JP3275295B2 - Display of work process diagram - Google Patents

Display of work process diagram

Info

Publication number
JP3275295B2
JP3275295B2 JP8134697A JP8134697A JP3275295B2 JP 3275295 B2 JP3275295 B2 JP 3275295B2 JP 8134697 A JP8134697 A JP 8134697A JP 8134697 A JP8134697 A JP 8134697A JP 3275295 B2 JP3275295 B2 JP 3275295B2
Authority
JP
Japan
Prior art keywords
work
display
simplified
display area
diagram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP8134697A
Other languages
Japanese (ja)
Other versions
JPH10275187A (en
Inventor
重雄 樋口
友彦 大賀
Original Assignee
日立プラント建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立プラント建設株式会社 filed Critical 日立プラント建設株式会社
Priority to JP8134697A priority Critical patent/JP3275295B2/en
Publication of JPH10275187A publication Critical patent/JPH10275187A/en
Application granted granted Critical
Publication of JP3275295B2 publication Critical patent/JP3275295B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Digital Computer Display Output (AREA)
  • User Interface Of Digital Computer (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は作業工程図の表示方
法及びその装置に係り、特にコンピュータを用い作業手
順の工程ネットワークを作成して作業工程図を表示する
作業工程図の表示方法及びその装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and a device for displaying a work process diagram, and more particularly to a method and a device for displaying a work process diagram for displaying a work process diagram by creating a process network of a work procedure using a computer. About.

【0002】[0002]

【従来の技術】建設工事を能率良く、かつ円滑に進める
ためには工事の作業手順が大変重要であり、各種の工事
計画法が提案されている。代表的な手法の一つとして、
関根智明著「PERT・CPM」(日科技連)に記載さ
れているPERT(PerformanceEvaluation and Review
Technique)法、CPM(Critial Path Method) 法があ
る。
2. Description of the Related Art In order to efficiently and smoothly carry out construction work, the work procedure of the construction is very important, and various construction planning methods have been proposed. As one of the typical methods,
PERT (PerformanceEvaluation and Review) described in "PERT CPM" by Tomoaki Sekine (Nikkagiren)
Technique) and CPM (Critial Path Method).

【0003】これらの方法は、各作業の順序関係を示す
工程ネットワークを作成し、この工程ネットワークを積
み上げて全体工程を作成するものである。従来、このよ
うに計画された作業工程を表示する方法として、ガント
チャートやネットワーク図が用いられている。ガントチ
ャートは、横軸に日付(工程)、縦軸に各種の生産設備
や作業領域などを表し、各作業の作業開始日及び作業期
間を一目で分かるように表したものである。一方、ネッ
トワーク図は、作業期間を表す矢印と作業の接続関係を
表す結合点で表したもので、作業の順序関係を分かりや
すく表現したものである。
[0003] In these methods, a process network indicating the order relation of each operation is created, and the process networks are stacked to create an entire process. Conventionally, a Gantt chart or a network diagram has been used as a method for displaying the planned work process. The Gantt chart shows dates (processes) on the horizontal axis and various production facilities and work areas on the vertical axis, so that the work start date and work period of each work can be seen at a glance. On the other hand, the network diagram is represented by an arrow indicating a work period and a connection point indicating a connection relation between the works, and expresses the order relation of the works in an easy-to-understand manner.

【0004】[0004]

【発明が解決しようとする課題】このようなガントチャ
ート等を用いた従来の作業工程図の表示では、一般に各
作業工程は図10の(1)詳細作業工程図表示に示すよ
うに、作業工程名称60とその期間を表す矩形61で表
示される。しかし、作業工程の計画規模が大きくなった
場合にはこのような矩形61による表示では、全作業工
程を表示することができないため、作業工程名称60や
作業期間を表す矩形61を省略、簡素化し、図10の
(2)全体作業工程図表示に示すように作業工程を線6
2のみで表示するようにしている。しかし、このように
線62のみで作業工程を表示すると、作業工程の名称や
作業工程の順序関係等詳細工程が分かりづらいという問
題があった。
In the display of a conventional work process diagram using such a Gantt chart or the like, generally, each work process is performed as shown in (1) Detailed work process diagram display in FIG. It is displayed as a name 60 and a rectangle 61 representing the period. However, when the planned scale of the work process becomes large, the display using the rectangle 61 cannot display all the work processes. Therefore, the work process name 60 and the rectangle 61 representing the work period are omitted and simplified. As shown in FIG. 10 (2) Overall work process diagram display, the work process
2 is displayed. However, if the work process is displayed only by the line 62, there is a problem that it is difficult to understand the detailed process such as the name of the work process and the order relation of the work processes.

【0005】そのためシステムによっては、図11の
(1)に示すように縦方向画面スクロール機能72を用
いて画面の表示領域71を縦方向に移動して多くの項目
を表示可能としたり、横方向画面スクロール機能73を
用いて、表示領域71を横方向に移動して多くの期間を
表示できるようにしている。また、図11の(2)に示
すように作業領域表示案内75を用いて作業工程図の全
体表示74と作業工程図の詳細表示76を切り替えて表
示する方法や、図11の(3)に示すように同一表示画
面77上で作業工程図の全体表示78と作業工程図の詳
細表示79を分け、作業工程図の全体表示78に設けた
移動可能な表示領域案内80に示した領域を作成工程図
の詳細表示79部内に表示する方法などがある。
Therefore, depending on the system, as shown in FIG. 11A, a vertical screen scroll function 72 is used to move the display area 71 of the screen in the vertical direction so that many items can be displayed. By using the screen scroll function 73, the display area 71 is moved in the horizontal direction so that many periods can be displayed. Also, as shown in FIG. 11 (2), a method of switching and displaying the entire display 74 of the work process diagram and the detailed display 76 of the work process diagram using the work area display guide 75, and FIG. As shown, the entire display 78 of the work process diagram and the detailed display 79 of the work process diagram are divided on the same display screen 77, and the area shown in the movable display area guide 80 provided in the entire display 78 of the work process diagram is created. For example, there is a method of displaying the details in the detailed display 79 of the process diagram.

【0006】しかしながら、いずれも操作が煩雑である
という問題点があった。本発明はこのような事情に鑑み
てなされたもので、作業工程の計画規模が大きな場合等
に、長期間にわたる作業工程を知ることができるととも
に所望の期間については詳細な作業工程を知ることがで
きる作業工程図を作成表示する作業工程図の表示方法及
びその装置を提供することを目的とする。
However, there is a problem that the operation is complicated. The present invention has been made in view of such circumstances, and in a case where the plan scale of a work process is large, it is possible to know a long-time work process and to know a detailed work process for a desired period. It is an object of the present invention to provide a method and a device for displaying a work process diagram for creating and displaying a work process diagram that can be created.

【0007】[0007]

【課題を解決する為の手段】記課題を解決するため
に、請求項1に記載の発明は、各種の作業の作業日程を
含む作業情報に基づいて、表示手段の工程図表示領域の
縦軸方向と横軸方向のうちの一方の軸方向に作業項目を
表示し、他方の軸方向を時間軸として各作業項目の作業
日程をグラフィックで表示する作業工程図の表示装置に
おいて、前記工程図表示領域の時間軸方向の任意の時刻
を指定する指定手段と、前記指定手段によって指定され
た時刻に基づいて前記工程図表示領域を、該時刻近傍の
所定の期間を示す詳細工程表示領域と、他の期間を示す
簡略工程表示領域とに区分する手段と、前記詳細工程表
示領域に対応する時間軸のスケールを第1のスケールと
し、前記簡略工程表示領域に対応する時間軸のスケール
を前記第1のスケールよりも縮小した第2のスケールと
して各表示領域の時間軸のスケールを設定するスケール
設定手段と、前記区分された詳細工程表示領域に対応す
る作業情報に基づいて前記表示手段の詳細工程表示領域
に前記第1のスケールの詳細な作業工程を表示させ、前
記簡略工程表示領域に対応する作業情報に基づいて前記
表示手段の簡略工程表示領域に前記第2のスケールの簡
略化した作業工程を表示させ又は一部の作業工程を省略
して表示させる表示制御手段と、を備えたことを特徴と
している。 また、請求項2に記載の発明は、請求項1に
記載の発明において、前記作業情報は、各作業の表示優
先順位を示す情報を含み、表示優先順位が上位の作業工
程は、前記簡略工程表示領域において作業工程が簡略化
して表示され、表示優先順位が下位の作業工程は、前記
簡略工程表示領域において作業工程の表示が省略される
ことを特徴としている。 また、請求項3に記載の発明
は、請求項1に記載の発明において、前記簡略工程表示
領域は、更に前記詳細工程表示領域と隣接する第1の簡
略工程表示領域と、前記第1の簡略工程表示領域と隣接
し該第1の簡略工程表示領域よりも前記時間軸方向の長
さが縮小されてなる第2の簡略工程表示領域とに区分さ
れていることを特徴としている。 また、請求項4に記載
の発明は、請求項3に記載の発明において、前記作業情
報は、各作業の第1から第3の表示優先順位を示す情報
を含み、第1の表示優先順位の作業工程は、前記第1及
び第2の簡略工程表示領域において作業工程が簡略化し
て表示され、第2の表示優先順位の作業工程は、前記第
1の簡略工程表示領域において作業工程が簡略化して表
示されるとともに第2の簡略工程表示領域において作業
工程の表示が省略され、第3の表示優先順位の作業工程
は、前記第1及び第2の簡略工程図表示領域において作
業工程の表示が省略されることを特徴としている。
To solve the above SL problems SUMMARY OF THE INVENTION, according to claim 1 invention, the work schedule for the various operations
Based on the work information including,
Work items are set in one of the vertical and horizontal directions.
Display and work of each work item with the other axis direction as time axis
A display device for the work process diagram that displays the schedule graphically
Any time in the time axis direction of the process diagram display area
Specifying means for specifying the
The process diagram display area based on the time
A detailed process display area showing a predetermined period and another period
Means for dividing into a simplified process display area and the detailed process table
The scale of the time axis corresponding to the display area is defined as the first scale.
And a time axis scale corresponding to the simplified process display area.
And a second scale smaller than the first scale
Scale to set the time axis scale for each display area
Setting means, corresponding to the divided detailed process display area.
Detailed process display area of the display means based on the work information
To display the detailed work process of the first scale,
Based on the work information corresponding to the simplified process display area
The simplified scale display area of the second scale is displayed in the simplified process display area of the display means.
Display abbreviated work processes or omit some work processes
Display control means for displaying
are doing. The invention described in claim 2 is the same as the invention described in claim 1.
In the invention described in the above, the work information is a display quality of each work.
Contains the information indicating the priorities, and the work
The process is simplified in the simplified process display area.
The work process with the lower display priority is displayed as
Display of work process is omitted in simplified process display area
It is characterized by: The invention according to claim 3
Represents the simplified process indication in the invention of claim 1
The area further includes a first simple area adjacent to the detailed process display area.
A schematic process display area and adjacent to the first simplified process display area
And the length in the time axis direction is longer than the first simplified process display area.
Is divided into a second simplified process display area in which
It is characterized by having been. Further, according to claim 4
The invention according to claim 3, wherein the work information
The information is information indicating the first to third display priorities of each work.
And the first display priority operation step includes the first and second display priorities.
And the work process is simplified in the second simplified process display area.
The work process of the second display priority order is
The work process is simplified and displayed in the simplified process display area 1
Work in the second simplified process display area
The display of the process is omitted, and the work process of the third display priority order
Are formed in the first and second simplified process diagram display areas.
The display of the business process is omitted.

【0008】本発明によれば、任意の指定した時刻に基
づいて、工程図表示領域を詳細工程表示領域と簡略工程
表示領域とに区分し、詳細工程表示領域には詳細な作業
工程を表示し、簡略工程表示領域には簡略化した作業工
程又は一部の作業工程を省略して表示するようしたた
め、例えば、作業工程の計画規模が大きく表示画面上に
作業工程の詳細を表示し切れない場合にでも、一つの表
示画面で長期間の作業工程の概略を知ることができると
ともに、所望の時刻近傍に対しては作業工程の詳細を知
ることができる。
According to the present invention, the process diagram display region is divided into a detailed process display region and a simplified process display region based on an arbitrary designated time, and the detailed process display region displays a detailed work process. In the simplified process display area, the simplified work process or a part of the work process is omitted and displayed. For example, in the case where the plan scale of the work process is large and the details of the work process cannot be displayed on the display screen. In this case, it is possible to know the outline of the long-term work process on one display screen, and to know the details of the work process near a desired time.

【0009】[0009]

【発明の実施の形態】以下添付図面に従って本発明に係
る作業工程図表示方法及びその装置の好ましい実施の形
態について詳説する。図1は本発明に係る作業工程図表
示装置の一実施の形態を示した構成図である。同図に示
すように作業工程図表示装置10は、各種処理を行うコ
ンピュータ20と、このコンピュータ20に接続された
出力部40と入力部50とから構成される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment of a method and apparatus for displaying a work process diagram according to the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 is a configuration diagram showing an embodiment of a work process diagram display device according to the present invention. As shown in FIG. 1, the work process diagram display device 10 includes a computer 20 for performing various processes, and an output unit 40 and an input unit 50 connected to the computer 20.

【0010】上記コンピュータ20は、作業工程図を作
成するための処理部22を備え、この処理部22は、入
力データ処理部23、PERT計算等の演算部24、作
業工程図を求める工程図作成部25を有している。これ
らの入力データ処理部23、演算部24及び工程図作成
部25は、それぞれ予め設定された処理手順に従って各
種演算処理を実行する。
The computer 20 includes a processing unit 22 for preparing a work process drawing. The processing unit 22 includes an input data processing unit 23, an operation unit 24 for PERT calculation, etc., and a process drawing for obtaining a work process drawing. It has a part 25. The input data processing unit 23, the arithmetic unit 24, and the process diagram creating unit 25 execute various arithmetic processes according to processing procedures set in advance.

