 receives the CPU occupancy transition report 83 from the CPU occupancy monitoring unit 22 within the resource calculation measurement time T1 (see the resource occupancy transition diagram in FIG. 3), When the rate exceeds the CPU system allowable rate L3 (see the CPU occupancy rate transition diagram in FIG. 4), the usage rate of the common resource (common resource / common I / O resource) is reduced to the resource reduction activation resource usage rate L2.
When it is lower than (see FIG. 3), the resource reduction flag 28
(See FIG. 2) is set to ON, and the resource calculation measurement time T
If this resource reduction flag 28 is in the ON state at the end of 1, the resource management unit 21 is notified of the resource reduction 85.

【0020】これと共に、リソース自動算出部24は、
リソース使用率監視部23からリソース使用率遷移報告
84を受けた時、そのリソース使用率がリソース増設起
動リソース使用率L1(図3参照)を超えた場合、一般
的にシステムの処理に使用される共通リソースならば、
リソースビジー回数29(図2参照)を加算し、特に、
CPUの入出力(I/O)処理に使用される共通I/O
リソースならば、CPU占有率がCPUシステム許容率
L3の範囲内であればリソースビジー回数29(図2参
照)を加算し、リソース算出測定時間T1内でのリソー
スビジー回数29を計測し、リソース算出測定時間T1
終了時にリソースビジー回数29がリソース増設起動回
数30(図2参照)を超えた場合、リソースの増設85
をリソース管理部21に通知する。
At the same time, the automatic resource calculation unit 24
When receiving the resource usage rate transition report 84 from the resource usage rate monitoring unit 23, if the resource usage rate exceeds the resource expansion activation resource usage rate L1 (see FIG. 3), it is generally used for processing of the system. If it is a common resource,
The number of resource busy times 29 (see FIG. 2) is added.
Common I / O used for CPU input / output (I / O) processing
If it is a resource, if the CPU occupancy is within the range of the CPU system allowance L3, the resource busy count 29 (see FIG. 2) is added, and the resource busy count 29 within the resource calculation measurement time T1 is measured. Measurement time T1
If the resource busy count 29 exceeds the resource extension activation count 30 (see FIG. 2) at the time of termination, the resource extension 85
To the resource management unit 21.

【0021】CPU占有率監視部22は、サービスプロ
バイダー部20によるCPUの占有率を監視81し、そ
のCPU占有率が変化した場合には、CPU占有率遷移
報告83をリソース自動算出部24に通知する。
The CPU occupancy monitoring unit 22 monitors the occupancy of the CPU by the service provider unit 81, and notifies the automatic resource calculation unit 24 of a CPU occupancy transition report 83 when the CPU occupancy changes. I do.

【0022】リソース使用率監視部23は、リソース管
理部21によるリソースの使用状況を監視82し、その
リソース使用率が変化した場合には、リソース使用率遷
移報告84をリソース自動算出部24に報告する。
The resource usage monitoring unit 23 monitors the resource usage by the resource management unit 21 and reports a resource usage transition report 84 to the automatic resource calculation unit 24 when the resource usage changes. I do.

【0023】図2は、本実施例の自動リソースアサイン
方式のリソース制御データを示す図である。図2におい
て、25は現在のリソース数、26はリソース増設数、
27はリソース減設数、28はリソース減設フラグ、2
9はリソースビジー回数、30はリソース増設起動回数
を示す。これらのリソース制御データはメモリ、レジス
タ等の記憶装置に実装できる他、リソースビジー回数2
9等は例えばカウンタによっても実現される。
FIG. 2 is a diagram showing resource control data of the automatic resource assignment system according to this embodiment. In FIG. 2, 25 is the current number of resources, 26 is the number of added resources,
27 is the number of resource reductions, 28 is a resource reduction flag, 2
Reference numeral 9 denotes the number of times of resource busy, and reference numeral 30 denotes the number of times of starting the resource addition. These resource control data can be implemented in a storage device such as a memory or a register.
9 and the like are also realized by, for example, a counter.

【0024】図3は、本実施例の自動リソースアサイン
方式のリソース使用率遷移図である。図3は、リソース
使用率と時間との関係を示し、縦軸は、リソース使用率
を示し、横軸は時間を示す。
FIG. 3 is a transition diagram of the resource utilization rate of the automatic resource assignment method according to the present embodiment. FIG. 3 shows the relationship between the resource usage rate and time, where the vertical axis indicates the resource usage rate and the horizontal axis indicates time.

【0025】図3を参照して、リソース増設要求を起動
するためのリソース増設起動リソース使用率を縦軸L1
に示し、リソース減設要求を起動するためのリソース減
設起動リソース使用率を縦軸L2に示す。タイミング制
御により起動するリソース算出測定時間を横軸T1に示
す。リソース使用率がリソース増設起動リソース使用率
を超えた場合に起動するリソースビジー単位時間をT2
に示す。
Referring to FIG. 3, the vertical axis L1 represents a resource expansion activation resource usage rate for activating a resource expansion request.
And the vertical axis L2 indicates the resource reduction activation resource usage rate for activating the resource reduction request. The horizontal axis T1 shows the resource calculation measurement time activated by the timing control. The resource busy unit time to be started when the resource usage rate exceeds the resource expansion startup resource usage rate is T2.
Shown in

【0026】図4は、本実施例の自動リソースアサイン
方式のCPU占有率遷移図である。図4は、CPU占有
率と時間との関係を示す。縦軸はCPU占有率を示し、
横軸は時間を示す。CPUシステム許容率を縦軸L3に
示す。
FIG. 4 is a transition diagram of the CPU occupancy of the automatic resource assignment method according to this embodiment. FIG. 4 shows the relationship between CPU occupancy and time. The vertical axis indicates CPU occupancy,
The horizontal axis indicates time. The vertical axis L3 shows the CPU system allowance.

【0027】次に本実施例の動作について説明する。Next, the operation of this embodiment will be described.

【0028】図5は、本実施例の自動リソースアサイン
方式のCPU占有率監視部22の処理フローを示すフロ
ーチャートである。図5を参照して、CPU占有率監視
部22は、タイミング制御により、CPUの占有率を監
視し(ステップ31)、前回監視したCPU占有率と変
化があるか否かを判定する(ステップ32)。
FIG. 5 is a flowchart showing the processing flow of the CPU occupancy monitoring unit 22 of the automatic resource assignment system according to this embodiment. Referring to FIG. 5, CPU occupancy monitoring section 22 monitors the occupancy of CPU by timing control (step 31), and determines whether or not there is a change from the CPU occupancy previously monitored (step 32). ).

【0029】変化がある場合には(ステップ32のYe
s分岐)、CPU占有率遷移報告をリソース自動算出部
24に通知する(ステップ33)。
If there is a change (Ye in step 32)
(s branch), and notifies the resource occupancy transition report to the automatic resource calculation unit 24 (step 33).

【0030】図6は、本実施例の自動リソースアサイン
方式のリソース使用率監視部の処理フローを示すフロー
チャートである。図6を参照して、リソース使用率監視
部23は、タイミング制御によりリソース使用率を監視
し(ステップ34)、前回監視したリソース使用率と変
化があるか否かを判定する(ステップ35)。
FIG. 6 is a flowchart showing the processing flow of the resource utilization monitoring unit of the automatic resource assignment system according to this embodiment. Referring to FIG. 6, resource utilization monitoring unit 23 monitors the resource utilization by timing control (step 34), and determines whether or not there is a change from the previously monitored resource utilization (step 35).

【0031】変化がある場合には、リソース使用率遷移
報告をリソース自動算出部24に送る(ステップ3
6)。
If there is a change, a resource utilization rate transition report is sent to the automatic resource calculation unit 24 (step 3).
6).

【0032】図7は、本実施例の自動リソースアサイン
方式のリソース自動算出部のリソース使用率遷移報告書
受信に対する処理を示すフローチャートである。図7を
参照して、リソース自動算出部24は、ステップ37で
リソース使用率遷移報告を入力した場合には、CPU占
有率がCPUシステム許容率L3よりも小さいか否かを
判定する(ステップ38)。CPU占有率の方がCPU
システム許容率L3よりも小さい場合には(ステップ3
8のYes分岐)、リソース使用率がリソース増設起動
リソース使用率L1よりも大きいか否かを判定する(ス
テップ39)。
FIG. 7 is a flowchart showing a process for receiving a resource usage rate transition report by the automatic resource calculating unit of the automatic resource assignment method according to the present embodiment. Referring to FIG. 7, when inputting the resource usage rate transition report in step 37, automatic resource calculating section 24 determines whether or not the CPU occupancy rate is smaller than CPU system allowable rate L3 (step 38). ). CPU occupancy is CPU
If it is smaller than the system allowance L3 (step 3
8), it is determined whether or not the resource usage rate is greater than the resource expansion activation resource usage rate L1 (step 39).

【0033】リソース使用率の方がリソース増設起動リ
ソース使用率L1よりも大きい場合(ステップ39のY
es分岐)、そのリソースにリソースビジー単位時間T
2が起動されているか否かを判定する(ステップ4
0)。
When the resource usage rate is larger than the resource expansion activation resource usage rate L1 (Y in step 39)
es branch), the resource busy unit time T
2 is activated or not (step 4).
0).

【0034】リソースビジー単位時間T2が起動されて
いなければ(ステップ40のNo分岐)、リソースビジ
ー回数29を1加算し(ステップ41)、リソースビシ
ー単位時間T2を起動する(ステップ42)。
If the resource busy unit time T2 has not been activated (No branch of step 40), the resource busy count 29 is incremented by 1 (step 41), and the resource busy unit time T2 is activated (step 42).

【0035】ステップ39でリソース使用率の方が小さ
いか、またはステップ40の判定において、リソースビ
ジー単位時間T2が起動されているならば、処理は終了
する。
If it is determined in step 39 that the resource use rate is smaller or, in the determination in step 40, the resource busy unit time T2 has been activated, the process ends.

【0036】ステップ38において、CPU占有率の方
がCPUシステム許容率L3と等しい位か、大きい場合
には(ステップ38のNo分岐)、リソース使用率がリ
ソース減設起動リソース使用率L2よりも小さいか否か
を判定する(ステップ43)。
In step 38, if the CPU occupancy is equal to or greater than the CPU system allowable rate L3 (No branch in step 38), the resource usage rate is smaller than the resource reduction activation resource usage rate L2. It is determined whether or not (step 43).

【0037】リソース使用率の方がリソース減設起動リ
ソース使用率L2よりも小さい場合(ステップ43のY
es分岐)、そのリソースのリソース減設フラグがOF
Fか否かを判定する(ステップ44)。リソース減設フ
ラグがOFFの場合には(ステップ44のYes分
岐)、リソース減設フラグをONに設定する(ステップ
45)。
When the resource usage rate is smaller than the resource reduction activation resource usage rate L2 (Y in step 43)
branch), the resource reduction flag of the resource is set to OF
It is determined whether it is F or not (step 44). If the resource reduction flag is OFF (Yes in step 44), the resource reduction flag is set to ON (step 45).

【0038】ステップ43において、リソース使用率が
リソース減設起動リソース使用率L2に等しいかまたは
大きい場合には、ソース減設フラグをOFFに設定する
(ステップ46)。
In step 43, if the resource utilization is equal to or greater than the resource reduction activation resource utilization L2, the source reduction flag is set to OFF (step 46).

【0039】図8は、本実施例の自動リソースアサイン
方式のリソース自動算出部24のCPU占有率遷移報告
受信に対する処理を示すフローチャートである。図8を
参照して、リソース自動算出部24は、ステップ47で
CPU占有率遷移報告を入力した場合には、CPU占有
率がCPUシステム許容率L3よりも小さいか否かを判
定する(ステップ48)。CPU占有率の方が小さい場
合には、特に、CPUの入出力(I/O)処理に使用さ
れる共通I/Oリソースに対して処理を実施するため
に、共通I/Oリソースか否かを判定する(ステップ4
9)。
FIG. 8 is a flow chart showing the processing for receiving the CPU occupancy transition report by the automatic resource calculating unit 24 of the automatic resource assignment system according to the present embodiment. Referring to FIG. 8, when the CPU occupancy transition report is input in step 47, the automatic resource calculating unit 24 determines whether or not the CPU occupancy is smaller than the CPU system allowance L3 (step 48). ). When the CPU occupancy is smaller, in particular, in order to perform processing on a common I / O resource used for input / output (I / O) processing of the CPU, whether the resource is a common I / O resource or not is determined. (Step 4
9).

【0040】共通I/Oリソースの場合には(ステップ
49のYes分岐)、リソース使用率がリソース増設起
動リソース使用率L1(図3参照)よりも大きいか否か
を判定する(ステップ50)。リソース使用率の方がL
1よりも大きい場合には、そのリソースにリソースビジ
ー単位時間T2(図3参照)が起動されているか否かを
判定する(ステップ51)。リソースビジー単位時間T
2が起動されていなければ(ステップ51のN分岐)、
リソースビジー回数29(図2参照)を1加算し(ステ
ップ52)、リソースビジー単位時間T2を駆動する
(ステップ53)。一般的にシステム内の処理の使用さ
れる共通リソースの場合には、処理は終了する。
In the case of a common I / O resource (Yes branch in step 49), it is determined whether the resource usage rate is greater than the resource expansion activation resource usage rate L1 (see FIG. 3) (step 50). Resource usage rate is L
If it is larger than 1, it is determined whether or not the resource busy unit time T2 (see FIG. 3) has been activated for the resource (step 51). Resource busy unit time T
If 2 is not activated (N branch of step 51),
The resource busy count 29 (see FIG. 2) is incremented by 1 (step 52), and the resource busy unit time T2 is driven (step 53). Generally, in the case of a common resource used for processing in the system, the processing ends.

【0041】また、リソース使用率がL1以下の場合
(ステップ50のNo分岐)、もしくはリソースビジー
単位時間T2が起動されているならば(ステップ51の
Yes分岐)、処理は終了する。
If the resource usage rate is equal to or lower than L1 (No branch in step 50), or if the resource busy unit time T2 has been activated (Yes branch in step 51), the process ends.

【0042】またCPU占有率がL3以上の大きい場合
に(ステップ48のNo分岐)は、リソース使用率がリ
ソース減設起動リソース使用率L2よりも小さいか否か
を判定する(ステップ54)。リソース使用率の方がL
2よりも小さい場合には(ステップ54のYes分
岐)、当該リソースのリソース減設フラグ28(図2参
照)がOFFか否かを判定する(ステップ55)。そし
て、リソース減設フラグ28がOFFの場合には(ステ
ップ55のYes分岐)、リソース減設フラグ28をO
Nに設定する(ステップ56)。
If the CPU occupancy is greater than L3 (No branch in step 48), it is determined whether the resource utilization is smaller than the resource reduction activation resource utilization L2 (step 54). Resource usage rate is L
If it is smaller than 2 (Yes in step 54), it is determined whether the resource reduction flag 28 (see FIG. 2) of the resource is OFF (step 55). When the resource reduction flag 28 is OFF (Yes in step 55), the resource reduction flag 28 is set to O.
N is set (step 56).

【0043】リソース使用率がL2以上の場合には、リ
ソース減設フラグ28をOFFに設定する(ステップ5
7)。
If the resource utilization is equal to or higher than L2, the resource reduction flag 28 is set to OFF (step 5).
7).

【0044】図9は、本実施例の自動リソースアサイン
方式のリソース自動算出部24のリソースビジー単位時
間のタイムアウト報告に対する処理を示すフローチャー
トである。図9を参照して、リソース自動算出部24
は、ステップ58で、リソースビジー単位時間T2タイ
ムアウト報告を入力した場合、共通I/Oリソースに対
して処理を実施するために、共通I/Oリソースか否か
を判定する(ステップ59)。共通I/Oリソースの場
合には(ステップ59のYes分岐)、CPU占有率が
CPUシステム許容率L3よりも小さいか否かを判定す
る(ステップ60)。CPU占有率の方がL3よりも小
さい場合には(ステップ60のYes分岐)、リソース
使用率がリソース増設起動リソース使用率L1よりも大
きいか否かを判定する(ステップ61)。リソース使用
率の方がL1よりも大きい場合には(ステップ61のY
es分岐)、リソースビジー回数29(図2参照)を1
加算し(ステップ62)、リソースビジー単位時間T2
を起動する(ステップ63)。
FIG. 9 is a flow chart showing the processing for the resource busy unit time timeout report by the automatic resource calculation unit 24 of the automatic resource assignment method according to this embodiment. Referring to FIG. 9, the automatic resource calculation unit 24
In step 58, when a resource busy unit time T2 timeout report is input, it is determined whether or not the resource is a common I / O resource in order to perform processing on the common I / O resource (step 59). In the case of the common I / O resource (Yes branch of step 59), it is determined whether or not the CPU occupancy is smaller than the CPU system allowance L3 (step 60). If the CPU occupancy is smaller than L3 (Yes branch of step 60), it is determined whether the resource usage is higher than the resource expansion activation resource usage L1 (step 61). If the resource usage rate is greater than L1, (Y in step 61)
branch), resource busy count 29 (see FIG. 2) is set to 1
Addition (step 62), resource busy unit time T2
Is started (step 63).

【0045】一方、リソース使用率がL1以下の場合
(ステップ61のNo分岐)、処理は終了する。また、
CPU占有率がL3以上の場合にも(ステップ60のN
o分岐)、処理は終了する。そして、共通リソースの場
合には(ステップ59のNo分岐)、ステップ61に移
行し、リソース使用率がリソース増設起動リソース使用
率L1よりも大きいか否かを判定する。
On the other hand, if the resource usage rate is equal to or less than L1 (No branch of step 61), the process ends. Also,
Even when the CPU occupancy is equal to or more than L3 (N in step 60)
The process ends. If the resource is a common resource (No branch in step 59), the process proceeds to step 61, and it is determined whether the resource usage rate is greater than the resource expansion activation resource usage rate L1.

【0046】図10は、本実施例の自動リソースアサイ
ン方式のリソース算出測定時間のタイムアウト報告に対
する処理を示すフローチャートである。図10を参照し
て、リソース自動算出部24は、ステップ64でリソー
ス算出測定時間T1タイムアウト報告を入力した場合、
リソースビジー回数29がリソース増設起動回数30よ
り小さいか否かを判定する(ステップ65)。リソース
ビジー回数29の方がリソース増設起動回数30(図2
参照)よりも大きい場合には(ステップ65のYes分
岐)、リソース増設要求66をリソース管理部21に通
知し(ステップ66)、リソースビジー回数29をリセ
ットする(ステップ57)。
FIG. 10 is a flowchart showing the processing for the timeout report of the resource calculation measurement time in the automatic resource assignment method according to the present embodiment. Referring to FIG. 10, when the resource automatic calculation unit 24 inputs the resource calculation measurement time T1 timeout report in step 64,
It is determined whether the resource busy count 29 is smaller than the resource extension start count 30 (step 65). The resource busy count 29 is equal to the resource extension start count 30 (FIG. 2).
If the number is larger than the reference number (Yes in step 65), the resource management unit 21 is notified of the resource addition request 66 (step 66), and the resource busy count 29 is reset (step 57).

【0047】一方、リソースビジー回数29がリソース
増設起動回数30以下の場合には(ステップ65のNo
分岐)、リソース減設フラグ28がONか否かを判定す
る(ステップ68)。リソース減設フラグ28がONの
場合(ステップ68のYes分岐)、リソース減設要求
69をリソース管理部21に通知し、リソース減設フラ
グ28をOFFに設定し(ステップ70)、次にステッ
プ67でリソースビジー回数29をリセットする。
On the other hand, when the resource busy count 29 is equal to or less than the resource extension start count 30 (No in step 65).
Branch), it is determined whether the resource reduction flag 28 is ON (step 68). When the resource reduction flag 28 is ON (Yes in step 68), the resource reduction request 69 is notified to the resource management unit 21, the resource reduction flag 28 is set to OFF (step 70), and then step 67 is performed. Resets the resource busy count 29.

【0048】図11(a)、図11(b)は、本実施例
の自動リソースアサイン方式のリソース管理部21のリ
ソース増設及び減設要求に対する処理をそれぞれ示すフ
ローチャートである。図11(a)を参照して、リソー
ス管理部21は、ステップ71でリソース増設要求報告
を入力した場合、現在のリソース数25にリソース増設
数26を加算する(ステップ72)。また、図11
(b)を参照して、リソース管理部21は、ステップ7
3でリソース増設要求報告を入力した場合、現在のリソ
ース数25からリソース減設数27を減算する(ステッ
プ74)。
FIGS. 11 (a) and 11 (b) are flowcharts respectively showing the processing for the resource addition and deletion requests of the resource management unit 21 of the automatic resource assignment system according to the present embodiment. Referring to FIG. 11A, when the resource addition request report is input in step 71, the resource management unit 21 adds the resource addition number 26 to the current resource number 25 (step 72). FIG.
Referring to (b), the resource management unit 21 determines in step 7
When the resource expansion request report is input in step 3, the resource reduction number 27 is subtracted from the current resource number 25 (step 74).

【0049】[0049]

【発明の効果】以上説明したように、本発明によれば、
様々なサービスで使用する共通リソースを需要と供給に
より自動アサインするように構成したことにより、サー
ビス仕様によるリソース設定変更が不要となり、また、
トラヒックなどの収集を基とした複雑なリソース算出手
順も不要とするという効果を奏する。さらに、本発明に
よれば、サービス・トラヒックの遷移に応じて常に適切
なリソースが自動にアサインできるという利点も有す
る。
As described above, according to the present invention,
By configuring so that common resources used in various services are automatically assigned according to supply and demand, it is not necessary to change resource settings according to service specifications.
There is an effect that a complicated resource calculation procedure based on collection of traffic or the like is not required. Further, according to the present invention, there is an advantage that an appropriate resource can always be automatically assigned in accordance with the transition of service traffic.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例の自動リソースアサイン方式
の機能ブロック図である。
FIG. 1 is a functional block diagram of an automatic resource assignment method according to an embodiment of the present invention.

【図2】本発明の一実施例の自動リソースアサイン方式
におけるリソース制御データ図である。
FIG. 2 is a resource control data diagram in the automatic resource assignment method according to one embodiment of the present invention.

【図3】本発明の一実施例を説明するための図であり、
リソース使用率の遷移図である。
FIG. 3 is a diagram for explaining one embodiment of the present invention;
It is a transition diagram of a resource usage rate.

【図4】本発明の一実施例を説明するための図であり、
CPU占有率の遷移図である。
FIG. 4 is a diagram for explaining one embodiment of the present invention;
It is a transition diagram of CPU occupancy.

【図5】本発明の一実施例におけるCPU占有率監視部
の処理を説明するためのフローチャートである。
FIG. 5 is a flowchart illustrating a process performed by a CPU occupancy monitoring unit according to an embodiment of the present invention.

【図6】本発明の一実施例におけるリソース使用率監視
部の処理を説明するためのフローチャートである。
FIG. 6 is a flowchart illustrating a process of a resource usage monitoring unit according to an embodiment of the present invention.

【図7】本発明の一実施例におけるリソース自動算出部
のリソース使用率遷移報告書受信に対する処理を説明す
るためのフローチャートである。
FIG. 7 is a flowchart illustrating a process for receiving a resource usage rate transition report by an automatic resource calculation unit according to an embodiment of the present invention.

【図8】本発明の一実施例におけるリソース自動算出部
のCPU占有率遷移報告受信に対する処理を説明するた
めのフローチャートである。
FIG. 8 is a flowchart illustrating a process for receiving a CPU occupancy ratio transition report by an automatic resource calculating unit according to an embodiment of the present invention.

【図9】本発明の一実施例におけるリソース自動算出部
のリソースビジー単位時間のタイムアウト報告に対する
処理を説明するためのフローチャートである。
FIG. 9 is a flowchart illustrating a process performed by a resource automatic calculation unit for a timeout report of a resource busy unit time according to an embodiment of the present invention.

【図10】本発明の一実施例におけるリソース算出測定
時間のタイムアウト報告に対する処理を説明するための
フローチャートである。
FIG. 10 is a flowchart illustrating a process for a timeout report of a resource calculation measurement time according to an embodiment of the present invention.

【図11】本発明の一実施例におけるリソース管理部の
リソース増設・減設要求に対する処理を説明するための
フローチャートである。
FIG. 11 is a flowchart illustrating a process for a resource addition / reduction request of a resource management unit according to an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

20 サービスプロバイダー部 21 リソース管理部 22 CPU占有率監視部 23 リソース使用率監視部 24 リソース自動算出部 25 現在のリソース数 26 リソース増設数 27 リソース減設数 28 リソース減設フラグ 29 リソースビジー回数 30 リソース増設起動回数 81 CPU占有率監視 82 リソース使用率監視 83 CPU占有率遷移報告 84 リソース使用率遷移報告 85 リソース増設・減設要求 86 リソース供給 L1 リソース増設起動リソース使用率 L2 リソース減設起動リソース使用率 L3 CPUシステム許容率 T1 リソース算出測定時間 T2 リソースビジー単位時間 Reference Signs List 20 service provider unit 21 resource management unit 22 CPU occupancy monitoring unit 23 resource usage monitoring unit 24 automatic resource calculation unit 25 current number of resources 26 number of added resources 27 reduced number of resources 28 reduced resource flag 29 number of times of resource busy 30 resources Number of additional activations 81 CPU occupancy monitoring 82 Resource utilization monitoring 83 CPU occupancy transition report 84 Resource utilization transition report 85 Resource addition / reduction request 86 Resource supply L1 Resource extension activation resource utilization L2 Resource reduction activation resource utilization L3 CPU system allowable rate T1 Resource calculation measurement time T2 Resource busy unit time

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】サービス提供手段を含むサービスプロバイ
ダー部と、 共通リソースを供給するリソース管理部と、 CPU占有率を監視するCPU占有率監視部と、 リソース使用率を監視するリソース使用率監視部と、 共通リソースの増設・減設を算出するリソース自動算出
部と、 を備えた自動リソースアサイン方式であって、 前記サービスプロバイダー部は、前記リソース管理部か
ら供給された共通リソースを使用してサービスを提供
し、 前記リソース管理部は、前記リソース自動算出部からの
共通リソースの増設・減設要求に基づき共通リソースの
増設・減設を行なうと共に、前記サービスプロバイダー
部に対して共通リソースを提供する手段を含み、 前記リソース自動算出部は、所定のリソース算出測定時
間内での前記CPU占有率監視部からのCPU占有率遷
移報告と、前記リソース使用率監視部からのリソース使
用率遷移報告と、共通リソースの増設・減設を決定する
ための予め定められた所定のリソース使用率と所定のC
PU占有率と、に基づき、共通リソースの増設・減設要
求を、前記リソース管理部に対して通知する手段を含
み、 前記CPU占有率監視部は、前記サービスプロバイダー
部によるCPUの占有率を監視し、該CPUの占有率が
変化した場合、該CPUの占有率の遷移を、CPU占有
率遷移報告として前記リソース自動算出部に通知する手
段を含み、 前記リソース使用率監視部は、前記リソース管理部によ
るリソースの使用状況を監視し、該リソース使用率が変
化した場合、該リソース使用率の遷移を、リソース使用
率遷移報告として、前記リソース自動算出部に通知する
手段を含む、 ことを特徴とする自動リソースアサイン方式。
1. A service provider unit including service providing means, a resource management unit for supplying a common resource, a CPU occupancy monitoring unit for monitoring a CPU occupancy, and a resource usage monitoring unit for monitoring a resource usage. An automatic resource assignment system, comprising: a resource automatic calculation unit that calculates addition / reduction of a common resource, wherein the service provider unit performs service using a common resource supplied from the resource management unit. Means for providing the common resource to the service provider unit while adding / removing the common resource based on the request for adding / removing the common resource from the automatic resource calculating unit. Wherein the automatic resource calculation unit calculates the CPU occupancy within a predetermined resource calculation measurement time. The CPU utilization rate transition report from the monitoring unit, the resource utilization rate transition report from the resource utilization rate monitoring unit, a predetermined resource utilization rate for determining the addition / reduction of the common resource, and a predetermined resource utilization rate. C
And a means for notifying the resource management unit of an increase / decrease request for a common resource based on the PU occupancy rate. The CPU occupancy monitoring unit monitors the occupancy rate of the CPU by the service provider unit. And when the occupancy rate of the CPU changes, the resource occupancy rate monitoring unit includes a means for notifying the transition of the occupancy rate of the CPU to the resource automatic calculation unit as a CPU occupancy rate transition report. Monitoring the resource usage by the unit, and when the resource usage rate changes, includes means for notifying the resource automatic calculation unit of the transition of the resource usage rate as a resource usage rate transition report, Automatic resource assignment method.
【請求項2】前記共通リソースの増設及び減設を決定す
るための所定のリソース使用率が、リソース増設要求を
起動するためのしきい値であるリソース使用率、及びリ
ソース減設要求を起動するためのしきい値であるリソー
ス使用率からなり、前記所定のCPU占有率が、CPU
システム許容率からなる、請求項1記載の自動リソース
アサイン方式。
2. The method according to claim 1, wherein the predetermined resource usage rate for determining whether to increase or decrease the common resource is a threshold value for activating a resource expansion request and a resource reduction request. The predetermined CPU occupancy rate is a threshold value for
2. The automatic resource assignment method according to claim 1, comprising a system allowance.
【請求項3】前記リソース自動算出部が、リソース算出
測定時間内に、前記CPU使用率監視部からのCPU占
有率遷移報告を受けた時、該CPU占有率が所定のシス
テム許容率を超えた場合において、共通リソースの使用
率が所定のしきい値よりも低い時に、リソース減設フラ
グをONに設定し、前記リソース算出測定時間終了時
に、前記リソース減設フラグがONの状態ならば、リソ
ースの減設を、前記リソース管理部に通知する手段と、 前記リソース使用率監視部からリソース使用率遷移報告
を受けた時、該リソース使用率が所定のしきい値を超え
た場合において、システム内の処理に使用される共通リ
ソースである場合、該リソースがビジーである回数を加
算し、CPUの入出力処理に使用される共通I/Oリソ
ースである場合には、前記CPU占有率が所定のシステ
ム許容率の範囲内であれば、前記リソースのビジーであ
る回数を加算し、前記リソース算出測定時間内での前記
リソースビジー回数を計測し、前記リソース算出測定時
間終了時に、前記リソースビジー回数が所定の回数を超
えた場合、リソースの増設を前記リソース管理部に通知
する手段を含む、ことを特徴とする請求項1記載の自動
リソースアサイン方式。
3. When the automatic resource calculating unit receives a CPU occupancy transition report from the CPU occupancy monitoring unit within a resource calculation measurement time, the CPU occupancy exceeds a predetermined system allowance. In the case, when the usage rate of the common resource is lower than a predetermined threshold, the resource reduction flag is set to ON, and at the end of the resource calculation measurement time, if the resource reduction flag is in the ON state, Means for notifying the resource management unit of the reduction of the number of resources, when receiving a resource usage rate transition report from the resource usage rate monitoring unit, when the resource usage rate exceeds a predetermined threshold, If the resource is a common resource used for the processing, add the number of times the resource is busy, and if it is a common I / O resource used for the input / output processing of the CPU, If the CPU occupancy is within a predetermined system allowance, add the number of times the resource is busy, measure the number of times the resource is busy within the resource calculation measurement time, and calculate the resource calculation time. 2. The automatic resource assignment method according to claim 1, further comprising: means for notifying the resource management unit of resource addition when the resource busy count exceeds a predetermined count at the time of termination.
【請求項4】(a)リソース使用状況と該リソースを使
用するCPU占有率を監視し、リソース使用率が予め定
められたしきい値を超えた回数を計測し、ある測定時間
内に前記しきい値を超えた回数が所定の回数を超えた場
合にリソースを増設するように制御し、その際、リソー
ス種別によっては、リソース使用率が前記しきい値を超
えた場合のCPU占有率が所定の許容率を超えていた場
合にはリソースの増設は行わず、 (b)CPU占有率が前記許容率を超えた場合におい
て、リソース使用率が予め定められたしきい値よりも低
い時にリソースを減設するように制御する、ことを特徴
とする自動リソースアサイン方式。
And (a) monitoring the resource usage status and the CPU occupancy rate using the resource, measuring the number of times the resource usage rate exceeds a predetermined threshold value, and measuring the number within a certain measurement time. When the number of times exceeding the threshold exceeds a predetermined number, control is performed so as to increase the resources. At this time, depending on the resource type, the CPU occupancy when the resource usage exceeds the threshold value may be increased. (B) When the CPU occupancy exceeds the allowable rate, the resource is not added when the resource usage rate is lower than a predetermined threshold. An automatic resource assignment method, characterized in that control is performed to reduce the number of resources.
JP6189997A 1997-02-28 1997-02-28 Automatic resource assignment method Expired - Fee Related JP3031278B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6189997A JP3031278B2 (en) 1997-02-28 1997-02-28 Automatic resource assignment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6189997A JP3031278B2 (en) 1997-02-28 1997-02-28 Automatic resource assignment method

Publications (2)

Publication Number Publication Date
JPH10240699A true JPH10240699A (en) 1998-09-11
JP3031278B2 JP3031278B2 (en) 2000-04-10

Family

ID=13184466

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6189997A Expired - Fee Related JP3031278B2 (en) 1997-02-28 1997-02-28 Automatic resource assignment method

Country Status (1)

Country Link
JP (1) JP3031278B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007077600A1 (en) * 2005-12-28 2007-07-12 Fujitsu Limited Administration program, administration method and administration apparatus
US8046769B2 (en) 2004-12-22 2011-10-25 Hitachi, Ltd. Load state monitoring apparatus and load state monitoring method
WO2012063296A1 (en) * 2010-11-12 2012-05-18 株式会社日立製作所 Server device, resource management method and program
JP2012181580A (en) * 2011-02-28 2012-09-20 Fujitsu Ltd Resource control device, resource control method, and resource control program

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101540416B1 (en) 2014-02-21 2015-07-30 김천기 Spats and crampons

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8046769B2 (en) 2004-12-22 2011-10-25 Hitachi, Ltd. Load state monitoring apparatus and load state monitoring method
WO2007077600A1 (en) * 2005-12-28 2007-07-12 Fujitsu Limited Administration program, administration method and administration apparatus
JPWO2007077600A1 (en) * 2005-12-28 2009-06-04 富士通株式会社 Operation management program, operation management method, and operation management apparatus
US8015275B2 (en) 2005-12-28 2011-09-06 Fujitsu Limited Computer product, method, and apparatus for managing operations of servers
WO2012063296A1 (en) * 2010-11-12 2012-05-18 株式会社日立製作所 Server device, resource management method and program
JP5412585B2 (en) * 2010-11-12 2014-02-12 株式会社日立製作所 Server apparatus, resource management method and program
US9244703B2 (en) 2010-11-12 2016-01-26 Hitachi, Ltd. Server system and management unit identifying a plurality of business application software on a virtual machine based on a program boundary for dynamic resource allocation
JP2012181580A (en) * 2011-02-28 2012-09-20 Fujitsu Ltd Resource control device, resource control method, and resource control program

Also Published As

Publication number Publication date
JP3031278B2 (en) 2000-04-10

Similar Documents

Publication Publication Date Title
USRE42726E1 (en) Dynamically modifying the resources of a virtual server
JP3812236B2 (en) Network management system with event control means
JP4747307B2 (en) Network processing control device, program, and method
CN102037681A (en) Method and apparatus for managing computing resources of management systems
JP2004532542A (en) Method and apparatus for data rate control in a communication system
CN109800261B (en) Dynamic control method and device for double-database connection pool and related equipment
CN113688001A (en) Dynamic balancing method and device for server hard disk power consumption, terminal and storage medium
JPH10240699A (en) Automatic resource assigning system
CN114461385A (en) Thread pool scheduling method, device and equipment and readable storage medium
JPH10304060A (en) Traffic measurement device and method therefor
CN112506808A (en) Test task execution method, computing device, computing system and storage medium
JP2000184001A (en) Line rate control system in code division multiple connection
JP3636012B2 (en) Information processing system, information processing apparatus, and software installation method
US8051173B2 (en) Device and method for controlling and monitoring of monitoring detectors in a node in a cluster system
JP2002207691A (en) Data transfer controller
CN114416326A (en) Big data control method, device, control system and readable storage medium
CN111857996B (en) Interrupt processing method, system, equipment and computer readable storage medium
US7328291B2 (en) System and method for controlling the service engagement in a data bus system
CN114221910A (en) Data control method and device for transmission channel
JP2001256207A (en) Computer system and recording medium
JP3803726B2 (en) Radio resource management method in radio base station apparatus and radio resource management method in radio base station apparatus
JP2001014189A (en) Instrument and method for measuring throughput
JPH03101440A (en) Band assignment system
JPH07152706A (en) Network computer
JPH10190730A (en) Traffic control method and traffic controller

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20000111

LAPS Cancellation because of no payment of annual fees