JP3838387B2 - Surveying system and surveying method - Google Patents

Surveying system and surveying method Download PDF

Info

Publication number
JP3838387B2
JP3838387B2 JP07674797A JP7674797A JP3838387B2 JP 3838387 B2 JP3838387 B2 JP 3838387B2 JP 07674797 A JP07674797 A JP 07674797A JP 7674797 A JP7674797 A JP 7674797A JP 3838387 B2 JP3838387 B2 JP 3838387B2
Authority
JP
Japan
Prior art keywords
surveying
survey
data
processing unit
instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP07674797A
Other languages
Japanese (ja)
Other versions
JPH10267656A (en
Inventor
保博 伊東
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nikon Corp
Original Assignee
Nikon Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikon Corp filed Critical Nikon Corp
Priority to JP07674797A priority Critical patent/JP3838387B2/en
Publication of JPH10267656A publication Critical patent/JPH10267656A/en
Application granted granted Critical
Publication of JP3838387B2 publication Critical patent/JP3838387B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、GPS(全地球測位システム)測量機や測角測距装置などの測量機器を用いて、地形の測量や基準点の測量を行う測量システム及び測量方法に関する。
【0002】
【従来の技術】
今日、GPS測量機を用いた測量が種々利用されるようになってきた。
このGPS測量機を用いた測量では、座標が確定している1又は複数の点にGPS測量機を設置し、座標が確定していない測定点に設けたGPS測量機の座標を算出確定して新たな基準点などとしていた。
【0003】
そして、このGPS測量機は、衛星からの電波を受信する受信アンテナと、受信した信号の内、所定の信号を選択して記憶する携帯用パーソナルコンピュータなどの情報収集装置とで構成し、少なくとも複数の受信アンテナを用いて異なる地点で同一の衛星からの電波を受信する。
このように、複数台のGPS測量機を用いて新たな座標を確定するに際しては、各GPS測量機が同時に複数の衛星からの電波を受信し、且つ、前記複数の衛星は同一の衛星とすることが必要であった。
【0004】
尚、この場合、座標が既に確定されている既知点の内の特定の既知点を選択し、座標を求める新点の位置と選択した既知点の位置とが網平均により測定誤差を修正して測量精度を高めることができるように、既知点を定めている。
又、各GPS測量機で同一の衛星から電波を受信できる時間により受信する衛星を決定することも測量計画として行われている。
【0005】
そして、この測量計画に基づき、GPS測量機に受信すべき衛星の番号、受信開始時刻や受信時間などを定めて情報収集装置とするマイクロコンピュータに設定することを行っていた。
そして、このようにして測量計画を立案し、この測量計画に基づいて測量を行うことにより、情報収集装置に受信アンテナで受信する電波から所要のデータを抜き出して記録していた。そして、この受信記録した測量データを事務所などに持ち帰った後、解析ソフトを組み込んだコンピュータである解析手段により測量データをロードし、解析処理を行って各GPS測量機を設置した位置の相対位置関係を求めていた。
【0006】
又、トータルステーションと呼ばれる高精度に方向角や上下角、及び、測点までの距離も計測可能なマイクロコンピュータを内蔵した測角測距装置を用いる測量においても、同様に、地図上で目的の新点の概略位置を決定し、既知点の決定を行っていた。
そして、このような測角測距装置では、既知点から目的の新点までの間に視認可能な複数の測点を定め、この測角測距装置を設置する測点を定めると共に、この測点から視認可能な目標とする測点を決定し、測角測距装置による計測方向も含む測量計画を立てるようにし、この測量計画に基づいて現場での測量を行っていた。
【0007】
尚、これらの測量計画の立案は、コンピュータを使用して選点図に基づいて平均計画図が作成され、網平均により測量誤差を修正することが極力容易となるように測点などを定めることも行われていた。
又、選点図は、座標の確定していない新点に対して、座標の確定している多数の既知点の内、網平均により誤差修正が容易な既知点を選択して決定するものである。更に、平均図は、決定した既知点と新点とを組み合わせて測量誤差を修正しつつ新点の座標を正確に算出するのに必要な多角形の組み合わせを定めるものである。そして、観測図は、平均図に基づいて各測点での測量条件などを定め、トータルステーションなどの測角測距装置を併用する場合は、どの測点に測角測距装置を設置してどの測点までの方向及び距離を測定するかも定めるものである。更に、天空図は、各測点での衛星の各時間における位置を示すものであって、時間毎の受信可能な衛星を決定するためのものである。
【0008】
【発明が解決しようとする課題】
前述のように、GPS測量機を用いて測量を行う場合、GPS測量機における複数台の受信アンテナの受信データを合わせて解析を行うことにより、測量を達成できることになる。
そして、各GPS測量機の受信データは、衛星の識別コードや時刻データ、位置データなどが含まれているが、1台のGPS測量機の受信データだけでは、受信の設定が正しく行われ且つ受信が正しく行われているか否かの判断が困難な場合が多かった。
【0009】
このため、各GPS測量機の受信データを持ち帰り、各受信データを合わせて解析を行ったときに1台の受信が正しく行われなかったことが判明すると、再度、現場に戻って測量を行うことが必要となり、現場が遠方の場合は、多くの時間と手数とが再度必要となる欠点があった。
又、トータルステーションなどの測角測距装置を用いる場合も、測点の数が多く、正確な測量を行うには各測点間の距離及び角度データに基づいた解析が必要であった。
【0010】
このため、現場では、正確な測量が行えたか否かの判断が困難な場合も多く、事務所などに持ち帰った後、解析を行った結果、再測量が必要であると判断されることもあった。
【0011】
【課題を解決するための手段】
本発明は、集中処理装置と複数の測量機器で構成され、集中処理装置は、測量機器の設置位置などの測量計画を記憶する測量計画管理手段と、各測量機器の測量データを通信手段を介して取り込むデータ取り込み手段と、データ取り込み手段に取り込んだ測量データにより測量の解析を行う測量データ解析手段と、解析結果を測量計画と合わせて測量誤差が許容範囲内であるかを判断し、許容範囲を超えたときは警告信号を出力する解析結果判断手段と、データ取り込み手段や解析結果判断手段を通信手段に接続し、前記通信手段で受信した測量データを前記データ取り込み手段に送り、解析結果判断手段からの警告信号を通信手段から送信させる通信接続手段とを有し、各測量機器は、測量データを通信手段により前記集中処理装置に送り、前記集中処理装置から警告信号が発せられたときは情報収集装置の表示部に警告を表示する送受信制御手段を有する測量システムとする。
【0012】
このように、測量機器に送受信制御手段を設け、通信手段により測量データを送ることができる測量機器とし、集中処理装置は各測量機器の測量データを取り込むデータ取り込み手段や測量データ解析手段を有するから、測量中に、又は測量の終了時であっても測量機器を現場に設置した状態で、集中処理装置により測量結果の解析及び測量誤差が許容範囲内かの判断を行うことができ、許容範囲を超えたときは警告信号を出力して測量機器を操作している作業者に再測量を促すことができる。
【0013】
又、本発明としては、集中処理装置は電話回線に接続し、各測量機器の通信手段は携帯電話機とする測量システムとすることが好ましい。
このように、通信手段として携帯電話機を用いれば、屋外の種々の条件の位置に設置する測量機器から容易に測量データを集中処理装置に送ることができる。
更に、本発明としては、この各測量機器をGPS測量機とする測量システムとするものである。
【0014】
このように、各測量機器をGPS測量機とする測量システムにおいては、測量機単体では測量計画に従った設定通りの受信が行われているか否かの確認ができないことが多いため、測量地点では測量の正否を判断することが極めて困難な測量であっても、集中処理装置に測量データを送信することにより、測量中に又は測量終了後、短時間で測量結果の正否を知ることができる。
【0015】
又、本発明は、測量計画に従って多数の測点を順次複数の測量機器を用いて測量するに際し、通信手段により測量現場から各測量機器の測量データを集中処理装置に送信し、集中処理装置により各測量機器の測量データを合わせて各測点の相対位置を求めて測点座標を算出する解析を行い、更に、解析結果の判断を行って再測量が必要なときには集中処理装置から再測量の必要な測量機器に再測量の要求を送信するものである。
【0016】
このように、測量データを通信手段により集中処理装置に送信するから、測量中に、又は測量の終了時であっても測量機器を現場に設置した状態で、集中処理装置により測量結果の解析を行うことができ、再測量の必要を現場の作業者に迅速に知らせることができる。
又、本発明としては、測量結果の解析を集中処理装置により行うに際し、先ず、測量データの数の確認を行うことが好ましい。
【0017】
このように、データ数の確認を先ず行うこととすれば、測量手順など測量数の誤りを短時間で発見することができる。
更に、本発明としては、集中処理装置には、測量計画のデータを記憶させておき、前記集中処理装置によって測量手順の確認を行うと共に、測量手順の指示データを測量機器に送信することが好ましい。
【0018】
このように、集中処理装置で測量手順の確認を行い、集中処理装置から測量機器に作業手順のデータを送信すれば、現場の作業者に作業手順を知らせることができ、集中管理により多数地点の作業の確認などを行って迅速且つ効果的に測量作業を行うことができる。
そして、本発明としては、この通信手段としては携帯電話機とすることが好ましい。
【0019】
このように、通信手段として携帯電話機を用いれば、屋外や郊外の種々の環境条件の位置に設置する測量機器から容易に測量データを集中処理装置に送ることができる。
【0020】
【発明の実施の形態】
本発明の第1の実施の形態は、GPS測量機を用いた測量を行うものである。 この実施の形態とする集中処理装置は、図1のAに示すように、モデム28を介して電話回線29に接続されるコンピュータを用いるものとしている。この集中処理装置10としてのコンピュータは、キーボードなどの入力手段21、CRTなどの表示手段22、プリンタなどの出力手段23を有し、本体には、測量計画管理手段11、データ取り込み手段12、測量データ解析手段13、解析結果判断手段14、及び、通信接続手段15としての機能を有するものである。
【0021】
この測量計画管理手段11は、選点図及び平均図や観測図更に天空図に基づく測量方法を記憶するものです。この測量方法は、観測位置の情報及び測量開始時刻や測量時間、受信すべき衛星の番号など、測量に必要な情報であることは、従来と同様である。
そして、この測量計画には、既知点の座標や使用する測量機器の種類及び製品ナンバー、更に、各測量機器である受信アンテナ31の設置位置などに関するデータも含ませることも従来と同様としている。
【0022】
尚、選点図及び平均図や観測図更に天空図は、従来と同様に、経験により図面を用いて作成し、又は別途コンピュータを用いて作成し、この各図に基づく測量計画を測量計画管理手段11に記憶させれば足りるものである。もっとも、選点図及び平均図や観測図更に天空図などのデータやプログラムも集中処理装置10としてのコンピュータに組み込み、測量計画管理手段11で測量計画を作成してこの作成した測量計画を測量計画管理手段11に記憶させるようにすることもできる。
【0023】
又、データ取り込み手段12は、電話回線29及びモデム28を介して送られる各測量機器30の測量データを、各々各測量機器30であるGPS測量機ごとに分けて記憶するものである。
そして、このデータ取り込み手段12は、測量計画管理手段11に記憶された測量計画に基づき、所定の時刻になると通信接続手段15を介して特定のGPS測量機から測量データを読み込むものとしている。
【0024】
更に、測量データ解析手段13は、測量計画管理手段11に記憶されている測量方法に基づいて、データ取り込み手段12に記憶された測量データの意味を解析するものであり、各測点の相対位置関係を求めると共に、多角網により測量誤差の修正を行って測点の座標を算出するものとしている。又、解析結果判断手段14によって各測量結果が許容値の範囲内であるかの確認を行いつつ解析を継続し、測量結果となる帳表や図面又はドキュメントを作成し、表示手段22や出力手段23に出力可能とするものである。
【0025】
尚、解析結果判断手段14は、解析処理の結果を測量計画の予想値などと比較して許容範囲を越える結果が算出されたとき、測量の再実行が必要なGPS測量機に通信接続手段15を介して警告信号を出力することもある。
又、通信接続手段15は、データ取り込み手段12や解析結果判断手段14、又は測量計画管理手段11に制御され、電話回線29を通して測量機器30であるGPS測量機に付設された通信手段49に集中処理装置10を接続するものである。又、この通信接続手段15は、GPS測量機に付設された通信手段49から信号が入力されると集中処理装置10の各手段に通信手段49を接続してデータなどを所要の手段に伝達するものである。
【0026】
そして、測量機器30であるGPS測量機は、図1のBに示したように、受信アンテナ31と情報収集装置35である携帯用パーソナルコンピュータとを有し、測量標が設置されている測点55の上に三脚51などを用いて受信アンテナ31が固定されるものである。更に、このGPS測量機は、モデム48を介してこの情報収集装置35に接続される通信手段49としての携帯電話を有するものとしている。
【0027】
この情報収集装置35は、キーボードなどの入力部と液晶画面などの表示部39とを有する携帯用パーソナルコンピュータであって、従来と同様に、測量制御手段36と測量データ記憶手段37の機能を有し、測量制御手段36により受信アンテナ31が受信する電波の内、設定された時刻や時間、選択された衛星からの必要なデータを選別して測量データ記憶手段37に記憶させるものとしている。
【0028】
又、この情報収集装置35は、測量制御手段36と測量データ記憶手段37の他、送受信制御手段38としての機能をも有するものである。
この送受信制御手段38は、所定の時刻になると通信手段49を作動させ、測量データ記憶手段37に記憶した測量データを集中処理装置10に送る制御を行うものである。又、集中処理装置10からデータの読み出し制御信号が入力されたときも、この送受信制御手段38は、測量データ記憶手段37に記憶した測量データを集中処理装置10に送る制御を行うものとしている。更に、集中処理装置10から警告信号が発せられたときは、情報収集装置35の表示部に警告を表示し、又、発音装置を有する情報収集装置35においては警告音を発音させるものである。
【0029】
そして、この通信手段49としては携帯電話機を用いるものとし、送受信制御手段38には、集中処理装置10を接続する電話回線29の電話番号や集中処理装置10に取り付けたモデム28との通信プロトコルなどを設定しておく。尚、一般の電話回線が測量現場に引かれている場合、通信手段49として直接に電話回線を使用することもできる。
【0030】
従って、このシステムでは、GPS測量機により測量を開始し、情報収集装置35の測量データ記憶手段37に測量データを記憶するとき、送受信制御手段38により通信手段49を介して測量データを集中処理装置10に転送することができる。そして、測量データ解析手段13や解析結果判断手段14により測量データの適否を判断し、測量中、又は測量終了後、測量機器30であるGPS測量機を測点に設置した状態で直ちに再測量が必要か否かを知ることができる。
【0031】
又、トータルステーションなどの測角測距装置33を測量機器に使用する測量システムとすることもある。
このシステムでは、図1のAに示した集中処理装置10の測量計画管理手段11に記憶させる測量計画として、測角測距装置33に合わせた測量計画を記憶させる。又、測量データ解析手段13は、測角測距装置33の距離データや角度データ、及び、座標データを測量計画に基づいて解析する測量データ解析手段13としておく。
【0032】
そして、測量機器としては図2に示すように、データ記憶装置41にモデム48を介して通信手段49を接続する。
このデータ記憶装置41は、トータルステーションの本体に接続され、トータルステーション本体の内部コンピュータに記憶された測量データを外部に取り出す外部記憶装置として用いられるマイクロコンピュータを利用する。そして、トータルステーション33の内部コンピュータに記憶された測量データを外部に取り出すデータ読みだし手段43を有すると共に、送受信制御手段45を有するものとしている。
【0033】
この送受信制御手段45やモデム48は、GPS測量機の送受信制御手段38やモデム48と同様のものである。
このように、測量機器30に通信手段49を設けて集中処理装置10に測量データを送信可能とすることにより、座標が未知であった新点での測量が終了したときに測量データを転送すれば、測点に測量機器30を設置したままでそのまま再測量を開始できる。又、測量が終了したときに測量データを転送し、近くの次の新点への移動中に解析処理及び解析判断を行い、再測量を行うに際して測量現場に戻る時間を短縮することができる。
【0034】
更に、GPS測量機の情報収集装置35に表示部39を有するパーソナルコンピュータを用いている場合、測量計画管理手段11に記憶された測量計画により、次の測量地点の指示のデータを測量機器30であるGPS測量機に送り、作業者に指示を送ることもある。又、トータルステーション33のように、内部にコンピュータを有し且つ表示部も有する測角測距装置に対しても、同様に次の測量位置の指示データを送ることができる。
【0035】
このように、次の測量位置の指示を集中処理装置10から送信すれば、多数の未地点の座標を順次測量するとき、作業者の負担を少なくすることができる。
そして、集中処理装置10から送信するデータとしては、測量計画に基づいた測量手順の指示を送信することもできる。
このように、手順の指示を行う場合は、作業者の負担を少なくすると共に、多少不慣れな作業者であっても、的確な測量作業を進めることができる。
【0036】
尚、測角測距装置を用いる測量では、測量データの解析処理を測量データ解析手段13で行うに際し、測量データの数を先ず確認することもある。
このように、測量データ数の確認を行えば、測量に誤りがなかったことの確認を極めて短時間で行い、誤りがあったときは現場の作業者に直ちに警告信号を送って知らせることができる。
【0037】
このように、集中処理装置10に測量計画管理手段11を設けた測量システムは、通信手段49及び通信接続手段15や送受信制御手段38,45などにより、測量データを集中処理装置10に集めて一箇所で測量計画に基づく測量作業の確認を行うことができる。そして、多数の測点での測量を実施し、又、この測量の状態を管理できるため、測量機器30の操作や測量作業に習熟していない作業者を現場に配置する場合であっても、集中処理装置10からの指示により的確に且つ迅速に測量作業を行うことができる。
【0038】
又、通信手段49とする携帯電話機は、屋外や郊外などを移動しつつ測量を行うこともある測量機器30からのデータ送信を極めて容易に実行することができるものである。
尚、測量機器30の近くに作業者がいる場合、送受信制御手段38により自動的に測量データを集中処理装置10に送る場合のみでなく、作業者が通信手段49及び測量制御手段36をマニュアル操作して測量データを集中処理装置10に送ることもできる。
【0039】
この場合、自動計測を行う測量機器30では、1人の作業者で複数の測量地点を回ることが可能となり、数少ない作業者で正しく測量を行うことができる。
又、この通信手段49としては、衛星通信が可能な携帯電話やデジタル通信電話などを用いることができる。
更に、この測量システムとしては、GPS測量機と測角測距装置とを併用するシステムとすることもある。
【0040】
【発明の効果】
請求項1に記載した発明は、集中処理装置と複数の測量機器で構成され、集中処理装置は、測量計画を記憶する測量計画管理手段と、測量データを取り込むデータ取り込み手段と、取り込んだ測量データにより測量の解析を行う測量データ解析手段と、測量誤差が許容範囲内であるかを判断して警告信号を出力することのできる解析結果判断手段と、データ取り込み手段などを通信手段に接続する通信接続手段とを有し、各測量機器は、測量データを前記通信手段により集中処理装置に送り、警告信号を受信すると表示部に警告表示を行う送受信制御手段を有す測量システムである。
【0041】
従って、各測量機器で測量したデータを集中処理装置へ通信手段により送信し、集中処理装置で各測量機器のデータを集めた解析を行うことができる。このため、測量機器を現場に配置した状態などでも測量結果の適否判断ができ、再測量が必要な場合は警告信号を送信して警告表示を測量機器に表示するため、迅速に再測量を開始することができる。
又、請求項2に記載した発明は、集中処理装置が電話回線に接続され、各測量機器の通信手段を携帯電話機とする測量システムである。
【0042】
従って、屋外や郊外など、種々の環境条件の現場に設置する測量機器から、常に容易に測量データを集中処理装置に送信し、警告信号を受信することができる。
そして、請求項3に記載した発明は、各測量機器をGPS測量機とする測量システムである。
従って、測量機単体では測量データの適否の確認が不可能なGPS測量機を使用する場合であっても、測量中に、又は測量終了後比較的短時間で、測量結果の適否を知ることができる。このため、再測量が必要な場合は、迅速に再測量を開始することができる。
【0043】
更に、請求項4に記載した発明は、測量計画に従って多数の測点で順次複数の測量機器を用いて測量を行うに際し、通信手段により測量現場から各測量機器の測量データを集中処理装置に送信し、集中処理装置により各測量機器の測量データを合わせて測点座標を算出する解析を行い、更に解析結果の判断を行って再測量が必要なときには集中処理装置から再測量の要求を必要な測量機器に送信する測量方法ある。
【0044】
このように、現場での測量中に、又は測量終了時に、測量データを現場から集中処理装置に送信するから、短時間で測量結果の適否を集中処理装置で知ることができ、測量データが不適切であれば、再測量要求を行うことにより、直ちに再測量を行うことができる。
又、請求項5に記載した発明は、測量結果の解析を前記集中処理装置により行うに際し、先ず、測量データの数の確認を行う測量方法である。
【0045】
このように、データ数の確認を行えば、測量に誤りがあった場合には、極めて短時間で再測量の必要性を判断することができる。
そして、請求項6に記載した発明は、集中処理装置には、測量計画のデータを記憶させておき、集中処理装置によって測量手順の確認を行うと共に、測量手順の指示データを測量機器に送信する測量方法である。
【0046】
このように、集中処理装置により測量手順の確認及び手順の指示データの送信を行えば、作業者の負担を軽くし、迅速に誤りのない測量作業を行うことが可能となる。
更に、請求項7に記載した発明は、通信手段として携帯電話機を使用する測量方法である。
【0047】
このように、携帯電話機を使用すれば、手軽に、郊外などの種々の環境条件の現場から集中処理装置に測量データを送信し、又、集中処理装置からの指示を受信することができる。
【図面の簡単な説明】
【図1】 本発明のシステムに用いる中央処理装置及び測量機器の一例を示す概略図。
【図2】 本発明のシステムに用いる測量機器の他の例を示す図。
【符号の説明】
10 集中処理装置
11 測量計画管理手段 12 データ取り込み手段
13 測量データ解析手段 14 解析結果判断手段
15 通信接続手段
21 入力手段 22 表示手段
23 出力手段
28 モデム 29 電話回線
30 測量機器
31 受信アンテナ 33 測角測距装置
35 情報収集装置
36 測量制御手段 37 測量データ記憶手段
38 送受信制御手段 39 表示部
41 データ記憶装置
43 データ読み出し手段 45 送受信制御手段
48 モデム 49 通信手段
51 三脚 55 測点
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a surveying system and a surveying method for surveying terrain and surveying a reference point using a surveying instrument such as a GPS (Global Positioning System) surveying instrument or an angle measuring device.
[0002]
[Prior art]
Today, various types of surveying using a GPS surveying instrument have come into use.
In surveying using this GPS surveying instrument, the GPS surveying instrument is installed at one or more points where the coordinates are fixed, and the coordinates of the GPS surveying instrument provided at the measuring points where the coordinates are not fixed are calculated and determined. It was a new reference point.
[0003]
The GPS surveying instrument includes a receiving antenna that receives radio waves from a satellite, and an information collecting device such as a portable personal computer that selects and stores a predetermined signal among the received signals. Receive radio waves from the same satellite at different points.
As described above, when determining new coordinates using a plurality of GPS surveying instruments, each GPS surveying instrument simultaneously receives radio waves from a plurality of satellites, and the plurality of satellites are the same satellite. It was necessary.
[0004]
In this case, a specific known point is selected from known points whose coordinates have already been determined, and the measurement error is corrected by the net average between the position of the new point for which the coordinate is obtained and the position of the selected known point. Known points are determined so that surveying accuracy can be improved.
In addition, it is also carried out as a survey plan to determine a satellite to be received based on a time when each GPS surveying instrument can receive radio waves from the same satellite.
[0005]
Based on this survey plan, the satellite number to be received by the GPS surveying instrument, the reception start time, the reception time, etc. are determined and set in the microcomputer as the information collecting device.
Then, the surveying plan is made in this way, and by performing the surveying based on the surveying plan, necessary data is extracted from the radio wave received by the receiving antenna and recorded in the information collecting device. Then, after taking the received and recorded survey data back to the office etc., load the survey data by the analysis means that is a computer incorporating analysis software, perform the analysis process, and the relative position of the position where each GPS survey instrument was installed I was looking for a relationship.
[0006]
Similarly, in surveying using an angle measuring device with a built-in microcomputer that can measure the direction angle, vertical angle, and distance to a measuring point with high accuracy, called a total station, a new target on the map can be used. The approximate position of the point was determined, and the known point was determined.
In such an angle measuring device, a plurality of measuring points that are visible between a known point and a target new point are determined, a measuring point where the angle measuring device is installed is determined, and A target measurement point that can be visually recognized from the point is determined, and a survey plan including a measurement direction by the angle measuring device is made, and a survey is performed on the site based on the survey plan.
[0007]
In planning these survey plans, an average plan map is created based on the collocation chart using a computer, and the survey points are determined so that it is as easy as possible to correct the survey error by the net average. Was also done.
In addition, the collocation chart is to select and determine a known point that can be easily corrected by a network average among a number of known points whose coordinates are determined for a new point whose coordinates are not fixed. is there. Further, the average chart determines the combination of polygons necessary for accurately calculating the coordinates of the new point while correcting the survey error by combining the determined known point and the new point. The observation map defines surveying conditions at each measurement point based on the average map, and when using an angle measurement device such as a total station, it is necessary to install the angle measurement device at which point. It also defines the direction and distance to the station. Further, the sky map shows the positions of the satellites at the respective measuring points at each time, and is for determining the receivable satellites at each time.
[0008]
[Problems to be solved by the invention]
As described above, when surveying is performed using a GPS surveying instrument, the surveying can be achieved by performing analysis by combining the reception data of a plurality of receiving antennas in the GPS surveying instrument.
The received data of each GPS surveying instrument includes satellite identification codes, time data, position data, etc., but reception settings are correctly performed and received only with the received data of one GPS surveying instrument. In many cases, it was difficult to judge whether or not
[0009]
For this reason, if it is found that the received data of each GPS surveying instrument is taken back and analysis is performed by combining the received data, if it is found that one of the receptions has not been performed correctly, it is necessary to return to the site and perform surveying again. When the site is far away, a lot of time and effort is required again.
Also, when using an angle measuring device such as a total station, the number of measurement points is large, and an analysis based on distance and angle data between the measurement points is necessary to perform accurate surveying.
[0010]
For this reason, it is often difficult to determine whether or not accurate surveying has been performed at the site, and it may be determined that re-surveying is necessary as a result of analysis after taking it back to the office. It was.
[0011]
[Means for Solving the Problems]
The present invention comprises a central processing unit and a plurality of surveying instruments. The central processing unit includes a survey plan management means for storing a survey plan such as the installation position of the survey instrument, and survey data of each survey instrument via a communication unit. Data importing means, surveying data analysis means for analyzing surveys using the survey data imported into the data importing means, and combining the analysis results with the survey plan to determine whether the survey error is within the allowable range. The analysis result judging means for outputting a warning signal when the data exceeds the limit , the data fetching means and the analysis result judging means are connected to the communication means, and the survey data received by the communication means is sent to the data fetching means to determine the analysis result and a communication connecting means Ru to send a warning signal from the means from the communication means, the surveying instrument, Ri sent to the centralized processing unit via the communication means survey data A surveying system having a transmission and reception control unit that displays a warning on the display unit of the information collecting device when the warning signal is issued from the centralized processing unit.
[0012]
As described above, the surveying instrument is provided with the transmission / reception control unit, and the surveying instrument can transmit the surveying data by the communication unit, and the central processing unit has the data capturing unit and the surveying data analyzing unit for capturing the surveying data of each surveying instrument. During surveying, or with the surveying equipment installed at the site even at the end of surveying, the central processing unit can analyze the survey results and determine whether the survey error is within the allowable range. when it exceeds the Ru can prompt a re-surveying the work who is operating the surveying equipment to output a warning signal.
[0013]
In the present invention, it is preferable that the central processing unit is connected to a telephone line, and the communication means of each surveying instrument is a surveying system using a mobile phone.
In this way, if a mobile phone is used as the communication means, survey data can be easily sent to the central processing unit from surveying equipment installed at various outdoor positions.
Further, according to the present invention, a surveying system in which each surveying instrument is a GPS surveying instrument is provided.
[0014]
In this way, in a survey system in which each surveying instrument is a GPS surveying instrument, it is often impossible to confirm whether or not the surveying instrument alone is receiving as set according to the survey plan. Even if the survey is extremely difficult to determine whether the survey is correct or not, it is possible to know the correctness of the survey result in a short time during the survey or after the survey is completed by transmitting the survey data to the central processing unit.
[0015]
The present invention, when surveying using sequential plurality of surveying devices with a large number of measuring points according to survey planning, transmitted from surveying the site by communication means survey data of each surveying equipment to the centralized processor, the centralized processing unit analyzes to calculate the measurement point coordinate determined the relative position of each measurement point to match the survey data of each surveying instruments, further, re-surveying from centralized processing unit when performing determination analysis results required re surveying A re-survey request is sent to the surveying equipment that needs to be used.
[0016]
In this way, surveying data is transmitted to the central processing unit by communication means, so the survey results are analyzed by the central processing unit while surveying equipment is installed on site during surveying or at the end of surveying. And can promptly inform the field workers of the need for re-surveying.
In the present invention, it is preferable to first confirm the number of surveying data when analyzing the surveying results using the central processing unit.
[0017]
Thus, if the number of data is confirmed first, an error in the number of surveys such as a surveying procedure can be found in a short time.
Furthermore, as the present invention, the centralized processing unit, may be stored data of survey planning, performs confirmation of surveying procedure by the centralized processing unit, it is preferable to transmit the instruction data survey procedure surveying instruments .
[0018]
In this way, if the surveying procedure is confirmed by the central processing unit and the work procedure data is transmitted from the central processing unit to the surveying equipment , the on-site worker can be informed of the operating procedure . Survey work can be performed quickly and effectively by confirming the work.
In the present invention, the communication means is preferably a mobile phone.
[0019]
As described above, when a mobile phone is used as the communication means, survey data can be easily sent to the central processing unit from surveying equipment installed at various environmental conditions in the outdoors and suburbs.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
The first embodiment of the present invention performs surveying using a GPS surveying instrument. The centralized processing apparatus according to this embodiment uses a computer connected to a telephone line 29 via a modem 28 as shown in FIG. The computer as the central processing apparatus 10 has an input means 21 such as a keyboard, a display means 22 such as a CRT, and an output means 23 such as a printer, and the main body includes a survey plan management means 11, a data capture means 12, and a survey. It has functions as data analysis means 13, analysis result judgment means 14, and communication connection means 15.
[0021]
This survey plan management means 11 memorizes survey methods based on collocation maps, average maps, observation maps and sky maps. This surveying method is information necessary for surveying, such as observation position information, surveying start time, surveying time, satellite number to be received, and the like.
The survey plan also includes data relating to the coordinates of the known points, the type and product number of the survey instrument to be used, and the installation position of the receiving antenna 31 as each survey instrument, as in the prior art.
[0022]
In addition, as in the past, collocation charts, average charts, observation charts, and sky charts are created based on experience using drawings, or separately created using a computer, and survey plans based on these figures are managed as survey plans. It is sufficient to store it in the means 11. However, data and programs such as collocation charts, average charts, observation charts, and sky charts are also incorporated into the computer as the central processing unit 10, and a survey plan is created by the survey plan management means 11, and the created survey plan is used as the survey plan. It can also be stored in the management means 11.
[0023]
The data fetching means 12 stores the survey data of each surveying instrument 30 sent via the telephone line 29 and the modem 28 separately for each GPS surveying instrument that is each surveying instrument 30.
The data fetching means 12 reads survey data from a specific GPS surveying instrument via the communication connection means 15 at a predetermined time based on the survey plan stored in the survey plan managing means 11.
[0024]
Further, the survey data analysis means 13 analyzes the meaning of the survey data stored in the data capture means 12 based on the survey method stored in the survey plan management means 11, and the relative position of each survey point. In addition to obtaining the relationship, the survey error is corrected by the polygonal network, and the coordinates of the survey point are calculated. The analysis result determination means 14 continues the analysis while confirming whether each survey result is within the allowable range, creates a table, drawing, or document as the survey result, and displays the display means 22 or the output means. It is possible to output to 23.
[0025]
The analysis result judging means 14 compares the result of the analysis processing with the expected value of the survey plan, etc., and when a result exceeding the allowable range is calculated, the communication connection means 15 is connected to the GPS surveying instrument that requires re-execution of the survey. A warning signal may be output via the.
The communication connection means 15 is controlled by the data capturing means 12, the analysis result judgment means 14, or the survey plan management means 11 and concentrated on the communication means 49 attached to the GPS surveying instrument 30 as the surveying instrument 30 through the telephone line 29. The processing apparatus 10 is connected. Further, when a signal is input from the communication means 49 attached to the GPS surveying instrument, the communication connection means 15 connects the communication means 49 to each means of the central processing unit 10 and transmits data or the like to the required means. Is.
[0026]
As shown in FIG. 1B, the GPS surveying instrument that is the surveying instrument 30 has the receiving antenna 31 and the portable personal computer that is the information collecting device 35, and the surveying point where the surveying mark is installed. The receiving antenna 31 is fixed on the 55 using a tripod 51 or the like. Further, the GPS surveying instrument has a mobile phone as a communication means 49 connected to the information collecting device 35 through a modem 48.
[0027]
This information collection device 35 is a portable personal computer having an input unit such as a keyboard and a display unit 39 such as a liquid crystal screen, and has the functions of the survey control means 36 and the survey data storage means 37 as in the prior art. In the radio wave received by the receiving antenna 31 by the surveying control means 36, the set time and time and necessary data from the selected satellite are selected and stored in the survey data storage means 37.
[0028]
The information collecting device 35 also has a function as a transmission / reception control means 38 in addition to the survey control means 36 and the survey data storage means 37.
The transmission / reception control unit 38 controls the operation of the communication unit 49 to send the survey data stored in the survey data storage unit 37 to the central processing unit 10 at a predetermined time. Further, even when a data read control signal is input from the central processing unit 10, the transmission / reception control unit 38 performs control to send the survey data stored in the survey data storage unit 37 to the central processing unit 10. Further, when a warning signal is issued from the central processing unit 10, a warning is displayed on the display unit of the information collecting device 35, and a warning sound is generated in the information collecting device 35 having a sounding device.
[0029]
The communication means 49 is a mobile phone, and the transmission / reception control means 38 includes a telephone number of the telephone line 29 to which the central processing unit 10 is connected, a communication protocol with the modem 28 attached to the central processing unit 10, etc. Is set in advance. When a general telephone line is drawn to the surveying site, the telephone line can be used directly as the communication means 49.
[0030]
Therefore, in this system, when the surveying is started by the GPS surveying instrument and the surveying data is stored in the surveying data storage unit 37 of the information collecting device 35, the centralized processing device transmits the surveying data by the transmission / reception control unit 38 via the communication unit 49. Can be transferred to 10. Then, the survey data analysis means 13 and the analysis result judgment means 14 determine the suitability of the survey data, and immediately after surveying or after the survey is completed, the surveying instrument 30 is a GPS surveying instrument installed at the survey point, and re-surveying is immediately performed. You can know whether it is necessary.
[0031]
In addition, an angle measuring device 33 such as a total station may be used as a surveying system using the surveying instrument.
In this system, as a survey plan to be stored in the survey plan management means 11 of the central processing unit 10 shown in FIG. 1A, a survey plan adapted to the angle measuring device 33 is stored. The survey data analysis means 13 is set as survey data analysis means 13 for analyzing the distance data, angle data, and coordinate data of the angle measuring device 33 based on the survey plan.
[0032]
As a surveying instrument, a communication means 49 is connected to a data storage device 41 via a modem 48 as shown in FIG.
This data storage device 41 is connected to the main body of the total station and uses a microcomputer used as an external storage device for taking out the survey data stored in the internal computer of the total station main body. And it has the data reading means 43 which takes out the surveying data memorize | stored in the internal computer of the total station 33, and also has the transmission / reception control means 45.
[0033]
The transmission / reception control means 45 and the modem 48 are the same as the transmission / reception control means 38 and the modem 48 of the GPS surveying instrument.
In this way, by providing the communication means 49 in the surveying instrument 30 so that the surveying data can be transmitted to the central processing unit 10, the surveying data can be transferred when surveying at a new point whose coordinates are unknown is completed. In this case, re-surveying can be started without changing the surveying instrument 30 at the survey point. Moreover, when surveying is completed, survey data is transferred, analysis processing and analysis judgment are performed during movement to the next new point nearby, and the time for returning to the surveying site when performing re-surveying can be shortened.
[0034]
Further, when a personal computer having a display unit 39 is used as the information collecting device 35 of the GPS surveying instrument, the surveying instrument 30 can send the instruction data of the next surveying point by the surveying plan stored in the surveying plan managing means 11. It may be sent to a certain GPS survey instrument, and an instruction may be sent to the worker. Similarly, the instruction data of the next surveying position can be sent to an angle measuring device having a computer inside and a display unit like the total station 33.
[0035]
In this way, if an instruction for the next surveying position is transmitted from the central processing apparatus 10, the burden on the operator can be reduced when surveying a large number of unspotted coordinates sequentially.
As the data transmitted from the central processing apparatus 10, an instruction of a surveying procedure based on the survey plan can be transmitted.
As described above, when the procedure is instructed, the burden on the operator is reduced, and even an unskilled worker can proceed with an accurate surveying work.
[0036]
In the surveying using the angle measuring device, when the surveying data analysis process is performed by the surveying data analyzing means 13, the number of surveying data may be first confirmed.
In this way, if the number of survey data is confirmed, it can be confirmed in a very short time that there is no error in the survey, and if there is an error, a warning signal can be immediately sent to the worker on site. .
[0037]
As described above, the surveying system in which the surveying plan management means 11 is provided in the centralized processing apparatus 10 collects surveying data in the centralized processing apparatus 10 by the communication means 49, the communication connection means 15, the transmission / reception control means 38 and 45, and the like. The surveying work based on the survey plan can be confirmed at the location. And since surveying at a number of survey points can be carried out and the status of this surveying can be managed, even when workers who are not familiar with the operation of the surveying instrument 30 and surveying work are placed on site, The surveying work can be performed accurately and promptly by an instruction from the central processing unit 10.
[0038]
In addition, the mobile phone serving as the communication means 49 can very easily execute data transmission from the surveying instrument 30 that may perform surveying while moving outdoors or in the suburbs.
Note that when there is an operator near the surveying instrument 30, not only when the survey data is automatically sent to the central processing unit 10 by the transmission / reception control means 38, but also the operator manually operates the communication means 49 and the survey control means 36. Thus, the survey data can be sent to the central processing unit 10.
[0039]
In this case, in the surveying instrument 30 that performs automatic measurement, it is possible for one worker to go around a plurality of surveying points, and it is possible to perform surveying correctly with few workers.
As the communication means 49, a mobile phone capable of satellite communication or a digital communication phone can be used.
Furthermore, this surveying system may be a system that uses a GPS surveying instrument and an angle measuring device together.
[0040]
【The invention's effect】
The invention described in claim 1 is composed of a central processing unit and a plurality of surveying instruments, and the central processing unit includes a survey plan management unit for storing a survey plan, a data capturing unit for capturing survey data, and the captured survey data. Survey data analysis means that performs survey analysis by means of communication, analysis result judgment means that can judge whether the survey error is within an allowable range and output a warning signal , communication that connects the data capture means, etc. to the communication means Each surveying instrument is a surveying system having a transmission / reception control unit that sends surveying data to the central processing unit through the communication unit and receives a warning signal when the warning signal is received .
[0041]
Therefore, the data measured by each surveying instrument can be transmitted to the central processing unit by communication means, and the central processing unit can analyze the data collected from each surveying instrument. For this reason, it is possible to judge the suitability of survey results even when surveying equipment is placed on site, and when re-surveying is necessary, a warning signal is sent and a warning display is displayed on the surveying instrument, so re-surveying starts quickly. can do.
The invention described in claim 2 is a surveying system in which a central processing unit is connected to a telephone line and the communication means of each surveying instrument is a mobile phone.
[0042]
Therefore, it is possible to always easily transmit survey data to the central processing unit and receive a warning signal from a surveying instrument installed at a site of various environmental conditions such as outdoors and suburbs.
The invention described in claim 3 is a surveying system in which each surveying instrument is a GPS surveying instrument.
Therefore, even when using a GPS surveying instrument that cannot be used to check the suitability of surveying data alone, it is possible to know the suitability of surveying results during surveying or in a relatively short time after surveying. it can. For this reason, when re-surveying is required, re-surveying can be started quickly.
[0043]
Furthermore, the invention described in claim 4 transmits the survey data of each surveying instrument from the surveying site to the central processing unit by the communication means when performing surveying using a plurality of surveying instruments at a large number of survey points in accordance with the survey plan. The central processing unit analyzes the survey data of each surveying instrument to calculate the point coordinates , and when the analysis result is judged and re-survey is necessary, the central processing unit needs to request re-surveying. There is a surveying method to send to surveying equipment.
[0044]
In this way, because survey data is transmitted from the site to the central processing unit during the survey at the site or at the end of the survey, the suitability of the survey results can be known in the central processing unit in a short time, and the survey data is not available. If appropriate, a re-survey can be performed immediately by making a re-survey request.
The invention described in claim 5 is a surveying method for confirming the number of survey data first when analyzing the survey result by the central processing unit.
[0045]
Thus, if the number of data is confirmed, if there is an error in surveying, the necessity of re-surveying can be determined in a very short time.
The invention described in claim 6 stores the data of the survey plan in the central processing device, confirms the survey procedure by the central processing device, and transmits the instruction data of the survey procedure to the surveying instrument . Surveying method.
[0046]
As described above, when the surveying procedure is confirmed and the instruction data of the procedure is transmitted by the central processing unit, the burden on the operator can be reduced, and the surveying operation without error can be performed quickly.
Furthermore, the invention described in claim 7 is a surveying method using a mobile phone as a communication means.
[0047]
As described above, when a mobile phone is used, surveying data can be easily transmitted to a central processing unit from a site having various environmental conditions such as a suburb, and an instruction from the central processing unit can be received.
[Brief description of the drawings]
FIG. 1 is a schematic diagram showing an example of a central processing unit and surveying instrument used in the system of the present invention.
FIG. 2 is a diagram showing another example of a surveying instrument used in the system of the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Central processing unit 11 Survey plan management means 12 Data acquisition means 13 Survey data analysis means 14 Analysis result judgment means 15 Communication connection means 21 Input means 22 Display means 23 Output means 28 Modem 29 Telephone line 30 Survey equipment 31 Receiving antenna 33 Angle measurement Distance measuring device 35 Information collecting device 36 Survey control means 37 Survey data storage means 38 Transmission / reception control means 39 Display unit 41 Data storage device 43 Data reading means 45 Transmission / reception control means 48 Modem 49 Communication means 51 Tripod 55 Measuring point

Claims (7)

集中処理装置と複数の測量機器で構成され、
前記集中処理装置は、測量機器の設置位置及び測量方法などの測量計画を記憶する測量計画管理手段と、前記各測量機器の測量データを通信手段を介して取り込むデータ取り込み手段と、前記データ取り込み手段に取り込んだ測量データによって測量の解析を行う測量データ解析手段と、解析結果を測量計画と合わせて測量誤差が許容範囲内であるかを判断し、許容範囲を超えると警告信号を出力する解析結果判断手段と、前記データ取り込み手段や前記解析結果判断手段を前記通信手段に接続し、前記通信手段で受信した測量データを前記データ取り込み手段に送り、解析結果判断手段からの警告信号を通信手段から送信させる通信接続手段とを有し、
前記各測量機器は、測量データを前記通信手段により前記集中処理装置に送り、前記集中処理装置から警告信号が発せられたときは情報収集装置の表示部に警告を表示する送受信制御手段を有することを特徴とする測量システム。
Consists of a central processing unit and multiple surveying instruments,
The central processing unit includes a survey plan management unit that stores a survey plan such as an installation position and a survey method of a survey instrument, a data capture unit that captures survey data of each survey instrument via a communication unit, and the data capture unit Survey data analysis means to analyze surveys using survey data imported into the system, and analysis results to determine whether the survey error is within the allowable range by combining the analysis results with the survey plan, and to output a warning signal when the allowable range is exceeded The determination means, the data capture means and the analysis result determination means are connected to the communication means, the survey data received by the communication means is sent to the data capture means, and a warning signal from the analysis result determination means is sent from the communication means. and a communication connecting means Ru is transmitted,
Each surveying instrument Ri send a survey data to the centralized processing apparatus by the communicating means, the transmission and reception control unit that displays a warning on the display unit of the information collecting device when the warning signal is issued from the centralized processing unit Surveying system characterized by having.
前記集中処理装置が電話回線に接続され、前記各測量機器の通信手段が携帯電話機であることを特徴とする請求項1に記載した測量システム。  2. The surveying system according to claim 1, wherein the central processing unit is connected to a telephone line, and the communication means of each surveying instrument is a mobile phone. 前記各測量機器がGPS測量機であることを特徴とする請求項1又は請求項2に記載した測量システム。  The surveying system according to claim 1 or 2, wherein each surveying instrument is a GPS surveying instrument. 測量計画に従って、多数の測点を順次複数の測量機器を用いて測量するに際し、各測点とされた測量現場から通信手段によって各測量機器の測量データを前記集中処理装置に送信し、この集中処理装置により前記各測量機器の測量データを合わせて各測点の相対位置を求めて測点座標を算出する解析を行い、更に解析結果を測量計画と合わせて測量誤差が許容範囲内であるかの判断を行って再測量が必要と判断されたときには、この集中処理装置から再測量が必要な測量機器に再測量の要求を送信することを特徴とする測量方法。 According survey planning, when surveying using sequential plurality of surveying devices with a large number of measuring points, and transmits the survey data of each survey device to the centralized processing unit by the communication means from the survey site that is the respective survey point, the concentration analyzes to calculate the measurement point coordinate survey data to match a determined relative position of each measuring point in each surveying instrument by the processor, the surveying error is within the allowable range together with further survey planning analysis results or when re-survey is determined to be necessary by performing judgment, surveying method characterized by transmitting a request for re-surveying surveying instrument requiring re surveying from the centralized processing unit. 測量結果の解析を前記集中処理装置により行うに際し、先ず、測量データの数の確認を行うことを特徴とする請求項4に記載した測量方法。  5. The surveying method according to claim 4, wherein when the survey result is analyzed by the central processing unit, first, the number of survey data is confirmed. 前記集中処理装置には、測量計画のデータを記憶させておき、前記集中処理装置によって測量手順の確認を行うと共に、測量手順の指示データを各測量機器に送信することを特徴とする請求項4又は請求項5に記載した測量方法。Wherein the centralized processing unit, may be stored data of survey planning, claim 4 performs the check of the survey procedure by the centralized processing unit, and transmits the instruction data survey procedure to each surveying instruments Or the surveying method described in Claim 5. 前記通信手段として携帯電話機を使用することを特徴とする請求項4乃至請求項6の何れかに記載した測量方法。  The surveying method according to claim 4, wherein a mobile phone is used as the communication means.
JP07674797A 1997-03-28 1997-03-28 Surveying system and surveying method Expired - Lifetime JP3838387B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07674797A JP3838387B2 (en) 1997-03-28 1997-03-28 Surveying system and surveying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07674797A JP3838387B2 (en) 1997-03-28 1997-03-28 Surveying system and surveying method

Publications (2)

Publication Number Publication Date
JPH10267656A JPH10267656A (en) 1998-10-09
JP3838387B2 true JP3838387B2 (en) 2006-10-25

Family

ID=13614205

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07674797A Expired - Lifetime JP3838387B2 (en) 1997-03-28 1997-03-28 Surveying system and surveying method

Country Status (1)

Country Link
JP (1) JP3838387B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136928A (en) * 1998-11-02 2000-05-16 Shimizu Corp Running-type topographic surveying apparatus using gps
JP2001337151A (en) * 2000-05-29 2001-12-07 Jekku:Kk Observation support system and storage medium
KR20020091715A (en) * 2001-05-31 2002-12-06 박봉훈 System and method for measuring in civil engineering work, and auto-cad method being used in the same
JP2003329450A (en) 2002-03-08 2003-11-19 Sokkia Co Ltd Surveying instrument
JP3760238B2 (en) * 2003-06-24 2006-03-29 独立行政法人情報通信研究機構 Verification method and verification system for satellite positioning terminal receiver
JP4237677B2 (en) * 2004-06-02 2009-03-11 インターナショナル・ビジネス・マシーンズ・コーポレーション Acquisition device, access control device, acquisition method, access control method, program, and recording medium
JP4965149B2 (en) * 2006-03-31 2012-07-04 株式会社トプコン RTK-GPS positioning system
JP4965329B2 (en) 2007-05-10 2012-07-04 株式会社トプコン Positioning system, receiving terminal and positioning method
JP5354717B2 (en) * 2008-11-06 2013-11-27 学校法人東京理科大学 Displacement measurement system, satellite signal receiving apparatus, and satellite positioning method
JP5583371B2 (en) * 2009-07-31 2014-09-03 大成建設株式会社 Finished type accuracy confirmation system, 3D measuring machine arrangement planning device, 3D measuring machine arrangement planning program, and 3D measuring machine arrangement planning method
JP5628648B2 (en) * 2010-11-30 2014-11-19 株式会社トプコン Surveying device and surveying device communication system including the same

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05280983A (en) * 1992-04-01 1993-10-29 Fujita Corp Surveying system
JP2756079B2 (en) * 1993-12-28 1998-05-25 株式会社成栄社 Survey system between tower support points
JP3532267B2 (en) * 1994-11-18 2004-05-31 古野電気株式会社 Positioning system

Also Published As

Publication number Publication date
JPH10267656A (en) 1998-10-09

Similar Documents

Publication Publication Date Title
EP1760430B1 (en) Geographic data collecting system
US6865484B2 (en) Satellite position measurement system
US8717432B2 (en) Geographical data collecting device
US6791492B2 (en) GPS positioning system
US8134465B2 (en) Registration method and placement assisting apparatus for location information tag
JP4263549B2 (en) Survey guidance device
US20070008515A1 (en) Geographic data collecting system
US7482974B2 (en) RTK-GPS survey system
US8515702B2 (en) Systems and methods for determining locations of buried objects
JP3838387B2 (en) Surveying system and surveying method
JP3209090B2 (en) Location information providing system
US6078285A (en) Survey apparatus and survey method
JP3728433B2 (en) Cable position information management system, cable position information management method, and cable position information management program
KR101723342B1 (en) Geodetic surveying system
KR100478914B1 (en) System for Collecting Parameters of Communication Condition Using a Navigation in Realtime and Method thereof
CN111045115B (en) System and method for judging meteorological conditions
CN111045116B (en) System and method for monitoring inorganization emission of atmospheric pollutants
JP2922710B2 (en) Slope displacement measurement system
JP2000048030A (en) Information collection system
JP2919273B2 (en) Multifunctional surveying measurement system
JP3502434B2 (en) Surveying equipment
KR20000043964A (en) System for estimating radio electronic wave environment
US20220035049A1 (en) Finished shape observation method and observation system using gnss, and storage medium thereof
JP7265079B1 (en) Information processing device and information processing method
JPH10197246A (en) Gps surveying apparatus and sky obstacle detector for gps, and scheduler

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040216

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050624

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050908

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051104

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060713

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060726

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120811

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120811

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150811

Year of fee payment: 9

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150811

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150811

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term