JP5857508B2 - How to calculate construction error - Google Patents

How to calculate construction error Download PDF

Info

Publication number
JP5857508B2
JP5857508B2 JP2011169451A JP2011169451A JP5857508B2 JP 5857508 B2 JP5857508 B2 JP 5857508B2 JP 2011169451 A JP2011169451 A JP 2011169451A JP 2011169451 A JP2011169451 A JP 2011169451A JP 5857508 B2 JP5857508 B2 JP 5857508B2
Authority
JP
Japan
Prior art keywords
construction error
measurement
design
construction
coordinates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011169451A
Other languages
Japanese (ja)
Other versions
JP2013032984A (en
Inventor
哲 近藤
哲 近藤
池田 雄一
雄一 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2011169451A priority Critical patent/JP5857508B2/en
Publication of JP2013032984A publication Critical patent/JP2013032984A/en
Application granted granted Critical
Publication of JP5857508B2 publication Critical patent/JP5857508B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

本発明は、施工現場等においてトータルステーション等の測量計を用いて施工誤差を求める方法に関する。   The present invention relates to a method for obtaining a construction error using a surveying instrument such as a total station at a construction site or the like.

従来、施工現場では、トータルステーションによって任意位置の三次元座標の計測が行われている(例えば、特許文献1)。
この計測の際には、先ず計測準備として、トータルステーションを施工現場に据え置くとともに、位置座標が既知の二つの基準位置にプリズムや反射板等の反射部材を置く。そして、反射部材に向けて計測用光を投光し、その反射光の位相差に基づいて各基準位置までの距離を測るとともに、計測用光の投光方向の水平角度や鉛直角度を測る。
そうしたら、位置座標を計測すべき対象位置たる計測位置に、上記の反射部材を置き、トータルステーションから反射部材へ向けて計測用光を投じ、その反射光の位相差に基づいて計測位置までの距離を測るとともに、計測用光の投光方向の水平角度や鉛直角度を測る。そして、これら距離や水平・鉛直角度、上述の基準位置の距離や水平・鉛直角度、及び基準位置の位置座標(既知)などに基づいて幾何学的計算を行うことにより、計測位置の三次元座標を求める。
Conventionally, at a construction site, measurement of three-dimensional coordinates at an arbitrary position is performed by a total station (for example, Patent Document 1).
In this measurement, as a preparation for measurement, the total station is first placed on the construction site, and a reflecting member such as a prism or a reflecting plate is placed at two reference positions whose position coordinates are known. Then, the measurement light is projected toward the reflecting member, the distance to each reference position is measured based on the phase difference of the reflected light, and the horizontal angle and the vertical angle in the light projection direction of the measurement light are measured.
Then, place the reflection member at the measurement position, which is the target position where the position coordinates are to be measured, and project measurement light from the total station toward the reflection member. The distance to the measurement position based on the phase difference of the reflected light And measure the horizontal and vertical angles of the measuring light in the projection direction. Then, by performing geometric calculation based on these distances, horizontal / vertical angles, the above-mentioned reference position distances, horizontal / vertical angles, and reference position position coordinates (known), the three-dimensional coordinates of the measurement position Ask for.

特開平11−325884号公報Japanese Patent Laid-Open No. 11-325884

最近では、反射部材を用いないトータルステーションも使用されている。すなわち、このトータルステーションでは、計測位置に向けて計測用光を投光し、計測位置からの反射光を受光して光の往復時間を計測することで距離を求め、これに前述の水平・鉛直角度などのデータを加味することで、計測位置の三次元座標を求めるようになっている。   Recently, a total station that does not use a reflecting member is also used. That is, in this total station, the measurement light is projected toward the measurement position, the reflected light from the measurement position is received and the round trip time of the light is measured, and the distance is obtained. By taking into account such data, the three-dimensional coordinates of the measurement position are obtained.

ところで、施工現場に形成される構造物の施工誤差が、トータルテンションによってその場で即座に計測できれば、計測された施工誤差に基づいて直ちに手直しをすることができて便利である。例えば、コンクリート打設により形成された実際の床面が、設計図等の設計データに規定された設計床面よりも高い場合には、その施工中又は施工直後に施工誤差分だけ鏝等で実際の床面をはつれば良く、逆に、低い場合には、更にコンクリートを盛れば良く、これにより、施工精度の高い床面を短工期で形成できて便利である。   By the way, if the construction error of the structure formed at the construction site can be measured immediately on the spot by the total tension, it is convenient that the construction error can be corrected immediately based on the measured construction error. For example, if the actual floor surface formed by concrete placement is higher than the design floor surface specified in the design data such as blueprints, the actual floor surface will be used for the construction error during or immediately after the construction. If the floor is low, on the contrary, it is sufficient to deposit more concrete, which makes it possible to form a floor with high construction accuracy in a short construction period.

本発明は、上記のような従来の問題に鑑みなされたものであって、その目的は、施工現場等において実際の面と設計面との間の施工誤差を求めることにある。   The present invention has been made in view of the above-described conventional problems, and an object thereof is to obtain a construction error between an actual surface and a design surface at a construction site or the like.

かかる目的を達成するために請求項1に係る発明は、
三次元位置座標を計測可能な測量計を用いることにより、
設計データで規定された設計面と、前記設計データに基づいて形成される実際の面との間の前記設計面の法線方向の施工誤差を求める方法であって、
前記測量計は、任意の着目位置に向けて計測用光を投光し、前記実際の面上において前記計測用光が当たる位置からの反射光を受光することで、前記当たる位置を計測位置としてその位置座標を出力するともに、出力された前記計測位置の位置座標を、前記設計面内の平面位置を規定する平面位置座標と、前記設計面の法線方向の位置を規定する法線位置座標とで示す機能を有し、
前記計測位置の平面位置座標と一致する前記設計面上の位置の位置座標を、前記設計データから取得する設計面位置座標取得ステップと、
前記計測位置の法線位置座標と、前記設計面位置座標取得ステップで取得した前記設計面上の位置の法線位置座標とに基づいて、前記施工誤差を算出する施工誤差算出ステップと、を有し、
前記施工誤差を求める方法は、流動物の打設の際に実行され、
前記実際の面は、前記流動物の打設により形成された面であり、
前記実際の面が前記設計面よりも高い場合には、前記流動物の高さを低くし、前記実際の面が前記設計面よりも低い場合には、前記流動物の高さを高くすることを特徴とする。
In order to achieve this object, the invention according to claim 1
By using a surveying instrument that can measure 3D position coordinates,
A method for obtaining a construction error in a normal direction of the design surface between a design surface defined by design data and an actual surface formed based on the design data,
The surveying instrument projects measurement light toward an arbitrary position of interest, and receives reflected light from a position where the measurement light strikes on the actual surface, whereby the contact position is set as a measurement position. While outputting the position coordinates, the output position coordinates of the measurement position are defined as plane position coordinates defining the plane position in the design surface and normal position coordinates defining the position of the design surface in the normal direction And has the function indicated by
A design surface position coordinate acquisition step of acquiring, from the design data, a position coordinate of a position on the design surface that coincides with a plane position coordinate of the measurement position;
A construction error calculating step for calculating the construction error based on the normal position coordinates of the measurement position and the normal position coordinates of the position on the design surface acquired in the design surface position coordinate acquisition step; And
The method for obtaining the construction error is executed at the time of placing the fluid,
The actual surface is a surface formed by placing the fluid,
When the actual surface is higher than the design surface, the height of the fluid is lowered, and when the actual surface is lower than the design surface, the height of the fluid is increased. It is characterized by.

上記請求項1に示す発明によれば、実際の面上の計測位置の位置座標を計測し、当該計測位置の平面位置座標と一致する設計面上の位置の位置座標を、設計データから取得し、そして、計測位置の法線位置座標と、上記設計面上の位置の法線位置座標とに基づいて、施工誤差を算出する。ここで、計測位置は、上述の如く、実際の面上の位置である。よって、実際の面と設計面との間の法線方向の施工誤差を求めることができる。   According to the first aspect of the present invention, the position coordinate of the measurement position on the actual surface is measured, and the position coordinate of the position on the design surface that matches the plane position coordinate of the measurement position is acquired from the design data. Then, a construction error is calculated based on the normal position coordinates of the measurement position and the normal position coordinates of the position on the design surface. Here, the measurement position is an actual position on the surface as described above. Therefore, the construction error in the normal direction between the actual surface and the design surface can be obtained.

また、実際の面に対して非接触で施工誤差を計測することができる。よって、実際の面の施工中に、同時並行作業で施工誤差の計測を行うことができて、これにより工期短縮を図れる。   Further, it is possible to measure the construction error in a non-contact manner with respect to the actual surface. Therefore, during construction of an actual surface, construction errors can be measured by simultaneous parallel work, thereby shortening the construction period.

請求項2に示す発明は、請求項1に記載の施工誤差を求める方法であって、
前記施工誤差算出ステップでは、前記計測位置の法線位置座標から前記設計面上の位置の法線位置座標を減算することにより、前記施工誤差を求めることを特徴とする。
上記請求項2に示す発明によれば、実際の面と設計面との間の法線方向の施工誤差を確実に求めることができる。
The invention according to claim 2 is a method for obtaining the construction error according to claim 1,
In the construction error calculating step, the construction error is obtained by subtracting the normal position coordinates of the position on the design surface from the normal position coordinates of the measurement position.
According to the second aspect of the present invention, it is possible to reliably determine the construction error in the normal direction between the actual surface and the design surface.

請求項3に示す発明は、請求項1又は2に記載の施工誤差を求める方法であって、
前記計測用光は、可視光であることを特徴とする。
上記請求項3に示す発明によれば、求められた施工誤差を有する位置が、計測用光のスポットにより実際の面上に視認可能に指し示される。よって、知り得た施工誤差に基づいてその場で手直しを行うことができて、利便性に優れる。
The invention shown in claim 3 is a method for obtaining the construction error according to claim 1 or 2,
The measurement light is visible light.
According to the third aspect of the present invention, the position having the calculated construction error is pointed on the actual surface by the measurement light spot so as to be visible. Therefore, it can be corrected on the spot based on the learned construction error, and it is excellent in convenience.

請求項4に示す発明は、請求項3に記載の施工誤差を求める方法であって、
前記施工誤差算出ステップよりも少なくとも後の時点において、前記計測用光を投光することを特徴とする。
上記請求項4に示す発明によれば、施工誤差算出ステップよりも少なくとも後の時点において、計測用光を投光するので、実際の面の手直しの際に、手直しすべき位置を計測用光のスポットで指し示すことができて、手直し作業の精度向上を図れる。
Invention of Claim 4 is the method of calculating | requiring the construction error of Claim 3, Comprising:
The measurement light is projected at least at a time point after the construction error calculating step.
According to the fourth aspect of the present invention, the measurement light is projected at least after the construction error calculating step. Therefore, when the actual surface is reworked, the position to be reworked is adjusted. It can be pointed at the spot, improving the accuracy of the rework work.

本発明によれば、施工現場等において実際の面と設計面との間の施工誤差を求めることができる。   According to the present invention, it is possible to obtain a construction error between an actual surface and a design surface at a construction site or the like.

実床面2Rの施工誤差Eを求めるべく施工現場に設置されたトータルステーション10の概略側面図である。It is a schematic side view of the total station 10 installed in the construction site in order to obtain | require the construction error E of the actual floor surface 2R. 施工誤差算出機能に係る施工誤差Eの算出手順のフローチャートである。It is a flowchart of the calculation procedure of the construction error E which concerns on a construction error calculation function. 実壁面4Rの施工誤差Eを求めるべく施工現場に設置されたトータルステーション10の概略側面図である。It is a schematic side view of the total station 10 installed in the construction site in order to obtain | require the construction error E of the actual wall surface 4R.

===本実施形態===
図1は、施工現場に設置された測量計としてのトータルステーション10の概略側面図である。
このトータルステーション10は、施工現場にて施工誤差Eを求める目的で設置されている。施工誤差Eを求める対象は、例えばコンクリート打設で施工現場に形成される床面2Rである。すなわち、設計図等の設計データ上では、床面2Vは例えば全面に亘って水平面をなす床面2V(請求項の「設計面」に相当)として規定されている。しかし、実際の床面2Rたる実床面2Rは、施工誤差Eに起因して不陸等を有し、つまり設計データ上の床面2Vたる設計床面2V通りには形成されていないことが多い。
=== This Embodiment ===
FIG. 1 is a schematic side view of a total station 10 as a surveying meter installed at a construction site.
The total station 10 is installed for the purpose of obtaining a construction error E at the construction site. The object for which the construction error E is obtained is, for example, the floor surface 2R formed on the construction site by placing concrete. That is, in the design data such as the design drawing, the floor surface 2V is defined as, for example, the floor surface 2V (corresponding to the “design surface” in the claims) that forms a horizontal plane over the entire surface. However, the actual floor surface 2R that is the actual floor surface 2R has unevenness due to the construction error E, that is, it is not formed on the design floor surface 2V that is the floor surface 2V in the design data. Many.

そこで、本実施形態では、施工中に施工誤差Eを計測し、しかも、この計測結果たる施工誤差Eを逐次的に施工に反映させるようにしている。例えば、以下の例では、コンクリート打設後に床面2Rを左官職等が鏝均しをしている最中、又はその直後に施工誤差Eを計測し、施工誤差Eが無くなるようにその場で直ちに手直しをする。そして、これにより、施工精度を向上させると同時に工期短縮も図っている。以下、詳説する。   Therefore, in this embodiment, the construction error E is measured during construction, and the construction error E as the measurement result is sequentially reflected in the construction. For example, in the following example, the construction error E is measured while the plasterer is leveling the floor 2R after placing concrete, or immediately after that, so that the construction error E is eliminated on the spot. Rework immediately. As a result, the construction accuracy is improved and the work period is shortened. The details will be described below.

<<<トータルステーション10について>>>
トータルステーション10は、任意位置の三次元座標を計測する計測機能と、携帯端末50と協働することで施工誤差Eを算出する施工誤差算出機能と、を有する。
<<< About Total Station 10 >>>
The total station 10 has a measurement function for measuring three-dimensional coordinates at an arbitrary position and a construction error calculation function for calculating a construction error E in cooperation with the portable terminal 50.

前者の計測機能に係る任意位置の三次元座標の計測は、次のようにして行われる。先ず、図1に示すように、トータルステーション10に対して、仮の計測位置として着目位置Pm(Xm,Ym,Zm)が入力される。そうしたら、トータルステーション10は、着目位置Pmに向けて計測用光としてレーザー光を投光するとともに、計測用光が当たった位置を計測位置Pkとして同位置Pkから反射光を受光する。そして、この計測用光の往復時間に基づいてトータルステーション10から計測位置Pkまでの距離を算出し、またこれと同時並行で、計測用光の投光方向の水平角度や鉛直角度を計測する。   Measurement of three-dimensional coordinates at an arbitrary position related to the former measurement function is performed as follows. First, as shown in FIG. 1, a target position Pm (Xm, Ym, Zm) is input as a temporary measurement position to the total station 10. Then, the total station 10 projects laser light as measurement light toward the target position Pm, and receives reflected light from the position Pk with the position where the measurement light has been applied as the measurement position Pk. Then, the distance from the total station 10 to the measurement position Pk is calculated based on the round trip time of the measurement light, and at the same time, the horizontal angle and the vertical angle in the light projection direction of the measurement light are measured.

そうしたら、計測された距離、水平角度、及び鉛直角度のデータと、予め取得済みの基準位置(不図示)のデータ(トータルステーション10から基準位置までの距離、基準位置への投光方向の水平角度と鉛直角度、基準位置の位置座標(既知の三次元座標))とに基づいて幾何学的計算を行うことにより、トータルステーション10は、計測位置Pkの三次元座標(Xk,Yk,Zk)を算出する。   Then, the measured distance, horizontal angle, and vertical angle data, and previously acquired reference position (not shown) data (the distance from the total station 10 to the reference position, the horizontal angle of the light projection direction to the reference position) The total station 10 calculates the three-dimensional coordinates (Xk, Yk, Zk) of the measurement position Pk by performing geometric calculation based on the vertical angle and the position coordinates of the reference position (known three-dimensional coordinates)). To do.

なお、基準位置のデータの取得方法は、背景技術のところで説明した内容と概ね同じであるので、ここでは相違点についてのみ述べると、プリズム等の反射部材を用いずに、基準位置に位置する適宜な部材から反射光を直接受光する点、及び、距離の算出を、計測用光の位相差に基づかずに、計測用光の往復時間に基づいて行う点で相違する。   Note that the method for acquiring the reference position data is almost the same as that described in the background art. Therefore, only the differences will be described here. The difference is that the reflected light is received directly from the other members and the distance is calculated based on the round trip time of the measuring light, not based on the phase difference of the measuring light.

一方、後者の施工誤差算出機能は、実床面2Rの設計床面2Vに対するZ方向の施工誤差Eを、トータルステーション10が実床面2Rから離れた非接触状態で求める機能である。よって、実床面2Rの施工工事と同時並行で施工誤差Eを計測できて、この計測された施工誤差Eを施工工事に即座に反映させることができる。この機能については後述する。   On the other hand, the latter construction error calculation function is a function for obtaining the construction error E in the Z direction with respect to the design floor 2V of the actual floor 2R in a non-contact state where the total station 10 is separated from the actual floor 2R. Therefore, the construction error E can be measured simultaneously with the construction work on the actual floor surface 2R, and the measured construction error E can be immediately reflected in the construction work. This function will be described later.

かかる機能を奏するトータルステーション10は、例えば、計測用光を投光する不図示の投光部、計測用光の反射光を受光する不図示の受光部、計測用光の投光方向の水平角度や鉛直角度を測る測定部、及びこれら各部の動作を制御しつつ、種々の演算を行う不図示のコンピュータと、を有している。そして、コンピュータは、CPUとメモリとを有し、メモリに予め格納されたプログラムを読み出してCPUが実行することにより、上述のような計測機能や施工誤差算出機能が実現される。なお、施工誤差算出機能については、後述の携帯端末50と協働して実現される。   The total station 10 having such a function includes, for example, a light projecting unit (not illustrated) that projects measurement light, a light receiving unit (not illustrated) that receives reflected light of the measurement light, a horizontal angle in the light projecting direction of the measurement light, and the like. It has a measuring unit that measures the vertical angle, and a computer (not shown) that performs various calculations while controlling the operations of these units. The computer has a CPU and a memory, and the above-described measurement function and construction error calculation function are realized by reading out a program stored in the memory and executing the program. The construction error calculation function is realized in cooperation with the mobile terminal 50 described later.

一方、トータルステーション10には、図1に示すように、外部機器50としての携帯端末50が通信可能に接続されている。この携帯端末50は、例えば、タブレットPC、PDA、スマートフォン、携帯電話などであり、総じて言えば、CPUとメモリとを有したコンピュータである。そして、メモリには、施工現場に構築すべき構造体の3Dモデルが予め記録・格納されており、構造体の各部位には、それぞれ3次元の位置座標が対応付けられている。すなわち、前述の設計床面2Vもこの構造体の3Dモデルの一部であり、よって、この設計床面2Vにも位置座標が対応付けられて上記メモリに格納されている。   On the other hand, as shown in FIG. 1, a portable terminal 50 as an external device 50 is connected to the total station 10 so as to be communicable. The mobile terminal 50 is, for example, a tablet PC, a PDA, a smart phone, a mobile phone, or the like, and is generally a computer having a CPU and a memory. The memory stores and stores in advance a 3D model of the structure to be constructed at the construction site, and each part of the structure is associated with a three-dimensional position coordinate. That is, the above-described design floor 2V is also a part of the 3D model of this structure. Therefore, the position coordinates are also associated with this design floor 2V and stored in the memory.

ここで、位置座標は、互いに直交する3軸(X軸、Y軸、Z軸)からなる三次元直交座標系で表されている。そして、XY座標で、設計床面2V内の任意の平面位置(二次元位置)を規定する一方、Z座標で、設計床面2Vの法線方向の任意の位置を規定するようになっている。すなわち、前者のXY座標(X,Y)が、請求項の「平面位置座標」に相当し、後者のZ座標(Z)が、請求項の「法線位置座標」に相当する。   Here, the position coordinates are represented by a three-dimensional orthogonal coordinate system including three axes (X axis, Y axis, Z axis) orthogonal to each other. An arbitrary plane position (two-dimensional position) in the design floor 2V is defined by the XY coordinates, while an arbitrary position in the normal direction of the design floor 2V is defined by the Z coordinates. . That is, the former XY coordinates (X, Y) correspond to “planar position coordinates” in the claims, and the latter Z coordinate (Z) corresponds to “normal position coordinates” in the claims.

また、上記メモリには、上述の施工誤差算出機能を行うためのプログラムが予め格納されており、このプログラムを上記CPUがメモリから読み出して実行することにより、トータルステーション10と協働する形で、施工誤差算出機能が実現される。   In addition, a program for performing the above-described construction error calculation function is stored in the memory in advance, and the CPU reads out the program from the memory and executes it to cooperate with the total station 10. An error calculation function is realized.

<<<施工誤差算出機能について>>>
図2は、同機能に係る施工誤差Eの算出手順のフローチャートである。
先ず、準備ステップS10として、図1に示すように、トータルステーション10を施工現場の適宜な設置位置Psに設置する。例えば、施工中の実床面2Rの略全面が見渡せる位置Psであって、且つ実床面2Rよりも鉛直方向に所定高さだけ高い位置Psなどに、トータルステーション10を設置する。
<<< Construction error calculation function >>>
FIG. 2 is a flowchart of a procedure for calculating the construction error E related to the function.
First, as preparation step S10, as shown in FIG. 1, the total station 10 is installed at an appropriate installation position Ps at the construction site. For example, the total station 10 is installed at a position Ps where the substantially whole surface of the actual floor surface 2R under construction can be seen, and at a position Ps higher than the actual floor surface 2R by a predetermined height.

次に、同準備ステップS10として、トータルステーション10は、位置座標が既知の二つの基準位置(不図示)に向けて計測用光を投光し、各基準位置からの反射光を受光する。これにより、前述したようにトータルステーション10と各基準位置との距離、及び各投光方向の水平角度や鉛直角度を計測し、これらのデータを取得する。そして、以降、当該基準位置のデータを用いることにより、トータルステーション10はその周囲の任意位置の三次元座標を、XYZの直交座標系で計測可能な状態になる。つまり、計測機能を使用可能な状態になる。   Next, as the preparation step S10, the total station 10 projects measurement light toward two reference positions (not shown) whose position coordinates are known, and receives reflected light from each reference position. Thereby, as described above, the distance between the total station 10 and each reference position, and the horizontal angle and vertical angle in each light projecting direction are measured, and these data are acquired. Thereafter, by using the data of the reference position, the total station 10 is in a state where the three-dimensional coordinates of an arbitrary position around the total station 10 can be measured in the XYZ orthogonal coordinate system. That is, the measurement function can be used.

そうしたら、現場作業者は、施工中の実床面2R上に計測用光が当たるように、携帯端末50の3Dモデル上で仮の計測位置として着目位置Pmを設定する(着目位置設定ステップS15)。すると、この着目位置Pmの位置座標(Xm,Ym,Zm)のデータは、携帯端末50からトータルステーション10へと送信される。なお、この着目位置Pmの設定は、携帯端末50からではなく、トータルステーション10が備える適宜な操作スイッチ(不図示)から行っても良い。   Then, the site worker sets the position of interest Pm as a temporary measurement position on the 3D model of the portable terminal 50 so that the measurement light hits the actual floor surface 2R under construction (attention position setting step S15). ). Then, the data of the position coordinates (Xm, Ym, Zm) of the target position Pm is transmitted from the portable terminal 50 to the total station 10. The position of interest Pm may be set not from the mobile terminal 50 but from an appropriate operation switch (not shown) provided in the total station 10.

次に、着目位置Pmの位置座標(Xm,Ym,Zm)のデータを受信したトータルステーション10は、施工現場における着目位置Pmに向けて計測用光を投光する。そして、前述の計測機能を用いることにより、この計測用光が実床面2Rにおいて当たった位置を計測位置Pkとして、トータルステーション10は同位置Pkの位置座標(Xk,Yk,Zk)を算出する(計測位置算出ステップS20)。   Next, the total station 10 that has received the data of the position coordinates (Xm, Ym, Zm) of the target position Pm projects measurement light toward the target position Pm at the construction site. Then, by using the measurement function described above, the total station 10 calculates the position coordinates (Xk, Yk, Zk) of the position Pk with the position where the measurement light hits the actual floor 2R as the measurement position Pk ( Measurement position calculation step S20).

そうしたら、トータルステーション10と携帯端末50とは互いに協働して、位置座標(Xk,Yk,Zk)が算出された計測位置PkのXY座標(Xk,Yk)と一致する設計床面2V上の位置の位置座標を、3Dモデルの設計データから取得する。つまり、トータルステーション10は、携帯端末50へ計測位置PkのXY座標(Xk,Yk)を送信し、これを受信した携帯端末50は、自身のメモリ内の3Dモデルの設計床面2Vに係るデータを検索して、このXY座標(Xk,Yk)とXY座標が一致する位置Paの三次元座標(Xa,Ya,Za)、つまり三次元座標(Xk,Yk,Za)を設計床面2Vのデータから取得する(設計面位置座標取得ステップS30)。なお、この位置Paが、請求項の「計測位置の平面位置座標と一致する前記設計面上の位置」に相当する。   Then, the total station 10 and the portable terminal 50 cooperate with each other on the design floor 2V where the position coordinates (Xk, Yk, Zk) coincide with the calculated XY coordinates (Xk, Yk) of the measurement position Pk. The position coordinates of the position are acquired from the design data of the 3D model. That is, the total station 10 transmits the XY coordinates (Xk, Yk) of the measurement position Pk to the portable terminal 50, and the portable terminal 50 that has received the data transmits the data related to the design floor 2V of the 3D model in its own memory. By searching, the three-dimensional coordinates (Xa, Ya, Za) of the position Pa where the XY coordinates (Xk, Yk) and the XY coordinates coincide, that is, the three-dimensional coordinates (Xk, Yk, Za) are data of the design floor 2V. (Design surface position coordinate acquisition step S30). This position Pa corresponds to “a position on the design surface that coincides with the plane position coordinates of the measurement position” in the claims.

そして、この取得した設計床面2V上の位置Paの三次元座標(Xk,Yk,Za)のうちのZ座標(Za)と、計測位置Pk(Xk,Yk,Zk)のZ座標(Zk)とに基づいて、携帯端末50は、施工誤差Eを算出する(施工誤差算出ステップS35)。すなわち、計測位置PkのZ座標(Zk)から設計床面2V上の位置PaのZ座標(Za)を減算することにより、設計床面2Vに対する実床面2Rの施工誤差E(=Zk−Za)を求める。   Then, the Z coordinate (Za) of the acquired three-dimensional coordinates (Xk, Yk, Za) of the position Pa on the design floor 2V and the Z coordinate (Zk) of the measurement position Pk (Xk, Yk, Zk). Based on the above, the portable terminal 50 calculates the construction error E (construction error calculation step S35). That is, by subtracting the Z coordinate (Za) of the position Pa on the design floor 2V from the Z coordinate (Zk) of the measurement position Pk, the construction error E (= Zk−Za) of the actual floor 2R with respect to the design floor 2V. )

なお、この施工誤差算出ステップS40の演算(Zk−Za)は、携帯端末50の方で行わずに、トータルステーション10の方で行っても良い。但し、その場合には、この演算に先だって、設計面位置座標取得ステップS30で携帯端末50が取得した位置Paの位置座標(Xk,Yk,Za)を携帯端末50からトータルステーション10へ送信するのは言うまでもない。   Note that the calculation (Zk−Za) in the construction error calculation step S40 may be performed by the total station 10 instead of by the portable terminal 50. However, in this case, prior to this calculation, the position coordinates (Xk, Yk, Za) of the position Pa acquired by the mobile terminal 50 in the design surface position coordinate acquisition step S30 are transmitted from the mobile terminal 50 to the total station 10. Needless to say.

そうしたら、この施工誤差Eを、計測位置Pkの位置座標と対応付けて、携帯端末50のメモリに記録するとともに、これと同時並行又は前後して、施工誤差Eを携帯端末50のモニターに表示するか、若しくは、この施工誤差Eをトータルステーション10に送信してトータルステーション10のメモリに記録するとともに、これと同時並行又は前後して、施工誤差Eをトータルステーション10のモニターに表示する。これにより、現場作業者は、実床面2Rの施工誤差Eを知ることができる。   Then, this construction error E is recorded in the memory of the portable terminal 50 in association with the position coordinates of the measurement position Pk, and at the same time or in parallel with this, the construction error E is displayed on the monitor of the portable terminal 50. Alternatively, the construction error E is transmitted to the total station 10 and recorded in the memory of the total station 10, and the construction error E is displayed on the monitor of the total station 10 in parallel or before and after this. Thereby, the field worker can know the construction error E of the actual floor surface 2R.

そして、現場作業者は、この施工誤差Eの値に従って施工中の実床面2Rを手直しする。例えば、施工誤差Eが正値の場合には、計測位置Pkは、設計床面2Vよりも鉛直方向に高いので、この値Eの分だけ実床面2Rの表面をはつるなどして均してその高さを低くする。一方、負値の場合には、計測位置Pkは、設計床面2Vよりも鉛直方向に低いので、この値Eの分だけ更に流動下のコンクリートを盛るなどしてその高さを高くする。   Then, the site worker reworkes the actual floor surface 2R under construction according to the value of the construction error E. For example, when the construction error E is a positive value, the measurement position Pk is higher in the vertical direction than the design floor surface 2V, so the surface of the actual floor surface 2R is smoothed by this value E, for example. Lower the height. On the other hand, in the case of a negative value, the measurement position Pk is lower in the vertical direction than the design floor surface 2V. Therefore, the height of the measurement position Pk is increased by, for example, depositing more concrete under flow.

また、ここで望ましくは、この手直し作業行う時点、つまり少なくとも上述の「施工誤差算出ステップS35」よりも後の時点においても、計測用光を実床面2Rに向けて投光し続けていると良く、更には計測用光が赤色可視光であると良い。そのようになっていれば、施工誤差Eを有する実床面2R上の位置を、計測用光のスポットで現場作業者は視認することができて、これにより、手直し精度の向上を図ることができる。   In addition, preferably, the measurement light is continuously projected toward the actual floor 2R at the time of performing the reworking operation, that is, at least after the above-described “construction error calculation step S35”. Furthermore, the measurement light is preferably red visible light. If so, the site worker can visually recognize the position on the actual floor surface 2R having the construction error E with the spot of the light for measurement, thereby improving the retouching accuracy. it can.

===その他の実施の形態===
以上、本発明の実施形態について説明したが、上記の実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。また、本発明は、その趣旨を逸脱することなく、変更や改良され得ると共に、本発明にはその等価物が含まれるのはいうまでもない。例えば、以下に示すような変形が可能である。
=== Other Embodiments ===
As mentioned above, although embodiment of this invention was described, said embodiment is for making an understanding of this invention easy, and is not for limiting and interpreting this invention. Further, the present invention can be changed or improved without departing from the gist thereof, and needless to say, the present invention includes equivalents thereof. For example, the following modifications are possible.

上述の実施形態では、計測用光として可視レーザー光を用いるのが望ましい旨を前述したが、何等これに限るものではない。場合によっては、計測用光に不可視のレーザー光を用いても良い。但し、その場合には、算出された施工誤差Eを有する位置を、実床面2R上にスポットとして指し示すことができないので、上述のような可視レーザー光を用いる方が望ましい。   In the above-described embodiment, it has been described that it is desirable to use visible laser light as the measurement light. However, the present invention is not limited to this. In some cases, invisible laser light may be used as measurement light. However, in that case, since the position having the calculated construction error E cannot be indicated as a spot on the actual floor 2R, it is preferable to use the visible laser light as described above.

上述の実施形態では、実床面2Rの施工誤差Eを求めていたが、何等これに限るものではない。例えば、図3の概略側面図に示すように、構造体の3Dモデルの鉛直な設計壁面4Vに基づき施工現場に形成される実際の壁面4R(以下、実壁面4Rと言う)について施工誤差Eを求めても良い。そして、その場合には、上述の実施形態の説明において、「床面」を「壁面」に置き換え、XY座標となっていた平面位置座標を、設計壁面4Vを規定するYZ座標に置き換え、更に、Z座標となっていた法線位置座標を、設計壁面4Vの法線方向となるX座標に置き換えて考えれば良い。詳しくは、次の通りである。
先ず、施工中又は施工直後の実壁面4R上に計測用光が当たるように、携帯端末50の3Dモデル上において、仮の計測位置として着目位置Pmを指定する。すると、トータルステーション10は、施工現場における着目位置Pmに向けて計測用光を投光し、この計測用光が実壁面4Rにおいて当たった位置を計測位置Pkとして、トータルステーション10は同位置Pkの位置座標(Xk,Yk,Zk)を算出する。
In the above-described embodiment, the construction error E of the actual floor surface 2R is obtained, but it is not limited to this. For example, as shown in the schematic side view of FIG. 3, the construction error E is calculated for an actual wall surface 4R (hereinafter referred to as an actual wall surface 4R) formed on the construction site based on the vertical design wall surface 4V of the 3D model of the structure. You may ask. In that case, in the description of the above-described embodiment, “floor surface” is replaced with “wall surface”, the plane position coordinates that have become the XY coordinates are replaced with YZ coordinates that define the design wall surface 4V, What is necessary is just to consider replacing the normal position coordinate that has been the Z coordinate with the X coordinate that is the normal direction of the design wall surface 4V. Details are as follows.
First, the target position Pm is designated as a temporary measurement position on the 3D model of the portable terminal 50 so that the measurement light strikes the actual wall surface 4R during or immediately after the construction. Then, the total station 10 projects measurement light toward the target position Pm at the construction site, and the position where the measurement light hits the actual wall surface 4R is set as the measurement position Pk, and the total station 10 has the position coordinates of the same position Pk. (Xk, Yk, Zk) is calculated.

そうしたら、トータルステーション10と携帯端末50とは互いに協働して、位置座標(Xk,Yk,Zk)が算出された計測位置PkのYZ座標(Yk,Zk)と一致する設計壁面4V上の位置の位置座標を、3Dモデルの設計データから取得する。つまり、トータルステーション10は、携帯端末50へ計測位置PkのYZ座標(Yk,Zk)を送信し、これを受信した携帯端末50は、自身のメモリ内の3Dモデルの設計壁面4Vに係るデータを検索して、このYZ座標(Yk,Zk)とYZ座標が一致する位置Paの三次元座標(Xa,Ya,Za)、つまり三次元座標(Xa,Yk,Zk)を設計壁面4Vのデータから取得する(設計面位置座標取得ステップ)。   Then, the total station 10 and the portable terminal 50 cooperate with each other, and the position on the design wall surface 4V where the position coordinate (Xk, Yk, Zk) coincides with the YZ coordinate (Yk, Zk) of the calculated measurement position Pk. Are acquired from the design data of the 3D model. In other words, the total station 10 transmits the YZ coordinates (Yk, Zk) of the measurement position Pk to the mobile terminal 50, and the mobile terminal 50 that has received this searches for data related to the design wall surface 4V of the 3D model in its own memory. Then, the three-dimensional coordinates (Xa, Ya, Za) of the position Pa where the YZ coordinates (Yk, Zk) coincide with the YZ coordinates, that is, the three-dimensional coordinates (Xa, Yk, Zk) are acquired from the data of the design wall surface 4V. (Design surface position coordinate acquisition step).

そして、この取得した設計壁面4V上の位置Paの三次元座標(Xa,Yk,Zk)のうちのX座標(Xa)と、計測位置Pk(Xk,Yk,Zk)のX座標(Xk)とに基づいて、携帯端末50は、実壁面4Rの施工誤差Eを算出する(施工誤差算出ステップ)。すなわち、計測位置PkのX座標(Xk)から設計壁面4V上の位置PaのX座標(Xa)を減算することにより、設計壁面4Vに対する実壁面4Rの施工誤差E(=Xk−Xa)を求める。そして、これを適宜なモニターに表示する。   Then, the X coordinate (Xa) of the three-dimensional coordinates (Xa, Yk, Zk) of the position Pa on the acquired design wall surface 4V, and the X coordinate (Xk) of the measurement position Pk (Xk, Yk, Zk) The portable terminal 50 calculates the construction error E of the actual wall surface 4R (construction error calculation step). That is, the construction error E (= Xk−Xa) of the actual wall surface 4R with respect to the design wall surface 4V is obtained by subtracting the X coordinate (Xa) of the position Pa on the design wall surface 4V from the X coordinate (Xk) of the measurement position Pk. . Then, this is displayed on an appropriate monitor.

上述の実施形態では、位置座標が既知の二つの基準位置をトータルステーション10で予め計測し、この基準位置との相対位置関係に基づいて周囲の任意位置の三次元座標を計測可能としていたが、何等これに限るものではない。例えば、トータルステーション10がGPS機能を有し、このGPS機能に基づいて自身10の位置座標を取得し、この自身10の位置座標と、計測用光により計測される計測位置Pkまでの距離と、計測用光の投光方向の水平角度や鉛直角度とに基づいて、計測位置Pkの三次元座標を算出しても良い。   In the above-described embodiment, two reference positions whose position coordinates are known are measured in advance by the total station 10, and the three-dimensional coordinates of the surrounding arbitrary positions can be measured based on the relative positional relationship with the reference position. This is not a limitation. For example, the total station 10 has a GPS function, acquires the position coordinates of itself 10 based on the GPS function, and measures the position coordinates of itself 10 and the distance to the measurement position Pk measured by the measurement light, The three-dimensional coordinates of the measurement position Pk may be calculated based on the horizontal angle or the vertical angle in the light projecting direction.

上述の実施形態では、携帯端末50に格納された3Dモデル上で着目位置Pmの指定を行うことにより、トータルステーション10に、施工誤差計測の起点となる着目位置Pmの入力を実行していたが、着目位置Pmの入力は、何等これに限るものではない。例えば、トータルステーション10が一体に備える適宜な入力画面から、着目位置Pmの三次元座標(Xm,Ym,Zm)を直接入力しても良いし、それ以外の方法で入力しても良い。   In the above-described embodiment, by specifying the target position Pm on the 3D model stored in the mobile terminal 50, the total position 10 is input with the target position Pm serving as a starting point for construction error measurement. The input of the position of interest Pm is not limited to this. For example, the three-dimensional coordinates (Xm, Ym, Zm) of the target position Pm may be directly input from an appropriate input screen provided integrally with the total station 10, or may be input by other methods.

2R 実床面(実際の面)、2V 設計床面(設計面)、
4R 実壁面(実際の面)、4V 設計壁面(設計面)、
10 トータルステーション(測量計)、
50 携帯端末、
Pa 位置(計測位置の平面位置座標と一致する前記設計面上の位置)、
Pk 計測位置、Pm 着目位置、Ps 設置位置、
E 施工誤差、
2R actual floor surface (actual surface), 2V design floor surface (design surface),
4R actual wall (actual surface), 4V design wall (design surface),
10 Total station (surveying meter),
50 mobile devices,
Pa position (position on the design surface that coincides with the plane position coordinates of the measurement position),
Pk measurement position, Pm focus position, Ps installation position,
E Construction error,

Claims (4)

三次元位置座標を計測可能な測量計を用いることにより、
設計データで規定された設計面と、前記設計データに基づいて形成される実際の面との間の前記設計面の法線方向の施工誤差を求める方法であって、
前記測量計は、任意の着目位置に向けて計測用光を投光し、前記実際の面上において前記計測用光が当たる位置からの反射光を受光することで、前記当たる位置を計測位置としてその位置座標を出力するともに、出力された前記計測位置の位置座標を、前記設計面内の平面位置を規定する平面位置座標と、前記設計面の法線方向の位置を規定する法線位置座標とで示す機能を有し、
前記計測位置の平面位置座標と一致する前記設計面上の位置の位置座標を、前記設計データから取得する設計面位置座標取得ステップと、
前記計測位置の法線位置座標と、前記設計面位置座標取得ステップで取得した前記設計面上の位置の法線位置座標とに基づいて、前記施工誤差を算出する施工誤差算出ステップと、を有し、
前記施工誤差を求める方法は、流動物の打設の際に実行され、
前記実際の面は、前記流動物の打設により形成された面であり、
前記実際の面が前記設計面よりも高い場合には、前記流動物の高さを低くし、前記実際の面が前記設計面よりも低い場合には、前記流動物の高さを高くすることを特徴とする施工誤差を求める方法。
By using a surveying instrument that can measure 3D position coordinates,
A method for obtaining a construction error in a normal direction of the design surface between a design surface defined by design data and an actual surface formed based on the design data,
The surveying instrument projects measurement light toward an arbitrary position of interest, and receives reflected light from a position where the measurement light strikes on the actual surface, whereby the contact position is set as a measurement position. While outputting the position coordinates, the output position coordinates of the measurement position are defined as plane position coordinates defining the plane position in the design surface and normal position coordinates defining the position of the design surface in the normal direction. And has the function indicated by
A design surface position coordinate acquisition step of acquiring, from the design data, a position coordinate of a position on the design surface that coincides with a plane position coordinate of the measurement position;
A construction error calculating step for calculating the construction error based on the normal position coordinates of the measurement position and the normal position coordinates of the position on the design surface acquired in the design surface position coordinate acquisition step; And
The method for obtaining the construction error is executed at the time of placing the fluid,
The actual surface is a surface formed by placing the fluid,
When the actual surface is higher than the design surface, the height of the fluid is lowered, and when the actual surface is lower than the design surface, the height of the fluid is increased. A method of obtaining construction errors characterized by
請求項1に記載の施工誤差を求める方法であって、
前記施工誤差算出ステップでは、前記計測位置の法線位置座標から前記設計面上の位置の法線位置座標を減算することにより、前記施工誤差を求めることを特徴とする施工誤差を求める方法。
A method for obtaining a construction error according to claim 1,
In the construction error calculating step, the construction error is obtained by subtracting the normal position coordinates of the position on the design surface from the normal position coordinates of the measurement position.
請求項1又は2に記載の施工誤差を求める方法であって、
前記計測用光は、可視光であることを特徴とする施工誤差を求める方法。
A method for obtaining a construction error according to claim 1 or 2,
The measuring light is visible light, and a method for obtaining a construction error.
請求項3に記載の施工誤差を求める方法であって、
前記施工誤差算出ステップよりも少なくとも後の時点において、前記計測用光を投光することを特徴とする施工誤差を求める方法。
A method for obtaining a construction error according to claim 3,
A method for obtaining a construction error, wherein the measuring light is projected at least at a time point after the construction error calculating step.
JP2011169451A 2011-08-02 2011-08-02 How to calculate construction error Expired - Fee Related JP5857508B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011169451A JP5857508B2 (en) 2011-08-02 2011-08-02 How to calculate construction error

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011169451A JP5857508B2 (en) 2011-08-02 2011-08-02 How to calculate construction error

Publications (2)

Publication Number Publication Date
JP2013032984A JP2013032984A (en) 2013-02-14
JP5857508B2 true JP5857508B2 (en) 2016-02-10

Family

ID=47788978

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011169451A Expired - Fee Related JP5857508B2 (en) 2011-08-02 2011-08-02 How to calculate construction error

Country Status (1)

Country Link
JP (1) JP5857508B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6454573B2 (en) * 2015-03-17 2019-01-16 大成建設株式会社 Measuring method and level difference calculating apparatus using total station
JP6420734B2 (en) * 2015-07-24 2018-11-07 大成ロテック株式会社 Road auxiliary equipment construction method and moving direction instruction program
JP6966184B2 (en) * 2016-06-15 2021-11-10 株式会社トプコン Surveying system
JP2018004401A (en) * 2016-06-30 2018-01-11 株式会社トプコン Laser scanner and laser scanner system, and registration method for dot group data
JP7332015B2 (en) * 2018-10-04 2023-08-23 株式会社大林組 Construction work device and construction work method
JP7101385B2 (en) * 2018-10-09 2022-07-15 計測ネットサービス株式会社 Concrete placement finish management method and concrete placement finish management system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001133264A (en) * 1999-11-08 2001-05-18 Kansai Koji Sokuryo Kk Laser marking system and method therefor
JP4716175B2 (en) * 2005-07-13 2011-07-06 株式会社日立プラントテクノロジー Construction support method and construction support system
JP5312890B2 (en) * 2008-10-01 2013-10-09 西松建設株式会社 Excavation management method for invert section
JP5182951B2 (en) * 2009-06-16 2013-04-17 株式会社ソーキ Tunneling wall surface display device, display method, and display program
JP5308930B2 (en) * 2009-06-26 2013-10-09 株式会社ソーキ Displacement measurement method

Also Published As

Publication number Publication date
JP2013032984A (en) 2013-02-14

Similar Documents

Publication Publication Date Title
JP5857508B2 (en) How to calculate construction error
CN107121123B (en) Satellite precision single machine measurement method
US9151608B2 (en) Apparatus, tool, and method for modifying a portion of a floor plan based on measurements made by one or more sensors
KR101229129B1 (en) Method for measuring verticality of structure using GNSS and system thereof
US20080046221A1 (en) Method and system for automatically performing a study of a multidimensional space
JP2019086330A (en) Tower structure displacement measuring system
CN109668543A (en) Inclination measurement method based on laser radar
JP6095369B2 (en) CAD information generation system, CAD information generation program, and CAD information generation method
CN114858140B (en) Point cloud coordinate transformation method and device for deep-buried tunnel structural surface based on target device
JP3867025B2 (en) Tunnel control chart, its creation method and system
CN104931027A (en) Facing pattern projection setting-out method
WO2014200043A1 (en) Preparation system used in surveying work
JP5838638B2 (en) Survey method
KR101237434B1 (en) Realistic 3D Architecture Modeling Method using Survey Instrument
EP3961151B1 (en) Surveying system, staking assistance method, and staking assistance program
CN109917410A (en) A kind of automatic amendment attitude error laser range finder
US20210088330A1 (en) Methods and ranging apparatus for positioning target object in target space
JP3645253B1 (en) Volume calculation system
KR100571608B1 (en) Method for measuring corner part of construction using no-target pulse laser total station
KR101321109B1 (en) Method for surveying multi hidden point
RU128317U1 (en) SYSTEM FOR CARRYING OUT GEODESIC MEASUREMENTS
CN114776045B (en) Method, device and equipment for installing precast beam and readable storage medium
KR101284851B1 (en) Object measurement method and recording medium storing program therefor
TWI431251B (en) Distance measuring equipment and measuring method thereof
JP2018115893A (en) Magnetic field map creating method and magnetic field map creating device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140718

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150417

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150421

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150605

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151117

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151130

R150 Certificate of patent or registration of utility model

Ref document number: 5857508

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees