JP3776638B2 - Information communication system, monitoring control apparatus, transmission apparatus and path setting method used in the information communication system - Google Patents

Information communication system, monitoring control apparatus, transmission apparatus and path setting method used in the information communication system Download PDF

Info

Publication number
JP3776638B2
JP3776638B2 JP25889399A JP25889399A JP3776638B2 JP 3776638 B2 JP3776638 B2 JP 3776638B2 JP 25889399 A JP25889399 A JP 25889399A JP 25889399 A JP25889399 A JP 25889399A JP 3776638 B2 JP3776638 B2 JP 3776638B2
Authority
JP
Japan
Prior art keywords
transmission
switching
connection switch
transmission path
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25889399A
Other languages
Japanese (ja)
Other versions
JP2000156694A (en
Inventor
英俊 岩崎
徹 中尾
晴美 藤間
雅淑 鈴木
弘宗 末次
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP25889399A priority Critical patent/JP3776638B2/en
Publication of JP2000156694A publication Critical patent/JP2000156694A/en
Application granted granted Critical
Publication of JP3776638B2 publication Critical patent/JP3776638B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Time-Division Multiplex Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Small-Scale Networks (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、例えばSDH(Synchronous Digital Hierarchy)に準拠した情報通信システムと、この情報通信システムで使用される伝送装置、監視制御装置およびこの情報通信システムにおけるパス設定方法に関する。
【0002】
【従来の技術】
近年、世界的に統一されたユーザ網インタフェースに基づく広帯域ISDN(Integrated Services Digital Network)の展開が求められ、各種の高速サービスや既存の低速サービスを統一的に多重化できるSDHが標準化されている。このような趨勢の中で、大容量の光海底ケーブルを国際間に敷設し、SDH規格に準拠した通信装置をリング状に結んだネットワークに関する技術開発が今盛んに行われている。
【0003】
SDHは、光伝送方式を前提とするもので、その膨大な帯域を生かすために様々な特徴的な機能が設けられている。例えば、SDHの適用される大容量光海底ケーブルシステムでは、障害発生に伴う信号の中断を避けるために伝送ケーブルをリング状に敷設するシステムが考えられている。またこの種のシステムにあっては、APS(Automatic Protection Switching)と呼ばれる機能を有したものがある。この機能は、ITU−T勧告G.841において規定されているもので、伝送システムの中継器や伝送媒体の障害に対し、通信パスの保護を実現するものである。
【0004】
このSDH伝送システムにおいては、伝送路や伝送装置に障害がない場合の運用効率を向上させるために、例えば通信の切断が許されるサービスに使われる情報のように比較的優先度の低いトラフィックを予備チャネル伝送路の空きチャネルに流す場合がある。このトラフィックをパートタイムトラフィックと呼ぶ。
【0005】
ところで、通常の動作として通信パスを設定する場合は、情報通信システムに設けられた監視制御装置から、通信パスが通過又は終端する各伝送装置に対して、伝送装置内の伝送路の接続スイッチを順次制御して伝送装置内の通信パスの接続を行う。
【0006】
このため、通常の動作として通信パスを設定するために監視制御装置により伝送装置に対してなされる伝送路の接続スイッチの制御と、APSの起動による各伝送装置内の伝送路の接続スイッチの制御が競合する場合がある。
【0007】
例えば、4つの伝送装置N1−N4で構成されるSDHネットワークにおいて、伝送装置N1とN2間で通信パスAが既に設定されていたとする。新たに伝送装置N3とN4間に予備チャネル伝送路を使って通信パスBを設定する場合、監視制御装置は予備チャネル伝送路をドロップするために伝送装置N3とN4における予備チャネル伝送路の接続スイッチを順次制御する。N3に対する制御が完了し、N4に対する制御の直前に伝送装置N1とN2間で通信パスの障害が発生すると、APSが起動して、伝送装置N1とN2間の通信パスAを流れているトラフィックを通すために、伝送装置N3とN4に対して予備チャネル伝送路をスルーする制御を行う。この後に予備チャネル伝送路をドロップさせるために、監視制御装置が伝送装置N4の伝送路の接続スイッチを制御すると、予備チャネル伝送路を使ってN1からN3とN4を経由してN2に達すべき、N1とN2間の退避したトラフィックがN4でドロップし、N1とN4が繋がるミスコネクトが発生する。
【0008】
このように監視制御装置から通信パス設定中に伝送装置内でAPS機能が動作すると、接続スイッチの切替えの結果、ミスコネクトを生じさせる場合がある。
【0009】
また前述したように、各通信パスを通るトラフィックが、各伝送装置における接続スイッチの切替えにより途切れないようにするためには、各伝送装置が記憶しているネットワーク上の全ての伝送装置間の通信パスの接続情報がすべて一致している必要がある。
【0010】
ところが、ある条件下においては、各伝送装置で記憶している通信パスの接続情報が一致していない場合がある。
例えば、従来のSDHネットワークシステムにおけるパス設定方式では新たな通信パスの設定は以下に示す手順で行なわれていた。
(A)網内に設けられた監視制御装置から、通信パスが通過または終端する各伝送装置に対して接続スイッチの切替制御命令を順次与える。
(B)制御命令を受けた伝送装置は、接続スイッチを切替える動作を行い、その動作が完了すると、その旨を示す結果応答を監視制御装置に返送する。
(C)全ての伝送装置から監視制御装置に結果応答が返送されて通信パスの状態が確定すると、ネットワーク上の全ての伝送装置間の通信パスの接続情報を監視制御装置から全ての伝送装置に対して通知し、各伝送装置に記憶されている通信パスの接続情報を更新させる。
【0011】
このような手順を踏んでいたため、(C)での更新作業が完了するまでは各伝送装置が記憶している通信パスの接続情報が相違している場合がある。もしも、このような状態でAPS機能が動作すると、伝送路の接続スイッチ切替えの際にミスコネクトが生じる。このような場合には、通信が途切れるだけでなく、誤った接続先に繋がることとなり、非常に大きな問題となる。
【0012】
【発明が解決しようとする課題】
このように従来では、通信パスを設定するために監視制御装置により伝送装置に対してなされる伝送路の接続スイッチの制御と、APSの起動による各伝送装置内の伝送路の接続スイッチ制御の競合を制御する手段が提供されていなかった。このためパス設定処理中に障害が発生した場合、APS機能によってトラヒックが途切れないように制御された各伝送装置内の伝送路の接続スイッチが、パス設定処理を継続している監視制御装置による伝送路接続スイッチの制御により上書きされる場合があり、この場合にはトラヒックが途切れたり、ミスコネクトを生じるおそれがあった。
【0013】
さらに、パス設定後に、ネットワーク上の全ての伝送装置間の通信パスの接続情報を監視制御装置から各伝送装置に順次通知中に障害が発生した場合、伝送装置間において通信パスの接続情報が一致していない状態でAPS機能が動作するのでトラフィックが途切れたり、ミスコネクトを生じるおそれがあった。
【0014】
本発明は上記事情によりなされたもので、通信パスの設定時にもミスコネクトやトラフィックの喪失が発生しない情報通信システム、この情報通信システムで使用される監視制御装置、伝送装置およびパス設定方法を提供することを目的とする。
【0015】
【課題を解決するための手段】
上記目的を達成するために本発明の情報通信システムは、
(1)現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおいて、複数の伝送装置の各々に設けられ、情報通信システムの障害発生時にトラフィックを回復するために、障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する伝送路決定手段と、監視制御装置に設けられ、全ての伝送装置に対して、最高の優先度を有する伝送路切替要因の設定要求を送信する設定要求手段と、監視制御装置に設けられ、全ての伝送装置に対して、最高の優先度を有する伝送路切替要因の解除要求を送信する解除要求手段と、複数の伝送装置の各々に設けられ、複数の伝送路切替要因を保持する切替要因記憶手段と、複数の伝送装置の各々に設けられ、設定要求手段からの設定要求信号に応じて、切替要因記憶手段に伝送路切替要因として最高の優先度を有する伝送路切替要因を設定し、解除要求手段からの解除要求信号に応じて、切替要因記憶手段から最高の優先度を有する伝送路切替要因を削除し、伝送路切替要因として、切替要因記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因を設定する切替要因変更手段と、監視制御装置に設けられ、接続スイッチの状態を決定するために使用する伝送路切替要因が最高の優先度を有する伝送路切替要因に設定された後に、接続スイッチを切替える信号を複数の伝送装置に送信する切替要求手段と、複数の伝送装置の各々に設けられ、接続スイッチ切替信号に応じて接続スイッチを切替える接続スイッチ切替手段とを具備することを特徴とする。
【0016】
また本発明のパス設定方法は、
(2)現用チャネルおよび予備チャネルを有する伝送路を介して接続され、障害発生時に接続スイッチの状態を切替えてトラフィックを回復する機能を有する複数の伝送装置と、伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおけるパス設定方法であって、監視制御装置から通信パスの設定を行う際に、全ての伝送装置に対して、最高の優先度を有する伝送路切替要因の設定要求信号を送信するステップと、全ての伝送装置の各々が、監視制御装置からの設定要求信号に応じて、接続スイッチの状態を決定するために使用する伝送路切替要因を保持する切替要因記憶手段に、最高の優先度を有する伝送路切替要因を設定するステップと、最高の優先度を有する伝送路切替要因に設定された後に、複数の伝送装置の各々が、監視制御装置からのパス設定の信号に応じて接続スイッチを切替えるステップと、監視制御装置が、全ての伝送装置に対して、最高の優先度を有する伝送路切替要因の解除要求信号を送信するステップと、監視制御装置からの解除要求信号に応じて、切替要因記憶手段から最高の優先度を有する伝送路切替要因を削除し、伝送路切替要因として、切替要因記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因を設定するステップとを含むことを特徴とする。
【0017】
上記(1)および(2)に記載の情報通信システムおよびパス設定方法においては、通常の接続スイッチ切替え作業に先立ち、各伝送装置を、少なくとも切替え機能に係わる伝送路切替要因のうち、最も優先度の高い伝送路切替要因に予めセットするようにしている。SDH伝送システムにおけるこのような伝送路切替要因は、ITU−T勧告G.841においてLockout Of Protection Spanとして定義されている。
【0018】
このようにしておくと、監視制御装置による接続スイッチ切替え作業中に障害が発生しても、保持する伝送路切替要因の中に最も優先度の高い伝送路切替要因が既に存在するために、発生した障害による伝送路切替要因により接続スイッチの切替え動作は起こらない。これにより、監視制御装置による接続スイッチ切替え作業中において障害時切替え機能が動作しないようになり、したがってミスコネクトを回避することができるようになる。
【0019】
また本発明の情報通信システムは、
(3)現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおいて、複数の伝送装置の各々に設けられ、情報通信システムの障害発生時にトラフィックを回復するために、障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する伝送路決定手段と、監視制御装置に設けられ、全ての伝送装置に対して、伝送路決定手段の機能を停止させる信号を送信する機能停止要求手段と、監視制御装置に設けられ、全ての伝送装置に対して、伝送路決定手段の機能停止を解除させる信号を送信する機能再起動要求手段と、複数の伝送装置の各々に設けられ、機能停止信号に応答して伝送路決定手段の機能を停止させる機能停止手段と、複数の伝送装置の各々に設けられ、解除信号に応答して伝送路決定手段の機能停止を解除させる機能再起動手段と、監視制御装置に設けられ、伝送路決定手段の機能が停止された後に、接続スイッチの切替信号を複数の伝送装置に送信する接続スイッチ切替要求手段と、複数の伝送装置の各々に設けられ、接続スイッチの切替信号に応じて接続スイッチを切替える接続スイッチ切替手段とを具備することを特徴とする。
【0020】
また本発明のパス設定方法は、
(4)現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおけるパス設定方法であって、監視制御装置から通信パスの設定を行う際に、全ての伝送装置に対して、情報通信システムの障害発生時にトラフィックを回復するために、障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える自動切替機能を停止させる信号を送信するステップと、機能が停止された後に、監視制御装置からの通信パスの設定操作に応じて接続スイッチを切替えるステップと、監視制御装置からの制御により接続スイッチが切替えられた後に、監視制御装置から全ての伝送装置に対して自動切替機能の停止を解除させる信号を送信するステップとを含むことを特徴とする。
【0021】
上記(3)に記載の情報通信システムでは、伝送路決定手段の機能を停止させる機能停止要求手段と、伝送路決定手段の機能停止を解除させる機能再起動要求手段とを設け、監視制御装置からの接続スイッチの切替え作業に先立ち各伝送装置における障害時切替え機能を直接に停止するようにしている。
【0022】
また上記(4)に記載のパス設定方法では、監視制御装置からの接続スイッチの切替え作業に先立ち各伝送装置における障害時切替え機能を直接に停止するようにしている。
【0023】
このようにしておくと、監視制御装置からの接続スイッチの切替え作業中に障害が発生しても、障害時切替え機能が停止されているためにこの機能による接続スイッチの切替え動作が起こらないことになる。これにより、監視制御装置からの接続スイッチの切替え作業中における障害時切替え機能による接続スイッチの切替え動作が生じないようになり、したがってミスコネクトを回避することができるようになる。
【0024】
【発明の実施の形態】
以下、図1−図6を参照して本発明の第1の実施形態を詳細に説明する。
図1は、本発明の実施の形態に係わる情報通信システムの実態構成図である。本実施形態ではSDHに準拠したリングネットワークを前提としており、m個の伝送装置N1〜Nmが高速回線(STM−16回線など)FLを介してリング状に接続されている。高速回線FL中で伝送される情報のうち、自装置宛てのチャネルの情報が伝送装置N1〜Nmにおいて低速回線SLにドロップされ、交換機などの通信装置(符号付せず)に送られる。
【0025】
高速回線FLは、時計回りおよび反時計回りの各現用チャネル伝送路と、時計回りおよび反時計回りの各予備チャネル伝送路とから構成されている。これら4種類の伝送路をそれぞれ別々の4本のファイバに通しても、また現用チャネル伝送路と予備チャネル伝送路を多重化して、時計回りの現用チャネル伝送路と予備チャネル伝送路を1本のファイバに通し、反時計回りの現用チャネル伝送路と予備チャネル伝送路をもう1本のファイバに通してもよい。さらに、時計回りおよび反時計回りの現用チャネル伝送路を1本のファイバに通し、時計回りおよび反時計回りの予備チャネル伝送路をもう1本のファイバに通してもよい。
【0026】
各伝送装置N1〜Nmは、それぞれLAN(Local Area Network)L1〜Lmを介して監視制御装置WS1〜WSmに接続されている。これらの監視制御装置WS1〜WSmは、例えば汎用のワークステーションとして実現されるもので、いずれの監視制御装置WS1〜WSmからも、各伝送装置N1〜Nmに対する監視制御を行うことができる。
【0027】
図2に、各伝送装置N1〜Nmの主要部構成を示す。各伝送装置N1〜Nmは、アッド・ドロップ・マルチプレクサ(ADM)201を備え、高速回線FLを介して伝送される同期伝送データを高速側インタフェース部(HS I/F)202−1〜202−4を介してアッド・ドロップ・マルチプレクサ201に導入し、更に低速側インタフェース部(LS I/F)203を介して低速回線SL側にドロップする。また、各伝送装置N1〜Nmは、低速回線SL側から入力される同期伝送データを、低速側インタフェース部203を介してアッド・ドロップ・マルチプレクサ201に導入し、高速回線FLにアッドするものである。
【0028】
アッド・ドロップ・マルチプレクサ201に対する動作制御は、各高速側インタフェース部202−1〜202−4から与えられる情報に基づき制御部204により行なわれる。
【0029】
制御部204は、例えばマイクロコンピュータなどにより実現されるもので、他の伝送装置Nおよび監視制御装置WSとの情報通信などを行う既知の通信および制御部に加えて、伝送路決定部204aと、接続スイッチ切替部204bと、伝送路切替要因変更部204cと、リングマップ更新部204dとを備えている。
【0030】
記憶部205には、全ての伝送装置間の通信パスの接続情報や伝送路切替要因のような各種制御に係わるデータが記憶されている。記憶部205は複数の伝送路切替要因を記憶することができるように構成されている。このため記憶部205は、既に記憶されている伝送路切替要因に加えて、伝送路切替要因変更部204cからの新たな伝送路切替要因や監視制御装置からの伝送路切替要因を記憶することができる。
【0031】
伝送路切替要因変更部204cは、障害発生時に、自装置の障害情報と、K1、K2バイトを使用して伝送装置間で授受される情報とに基づいて、伝送路切替要因を決定する。そして、伝送路切替要因変更部204cは、この決定した伝送路切替要因と、監視制御装置からの伝送路切替要因と、記憶部205に記憶されている現在の伝送路切替要因のうちで、最も優先度の高い伝送路切替要因を、自装置の接続スイッチの状態を決定するために使用される新しい伝送路切替要因として決定する。伝送路決定部204aは、この新しい接続スイッチの状態を決定するために使用される伝送路切替要因と、記憶部205に記憶されている全ての伝送装置間の通信パスの接続情報と、自装置内の伝送路の現在の接続スイッチ状態とに基づいて、トラフィックを回復するために、自装置の伝送路の新たな接続スイッチの状態を決定する。
【0032】
また、伝送路切替要因変更部204cは、監視制御装置からの伝送路切替要因や障害発生により新しく発生した伝送路切替要因を既に記憶部205に記憶されている複数の伝送路切替要因に追加する機能を有する。
【0033】
伝送路切替要因は、伝送装置内の接続スイッチ切替えの際などに参照される情報である。各伝送路切替要因はそれぞれ優先度を持っている。伝送路切替要因には、最高の優先度を持つ伝送路切替要因と、この最高優先度切替要因よりも低い優先度を持ち、障害発生時の伝送路切替要因として使用される少なくとも1つの伝送路切替要因が含まれている。このような伝送路切替要因の例としては、図3に示されているようなITU−T勧告G.841においてプロテクショングループとして規定されているものがある。
【0034】
接続スイッチ切替部204bは、通常の動作では監視制御装置からの接続スイッチ切替要求により自装置の接続スイッチを切替え、障害発生時には、伝送路決定部204aにより決定された新たな接続スイッチの状態に基づき自装置の接続スイッチを切替えるものである。伝送路決定部204aと接続スイッチ切替部204bにより、ITU−T勧告G.841に規定されているAPS機能が実現される。
【0035】
接続スイッチは、低速回線からのトラフィックを時計回りまたは反時計回りの現用チャネル伝送路あるいは時計回りまたは反時計回りの予備チャネル伝送路に流したり、時計回りまたは反時計回りの現用チャネル伝送路あるいは時計回りまたは反時計回りの予備チャネル伝送路からのトラフィックを低速回線にドロップしたり、隣接するノードから送られてきたトラフィックを他の隣接するノードにパススルーしたりするためのスイッチである。
【0036】
リングマップ更新部204dは、監視制御装置から送られてくるリングマップにより、記憶部205に記憶されているリングマップを更新する。リングマップには、全ての伝送装置間の通信パスの接続情報が含まれている。
【0037】
次に、監視制御装置WS1〜WSmの構成を図4を参照して説明する。監視制御装置WS1〜WSmは、キーボードや表示ディスプレイなどを備える入出力部206と、通信管理ネットワークMNWとの間のインタフェース機能を実現するインタフェース部(I/F)207と、監視制御に係わるプログラムなどを記憶した記憶部208と、これら入出力部206およびインタフェース部(I/F)207を、記憶部208に記憶された制御プログラムに基づき制御する主制御部209とを備えている。
【0038】
主制御部209は、例えばマイクロコンピュータなどにより実現されるもので、伝送装置N1〜Nmとの情報通信などを行う既知の通信および制御部に加えて、最高優先度切替要因の設定要求部209aと、接続スイッチ切替要求部209bと、リングマップ更新要求部209cと、最高優先度切替要因の解除要求部209dとを備えている。
【0039】
最高優先度切替要因の設定要求部209aは、各伝送装置N1〜Nmに対して、最高の優先度を有する伝送路切替要因であるLockout Of Protection Spanを送る。
【0040】
接続スイッチ切替要求部209bは、通信パスが通過または終端するために接続スイッチの切替を行うべき伝送装置Nに対して、例えば操作者の操作に基づき、接続スイッチの切替えを要求する。
【0041】
リングマップ更新要求部209cは、接続スイッチの切替えを行うべきすべての伝送装置から接続スイッチの切替えが完了したことを示す応答が返送された後にリングマップを生成し、このリングマップを各伝送装置N1〜Nmに送信する。
【0042】
最高優先度切替要因の解除要求部209dは、各伝送装置N1〜Nmにおけるリングマップ更新作業の完了の後に、各伝送装置N1〜Nmに、Lockout Of Protection Spanを取消すように要求する。
【0043】
次に、上記構成の情報通信システムにおける接続スイッチの切替プロセスを、図5および図6を参照して説明する。図5は、本実施の形態に係わる情報通信システムの論理的構成を示している。以下の説明では、監視制御装置WS1から3つの伝送装置N1〜N3を対象として接続スイッチの切替えに係わる各種制御を行うものとし、また実際に接続スイッチの切替えを行うべき伝送装置をN2およびN3とする。監視制御装置WS1と伝送装置N1〜N3との間には、双方の間での各種制御情報の授受を行うための通信管理ネットワークMNWが形成されている。
【0044】
図6のメッセージシーケンス図において、通信パス設定作業が開始されると、監視制御装置WS1は、最高優先度切替要因の設定要求部209aにより最高優先度切替要因(Lockout Of Protection Span)の設定要求信号304〜306を各伝送装置N1〜N3に対して送出する。これに応答して各伝送装置N1〜N3は、切替要因変更部204cにより、記憶部205に記憶されている伝送路切替要因に加えて、新たな伝送路切替要因としてLockout Of Protection Spanを記憶部205に記憶させる。その後、各伝送装置N1〜N3は、変更が完了した旨を示す応答信号307〜309を監視制御装置WS1に向け返送する。
【0045】
監視制御装置WS1からの接続スイッチの切替え中に障害が発生した場合、伝送路切替要因変更部204cは、自装置の障害情報やK1、K2バイトを使用して伝送装置間で授受される情報に基づいて伝送路切替要因を決定し、記憶部205に記憶させる。次に伝送路切替要因変更部204cは、この決定された伝送路切替要因の優先度と、この決定前から記憶部205に既に記憶されている伝送路切替要因の優先度とを順次比較する。記憶部205には最高優先度切替要因が記憶されており、障害が発生することにより決定される伝送路切替要因はこの最高優先度切替要因よりも低い優先度を持つことから、伝送路切替要因変更部204cは、接続スイッチ切替部204bを制御することもなく、接続スイッチの切替えは行われない。
【0046】
応答信号307〜309を受信すると、監視制御装置WS1は、接続スイッチ切替要求部209bにより、接続スイッチの切替えを行うべき伝送装置N2,N3に対して接続スイッチ切替要求信号310,311を送出する。これに応答して伝送装置N2,N3は接続スイッチ切替部204bにより接続スイッチを切替え、接続スイッチの切替えが正常に完了した旨を示す応答信号312,313を監視制御装置WS1に向け返送する。
【0047】
この応答信号312,313を受信すると、監視制御装置WS1は、リングマップ更新要求部209cによりこの時点でのリングマップを作成し、このリングマップ情報を含むリングマップ更新要求信号314〜316を各伝送装置N1〜N3に対して送出する。これに応答して各伝送装置N1〜N3は、リングマップ更新部204dにより、記憶部205に記憶されているリングマップを更新するとともに、更新が正常に完了した旨を示す応答信号317〜319を監視制御装置WS1に向け返送する。
【0048】
応答信号317〜319を受けた監視制御装置WS1は、最高優先度切替要因の解除要求部209dにより、Lockout Of Protection Spanを取消すように要求する要求信号320〜322を各伝送装置N1〜N3に送出する。これに応答して各伝送装置N1〜N3は、伝送路切替要因変更部204cにより、Lockout Of
Protection Spanを記憶部205から消去する。
【0049】
監視制御装置WS1からの要求により伝送路切替要因が最高優先度切替要因に変更されている間に障害が発生していた場合、各伝送装置N1〜N3は、記憶部205からLockout Of Protection Spanを消去した後に、記憶部205に記憶されている伝送路切替要因のうちで最も優先度の高い伝送路切替要因、新たなリングマップ、障害情報などに基づいて、必要に応じて接続スイッチを切替える。これらの制御が完了すると、各伝送装置N1〜N3は、その旨を示す応答信号323〜325を監視制御装置WS1に向け返送する。
【0050】
上記のプロセスにおいて、各伝送装置N1〜N3と監視制御装置WS1との間での情報の授受は、STM信号のセクションオーバーヘッド(SOH)に定義されたデータ通信チャネル(DCC)を介して行なわれる。
【0051】
このように本実施形態では、監視制御装置WS1からの接続スイッチの切替え先立ち、監視制御装置WS1から各伝送装置N1〜N3に対して最高優先度切替要因の設定要求信号304〜306を送出して、各伝送装置N1〜N3の伝送路切替要因を、最高の優先度を持つ伝送路切替要因に設定するようにしている。このため、監視制御装置WS1からの接続スイッチの切替え中に障害が発生しても、伝送路切替要因変更部204cによる伝送路切替要因の変更は行われることはなく、したがって障害による接続スイッチの切替えも行われない。また、全ての伝送装置N1〜N3におけるリングマップを更新した後に、最高優先度の伝送路切替要因を解除するようにしていることから、各伝送装置N1〜N3においてリングマップが相違したまま接続スイッチの切替えが行われることはない。したがって、監視制御装置による接続スイッチの切替え時に、ミスコネクトを回避することが可能となる。
【0052】
次に、図7−図9を参照して本発明の第2の実施形態を説明する。
本実施形態の情報通信システムにおいても図1および図5に示す構成を前提とする。しかしながら、伝送装置および監視制御装置の構成において上記第1の実施形態と異なっており、区別のために本実施形態では、伝送装置にn1〜nm、監視制御装置にws1〜wsmなる符号を付して示す。なお、他の同一部分には同一の符号を付すものとする。
【0053】
図7に、本実施形態における伝送装置n1〜nmの構成を示す。伝送装置n1〜nmは、伝送装置N1〜Nmと略同等の構成をしているが、制御部の構成において異なっており、区別のために制御部の符号を240として説明する。
【0054】
この制御部240は、例えばマイクロコンピュータなどにより実現されるもので、他の伝送装置および監視制御装置ws1〜wsmとの情報通信などを行う既知の通信および制御部、伝送路決定部204a、接続スイッチ切替部204b、伝送路切替要因変更部204c、リングマップ更新部204dに加えて、機能停止部240aと、機能再起動部240bとを備えている。
【0055】
機能停止部240aは、監視制御装置ws1〜wsmからの要求に応じて伝送路決定部204aの機能を停止するものであり、また機能再起動部240bは、同様に監視制御装置ws1〜wsmからの要求に応じて、停止された伝送路決定部204aの機能を再起動する。
【0056】
図8に本実施形態に係わる監視制御装置ws1〜wsmの構成を示す。監視制御装置ws1〜wsmは、監視制御装置WS1〜WSmと略同等の構成をしているが主制御部の構成において異なっており、区別のために主制御部の符号を290として説明する。
【0057】
この主制御部290は、例えばマイクロコンピュータなどにより実現されるもので、伝送装置n1〜nmとの情報通信などを行う既知の通信および制御部に加えて、機能停止要求部290aと、接続スイッチ切替要求部209bと、リングマップ更新要求部209cと、機能再起動要求部290bとを備えている。
【0058】
機能停止要求部290aは、伝送装置n1〜nmのそれぞれに対して伝送路決定部204aの機能停止を要求するものであり、また機能再起動要求部290bは、同様に伝送装置n1〜nmのそれぞれに対して伝送路決定部204aの機能の再起動を要求する。
【0059】
次に、上記構成の情報通信システムにおける通信パスの設定プロセスを、図9のメッセージシーケンス図を参照して説明する。なお、ここでは監視制御装置ws1から3つの伝送装置n1〜n3を対象として通信パス設定に係わる各種制御を行うものとし、また実際に通信パスの設定を行うべき伝送装置をn2およびn3とする。
【0060】
図9において通信パス設定作業が開始されると、監視制御装置ws1は、機能停止要求部290aにより、機能停止要求信号504〜506を各伝送装置n1〜n3に対して送出する。これに応答して各伝送装置n1〜n3は、機能停止部240aにより伝送路決定部204aの機能を停止した後に、停止が完了した旨を示す応答信号507〜509を監視制御装置ws1に向け返送する。機能停止要求信号504〜506は、例えばCMIPプロトコルにおけるGET命令、CREATE命令などとして実現される。
【0061】
応答信号507〜509を受信すると、監視制御装置ws1は、接続スイッチ切替要求部209aにより、接続スイッチの切替えを行うべき伝送装置n2,n3に対して接続スイッチ切替要求信号510,511を送出する。これに応答して伝送装置n2,n3は、接続スイッチ切替部204bにより接続スイッチを切替え、接続スイッチの切替えが正常に完了した旨を示す応答信号512,513を監視制御装置ws1に向け返送する。
【0062】
監視制御装置ws1からの要求により伝送路決定部204aの機能が停止されている間に障害が発生していた場合、伝送路切替要因変更部204cは、自装置の障害情報やK1、K2バイトを使用して伝送装置間で授受される情報に基づいて伝送路切替要因を決定し、記憶部205に記憶させる。次に伝送路切替要因変更部204cは、この決定された伝送路切替要因の優先度と、この決定前から記憶部205に既に記憶されている伝送路切替要因の優先度とを順次比較する。伝送路切替要因変更部204cは、記憶部205に記憶されている伝送路切替要因のうち最も優先度の高い伝送路切替要因を伝送路決定部204aに送る。しかしながら、伝送路決定部204aは機能停止されていることから、接続スイッチ切替部204bを制御することもなく、接続スイッチの切替えは行われない。
【0063】
応答信号512,513を受信すると、監視制御装置ws1は、リングマップ更新要求部209cによりこの時点でのリングマップを作成し、このリングマップ情報を含むリングマップ更新要求信号514〜516を各伝送装置n1〜n3に対して送出する。これに応答して各伝送装置n1〜n3は、リングマップ更新部204dにより、記憶部205に記憶されているリングマップを更新するとともに、更新が正常に完了した旨を示す応答信号517〜519を監視制御装置ws1に向け返送する。
【0064】
応答信号517〜519を受けた監視制御装置ws1は、機能再起動要求部290bにより、機能再起動要求信号520〜522を各伝送装置n1〜n3に送出する。これに応答して各伝送装置n1〜n3は、機能再起動部240bにより、伝送路決定部204aの機能を再起動する。
【0065】
監視制御装置ws1からの要求により伝送路決定部204aの機能が停止されている間に障害が発生していた場合、各伝送装置n1〜n3は、伝送路決定部204aの機能が再起動された後に、記憶部205に記憶されている伝送路切替要因のうちで最も優先度の高い伝送路切替要因、新たなリングマップ、障害情報などに基づいて、必要に応じて接続スイッチを切替える。これらの制御が完了すると、各伝送装置n1〜n3は、その旨を示す応答信号523〜525を監視制御装置ws1に向け返送する。
【0066】
上記のプロセスにおいて、各伝送装置n1〜n3と監視制御装置ws1との間での情報の授受は、STM信号のセクションオーバーヘッド(SOH)に定義されたデータ通信チャネル(DCC)を介して行なわれる。
【0067】
このようにして本実施形態では、監視制御装置ws1からの接続スイッチの切替えに先立ち、監視制御装置ws1から各伝送装置n1〜n3に対して機能停止要求信号504〜506を送出して、各伝送装置n1〜n3における伝送路決定部204aの機能を停止するようにしている。
【0068】
したがって、仮に監視制御装置からの接続スイッチの切替え作業中に障害が発生したとしても、伝送路決定部204aの機能が駆動されず、接続スイッチの切替えが起こらない。しかも、伝送路決定部204aの機能を、全ての伝送装置n1〜n3におけるリングマップを更新した後に再起動するようにしている。このため、各伝送装置n1〜nmにおいてリングマップが相違しているまま接続スイッチの切替えが行なわれることはない。したがって、監視制御装置からの接続スイッチの切替え時に、ミスコネクトを回避することが可能となる。
【0069】
なお、本発明は上記実施の形態に限定されるものではなく、例えばネットワーク構成はリング状に限らず、他の接続形態であっても良い。
また、制御部204,240、および主制御部209,290の構成についても上記例に限らず、監視制御装置から接続スイッチの切替え伝送路決定部204aの機能を停止できればよい。
その他、本発明の要旨を逸脱しない範囲で種々の変形実施を行うことができる。
【0070】
【発明の効果】
以上詳述したように本発明によれば、接続スイッチの切替えに先立ち、全ての伝送装置の伝送路切替要因を、障害時用の伝送路切替要因のうち最も優先度の高い最高優先度伝送路切替要因に設定するか、または障害時接続スイッチ切替機能を直接的に停止するようにしたので、接続スイッチの切替え時にもミスコネクトやトラフィックの落ちが発生しない情報通信システム、この情報通信システムで使用される監視制御装置、伝送装置およびパス設定方法を提供することが可能となる。
【図面の簡単な説明】
【図1】本発明の実施の形態に係わる情報通信システムの実態構成図。
【図2】本発明の第1の実施形態に係わる伝送装置N1〜Nmの主要部構成を示す機能ブロック図。
【図3】ITU−T勧告G.841において定められた切替状態の優先順位を示す図。
【図4】本発明の第1の実施形態に係わる監視制御装置WS1〜WSmの主要部構成を示す機能ブロック図。
【図5】本発明の実施の形態に係わる情報通信システムの論理的構成を示す図。
【図6】本発明の第1の実施の形態に係わる監視制御装置WS1と伝送装置N1〜N3との間でのメッセージシーケンス図。
【図7】本発明の第2の実施形態に係わる伝送装置n1〜nmの主要部構成を示す機能ブロック図。
【図8】本発明の第2の実施形態に係わる監視制御装置ws1〜wsmの主要部構成を示す機能ブロック図。
【図9】本発明の第2の実施の形態に係わる監視制御装置ws1と伝送装置n1〜n3との間でのメッセージシーケンス図。
【符号の説明】
N1〜Nm、n1〜nm…伝送装置
WS1〜WSm、ws1〜wsm…監視制御装置
L1〜Lm…LAN
FL…高速回線
SL…低速回線
MNW…通信管理ネットワーク
201…アッド・ドロップ・マルチプレクサ(ADM)
202−1〜202−4…高速側インタフェース部(HS I/F)
203…低速側インタフェース部(LS I/F)
204…制御部
204a…伝送路決定部
204b…接続スイッチ切替部
204c…伝送路切替要因変更部
204d…リングマップ更新部
205…記憶部
206…入出力部
207…インタフェース部(I/F)
208…記憶部
209…主制御部
209a…最高優先度切替要因の設定要求部
209b…接続スイッチ切替要求部
209c…リングマップ更新要求部
209d…最高優先度切替要因の解除要求部
240…制御部
240a…機能停止部
240b…機能再起動部
290…主制御部
290a…機能停止要求部
290b…機能再起動要求部
304〜306…最高優先度切替要因の設定要求信号
307〜309…最高優先度切替要因の設定要求信号304〜306に対する応答信号
310,311…接続スイッチ切替要求信号
312,313…接続スイッチ切替要求信号310,311に対する応答信号
314〜316…リングマップ更新要求信号
317〜319…リングマップ更新要求信号314〜316に対する応答信号
320〜322…最高優先度切替要因(Lockout Of Protection Span )状態を解除する要求信号
323〜325…最高優先度切替要因状態を解除する要求信号320〜322に対する応答信号
504〜506…機能停止要求信号
507〜509…機能停止要求信号504〜506に対する応答信号
510,511…接続スイッチ切替要求信号
512,513…接続スイッチ切替要求信号510,511に対する応答信号
514〜516…リングマップ更新要求信号
517〜519…リングマップ更新要求信号514〜516に対する応答信号
520〜522…機能再起動要求信号
523〜525…機能再起動要求信号520〜522に対する応答信号
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an information communication system compliant with, for example, SDH (Synchronous Digital Hierarchy), a transmission device used in the information communication system, a monitoring control device, and a path setting method in the information communication system.
[0002]
[Prior art]
In recent years, development of broadband ISDN (Integrated Services Digital Network) based on a globally unified user network interface has been demanded, and SDH capable of uniformly multiplexing various high-speed services and existing low-speed services has been standardized. Under such a trend, technological development relating to a network in which a large-capacity optical submarine cable is laid internationally and communication devices compliant with the SDH standard are connected in a ring shape is being actively carried out.
[0003]
SDH is premised on an optical transmission system, and various characteristic functions are provided in order to make use of its enormous bandwidth. For example, in a large-capacity optical submarine cable system to which SDH is applied, a system in which a transmission cable is laid in a ring shape is considered in order to avoid interruption of a signal due to occurrence of a failure. Some systems of this type have a function called APS (Automatic Protection Switching). This function is based on ITU-T Recommendation G. 841 and implements protection of a communication path against a failure of a repeater or a transmission medium of a transmission system.
[0004]
In this SDH transmission system, in order to improve the operation efficiency when there is no failure in the transmission path or the transmission device, for example, traffic with a relatively low priority such as information used for a service that is permitted to be disconnected is reserved. In some cases, the channel is sent to an empty channel in the channel transmission path. This traffic is called part-time traffic.
[0005]
By the way, when a communication path is set as a normal operation, a connection switch for a transmission path in the transmission apparatus is set for each transmission apparatus through which the communication path passes or terminates from the monitoring control apparatus provided in the information communication system. The communication path in the transmission apparatus is connected by sequentially controlling.
[0006]
Therefore, as a normal operation, control of the transmission line connection switch to the transmission apparatus by the monitoring and control apparatus to set the communication path, and control of the transmission line connection switch in each transmission apparatus by starting the APS May conflict.
[0007]
For example, it is assumed that a communication path A has already been set between the transmission apparatuses N1 and N2 in the SDH network including four transmission apparatuses N1 to N4. When a communication path B is newly set up between the transmission apparatuses N3 and N4 using the backup channel transmission path, the supervisory control apparatus switches the connection switch for the backup channel transmission path in the transmission apparatuses N3 and N4 in order to drop the backup channel transmission path. Are controlled sequentially. When the control for N3 is completed and a communication path failure occurs between the transmission apparatuses N1 and N2 immediately before the control for N4, the APS is activated and traffic flowing through the communication path A between the transmission apparatuses N1 and N2 In order to pass, the transmission devices N3 and N4 are controlled to pass through the backup channel transmission path. After this, when the monitoring and control apparatus controls the connection switch of the transmission path of the transmission apparatus N4 in order to drop the protection channel transmission path, it should reach N2 from N1 via N3 and N4 using the protection channel transmission path. The saved traffic between N1 and N2 is dropped at N4, and a misconnection in which N1 and N4 are connected occurs.
[0008]
As described above, when the APS function operates in the transmission apparatus while the communication path is set from the supervisory control apparatus, misconnection may occur as a result of switching the connection switch.
[0009]
Further, as described above, in order to prevent the traffic passing through each communication path from being interrupted by switching the connection switch in each transmission device, communication between all transmission devices on the network stored in each transmission device. All path connection information must match.
[0010]
However, under certain conditions, connection information of communication paths stored in each transmission device may not match.
For example, in the path setting method in the conventional SDH network system, a new communication path is set according to the following procedure.
(A) A switch control command for the connection switch is sequentially given to each transmission device through which the communication path passes or terminates from a monitoring control device provided in the network.
(B) The transmission device that has received the control command performs an operation of switching the connection switch, and when the operation is completed, returns a result response indicating that to the monitoring control device.
(C) When a result response is returned from all the transmission apparatuses to the monitoring control apparatus and the state of the communication path is determined, connection information of communication paths between all transmission apparatuses on the network is transmitted from the monitoring control apparatus to all the transmission apparatuses. The communication path connection information stored in each transmission apparatus is updated.
[0011]
Since such a procedure has been taken, connection information of communication paths stored in each transmission apparatus may be different until the update operation in (C) is completed. If the APS function operates in such a state, a misconnection occurs when the connection switch of the transmission path is switched. In such a case, not only communication is interrupted, but also an incorrect connection destination is connected, which is a very big problem.
[0012]
[Problems to be solved by the invention]
Thus, in the past, the competition between the transmission line connection switch control performed by the supervisory control apparatus for the transmission apparatus to set the communication path and the transmission path connection switch control in each transmission apparatus by the activation of the APS No means for controlling was provided. For this reason, when a failure occurs during the path setting process, the transmission switch connected to the transmission path in each transmission apparatus that is controlled so that traffic is not interrupted by the APS function transmits the monitoring control apparatus that continues the path setting process. In some cases, overwriting may occur due to control of the path connection switch. In this case, traffic may be interrupted or misconnection may occur.
[0013]
Further, after a path is set, if a failure occurs during the sequential notification of communication path connection information between all transmission apparatuses on the network from the monitoring and control apparatus to each transmission apparatus, the communication path connection information is consistent between the transmission apparatuses. Since the APS function operates in a state where it is not done, there is a possibility that traffic is interrupted or misconnection occurs.
[0014]
The present invention has been made in view of the above circumstances, and provides an information communication system that does not cause misconnection or loss of traffic even when a communication path is set, a monitoring control device, a transmission device, and a path setting method used in the information communication system. The purpose is to do.
[0015]
[Means for Solving the Problems]
In order to achieve the above object, the information communication system of the present invention provides:
(1) In an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a backup channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices Between each transmission device and a transmission path switching factor provided in each of the plurality of transmission devices and used to determine the state of the connection switch at the time of the failure in order to recover the traffic when the failure of the information communication system occurs. The transmission path determination means for generating a signal for switching the connection switch based on the connection information of the communication path and the current connection switch state in the own device, and the monitoring control device are provided with the highest for all transmission devices. The setting request means for transmitting the setting request of the transmission path switching factor having the priority of the above and the supervisory control device are provided for all transmission devices. A cancellation request means for transmitting a cancellation request for a transmission path switching factor having a priority level, a switching factor storage means provided in each of the plurality of transmission apparatuses and holding a plurality of transmission path switching factors, and a plurality of transmission apparatuses A transmission path switching factor having the highest priority as a transmission path switching factor is set in the switching factor storage means according to a setting request signal from each setting request means, and a cancellation request signal from the cancellation request means is set. Accordingly, the transmission path switching factor having the highest priority is deleted from the switching factor storage means, and the transmission path switching factor has the highest priority among the transmission path switching factors held in the switching factor storage means. A switching factor change means for setting a transmission channel switching factor, and a transmission channel switching factor that is provided in the monitoring control device and has the highest priority as the transmission channel switching factor used to determine the state of the connection switch After the setting, a switching request unit that transmits a signal for switching the connection switch to the plurality of transmission devices, and a connection switch switching unit that is provided in each of the plurality of transmission devices and switches the connection switch according to the connection switch switching signal. It is characterized by comprising.
[0016]
The path setting method of the present invention
(2) A plurality of transmission devices connected via transmission lines having a working channel and a backup channel, and having a function of recovering traffic by switching the state of a connection switch when a failure occurs, and each of the transmission line and the plurality of transmission devices A path setting method in an information communication system including at least one monitoring control device that monitors and controls the highest priority for all transmission devices when setting a communication path from the monitoring control device. A step of transmitting a setting request signal of a transmission path switching factor, and a transmission path switching factor used by each of all transmission apparatuses to determine the state of the connection switch in accordance with the setting request signal from the monitoring control apparatus The step of setting the transmission path switching factor having the highest priority in the switching factor storage means for holding the transmission path, and the transmission path switching having the highest priority. After each of the transmission devices is set, the step of switching the connection switch according to the path setting signal from the supervisory control device and the supervisory control device has the highest priority over all the transmission devices. A transmission path switching factor cancellation request signal having a degree of transmission, and in response to the cancellation request signal from the monitoring control device, the transmission path switching factor having the highest priority is deleted from the switching factor storage means, and the transmission path And a step of setting a transmission path switching factor having the highest priority among the transmission path switching factors held in the switching factor storage means as the switching factor.
[0017]
In the information communication system and path setting method described in (1) and (2) above, prior to normal connection switch switching work, each transmission device is assigned the highest priority among the transmission path switching factors related to at least the switching function. Is set in advance to a high transmission path switching factor. Such transmission path switching factors in the SDH transmission system are described in ITU-T Recommendation G.3. 841 is defined as Lockout Of Protection Span.
[0018]
In this way, even if a failure occurs during the connection switch switching work by the monitoring and control device, it occurs because the transmission path switching factor with the highest priority already exists among the transmission path switching factors to be held. The switching operation of the connection switch does not occur due to the transmission path switching factor due to the failure. As a result, the failure-time switching function does not operate during the connection switch switching operation by the monitoring control apparatus, and therefore, misconnection can be avoided.
[0019]
The information communication system of the present invention
(3) In an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a backup channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices Between each transmission device and a transmission path switching factor provided in each of the plurality of transmission devices and used to determine the state of the connection switch at the time of the failure in order to recover the traffic when the failure of the information communication system occurs. The transmission path determination means for generating a signal for switching the connection switch based on the connection information of the communication path and the current connection switch state in the own apparatus, and the monitoring control apparatus are provided for transmission to all the transmission apparatuses. The function stop requesting means for transmitting a signal for stopping the function of the path determining means and the monitoring control device are provided in the transmission path for all the transmission devices. A function restart request means for transmitting a signal for releasing the function stop of the fixing means, a function stop means provided in each of the plurality of transmission devices, and stopping the function of the transmission path determination means in response to the function stop signal; Provided in each of the plurality of transmission devices, function restarting means for releasing the function stop of the transmission path determination means in response to the release signal, and provided in the monitoring control device, after the function of the transmission path determination means is stopped A connection switch switching requesting means for transmitting a connection switch switching signal to a plurality of transmission devices; and a connection switch switching means provided in each of the plurality of transmission devices for switching the connection switch in response to the connection switch switching signal. It is characterized by doing.
[0020]
The path setting method of the present invention
(4) In an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a backup channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices In the path setting method, when the communication path is set from the monitoring and control device, the state of the connection switch at the time of the failure is detected for all the transmission devices in order to recover the traffic when the failure of the information communication system occurs. Sends a signal to stop the automatic switching function to switch the connection switch based on the transmission path switching factor used to determine the communication path, the connection information of the communication paths between all the transmission devices, and the current connection switch state in the own device And switching the connection switch according to the communication path setting operation from the monitoring control device after the function is stopped , After the connection switch is switched by the control from the monitoring control unit, characterized in that it comprises a step of transmitting a signal for releasing the stop of the automatic switching function from the monitoring control unit for all of the transmission device.
[0021]
In the information communication system described in (3) above, a function stop requesting means for stopping the function of the transmission path determining means and a function restart requesting means for releasing the function stop of the transmission path determining means are provided. Prior to the switching operation of the connection switch, the switching function at the time of failure in each transmission apparatus is directly stopped.
[0022]
Further, in the path setting method described in (4) above, the switching function at the time of failure in each transmission apparatus is directly stopped prior to the switching operation of the connection switch from the monitoring control apparatus.
[0023]
In this way, even if a failure occurs during the switching operation of the connection switch from the monitoring and control device, the switching function at the time of the failure is stopped, so the switching operation of the connection switch by this function does not occur. Become. As a result, the switching operation of the connection switch by the failure switching function during the switching operation of the connection switch from the supervisory control device does not occur, and therefore, misconnection can be avoided.
[0024]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a first embodiment of the present invention will be described in detail with reference to FIGS.
FIG. 1 is an actual configuration diagram of an information communication system according to an embodiment of the present invention. In this embodiment, a ring network compliant with SDH is assumed, and m transmission apparatuses N1 to Nm are connected in a ring shape via a high-speed line (such as an STM-16 line) FL. Of the information transmitted through the high-speed line FL, information on the channel addressed to the own apparatus is dropped on the low-speed line SL in the transmission apparatuses N1 to Nm and sent to a communication apparatus (not labeled) such as an exchange.
[0025]
The high-speed line FL is composed of clockwise and counterclockwise working channel transmission lines and clockwise and counterclockwise standby channel transmission lines. Even if these four types of transmission lines are respectively passed through four separate fibers, the working channel transmission line and the protection channel transmission line are multiplexed, and the clockwise working channel transmission line and the protection channel transmission line are combined into one cable. The working channel transmission path and the backup channel transmission path that are counterclockwise may be passed through another fiber through the fiber. Further, the clockwise and counterclockwise working channel transmission paths may be passed through one fiber, and the clockwise and counterclockwise standby channel transmission paths may be passed through another fiber.
[0026]
Each of the transmission devices N1 to Nm is connected to the monitoring control devices WS1 to WSm via LANs (Local Area Networks) L1 to Lm, respectively. These monitoring control devices WS1 to WSm are realized as, for example, general-purpose workstations, and can perform monitoring control on the transmission devices N1 to Nm from any of the monitoring control devices WS1 to WSm.
[0027]
FIG. 2 shows a main part configuration of each of the transmission apparatuses N1 to Nm. Each of the transmission apparatuses N1 to Nm includes an add / drop multiplexer (ADM) 201, and transmits synchronous transmission data transmitted via the high-speed line FL to high-speed side interface units (HS I / F) 202-1 to 202-4. Are added to the add / drop multiplexer 201 and further dropped to the low-speed line SL side via the low-speed side interface unit (LS I / F) 203. Each of the transmission devices N1 to Nm introduces synchronous transmission data input from the low-speed line SL side into the add / drop multiplexer 201 via the low-speed side interface unit 203 and adds it to the high-speed line FL. .
[0028]
Operation control for the add / drop multiplexer 201 is performed by the control unit 204 based on information given from the high-speed side interface units 202-1 to 202-4.
[0029]
The control unit 204 is realized by, for example, a microcomputer, and in addition to a known communication and control unit that performs information communication with other transmission devices N and the monitoring control device WS, the transmission path determination unit 204a, A connection switch switching unit 204b, a transmission path switching factor changing unit 204c, and a ring map updating unit 204d are provided.
[0030]
The storage unit 205 stores data related to various controls such as connection information of communication paths between all transmission apparatuses and transmission path switching factors. The storage unit 205 is configured to store a plurality of transmission path switching factors. Therefore, the storage unit 205 may store a new transmission path switching factor from the transmission path switching factor change unit 204c and a transmission path switching factor from the monitoring control device in addition to the transmission path switching factor that has already been stored. it can.
[0031]
The transmission path switching factor change unit 204c determines a transmission path switching factor based on the failure information of the own device and information exchanged between the transmission devices using the K1 and K2 bytes when a failure occurs. Then, the transmission path switching factor change unit 204c is the most important among the determined transmission path switching factor, the transmission path switching factor from the monitoring and control apparatus, and the current transmission path switching factor stored in the storage unit 205. The high-priority transmission path switching factor is determined as a new transmission path switching factor used for determining the state of the connection switch of the own apparatus. The transmission path determination unit 204a includes a transmission path switching factor used to determine the state of the new connection switch, connection information of communication paths between all transmission apparatuses stored in the storage unit 205, and the own apparatus. Based on the current connection switch state of the internal transmission line, in order to recover the traffic, the state of the new connection switch of the transmission line of its own device is determined.
[0032]
Also, the transmission path switching factor change unit 204c adds a transmission path switching factor from the monitoring control device or a transmission path switching factor newly generated due to a failure to a plurality of transmission path switching factors already stored in the storage unit 205. It has a function.
[0033]
The transmission path switching factor is information that is referred to when the connection switch in the transmission apparatus is switched. Each transmission path switching factor has a priority. The transmission path switching factor includes a transmission path switching factor having the highest priority and at least one transmission path that has a lower priority than the highest priority switching factor and is used as a transmission path switching factor when a failure occurs. Switching factors are included. Examples of such transmission path switching factors include ITU-T recommendation G.264 as shown in FIG. Some of them are defined as protection groups at 841.
[0034]
In normal operation, the connection switch switching unit 204b switches the connection switch of its own device in response to a connection switch switching request from the monitoring control device. When a failure occurs, the connection switch switching unit 204b is based on the state of the new connection switch determined by the transmission path determination unit 204a. The connection switch of the own device is switched. The transmission path determination unit 204a and the connection switch switching unit 204b allow the ITU-T Recommendation G. The APS function defined in 841 is realized.
[0035]
The connection switch allows traffic from a low-speed line to flow in a clockwise or counterclockwise working channel transmission line or a clockwise or counterclockwise standby channel transmission line, or in a clockwise or counterclockwise working channel transmission line or clock. This is a switch for dropping traffic from a standby or counterclockwise standby channel transmission line to a low-speed line or passing through traffic sent from an adjacent node to another adjacent node.
[0036]
The ring map update unit 204d updates the ring map stored in the storage unit 205 with the ring map sent from the monitoring control device. The ring map includes communication path connection information between all transmission apparatuses.
[0037]
Next, the configuration of the monitoring control devices WS1 to WSm will be described with reference to FIG. The monitoring control devices WS1 to WSm include an input / output unit 206 including a keyboard and a display, an interface unit (I / F) 207 that realizes an interface function between the communication management network MNW, a program related to monitoring control, and the like. And a main control unit 209 that controls the input / output unit 206 and the interface unit (I / F) 207 based on a control program stored in the storage unit 208.
[0038]
The main control unit 209 is realized by, for example, a microcomputer and the like, in addition to the known communication and control unit that performs information communication with the transmission apparatuses N1 to Nm, the highest priority switching factor setting request unit 209a A connection switch switching request unit 209b, a ring map update request unit 209c, and a highest priority switching factor release request unit 209d.
[0039]
The highest priority switching factor setting request unit 209a sends a lockout of protection span, which is a transmission channel switching factor having the highest priority, to each of the transmission apparatuses N1 to Nm.
[0040]
The connection switch switching request unit 209b requests the transmission apparatus N that should switch the connection switch to pass or terminate the communication path, for example, based on the operation of the operator, to switch the connection switch.
[0041]
The ring map update request unit 209c generates a ring map after a response indicating that the switching of the connection switch has been completed is returned from all the transmission apparatuses that should perform the switching of the connection switch, and the ring map is updated to each transmission apparatus N1. Send to ~ Nm.
[0042]
The highest priority switching factor release request unit 209d requests each of the transmission apparatuses N1 to Nm to cancel the Lockout Of Protection Span after completion of the ring map update operation in each of the transmission apparatuses N1 to Nm.
[0043]
Next, a connection switch switching process in the information communication system configured as described above will be described with reference to FIGS. FIG. 5 shows a logical configuration of the information communication system according to the present embodiment. In the following description, it is assumed that various controls related to switching of connection switches are performed for the three transmission devices N1 to N3 from the supervisory control device WS1, and the transmission devices that should actually switch the connection switches are N2 and N3. To do. A communication management network MNW for exchanging various types of control information between the monitoring control device WS1 and the transmission devices N1 to N3 is formed.
[0044]
In the message sequence diagram of FIG. 6, when the communication path setting operation is started, the supervisory control device WS1 uses the highest priority switching factor setting request unit 209a to set the highest priority switching factor (Lockout Of Protection Span) setting request signal. 304 to 306 are sent to the transmission apparatuses N1 to N3. In response to this, each of the transmission apparatuses N1 to N3 stores the Lockout Of Protection Span as a new transmission path switching factor in addition to the transmission path switching factor stored in the storage unit 205 by the switching factor change unit 204c. 205 stores the result. Thereafter, each of the transmission apparatuses N1 to N3 returns response signals 307 to 309 indicating that the change has been completed to the monitoring control apparatus WS1.
[0045]
When a failure occurs during switching of the connection switch from the monitoring control device WS1, the transmission path switching factor changing unit 204c uses the failure information of the own device and information exchanged between the transmission devices using the K1 and K2 bytes. Based on this, a transmission path switching factor is determined and stored in the storage unit 205. Next, the transmission path switching factor change unit 204c sequentially compares the determined priority of the transmission path switching factor with the priority of the transmission path switching factor already stored in the storage unit 205 before the determination. The storage unit 205 stores the highest priority switching factor, and the transmission path switching factor determined by the occurrence of a failure has a lower priority than the highest priority switching factor. The changing unit 204c does not control the connection switch switching unit 204b, and the connection switch is not switched.
[0046]
When the response signals 307 to 309 are received, the monitoring control device WS1 sends connection switch switching request signals 310 and 311 to the transmission devices N2 and N3 that should switch the connection switch by the connection switch switching request unit 209b. In response to this, the transmission devices N2 and N3 switch the connection switch by the connection switch switching unit 204b, and return response signals 312 and 313 indicating that the switching of the connection switch has been normally completed to the monitoring control device WS1.
[0047]
Upon reception of the response signals 312, 313, the supervisory control device WS1 creates a ring map at this time by the ring map update request unit 209c, and transmits ring map update request signals 314 to 316 including this ring map information. Send to devices N1-N3. In response to this, each of the transmission apparatuses N1 to N3 updates the ring map stored in the storage unit 205 by the ring map update unit 204d and sends response signals 317 to 319 indicating that the update has been normally completed. Return to the monitoring control device WS1.
[0048]
Upon receiving the response signals 317 to 319, the supervisory control device WS1 sends request signals 320 to 322 requesting cancellation of Lockout Of Protection Span to the transmission devices N1 to N3 by the highest priority switching factor release request unit 209d. To do. In response to this, each of the transmission apparatuses N1 to N3 is locked out by the transmission path switching factor changing unit 204c.
Delete the protection span from the storage unit 205.
[0049]
If a failure has occurred while the transmission path switching factor has been changed to the highest priority switching factor due to a request from the supervisory control device WS1, each of the transmission devices N1 to N3 acquires a Lockout Of Protection Span from the storage unit 205. After erasing, the connection switch is switched as necessary based on the transmission path switching factor having the highest priority among the transmission path switching factors stored in the storage unit 205, a new ring map, failure information, and the like. When these controls are completed, each of the transmission apparatuses N1 to N3 returns response signals 323 to 325 indicating that to the monitoring control apparatus WS1.
[0050]
In the above process, information exchange between each of the transmission apparatuses N1 to N3 and the monitoring control apparatus WS1 is performed via a data communication channel (DCC) defined in the section overhead (SOH) of the STM signal.
[0051]
As described above, in the present embodiment, the supervisory control device WS1 sends the highest priority switching factor setting request signals 304 to 306 to the transmission devices N1 to N3 in advance of switching of the connection switch from the supervisory control device WS1. The transmission path switching factor of each of the transmission apparatuses N1 to N3 is set to the transmission path switching factor having the highest priority. For this reason, even if a failure occurs during the switching of the connection switch from the monitoring control device WS1, the transmission path switching factor is not changed by the transmission channel switching factor changing unit 204c. Also not done. In addition, since the highest priority transmission path switching factor is canceled after the ring maps in all the transmission apparatuses N1 to N3 are updated, the connection switches are maintained while the ring maps are different in the respective transmission apparatuses N1 to N3. Is not switched. Therefore, it is possible to avoid misconnection when the connection switch is switched by the monitoring control device.
[0052]
Next, a second embodiment of the present invention will be described with reference to FIGS.
The information communication system of the present embodiment also assumes the configuration shown in FIGS. However, the configurations of the transmission device and the monitoring control device are different from those of the first embodiment. For the sake of distinction, in this embodiment, the transmission devices are denoted by reference numerals n1 to nm and the monitoring control device is denoted by ws1 to wsm. Show. In addition, the same code | symbol shall be attached | subjected to another identical part.
[0053]
FIG. 7 shows the configuration of the transmission apparatuses n1 to nm in the present embodiment. The transmission devices n1 to nm have substantially the same configuration as that of the transmission devices N1 to Nm, but are different in the configuration of the control unit.
[0054]
The control unit 240 is realized by a microcomputer, for example, and is a known communication and control unit that performs information communication with other transmission devices and monitoring control devices ws1 to wsm, a transmission path determination unit 204a, a connection switch, and the like. In addition to the switching unit 204b, the transmission path switching factor changing unit 204c, and the ring map updating unit 204d, a function stopping unit 240a and a function restarting unit 240b are provided.
[0055]
The function stopping unit 240a stops the function of the transmission path determining unit 204a in response to a request from the monitoring control devices ws1 to wsm, and the function restarting unit 240b is similarly sent from the monitoring control devices ws1 to wsm. In response to the request, the function of the stopped transmission path determination unit 204a is restarted.
[0056]
FIG. 8 shows the configuration of the monitoring control devices ws1 to wsm according to the present embodiment. The monitoring control devices ws1 to wsm have substantially the same configuration as the monitoring control devices WS1 to WSm, but are different in the configuration of the main control unit.
[0057]
The main control unit 290 is realized by, for example, a microcomputer. In addition to a known communication and control unit that performs information communication with the transmission apparatuses n1 to nm, the function stop request unit 290a and a connection switch switching A request unit 209b, a ring map update request unit 209c, and a function restart request unit 290b are provided.
[0058]
The function stop request unit 290a requests the transmission devices n1 to nm to stop the function of the transmission path determination unit 204a, and the function restart request unit 290b similarly applies to each of the transmission devices n1 to nm. Is requested to restart the function of the transmission path determination unit 204a.
[0059]
Next, a communication path setting process in the information communication system configured as described above will be described with reference to the message sequence diagram of FIG. Here, various controls related to communication path setting are performed for the three transmission devices n1 to n3 from the supervisory control device ws1, and the transmission devices that should actually set the communication path are n2 and n3.
[0060]
In FIG. 9, when the communication path setting work is started, the monitoring control device ws1 sends function stop request signals 504 to 506 to the respective transmission devices n1 to n3 by the function stop request unit 290a. In response to this, each of the transmission devices n1 to n3 returns the response signals 507 to 509 indicating that the stop is completed to the monitoring control device ws1 after the function stop unit 240a stops the function of the transmission path determination unit 204a. To do. The function stop request signals 504 to 506 are realized as, for example, a GET instruction or a CREATE instruction in the CMIP protocol.
[0061]
When the response signals 507 to 509 are received, the monitoring control device ws1 sends the connection switch switching request signals 510 and 511 to the transmission devices n2 and n3 that are to switch the connection switch by the connection switch switching request unit 209a. In response to this, the transmission devices n2 and n3 switch the connection switch by the connection switch switching unit 204b, and return response signals 512 and 513 indicating that the switching of the connection switch has been normally completed to the monitoring control device ws1.
[0062]
If a failure has occurred while the function of the transmission line determination unit 204a is stopped due to a request from the monitoring control device ws1, the transmission line switching factor change unit 204c stores the failure information of the own device and the K1 and K2 bytes. The transmission path switching factor is determined based on the information used and transmitted between the transmission apparatuses, and is stored in the storage unit 205. Next, the transmission path switching factor change unit 204c sequentially compares the determined priority of the transmission path switching factor with the priority of the transmission path switching factor already stored in the storage unit 205 before the determination. The transmission path switching factor change unit 204c sends the transmission path switching factor with the highest priority among the transmission path switching factors stored in the storage unit 205 to the transmission path determination unit 204a. However, since the function of the transmission path determination unit 204a is stopped, the connection switch is not switched without controlling the connection switch switching unit 204b.
[0063]
When the response signals 512 and 513 are received, the supervisory control device ws1 creates a ring map at this time by the ring map update request unit 209c, and transmits the ring map update request signals 514 to 516 including this ring map information to each transmission device. Send to n1 to n3. In response to this, each of the transmission apparatuses n1 to n3 updates the ring map stored in the storage unit 205 by the ring map update unit 204d and sends response signals 517 to 519 indicating that the update has been normally completed. Returned to the monitoring control device ws1.
[0064]
Upon receiving the response signals 517 to 519, the supervisory control device ws1 sends a function restart request signal 520 to 522 to each of the transmission devices n1 to n3 by the function restart request unit 290b. In response to this, each of the transmission apparatuses n1 to n3 restarts the function of the transmission path determination unit 204a by the function restarting unit 240b.
[0065]
When a failure has occurred while the function of the transmission path determination unit 204a is stopped due to a request from the monitoring control device ws1, each of the transmission apparatuses n1 to n3 restarts the function of the transmission path determination unit 204a. Later, the connection switch is switched as necessary based on the transmission path switching factor having the highest priority among the transmission path switching factors stored in the storage unit 205, a new ring map, failure information, and the like. When these controls are completed, each of the transmission apparatuses n1 to n3 returns response signals 523 to 525 indicating that to the monitoring control apparatus ws1.
[0066]
In the above process, information is exchanged between the transmission devices n1 to n3 and the monitoring control device ws1 via the data communication channel (DCC) defined in the section overhead (SOH) of the STM signal.
[0067]
In this way, in the present embodiment, prior to switching of the connection switch from the supervisory control device ws1, function stop request signals 504 to 506 are sent from the supervisory control device ws1 to the transmission devices n1 to n3, and each transmission is performed. The function of the transmission path determination unit 204a in the devices n1 to n3 is stopped.
[0068]
Accordingly, even if a failure occurs during the switching operation of the connection switch from the monitoring control device, the function of the transmission path determination unit 204a is not driven and the connection switch is not switched. In addition, the function of the transmission path determination unit 204a is restarted after updating the ring map in all the transmission apparatuses n1 to n3. For this reason, the connection switches are not switched while the ring maps are different in each of the transmission apparatuses n1 to nm. Therefore, misconnection can be avoided when the connection switch is switched from the monitoring control device.
[0069]
In addition, this invention is not limited to the said embodiment, For example, a network structure is not restricted to a ring shape, Other connection forms may be sufficient.
Further, the configurations of the control units 204 and 240 and the main control units 209 and 290 are not limited to the above example, and it is only necessary that the function of the switching transmission line determination unit 204a of the connection switch can be stopped from the monitoring control device.
In addition, various modifications can be made without departing from the scope of the present invention.
[0070]
【The invention's effect】
As described above in detail, according to the present invention, prior to switching the connection switch, the transmission path switching factor of all transmission apparatuses is the highest priority transmission path with the highest priority among the transmission path switching factors for failure. An information communication system that does not cause misconnection or traffic drop even when the connection switch is switched because it is set as a switching factor or the connection switch switching function at the time of failure is directly stopped. Used in this information communication system It is possible to provide a monitoring control device, a transmission device, and a path setting method.
[Brief description of the drawings]
FIG. 1 is an actual configuration diagram of an information communication system according to an embodiment of the present invention.
FIG. 2 is a functional block diagram showing a main part configuration of transmission apparatuses N1 to Nm according to the first embodiment of the present invention.
FIG. 3 is an ITU-T recommendation G.1. The figure which shows the priority of the switching state defined in 841. FIG.
FIG. 4 is a functional block diagram showing a main configuration of the monitoring control devices WS1 to WSm according to the first embodiment of the present invention.
FIG. 5 is a diagram showing a logical configuration of the information communication system according to the embodiment of the present invention.
FIG. 6 is a message sequence diagram between the monitoring control device WS1 and the transmission devices N1 to N3 according to the first embodiment of the present invention.
FIG. 7 is a functional block diagram showing a main part configuration of transmission apparatuses n1 to nm according to a second embodiment of the present invention.
FIG. 8 is a functional block diagram showing a main part configuration of monitoring control devices ws1 to wsm according to a second embodiment of the present invention.
FIG. 9 is a message sequence diagram between the monitoring control device ws1 and the transmission devices n1 to n3 according to the second embodiment of the present invention.
[Explanation of symbols]
N1 to Nm, n1 to nm ... Transmission device
WS1 to WSm, ws1 to wsm ... monitoring control device
L1-Lm ... LAN
FL ... High speed line
SL ... Low speed line
MNW: Communication management network
201: Add-drop multiplexer (ADM)
202-1 to 202-4 ... High-speed interface unit (HS I / F)
203 ... Low-speed interface unit (LS I / F)
204 ... Control unit
204a ... Transmission path determination unit
204b ... Connection switch switching unit
204c ... Transmission path switching factor changing unit
204d ... Ring map update unit
205: Storage unit
206: Input / output unit
207 Interface unit (I / F)
208: Storage unit
209 ... Main control unit
209a: Setting request part for highest priority switching factor
209b: Connection switch switching request unit
209c ... Ring map update request part
209d: Request for canceling the highest priority switching factor
240 ... control unit
240a ... Function stop part
240b ... Function restarting unit
290 ... Main control unit
290a ... Function stop request section
290b ... Function restart request unit
304 to 306 ... High priority switching factor setting request signal
307 to 309... Response signals for the highest priority switching factor setting request signals 304 to 306
310, 311 ... Connection switch switching request signal
312, 313... Response signals for connection switch switching request signals 310 and 311
314 to 316 ... Ring map update request signal
317 to 319 ... Response signals for the ring map update request signals 314 to 316
320 to 322... Request signal for releasing the highest priority switching factor (Lockout Of Protection Span) state
323 to 325... Response signals for request signals 320 to 322 for canceling the highest priority switching factor state
504 to 506 ... Function stop request signal
507 to 509... Response signals for function stop request signals 504 to 506
510, 511 ... Connection switch switching request signal
512, 513 ... Response signals for connection switch switching request signals 510, 511
514 to 516 ... Ring map update request signal
517 to 519 ... Response signals for ring map update request signals 514 to 516
520-522 ... Function restart request signal
523 to 525... Response signals for function restart request signals 520 to 522

Claims (16)

現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおいて、
前記複数の伝送装置の各々に設けられ、前記情報通信システムの障害発生時にトラフィックを回復するために、前記障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する伝送路決定手段と、
前記監視制御装置に設けられ、全ての伝送装置に対して、最高の優先度を有する伝送路切替要因の設定要求を送信する設定要求手段と、
前記監視制御装置に設けられ、前記全ての伝送装置に対して、前記最高の優先度を有する伝送路切替要因の解除要求を送信する解除要求手段と、
複数の伝送装置の各々に設けられ、複数の伝送路切替要因を保持する切替要因記憶手段と、
複数の伝送装置の各々に設けられ、前記設定要求手段からの設定要求信号に応じて、前記切替要因記憶手段に伝送路切替要因として前記最高の優先度を有する伝送路切替要因を設定し、前記解除要求手段からの解除要求信号に応じて、前記切替要因記憶手段から前記最高の優先度を有する伝送路切替要因を削除し、伝送路切替要因として、前記切替要因記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因を設定する切替要因変更手段と、
前記監視制御装置に設けられ、前記接続スイッチの状態を決定するために使用する伝送路切替要因が最高の優先度を有する伝送路切替要因に設定された後に、接続スイッチを切替える信号を前記複数の伝送装置に送信する切替要求手段と、
前記複数の伝送装置の各々に設けられ、前記接続スイッチ切替信号に応じて接続スイッチを切替える接続スイッチ切替手段とを具備する情報通信システム。
In an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a backup channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices,
A transmission path switching factor and all transmissions provided in each of the plurality of transmission devices and used to determine the state of the connection switch at the time of the failure in order to recover traffic when the information communication system fails. A transmission path determining means for generating a signal for switching the connection switch based on connection information of a communication path between the devices and a current connection switch state in the own device;
Setting request means provided in the supervisory control device, for all the transmission devices, a setting request means for transmitting a setting request for a transmission path switching factor having the highest priority,
Release request means provided in the supervisory control device, and for all the transmission devices, a release request means for transmitting a release request for a transmission path switching factor having the highest priority,
Switching factor storage means provided in each of the plurality of transmission devices and holding a plurality of transmission path switching factors;
Provided in each of a plurality of transmission devices, according to a setting request signal from the setting request means, set the transmission path switching factor having the highest priority as a transmission path switching factor in the switching factor storage means, In response to the release request signal from the release request means, the transmission path switching factor having the highest priority is deleted from the switching factor storage means, and the transmission held in the switching factor storage means as the transmission path switching factor A switching factor changing means for setting a transmission channel switching factor having the highest priority among the path switching factors;
Provided in the supervisory control device, after the transmission path switching factor used to determine the state of the connection switch is set to the transmission path switching factor having the highest priority, a signal for switching the connection switch Switching request means for transmitting to the transmission device;
An information communication system comprising: a connection switch switching unit that is provided in each of the plurality of transmission devices and switches a connection switch according to the connection switch switching signal.
前記監視制御装置に設けられ、前記切替要求手段からの信号に応答して前記接続スイッチ切替手段により接続スイッチが切替えられた後に、前記全ての伝送装置間の通信パスの接続情報を含むリングマップを前記全ての伝送装置に送信するリングマップ更新要求手段と、
前記複数の伝送装置の各々に設けられ、前記リングマップ更新要求手段から送られてくる通信パス接続情報を含むリングマップによりリングマップを更新するリングマップ更新手段とをさらに具備し、
前記伝送路決定手段は、接続スイッチの状態を決定するために使用する伝送路切替要因として、前記伝送路切替要因を保持する記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因が設定された後に、前記更新された通信パスの接続情報、前記接続スイッチの状態を決定するために使用する伝送路切替要因、自装置内の現在の接続スイッチ状態に基づいて接続スイッチを切替える信号を発生する請求項1記載の情報通信システム。
A ring map including connection information of communication paths between all the transmission apparatuses after the connection switch is switched by the connection switch switching means in response to a signal from the switching request means provided in the monitoring control apparatus. Ring map update request means for transmitting to all the transmission devices;
Ring map update means provided in each of the plurality of transmission devices, and further comprising a ring map update means for updating a ring map with a ring map including communication path connection information sent from the ring map update request means,
The transmission path determining means has the highest priority among the transmission path switching factors held in the storage means for holding the transmission path switching factor as the transmission path switching factor used for determining the state of the connection switch. Based on the updated connection information of the communication path, the transmission path switching factor used to determine the state of the connection switch, and the current connection switch state in the own device. 2. The information communication system according to claim 1, wherein a signal for switching the connection switch is generated.
現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおいて、
前記複数の伝送装置の各々に設けられ、前記情報通信システムの障害発生時にトラフィックを回復するために、前記障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する伝送路決定手段と、
前記監視制御装置に設けられ、全ての伝送装置に対して、前記伝送路決定手段の機能を停止させる信号を送信する機能停止要求手段と、
前記監視制御装置に設けられ、前記全ての伝送装置に対して、前記伝送路決定手段の機能停止を解除させる信号を送信する機能再起動要求手段と、
前記複数の伝送装置の各々に設けられ、前記機能停止信号に応答して前記伝送路決定手段の機能を停止させる機能停止手段と、
前記複数の伝送装置の各々に設けられ、前記解除信号に応答して前記伝送路決定手段の機能停止を解除させる機能再起動手段と、
前記監視制御装置に設けられ、前記伝送路決定手段の機能が停止された後に、接続スイッチの切替信号を前記複数の伝送装置に送信する接続スイッチ切替要求手段と、
前記複数の伝送装置の各々に設けられ、前記接続スイッチの切替信号に応じて接続スイッチを切替える接続スイッチ切替手段とを具備する情報通信システム。
In an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a backup channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices,
A transmission path switching factor and all transmissions provided in each of the plurality of transmission devices and used to determine the state of the connection switch at the time of the failure in order to recover traffic when the information communication system fails. A transmission path determining means for generating a signal for switching the connection switch based on connection information of a communication path between the devices and a current connection switch state in the own device;
A function stop requesting means for sending a signal for stopping the function of the transmission path determining means to all the transmission devices provided in the supervisory control device;
Provided in the monitoring control device, for all the transmission devices, a function restart request means for transmitting a signal for releasing the function stop of the transmission path determination means,
A function stopping unit provided in each of the plurality of transmission devices, and stopping a function of the transmission path determining unit in response to the function stop signal;
A function restarting unit that is provided in each of the plurality of transmission devices and that cancels the function stop of the transmission path determination unit in response to the release signal;
A connection switch switching requesting means for transmitting a connection switch switching signal to the plurality of transmission devices after the function of the transmission path determining means is stopped, provided in the monitoring control device;
An information communication system comprising: a connection switch switching unit that is provided in each of the plurality of transmission devices and switches a connection switch according to a switching signal of the connection switch.
前記監視制御装置に設けられ、前記接続スイッチ切替要求手段からの切替信号に応答して前記接続スイッチ切替手段により接続スイッチが切替えられた後に、前記全ての伝送装置間の通信パスの接続情報を含むリングマップを前記全ての伝送装置に送信するリングマップ更新要求手段と、
前記複数の伝送装置の各々に設けられ、前記リングマップ更新要求手段から送られてくる通信パス接続情報を含むリングマップによりリングマップを更新するリングマップ更新手段とをさらに具備し、
前記伝送路決定手段は、前記機能停止が解除された後に、前記更新された通信パスの接続情報、前記接続スイッチの状態を決定するために使用する伝送路切替要因、自装置内の現在の接続スイッチ状態に基づいて接続スイッチを切替える信号を発生する請求項3記載の情報通信システム。
Provided in the supervisory control device, including connection information of communication paths between all the transmission devices after the connection switch is switched by the connection switch switching unit in response to a switching signal from the connection switch switching request unit A ring map update request means for transmitting a ring map to all the transmission devices;
Ring map update means provided in each of the plurality of transmission devices, and further comprising a ring map update means for updating a ring map with a ring map including communication path connection information sent from the ring map update request means,
The transmission path determination means includes the updated communication path connection information, the transmission path switching factor used to determine the state of the connection switch, and the current connection in the own apparatus after the function stop is released. 4. The information communication system according to claim 3, wherein a signal for switching the connection switch is generated based on the switch state.
現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システム中で使用される監視制御装置において、
前記複数の伝送装置の各々に対して、最高の優先度を有する伝送路切替要因の設定要求信号を送信して、前記伝送装置の接続スイッチの状態を決定するために使用する伝送路切替要因を前記最高の優先度を有する伝送路切替要因に設定する設定要求手段と、
前記複数の伝送装置の各々に対して、前記最高の優先度を有する伝送路切替要因の解除要求信号を送信する解除要求手段と、
前記伝送装置の接続スイッチの状態を決定するために使用する伝送路切替要因が最高の優先度を有する伝送路切替要因に設定された後に、接続スイッチを切替える信号を前記複数の伝送装置に送信して、前記複数の伝送装置の接続スイッチを切替えさせる接続スイッチ切替要求手段とを具備する監視制御装置。
Use in an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a protection channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices In the monitoring and control device to be
A transmission path switching factor used to determine a state of a connection switch of the transmission apparatus by transmitting a setting request signal of a transmission path switching factor having the highest priority to each of the plurality of transmission apparatuses. A setting request means for setting the transmission path switching factor having the highest priority;
Release request means for transmitting a release request signal of a transmission path switching factor having the highest priority to each of the plurality of transmission devices;
After the transmission path switching factor used to determine the state of the connection switch of the transmission apparatus is set to the transmission path switching factor having the highest priority, a signal for switching the connection switch is transmitted to the plurality of transmission apparatuses. And a connection switch switching requesting means for switching connection switches of the plurality of transmission devices.
前記接続スイッチ切替要求手段からの信号に応答して前記伝送装置の接続スイッチが切替えられた後に、前記全ての伝送装置間の通信パスの接続情報を含むリングマップを前記全ての伝送装置に送信して前記全ての伝送装置のリングマップを更新させるリングマップ更新手段をさらに具備する請求項5記載の監視制御装置。  After a connection switch of the transmission device is switched in response to a signal from the connection switch switching request means, a ring map including connection information of communication paths between all the transmission devices is transmitted to all the transmission devices. 6. The monitoring control apparatus according to claim 5, further comprising a ring map update means for updating ring maps of all the transmission apparatuses. 現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システム中で使用される監視制御装置において、
前記情報通信システムの障害発生時にトラフィックを回復するために前記障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する自動切替機能を停止させる信号を前記全ての伝送装置に対して送信する自動切替機能停止要求手段と、
前記全ての伝送装置に対して前記自動切替機能停止を解除させる信号を送信する自動切替機能再起動要求手段と、
前記自動切替機能が停止された後に、接続スイッチの切替信号を前記複数の伝送装置に送信して、前記複数の伝送装置の接続スイッチを切替えさせる接続スイッチ切替要求手段とを具備する監視制御装置。
Use in an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a protection channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices In the monitoring and control device to be
Transmission path switching factor used to determine the state of a connection switch at the time of the failure in order to recover the traffic when a failure occurs in the information communication system, connection information of communication paths between all transmission devices, and within the own device Automatic switching function stop request means for transmitting a signal for stopping the automatic switching function for generating a signal for switching the connection switch based on the current connection switch state to all the transmission devices;
Automatic switching function restart request means for transmitting a signal for canceling the automatic switching function stop for all the transmission devices;
A monitoring control device comprising connection switch switching requesting means for transmitting a connection switch switching signal to the plurality of transmission devices after the automatic switching function is stopped to switch the connection switches of the plurality of transmission devices.
前記接続スイッチ切替要求手段からの切替信号に応答して前記複数の伝送装置の接続スイッチが切替えられた後に、前記全ての伝送装置間の通信パスの接続情報を含むリングマップを前記全ての伝送装置に送信して前記全ての伝送装置のリングマップを更新させるリングマップ更新手段をさらに具備する請求項7記載の監視制御装置。  After the connection switches of the plurality of transmission apparatuses are switched in response to a switching signal from the connection switch switching request means, a ring map including connection information of communication paths between all the transmission apparatuses is displayed on all the transmission apparatuses. The monitoring control device according to claim 7, further comprising: a ring map updating unit that transmits to the network and updates a ring map of all the transmission devices. 現用チャネルおよび予備チャネルを有する伝送路を介して接続され、障害発生時に接続スイッチの状態を切替えてトラフィックを回復する自動切替機能を有する複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システム中で使用される伝送装置において、
前記情報通信システムの障害発生時にトラフィックを回復するために、前記障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する伝送路決定手段と、
複数の伝送路切替要因を保持する切替要因記憶手段と、
前記監視制御装置からの最高の優先度を有する伝送路切替要因の設定要求信号に応じて、前記切替要因記憶手段に伝送路切替要因として前記最高の優先度を有する伝送路切替要因を設定し、前記監視制御装置からの前記最高の優先度を有する伝送路切替要因の解除要求信号に応じて、前記切替要因記憶手段から前記最高の優先度を有する伝送路切替要因を削除し、伝送路切替要因として、前記切替要因記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因を設定する伝送路切替要因変更手段と、
前記接続スイッチを切替える信号に応じて接続スイッチを切替える接続スイッチ切替手段とを具備し、
前記接続スイッチ切替手段は、前記伝送路切替要因が最高の優先度を有する伝送路切替要因に設定された後に、前記監視制御装置から送られる接続スイッチを切替える信号に応じて接続スイッチを切替える伝送装置。
A plurality of transmission devices connected via a transmission line having a working channel and a protection channel, and having an automatic switching function for recovering traffic by switching the state of a connection switch when a failure occurs, and In a transmission device used in an information communication system comprising at least one monitoring control device for monitoring and controlling
In order to recover traffic when a failure occurs in the information communication system, transmission path switching factors used to determine the state of the connection switch at the time of the failure, connection information of communication paths between all transmission devices, and the own device A transmission path determining means for generating a signal for switching the connection switch based on the current connection switch state in
Switching factor storage means for holding a plurality of transmission path switching factors;
In response to the setting request signal of the transmission path switching factor having the highest priority from the monitoring and control apparatus, the transmission path switching factor having the highest priority is set as the transmission path switching factor in the switching factor storage unit. In response to the cancellation request signal of the transmission path switching factor having the highest priority from the supervisory control device, the transmission path switching factor having the highest priority is deleted from the switching factor storage means, and the transmission path switching factor As a transmission path switching factor changing means for setting a transmission path switching factor having the highest priority among the transmission path switching factors held in the switching factor storage means,
Connection switch switching means for switching the connection switch according to a signal for switching the connection switch,
The connection switch switching means switches the connection switch according to a signal for switching the connection switch sent from the monitoring control device after the transmission path switching factor is set to the transmission path switching factor having the highest priority. .
前記接続スイッチ切替手段により接続スイッチが切替えられた後に前記監視制御装置から送られた、前記全ての伝送装置間の通信パスの接続情報を含むリングマップを更新するリングマップ更新手段とをさらに具備し、
前記伝送路決定手段は、前記伝送路切替要因として、前記切替要因記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因が設定された後に、前記更新された通信パスの接続情報、前記伝送路切替要因、自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する請求項9記載の伝送装置。
Ring map update means for updating a ring map including connection information of communication paths between all the transmission devices sent from the monitoring and control device after the connection switch is switched by the connection switch switching device. ,
The transmission path determination means is updated after the transmission path switching factor having the highest priority among the transmission path switching factors held in the switching factor storage means is set as the transmission path switching factor. 10. The transmission apparatus according to claim 9, wherein a signal for switching the connection switch is generated based on connection information of the communication path, the transmission path switching factor, and a current connection switch state in the own apparatus.
現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システム中で使用される伝送装置において、
前記情報通信システムの障害発生時にトラフィックを回復するために、前記障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生し、前記監視制御装置からの機能停止信号により機能を停止し、前記監視制御装置からの解除信号により機能停止を解除する伝送路決定手段と、
切替信号に応じて接続スイッチを切替える接続スイッチ切替手段とを具備し、
前記接続スイッチ切替手段は、前記伝送路決定手段の機能が停止された後に前記監視制御装置から送られる切替信号に応じて接続スイッチを切替える伝送装置。
Use in an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a protection channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices Transmission equipment,
In order to recover traffic when a failure occurs in the information communication system, transmission path switching factors used to determine the state of the connection switch at the time of the failure, connection information of communication paths between all transmission devices, and the own device A signal for switching the connection switch based on the current connection switch state, stopping the function by the function stop signal from the monitoring control device, and releasing the function stop by the release signal from the monitoring control device Route determination means;
Connection switch switching means for switching the connection switch according to the switching signal,
The connection switch switching unit is a transmission device that switches a connection switch in accordance with a switching signal sent from the monitoring control device after the function of the transmission path determination unit is stopped.
前記接続スイッチ切替手段により接続スイッチが切替えられた後に前記監視制御装置から送られる前記全ての伝送装置間の通信パスの接続情報を含むリングマップを更新するリングマップ更新手段をさらに具備し、
前記伝送路決定手段は、前記機能停止が解除された後に、前記更新された通信パスの接続情報、前記接続スイッチの状態を決定するために使用する伝送路切替要因、自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える信号を発生する請求項11記載の伝送装置。
A ring map update unit for updating a ring map including connection information of communication paths between all the transmission devices sent from the monitoring control device after the connection switch is switched by the connection switch switching unit;
The transmission path determination means includes the updated communication path connection information, the transmission path switching factor used to determine the state of the connection switch, and the current connection in the own apparatus after the function stop is released. 12. The transmission apparatus according to claim 11, wherein a signal for switching the connection switch is generated based on the switch state.
現用チャネルおよび予備チャネルを有する伝送路を介して接続され、障害発生時に接続スイッチの状態を切替えてトラフィックを回復する機能を有する複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおけるパス設定方法であって、
前記監視制御装置から通信パスの設定を行う際に、全ての伝送装置に対して、最高の優先度を有する伝送路切替要因の設定要求信号を送信するステップと、
前記全ての伝送装置の各々が、前記監視制御装置からの設定要求信号に応じて、接続スイッチの状態を決定するために使用する伝送路切替要因を保持する切替要因記憶手段に、前記最高の優先度を有する伝送路切替要因を設定するステップと、
最高の優先度を有する伝送路切替要因に設定された後に、前記複数の伝送装置の各々が、前記監視制御装置からのパス設定の信号に応じて接続スイッチを切替えるステップと、
前記監視制御装置が、前記全ての伝送装置に対して、前記最高の優先度を有する伝送路切替要因の解除要求信号を送信するステップと、
前記監視制御装置からの解除要求信号に応じて、前記切替要因記憶手段から前記最高の優先度を有する伝送路切替要因を削除し、伝送路切替要因として、前記切替要因記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因を設定するステップとを含むパス設定方法。
A plurality of transmission devices that are connected via a transmission line having a working channel and a protection channel and have a function of recovering traffic by switching the state of a connection switch when a failure occurs, and monitoring each of the transmission line and the plurality of transmission devices A path setting method in an information communication system comprising at least one supervisory control device to control,
When setting the communication path from the supervisory control device, transmitting a setting request signal for a transmission path switching factor having the highest priority to all the transmission devices;
Each of all the transmission devices has the highest priority in the switching factor storage means that holds the transmission path switching factor used for determining the state of the connection switch in response to the setting request signal from the monitoring control device. Setting a transmission path switching factor having a degree;
Each of the plurality of transmission devices, after being set as a transmission path switching factor having the highest priority, switching a connection switch according to a path setting signal from the monitoring and control device;
The supervisory control device transmits a release request signal for a transmission path switching factor having the highest priority to all the transmission devices;
In response to a release request signal from the monitoring control device, the transmission path switching factor having the highest priority is deleted from the switching factor storage means, and is retained in the switching factor storage means as a transmission path switching factor. A path setting method including a step of setting a transmission path switching factor having the highest priority among the transmission path switching factors.
前記監視制御装置からの信号に応答して接続スイッチが切替えられた後に、前記複数の伝送装置間の通信パスの接続情報を含むリングマップを前記監視制御装置から前記全ての伝送装置に送信するステップと、
前記監視制御装置から送信された通信パスの接続情報を含むリングマップにより前記伝送装置のリングマップを更新するステップと、
前記伝送路切替要因として、前記切替要因記憶手段に保持されている伝送路切替要因のうちで最も高い優先度を有する伝送路切替要因が設定された後に、前記更新された通信パスの接続情報、前記接続スイッチの状態を決定するために使用する伝送路切替要因、障害情報に基づいて接続スイッチを切替えるステップとをさらに含む請求項13記載のパス設定方法。
After a connection switch is switched in response to a signal from the supervisory control device, a step of transmitting a ring map including connection information of communication paths between the plurality of transmission devices from the supervisory control device to all the transmission devices When,
Updating the ring map of the transmission device with a ring map including communication path connection information transmitted from the supervisory control device;
After the transmission path switching factor having the highest priority among the transmission path switching factors held in the switching factor storage means is set as the transmission path switching factor, the updated communication path connection information, The path setting method according to claim 13, further comprising: switching a connection switch based on a transmission path switching factor used for determining a state of the connection switch and failure information.
現用チャネルおよび予備チャネルを有する伝送路を介して接続される複数の伝送装置と、前記伝送路および複数の伝送装置のそれぞれを監視制御する少なくとも1つの監視制御装置とを備える情報通信システムにおけるパス設定方法であって、
前記監視制御装置から通信パスの設定を行う際に、前記全ての伝送装置に対して、前記情報通信システムの障害発生時にトラフィックを回復するために、前記障害発生時の接続スイッチの状態を決定するために使用する伝送路切替要因と全ての伝送装置間の通信パスの接続情報と自装置内の現在の接続スイッチ状態とに基づいて接続スイッチを切替える自動切替機能を停止させる信号を送信するステップと、
前記自動切替機能が停止された後に、前記監視制御装置からの通信パスの設定操作に応じて接続スイッチを切替えるステップと、
前記監視制御装置からの制御により接続スイッチが切替えられた後に、前記監視制御装置から前記全ての伝送装置に対して前記自動切替機能の停止を解除させる信号を送信するステップとを含むパス設定方法。
Path setting in an information communication system comprising a plurality of transmission devices connected via a transmission line having a working channel and a protection channel, and at least one monitoring control device for monitoring and controlling each of the transmission line and the plurality of transmission devices A method,
When setting a communication path from the supervisory control device, the state of the connection switch at the time of the failure is determined in order to recover the traffic when the failure of the information communication system occurs for all the transmission devices. Transmitting a signal for stopping an automatic switching function for switching a connection switch based on a transmission path switching factor to be used, connection information of communication paths between all transmission devices, and a current connection switch state in the own device; ,
After the automatic switching function is stopped, switching the connection switch according to the communication path setting operation from the monitoring control device;
A path setting method including a step of transmitting a signal for canceling the suspension of the automatic switching function to all the transmission apparatuses from the monitoring control apparatus after the connection switch is switched by the control from the monitoring control apparatus.
前記監視制御装置からの切替信号に応答して前記接続スイッチが切替えられた後に、前記監視制御装置からの前記全ての伝送装置間の通信パスの接続情報を含むリングマップにより前記伝送装置のリングマップを更新するステップと、
前記自動切替機能の停止が解除された後に、前記更新された通信パスの接続情報、前記接続スイッチの状態を決定するために使用する伝送路切替要因、自装置の現在の接続スイッチ状態とに基づいて接続スイッチを切替えるステップをさらに含む請求項15記載のパス設定方法。
After the connection switch is switched in response to a switching signal from the supervisory control device, a ring map of the transmission device by a ring map including connection information of communication paths between all the transmission devices from the supervisory control device A step of updating
After the suspension of the automatic switching function is released, based on the updated connection information of the communication path, the transmission path switching factor used to determine the state of the connection switch, and the current connection switch state of the own device The path setting method according to claim 15, further comprising a step of switching connection switches.
JP25889399A 1998-09-16 1999-09-13 Information communication system, monitoring control apparatus, transmission apparatus and path setting method used in the information communication system Expired - Fee Related JP3776638B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25889399A JP3776638B2 (en) 1998-09-16 1999-09-13 Information communication system, monitoring control apparatus, transmission apparatus and path setting method used in the information communication system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP26193898 1998-09-16
JP10-261938 1998-09-16
JP25889399A JP3776638B2 (en) 1998-09-16 1999-09-13 Information communication system, monitoring control apparatus, transmission apparatus and path setting method used in the information communication system

Publications (2)

Publication Number Publication Date
JP2000156694A JP2000156694A (en) 2000-06-06
JP3776638B2 true JP3776638B2 (en) 2006-05-17

Family

ID=26543875

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25889399A Expired - Fee Related JP3776638B2 (en) 1998-09-16 1999-09-13 Information communication system, monitoring control apparatus, transmission apparatus and path setting method used in the information communication system

Country Status (1)

Country Link
JP (1) JP3776638B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011114481A1 (en) 2010-03-18 2011-09-22 富士通株式会社 Node and ring information transmitting method
WO2011125217A1 (en) 2010-04-09 2011-10-13 富士通株式会社 Transmission apparatus and method

Also Published As

Publication number Publication date
JP2000156694A (en) 2000-06-06

Similar Documents

Publication Publication Date Title
JP3390705B2 (en) Reverse compatible fault recovery in bidirectional multisection switched ring transmission systems
US20030058804A1 (en) Method of reducing traffic during path restoration
CA2369277A1 (en) Ring configuration method, failure recovery method, and node address assignment method when configuring ring in network
US7170851B1 (en) Systems and methods for automatic topology provisioning for SONET networks
US7002907B1 (en) System and methods for automatic equipment provisioning for SONET networks
US7058012B1 (en) Systems and methods for automatic end-to-end path provisioning for SONET networks
JP2007221234A (en) Download method and transmission apparatus using the same
JP3776638B2 (en) Information communication system, monitoring control apparatus, transmission apparatus and path setting method used in the information communication system
EP1420598B1 (en) Fast reconfiguration of network elements
JP3526445B2 (en) WDM ring network system, optical path setting method, failure recovery method, and program
JP3844982B2 (en) Transmission equipment
EP1839181B1 (en) Method and system for performing circuit upgrade
JP2000196524A (en) Method and device for optimizing availability of low priority channel in transmitting optical fiber transoceanic ms-sp ring in error exsting state
JP3423185B2 (en) Self-rescue network, transmission line switching method and transmission device
JP3641234B2 (en) Ring connection network system and node device
US7079483B2 (en) Ring network and method for path interchange therein
EP0969615A2 (en) Control method and equipment for ring network system
US7123582B2 (en) Data transmission system, and node equipment and network management equipment used in the same
JP3505406B2 (en) Ring network system and transmission device
JP4212559B2 (en) Line connection changing method and apparatus
JP3366825B2 (en) Transmission apparatus for BLSR network, BLSR network system, and traffic output control method in output path switching in case of failure
JP2561006B2 (en) Routing control method
JP3637303B2 (en) Data transmission system, monitoring control device, and node device
KR100861765B1 (en) Method for establishing, restoring and protecting service connection in an optical network
JP3534630B2 (en) Information management method in ring network

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050720

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050802

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050907

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060221

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060223

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100303

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100303

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110303

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120303

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees