JP6332291B2 - Power consumption management device and power consumption management program - Google Patents

Power consumption management device and power consumption management program Download PDF

Info

Publication number
JP6332291B2
JP6332291B2 JP2016013161A JP2016013161A JP6332291B2 JP 6332291 B2 JP6332291 B2 JP 6332291B2 JP 2016013161 A JP2016013161 A JP 2016013161A JP 2016013161 A JP2016013161 A JP 2016013161A JP 6332291 B2 JP6332291 B2 JP 6332291B2
Authority
JP
Japan
Prior art keywords
power consumption
consumer
request
customer
consumption management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016013161A
Other languages
Japanese (ja)
Other versions
JP2017135825A (en
Inventor
信夫 亀田
信夫 亀田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2016013161A priority Critical patent/JP6332291B2/en
Publication of JP2017135825A publication Critical patent/JP2017135825A/en
Application granted granted Critical
Publication of JP6332291B2 publication Critical patent/JP6332291B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

本発明は、電力消費管理装置および電力消費管理プログラムに関し、特に、電力消費に関する要請を行う電力消費管理装置および電力消費管理プログラムに関する。   The present invention relates to a power consumption management device and a power consumption management program, and more particularly to a power consumption management device and a power consumption management program that make a request for power consumption.

従来、電力需給の逼迫時に一般家庭およびオフィス等の電力需要施設における電力消費が抑制されるように、電力需要施設における電力消費を管理するシステムが開発されている。   2. Description of the Related Art Conventionally, a system for managing power consumption in a power demand facility has been developed so that power consumption in a power demand facility such as a general home or office is suppressed when power supply and demand is tight.

たとえば、電力需給の逼迫が予想される場合、複数の電力需要施設における電力消費を管理する事業者が、電力会社等から電力消費の抑制の要請を受ける。   For example, when power supply and demand are expected to be tight, a business operator that manages power consumption in a plurality of power demand facilities receives a request for suppression of power consumption from an electric power company or the like.

事業者は、電力会社等からの要請の内容、および各電力需要施設における通常の消費電力量等に基づいて、各電力需要施設において抑制すべき消費電力量を設定する。そして、事業者は、設定した消費電力量の抑制を各需要家に要請する。   The business operator sets the power consumption to be suppressed in each power demand facility based on the contents of the request from the power company and the normal power consumption in each power demand facility. Then, the business operator requests each consumer to suppress the set power consumption.

このようなシステムの一例として、たとえば、特許文献1(特開2012−205358号公報)には、以下のような技術が開示されている。すなわち、電力管理システムは、予め登録された複数の参加者を含むコミュニティに関する参加者リストを保持する保持部と、電力削減制御の実行の要否を判定する判定部と、電力削減制御の実行が必要であると判定部が判定した場合に、参加者リストに含まれている複数の参加者の中から、電力削減制御の対象となる1以上の対象者を選定する選定部と、選定部によって選定された対象者に関して、電力削減制御を実行する制御部と、電力削減制御が実行された対象者に対して、削減電力に基づく特典を付与する付与部とを備える。   As an example of such a system, for example, Japanese Patent Application Laid-Open No. 2012-205358 discloses the following technique. That is, the power management system includes a holding unit that holds a participant list related to a community including a plurality of registered participants, a determination unit that determines whether or not to execute power reduction control, and execution of power reduction control. When the determination unit determines that it is necessary, a selection unit that selects one or more target persons to be subjected to power reduction control from a plurality of participants included in the participant list, and a selection unit With respect to the selected target person, the control part which performs power reduction control, and the provision part which provides the privilege based on reduced power with respect to the target person by which power reduction control was performed are provided.

2012−205358号公報2012-205358 gazette

需要家に電力消費の抑制を要請し、電力会社等からの要請が満たされた場合であっても、気温等の影響で自然に電力需要が減少した可能性があり、需要家が電力消費の抑制を実施したとは限らない。電力消費に関する要請を、より確実に満たす技術が望まれる。   Even if the demand for power consumption is requested from the consumer and the demand from the power company is satisfied, the power demand may have decreased naturally due to the influence of temperature, etc. The suppression is not necessarily implemented. It is desirable to have a technology that more reliably meets the demand for power consumption.

この発明は、上述の課題を解決するためになされたもので、その目的は、需要家に電力消費に関する要請に従った動作をより確実に行わせることが可能な電力消費管理装置および電力消費管理プログラムを提供することである。   The present invention has been made to solve the above-described problems, and an object of the present invention is to provide a power consumption management apparatus and a power consumption management capable of causing a consumer to more reliably perform an operation in accordance with a request regarding power consumption. Is to provide a program.

(1)上記課題を解決するために、この発明のある局面に係わる電力消費管理装置は、需要家が電力消費に関する要請に従う予定であるか否かに関する応答情報、および前記需要家が前記要請に従った動作を実行したか否かに関する実施情報を取得する取得部と、前記取得部によって取得された前記応答情報および前記実施情報に基づいて、前記需要家を複数の区分のいずれかに分類する分類部と、前記需要家に対する新たな前記要請の内容を、前記分類部によって分類された前記需要家の前記区分に応じて設定する設定部とを備える。   (1) In order to solve the above-described problem, a power consumption management device according to an aspect of the present invention provides response information regarding whether or not a consumer intends to comply with a request regarding power consumption, and the consumer responds to the request. Based on the acquisition unit that acquires implementation information regarding whether or not the operation has been performed, and the response information and the implementation information acquired by the acquisition unit, the consumer is classified into one of a plurality of categories. A classification unit; and a setting unit configured to set the content of the new request for the consumer according to the classification of the consumer classified by the classification unit.

(6)上記課題を解決するために、この発明のある局面に係わる電力消費管理プログラムは、コンピュータを、需要家が電力消費に関する要請に従う予定であるか否かに関する応答情報、および前記需要家が前記要請に従った動作を実行したか否かに関する実施情報を取得する取得部と、前記取得部によって取得された前記応答情報および前記実施情報に基づいて、前記需要家を複数の区分のいずれかに分類する分類部と、前記需要家に対する新たな前記要請の内容を、前記分類部によって分類された前記需要家の前記区分に応じて設定する設定部と、として機能させるためのプログラムである。   (6) In order to solve the above-described problem, a power consumption management program according to an aspect of the present invention provides a computer, response information regarding whether or not a consumer intends to follow a request regarding power consumption, and the consumer An acquisition unit that acquires implementation information related to whether or not an operation according to the request has been executed, and the consumer is selected from the plurality of categories based on the response information and the implementation information acquired by the acquisition unit. And a setting unit for setting the content of the new request for the consumer according to the classification of the consumer classified by the classification unit.

本発明は、このような特徴的な処理部を備える電力消費管理装置として実現できるだけでなく、かかる特徴的な処理をステップとする方法として実現することができる。また、本発明は、電力消費管理装置の一部または全部を実現する半導体集積回路として実現したり、電力消費管理装置を含むシステムとして実現したりすることができる。   The present invention can be realized not only as a power consumption management apparatus including such a characteristic processing unit, but also as a method using such characteristic processing as a step. In addition, the present invention can be realized as a semiconductor integrated circuit that realizes part or all of the power consumption management device, or as a system including the power consumption management device.

本発明によれば、需要家に電力消費に関する要請に従った動作をより確実に行わせることができる。   ADVANTAGE OF THE INVENTION According to this invention, the operation | movement according to the request | requirement regarding electric power consumption can be performed more reliably to a consumer.

図1は、電力の安定供給を図る仕組みの一例を説明するための図である。FIG. 1 is a diagram for explaining an example of a mechanism for achieving a stable supply of electric power. 図2は、本発明の実施の形態に係る電力消費管理システムの構成を示す図である。FIG. 2 is a diagram showing the configuration of the power consumption management system according to the embodiment of the present invention. 図3は、本発明の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。FIG. 3 is a diagram showing a configuration of the power consumption management device in the power consumption management system according to the embodiment of the present invention. 図4は、本発明の実施の形態に係る電力消費管理装置における需要家指示テーブルの一例を示す図である。FIG. 4 is a diagram showing an example of a customer instruction table in the power consumption management apparatus according to the embodiment of the present invention. 図5は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。FIG. 5 is a diagram showing an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention. 図6は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。FIG. 6 is a diagram illustrating an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention. 図7は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。FIG. 7 is a diagram showing an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention. 図8は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。FIG. 8 is a diagram illustrating an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention. 図9は、本発明の実施の形態に係る電力消費管理システムにおけるDR実施の通知処理のシーケンスの一例を示す図である。FIG. 9 is a diagram showing an example of a DR implementation notification process sequence in the power consumption management system according to the embodiment of the present invention.

最初に、本発明の実施形態の内容を列記して説明する。   First, the contents of the embodiment of the present invention will be listed and described.

(1)本発明の実施の形態に係る電力消費管理装置は、需要家が電力消費に関する要請に従う予定であるか否かに関する応答情報、および前記需要家が前記要請に従った動作を実行したか否かに関する実施情報を取得する取得部と、前記取得部によって取得された前記応答情報および前記実施情報に基づいて、前記需要家を複数の区分のいずれかに分類する分類部と、前記需要家に対する新たな前記要請の内容を、前記分類部によって分類された前記需要家の前記区分に応じて設定する設定部とを備える。   (1) The power consumption management device according to the embodiment of the present invention is a response information regarding whether or not a consumer intends to comply with a request regarding power consumption, and whether or not the consumer has performed an operation according to the request. An acquisition unit that acquires implementation information regarding whether or not, a classification unit that classifies the consumer into any of a plurality of categories based on the response information and the implementation information acquired by the acquisition unit, and the consumer A setting unit configured to set the content of the new request for the user according to the classification of the consumer classified by the classification unit.