【0011】また、上記コンピュータ20は、入力部5
0から入力されたデータを取り込んだり、処理部22が
処理したデータを出力部40に出力する入出力制御部2
6、、記録媒体に構成される工程ネットワーク構造デー
タ部30及び演算結果格納部32を備えている。上記工
程ネットワーク構造データ部30は、作業の順序関係や
マイルストーンなどのイベントと作業の順序関係、各作
業の所要日数、作業工程表示の優先順位に関するデータ
など、作業工程に関するデータがネットワークを作成で
きる構造データの形で格納されている。
The computer 20 has an input unit 5
Input / output control unit 2 which takes in data input from 0 or outputs data processed by the processing unit 22 to the output unit 40
6, a process network structure data unit 30 and a calculation result storage unit 32 configured on a recording medium. The process network structure data unit 30 can create a network of data on work processes, such as data on work order relationships, events and work order relationships such as milestones, the number of days required for each work, and data on work process display priorities. Stored in the form of structural data.

【0012】また、上記演算結果格納部32は、工程ネ
ットワーク構造データ部30のデータを演算部24や工
程図作成部25によって処理した結果を、出力部40に
よって作業工程図を表示できる形式でデータを格納して
いる。一方、出力部40は、処理部22が作成した工程
ネットワークや作業工程図を表示するための表示装置4
1、それらをハードコピー等として出力するプリンタ4
2から構成される。
The operation result storage unit 32 stores the result of processing the data of the process network structure data unit 30 by the operation unit 24 and the process diagram creation unit 25 in a format in which the output unit 40 can display a work process diagram. Is stored. On the other hand, the output unit 40 is a display device 4 for displaying a process network and a work process diagram created by the processing unit 22.
1. Printer 4 for outputting them as a hard copy or the like
2

【0013】また、入力部50は、オペレータが各種の
データを直接入力するためのキーボード51、他の計算
機システムからデータファイルの形式で入力するための
フロッピーディスク駆動装置52、他のコンピュータ等
から通信回線を介してデータを入力するためのモデム5
3等から構成される。次に上記作業工程図表示装置10
によって作成される作業工程図について説明する。図2
は上記作業工程図表示装置10によって出力部40の表
示手段41等に出力される画像構成の一例を示した図で
ある。同図に示すように表示手段41の画面上に作業工
程図130が表示される。作業工程図130は、行方向
に日付が、列方向に作業項目131が表示され、この作
業工程図130によって各作業項目に対する作業工程
(作業日程)が示される。
An input unit 50 is provided with a keyboard 51 for the operator to directly input various data, a floppy disk drive 52 for inputting data in the form of a data file from another computer system, and communication from another computer. Modem 5 for inputting data via a line
3 and so on. Next, the work process diagram display device 10
Will be described. FIG.
FIG. 3 is a diagram showing an example of an image configuration output to the display means 41 or the like of the output unit 40 by the work process diagram display device 10. As shown in the figure, a work process diagram 130 is displayed on the screen of the display means 41. In the work process diagram 130, dates are displayed in the row direction and work items 131 are displayed in the column direction. The work process diagram 130 shows a work process (work schedule) for each work item.

【0014】上記日付は、全体工程を月単位で表示する
全体工程日付135、全体工程日付135の所定月を週
単位で表示する月間工程日付136、及び月間工程日付
136の所定週を日単位で表示する週間工程日付137
に区分される。そして、作業工程図130はこれらの全
体工程日付135、月間工程日付136、及び週間工程
日付137に対応して、全工程期間の作業工程を表示す
る全体工程表示領域132、月間工程を表示する月間工
程表示領域133、及び週間工程を表示する週間工程表
示領域134で表示される。尚、作業工程図130に示
すように、各表示領域の日付方向のスケールは表示する
日付の単位に応じて伸縮される。
The date includes an entire process date 135 for displaying the entire process on a monthly basis, a monthly process date 136 for displaying a predetermined month of the entire process date 135 on a weekly basis, and a predetermined week on the monthly process date 136 on a daily basis. Weekly process date 137 to be displayed
It is divided into The work process diagram 130 corresponds to the overall process date 135, the monthly process date 136, and the weekly process date 137, and corresponds to the entire process display area 132 for displaying the process of the entire process period, and the monthly for displaying the monthly process. The process is displayed in the process display region 133 and the weekly process display region 134 for displaying the weekly process. As shown in the work process diagram 130, the scale in the date direction of each display area is expanded or contracted in accordance with the unit of the displayed date.

【0015】それに対して、作業項目131は、各作業
を行う作業領域(A作業域、B作業域、C作業域)毎に
区分され、各作業項目の行にはその作業工程の作業期間
を示す線154、154、…又は矩形150、152が
表示される。上記週間工程表示領域134は、この週間
工程期間の作業工程の詳細を表示するための表示領域と
して使用される。この週間工程表示領域134では、週
間工程期間(7日間)に行われるすべての作業の作業期
間が矩形によって表示されるとともに、この矩形の上部
に作業工程名称も表示されるようになっている。図2に
示す作業工程の例では、この週間工程期間(3月15日
から3月21日までの期間)にA作業域とC作業域で芯
出し作業が行われるため、この作業期間が矩形150、
152で示されるとともに、この矩形150、152の
上部に作業工程名称(芯出し)150A、152Aが表
示される。
On the other hand, the work item 131 is divided into work areas (work area A, work area B, work area C) in which each work is performed, and the work period of the work process is described in the row of each work item. ., Or rectangles 150, 152 are displayed. The weekly process display area 134 is used as a display area for displaying details of the work process in the weekly process period. In the weekly process display area 134, the work periods of all the work performed during the weekly process period (7 days) are displayed as rectangles, and the work process names are also displayed above the rectangles. In the example of the work process shown in FIG. 2, since the centering work is performed in the work area A and the work area C during this weekly work period (the period from March 15 to March 21), this work period is rectangular. 150,
The work process names (centering) 150A and 152A are displayed above the rectangles 150 and 152, respectively.

【0016】一方、上記全体工程表示領域132及び月
間工程表示領域133は、これらの期間の作業工程の概
略を表示するための表示領域として使用される。月間工
程表示領域133では、上記週間工程表示領域134の
前後2週間分の月間工程期間の作業工程が表示され、全
体工程表示領域132では月間工程表示領域133の前
後の数か月分の全体工程期間の作業工程が表示される
が、これらの全体工程期間や月間工程期間に行われる作
業の作業期間は線154、154、154、…で簡略化
されて表示されるとともに、表示される作業期間も予め
設定された所望の作業のみが選択されて表示されるよう
になっている。尚、詳細は後述するが、各作業について
全体工程表示領域132、月間工程表示領域133に作
業期間を表示するか否かは、予め各作業毎に設定された
表示優先順位を参照する。
On the other hand, the whole process display area 132 and the monthly process display area 133 are used as display areas for displaying the outline of the work process in these periods. In the monthly process display area 133, the work processes in the monthly process period for two weeks before and after the weekly process display area 134 are displayed, and in the overall process display area 132, the entire process for several months before and after the monthly process display area 133 is displayed. The work process of the period is displayed, and the work period of the work performed in the entire process period and the monthly process period is simplified and displayed by lines 154, 154, 154,. Also, only the desired work set in advance is selected and displayed. Although details will be described later, whether or not to display the work period in the overall process display area 132 and the monthly process display area 133 for each work refers to the display priority set in advance for each work.

【0017】また、図2に示すように作業工程図130
の上部に作業工程図130の日付に対応して週間工程図
日付137の日付を指定する指定記号120が表示され
る。この指定記号120は、マウスやキーボード等によ
り所望の位置に移動させることができ、この指定記号1
20を所望の日に対応する位置に移動させることによ
り、その日の前後3日(計7日間)を週間工程日付に変
更し、作業工程の詳細を表示する週間工程表示領域の日
付を変更することができるようになっている。尚、初め
の指定記号120の位置、即ち、初めに週間工程日付に
割り当てられる日付は、初期入力としてユーザーが設定
するようにしてもよいし、また、現在日によって自動で
設定するようにしてもよい。
Further, as shown in FIG.
The designation symbol 120 for designating the date of the weekly process drawing date 137 is displayed at the top of the column corresponding to the date of the work process drawing 130. The designation symbol 120 can be moved to a desired position using a mouse, a keyboard, or the like.
By moving 20 to a position corresponding to a desired day, three days before and after that day (a total of seven days) are changed to weekly process dates, and dates in the weekly process display area for displaying details of work processes are changed. Is available. The position of the first designation symbol 120, that is, the date initially assigned to the weekly process date may be set by the user as an initial input, or may be automatically set according to the current date. Good.

【0018】このように、作業工程図130は、作業工
程の全体の概略を表示する簡略工程表示領域(全体工程
表示領域及び月間工程表示領域)と、作業工程の詳細を
表示する詳細工程表示領域(週間工程表示領域)とで構
成されるため、この作業工程図130によって作業工程
の全体の様子を知ることができると同時に、所望の期間
について詳細な作業工程を知ることができる。
As described above, the work process diagram 130 includes a simplified process display region (overall process display region and monthly process display region) for displaying an outline of the entire work process, and a detailed process display region for displaying the details of the work process. (Weekly process display area), it is possible to know the overall state of the work process from the work process diagram 130, and at the same time to know the detailed work process for a desired period.

【0019】尚、作業項目の全てが1画面内に表示され
ない場合には、図2に示す画面上の右部の縦方向スクロ
ール機能140によって作業項目表示領域131を縦方
向にスクロールすることにより、すべての作業項目に関
する作業工程が画面上に表示されるようになっている。
また、図2に示すように作業工程図130には各作業の
作業工程の他に作業に伴う作業人員の山積み139が表
示されるようになっている。ここでは、作業人員の山積
み139に表示するようにしているが、これに限らず他
の資材の山積みを表示するようにしてもよい。
When not all the work items are displayed in one screen, the work item display area 131 is scrolled in the vertical direction by the vertical scroll function 140 on the right portion of the screen shown in FIG. Work processes for all work items are displayed on the screen.
In addition, as shown in FIG. 2, the work process diagram 130 displays a pile 139 of workers involved in the work in addition to the work process of each work. Here, the pile is displayed on the pile 139 of the worker, but the present invention is not limited to this, and the pile of other materials may be displayed.

【0020】更に、図2に示すように画面上の上部に、
表示結果に対する処理機能111、すなわち、各作業工
程の詳細情報表示112、作業工程間やマイルストーン
などの制約条件表示113、作業人員の山積み表示11
4、作業工程の工程修正115、印刷116及び初期画
面へ戻る117を設定するための処理項目が表示され、
これらの処理機能111を選択して各種項目を設定する
ことができる。
Further, as shown in FIG.
Processing function 111 for the display result, that is, detailed information display 112 of each work process, constraint condition display 113 such as between work processes and milestones, and pile display of work staff 11
4. Process items for setting process correction 115 of work process, printing 116 and returning to the initial screen 117 are displayed,
Various items can be set by selecting these processing functions 111.

【0021】次に、上記作業工程図130を作成する上
記作業工程図表示装置10の作用について詳説する。図
3は、上記作業工程図表示装置10の概略処理手順を示
したフローチャートである。まず、処理を開始して(ス
テップ90)、作業工程に関する情報のデータを入力部
50から入力する(ステップ91)。ここで入力される
データの順序関係や方法は制限されない。そして、入力
されたデータの前処理を入力データ処理部23によって
行い、所定の形式に配列した工程ネットワーク構造デー
タを作成して工程ネットワーク構造データ部30に格納
する(ステップS92)。
Next, the operation of the work process diagram display device 10 for creating the work process diagram 130 will be described in detail. FIG. 3 is a flowchart showing a schematic processing procedure of the work process diagram display device 10. First, the process is started (step 90), and data of information on a work process is input from the input unit 50 (step 91). The order and method of the data input here are not limited. Then, preprocessing of the input data is performed by the input data processing unit 23, and process network structure data arranged in a predetermined format is created and stored in the process network structure data unit 30 (step S92).

【0022】図4、図5は上記工程ネットワーク構造デ
ータ部30に記録される工程ネットワーク構造データの
構造を示した図である。図4は一般的な工程ネットワー
クを図形式で示したものである。同図に示すように、工
程ネットワーク構造データは、例えば、a作業とb作業
とc作業は同時に実施できること、また、d作業はa作
業の完了後にできることなど、作業の順序関係等を示し
たものである。
FIGS. 4 and 5 show the structure of the process network structure data recorded in the process network structure data section 30. FIG. FIG. 4 shows a general process network in a diagram format. As shown in the figure, the process network structure data indicates, for example, the work order relationship, such as that work a, work b, and work c can be performed simultaneously, and work d can be performed after work a is completed. It is.

【0023】図5は工程ネットワーク構造データを表形
式で表したものであり、上記工程ネットワーク構造デー
タ部30に記録される実際の工程ネットワーク構造デー
タの構造を示している。同図に示すように工程ネットワ
ーク構造データ部30には、作業名称a〜nで示される
各作業に対して、その作業が実施される作業領域の名称
A,B,C、その作業を実施するまでに完了していなけ
ればならない先行作業、その作業の完了後に行われる後
続作業、その作業を実施するために行われていなければ
ならない先行イベント(イベントとしては例えば、消防
庁の立ち会い、電気工事の完成等がある。)、作業後に
実施される後続イベント、作業に要する作業日数、作業
従事者の人員数が記憶されている。尚、図6に示すよう
にイベントの日付も表形式(イベント情報)の形で工程
ネットワーク構造データ部30に記憶されている。
FIG. 5 shows the process network structure data in the form of a table, and shows the structure of the actual process network structure data recorded in the process network structure data section 30. As shown in the figure, in the process network structure data section 30, for each work indicated by the work names a to n, the names A, B, and C of the work areas in which the work is performed, and the work are performed. Precedent work that must be completed by the end of the work, subsequent work that is performed after the work is completed, and predecessor events that must be performed to carry out the work (for example, attendance at the Fire and Disaster Management Agency, Completion, etc.), subsequent events to be performed after the work, the number of work days required for the work, and the number of workers. As shown in FIG. 6, the date of the event is also stored in the process network structure data unit 30 in the form of a table (event information).

【0024】また、工程ネットワーク構造データ部30
には表示に関する表示優先順位が記憶されている。上述
したように作業工程図表示装置10は、作業工程図13
0を、全体工程表示領域132、月間工程表示領域13
3、週間工程表示領域134の3つの表示領域に区分し
て表示する(図2参照)。この工程ネットワーク構造デ
ータ部30に記録された表示優先順位は、各表示領域に
おける各作業工程の表示の優先順位を示したもので、作
業工程の概略のみを表示する全体工程表示領域132又
は月間工程表示領域133において各作業の作業期間を
表示するか否かを決定するパラメータである。
The process network structure data section 30
Stores a display priority order regarding display. As described above, the operation process diagram display device 10 is configured to display the operation process diagram 13
0 is the entire process display area 132 and the monthly process display area 13
3. The display is divided into three display areas of a weekly process display area 134 (see FIG. 2). The display priority recorded in the process network structure data unit 30 indicates the display priority of each work process in each display area, and the entire process display area 132 for displaying only the outline of the work process or the monthly process This is a parameter for determining whether or not to display the work period of each work in the display area 133.

【0025】ここでは,表示優先順位が1の値の作業に
関しては、週間工程表示領域134のみでその作業期間
が表示され、表示優先順位が2の値の作業に関しては,
月間工程表示領域133と週間工程表示領域134でそ
の作業期間が表示されることを示す。一方,表示優先順
位が3の値の作業に関しては、全体工程表示領域13
2、月間工程表示領域133及び週間工程表示領域13
4の全ての表示領域で作業期間が表示されることを示し
ている。
Here, for the work with the display priority of 1 value, the work period is displayed only in the weekly process display area 134. For the work with the display priority of 2 value,
This indicates that the work period is displayed in the monthly process display area 133 and the weekly process display area 134. On the other hand, for the work with the display priority of 3 value, the entire process display area 13
2. Monthly process display area 133 and weekly process display area 13
4 shows that the work period is displayed in all display areas.

【0026】具体的には、図5に示すようにa作業は表
示優先順位が2であるから,月間工程表示領域133及
び週間工程表示領域134ではその作業期間が表示され
るが,全体工程表示領域132では表示されない。一
方,b作業は表示優先順位が3であるから全体工程表示
領域132、月間工程表示領域133及び週間工程表示
領域134のいずれの表示領域でもその作業期間が表示
される。c作業は表示優先順位が1であるから週間工程
表示領域134のみでその作業期間が表示され、他の表
示領域では表示されないことを示している。
Specifically, as shown in FIG. 5, the work a has a display priority of 2, so the work period is displayed in the monthly process display area 133 and the weekly process display area 134, but the entire process display is performed. It is not displayed in the area 132. On the other hand, since the work b has a display priority of 3, the work period is displayed in any of the entire process display area 132, the monthly process display area 133, and the weekly process display area 134. Since the work c has the display priority of 1, the work period is displayed only in the weekly process display area 134 and is not displayed in the other display areas.

【0027】このように、入力部50から作業工程に関
する情報のデータを入力して(ステップS91)、入力
データ処理部23の前処理によって工程ネットワーク構
造データを作成し、工程ネットワーク構造データ部30
に格納すると(ステップS92)、次に、工程ネットワ
ーク構造データ部30に格納された工程ネットワーク構
造データを用いて工程計画演算処理を演算部24によっ
て行う(ステップS93)。即ち、演算部24はPER
T手法に基づき上述の工程ネットワーク構造データから
作業開始日、作業完了日、作業期間や最早開始日、最早
完了日、最遅開始日、最遅完了日等を求める。そして、
作業員の山積みを考慮した資源量平準化処理を施し作業
工程を計画する。また、標準的な作業手順としてクリテ
ィカルパスなどを求める。
As described above, the information data relating to the work process is input from the input unit 50 (step S91), and the process network structure data is created by the preprocessing of the input data processing unit 23, and the process network structure data unit 30 is prepared.
(Step S92), the process planning operation is performed by the operation unit 24 using the process network structure data stored in the process network structure data unit 30 (step S93). That is, the calculation unit 24 performs the PER
Based on the T method, a work start date, a work completion date, a work period, an earliest start date, an earliest completion date, a latest start date, a latest completion date, and the like are obtained from the process network structure data described above. And
Perform resource leveling process considering the pile of workers and plan the work process. In addition, a critical path or the like is obtained as a standard work procedure.

【0028】次に、システムで予め設定されている表示
日付や利用者が設定した表示日付に基づき表示日付を入
力する(ステップS94)。表示日付とは、上記図2に
示した作業工程図130の週間工程日付137の期間を
決定する指定記号120によって示される日付であり、
週間工程日付137の中間日を示している。マウス等に
より指定記号120の位置を移動させて、又はキーボー
ド等により日付を入力して表示日付を変更すると、この
ステップS94の処理は、反復処理により繰り返し実行
されるため、2回目以降の反復処理においては、指定記
号120の移動位置又はキーボード等から変更値を入力
する。
Next, a display date is input based on a display date preset in the system or a display date set by the user (step S94). The display date is the date indicated by the designation symbol 120 that determines the period of the weekly process date 137 in the work process diagram 130 shown in FIG.
The middle date of the weekly process date 137 is shown. If the display date is changed by moving the position of the designated symbol 120 with a mouse or the like, or by inputting a date with a keyboard or the like, the processing of step S94 is repeatedly executed by an iterative processing. In, the change value is input from the moving position of the designation symbol 120 or the keyboard or the like.

【0029】そして、この設定された表示日付の値に基
づき、詳細を後述する作業優先順位処理を行い(ステッ
プS95)、全体工程日付135、月間工程日付13
6、及び週間工程日付137を設定する。また、工程ネ
ットワーク構造データ部30に記憶されている作業工程
の表示優先順位を基に、作業工程図の各表示領域毎に表
示する内容を決定する。
Then, based on the set display date value, work priority order processing, which will be described in detail later, is performed (step S95), and the overall process date 135 and the monthly process date 13 are processed.
6, and the weekly process date 137 are set. Further, based on the display priority of the work process stored in the process network structure data section 30, the content to be displayed for each display area of the work process diagram is determined.

【0030】以上、作業工程の計画及び作業工程図の表
示内容を決定すると、次に、工程図作成部25によって
表示座標設定処理を行う(ステップS96)。即ち、工
程図作成部25は、作業の開始日、作業期間等と表示画
面の座標の変換を行い、座標変換したデータを演算結果
格納部32に表示画面用データとして格納する。図7
は、演算結果格納部32に格納された表示画面用データ
の一部を示した図である。同図に示す表示画面用データ
は、出力部40において表示優先順位に応じて作業工程
図を表示できる形式に記憶されており、ここでは、作業
開始日及び作業完了日を表示装置上のX座標やY座標に
置き換えた値の他に、演算部24によるPERT計算で
求めた最早開始日、最遅完了日をも含めて格納される。
After the work process plan and the display contents of the work process diagram have been determined as described above, the process diagram creating section 25 performs a display coordinate setting process (step S96). That is, the process diagram creation unit 25 converts the start date of the work, the work period, and the like, and the coordinates of the display screen, and stores the converted data in the calculation result storage unit 32 as the data for the display screen. FIG.
5 is a diagram showing a part of display screen data stored in a calculation result storage unit 32. FIG. The display screen data shown in the figure is stored in a format in which a work process diagram can be displayed in the output unit 40 in accordance with the display priority. Here, the work start date and the work completion date are indicated by the X coordinate on the display device. In addition to the values replaced with the Y coordinate and the Y coordinate, the data is stored including the earliest start date and the latest completion date obtained by the PERT calculation by the arithmetic unit 24.

【0031】このように表示画面用データを作成して演
算結果格納部32に表示画面用データを格納すると、こ
の表示画像用データに基づいて、図2に示したような作
業工程図130等の画像を作成し、入出力制御部26に
よって表示部40の表示装置41に出力表示する(ステ
ップS97)。作業工程図130等の画像を表示する
と、その後は、入力部50からのイベント待ちになり
(ステップS98)、週間工程図用日付の表示日付変更
の処理を行う場合には、再度ステップS94の表示日付
入力からの処理を繰り返す。また、印刷が指定されて印
刷を行う場合には、作成した作業工程図130を出力部
40のプリンタ42等へ出力する(ステップS99)。
終了を指定された場合には、そのまま終了する(ステッ
プS100)。
When the display screen data is created in this way and the display screen data is stored in the calculation result storage section 32, based on the display image data, a work process diagram 130 or the like as shown in FIG. An image is created and output and displayed on the display device 41 of the display unit 40 by the input / output control unit 26 (step S97). When the image of the work process diagram 130 or the like is displayed, the process waits for an event from the input unit 50 (step S98), and when the process of changing the display date of the week process diagram date is performed, the display of step S94 is performed again. Repeat the process from the date input. When printing is designated and printing is performed, the created work process diagram 130 is output to the printer 42 of the output unit 40 (step S99).
If the end is specified, the process ends (step S100).

【0032】次に、表示に関する詳細な処理手順を説明
する。図8は、表示に関する処理手順を示したフローチ
ャートであり、図3のフローチャートのステップS95
の表示優先順位処理の詳細を示したフローチャートであ
る。図3のフローチャートでも示したようにシステムで
予め設定されている表示日付や利用者が設定した表示日
付に基づき表示日付入力を行うと(ステップS94)、
次に、この設定された表示日付で、全体工程表示領域、
月間工程表示領域、及び週間工程表示領域の設定を行う
(ステップS150)。尚、ここでは、図2の作業工程
図130にも示したように各表示領域での表示期間は、
全体工程表示領域で2ヶ月、月間工程表表示領域で2週
間、週間工程表示領域で7日に設定する。但し、それぞ
れの表示期間は、作業工程図の全期間より適当に決める
ことができる。
Next, a detailed processing procedure related to display will be described. FIG. 8 is a flowchart showing a processing procedure relating to the display. Step S95 of the flowchart in FIG.
5 is a flowchart showing details of a display priority order process. As shown in the flowchart of FIG. 3, when the display date is input based on the display date preset by the system or the display date set by the user (step S94),
Next, with the set display date, the entire process display area,
The monthly process display area and the weekly process display area are set (step S150). Here, as shown in the work process diagram 130 of FIG. 2, the display period in each display area is as follows.
Two months are set in the whole process display area, two weeks are set in the monthly process chart display area, and seven days are set in the weekly process display area. However, each display period can be determined appropriately from the entire period of the work process diagram.

【0033】次に、工程ネットワーク構造データ部30
に記憶されている各作業の作業工程の表示開始日及び表
示終了日を参照し(ステップS151)、各作業工程の
表示位置を評価する(ステップS152)。そして、対
象としている作業工程を作業工程図のどの部分、すなわ
ち全体工程表示領域153、月間工程表示領域155、
週間工程表示領域157に表示するか決定する(ステッ
プS153、S155、S157)。そして、工程ネッ
トワーク構造データの表示優先順位を参照し、作業工程
の表示、非表示を判定し、それぞれ全体工程図表示有無
処理(ステップS154)、月間工程図表示有無処理
(ステップS156)、週間工程図表示有無処理(ステ
ップS158)を行う。作業工程を表示するものに関し
ては、図9の表示内容に示すように、全体工程表示領域
では作業日数を1ヶ月単位で表示し、作業名称を表示せ
ず、月間工程表示領域では作業日数を1週間単位で表示
し、作業名称を表示しない。一方、週間工程表示領域で
は、作業日数を1日単位で、かつ作業名称を表示する。
Next, the process network structure data section 30
The display start date and the display end date of the work process of each work stored in (1) are referred to (step S151), and the display position of each work process is evaluated (step S152). Then, the target work process is displayed in any part of the work process diagram, that is, the whole process display area 153, the monthly process display area 155,
It is determined whether to display in the weekly process display area 157 (steps S153, S155, S157). Then, referring to the display priority of the process network structure data, the display and non-display of the work process are determined, and the whole process diagram display presence / absence process (step S154), the monthly process diagram display presence / absence process (step S156), and the weekly process, respectively. A figure display presence / absence process (step S158) is performed. Regarding the display of the work process, as shown in the display content of FIG. 9, the work days are displayed in units of one month in the whole process display area, the work name is not displayed, and the work days are displayed in the monthly process display area. Display by week, do not display the work name. On the other hand, in the weekly process display area, the number of working days is displayed in units of one day, and the name of the work is displayed.

【0034】以上の処理をステップS159の判定処理
によって全ての作業工程に対して行い、表示座標設定処
理を行う(ステップS95)。以上、上記実施の形態で
は、作業工程図において作業工程の詳細を表示する表示
領域(詳細工程表示領域)を日単位で表示し、作業工程
の全体の概略を表示する表示領域(簡略工程表示領域)
を月と週単位で表示するようにしたが、これに限らず、
詳細工程表示領域と簡略工程表示領域の日付単位は任意
に設定でき、各表示領域の期間も任意に設定できる。
The above process is performed for all the work processes by the determination process of step S159, and the display coordinate setting process is performed (step S95). As described above, in the above embodiment, the display area (detailed process display area) for displaying the details of the work process in the work process diagram is displayed on a daily basis, and the display area (simplified process display area) for displaying the outline of the entire work process. )
Is displayed on a monthly and weekly basis, but is not limited to this.
The date unit of the detailed process display area and the simplified process display area can be set arbitrarily, and the period of each display area can also be set arbitrarily.

【0035】また、上記実施の形態では、簡略工程表示
領域を異なる日付単位によって全体工程表示領域と月間
表示領域の2つの表示領域で分割したが、これに限らず
簡略工程表示領域を1つの表示領域又は更に多くの表示
領域で分割するようにしてもよい。
In the above-described embodiment, the simplified process display area is divided into two display areas of the whole process display area and the monthly display area by different date units. However, the present invention is not limited to this. You may make it divide by an area | region or more display areas.

【0036】[0036]

【発明の効果】以上に説明したように、任意の指定した
時刻に基づいて、工程図表示領域を詳細工程表示領域と
簡略工程表示領域とに区分し、詳細工程表示領域には詳
細な作業工程を表示し、簡略工程表示領域には簡略化し
た作業工程又は一部の作業工程を省略して表示するよう
したため、例えば、作業工程の計画規模が大きく表示画
面上に作業工程の詳細を表示し切れない場合にでも、長
期間の作業工程の概略を知ることができるとともに、所
望の時刻近傍に対しては作業工程の詳細を知ることがで
きる。従って、従来の表示装置のように、作業工程図の
表示画面を移動等の手段を用いて操作し、詳細を表示さ
せたい部分を探索するというような煩雑な操作が不要と
なる。
As described above, the process diagram display region is divided into the detailed process display region and the simplified process display region based on an arbitrary designated time, and the detailed process display region is displayed in the detailed process display region. Is displayed in the simplified process display area by omitting the simplified work process or a part of the work process.For example, the plan scale of the work process is large and the details of the work process are displayed on the display screen. Even if it is not possible, it is possible to know the outline of the work process for a long time and to know the details of the work process near a desired time. Therefore, it is not necessary to operate the display screen of the work process diagram using a means such as moving the display screen of the work process diagram as in the conventional display device, and to perform a complicated operation of searching for a part for which details are to be displayed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は本発明に係る作業工程図表示装置の一実
施の形態を示した構成図である。
FIG. 1 is a configuration diagram showing an embodiment of a work process diagram display device according to the present invention.

【図2】図2は作業工程図表示装置によって作成される
作業工程図の構成を示した図である。
FIG. 2 is a diagram showing a configuration of a work process diagram created by a work process diagram display device.

【図3】図3は、本発明に係る作業工程図表示装置の概
略処理手順を示したフローチャートである。
FIG. 3 is a flowchart showing a schematic processing procedure of a work process diagram display device according to the present invention.

【図4】図4は、工程ネットワーク構造データの構造を
説明した工程ネットワークを図形式で示した説明図であ
る。
FIG. 4 is an explanatory diagram showing, in a diagram format, a process network describing the structure of process network structure data.

【図5】図5は、工程ネットワーク構造データを構造を
表形式で表した説明図である。
FIG. 5 is an explanatory diagram showing process network structure data in a table format.

【図6】図6は、工程ネットワーク構造データ部に記憶
されているイベントの日付を説明した説明図である。
FIG. 6 is an explanatory diagram illustrating dates of events stored in a process network structure data unit.

【図7】図7は、演算結果格納部に格納された表示画面
用データの一部を示した図である。
FIG. 7 is a diagram illustrating a part of display screen data stored in a calculation result storage unit;

【図8】図8は、表示に関する処理手順を示したフロー
チャートである。
FIG. 8 is a flowchart illustrating a processing procedure regarding display.

【図9】図9は、作業工程図の各表示領域で表示内容を
示した図である。
FIG. 9 is a diagram showing display contents in each display area of the work process diagram.

【図10】図10は、従来における作業工程図の作業期
間の表示方法を示した図であり、(1)は詳細な作業工
程、(2)は全体の作業工程の表示方法を示した図であ
る。
FIGS. 10A and 10B are diagrams showing a conventional method for displaying a work period in a work process diagram, in which (1) shows a detailed work process, and (2) shows a display method for the entire work process. It is.

【図11】図11は、従来における作業工程図の表示方
式を示した図であり、(1)は表示領域移動方式、
(2)は画面切り換え表示方式、(3)は組み合わせ表
示方式を示した図である。
FIG. 11 is a diagram showing a display method of a conventional work process diagram, in which (1) is a display area moving method,
(2) is a diagram showing a screen switching display system, and (3) is a diagram showing a combination display system.

【符号の説明】[Explanation of symbols]

10…作業工程図表示装置 20…コンピュータ 22…処理部 23…入力データ処理部 24…演算部 25…工程図作成部 40…出力部 50…入力部 130…作業工程図 DESCRIPTION OF SYMBOLS 10 ... Work process diagram display apparatus 20 ... Computer 22 ... Processing unit 23 ... Input data processing unit 24 ... Calculation unit 25 ... Process diagram creation unit 40 ... Output unit 50 ... Input unit 130 ... Work process diagram

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) G06F 17/60 108 JICSTファイル(JOIS)──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) G06F 17/60 108 JICST file (JOIS)

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 各種の作業の作業日程を含む作業情報に
基づいて、表示手段の工程図表示領域の縦軸方向と横軸
方向のうちの一方の軸方向に作業項目を表示し、他方の
軸方向を時間軸として各作業項目の作業日程をグラフィ
ックで表示する作業工程図の表示装置において、 前記工程図表示領域の時間軸方向の任意の時刻を指定す
る指定手段と、 前記指定手段によって指定された時刻に基づいて前記工
程図表示領域を、該時刻近傍の所定の期間を示す詳細工
程表示領域と、他の期間を示す簡略工程表示領域とに区
分する手段と、 前記詳細工程表示領域に対応する時間軸のスケールを第
1のスケールとし、前記簡略工程表示領域に対応する時
間軸のスケールを前記第1のスケールよりも縮小した第
2のスケールとして各表示領域の時間軸のスケールを設
定するスケール設定手段と、 前記区分された詳細工程表示領域に対応する作業情報に
基づいて前記表示手段の詳細工程表示領域に前記第1の
スケールの詳細な作業工程を表示させ、前記簡略工程表
示領域に対応する作業情報に基づいて前記表示手段の簡
略工程表示領域に前記第2のスケールの簡略化した作業
工程を表示させ又は一部の作業工程を省略して表示させ
る表示制御手段と、 を備えたことを特徴とする作業工程図の表示装置。
1. A work item is displayed in one of a vertical axis direction and a horizontal axis direction of a process diagram display area of a display unit based on work information including work schedules of various works, and the other is displayed. In a display device for a work process diagram that graphically displays the work schedule of each work item with the axis direction as a time axis, a designation means for designating an arbitrary time in the time axis direction of the process diagram display area, and designation by the designation means Means for dividing the process diagram display region into a detailed process display region indicating a predetermined period near the time and a simplified process display region indicating another period based on the specified time; The corresponding time axis scale is a first scale, and the time axis scale corresponding to the simplified process display area is a second scale smaller than the first scale. Scale setting means for setting a scale, and displaying the detailed work process of the first scale in the detailed process display area of the display means based on the work information corresponding to the divided detailed process display area, Display control means for displaying the simplified work process of the second scale in the simplified process display region of the display means based on the work information corresponding to the process display region or for omitting and displaying some of the work processes; A display device for a work process diagram, comprising:
【請求項2】 前記作業情報は、各作業の表示優先順位
を示す情報を含み、表示優先順位が上位の作業工程は、
前記簡略工程表示領域において作業工程が簡略化して表
示され、表示優先順位が下位の作業工程は、前記簡略工
程表示領域において作業工程の表示が省略されることを
特徴とする請求項1の作業工程図の表示装置
2. The work information includes information indicating a display priority of each work, and a work process having a higher display priority includes:
The display simplified process working process is simplified in the display area, the working process of the lower display priority, the working process of claim 1, wherein the display of the work processes in the simplified process display area is omitted The display device in the figure.
【請求項3】 前記簡略工程表示領域は、更に前記詳細
工程表示領域と隣接する第1の簡略工程表示領域と、前
記第1の簡略工程表示領域と隣接し該第1の簡略工程表
示領域よりも前記時間軸方向の長さが縮小されてなる第
2の簡略工程表示領領域とに区分されている請求項1の
作業工程図の表示装置
3. The simplified process display area further includes a first simplified process display area adjacent to the detailed process display area, and a first simplified process display area adjacent to the first simplified process display area. 2. A display device for a work process diagram according to claim 1, wherein the display device is also divided into a second simplified process display region in which the length in the time axis direction is reduced.
【請求項4】 前記作業情報は、各作業の第1から第3
の表示優先順位を示す情報を含み、第1の表示優先順位
の作業工程は、前記第1及び第2の簡略工程表示領域に
おいて作業工程が簡略化して表示され、第2の表示優先
順位の作業工程は、前記第1の簡略工程表示領域におい
て作業工程が簡略化して表示されるとともに第2の簡略
工程表示領域において作業工程の表示が省略され、第3
の表示優先順位の作業工程は、前記第1及び第2の簡略
工程図表示領域において作業工程の表示が省略されるこ
とを特徴とする請求項の作業工程図の表示装置
4. The work information includes first to third information of each work.
In the first display priority operation process, the operation process is displayed in a simplified manner in the first and second simplified process display areas, and the second display priority operation process is performed. In the process, the work process is displayed in a simplified manner in the first simplified process display region, and the display of the work process is omitted in the second simplified process display region.
4. The work process diagram display device according to claim 3 , wherein the display of the work process is omitted in the first and second simplified process diagram display areas in the work process of the display priority order.
JP8134697A 1997-03-31 1997-03-31 Display of work process diagram Expired - Fee Related JP3275295B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8134697A JP3275295B2 (en) 1997-03-31 1997-03-31 Display of work process diagram

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8134697A JP3275295B2 (en) 1997-03-31 1997-03-31 Display of work process diagram

Publications (2)

Publication Number Publication Date
JPH10275187A JPH10275187A (en) 1998-10-13
JP3275295B2 true JP3275295B2 (en) 2002-04-15

Family

ID=13743814

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8134697A Expired - Fee Related JP3275295B2 (en) 1997-03-31 1997-03-31 Display of work process diagram

Country Status (1)

Country Link
JP (1) JP3275295B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001125619A (en) * 1999-10-25 2001-05-11 Nec Corp Method and device for load adjustment and recording medium
JP4528425B2 (en) * 2000-09-14 2010-08-18 本田技研工業株式会社 Mold manufacturing schedule determination method
JP4647800B2 (en) * 2001-01-30 2011-03-09 三菱重工業株式会社 Shipbuilding production planning equipment
JP4819402B2 (en) * 2005-06-01 2011-11-24 株式会社リコー Task management apparatus, task management method, and task management program
US8346581B2 (en) * 2008-12-15 2013-01-01 Exelis, Inc. Project timeline visualization methods and systems
US20140098104A1 (en) * 2012-10-10 2014-04-10 Microsoft Corporation Techniques to present event information using an event timing visualization
JP2020052815A (en) * 2018-09-27 2020-04-02 株式会社日立ソリューションズ東日本 Display method for process control chart and display system for process control chart
JP7229132B2 (en) * 2019-09-18 2023-02-27 日本製鉄株式会社 Load condition drawing device, load condition drawing method, and load condition drawing program

Also Published As

Publication number Publication date
JPH10275187A (en) 1998-10-13

Similar Documents

Publication Publication Date Title
JP2967961B2 (en) How to show monthly calendar display
US5761646A (en) Technique for assisting a user in setting attributes of selected screen objects by use of a preview display of a replica object
US9448699B2 (en) Techniques for use with a calendar and messaging component
US7042468B2 (en) Text overlay for multi-dimensional construction project models
US20060004618A1 (en) Explaining task scheduling for a project
JP2005301894A (en) Work progress management method, work progress management device and program
JP3275295B2 (en) Display of work process diagram
JP2017182405A (en) Business management device, information processing method, and business management program
US20050216440A1 (en) Information processing apparatus and information processing method
JP2010061603A (en) Schedule display system
JP5854745B2 (en) DATA INTERFACE DEVICE, DATA INTERFACE METHOD, DATA INTERFACE PROGRAM, AND PROCESS MANAGEMENT SYSTEM FOR PROCESS MANAGEMENT TOOL
US20050204304A1 (en) User interface elements of a sheet set manager for a graphics program
JPH09274627A (en) Method and device for generating schedule managing table
JP2009048425A (en) Project management system, project management device, project management method, and project management program
JP2002342372A (en) Information terminal equipment and schedule retrieval program
JP2002229765A (en) Screen display device
JP3353470B2 (en) Work process display device
JP2004227241A (en) Bus travelling schedule preparing device
EP4155981A1 (en) Information processing apparatus and program
JP3234713B2 (en) Schedule management method and schedule management device
JP6611971B1 (en) Graph creating apparatus, graph creating method, and program
JP5791919B2 (en) Diamond creating apparatus and diamond creating method
US20230376903A1 (en) Automatic project planning, budgeting, and tracking tool
JPH0830678A (en) Schedule control processor
JP2612732B2 (en) Schedule planning support method and device

Legal Events

Date Code Title Description
S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080208

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090208

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090208

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100208

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees