JP7357482B2 - Sheet metal processing cost control device and sheet metal processing cost control method - Google Patents

Sheet metal processing cost control device and sheet metal processing cost control method Download PDF

Info

Publication number
JP7357482B2
JP7357482B2 JP2019140156A JP2019140156A JP7357482B2 JP 7357482 B2 JP7357482 B2 JP 7357482B2 JP 2019140156 A JP2019140156 A JP 2019140156A JP 2019140156 A JP2019140156 A JP 2019140156A JP 7357482 B2 JP7357482 B2 JP 7357482B2
Authority
JP
Japan
Prior art keywords
cost
sheet metal
metal processing
actual
estimated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019140156A
Other languages
Japanese (ja)
Other versions
JP2021022329A (en
Inventor
康晴 土田
正樹 麻生
Original Assignee
トルンプ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by トルンプ株式会社 filed Critical トルンプ株式会社
Priority to JP2019140156A priority Critical patent/JP7357482B2/en
Publication of JP2021022329A publication Critical patent/JP2021022329A/en
Application granted granted Critical
Publication of JP7357482B2 publication Critical patent/JP7357482B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

本発明は、板金加工原価管理装置及び板金加工原価管理方法に関する。 The present invention relates to a sheet metal processing cost management device and a sheet metal processing cost management method.

板金加工を管理する技術が提案されている。例えば、特許文献1には、製作指示によりネスティングして得られるシートの加工データに基づく加工スケジュールを生成して、当該加工スケジュールをシート1枚ごとに管理する生産管理装置と、生産管理装置と通信ネットワークを介して相互接続され、生産管理装置から受信した加工スケジュールを実行する板金加工設備とを備えた板金加工システムが開示されている。 Techniques for managing sheet metal processing have been proposed. For example, Patent Document 1 describes a production management device that generates a processing schedule based on sheet processing data obtained by nesting according to production instructions and manages the processing schedule for each sheet, and a production management device that communicates with the production management device. A sheet metal processing system is disclosed that includes sheet metal processing equipment that is interconnected via a network and that executes a processing schedule received from a production control device.

生産管理装置は、板金加工設備からの加工スケジュール要求に対して、先行するシートの加工終了予定時刻と、次のシートの搬入準備完了予定時刻とを同期させるタイミングまで待って、次のシート1枚分の加工スケジュールを当該板金加工設備へ送信する。つまり、生産管理装置が加工中のシートについて加工時間シミュレーション機能により算出した加工終了予定時刻から、過去の記録を参照して推定した次の材料シートの出庫に要する時間を逆算した時刻に、生産管理装置は次のシート1枚分の加工スケジュールを板金加工設備に渡す。 In response to the processing schedule request from the sheet metal processing equipment, the production control device waits until the timing to synchronize the scheduled processing end time of the preceding sheet with the scheduled completion time of the next sheet's delivery preparation, and then starts processing the next sheet. Send the processing schedule for the relevant sheet metal processing equipment. In other words, the production control device calculates the time required for shipping the next material sheet, which is estimated by referring to past records, from the expected processing end time calculated by the processing time simulation function for the sheet being processed by the production control device. The device passes the processing schedule for the next sheet to the sheet metal processing equipment.

国際公開第2005/047998号パンフレットInternational Publication No. 2005/047998 pamphlet

ところで、上記のような技術では、板金加工の予定については管理が可能であるが、板金加工機により実行された板金加工の実績を参酌した原価管理は十分になされていない。そのため、板金加工の原価管理をより適切に行うことができる技術が望まれている。 By the way, with the above technology, it is possible to manage the schedule of sheet metal processing, but cost management that takes into account the actual results of sheet metal processing executed by the sheet metal processing machine is not sufficiently performed. Therefore, there is a need for technology that can more appropriately manage the cost of sheet metal processing.

そこで本発明は、板金加工の原価管理をより適切に行うことができる板金加工原価管理装置及び板金加工原価管理方法を提供することを目的とする。 Therefore, an object of the present invention is to provide a sheet metal processing cost management device and a sheet metal processing cost management method that can more appropriately manage the cost of sheet metal processing.

本発明は、板金加工の工程に関する工程情報に、工程情報に係る工程について想定される費用である想定原価を関連付けて算出する想定原価算出部と、板金加工機により実行される板金加工を電気通信回線を介して工程情報に基づいて管理しつつ、工程情報に係る工程について実際に生じた費用である実績原価を算出する実績原価算出部と、工程情報に係る工程について、想定原価算出部により算出された想定原価に対する実績原価算出部により算出された実績原価の差を利益として算出する利益算出部とを備えた板金加工原価管理装置である。 The present invention includes an estimated cost calculation unit that calculates an expected cost by associating process information regarding a sheet metal processing process with an expected cost that is an expected cost for a process related to the process information, and a sheet metal processing machine that performs sheet metal processing by electronic communication. The actual cost calculation unit calculates the actual cost, which is the cost actually incurred for the process related to the process information, while managing based on process information via a line, and the estimated cost calculation unit calculates the process related to the process information. This sheet metal processing cost management device includes a profit calculation unit that calculates as profit the difference between the actual cost calculated by the actual cost calculation unit and the estimated cost calculated by the actual cost calculation unit.

この構成によれば、板金加工原価管理装置1において、想定原価算出部により、板金加工の工程に関する工程情報に、工程情報に係る工程について想定される費用である想定原価が関連付けて算出される。つまり、工程ごとの想定原価が見積られる。また、実績原価算出部により、板金加工機により実行される板金加工が電気通信回線を介して工程情報に基づいて管理されつつ、工程情報に係る工程について実際に生じた費用である実績原価が算出される。つまり、想定原価の見積で利用した工程情報が板金加工機により実行される板金加工の管理に再利用されつつ、工程ごとの実績原価が算出される。さらに、利益算出部により、工程情報に係る工程について、想定原価算出部により算出された想定原価に対する実績原価算出部により算出された実績原価の差が利益として算出される。つまり、工程ごとの利益が算出される。以上により、板金加工機により実行された板金加工の実績を参酌しつつ板金加工の原価管理をより適切に行うことができる。 According to this configuration, in the sheet metal processing cost management device 1, the estimated cost calculation unit calculates the estimated cost, which is the expected cost for the process related to the process information, in association with the process information regarding the sheet metal processing process. In other words, the estimated cost for each process is estimated. In addition, the actual cost calculation department calculates the actual costs, which are the costs actually incurred for the process related to the process information, while managing the sheet metal processing performed by the sheet metal processing machine based on the process information via the telecommunications line. be done. In other words, the actual cost for each process is calculated while the process information used in estimating the expected cost is reused for managing the sheet metal processing performed by the sheet metal processing machine. Further, the profit calculation unit calculates the difference between the actual cost calculated by the actual cost calculation unit and the estimated cost calculated by the expected cost calculation unit as profit for the process related to the process information. In other words, the profit for each process is calculated. As described above, it is possible to more appropriately manage the cost of sheet metal processing while taking into account the past performance of sheet metal processing performed by the sheet metal processing machine.

この場合、板金加工に関する図面データを作成する板金加工図面作成部をさらに備え、想定原価算出部は、板金加工図面作成部により作成された図面データに基づいて、工程情報と想定原価とを関連付けて算出することが好適である。 In this case, the sheet metal processing drawing creation section further includes a sheet metal processing drawing creation section that creates drawing data regarding sheet metal processing, and the estimated cost calculation section associates process information with estimated costs based on the drawing data created by the sheet metal processing drawing creation section. It is suitable to calculate.

この構成によれば、板金加工図面作成部により、板金加工に関する図面データが作成され、想定原価算出部により、板金加工図面作成部により作成された図面データに基づいて工程情報と想定原価とが関連付けて算出される。つまり、作成された図面データが工程ごとの工程情報及び想定原価の算出に利用される。これにより、図面データの作成と工程ごとの工程情報及び想定原価の算出とが一連の処理で実行され、板金加工の原価管理をより容易に行うことができる。 According to this configuration, the sheet metal processing drawing creation section creates drawing data related to sheet metal processing, and the estimated cost calculation section associates process information with estimated costs based on the drawing data created by the sheet metal processing drawing creation section. Calculated by In other words, the created drawing data is used to calculate process information and estimated costs for each process. As a result, the creation of drawing data and the calculation of process information and estimated costs for each process are executed in a series of processes, making it easier to manage the cost of sheet metal processing.

また、工程情報は、板金加工のシートに関する情報に関する情報を含み、想定原価算出部は、シートごとに想定される費用である想定原価を算出し、実績原価算出部は、シートごとに実際に生じた費用である実績原価を算出し、利益算出部は、シートごとに想定原価に対する実績原価の差を利益として算出することが好適である。 In addition, the process information includes information regarding sheets of sheet metal processing, and the estimated cost calculation unit calculates the expected cost, which is the expected cost for each sheet, and the actual cost calculation unit calculates the actual cost for each sheet. It is preferable that the profit calculation unit calculates the difference between the actual cost and the estimated cost for each sheet as profit.

この構成によれば、工程情報は、板金加工のシートに関する情報に関する情報を含み、想定原価算出部により、シートごとに想定される費用である想定原価が算出され、実績原価算出部により、シートごとに実際に生じた費用である実績原価が算出され、利益算出部により、シートごとに想定原価に対する実績原価の差が利益として算出される。これにより、シートごとに板金加工の実績を参酌しつつ板金加工の原価管理をより適切に行うことができる。 According to this configuration, the process information includes information regarding sheets of sheet metal processing, and the estimated cost calculation unit calculates the expected cost, which is the expected cost for each sheet, and the actual cost calculation unit calculates the expected cost for each sheet. Actual costs, which are expenses actually incurred, are calculated, and the profit calculation unit calculates the difference between the actual costs and the estimated costs for each sheet as profit. Thereby, it is possible to more appropriately manage the cost of sheet metal processing while taking into consideration the past performance of sheet metal processing for each sheet.

また、工程情報は、板金加工のシートから製造される部品に関する情報に関する情報を含み、想定原価算出部は、部品ごとに想定される費用である想定原価を算出し、実績原価算出部は、部品ごとに実際に生じた費用である実績原価を算出し、利益算出部は、部品ごとに想定原価に対する実績原価の差を利益として算出することが好適である。 In addition, the process information includes information related to parts manufactured from sheets of sheet metal processing, the estimated cost calculation unit calculates the expected cost that is the expected cost for each part, and the actual cost calculation unit calculates the estimated cost for each part. Preferably, the actual cost, which is the expense actually incurred, is calculated for each part, and the profit calculation unit calculates the difference between the actual cost and the estimated cost for each part as profit.

この構成によれば、工程情報は、板金加工のシートから製造される部品に関する情報に関する情報を含み、想定原価算出部により、部品ごとに想定される費用である想定原価が算出され、実績原価算出部により、部品ごとに実際に生じた費用である実績原価が算出され、利益算出部により、部品ごとに想定原価に対する実績原価の差が利益として算出される。これにより、部品ごとに板金加工の実績を参酌しつつ板金加工の原価管理をより適切に行うことができる。 According to this configuration, the process information includes information about parts manufactured from sheets of sheet metal processing, and the estimated cost calculation unit calculates the expected cost, which is the expected cost for each part, and calculates the actual cost. The actual cost, which is the actual cost incurred for each part, is calculated by the department, and the profit calculation part calculates the difference between the actual cost and the estimated cost for each part as profit. Thereby, it is possible to more appropriately manage the cost of sheet metal processing while taking into consideration the past performance of sheet metal processing for each part.

また、本発明は、板金加工原価管理装置の想定原価算出部が、板金加工の工程に関する工程情報に、工程情報に係る工程について想定される費用である想定原価を関連付けて算出する想定原価算出工程と、板金加工原価管理装置の実績原価算出部が、板金加工機により実行される板金加工を電気通信回線を介して工程情報に基づいて管理しつつ、工程情報に係る工程について実際に生じた費用である実績原価を算出する実績原価算出工程と、板金加工原価管理装置の利益算出部が、工程情報に係る工程について、想定原価算出工程で算出された想定原価に対する実績原価算出工程で算出された実績原価の差を利益として算出する利益算出工程とを備えた板金加工原価管理方法である。 The present invention also provides an estimated cost calculation step in which the estimated cost calculation unit of the sheet metal processing cost management device calculates the estimated cost by associating the process information regarding the sheet metal processing process with the expected cost, which is the expected cost for the process related to the process information. Then, the actual cost calculation unit of the sheet metal processing cost management device manages the sheet metal processing performed by the sheet metal processing machine based on the process information via the telecommunications line, and calculates the actual costs incurred for the process related to the process information. The actual cost calculation process that calculates the actual costs that are This sheet metal processing cost management method includes a profit calculation step in which the difference between actual costs is calculated as profit.

この場合、板金加工原価管理装置の板金加工図面作成部が、板金加工に関する図面データを作成する板金加工図面作成工程をさらに備え、想定原価算出工程では、想定原価算出部は、板金加工図面作成部により作成された図面データに基づいて、工程情報と想定原価とを関連付けて算出することが好適である。 In this case, the sheet metal processing drawing creation section of the sheet metal processing cost management device further includes a sheet metal processing drawing creation step for creating drawing data related to sheet metal processing, and in the estimated cost calculation step, the estimated cost calculation section includes a sheet metal processing drawing creation section. It is preferable to calculate process information and estimated costs in association with each other based on the drawing data created by.

また、工程情報は、板金加工のシートに関する情報に関する情報を含み、想定原価算出工程では、想定原価算出部は、シートごとに想定される費用である想定原価を算出し、実績原価算出工程では、実績原価算出部は、シートごとに実際に生じた費用である実績原価を算出し、利益算出工程では、利益算出部は、シートごとに想定原価に対する実績原価の差を利益として算出することが好適である。 In addition, the process information includes information related to sheets of sheet metal processing, and in the estimated cost calculation process, the estimated cost calculation unit calculates the expected cost, which is the expected cost for each sheet, and in the actual cost calculation process, It is preferable that the actual cost calculation unit calculates the actual cost, which is the actual cost, for each sheet, and in the profit calculation process, the profit calculation unit calculates the difference between the actual cost and the expected cost for each sheet as profit. It is.

工程情報は、板金加工のシートから製造される部品に関する情報に関する情報を含み、想定原価算出工程では、想定原価算出部は、部品ごとに想定される費用である想定原価を算出し、実績原価算出工程では、実績原価算出部は、部品ごとに実際に生じた費用である実績原価を算出し、利益算出工程では、利益算出部は、部品ごとに想定原価に対する実績原価の差を利益として算出することが好適である。 The process information includes information about parts manufactured from sheets of sheet metal processing, and in the estimated cost calculation process, the estimated cost calculation unit calculates the estimated cost, which is the expected cost for each part, and calculates the actual cost. In the process, the actual cost calculation department calculates actual costs, which are the costs actually incurred for each part, and in the profit calculation process, the profit calculation department calculates the difference between the actual cost and the estimated cost for each part as profit. It is preferable that

本発明の板金加工原価管理装置及び板金加工原価管理方法によれば、板金加工の原価管理をより適切に行うことができる。 According to the sheet metal processing cost management device and the sheet metal processing cost management method of the present invention, it is possible to more appropriately manage the cost of sheet metal processing.

実施形態の板金加工原価管理装置を示すブロック図である。It is a block diagram showing a sheet metal processing cost management device of an embodiment. 実施形態の板金加工原価管理方法の工程を示すフローチャートである。It is a flowchart which shows the process of the sheet metal processing cost management method of embodiment. 板金加工図面作成工程で作成される図面データの一例を示す図である。It is a figure which shows an example of the drawing data created in the sheet metal processing drawing creation process. 想定原価算出工程でシートごとに関連付けて算出された工程情報と想定原価を含む管理項目との一例を示す図である。FIG. 7 is a diagram illustrating an example of process information calculated in association with each sheet in the estimated cost calculation process and management items including estimated costs. 想定原価算出工程で部品ごとに関連付けて算出された工程情報と想定原価を含む管理項目との一例を示す図である。FIG. 3 is a diagram showing an example of process information calculated in association with each part in an estimated cost calculation process and management items including estimated costs. 実績原価算出工程でシートごとに関連付けて算出された工程情報と実績原価とを含む管理項目との一例を示す図である。FIG. 7 is a diagram illustrating an example of management items including process information and actual costs calculated in association with each sheet in an actual cost calculation process. 実績原価算出工程で部品ごとに関連付けて算出された工程情報と実績原価とを含む管理項目との一例を示す図である。FIG. 3 is a diagram illustrating an example of management items including process information and actual costs calculated in association with each part in an actual cost calculation process. 利益算出工程でシートごとに関連付けて算出された工程情報と利益を含む管理項目との一例を示す図である。FIG. 7 is a diagram illustrating an example of process information calculated in association with each sheet in a profit calculation process and management items including profit. 利益算出工程で部品ごとに関連付けて算出された工程情報と利益を含む管理項目との一例を示す図である。FIG. 7 is a diagram illustrating an example of process information calculated in association with each part in a profit calculation process and management items including profit.

以下、図面を参照して、本発明の実施形態に係る板金加工原価管理装置及び板金加工原価管理方法について説明する。図1に示すように、本実施形態に係る板金加工原価管理装置1は、板金加工図面作成部2、想定原価算出部3、実績原価算出部4及び利益算出部5を備える。本実施形態の板金加工原価管理装置1は、例えば、板金加工原価管理装置1とネットワーク等の電気通信回線Lを介して接続されたパーソナルコンピュータ等のコンピュータ装置により、工場の板金加工機10A,10B,10Cにより実行される板金加工を管理する。 DESCRIPTION OF THE PREFERRED EMBODIMENTS A sheet metal processing cost management device and a sheet metal processing cost management method according to embodiments of the present invention will be described below with reference to the drawings. As shown in FIG. 1, the sheet metal processing cost management device 1 according to the present embodiment includes a sheet metal processing drawing creation section 2, an estimated cost calculation section 3, an actual cost calculation section 4, and a profit calculation section 5. The sheet metal processing cost management device 1 of the present embodiment is operated by a computer device such as a personal computer connected to the sheet metal processing cost management device 1 via a telecommunication line L such as a network, for example, to control sheet metal processing machines 10A and 10B of a factory. , 10C.

板金加工原価管理装置1は、例えば、CPU(Central Processing Unit)、ROM(Read OnlyMemory)、RAM(Random Access Memory)、ハードディスク及び液晶ディスプレイ等を有するパーソナルコンピュータ等のコンピュータ装置である。板金加工原価管理装置1では、ROMに記憶されているプログラムがRAMにロードされ、CPUで実行されることで、上記の板金加工図面作成部2等の各部の動作が実行される。なお、板金加工原価管理装置1は、複数のコンピュータ装置及び記憶装置から構成されていてもよい。例えば、板金加工図面作成部2、想定原価算出部3、実績原価算出部4及び利益算出部5は、それぞれ別個のパーソナルコンピュータ等のコンピュータ装置から構成されていてもよい。また、板金加工図面作成部2、想定原価算出部3、実績原価算出部4及び利益算出部5は、それぞれ別個のアプリケーションプログラムにより実行されてもよい。 The sheet metal processing cost management device 1 is, for example, a computer device such as a personal computer having a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), a hard disk, a liquid crystal display, and the like. In the sheet metal processing cost management device 1, a program stored in the ROM is loaded into the RAM and executed by the CPU, thereby executing the operations of each section such as the sheet metal processing drawing creation section 2 described above. Note that the sheet metal processing cost management device 1 may include a plurality of computer devices and storage devices. For example, the sheet metal processing drawing creation section 2, the estimated cost calculation section 3, the actual cost calculation section 4, and the profit calculation section 5 may each be configured from separate computer devices such as personal computers. Furthermore, the sheet metal processing drawing creation section 2, the estimated cost calculation section 3, the actual cost calculation section 4, and the profit calculation section 5 may be executed by separate application programs.

板金加工図面作成部2は、板金加工に関する図面データを作成する。板金加工図面作成部2は、例えば、3次元のCAD(Computer Aided Design:コンピュータ支援設計)とCAM(computeraided manufacturing:コンピュータ支援製造)の両方の機能を併せ持ち、ソフトウェア上での製品の作図に加えて、3次元の立体図及び展開図を自在に作成することができる。また、板金加工図面作成部2は、板金加工機10A,10B,10Cにより板金加工を実行するためのプログラムを作成する。 The sheet metal processing drawing creation unit 2 creates drawing data regarding sheet metal processing. The sheet metal processing drawing creation section 2 has, for example, both three-dimensional CAD (Computer Aided Design) and CAM (computer aided manufacturing) functions, and in addition to drawing products on software. , you can freely create three-dimensional three-dimensional diagrams and developed diagrams. Further, the sheet metal processing drawing creation section 2 creates a program for executing sheet metal processing using the sheet metal processing machines 10A, 10B, and 10C.

想定原価算出部3は、板金加工の工程に関する工程情報に、工程情報に係る工程について想定される費用である想定原価を関連付けて算出する。工程情報には、板金加工のシートに関する情報に関する情報を含み、例えば、板金加工のシートごとのシート名、担当者、機械名称、プログラム名、材質・サイズ及び抜き、曲げ、溶接等の加工種別等の情報を含む。また、工程情報には、板金加工のシートから製造される部品に関する情報に関する情報を含み、例えば、板金加工の部品ごとの部品名、シート名、担当者、機械名称、プログラム名、材質・サイズ、抜き、曲げ、溶接等の加工種別及び1枚のシートでの生産数等の情報を含む。想定原価は、例えば、工程情報に係る工程について想定される加工時間である想定加工時間と、工程情報に係る工程についての時間当たりに要する費用との積により算出される。 The estimated cost calculation unit 3 calculates an estimated cost, which is a cost expected for the process related to the process information, in association with process information regarding the sheet metal processing process. The process information includes information about sheets of sheet metal processing, such as sheet name, person in charge, machine name, program name, material/size, and processing type such as punching, bending, welding, etc. for each sheet of sheet metal processing. Contains information. In addition, the process information includes information regarding parts manufactured from sheet metal processing sheets, such as the part name, sheet name, person in charge, machine name, program name, material/size, It includes information such as processing types such as punching, bending, and welding, and the number of products produced per sheet. The assumed cost is calculated, for example, by multiplying the estimated processing time, which is the estimated processing time for the process related to the process information, and the cost required per hour for the process related to the process information.

想定原価算出部3は、板金加工図面作成部2により作成された図面データに基づいて、工程情報と想定原価とを関連付けて算出する。つまり、想定原価算出部3は、図面データに基づいて、図面データに係る製品を製造するために必要な工程を分解して工程情報を導出し、当該工程情報と想定原価とを関連付けて算出する。 The estimated cost calculation unit 3 calculates the process information in association with the estimated cost based on the drawing data created by the sheet metal processing drawing creation unit 2. That is, based on the drawing data, the estimated cost calculation unit 3 decomposes the steps necessary to manufacture the product related to the drawing data, derives process information, and calculates the process information by associating it with the estimated cost. .

想定原価算出部3は、シートごとに想定される費用である想定原価を算出する。シートごとに想定される費用である想定原価は、例えば、工程情報に係る工程についてシートごとに想定される加工時間である想定加工時間と、工程情報に係る工程についてシートごとに時間当たりに要する費用との積により算出される。想定原価算出部3は、部品ごとに想定される費用である想定原価を算出する。部品ごとに想定される費用である想定原価は、例えば、工程情報に係る工程について部品ごとに想定される加工時間である想定加工時間と、工程情報に係る工程について部品ごとに時間当たりに要する費用との積により算出される。 The estimated cost calculation unit 3 calculates an estimated cost that is the expected cost for each sheet. The expected cost, which is the expected cost for each sheet, includes, for example, the expected processing time, which is the expected processing time for each sheet for the process related to the process information, and the cost required per hour for each sheet for the process related to the process information. Calculated by multiplying by The estimated cost calculation unit 3 calculates an estimated cost that is the expected cost for each part. The expected cost, which is the expected cost for each part, includes, for example, the expected machining time, which is the expected machining time for each part for the process related to the process information, and the cost required per hour for each part for the process related to the process information. Calculated by multiplying by

実績原価算出部4は、板金加工機10A,10B,10Cにより実行される板金加工を電気通信回線Lを介して工程情報に基づいて管理しつつ、工程情報に係る工程について実際に生じた費用である実績原価を算出する。管理とは、例えば、板金加工機10A,10B,10Cごとの稼働状況の管理の他に、板金加工機10A,10B,10Cにより実行される板金加工の予定に対する板金加工機10A,10B,10Cにより実行された板金加工の実績の管理を含む。実績原価は、例えば、工程情報に係る工程について実際に要した加工時間である実績加工時間と、工程情報に係る工程についての時間当たりに要する費用との積により算出される。 The actual cost calculation unit 4 manages the sheet metal processing executed by the sheet metal processing machines 10A, 10B, and 10C via the telecommunication line L based on the process information, and calculates the actual cost for the process related to the process information. Calculate a certain actual cost. Management means, for example, in addition to the management of the operating status of each sheet metal processing machine 10A, 10B, 10C, management of the sheet metal processing schedule executed by the sheet metal processing machine 10A, 10B, 10C by the sheet metal processing machine 10A, 10B, 10C. Includes management of the results of sheet metal processing performed. The actual cost is calculated, for example, by multiplying the actual processing time, which is the processing time actually required for the process related to the process information, and the cost required per hour for the process related to the process information.

実績原価算出部4は、シートごとに実際に生じた費用である実績原価を算出する。シートごとに実際に要した費用である実績原価は、例えば、工程情報に係る工程についてシートごとに実際に要した費用である実績加工時間と、工程情報に係る工程についてシートごとに時間当たりに要する費用との積により算出される。実績原価算出部4は、部品ごとに実際に生じた費用である実績原価を算出する。部品ごとに実際に生じた費用である実績原価は、例えば、工程情報に係る工程について部品ごとに実際に生じた加工時間である実績加工時間と、工程情報に係る工程について部品ごとに時間当たりに要する費用との積により算出される。 The actual cost calculation unit 4 calculates actual costs, which are expenses actually incurred for each sheet. For example, the actual cost, which is the cost actually required for each sheet, is the actual cost, which is the cost actually required for each sheet, for the process related to the process information, and the actual processing time, which is the cost actually required for each sheet, for the process related to the process information. Calculated by multiplying by cost. The actual cost calculation unit 4 calculates actual costs, which are costs actually incurred for each part. For example, the actual cost, which is the cost actually incurred for each part, is the actual machining time, which is the actual machining time for each part, for the process related to the process information, and the actual cost per hour for each part, for the process related to the process information. Calculated by multiplying by the required cost.

利益算出部5は、工程情報に係る工程について、想定原価算出部3により算出された想定原価に対する実績原価算出部4により算出された実績原価の差を利益として算出する。利益算出部5は、シートごとに想定原価に対する実績原価の差を利益として算出する。利益算出部5は、部品ごとに想定原価に対する実績原価の差を利益として算出する。 The profit calculation unit 5 calculates the difference between the actual cost calculated by the actual cost calculation unit 4 and the estimated cost calculated by the expected cost calculation unit 3 as profit for the process related to the process information. The profit calculation unit 5 calculates the difference between the estimated cost and the actual cost for each sheet as profit. The profit calculation unit 5 calculates the difference between the estimated cost and the actual cost for each part as profit.

以下、本実施形態の板金加工原価管理装置による板金加工原価管理方法について説明する。図2に示すように、板金加工原価管理装置1の板金加工図面作成部2により、板金加工に関する図面データを作成する板金加工図面作成工程が実行される(S1)。板金加工図面作成部2は、CADにより、例えば、図3に示すように、1枚のシートM1について部品P1及び部品P2が製作される図面Dを作成する。板金加工図面作成部2は、CADによる図面データを作成し、想定原価算出部3に引き渡す。 Hereinafter, a sheet metal processing cost management method using the sheet metal processing cost management apparatus of this embodiment will be explained. As shown in FIG. 2, the sheet metal processing drawing creation section 2 of the sheet metal processing cost management device 1 executes a sheet metal processing drawing creation step of creating drawing data regarding sheet metal processing (S1). The sheet metal processing drawing creation unit 2 uses CAD to create a drawing D in which parts P1 and P2 are manufactured for one sheet M1, as shown in FIG. 3, for example. The sheet metal processing drawing creation section 2 creates drawing data using CAD and delivers it to the estimated cost calculation section 3.

図2に示すように、板金加工原価管理装置1の想定原価算出部3により、板金加工の工程に関する工程情報に、工程情報に係る工程について想定される費用である想定原価を関連付けて算出する想定原価算出工程が実行される(S2)。想定原価算出工程では、想定原価算出部3は、板金加工図面作成部2により作成された図面データに基づいて、工程情報と想定原価とを関連付けて算出する。 As shown in FIG. 2, the estimated cost calculation unit 3 of the sheet metal processing cost management device 1 calculates an assumption by associating process information regarding the sheet metal processing process with an estimated cost, which is the expected cost for the process related to the process information. A cost calculation process is executed (S2). In the estimated cost calculation step, the estimated cost calculation section 3 calculates the estimated cost by associating the process information with the estimated cost based on the drawing data created by the sheet metal processing drawing creation section 2.

想定原価算出部3は、例えば、図4に示すように、板金加工のシートに関する情報に関する情報を含む工程情報について、シートごとに想定される費用である想定原価を算出する。図4の例では、想定原価算出部3は、シートM1に関する工程情報について、シートM1に想定される費用である想定原価を算出している。シートM1の想定原価は、シートM1ごとに想定される加工時間である想定加工時間とシートM1ごとに時間当たりに要する費用との積である。また、想定原価算出部3は、例えば、図5に示すように、板金加工のシートから製造される部品に関する情報に関する情報を含む工程情報について、部品ごとに想定される費用である想定原価を算出する。図5の例では、想定原価算出部3は、シートM1から製造される部品P1及び部品P2ごとに想定される費用である想定原価を算出している。部品P1及び部品P2の想定原価は、部品P1及び部品P2ごとに想定される加工時間である想定加工時間と部品P1及び部品P2ごとに時間当たりに要する費用との積である。 For example, as shown in FIG. 4, the estimated cost calculation unit 3 calculates an estimated cost, which is the estimated cost for each sheet, for process information that includes information regarding sheets of sheet metal processing. In the example of FIG. 4, the estimated cost calculation unit 3 calculates the estimated cost, which is the expected cost of the sheet M1, for the process information regarding the sheet M1. The estimated cost of the sheet M1 is the product of the estimated processing time, which is the estimated processing time for each sheet M1, and the cost required per hour for each sheet M1. Furthermore, as shown in FIG. 5, the expected cost calculation unit 3 calculates the expected cost, which is the expected cost for each part, for process information that includes information about parts manufactured from sheets of sheet metal processing. do. In the example of FIG. 5, the estimated cost calculation unit 3 calculates the estimated cost, which is the estimated cost for each part P1 and part P2 manufactured from the sheet M1. The estimated cost of the parts P1 and P2 is the product of the estimated machining time, which is the estimated machining time for each of the parts P1 and P2, and the cost required per hour for each of the parts P1 and P2.

図2に示すように、板金加工原価管理装置1の実績原価算出部4が、板金加工機10A,10B,10Cにより実行される板金加工を電気通信回線Lを介して工程情報に基づいて管理しつつ、工程情報に係る工程について実際に生じた費用である実績原価を算出する実績原価算出工程が実行される(S3)。 As shown in FIG. 2, the actual cost calculation unit 4 of the sheet metal processing cost management device 1 manages the sheet metal processing performed by the sheet metal processing machines 10A, 10B, and 10C via the telecommunication line L based on process information. At the same time, an actual cost calculation step is executed to calculate actual costs, which are expenses actually incurred for the process related to the process information (S3).

実績原価算出工程では、実績原価算出部4は、シートごとに実際に生じた費用である実績原価を算出する。図6の例では、実績原価算出部4は、シートM1に関する工程情報について、シートM1に実際に生じた費用である実績原価を算出している。シートM1の実績原価は、シートM1ごとに実際に要した費用である実績加工時間とシートM1ごとに時間当たりに要する費用との積である。また、実績原価算出工程では、実績原価算出部4は、部品ごとに実際に生じた費用である実績原価を算出する。図7の例では、実績原価算出部4は、シートM1から製造された部品P1及び部品P2ごとに実際に生じた費用である実績原価を算出している。部品P1及び部品P2の実績原価は、部品P1及び部品P2ごとに実際に生じた加工時間である実績加工時間と部品P1及び部品P2ごとに時間当たりに要する費用との積である。 In the actual cost calculation step, the actual cost calculation unit 4 calculates actual costs, which are expenses actually incurred for each sheet. In the example of FIG. 6, the actual cost calculation unit 4 calculates the actual cost, which is the cost actually incurred on the sheet M1, for the process information regarding the sheet M1. The actual cost for the sheet M1 is the product of the actual processing time, which is the actual cost for each sheet M1, and the cost per hour for each sheet M1. Furthermore, in the actual cost calculation step, the actual cost calculation unit 4 calculates actual costs that are costs actually incurred for each part. In the example of FIG. 7, the actual cost calculation unit 4 calculates actual costs that are costs actually incurred for each part P1 and part P2 manufactured from the sheet M1. The actual cost of the parts P1 and P2 is the product of the actual machining time, which is the actual machining time for each of the parts P1 and P2, and the cost required per hour for each of the parts P1 and P2.

図2に示すように、板金加工原価管理装置1の利益算出部5が、工程情報に係る工程について、想定原価算出工程で算出された想定原価に対する実績原価算出工程で算出された実績原価の差を利益として算出する利益算出工程が実行される(S4)。利益算出工程では、利益算出部5は、シートごとに想定原価に対する実績原価の差を利益として算出する。図8の例では、シートM1の想定原価に対する実績原価の差を利益として算出している。また、利益算出工程では、利益算出部5は、部品ごとに想定原価に対する実績原価の差を利益として算出する。図9の例では、部品P1及び部品P2の想定原価に対する実績原価の差を利益として算出している。 As shown in FIG. 2, the profit calculation unit 5 of the sheet metal processing cost management device 1 calculates the difference between the actual cost calculated in the actual cost calculation process and the expected cost calculated in the expected cost calculation process for the process related to the process information. A profit calculation step of calculating the profit as profit is executed (S4). In the profit calculation step, the profit calculation unit 5 calculates the difference between the actual cost and the estimated cost for each sheet as profit. In the example of FIG. 8, the difference between the estimated cost and the actual cost of sheet M1 is calculated as profit. In the profit calculation step, the profit calculation unit 5 calculates the difference between the estimated cost and the actual cost for each part as profit. In the example of FIG. 9, the difference between the estimated cost and the actual cost of parts P1 and P2 is calculated as profit.

板金加工機10A,10B,10Cによる板金加工の実行中において、板金加工機10A,10B,10Cのそれぞれの稼働状況の管理に加えて、板金加工機10A,10B,10Cにより実行される板金加工の予定に対する板金加工機10A,10B,10Cにより実行された板金加工の実績の管理として、図4~図9に図示した情報は、板金加工原価管理装置1を構成する液晶ディスプレイ等に逐次表示される。 While the sheet metal processing machines 10A, 10B, and 10C are performing sheet metal processing, in addition to managing the operating status of each of the sheet metal processing machines 10A, 10B, and 10C, the sheet metal processing machines 10A, 10B, and 10C are In order to manage the results of sheet metal processing executed by the sheet metal processing machines 10A, 10B, and 10C against the schedule, the information illustrated in FIGS. .

本実施形態によれば、板金加工原価管理装置1において、想定原価算出部3により、板金加工の工程に関する工程情報に、工程情報に係る工程について想定される費用である想定原価が関連付けて算出される。つまり、工程ごとの想定原価が見積られる。また、実績原価算出部4により、板金加工機10A,10B,10Cにより実行される板金加工が電気通信回線Lを介して工程情報に基づいて管理されつつ、工程情報に係る工程について実際に生じた費用である実績原価が算出される。つまり、想定原価の見積で利用した工程情報が板金加工機10A,10B,10Cにより実行される板金加工の管理に再利用されつつ、工程ごとの実績原価が算出される。さらに、利益算出部5により、工程情報に係る工程について、想定原価算出部3により算出された想定原価に対する実績原価算出部4により算出された実績原価の差が利益として算出される。つまり、工程ごとの利益が算出される。以上により、板金加工機10A,10B,10Cにより実行された板金加工の実績を参酌しつつ板金加工の原価管理をより適切に行うことができる。 According to this embodiment, in the sheet metal processing cost management device 1, the estimated cost calculation unit 3 calculates the estimated cost in association with the process information regarding the sheet metal processing process, which is the expected cost for the process related to the process information. Ru. In other words, the estimated cost for each process is estimated. In addition, the actual cost calculation unit 4 manages the sheet metal processing executed by the sheet metal processing machines 10A, 10B, and 10C via the telecommunication line L based on the process information, and also calculates the actual cost of the process related to the process information. Actual costs, which are expenses, are calculated. That is, the actual cost for each process is calculated while the process information used in estimating the assumed cost is reused for managing the sheet metal processing performed by the sheet metal processing machines 10A, 10B, and 10C. Further, the profit calculation unit 5 calculates as profit the difference between the actual cost calculated by the actual cost calculation unit 4 and the estimated cost calculated by the expected cost calculation unit 3 for the process related to the process information. In other words, the profit for each process is calculated. As described above, it is possible to more appropriately manage the cost of sheet metal processing while taking into consideration the results of sheet metal processing performed by the sheet metal processing machines 10A, 10B, and 10C.

また、本実施形態によれば、板金加工図面作成部2により、板金加工に関する図面データが作成され、想定原価算出部3により、板金加工図面作成部2により作成された図面データに基づいて工程情報と想定原価とが関連付けて算出される。つまり、作成された図面データが工程ごとの工程情報及び想定原価の算出に利用される。これにより、図面データの作成と工程ごとの工程情報及び想定原価の算出とが一連の処理で実行され、板金加工の原価管理をより容易に行うことができる。 Further, according to the present embodiment, the sheet metal processing drawing creation unit 2 creates drawing data regarding sheet metal processing, and the estimated cost calculation unit 3 provides process information based on the drawing data created by the sheet metal processing drawing creation unit 2. and the estimated cost are correlated and calculated. In other words, the created drawing data is used to calculate process information and estimated costs for each process. As a result, the creation of drawing data and the calculation of process information and estimated costs for each process are executed in a series of processes, making it easier to manage the cost of sheet metal processing.

また、本実施形態によれば、工程情報は、板金加工のシートM1に関する情報に関する情報を含み、想定原価算出部3により、シートM1ごとに想定される費用である想定原価が算出され、実績原価算出部4により、シートM1ごとに実際に生じた費用である実績原価が算出され、利益算出部5により、シートM1ごとに想定原価に対する実績原価の差が利益として算出される。これにより、シートM1ごとに板金加工の実績を参酌しつつ板金加工の原価管理をより適切に行うことができる。 Further, according to the present embodiment, the process information includes information regarding the sheet M1 of sheet metal processing, and the estimated cost calculation unit 3 calculates the expected cost, which is the expected cost for each sheet M1, and calculates the actual cost. The calculation unit 4 calculates actual costs, which are expenses actually incurred, for each sheet M1, and the profit calculation unit 5 calculates the difference between the actual costs and the estimated costs as profit for each sheet M1. Thereby, it is possible to more appropriately manage the cost of sheet metal processing while taking into consideration the past performance of sheet metal processing for each sheet M1.

また、本実施形態によれば、工程情報は、板金加工のシートM1から製造される部品P1及び部品P2に関する情報に関する情報を含み、想定原価算出部3により、部品P1及び部品P2ごとに想定される費用である想定原価が算出され、実績原価算出部4により、部品P1及び部品P2ごとに実際に生じた費用である実績原価が算出され、利益算出部5により、部品P1及び部品P2ごとに想定原価に対する実績原価の差が利益として算出される。これにより、部品P1及び部品P2ごとに板金加工の実績を参酌しつつ板金加工の原価管理をより適切に行うことができる。 Further, according to the present embodiment, the process information includes information regarding the part P1 and the part P2 manufactured from the sheet M1 for sheet metal processing, and the estimated cost calculation unit 3 calculates the estimated cost for each part P1 and the part P2. The estimated cost, which is the cost actually incurred, is calculated by the actual cost calculation unit 4, and the actual cost, which is the cost actually incurred, is calculated for each part P1 and P2.The profit calculation unit 5 calculates the actual cost, which is the cost actually incurred for each part P1 and P2. The difference between the actual cost and the expected cost is calculated as profit. Thereby, it is possible to more appropriately manage the cost of sheet metal processing while taking into consideration the past performance of sheet metal processing for each of the parts P1 and P2.

尚、本発明は、上記した実施の形態に限定されるものではなく、本発明の実施形態の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。 It should be noted that the present invention is not limited to the embodiments described above, and it goes without saying that various changes can be made without departing from the gist of the embodiments of the present invention.

1…板金加工原価管理装置、2…板金加工図面作成部、3…想定原価算出部、4…実績原価算出部、5…利益算出部、10A,10B,10C…板金加工機、L…電気通信回線、D…図面、M1…シート、P1,P2…部品。 1...Sheet metal processing cost management device, 2...Sheet metal processing drawing creation department, 3...Estimated cost calculation department, 4...Actual cost calculation department, 5...Profit calculation department, 10A, 10B, 10C...Sheet metal processing machine, L...Telecommunications Line, D...Drawing, M1...Sheet, P1, P2...Parts.

Claims (6)

板金加工の工程に関する工程情報に、前記工程情報に係る前記工程について想定される費用である想定原価を関連付けて算出する想定原価算出部と、
板金加工機により実行される板金加工を電気通信回線を介して前記工程情報に基づいて管理しつつ、前記工程情報に係る前記工程について実際に生じた費用である実績原価を算出する実績原価算出部と、
前記工程情報に係る前記工程について、前記想定原価算出部により算出された前記想定原価に対する前記実績原価算出部により算出された前記実績原価の差を利益として算出する利益算出部と、
を備え
前記工程情報は、前記板金加工のシートに関する情報を含み、
前記想定原価算出部は、前記工程情報に係る前記工程について前記シートごとに想定される加工時間である想定加工時間と、前記工程情報に係る前記工程について前記シートごとに時間当たりに要する費用との積により、前記シートごとに想定される費用である前記想定原価を算出し、
前記実績原価算出部は、前記工程情報に係る前記工程について前記シートごとに実際に要した加工時間である実績加工時間と、前記工程情報に係る前記工程について前記シートごとに時間当たりに要する費用との積により、前記シートごとに実際に生じた費用である前記実績原価を算出し、
前記利益算出部は、前記シートごとに前記想定原価に対する前記実績原価の差を前記利益として算出する、板金加工原価管理装置。
an estimated cost calculation unit that calculates an expected cost that is an expected cost for the process related to the process information by associating it with process information regarding the process of sheet metal processing;
an actual cost calculation unit that manages sheet metal processing performed by a sheet metal processing machine based on the process information via a telecommunications line, and calculates actual costs that are costs actually incurred for the process related to the process information; and,
a profit calculation unit that calculates a difference between the actual cost calculated by the actual cost calculation unit and the estimated cost calculated by the expected cost calculation unit as a profit for the process related to the process information;
Equipped with
The process information includes information regarding the sheet of sheet metal processing,
The estimated cost calculation unit calculates the expected processing time, which is the estimated processing time for each sheet, for the process related to the process information, and the cost required per hour for each sheet for the process related to the process information. Calculate the expected cost, which is the expected cost for each sheet, by multiplying
The actual cost calculation unit calculates the actual processing time that is the actual processing time required for each sheet for the process related to the process information, and the cost required per hour for each sheet for the process related to the process information. Calculate the actual cost, which is the actual cost for each sheet, by the product of
The profit calculation unit is a sheet metal processing cost management device that calculates the difference between the actual cost and the estimated cost for each sheet as the profit .
板金加工に関する図面データを作成する板金加工図面作成部をさらに備え、
前記想定原価算出部は、前記板金加工図面作成部により作成された前記図面データに基づいて、前記工程情報と前記想定原価とを関連付けて算出する、請求項1に記載の板金加工原価管理装置。
It is further equipped with a sheet metal processing drawing creation section that creates drawing data related to sheet metal processing,
The sheet metal processing cost management device according to claim 1, wherein the estimated cost calculation unit calculates the process information in association with the estimated cost based on the drawing data created by the sheet metal processing drawing creation unit.
前記工程情報は、板金加工のシートから製造される部品に関する情報を含み、
前記想定原価算出部は、前記部品ごとに想定される費用である前記想定原価を算出し、
前記実績原価算出部は、前記部品ごとに実際に生じた費用である前記実績原価を算出し、
前記利益算出部は、前記部品ごとに前記想定原価に対する前記実績原価の差を利益として算出する、請求項1又は2に記載の板金加工原価管理装置。
The process information includes information regarding parts manufactured from sheets of sheet metal processing,
The estimated cost calculation unit calculates the estimated cost that is the expected cost for each part,
The actual cost calculation unit calculates the actual cost that is the actual cost for each part,
3. The sheet metal processing cost management device according to claim 1 , wherein the profit calculation unit calculates a difference between the actual cost and the estimated cost for each part as a profit.
板金加工原価管理装置の想定原価算出部が、板金加工の工程に関する工程情報に、前記工程情報に係る前記工程について想定される費用である想定原価を関連付けて算出する想定原価算出工程と、
前記板金加工原価管理装置の実績原価算出部が、板金加工機により実行される板金加工を電気通信回線を介して前記工程情報に基づいて管理しつつ、前記工程情報に係る前記工程について実際に生じた費用である実績原価を算出する実績原価算出工程と、
前記板金加工原価管理装置の利益算出部が、前記工程情報に係る前記工程について、前記想定原価算出工程で算出された前記想定原価に対する前記実績原価算出工程で算出された前記実績原価の差を利益として算出する利益算出工程と、
を備え
前記工程情報は、板金加工のシートに関する情報を含み、
前記想定原価算出工程では、前記想定原価算出部は、前記工程情報に係る前記工程について前記シートごとに想定される加工時間である想定加工時間と、前記工程情報に係る前記工程について前記シートごとに時間当たりに要する費用との積により、前記シートごとに想定される費用である前記想定原価を算出し、
前記実績原価算出工程では、前記実績原価算出部は、前記工程情報に係る前記工程について前記シートごとに実際に要した加工時間である実績加工時間と、前記工程情報に係る前記工程について前記シートごとに時間当たりに要する費用との積により、前記シートごとに実際に生じた費用である前記実績原価を算出し、
前記利益算出工程では、前記利益算出部は、前記シートごとに前記想定原価に対する前記実績原価の差を前記利益として算出する、板金加工原価管理方法。
an estimated cost calculation step in which the estimated cost calculation unit of the sheet metal processing cost management device calculates by associating process information regarding the sheet metal processing process with an estimated cost that is an expected cost for the process related to the process information;
The actual cost calculation unit of the sheet metal processing cost management device manages the sheet metal processing performed by the sheet metal processing machine based on the process information via a telecommunication line, and calculates the actual cost of the process related to the process information. an actual cost calculation process that calculates actual costs, which are costs that have been
The profit calculation unit of the sheet metal processing cost management device calculates profit by calculating the difference between the actual cost calculated in the actual cost calculation step and the estimated cost calculated in the expected cost calculation step for the process related to the process information. a profit calculation process that calculates
Equipped with
The process information includes information regarding sheets of sheet metal processing,
In the estimated cost calculation step, the estimated cost calculation unit calculates an estimated processing time, which is a processing time estimated for each sheet for the process related to the process information, and an estimated processing time for each sheet for the process related to the process information. Calculate the expected cost, which is the expected cost for each sheet, by multiplying it by the cost required per hour,
In the actual cost calculation step, the actual cost calculation unit calculates the actual processing time that is the actual processing time required for each sheet for the process related to the process information, and the actual processing time for each sheet for the process related to the process information. Calculate the actual cost, which is the cost actually incurred for each sheet, by multiplying the cost per hour by the cost required per hour,
In the profit calculation step, the profit calculation unit calculates the difference between the actual cost and the estimated cost for each sheet as the profit.
前記板金加工原価管理装置の板金加工図面作成部が、板金加工に関する図面データを作成する板金加工図面作成工程をさらに備え、
前記想定原価算出工程では、前記想定原価算出部は、前記板金加工図面作成部により作成された前記図面データに基づいて、前記工程情報と前記想定原価とを関連付けて算出する、請求項に記載の板金加工原価管理方法。
The sheet metal processing drawing creation unit of the sheet metal processing cost management device further includes a sheet metal processing drawing creation step of creating drawing data regarding sheet metal processing,
According to claim 4 , in the estimated cost calculation step, the estimated cost calculation unit calculates the process information in association with the estimated cost based on the drawing data created by the sheet metal processing drawing creation unit. sheet metal processing cost control method.
前記工程情報は、板金加工のシートから製造される部品に関する情報を含み、
前記想定原価算出工程では、前記想定原価算出部は、前記部品ごとに想定される費用である前記想定原価を算出し、
前記実績原価算出工程では、前記実績原価算出部は、前記部品ごとに実際に生じた費用である前記実績原価を算出し、
前記利益算出工程では、前記利益算出部は、前記部品ごとに前記想定原価に対する前記実績原価の差を利益として算出する、請求項4又は5に記載の板金加工原価管理方法。
The process information includes information regarding parts manufactured from sheets of sheet metal processing,
In the expected cost calculation step, the expected cost calculation unit calculates the expected cost that is the expected cost for each part,
In the actual cost calculation step, the actual cost calculation unit calculates the actual cost that is the actual cost for each part,
6. The sheet metal processing cost management method according to claim 4, wherein in the profit calculation step, the profit calculation unit calculates the difference between the actual cost and the estimated cost for each part as profit.
JP2019140156A 2019-07-30 2019-07-30 Sheet metal processing cost control device and sheet metal processing cost control method Active JP7357482B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019140156A JP7357482B2 (en) 2019-07-30 2019-07-30 Sheet metal processing cost control device and sheet metal processing cost control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019140156A JP7357482B2 (en) 2019-07-30 2019-07-30 Sheet metal processing cost control device and sheet metal processing cost control method

Publications (2)

Publication Number Publication Date
JP2021022329A JP2021022329A (en) 2021-02-18
JP7357482B2 true JP7357482B2 (en) 2023-10-06

Family

ID=74575191

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019140156A Active JP7357482B2 (en) 2019-07-30 2019-07-30 Sheet metal processing cost control device and sheet metal processing cost control method

Country Status (1)

Country Link
JP (1) JP7357482B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114187129B (en) * 2021-11-15 2022-09-27 广东宏远新科自动化技术开发有限公司 Intelligent process scheduling method and system for manufacturing mechanical products

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002007791A (en) 2000-06-27 2002-01-11 Honda Motor Co Ltd Method and device for quoting product cost
JP2002073147A (en) 2000-08-29 2002-03-12 Yamatake Corp Manufacture cost calculation system and recording medium with recorded manufacturing cost calculating program
JP2002182733A (en) 2000-12-19 2002-06-26 Oki Electric Ind Co Ltd Work information cost estimating device, work information output device, work information cost estimating method and work information output method
JP2003030499A (en) 2001-07-16 2003-01-31 Komatsu Ltd System, program and method for transacting sheet metal product
JP2004258717A (en) 2003-02-24 2004-09-16 Toyo Business Engineering Corp Cost management system and method
JP3645981B2 (en) 1996-12-16 2005-05-11 株式会社ボッシュオートモーティブシステム Mobile work capacity measurement and evaluation device
JP2005284698A (en) 2004-03-30 2005-10-13 Jfe Steel Kk Profit and loss management information presenting method, profit and loss management information presenting device, profit and loss management information presentation processing program, and the like
JP2007034599A (en) 2005-07-26 2007-02-08 Shimadzu Corp Design support method and device
JP2007305157A (en) 2007-07-17 2007-11-22 Hitachi Ltd Method for mediating transaction between company
JP2008250368A (en) 2007-03-29 2008-10-16 Satoshi Hayashi Cost management system
JP4234405B2 (en) 2002-11-28 2009-03-04 東芝エレベータ株式会社 Man-hour automatic calculation system, man-hour automatic calculation method and program thereof
US20090307152A1 (en) 2008-06-09 2009-12-10 Oracle International Corporation Cost Management System

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2687736B2 (en) * 1991-02-22 1997-12-08 日本電気株式会社 Sheet metal product costing device
JPH07282142A (en) * 1994-04-11 1995-10-27 Hitachi Ltd Method for estimating cost of metal plate product and device therefor
JPH10301999A (en) * 1997-04-22 1998-11-13 Nec Corp Design management device for press sheet metal parts

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3645981B2 (en) 1996-12-16 2005-05-11 株式会社ボッシュオートモーティブシステム Mobile work capacity measurement and evaluation device
JP2002007791A (en) 2000-06-27 2002-01-11 Honda Motor Co Ltd Method and device for quoting product cost
JP2002073147A (en) 2000-08-29 2002-03-12 Yamatake Corp Manufacture cost calculation system and recording medium with recorded manufacturing cost calculating program
JP2002182733A (en) 2000-12-19 2002-06-26 Oki Electric Ind Co Ltd Work information cost estimating device, work information output device, work information cost estimating method and work information output method
JP2003030499A (en) 2001-07-16 2003-01-31 Komatsu Ltd System, program and method for transacting sheet metal product
JP4234405B2 (en) 2002-11-28 2009-03-04 東芝エレベータ株式会社 Man-hour automatic calculation system, man-hour automatic calculation method and program thereof
JP2004258717A (en) 2003-02-24 2004-09-16 Toyo Business Engineering Corp Cost management system and method
JP2005284698A (en) 2004-03-30 2005-10-13 Jfe Steel Kk Profit and loss management information presenting method, profit and loss management information presenting device, profit and loss management information presentation processing program, and the like
JP2007034599A (en) 2005-07-26 2007-02-08 Shimadzu Corp Design support method and device
JP2008250368A (en) 2007-03-29 2008-10-16 Satoshi Hayashi Cost management system
JP2007305157A (en) 2007-07-17 2007-11-22 Hitachi Ltd Method for mediating transaction between company
US20090307152A1 (en) 2008-06-09 2009-12-10 Oracle International Corporation Cost Management System

Also Published As

Publication number Publication date
JP2021022329A (en) 2021-02-18

Similar Documents

Publication Publication Date Title
TW442742B (en) Integrated support system for supporting sheet metal machining
WO2002054295A1 (en) Method of preparing estimate for sheet metal working
US9600792B2 (en) Method and apparatus for generating an engineering workflow
US20190129393A1 (en) Method and apparatus for shaping a production process for producing a product made up of multiple subproducts
JP7357482B2 (en) Sheet metal processing cost control device and sheet metal processing cost control method
JP6344010B2 (en) Production plan creation support program, production plan creation support method, and production plan creation support device
CN104950833A (en) Production plan creation support method and production plan creation support apparatus
WO2020053991A1 (en) Manufacturing system design assistance apparatus
JP7405679B2 (en) Line configuration planning device
JP7314043B2 (en) PRODUCTION PLANNING SUPPORT SYSTEM AND PRODUCTION PLANNING SUPPORT METHOD
US7653565B2 (en) Processing program edition conferencing method and system
JP2017126148A (en) Optimum number of lots determination program and system
JP2009126621A (en) Proper inventory quantity determination system and its method
JP4192937B2 (en) Production management device
JP2021039398A (en) Man-hour automatic calculation system
JP6713963B2 (en) Method and apparatus for generating initial inventory information for supply chain operation simulation
US20130060718A1 (en) Tooling design price quotation in product data management systems
JP5792527B2 (en) Standard inventory setting device and standard inventory setting method
JP2004062526A (en) Production management system
JP2000322119A (en) Substitutive lot determination system
JP3825642B2 (en) Production planning method
TWI755299B (en) Production line scheduling method, production line system and computer readable medium
JP6937412B2 (en) Bending time calculation device, bending time calculation system and program
JP2848349B2 (en) Cost accumulation simulation system
JP6022960B2 (en) Work instruction generation system and method

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20210416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20210416

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220729

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230331

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230404

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230829

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230926

R150 Certificate of patent or registration of utility model

Ref document number: 7357482

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150