このように、電力消費に関するイベントへの参加可否に関する需要家からの情報に加えて、要請に従った動作の実施または非実施に関する情報を取得する構成により、当該イベントの成功が、たとえば自然に電力需要が減少したことによるものなのか、需要家が実際に要請に従った動作を実施したことによるものなのかを判別することができる。そして、この判別結果を加味して需要家を詳細に分類し、分類した各需要家の区分に応じて、電力消費に関する要請先の需要家を選択し、また、要請内容を設定することができるため、電力消費に関する要請先として適切な対象者を選定し、電力会社等からの要請をより確実に満たすことができる。したがって、本発明の実施の形態に係る電力消費管理装置では、需要家に電力消費に関する要請に従った動作をより確実に行わせることができる。また、電力消費に関するイベントの成功に寄与する可能性が低い需要家を配下に置いても、各需要家を詳細で適切な区分に分類することができるため、電力会社等からの要請をより確実に満たしながら、電力消費に関する要請に対するシステムのキャパシティを増加させることができる。   In this way, in addition to information from customers regarding whether or not to participate in events related to power consumption, information regarding the implementation or non-execution of operations in accordance with requests can be acquired, so that the success of the event can be achieved naturally, for example, It can be determined whether the demand is due to a decrease or whether the consumer is actually performing an operation according to the request. Then, taking into account this discrimination result, the customers can be classified in detail, and according to the classification of each classified consumer, the requesting consumer regarding power consumption can be selected, and the request contents can be set. Therefore, an appropriate target person can be selected as a request destination regarding power consumption, and the request from the electric power company or the like can be satisfied more reliably. Therefore, in the power consumption management device according to the embodiment of the present invention, it is possible to cause the consumer to more reliably perform the operation according to the request regarding the power consumption. In addition, even if there are customers who are unlikely to contribute to the success of an event related to power consumption, each customer can be classified into a detailed and appropriate category, making it more reliable to request power companies. While satisfying the above, the capacity of the system with respect to the demand for power consumption can be increased.

(2)好ましくは、前記電力消費管理装置は、さらに、前記需要家が前記要請を満たしたか否かを判断する判断部を備え、前記分類部は、前記応答情報、前記実施情報および前記判断部の判断結果に基づいて前記需要家を分類する。   (2) Preferably, the power consumption management device further includes a determination unit that determines whether or not the customer satisfies the request, and the classification unit includes the response information, the implementation information, and the determination unit. The customers are classified based on the determination result.

このように、需要家からの電力消費に関するイベントへの参加可否に関する情報、および要請に従った動作の実施または非実施に関する情報に加えて、当該イベントが成功したか否かの情報を用いる構成により、需要家をより詳細で適切な区分に分類することが可能となる。   In this way, in addition to information on whether or not to participate in an event related to power consumption from a consumer and information on whether or not to perform an operation according to a request, information regarding whether or not the event has succeeded is used. It becomes possible to classify consumers into more detailed and appropriate categories.

(3)好ましくは、前記電力消費管理装置は、さらに、前記需要家が前記要請を満たしたことに対する対価を算出する対価演算部を備え、前記対価演算部は、前記分類部によって分類された前記需要家の前記区分に応じた値の前記対価を算出する。   (3) Preferably, the said power consumption management apparatus is further provided with the consideration calculating part which calculates the consideration with respect to the said consumer satisfy | filling the said request | requirement, and the said consideration calculating part is classified by the said classification | category part The value of the value according to the classification of the consumer is calculated.

このような構成により、分類した需要家の区分に応じた適切なインセンティブを当該需要家に与えることができる。たとえば、電力消費の抑制量が同等である複数の需要家が存在する場合において、意図的に電力消費を抑制する処理を行った需要家を優遇することができる。   With such a configuration, it is possible to give an appropriate incentive according to the classified consumer classification to the consumer. For example, in the case where there are a plurality of consumers with the same amount of power consumption suppression, it is possible to give a preferential treatment to a customer who has intentionally suppressed power consumption.

(4)好ましくは、前記複数の区分にそれぞれ優先度が付与されており、前記電力消費管理装置は、さらに、前記優先度に基づいて、前記要請の対象とすべき前記需要家を決定する要請部を備える。   (4) Preferably, a priority is assigned to each of the plurality of sections, and the power consumption management device further requests based on the priority to determine the consumer to be a target of the request. A part.

このような構成により、区分ごとに付与された優先度を用いて、電力消費に関する要請先として適切な需要家を容易に選択することができる。   With such a configuration, it is possible to easily select an appropriate consumer as a request destination for power consumption using the priority given to each category.

(5)好ましくは、前記設定部は、前記要請に従った動作を実行したか否かに応じて、前記需要家に対する新たな前記要請を異なる内容に設定する。   (5) Preferably, the said setting part sets the said new request | requirement with respect to the said consumer to a different content according to whether the operation | movement according to the said request | requirement was performed.

このような構成により、電力消費に関するイベントへの参加を表明し、かつ当該イベントが成功した際の複数の需要家に対して、意図的に電力消費を抑制する処理を行ったか否かに応じて異なる要請内容を設定することができる。   According to such a configuration, depending on whether or not processing for suppressing power consumption is intentionally performed for a plurality of consumers when an event regarding power consumption is expressed and the event is successful. Different requirements can be set.

(6)本発明の実施の形態に係る電力消費管理プログラムは、電力消費管理プログラムであって、コンピュータを、需要家が電力消費に関する要請に従う予定であるか否かに関する応答情報、および前記需要家が前記要請に従った動作を実行したか否かに関する実施情報を取得する取得部と、前記取得部によって取得された前記応答情報および前記実施情報に基づいて、前記需要家を複数の区分のいずれかに分類する分類部と、前記需要家に対する新たな前記要請の内容を、前記分類部によって分類された前記需要家の前記区分に応じて設定する設定部と、として機能させるためのプログラムである。   (6) A power consumption management program according to an embodiment of the present invention is a power consumption management program, wherein the computer responds to whether or not a consumer intends to follow a request regarding power consumption, and the consumer. An acquisition unit that acquires implementation information related to whether or not an operation according to the request has been executed, and the consumer is classified into any of a plurality of categories based on the response information and the implementation information acquired by the acquisition unit This is a program for functioning as a classification unit that classifies and a setting unit that sets the content of the new request for the consumer according to the classification of the consumer classified by the classification unit. .

このように、電力消費に関するイベントへの参加可否に関する需要家からの情報に加えて、要請に従った動作の実施または非実施に関する情報を取得する構成により、当該イベントの成功が、たとえば自然に電力需要が減少したことによるものなのか、需要家が実際に要請に従った動作を実施したことによるものなのかを判別することができる。そして、この判別結果を加味して需要家を詳細に分類し、分類した各需要家の区分に応じて、電力消費に関する要請先の需要家を選択し、また、要請内容を設定することができるため、電力消費に関する要請先として適切な対象者を選定し、電力会社等からの要請をより確実に満たすことができる。したがって、本発明の実施の形態に係る電力消費管理装置では、需要家に電力消費に関する要請に従った動作をより確実に行わせることができる。また、電力消費に関するイベントの成功に寄与する可能性が低い需要家を配下に置いても、各需要家を詳細で適切な区分に分類することができるため、電力会社等からの要請をより確実に満たしながら、電力消費に関する要請に対するシステムのキャパシティを増加させることができる。   In this way, in addition to information from customers regarding whether or not to participate in events related to power consumption, information regarding the implementation or non-execution of operations in accordance with requests can be acquired, so that the success of the event can be achieved naturally, for example, It can be determined whether the demand is due to a decrease or whether the consumer is actually performing an operation according to the request. Then, taking into account this discrimination result, the customers can be classified in detail, and according to the classification of each classified consumer, the requesting consumer regarding power consumption can be selected, and the request contents can be set. Therefore, an appropriate target person can be selected as a request destination regarding power consumption, and the request from the electric power company or the like can be satisfied more reliably. Therefore, in the power consumption management device according to the embodiment of the present invention, it is possible to cause the consumer to more reliably perform the operation according to the request regarding the power consumption. In addition, even if there are customers who are unlikely to contribute to the success of an event related to power consumption, each customer can be classified into a detailed and appropriate category, making it more reliable to request power companies. While satisfying the above, the capacity of the system with respect to the demand for power consumption can be increased.

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施の形態の少なくとも一部を任意に組み合わせてもよい。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated. Moreover, you may combine arbitrarily at least one part of embodiment described below.

図1は、電力の安定供給を図る仕組みの一例を説明するための図である。   FIG. 1 is a diagram for explaining an example of a mechanism for achieving a stable supply of electric power.

図1を参照して、電力の安定供給を図る仕組みの一例であるデマンドレスポンス(DR:Demand Response)において、電力会社91は、電力需給の逼迫が予想される場合に、アグリゲータ92に対して電力消費の抑制要請を行う(ステップS1)。   Referring to FIG. 1, in a demand response (DR: Demand Response) which is an example of a mechanism for achieving a stable supply of electric power, an electric power company 91 supplies electric power to an aggregator 92 when an electric power supply and demand is expected to be tight. A consumption suppression request is made (step S1).

アグリゲータ92は、電力会社91から電力消費の抑制要請を受けると、自己と契約関係にある複数の需要家90に電力消費の抑制要請を行う(ステップS2)。   When the aggregator 92 receives a request for suppressing power consumption from the power company 91, the aggregator 92 makes a request for suppressing power consumption to a plurality of consumers 90 in a contractual relationship with itself (step S2).

アグリゲータ92からDRへの参加要請すなわち電力消費の抑制要請を受けた需要家90が自己の電力需要施設において電力消費の抑制を行うと、アグリゲータ92にネガワットすなわち抑制された消費電力が提供される(ステップS3)。アグリゲータ92は、各需要家90から提供されたネガワットをまとめて電力会社91へ提供する(ステップS4)。   When a consumer 90 that has received a request for participation in DR from the aggregator 92, that is, a request for suppressing power consumption, suppresses power consumption at its own power demand facility, the aggregator 92 is provided with negative wattage, that is, reduced power consumption. Step S3). The aggregator 92 collectively provides the negative wattage provided from each customer 90 to the power company 91 (step S4).

電力会社91は、アグリゲータ92からネガワットが提供されると、ネガワットの大きさに応じた対価をアグリゲータ92に対して支払う(ステップS5)。なお、対価は、たとえば、お金であってもよいし、何らかの物品またはサービスと交換可能なポイントであってもよい。   When the negative power is provided from the aggregator 92, the power company 91 pays a price corresponding to the size of the negative power to the aggregator 92 (step S5). The consideration may be, for example, money, or a point exchangeable for some goods or service.

そして、アグリゲータ92は、電力会社91から受け取った対価を各需要家90へ分配する(ステップS6)。   And the aggregator 92 distributes the consideration received from the electric power company 91 to each customer 90 (step S6).

このように、需要家90に電力消費の抑制の対価を与えることにより、需要家90における電力消費の抑制の実施を促進することができる。   As described above, by giving the consumer 90 a value for suppressing the power consumption, the implementation of the suppression of the power consumption in the consumer 90 can be promoted.

図2は、本発明の実施の形態に係る電力消費管理システムの構成を示す図である。   FIG. 2 is a diagram showing the configuration of the power consumption management system according to the embodiment of the present invention.

図2を参照して、電力消費管理システム401は、系統側管理装置151と、電力消費管理装置101と、複数の施設装置31と、複数の機器32と、複数の端末装置33と、複数の電力量計35とを備える。   Referring to FIG. 2, a power consumption management system 401 includes a system side management device 151, a power consumption management device 101, a plurality of facility devices 31, a plurality of devices 32, a plurality of terminal devices 33, and a plurality of terminal devices 33. A watt hour meter 35.

系統側管理装置151は、たとえば電力会社91によって運用されるサーバであり、インターネット等のネットワーク302経由で電力消費管理装置101に接続される。   The grid-side management device 151 is a server operated by, for example, the power company 91 and is connected to the power consumption management device 101 via the network 302 such as the Internet.

電力消費管理装置101は、たとえばアグリゲータ92によって運営されるサーバであり、インターネット等のネットワーク303経由で各施設装置31に接続される。電力消費管理装置101は、たとえば住宅である複数の電力需要施設301における電力消費に関する情報を管理する。   The power consumption management apparatus 101 is a server operated by, for example, an aggregator 92 and is connected to each facility apparatus 31 via a network 303 such as the Internet. The power consumption management device 101 manages information related to power consumption in a plurality of power demanding facilities 301 that are, for example, houses.

電力需要施設301の各々において、施設装置31、1または複数の機器32、および電力量計35が設置される。電力需要施設301は、たとえば需要家90が管理する。   In each of the power demanding facilities 301, a facility device 31, one or a plurality of devices 32, and a power meter 35 are installed. The power demand facility 301 is managed by the customer 90, for example.

施設装置31は、たとえばEMS(Energy Management System)において用いられるゲートウェイ装置である。施設装置31は、電力需要施設301における各機器32のうち、自己と有線接続または無線接続された機器32を制御可能である。   The facility apparatus 31 is a gateway apparatus used in, for example, EMS (Energy Management System). The facility apparatus 31 can control a device 32 that is wired or wirelessly connected to itself among the devices 32 in the power demand facility 301.

機器32は、たとえば、空調機器、照明機器または冷蔵庫である。なお、電力需要施設301における各機器32のうちの一部または全部が、消費電力および動作設定等の自己の状態を施設装置31に通知可能であってもよい。   The device 32 is, for example, an air conditioner, a lighting device, or a refrigerator. Note that some or all of the devices 32 in the power demand facility 301 may be able to notify the facility device 31 of their own state such as power consumption and operation settings.

電力量計35は、たとえば施設装置31に有線接続され、電力需要施設301における消費電力量等を計測し、計測結果を施設装置31へ送信する。   The watt-hour meter 35 is connected to, for example, the facility apparatus 31, measures the amount of power consumed in the power demand facility 301, and transmits the measurement result to the facility apparatus 31.

端末装置33は、たとえば、需要家90の使用するスマートフォン、タブレットまたはパソコン等であり、施設装置31に無線接続される。   The terminal device 33 is, for example, a smartphone, a tablet, a personal computer, or the like used by the customer 90, and is wirelessly connected to the facility device 31.

たとえば、電力会社91は、アグリゲータ92への電力消費に関する要請として、系統側管理装置151から電力消費管理装置101へ要請情報を送信する。要請情報は、たとえば、複数の電力需要施設301における電力消費の総抑制量の目標値(以下、抑制目標とも称する。)、および電力消費を抑制すべき期間を含む。なお、要請情報の示す抑制目標は、抑制すべき電力量に限らず、削減率または削減割合であってもよいし、上記期間中の消費電力量の上限値等であってもよい。   For example, the power company 91 transmits request information from the grid management device 151 to the power consumption management device 101 as a request for power consumption to the aggregator 92. The request information includes, for example, a target value (hereinafter also referred to as a suppression target) of the total power consumption suppression amount in the plurality of power demand facilities 301 and a period during which power consumption should be suppressed. Note that the suppression target indicated by the request information is not limited to the amount of power to be suppressed, but may be a reduction rate or a reduction ratio, or an upper limit value of the power consumption during the period.

電力消費管理装置101は、系統側管理装置151から要請情報を受信すると、受信した電力管理情報に基づいて、各需要家90への電力消費に関する要請として、電力消費を抑制すべき節電期間および電力消費の抑制量を節電目標として示す指示情報を1または複数の施設装置31へ送信する。なお、節電目標は、抑制すべき電力量に限らず、削減率または削減割合であってもよい。   When the power consumption management apparatus 101 receives the request information from the grid-side management apparatus 151, the power consumption management period and power to suppress power consumption as a request regarding power consumption to each customer 90 based on the received power management information Instruction information indicating a consumption suppression amount as a power saving target is transmitted to one or a plurality of facility apparatuses 31. The power saving target is not limited to the amount of power to be suppressed, and may be a reduction rate or a reduction rate.

施設装置31は、電力消費管理装置101から受信した指示情報の内容を画面に表示するための画面情報を作成し、端末装置33へ送信する。   The facility device 31 creates screen information for displaying the content of the instruction information received from the power consumption management device 101 on the screen, and transmits the screen information to the terminal device 33.

端末装置33は、施設装置31から受信した画面情報の内容を、たとえば自己の画面に表示する。そして、需要家90は、端末装置33の画面表示を確認し、アグリゲータ92からの電力消費に関する要請に従って電力需要施設301において電力消費の抑制を実施するか否か、すなわちデマンドレスポンスに参加するか否かを判断する。   The terminal device 33 displays the contents of the screen information received from the facility device 31 on its own screen, for example. Then, the consumer 90 confirms the screen display of the terminal device 33 and determines whether or not to suppress power consumption in the power demand facility 301 in accordance with a request regarding power consumption from the aggregator 92, that is, whether or not to participate in a demand response. Determine whether.

図3は、本発明の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。   FIG. 3 is a diagram showing a configuration of the power consumption management device in the power consumption management system according to the embodiment of the present invention.

図3を参照して、電力消費管理装置101は、系統側取得部11と、指示部(設定部および要請部)12と、記憶部13と、需要家側取得部14と、分類部15と、判断部17と、対価演算部19とを備える。   Referring to FIG. 3, power consumption management apparatus 101 includes system side acquisition unit 11, instruction unit (setting unit and request unit) 12, storage unit 13, customer side acquisition unit 14, and classification unit 15. The determination unit 17 and the consideration calculation unit 19 are provided.

系統側取得部11は、系統側管理装置151から要請情報を取得して指示部12へ出力する。   The system side acquisition unit 11 acquires request information from the system side management device 151 and outputs the request information to the instruction unit 12.

需要家側取得部14は、需要家90が電力消費に関する要請に従う予定であるか否かに関する応答情報、および需要家90が当該要請に従った動作を実行したか否かに関する実施情報を、施設装置31から取得して分類部15へ出力する。   The customer-side acquisition unit 14 obtains response information regarding whether or not the customer 90 intends to comply with a request regarding power consumption, and implementation information regarding whether or not the customer 90 has performed an operation according to the request. Obtained from the device 31 and output to the classification unit 15.

分類部15は、需要家側取得部14によって取得された応答情報および実施情報に基づいて、需要家90を複数の区分のいずれかに分類する。たとえば、分類部15は、需要家90を、上記要請に従った動作を実行したか否かに応じて異なる区分に設定する。   The classification unit 15 classifies the customer 90 into any of a plurality of categories based on the response information and the execution information acquired by the customer side acquisition unit 14. For example, the classification unit 15 sets the customer 90 to a different category depending on whether or not the operation according to the request has been executed.

また、需要家側取得部14は、施設装置31から電力量計35の計測結果に基づく計測情報を取得して判断部17へ出力する。   Further, the customer side acquisition unit 14 acquires measurement information based on the measurement result of the watt hour meter 35 from the facility device 31 and outputs the measurement information to the determination unit 17.

判断部17は、需要家側取得部14から受けた計測情報に基づいて、需要家90が上記要請を満たしたか否かを判断する。   The determination unit 17 determines whether or not the customer 90 satisfies the request based on the measurement information received from the customer side acquisition unit 14.

たとえば、分類部15は、応答情報、実施情報および判断部17の判断結果に基づいて需要家90を分類する。   For example, the classification unit 15 classifies the customer 90 based on the response information, the implementation information, and the determination result of the determination unit 17.

指示部12は、需要家90に対する新たな要請の内容を、分類部15によって分類された当該需要家90の区分に応じて設定する。   The instruction unit 12 sets the content of a new request for the customer 90 according to the classification of the customer 90 classified by the classification unit 15.

具体的には、記憶部13は、需要家の識別情報と区分との対応関係を示す需要家管理テーブルを記憶する。分類部15は、需要家90の分類結果に基づいて、需要家管理テーブルに需要家90を新たに登録するか、または需要家管理テーブルに登録されている需要家90の区分を変更する。   Specifically, the storage unit 13 stores a customer management table indicating the correspondence between customer identification information and classification. The classification unit 15 newly registers the customer 90 in the customer management table based on the classification result of the customer 90 or changes the classification of the customer 90 registered in the customer management table.

また、記憶部13は、需要家の区分と指示情報の作成および送信の基準となる情報との対応関係を示す需要家指示テーブルを記憶する。   In addition, the storage unit 13 stores a customer instruction table indicating a correspondence relationship between a customer category and information used as a reference for creating and transmitting instruction information.

指示部12は、系統側取得部11から受けた要請情報、ならびに記憶部13に保存されている需要家管理テーブルおよび需要家指示テーブルに基づいて、複数の需要家90のうち、電力消費に関する要請先とすべき1または複数の需要家90を選択し、また、選択した需要家90への指示情報を作成する。そして、指示部12は、作成した指示情報を、選択した需要家90へ送信する。なお、指示部12は、需要家単位で異なる内容の指示情報を作成する構成であってもよいし、各需要家90の一部または全部において共通の内容の指示情報を作成する構成であってもよい。   Based on the request information received from the grid-side acquisition unit 11 and the customer management table and customer instruction table stored in the storage unit 13, the instruction unit 12 requests power consumption among a plurality of consumers 90. One or a plurality of consumers 90 to be selected are selected, and instruction information for the selected consumers 90 is created. Then, the instruction unit 12 transmits the generated instruction information to the selected customer 90. The instruction unit 12 may be configured to create instruction information having different contents for each consumer, or may be configured to create instruction information having common contents for some or all of the consumers 90. Also good.

たとえば、需要家指示テーブルにおいて、複数の区分にそれぞれ優先度が付与されている。指示部12は、当該優先度に基づいて、要請の対象とすべき需要家90を決定する。   For example, in the customer instruction table, a priority is assigned to each of a plurality of sections. The instruction unit 12 determines a customer 90 to be requested based on the priority.

図4は、本発明の実施の形態に係る電力消費管理装置における需要家指示テーブルの一例を示す図である。   FIG. 4 is a diagram showing an example of a customer instruction table in the power consumption management apparatus according to the embodiment of the present invention.

図4を参照して、需要家指示テーブルにおいて、区分A1の需要家は、DRへの参加を表明し、DRに成功すなわち電力消費管理装置101から通知された節電目標の達成に成功し、かつDRを実施すなわち電力消費管理装置101からの要請に従った動作を実行した需要家である。区分A1の需要家は、DR成功の確度が高く、このため、次回以降の要請において、優先度が1であり、抑制依頼量が増加され、インセンティブすなわち対価が増額される。   Referring to FIG. 4, in the customer instruction table, the customer of section A1 expresses participation in DR, succeeds in DR, that is, succeeds in achieving the power saving target notified from power consumption management device 101, and It is a customer who has performed DR, that is, has performed an operation in accordance with a request from the power consumption management apparatus 101. The customer of the category A1 has a high probability of DR success. Therefore, in the subsequent requests, the priority is 1, the amount of suppression requests is increased, and the incentive, that is, the consideration is increased.

区分A2の需要家は、DRへの参加を表明し、DRに成功し、かつDRを実施しなかった需要家である。区分A2の需要家は、DR成功の確度が低く、このため、次回以降の要請において、優先度が2であり、抑制依頼量は変わらず、インセンティブは据え置きである。   The customer of Category A2 is a customer who expressed participation in DR, succeeded in DR, and did not implement DR. The customer of the category A2 has a low probability of DR success. Therefore, in the next and subsequent requests, the priority is 2, the amount of suppression requests does not change, and the incentive is deferred.

すなわち、指示部12は、電力消費に関する要請に従った動作を実行したか否かに応じて、需要家90に対する新たな要請を異なる内容に設定する。   That is, the instruction unit 12 sets a new request for the customer 90 with different contents depending on whether or not an operation according to the request regarding power consumption has been executed.

区分B1の需要家は、DRへの参加を表明し、DRに失敗し、かつDRを実施した需要家である。区分B1の需要家は、DR成功の確度が低く、DR成功への阻害要因を除去したり、抑制依頼量を調整したりする必要がある。このため、次回以降の要請において、優先度が3であり、抑制依頼量が減らされ、インセンティブは据え置きである。   The customer of category B1 is a customer who expressed participation in DR, failed DR, and implemented DR. The customer of category B1 has a low probability of DR success, and needs to remove an obstacle to DR success or adjust the amount of request for suppression. For this reason, in the next and subsequent requests, the priority is 3, the amount of suppression requests is reduced, and the incentive is deferred.

区分B2の需要家は、DRへの参加を表明し、DRに失敗し、かつDRを実施しなかった需要家である。区分B2の需要家は、DR成功の確度が低く、このため、次回以降の要請において、優先度が6であり、抑制依頼量が減らされ、インセンティブが減額される。   The customer of category B2 is a customer who expressed participation in DR, failed in DR, and did not implement DR. The customer of the category B2 has a low probability of DR success. Therefore, in the subsequent requests, the priority is 6, the amount of suppression requests is reduced, and the incentive is reduced.

区分C1の需要家は、DRへの不参加を表明し、DRに成功し、かつDRを実施した需要家である。区分C1の需要家は、DRの確度評価の対象外であり、DRへの参加を促す必要がある。このため、次回以降の要請において、優先度が4であり、抑制依頼量は変わらず、インセンティブは据え置きである。   The customer of category C1 is a customer who expressed non-participation in DR, succeeded in DR, and implemented DR. The customer of the category C1 is not subject to DR accuracy evaluation and needs to encourage participation in DR. For this reason, in the next and subsequent requests, the priority is 4, the amount of suppression requests remains the same, and the incentive is deferred.

区分C2の需要家は、DRへの不参加を表明し、DRに成功し、かつDRを実施しなかった需要家である。区分C2の需要家は、DRの確度評価の対象外であり、需要家によるDR実施以外の要因でDRに成功している。このため、次回以降の要請において、優先度が5であり、抑制依頼量は減らされ、インセンティブは据え置きである。   The customer of Category C2 is a customer who expressed non-participation in DR, succeeded in DR, and did not perform DR. The customer in category C2 is not subject to DR accuracy evaluation, and has succeeded in DR due to factors other than the DR implementation by the customer. For this reason, in the next and subsequent requests, the priority is 5, the amount of suppression requests is reduced, and the incentive is deferred.

区分D1の需要家は、DRへの不参加を表明し、DRに失敗し、かつDRを実施した需要家である。区分D1の需要家は、DRの確度評価の対象外であり、DRへの参加を促したり、DR成功への阻害要因を除去したり、抑制依頼量を調整したりする必要がある。このため、次回以降の要請において、優先度が7であり、抑制依頼量は減らされ、インセンティブが減額される。   The customer of category D1 is a customer who expressed non-participation in DR, failed in DR, and implemented DR. The customer of the category D1 is not subject to DR accuracy evaluation, and needs to promote participation in the DR, remove an obstacle to the success of the DR, or adjust the amount of request for suppression. For this reason, in the subsequent requests, the priority is 7, the amount of suppression requests is reduced, and the incentive is reduced.

区分D2の需要家は、DRへの不参加を表明し、DRに失敗し、かつDRを実施しなかった需要家である。区分D2の需要家は、DRの確度評価の対象外であり、このため、次回以降の要請において、優先度が8であり、抑制依頼量は減らされ、インセンティブが減額される。   The customer of category D2 is a customer who expressed non-participation in DR, failed in DR, and did not perform DR. The customer of the category D2 is not subject to DR accuracy evaluation. Therefore, in the subsequent requests, the priority is 8, the amount of suppression requests is reduced, and the incentive is reduced.

再び図3を参照して、対価演算部19は、需要家90が電力消費に関する要請を満たしたことに対する対価を算出する。より詳細には、対価演算部19は、記憶部13に保存されている需要家管理テーブルを参照することにより、分類部15によって分類された需要家90の区分に応じた値の対価を算出する。   Referring again to FIG. 3, the consideration calculating unit 19 calculates a consideration for satisfying a demand related to power consumption by the customer 90. More specifically, the consideration calculation unit 19 refers to a customer management table stored in the storage unit 13 to calculate a consideration of a value according to the classification of the customer 90 classified by the classification unit 15. .

ここで、需要家管理テーブルは、たとえば、需要家の識別情報と区分とインセンティブとの対応関係を示す。   Here, the customer management table indicates, for example, the correspondence between customer identification information, classification, and incentives.

対価演算部19は、算出した需要家の対価を、たとえば需要家管理テーブルに登録する。需要家管理テーブルに登録された対価が、DRに成功した需要家90に与えられる。   The consideration calculating unit 19 registers the calculated consideration of the consumer in, for example, the consumer management table. The consideration registered in the customer management table is given to the customer 90 who has succeeded in the DR.

なお、分類部15は、施設装置31への複数回分の指示情報に対する需要家90の実績を平均化したり、重み付けしたりすることにより、需要家90の区分を決定する構成であってもよい。   The classification unit 15 may be configured to determine the classification of the customer 90 by averaging or weighting the results of the customer 90 with respect to the instruction information for a plurality of times to the facility device 31.

次に、本発明の実施の形態に係る電力消費管理システムが電力消費に関する要請を行う際の動作について説明する。   Next, the operation when the power consumption management system according to the embodiment of the present invention makes a request for power consumption will be described.

電力消費管理システム401における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のシーケンス図またはフローチャートの各ステップの一部または全部を含むプログラムを図示しないメモリからそれぞれ読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。   Each device in the power consumption management system 401 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads a program including a part or all of each step of the following sequence diagram or flowchart from a memory (not shown). Run. Each of the programs of the plurality of apparatuses can be installed from the outside. The programs of the plurality of apparatuses are distributed while being stored in a recording medium.

図5は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。図5では、理解を容易にするために、1つの電力需要施設301における需要家および設備を代表的に示している。   FIG. 5 is a diagram showing an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention. In FIG. 5, for ease of understanding, consumers and facilities in one power demand facility 301 are representatively shown.

図5を参照して、まず、系統側管理装置151は、電力需要を予測し、電力需給が逼迫する可能性が高い場合、電力消費の抑制を行うべきであると判断する。そして、系統側管理装置151は、たとえば、節電期間および当該節電期間における消費電力量の上限値を目標値として示す要請情報を電力消費管理装置101へ送信する(ステップS11)。   With reference to FIG. 5, first, the grid-side management device 151 predicts power demand, and determines that power consumption should be suppressed when there is a high possibility that power supply and demand will be tight. And the system side management apparatus 151 transmits the request information which shows the power saving period and the upper limit of the power consumption in the said power saving period as a target value to the power consumption management apparatus 101, for example (step S11).

次に、電力消費管理装置101は、系統側管理装置151から要請情報を受信して、受信した要請情報の示す抑制目標に基づいて指示情報を作成し、電力消費に関する要請先として選択した1または複数の施設装置31へ送信する(ステップS12)。   Next, the power consumption management apparatus 101 receives the request information from the grid-side management apparatus 151, creates instruction information based on the suppression target indicated by the received request information, and is selected as a request destination for power consumption 1 or It transmits to the plurality of facility apparatuses 31 (step S12).

次に、施設装置31は、電力消費管理装置101から指示情報を受信して、受信した指示情報に基づいて画面情報を作成し、たとえば需要家90の端末装置33へ送信する(ステップS13)。   Next, the facility apparatus 31 receives the instruction information from the power consumption management apparatus 101, creates screen information based on the received instruction information, and transmits it to the terminal device 33 of the customer 90, for example (step S13).

次に、需要家90は、端末装置33の画面表示を確認し、DRへ参加するか否かを判断する。そして、需要家90は、たとえば、端末装置33を操作することにより、判断結果を示す応答情報を施設装置31へ送信する(ステップS14)。   Next, the customer 90 confirms the screen display of the terminal device 33 and determines whether or not to participate in DR. And the consumer 90 transmits the response information which shows a judgment result to the facility apparatus 31, for example by operating the terminal device 33 (step S14).

次に、施設装置31は、需要家90から受信した応答情報を電力消費管理装置101へ送信する(ステップS15)。   Next, the facility apparatus 31 transmits the response information received from the customer 90 to the power consumption management apparatus 101 (step S15).

次に、需要家90は、DRへ参加すると判断した場合、たとえば節電期間の開始タイミングにおいて、リモコン等を操作して制御情報を機器32へ送信することにより、機器32の動作内容を変更する(ステップS16)。   Next, when the customer 90 determines to participate in DR, for example, at the start timing of the power saving period, the operation information of the device 32 is changed by operating the remote controller or the like to transmit control information to the device 32 ( Step S16).

次に、需要家90は、たとえば端末装置33を操作することにより、DRを実施したか否かを示す実施情報を施設装置31へ送信する(ステップS17)。   Next, the consumer 90 transmits the implementation information which shows whether DR was implemented by operating the terminal device 33, for example to the facility apparatus 31 (step S17).

次に、施設装置31は、需要家90から受信した実施情報を電力消費管理装置101へ送信する(ステップS18)。   Next, the facility apparatus 31 transmits the implementation information received from the customer 90 to the power consumption management apparatus 101 (step S18).

次に、施設装置31は、たとえば節電期間の終了タイミングにおいて、計測結果要求を電力量計35へ送信する(ステップS19)。   Next, the facility apparatus 31 transmits a measurement result request to the watt hour meter 35, for example, at the end timing of the power saving period (step S19).

次に、電力量計35は、施設装置31から計測結果要求を受信して、電力需要施設301における総消費電力量等の計測結果を施設装置31へ送信する(ステップS20)。   Next, the watt-hour meter 35 receives the measurement result request from the facility apparatus 31 and transmits the measurement result such as the total power consumption in the power demand facility 301 to the facility apparatus 31 (step S20).

なお、電力量計35は、施設装置31から計測結果要求を受信して応答する構成に限らず、定期的または不定期に計測結果を施設装置31へ送信する構成であってもよい。   Note that the watt-hour meter 35 is not limited to a configuration that receives and responds to a measurement result request from the facility device 31, but may be configured to transmit the measurement result to the facility device 31 regularly or irregularly.

次に、施設装置31は、電力量計35から受信した計測結果に基づいて、節電期間における施設装置31における電力消費の量を示す計測情報を作成し、電力消費管理装置101へ送信する(ステップS21)。   Next, the facility apparatus 31 creates measurement information indicating the amount of power consumption in the facility apparatus 31 during the power saving period based on the measurement result received from the watt-hour meter 35, and transmits the measurement information to the power consumption management apparatus 101 (step). S21).

次に、電力消費管理装置101は、施設装置31から受信した応答情報、実施情報および計測情報に基づいて、当該施設装置31に対応する需要家90の区分を決定する(ステップS22)。   Next, the power consumption management apparatus 101 determines the category of the customer 90 corresponding to the facility apparatus 31 based on the response information, the execution information, and the measurement information received from the facility apparatus 31 (step S22).

次に、電力消費管理装置101は、当該需要家90に対する次回以降のインセンティブの値を、決定した区分に応じて算出する(ステップS23)。   Next, the power consumption management apparatus 101 calculates the value of the next incentive for the customer 90 according to the determined category (step S23).

次に、電力消費管理装置101は、需要家90の分類結果、およびインセンティブの算出結果を需要家管理テーブルに登録する(ステップS24)。   Next, the power consumption management apparatus 101 registers the classification result of the consumer 90 and the incentive calculation result in the consumer management table (step S24).

次に、系統側管理装置151は、電力需給が逼迫する可能性が高い場合、電力消費の抑制を行うべきであると判断し、新たな要請情報を電力消費管理装置101へ送信する(ステップS25)。   Next, when there is a high possibility that power supply and demand will be tight, the grid-side management device 151 determines that power consumption should be suppressed, and transmits new request information to the power consumption management device 101 (step S25). ).

次に、電力消費管理装置101は、系統側管理装置151から要請情報を受信して、受信した要請情報の示す抑制目標に基づいて指示情報を作成する。より詳細には、電力消費管理装置101は、更新後の需要家指示テーブルおよび需要家管理テーブルを用いて、受信した要請情報の示す抑制目標を満たすように、電力消費に関する要請先として1または複数の需要家90を選択するとともに、電力消費に関する要請の内容すなわち指示情報の内容を設定する。電力消費管理装置101は、たとえば、抑制目標を満たす総抑制量が得られるまで、優先度が1の需要家90から順番に要請先として選択していく(ステップS26)。   Next, the power consumption management apparatus 101 receives the request information from the system side management apparatus 151, and creates instruction information based on the suppression target indicated by the received request information. More specifically, the power consumption management apparatus 101 uses one or more request destinations related to power consumption so as to satisfy the suppression target indicated by the received request information using the updated customer instruction table and customer management table. The customer 90 is selected, and the content of the request regarding power consumption, that is, the content of the instruction information is set. The power consumption management apparatus 101 selects, for example, as a request destination in order from the customer 90 with a priority of 1 until a total suppression amount that satisfies the suppression target is obtained (step S26).

次に、電力消費管理装置101は、作成した指示情報を、電力消費に関する要請先として選択した1または複数の施設装置31へ送信する(ステップS27)。   Next, the power consumption management apparatus 101 transmits the created instruction information to one or a plurality of facility apparatuses 31 selected as request destinations regarding power consumption (step S27).

図5に示すシーケンスでは、需要家90がDRの実施または非実施のための機器操作を行い、また、施設装置31に実施結果を通知する。このような方法の長所としては、施設装置31と通信可能な機器32を導入する等の新しい設備が不要である点があげられる。一方、短所としては、需要家90が、DRを実施するための操作を行うとは限らない点、および機器32に対するDRの実施または非実施を誤ったり、施設装置31への通知内容を誤ったりする点があげられる。   In the sequence shown in FIG. 5, the customer 90 performs a device operation for performing or not performing the DR, and notifies the facility apparatus 31 of the execution result. As an advantage of such a method, a new facility such as the introduction of a device 32 that can communicate with the facility apparatus 31 is unnecessary. On the other hand, as disadvantages, the customer 90 does not always perform an operation for performing DR, and wrong or wrong implementation of DR for the device 32, or wrong notification content to the facility apparatus 31. There are points to do.

図6は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。   FIG. 6 is a diagram illustrating an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention.

図6を参照して、ステップS31〜S36の動作は、図5に示すステップS11〜S16の動作と同様である。   Referring to FIG. 6, the operations in steps S31 to S36 are the same as the operations in steps S11 to S16 shown in FIG.

次に、施設装置31は、状態要求を機器32へ送信する(ステップS37)。   Next, the facility apparatus 31 transmits a status request to the device 32 (step S37).

次に、機器32は、自己の状態を示す状態応答を施設装置31へ送信する(ステップS38)。   Next, the device 32 transmits a state response indicating its own state to the facility apparatus 31 (step S38).

次に、施設装置31は、機器32から受信した状態応答に基づいて、DRが実施されたか否かを判定し(ステップS39)、判定結果を示す実施情報を電力消費管理装置101へ送信する(ステップS40)。   Next, the facility apparatus 31 determines whether or not DR has been performed based on the state response received from the device 32 (step S39), and transmits implementation information indicating the determination result to the power consumption management apparatus 101 ( Step S40).

ステップS41〜S49の動作は、図5に示すステップS19〜S27の動作と同様である。   The operations in steps S41 to S49 are the same as the operations in steps S19 to S27 shown in FIG.

図6に示すシーケンスでは、施設装置31が、機器32の状態からDRの実施または非実施を判定する。このような方法の長所としては、機器32の状態が自動通知される一方で機器32の動作が自動的には変更されないので安全性が比較的高い点があげられる。一方、短所としては、施設装置31が状態を取得可能な機器32が少ない点、およびDRの実施判定が困難である点があげられる。たとえば、冷房設定が25度である場合、通常の設定温度が20度であればDRを実施しているが、通常の設定温度が28度であればDRを実施しておらず、判定が困難である。   In the sequence illustrated in FIG. 6, the facility apparatus 31 determines whether or not DR is performed based on the state of the device 32. The advantage of such a method is that the state of the device 32 is automatically notified, while the operation of the device 32 is not automatically changed, so that the safety is relatively high. On the other hand, the disadvantages include that there are few devices 32 from which the facility apparatus 31 can acquire the state, and that it is difficult to determine whether to perform DR. For example, when the cooling setting is 25 degrees, DR is performed if the normal set temperature is 20 degrees. However, if the normal set temperature is 28 degrees, the DR is not performed and determination is difficult. It is.

図7は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。   FIG. 7 is a diagram showing an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention.

図7を参照して、ステップS51〜S56の動作は、図5に示すステップS11〜S16の動作と同様である。   Referring to FIG. 7, the operations in steps S51 to S56 are the same as the operations in steps S11 to S16 shown in FIG.

次に、機器32は、DRを実施したか否かを示す実施情報を施設装置31へ送信する(ステップS57)。   Next, the device 32 transmits execution information indicating whether or not DR has been executed to the facility apparatus 31 (step S57).

次に、施設装置31は、機器32から受信した実施情報を電力消費管理装置101へ送信する(ステップS58)。   Next, the facility apparatus 31 transmits the implementation information received from the device 32 to the power consumption management apparatus 101 (step S58).

ステップS59〜S67の動作は、図5に示すステップS19〜S27の動作と同様である。   The operations in steps S59 to S67 are the same as the operations in steps S19 to S27 shown in FIG.

図7に示すシーケンスでは、需要家90によるDRの実施と連動して機器32から実施結果が施設装置31に通知される。このような方法の長所としては、DRの実施を確実に通知できる点があげられる。一方、短所としては、実施結果を通知可能な機器32が少ない点があげられる。   In the sequence shown in FIG. 7, the implementation result is notified from the device 32 to the facility apparatus 31 in conjunction with the DR implementation by the customer 90. As an advantage of such a method, it is possible to reliably notify the implementation of DR. On the other hand, a disadvantage is that there are few devices 32 that can notify the implementation result.

図8は、本発明の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。   FIG. 8 is a diagram illustrating an example of a sequence of power consumption suppression processing in the power consumption management system according to the embodiment of the present invention.

図8を参照して、ステップS71〜S75の動作は、図5に示すステップS11〜S15の動作と同様である。   Referring to FIG. 8, the operations in steps S71 to S75 are the same as the operations in steps S11 to S15 shown in FIG.

次に、施設装置31は、DRへ参加する旨の応答情報を需要家90から受信した場合、制御情報を作成して機器32へ送信することにより、機器32の動作内容を変更する(ステップS76)。   Next, when the facility apparatus 31 receives response information to participate in DR from the customer 90, the facility apparatus 31 creates control information and transmits the control information to the apparatus 32, thereby changing the operation content of the apparatus 32 (step S76). ).

次に、施設装置31は、DRを実施したか否かを示す実施情報を電力消費管理装置101へ送信する(ステップS77)。   Next, the facility apparatus 31 transmits execution information indicating whether or not DR has been performed to the power consumption management apparatus 101 (step S77).

ステップS78〜S86の動作は、図5に示すステップS19〜S27の動作と同様である。   The operations in steps S78 to S86 are the same as the operations in steps S19 to S27 shown in FIG.

図8に示すシーケンスでは、需要家90からのDRへの参加表明と連動して機器32が制御され、実施結果が電力消費管理装置101に通知される。このような方法の長所としては、需要家90が参加表明しただけでDRの実施は忘れてしまうことを防げる点があげられる。一方、短所としては、施設装置31が制御可能な機器32が少ない点、施設装置31による機器32の操作を可能とするために、機器および設備等、具体的には、EchonetLite(登録商標)規格に対応した機器、学習リモコンによる操作システム、または接点によるオン/オフ機構等が必要である点があげられる。また、需要家90による電力消費管理装置101への参加可否の回答後に状況が変化した場合に、DRの実施および非実施の変更を忘れる可能性がある点、および機器を自動操作することにより安全性が低下する場合がある点があげられる。   In the sequence shown in FIG. 8, the device 32 is controlled in conjunction with a DR participation expression from the customer 90, and the implementation result is notified to the power consumption management apparatus 101. As an advantage of such a method, it is possible to prevent the customer 90 from forgetting to perform the DR just by expressing the participation. On the other hand, the disadvantages are that there are few devices 32 that can be controlled by the facility apparatus 31, and in order to allow the facility apparatus 31 to operate the devices 32, such as devices and facilities, specifically, the EchonetLite (registered trademark) standard. It is necessary to have a device compatible with the above, an operation system using a learning remote controller, or an on / off mechanism using a contact. In addition, if the situation changes after the customer 90 has answered whether or not to participate in the power consumption management apparatus 101, it is possible to forget to change the implementation and non-implementation of DR, and it is safe by automatically operating the device. The point that a property may fall is mentioned.

ここで、需要家側の電力消費量の増減により需給をコントロールするDRの標準プロトコルであるOpenADRでは、DRAS(Demand Response Automation Server)からDR信号を需要家に送信することにより、電力需要をコントロールすることができる。また、DRASは、DRへの参加可否の応答を受信することができる。   Here, in OpenADR, which is a standard protocol for DR that controls supply and demand by increasing or decreasing power consumption on the consumer side, power demand is controlled by transmitting a DR signal from the DRAS (Demand Response Automation Server) to the consumer. be able to. Also, the DRAS can receive a response indicating whether or not to participate in DR.

DRASは、OpenADRのサーバ(VTN:Virtual Top Node)として動作する。また、需要家側の装置は、OpenADRのクライアント(VEN: Virtual End Node)として動作する。   The DRAS operates as an OpenADR server (VTN: Virtual Top Node). The customer side device operates as a client (VEN: Virtual End Node) of OpenADR.

アグリゲータは、複数の需要家をまとめて、電力需要をコントロールする。アグリゲータ用のDRASは、電力会社用のDRASに対してはOpenADRのクライアント(VEN)として動作し、需要家側の装置に対してはサーバ(VTN)として動作する。   The aggregator controls a power demand by collecting a plurality of consumers. The DRAS for the aggregator operates as an OpenADR client (VEN) for the DRAS for the electric power company, and operates as a server (VTN) for the device on the customer side.

電力会社用のDRASは、系統側管理装置151の一例であり、アグリゲータ用のDRASは、電力消費管理装置101の一例である。
OpenADRでは、需要家の電力使用量をDRASに送信することができる。DRASは、DR信号に対する、需要家の参加可否の応答、およびDR期間における電力使用量は取得できるが、実際に需要家がDRを実施したかどうかの情報は取得できない。このため、需要家がDRを実施した場合と、気温等の影響で自然に需要が増減した場合とを区別することができない。
The DRAS for the electric power company is an example of the system-side management device 151, and the DRAS for the aggregator is an example of the power consumption management device 101.
In OpenADR, the power usage amount of a consumer can be transmitted to DRAS. The DRAS can acquire the response of whether or not the customer can participate in the DR signal and the power usage amount during the DR period, but cannot acquire information on whether or not the customer actually performed the DR. For this reason, it is not possible to distinguish between the case where the customer performs DR and the case where the demand naturally increases or decreases due to the influence of temperature or the like.

これに対して、本発明の実施の形態に係る電力消費管理システムでは、需要家側のシステムからDRASに、具体的には施設装置31から電力消費管理装置101に、DRを実施したかどうかを通知する機能が追加されている。   In contrast, in the power consumption management system according to the embodiment of the present invention, it is determined whether DR has been performed from the customer side system to DRAS, specifically from the facility apparatus 31 to the power consumption management apparatus 101. A notification feature has been added.

図9は、本発明の実施の形態に係る電力消費管理システムにおけるDR実施の通知処理のシーケンスの一例を示す図である。   FIG. 9 is a diagram showing an example of a DR implementation notification process sequence in the power consumption management system according to the embodiment of the present invention.

図9を参照して、DRを実施したかどうかを通知する方法として、OpenADRの通知機能を実現する「レポート(Report)」にマッピングを行う方法1がある。   Referring to FIG. 9, as a method for notifying whether or not DR has been implemented, there is a method 1 in which mapping is performed on a “report” that realizes an OpenADR notification function.

OpenADRでは、たとえば、スマートメータ等の測定値、およびエアコンの設定温度等の状態を、測定対象(rID)として定義し、レポートで送信することができる。   In OpenADR, for example, a measurement value such as a smart meter and a state such as a set temperature of an air conditioner can be defined as a measurement target (rID) and transmitted in a report.

すなわち、DRを実施したかどうかをrIDとして定義し、DRASおよび需要家側のシステム(以下、需要家システムとも称する。)において測定対象として扱うことにより、レポートとして送信することができる。   That is, whether or not DR has been implemented is defined as rID, and can be transmitted as a report by treating it as a measurement target in the DRAS and the customer side system (hereinafter also referred to as the customer system).

具体的には、まず、需要家システムは、DRの実施または非実施をrIDとして通知することができる旨のレポート能力通知をDRASへ送信する(ステップS101)。   Specifically, first, the customer system transmits to the DRAS a report capability notification indicating that the execution or non-execution of DR can be notified as an rID (step S101).

次に、DRASは、需要家システムからレポート能力通知を受信して、DRの実施または非実施を示すレポートを要求する旨の定義レポート送信要求を需要家システムへ送信する(ステップS102)。   Next, the DRAS receives the report capability notification from the customer system, and transmits a definition report transmission request for requesting a report indicating implementation or non-execution of the DR to the customer system (step S102).

次に、DRASは、DR信号を需要家システムへ送信し(ステップS103)、需要家システムは、DRへの参加可否応答をDRASへ送信する(ステップS104)。   Next, the DRAS transmits a DR signal to the customer system (step S103), and the customer system transmits a DR participation permission response to the DRAS (step S104).

次に、需要家システムは、DRの実施または非実施を示すレポートをDRASへ送信する(ステップS105)。   Next, the customer system transmits a report indicating implementation or non-execution of DR to the DRAS (step S105).

次に、需要家システムは、電力使用量を測定値として示すレポートをDRASへ送信する(ステップS106)。   Next, a consumer system transmits the report which shows electric power consumption as a measured value to DRAS (step S106).

方法1の長所としては、OpenADR2.0bを使用して送信することができる点があげられる。一方、短所としては、既製品のプログラムを利用する場合等、需要家システムのOpenADR2.0bの処理部が対応できない場合のある点があげられる。   The advantage of Method 1 is that it can be transmitted using OpenADR2.0b. On the other hand, the disadvantage is that the OpenADR2.0b processing unit of the customer system may not be able to handle such as when an off-the-shelf program is used.

他の方法2としては、OpenADRのトランスポートプロトコルを利用する、すなわち、OpenADRの通信の下位レイヤで利用しているXMPPまたはHTTP(s)等のトランスポートプロトコルのパケットに独自形式で格納して通知する方法が考えられる。   As another method 2, the OpenADR transport protocol is used, that is, the transport protocol packet such as XMPP or HTTP (s) used in the lower layer of the OpenADR communication is stored and notified in a unique format. A way to do this is conceivable.

たとえば、DRASおよび需要家システムが、XMPPまたはHTTPで接続され、OpenADR2.0bに従うXMLのデータを送受信可能とする。   For example, the DRAS and the customer system are connected by XMPP or HTTP, and can transmit and receive XML data according to OpenADR2.0b.

あるいは、DRASおよび需要家システムが、XMPPまたはHTTPで接続され、上記XMLデータの代わりに、DRの実施または非実施を示すデータを需要家システムからDRASへ送信する。送信データの形式は任意である。   Alternatively, the DRAS and the customer system are connected by XMPP or HTTP, and instead of the XML data, data indicating whether the DR is implemented or not is transmitted from the customer system to the DRAS. The format of the transmission data is arbitrary.

方法2の長所としては、方法1に対応できない需要家システムにも適用できる点があげられる。また、OPenADR2.0bを使用するので、通信可能であることが保証される点があげられる。一方、短所としては、通信容量の不足等により、トランスポートプロトコルを使用できない場合がある点があげられる。   The advantage of Method 2 is that it can be applied to a customer system that cannot support Method 1. In addition, since OPenADR2.0b is used, it is guaranteed that communication is possible. On the other hand, a disadvantage is that the transport protocol may not be used due to a lack of communication capacity.

他の方法3としては、方法2において、XMPPまたはHTTPの代わりに、別のプロトコルを用意して送信する方法が考えられる。   As another method 3, a method in which another protocol is prepared and transmitted instead of XMPP or HTTP in method 2 can be considered.

方法3の長所としては、方法1および方法2に対応できない需要家システムに適用できる点、および方法1,2と同様に、自動処理が可能な点があげられる。一方、短所としては、使用するプロトコルで通信できるように環境を準備する必要がある点、および使用するプロトコルごとにDRAS側の対応が必要になる点があげられる。   Advantages of method 3 include that it can be applied to a customer system that cannot support method 1 and method 2, and that automatic processing is possible, as in methods 1 and 2. On the other hand, there are disadvantages in that it is necessary to prepare an environment so that communication can be performed with the protocol to be used, and that the DRAS side needs to be supported for each protocol to be used.

他の方法4としては、方法3のプロトコルの代わりに、e−mailを使用する方法が考えられる。e−mailは、一般的にはオペレータが処理するが、定型メールにすることで自動処理も可能である。   As another method 4, a method using e-mail instead of the protocol of method 3 can be considered. The e-mail is generally processed by an operator, but automatic processing is also possible by using a standard mail.

方法4の長所としては、方法1−3に対応できない需要家システムに適用できる点、および定型メールを使用する等、工夫すれば自動処理が可能な点があげられる。一方、短所としては、e−mailが送信できるように環境を準備する必要がある点、および一般的には自動処理できず、人の介在が必要になる点があげられる。   Advantages of Method 4 include that it can be applied to a customer system that is not compatible with Method 1-3, and that automatic processing is possible if it is devised, such as using a standard mail. On the other hand, there are disadvantages in that it is necessary to prepare an environment so that e-mail can be transmitted, and in general, automatic processing cannot be performed and human intervention is required.

他の方法5としては、プロトコルの代わりに、電話およびFAX等の通信手段で送信し、オペレータを介して入力する方法が考えられる。   As another method 5, instead of the protocol, a method of transmitting by communication means such as telephone and FAX and inputting via an operator can be considered.

方法5の長所としては、方法1−4に対応できない需要家システムに適用できる点、ならびに電話およびFAX等を使用し、人が介在することにより、DRASおよび需要家システムの開発対応が不要となる点があげられる。一方、短所としては、使用する電話等の通信手段を用意する必要がある点、および人の介在が必要になる点があげられる。   Advantages of Method 5 are that it can be applied to a customer system that is not compatible with Method 1-4, and the use of a telephone, a fax, or the like and the intervention of a person eliminates the need for DRAS and customer system development. A point is raised. On the other hand, the disadvantages are that it is necessary to prepare communication means such as a telephone to be used and that human intervention is required.

電力消費管理システム401において、DRの実施または非実施を通知する方法として、上記方法1〜方法5のいずれを採用することも可能である。   In the power consumption management system 401, any of the above method 1 to method 5 can be adopted as a method for notifying whether or not DR is implemented.

なお、本発明の実施の形態に係る電力消費管理システムでは、応答情報は、DRへ参加するか否か、すなわち電力消費に関する要請に従うか否かを示す情報であるとしたが、これに限定するものではない。応答情報は、電力消費に関する要請に従う確率をパーセンテージ等で示す情報であってもよい。この場合、電力消費管理装置101は、たとえば、確率が所定の閾値以上であるか否かに応じて、需要家90のDRへの参加可否を判定する。   In the power consumption management system according to the embodiment of the present invention, the response information is information indicating whether or not to participate in DR, that is, whether or not to comply with a request regarding power consumption, but is limited to this. It is not a thing. The response information may be information indicating, as a percentage, the probability of complying with the request regarding power consumption. In this case, the power consumption management apparatus 101 determines whether or not the customer 90 can participate in DR depending on, for example, whether or not the probability is equal to or higher than a predetermined threshold.

また、本発明の実施の形態に係る電力消費管理システムでは、実施情報は、DRを実施したか否か、すなわち電力消費に関する要請に従った動作を実行したか否かを示す情報であるとしたが、これに限定するものではない。実施情報は、DRを実施した確度をパーセンテージ等で示す情報であってもよい。この場合、電力消費管理装置101は、たとえば、確度が所定の閾値以上であるか否かに応じて、需要家90によるDRの実施または非実施を判定する。   In the power consumption management system according to the embodiment of the present invention, the execution information is information indicating whether or not DR has been performed, that is, whether or not an operation according to a request regarding power consumption has been performed. However, the present invention is not limited to this. The implementation information may be information indicating the accuracy with which DR is implemented, as a percentage or the like. In this case, for example, the power consumption management apparatus 101 determines whether or not the DR is performed by the customer 90 depending on whether or not the accuracy is equal to or higher than a predetermined threshold.

また、電力消費管理装置101は、電力量計35の計測結果からDRの成功を判断する構成であるとしたが、これに限定するものではない。電力消費管理装置101は、ユーザからの入力操作等、他の情報からDRの成功を判断する構成であってもよい。   Further, although the power consumption management apparatus 101 is configured to determine the success of the DR from the measurement result of the watt-hour meter 35, the present invention is not limited to this. The power consumption management apparatus 101 may be configured to determine the success of DR from other information such as an input operation from the user.

また、電力消費管理装置101は、判断部17を備えず、需要家90が要請を満たしたか否かの情報を用いずに需要家90を分類する構成であってもよい。   Moreover, the power consumption management apparatus 101 may be configured not to include the determination unit 17 and to classify the consumers 90 without using information on whether or not the customer 90 satisfies the request.

また、電力消費管理装置101は、対価演算部19を備えず、需要家90に対するインセンティブを算出しない構成であってもよい。   Moreover, the power consumption management apparatus 101 may not include the consideration calculation unit 19 and may not be configured to calculate an incentive for the customer 90.

ところで、需要家に電力消費の抑制を要請し、電力会社等からの要請が満たされた場合であっても、気温等の影響で自然に電力需要が減少した可能性があり、需要家が電力消費の抑制を実施したとは限らない。電力消費の抑制の要請を、より確実に満たす技術が望まれる。   By the way, even if the demand for power consumption is requested from the consumer and the demand from the power company is satisfied, the demand for power may have decreased naturally due to the influence of temperature, etc. It is not always true that consumption has been reduced. A technology that more reliably satisfies the demand for reducing power consumption is desired.

これに対して、本発明の実施の形態に係る電力消費管理装置では、需要家側取得部14は、需要家90が電力消費に関する要請に従う予定であるか否かに関する応答情報、および需要家90が当該要請に従った動作を実行したか否かに関する実施情報を取得する。分類部15は、需要家側取得部14によって取得された応答情報および実施情報に基づいて、需要家90を複数の区分のいずれかに分類する。そして、指示部12は、需要家90に対する新たな要請の内容を、分類部15によって分類された当該需要家90の区分に応じて設定する。   On the other hand, in the power consumption management device according to the embodiment of the present invention, the consumer side acquisition unit 14 receives response information regarding whether or not the consumer 90 is scheduled to follow a request regarding power consumption, and the consumer 90. The execution information regarding whether or not the operation according to the request has been executed is acquired. The classification unit 15 classifies the customer 90 into any of a plurality of categories based on the response information and the execution information acquired by the customer side acquisition unit 14. And the instruction | indication part 12 sets the content of the new request | requirement with respect to the consumer 90 according to the classification | category of the said consumer 90 classified by the classification | category part 15. FIG.

このように、需要家からのDRへの参加可否に関する情報に加えて、DRの実施または非実施に関する情報を取得する構成により、DRの成功が、たとえば自然に電力需要が減少したことによるものなのか、需要家が実際にDRを実施したことによるものなのかを判別することができる。そして、この判別結果を加味して需要家を詳細に分類し、分類した各需要家の区分に応じて、DRの要請先の需要家を選択し、また、要請内容を設定することができるため、電力消費に関する要請先として適切な対象者を選定し、電力会社等からの要請をより確実に満たすことができる。   In this way, in addition to information on whether or not a customer can participate in DR, in addition to information on whether or not DR is implemented, the success of DR is due to, for example, a natural decrease in power demand. It can be discriminated whether the customer is actually due to DR. Then, taking into account this discrimination result, it is possible to classify the customers in detail, select the DR request destination customer according to the classified customer category, and set the request contents Therefore, it is possible to select an appropriate target person as a request destination for power consumption and satisfy the request from the electric power company more reliably.

したがって、本発明の実施の形態に係る電力消費管理装置では、需要家に電力消費に関する要請に従った動作をより確実に行わせることができる。   Therefore, in the power consumption management device according to the embodiment of the present invention, it is possible to cause the consumer to more reliably perform the operation according to the request regarding the power consumption.

また、DRの成功に寄与する可能性が低い需要家を配下に置いても、各需要家を詳細で適切な区分に分類することができるため、電力会社等からの要請をより確実に満たしながら、DRの要求に対するシステムのキャパシティを増加させることができる。   In addition, even if customers who are unlikely to contribute to the success of DR are subordinated, each customer can be classified into a detailed and appropriate category, thus satisfying the demands from electric power companies more reliably. , The capacity of the system for DR requirements can be increased.

また、本発明の実施の形態に係る電力消費管理装置では、判断部17は、需要家90が要請を満たしたか否かを判断する。そして、分類部15は、応答情報、実施情報および判断部17の判断結果に基づいて需要家90を分類する。   In the power consumption management apparatus according to the embodiment of the present invention, the determination unit 17 determines whether or not the customer 90 satisfies the request. Then, the classification unit 15 classifies the customers 90 based on the response information, the implementation information, and the determination result of the determination unit 17.

このように、需要家からのDRへの参加可否に関する情報、およびDRの実施または非実施に関する情報に加えて、DRが成功したか否かの情報を用いる構成により、需要家をより詳細で適切な区分に分類することが可能となる。   Thus, in addition to the information regarding whether or not the DR participation from the customer and the information regarding whether or not the DR is implemented, the configuration using the information indicating whether or not the DR has been successful makes the consumer more detailed and appropriate. Can be classified into various categories.

また、本発明の実施の形態に係る電力消費管理装置では、対価演算部19は、需要家90が要請を満たしたことに対する対価を算出する。そして、対価演算部19は、分類部15によって分類された需要家90の区分に応じた値の対価を算出する。   Moreover, in the power consumption management apparatus according to the embodiment of the present invention, the consideration calculation unit 19 calculates a consideration for the customer 90 satisfying the request. Then, the consideration calculation unit 19 calculates a consideration of a value according to the classification of the customer 90 classified by the classification unit 15.

このような構成により、分類した需要家の区分に応じた適切なインセンティブを当該需要家に与えることができる。たとえば、電力消費の抑制量が同等である複数の需要家が存在する場合において、意図的に電力消費を抑制する処理を行った需要家を優遇することができる。   With such a configuration, it is possible to give an appropriate incentive according to the classified consumer classification to the consumer. For example, in the case where there are a plurality of consumers with the same amount of power consumption suppression, it is possible to give a preferential treatment to a customer who has intentionally suppressed power consumption.

また、本発明の実施の形態に係る電力消費管理装置では、複数の区分にそれぞれ優先度が付与されている。そして、指示部12は、当該優先度に基づいて、要請の対象とすべき需要家90を決定する。   Moreover, in the power consumption management apparatus according to the embodiment of the present invention, priority is assigned to each of a plurality of sections. And the instruction | indication part 12 determines the consumer 90 which should be made the object of a request | requirement based on the said priority.

このような構成により、区分ごとに付与された優先度を用いて、DRの要請先として適切な需要家を容易に選択することができる。   With such a configuration, it is possible to easily select an appropriate consumer as a DR request destination using the priority assigned to each category.

また、本発明の実施の形態に係る電力消費管理装置では、指示部12は、要請に従った動作を実行したか否かに応じて、需要家90に対する新たな要請を異なる内容に設定する。   Moreover, in the power consumption management apparatus according to the embodiment of the present invention, the instruction unit 12 sets a new request for the customer 90 with different contents depending on whether or not the operation according to the request has been executed.

このような構成により、DRへの参加を表明し、かつDRに成功した複数の需要家に対して、意図的に電力消費を抑制する処理を行ったか否かに応じて異なる要請内容を設定することができる。   With such a configuration, different request contents are set depending on whether or not processing for suppressing power consumption is intentionally performed for a plurality of consumers who have expressed their participation in DR and who have succeeded in DR. be able to.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。   The above embodiment should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

以上の説明は、以下に付記する特徴を含む。   The above description includes the following features.

[付記1]
需要家が電力消費に関する要請に従う予定であるか否かに関する応答情報、および前記需要家が前記要請に従った動作を実行したか否かに関する実施情報を取得する取得部と、
前記取得部によって取得された前記応答情報および前記実施情報に基づいて、前記需要家を複数の区分のいずれかに分類する分類部と、
前記需要家に対する新たな前記要請の内容を、前記分類部によって分類された前記需要家の前記区分に応じて設定する設定部とを備え、
前記分類部は、前記需要家を、前記要請に従った動作を実行したか否かに応じて異なる区分に設定し、
前記実施情報は、OpenADRにおけるReportにrIDとして定義され、
さらに、
前記需要家の識別情報と前記区分との対応関係を示す需要家管理テーブル、および前記需要家の区分と前記要請の内容の作成および送信の基準となる情報との対応関係を示す需要家指示テーブルを記憶する記憶部を備え、
前記分類部は、分類結果に応じて前記需要家管理テーブルを更新し、
前記設定部は、前記需要家管理テーブルおよび前記需要家指示テーブルを用いて前記要請の内容を設定する、電力消費管理装置。
[Appendix 1]
An acquisition unit for acquiring response information regarding whether or not the consumer intends to comply with a request regarding power consumption, and implementation information regarding whether or not the consumer has performed an operation according to the request;
Based on the response information and the implementation information acquired by the acquisition unit, a classification unit that classifies the consumer into any of a plurality of categories;
A setting unit that sets the content of the new request for the consumer according to the classification of the consumer classified by the classification unit;
The classification unit sets the consumer to different categories depending on whether or not the operation according to the request has been performed,
The implementation information is defined as rID in the report in OpenADR,
further,
A customer management table indicating a correspondence relationship between the identification information of the consumer and the classification, and a customer instruction table indicating a correspondence relationship between the classification of the consumer and information used as a basis for creating and transmitting the contents of the request A storage unit for storing
The classification unit updates the customer management table according to a classification result,
The said setting part is an electric power consumption management apparatus which sets the content of the said request | requirement using the said consumer management table and the said customer instruction | indication table.

11 系統側取得部
12 指示部(設定部および要請部)
13 記憶部
14 需要家側取得部
15 分類部
17 判断部
19 対価演算部
31 施設装置
32 機器
33 端末装置
35 電力量計
90 需要家
101 電力消費管理装置
151 系統側管理装置
301 電力需要施設
302,303 ネットワーク
401 電力消費管理システム
11 System side acquisition unit 12 Instruction unit (setting unit and request unit)
DESCRIPTION OF SYMBOLS 13 Memory | storage part 14 Consumer side acquisition part 15 Classification | category part 17 Judgment part 19 Consideration calculation part 31 Facility apparatus 32 Equipment 33 Terminal apparatus 35 Electricity meter 90 Consumer 101 Power consumption management apparatus 151 System side management apparatus 301 Electric power demand facility 302, 303 Network 401 Power Consumption Management System

Claims (6)

需要家が電力消費に関する要請に従う予定であるか否かに関する応答情報、および前記需要家が前記要請に従った動作を実行したか否かに関する実施情報を取得する取得部と、
前記取得部によって取得された前記応答情報および前記実施情報に基づいて、前記需要家を複数の区分のいずれかに分類する分類部と、
前記需要家に対する新たな前記要請の内容を、前記分類部によって分類された前記需要家の前記区分に応じて設定する設定部とを備える、電力消費管理装置。
An acquisition unit for acquiring response information regarding whether or not the consumer intends to comply with a request regarding power consumption, and implementation information regarding whether or not the consumer has performed an operation according to the request;
Based on the response information and the implementation information acquired by the acquisition unit, a classification unit that classifies the consumer into any of a plurality of categories;
A power consumption management device comprising: a setting unit configured to set the content of the new request for the consumer according to the classification of the consumer classified by the classification unit.
前記電力消費管理装置は、さらに、
前記需要家が前記要請を満たしたか否かを判断する判断部を備え、
前記分類部は、前記応答情報、前記実施情報および前記判断部の判断結果に基づいて前記需要家を分類する、請求項1に記載の電力消費管理装置。
The power consumption management device further includes:
A determination unit for determining whether the customer satisfies the request;
The power consumption management device according to claim 1, wherein the classification unit classifies the consumers based on the response information, the implementation information, and a determination result of the determination unit.
前記電力消費管理装置は、さらに、
前記需要家が前記要請を満たしたことに対する対価を算出する対価演算部を備え、
前記対価演算部は、前記分類部によって分類された前記需要家の前記区分に応じた値の前記対価を算出する、請求項1または請求項2に記載の電力消費管理装置。
The power consumption management device further includes:
A consideration calculating unit for calculating a consideration for satisfying the request by the consumer;
The power consumption management device according to claim 1, wherein the consideration calculation unit calculates the consideration of a value corresponding to the classification of the consumer classified by the classification unit.
前記複数の区分にそれぞれ優先度が付与されており、
前記電力消費管理装置は、さらに、
前記優先度に基づいて、前記要請の対象とすべき前記需要家を決定する要請部を備える、請求項1から請求項3のいずれか1項に記載の電力消費管理装置。
A priority is given to each of the plurality of categories,
The power consumption management device further includes:
The power consumption management apparatus according to any one of claims 1 to 3, further comprising a request unit that determines the consumer to be a target of the request based on the priority.
前記設定部は、前記要請に従った動作を実行したか否かに応じて、前記需要家に対する新たな前記要請を異なる内容に設定する、請求項1から請求項4のいずれか1項に記載の電力消費管理装置。   The said setting part sets the said new request | requirement with respect to the said consumer to a different content according to whether the operation | movement according to the said request | requirement was performed, The content of any one of Claims 1-4 Power consumption management device. 電力消費管理プログラムであって、
コンピュータを、
需要家が電力消費に関する要請に従う予定であるか否かに関する応答情報、および前記需要家が前記要請に従った動作を実行したか否かに関する実施情報を取得する取得部と、
前記取得部によって取得された前記応答情報および前記実施情報に基づいて、前記需要家を複数の区分のいずれかに分類する分類部と、
前記需要家に対する新たな前記要請の内容を、前記分類部によって分類された前記需要家の前記区分に応じて設定する設定部と、
として機能させるための、電力消費管理プログラム。
A power consumption management program,
Computer
An acquisition unit for acquiring response information regarding whether or not the consumer intends to comply with a request regarding power consumption, and implementation information regarding whether or not the consumer has performed an operation according to the request;
Based on the response information and the implementation information acquired by the acquisition unit, a classification unit that classifies the consumer into any of a plurality of categories;
A setting unit for setting the content of the new request for the consumer according to the classification of the consumer classified by the classification unit;
Power consumption management program to function as
JP2016013161A 2016-01-27 2016-01-27 Power consumption management device and power consumption management program Active JP6332291B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016013161A JP6332291B2 (en) 2016-01-27 2016-01-27 Power consumption management device and power consumption management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016013161A JP6332291B2 (en) 2016-01-27 2016-01-27 Power consumption management device and power consumption management program

Publications (2)

Publication Number Publication Date
JP2017135825A JP2017135825A (en) 2017-08-03
JP6332291B2 true JP6332291B2 (en) 2018-05-30

Family

ID=59502985

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016013161A Active JP6332291B2 (en) 2016-01-27 2016-01-27 Power consumption management device and power consumption management program

Country Status (1)

Country Link
JP (1) JP6332291B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6782724B2 (en) * 2018-03-22 2020-11-11 Kddi株式会社 Power suppression device, program and method for request to activate demand response
JP6909912B1 (en) * 2020-08-21 2021-07-28 東京瓦斯株式会社 Demand adjustment server and demand adjustment system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5487125B2 (en) * 2011-01-11 2014-05-07 株式会社東芝 Power supply / demand adjustment reserve capacity trading system and power supply / demand adjustment reserve capacity transaction method
JP2012151992A (en) * 2011-01-19 2012-08-09 Hitachi Ltd Power demand adjustment device, power adjustment network system, and power adjustment method
JP5951399B2 (en) * 2012-08-06 2016-07-13 株式会社東芝 Monitoring control method and monitoring control apparatus
JP6009925B2 (en) * 2012-12-13 2016-10-19 株式会社東芝 Electronic equipment and equipment system
US10209759B2 (en) * 2014-08-26 2019-02-19 Embertec Pty Ltd Standby power controller with external information capability

Also Published As

Publication number Publication date
JP2017135825A (en) 2017-08-03

Similar Documents

Publication Publication Date Title
JP5635005B2 (en) Energy saving
US10235662B2 (en) Unusual usage alerts
US20130041852A1 (en) Customizable dynamic resource regulating devices and methods
JP6234264B2 (en) Electric power demand adjustment system, electric power demand adjustment method, and electric power demand adjustment device
US10380706B2 (en) Equipment management apparatus
JP6534692B2 (en) Order management apparatus, order management method and order management system
JP5928916B2 (en) Action management device, action management method and program
JP2015226434A (en) Power consumption management apparatus, power consumption management system, power consumption management method, and power consumption management program
JP6332291B2 (en) Power consumption management device and power consumption management program
JP6289759B2 (en) Control device, control system, control method, and program
JP6635895B2 (en) Power demand control system, power demand control method, aggregator system, customer power management system, and program
US10268171B2 (en) Demand response control result presentation apparatus
JP6437139B2 (en) Power management apparatus, server, power management system, power management method, and program
JPWO2019030986A1 (en) Power management device, power management system, power management method, and control program
JP6464954B2 (en) Consumer device, power consumption management method, and power consumption management program
JP2016073072A (en) Apparatus controller
JP2016015850A (en) Power consumption management device, power consumption management system, power consumption management method and power consumption management program
JP6686510B2 (en) Power consumption management device and power consumption management program
JP2018092345A (en) Heatstroke prevention system
JP6376379B2 (en) Power management equipment
JP2017037459A (en) Power information management device, power information management method and power information management program
JP6904450B2 (en) Power consumption management device and power consumption management program
WO2017018530A1 (en) Information processing system, information processing method, and program
JP2018207709A (en) Display processor, display processing method and display processing program
JP6675939B2 (en) Energy demand control device, energy demand control method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170522

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180323

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180403

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180416

R150 Certificate of patent or registration of utility model

Ref document number: 6332291

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250