JP3246473B2 - Path switching control system and path switching control method - Google Patents

Path switching control system and path switching control method

Info

Publication number
JP3246473B2
JP3246473B2 JP14576999A JP14576999A JP3246473B2 JP 3246473 B2 JP3246473 B2 JP 3246473B2 JP 14576999 A JP14576999 A JP 14576999A JP 14576999 A JP14576999 A JP 14576999A JP 3246473 B2 JP3246473 B2 JP 3246473B2
Authority
JP
Japan
Prior art keywords
path
failure
switching control
byte
transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14576999A
Other languages
Japanese (ja)
Other versions
JP2000341253A (en
Inventor
和則 新谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP14576999A priority Critical patent/JP3246473B2/en
Publication of JP2000341253A publication Critical patent/JP2000341253A/en
Application granted granted Critical
Publication of JP3246473B2 publication Critical patent/JP3246473B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Maintenance And Management Of Digital Transmission (AREA)
  • Detection And Prevention Of Errors In Transmission (AREA)
  • Time-Division Multiplex Systems (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はパス切替制御システ
ム及びパス切替制御方法に関し、特に冗長構成ネットワ
ークにおいて、現用及び予備のパスとなる2つの伝送ル
ートの切替えを障害発生に応答して行うパス切替制御シ
ステム及びパス切替制御方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a path switching control system and a path switching control method, and more particularly, to a path switching for switching two transmission routes serving as a working path and a protection path in response to a failure occurrence in a redundant network. The present invention relates to a control system and a path switching control method.

【0002】[0002]

【従来の技術】図9は、冗長構成ネットワークの切替制
御システムの従来例を示す図である。同図において、送
信端701からの信号が分岐点702で分岐され、伝送
ルートAと伝送ルートBとの2つのルートを通る。伝送
ルートAには中継ノード703が存在し、伝送ルートB
には中継ノード704が存在する。
2. Description of the Related Art FIG. 9 is a diagram showing a conventional example of a switching control system for a redundant network. In the figure, a signal from a transmitting end 701 is branched at a branch point 702 and passes through two routes, a transmission route A and a transmission route B. The relay node 703 exists in the transmission route A, and the transmission route B
Has a relay node 704.

【0003】受信側では、障害検出部705、706で
ルート故障を検出し、切替制御部708は2つのルート
のうち正常な方を選択するように選択部707を切替制
御する。
On the receiving side, a failure detection unit 705 or 706 detects a route failure, and a switching control unit 708 controls switching of a selection unit 707 so as to select a normal one of the two routes.

【0004】ここで、送信端701より上流で故障が発
生した場合、障害はルートAとルートBに波及し、両系
故障となる。このとき、冗長構成で救済を行うことがで
きないので、選択部707でのルート切替えは不要であ
る。
[0004] Here, when a failure occurs upstream of the transmitting end 701, the failure spreads to route A and route B, and both systems fail. At this time, since the repair cannot be performed with the redundant configuration, the route switching by the selecting unit 707 is unnecessary.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上述し
た従来の切替制御システムにおいては、以下のような問
題点がある。すなわち、ルートAとルートBとに距離差
があり、ルートAの方が短いとすると、ルートAを受信
側で選択していた場合、両系が故障していても、障害を
障害検出部705で障害検出部706より先に検出して
しまう。このため、切替制御部はルートBは正常で、ル
ートAは障害発生と判断し、ルートBへの切替を行って
しまう。
However, the conventional switching control system described above has the following problems. That is, if there is a distance difference between route A and route B, and route A is shorter, if route A is selected on the receiving side, even if both systems have failed, the failure is detected by failure detection unit 705. Therefore, the failure is detected before the failure detection unit 706. Therefore, the switching control unit determines that the route B is normal and the route A has a fault, and switches to the route B.

【0006】ここで、図10を参照すると、時刻a点で
発生した障害はルートA及びルートBに障害が波及す
る。すると、それぞれのルートの伝送遅延時間差によ
り、時刻b点でルートAの故障を検出し、時刻c点でル
ートBの故障を検出することになる。この場合、時刻b
点に着目すると、ルートAの故障は検出されているのに
対し、ルートBの故障は検出されず、時刻c点まではル
ートBが正常であることになる。このため、ルートAか
らルートBに伝送路の切替が行われる。
[0006] Referring to FIG. 10, a fault that has occurred at time point “a” propagates to route A and route B. Then, based on the transmission delay time difference between the routes, a failure of the route A is detected at the time point b, and a failure of the route B is detected at the time point c. In this case, time b
Focusing on the point, while the failure of the route A is detected, the failure of the route B is not detected, and the route B is normal until the time point c. Therefore, the transmission path is switched from the route A to the route B.

【0007】しかし、ルートA及びルートBは最終的に
は両方とも障害になるので、ルートAからルートBへの
伝送路の切替えは不要であり、不要な切替えをネットワ
ーク管理システムに通知してしまうと、ネットワーク管
理者の誤判断を招くおそれがある。
However, since both the routes A and B eventually become obstacles, it is unnecessary to switch the transmission path from the route A to the route B, and the unnecessary switching is notified to the network management system. This may cause a network manager to make an erroneous determination.

【0008】本発明は上述した従来技術の欠点を解決す
るためになされたものであり、その目的は両系障害発生
時の不要な切替動作を防止することのできるパス切替制
御システム及びパス切替制御方法を提供することであ
る。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned drawbacks of the prior art, and has as its object to provide a path switching control system and a path switching control capable of preventing unnecessary switching operations when a fault occurs in both systems. Is to provide a way.

【0009】[0009]

【課題を解決するための手段】本発明によるパス切替制
御システムは、分岐され現用及び予備のパスとなる第1
及び第2の伝送ルートの切替えを障害発生に応答して行
うパス切替制御システムであって、前記第1及び第2の
伝送ルートに分岐される直前のパスにおける障害を検出
する障害検出手段と、この障害検出結果を分岐される前
記第1及び第2の伝送ルートによるパスにそれぞれ出力
する分岐手段と、この分岐された前記第1及び第2の伝
送ルートによるパスに出力された障害検出結果が共にパ
スに障害があることを示したとき前記第1及び第2の伝
送ルートの切替えを抑止する切替え抑止手段とを含むこ
とを特徴とする。前記分岐手段は、前記障害検出結果を
前記パスに挿入する挿入部と、この挿入後に前記第1及
び第2の伝送ルートの分岐を行う分岐部とを含むことを
特徴とする。また、前記パスはSDH信号を伝送するパ
スであり、前記障害検出結果は前記SDH信号のAU部
の特定部分に挿入されることを特徴とする。なお、前記
AU部の特定部分は、H3バイトであるか、H1バイト
のSSビットであることを特徴とする。
SUMMARY OF THE INVENTION A path switching control system according to the present invention has a first path which is branched and becomes a working and protection path.
A path switching control system that performs switching of a second transmission route in response to occurrence of a failure, and a failure detection unit that detects a failure in a path immediately before branching to the first and second transmission routes; A branching means for outputting the failure detection result to the path of the first and second transmission routes that are branched, and a failure detection result output to the path of the first and second transmission routes that are branched. A switch inhibiting means for inhibiting the switching of the first and second transmission routes when both indicate that there is a failure in the path. The branching unit includes an insertion unit that inserts the failure detection result into the path, and a branching unit that branches the first and second transmission routes after the insertion. The path is a path for transmitting an SDH signal, and the failure detection result is inserted into a specific part of an AU section of the SDH signal. Note that the specific portion of the AU section is H3 bytes or SS bits of H1 bytes.

【0010】本発明によるパス切替制御方法は、分岐さ
れ現用及び予備のパスとなる第1及び第2の伝送ルート
の切替えを障害発生に応答して行うパス切替制御方法で
あって、前記第1及び第2の伝送ルートに分岐される直
前のパスにおける障害を検出する障害検出ステップと、
この障害検出結果を分岐される前記第1及び第2の伝送
ルートによるパスにそれぞれ出力する分岐ステップと、
この分岐された前記第1及び第2の伝送ルートによるパ
スに出力された障害検出結果が共にパスに障害があるこ
とを示したとき前記第1及び第2の伝送ルートの切替え
を抑止する切替え抑止ステップとを含むことを特徴とす
る。前記分岐ステップにおいては、前記障害検出結果を
前記パスに挿入し、この挿入後に前記第1及び第2の伝
送ルートの分岐を行うことを特徴とする。また、前記パ
スはSDH信号を伝送するパスであり、前記障害検出結
果は前記SDH信号のAU部の特定部分に挿入されるこ
とを特徴とする。なお、前記AU部の特定部分は、H3
バイトであるか、H1バイトのSSビットであることを
特徴とする。
[0010] A path switching control method according to the present invention is a path switching control method for switching a first and a second transmission route that is branched and becomes a working path and a protection path in response to occurrence of a failure. And a failure detection step of detecting a failure in the path immediately before branching to the second transmission route;
A branching step of outputting the failure detection result to a path based on the first and second transmission routes to be branched, respectively;
Switching suppression for suppressing the switching of the first and second transmission routes when the failure detection result output to the path by the branched first and second transmission routes indicates that the path has a failure. And a step. In the branching step, the failure detection result is inserted into the path, and after the insertion, the first and second transmission routes are branched. The path is a path for transmitting an SDH signal, and the failure detection result is inserted into a specific part of an AU section of the SDH signal. The specific part of the AU section is H3
Byte or SS bit of H1 byte.

【0011】要するに本発明は、ディジタル伝送システ
ムにおいて、送信端で複数ルートへ信号を分岐送信して
おき、受信端で複数ルートから受信する信号を選択する
ことにより構成されるルート冗長系の切替制御方式に関
し、送信端よりも上流側の故障を起因とする両系故障時
の不要な切替動作を防止するものである。
In short, the present invention provides a digital transmission system in which a transmitting end branches and transmits signals to a plurality of routes, and a receiving end selects a signal to be received from the plurality of routes, thereby controlling switching of a route redundant system. Regarding the system, it is to prevent an unnecessary switching operation at the time of a failure in both systems due to a failure on the upstream side of the transmission end.

【0012】[0012]

【発明の実施の形態】次に、本発明の実施の一形態につ
いて図面を参照して説明する。なお、以下の説明におい
て参照する各図においては、他の図と同等部分には同一
符号が付されている。
Next, an embodiment of the present invention will be described with reference to the drawings. In the drawings referred to in the following description, the same parts as those in the other drawings are denoted by the same reference numerals.

【0013】図1は本発明によるパス切替制御システム
の実施の一形態を示すブロック図である。同図には、伝
送システムの冗長構成が示されている。同図において
は、送信ノード201の分岐部103で伝送ルートA及
びBに信号を分岐し、受信ノード204の選択部111
で正常な信号を受信しているルートを選択する。伝送ル
ートAは上流障害情報転送部104を有する中継ノード
202を通過し、伝送ルートBは上流障害情報転送部1
05を有する中継ノード203を通過する。
FIG. 1 is a block diagram showing an embodiment of a path switching control system according to the present invention. FIG. 1 shows a redundant configuration of the transmission system. In the figure, a signal is branched to transmission routes A and B by a branching unit 103 of a transmitting node 201, and a selecting unit 111 of a receiving node 204.
Use to select a route that receives a normal signal. The transmission route A passes through the relay node 202 having the upstream failure information transfer unit 104, and the transmission route B is the upstream failure information transfer unit 1
05 through the relay node 203 having

【0014】また、両ルートの信号の正常性を障害検出
部108、109で監視し、現用ルートで障害検出した
場合は予備ルートへ切替動作を行う。すなわち、本冗長
構成の救済区間は分岐部103から選択部111であ
り、端点Taより上流で発生する障害に対しては救済の
対象外である。しかしこの上流故障は伝送ルートA,B
の両ルートへ波及し、両ルートとも正常な信号が伝送さ
れない。本発明の特徴は、伝送ルートA又はB内で発生
した故障なのか、上流故障を要因とする両系故障なのか
を選択部111で判断できるようにし、上流故障発生時
には不要な切替動作を行わないようにするものである。
ここで、説明のために、冗長構成の救済伝送区間(分岐
部103から選択部111の伝送ルートA又はB)内で
の障害を「ルート故障」、端点Taより上流での障害を
「上流故障」と定義する。
The normality of the signals on both routes is monitored by the fault detecting units 108 and 109, and when a fault is detected on the working route, a switching operation to the spare route is performed. In other words, the remedy section of the present redundant configuration is from the branching unit 103 to the selection unit 111, and a fault that occurs upstream of the end point Ta is not targeted for rescue. However, this upstream failure is caused by transmission routes A and B
And both routes do not transmit a normal signal. A feature of the present invention is that the selection unit 111 can determine whether a failure has occurred in the transmission route A or B or a two-system failure due to an upstream failure, and an unnecessary switching operation is performed when an upstream failure occurs. That is not to be.
Here, for the sake of explanation, a failure in a redundant transmission section (transmission route A or B from the branching unit 103 to the selection unit 111) is referred to as a “route failure”, and a failure upstream of the end point Ta is referred to as an “upstream failure”. Is defined.

【0015】この上流故障とルート故障を受信ノード側
で判断させる手段として、分岐部103以前にその情報
(上流故障情報)を主信号の特定タイムスロットに挿入
する仕組みを持たせる。障害検出部101で上流故障を
検出したとき、障害情報挿入部102において上流故障
情報を挿入し、送出する。また、この情報を受信端まで
転送するためにルート上の途中に存在する中継ノード2
02,203においては、上流故障情報を転送する仕組
みを持たせる(上流故障情報転送部)。受信側では、上
流故障情報を検出するための上流障害情報検出部10
6、107を持たせる。そして切替制御部110は、上
流故障情報と障害検出部108、109で検出された障
害とを基に、ルート故障か上流故障か判断し、選択部1
11の切替制御を行う。
As means for making the receiving node determine the upstream fault and the route fault, a mechanism for inserting the information (upstream fault information) into a specific time slot of the main signal before the branching unit 103 is provided. When the fault detecting unit 101 detects an upstream fault, the fault information inserting unit 102 inserts upstream fault information and sends it. Also, in order to transfer this information to the receiving end, the relay node 2 existing on the route
In 02 and 203, a mechanism for transferring upstream failure information is provided (upstream failure information transfer unit). On the receiving side, an upstream fault information detection unit 10 for detecting upstream fault information
6, 107 are provided. The switching control unit 110 determines whether the failure is a root failure or an upstream failure based on the upstream failure information and the failures detected by the failure detection units 108 and 109,
11 is controlled.

【0016】図2は、SDH(Synchronous Digital Hi
erarchy )伝送装置による4ノードのリング型ネットワ
ークシステムの構成例である。このリングネットワーク
システムは、リング内では高速のSDHフレーム伝送を
行っており、各ノードは低速のSDHフレームをこの高
速伝送ネットワークに高次群パスVC単位で多重分離す
る機能をもっているので端点Taから端点Tbへ、高次
群パスの伝送をこのネットワークを介して行うことがで
きる。
FIG. 2 shows an SDH (Synchronous Digital Hi
(Erarchy) This is an example of the configuration of a 4-node ring network system using transmission devices. This ring network system transmits a high-speed SDH frame in a ring, and each node has a function of demultiplexing a low-speed SDH frame into the high-speed transmission network in units of higher-order group paths VC. , Higher-order group paths can be transmitted over this network.

【0017】この端点Taから端点Tbへのリング内で
の伝送は、送信ノード(A)201から、中継ノード
(B)202を介する伝送ルートAと、中継ノード
(C)203を介する伝送ルートBとの両方が用いら
れ、冗長構成になっている。片方のルートで障害が発生
した場合、受信ノード(D)204の選択部で片方向パ
ス切替を行うことで、端点Taから端点Tbへの信号伝
送の故障救済が行われる。
The transmission from the end point Ta to the end point Tb within the ring is performed by a transmission route A from the transmission node (A) 201 via the relay node (B) 202 and a transmission route B via the relay node (C) 203. Are used to form a redundant configuration. When a failure occurs in one of the routes, the selection unit of the receiving node (D) 204 performs one-way path switching, thereby relieving a failure in signal transmission from the end point Ta to the end point Tb.

【0018】上流故障を受信端に通知する手段として、
SDH多重フレームのAU(Administrative Unit )ポ
インタのH1バイト,H2バイト,H3バイトのうちH
3バイトを使用する。図3には、SDH信号(STM−
N)のフレーム構成が示されている。SDH信号のサイ
ズはN×270×9バイトである。そして、そのうちの
9×9バイト長の部分が、SOH(Section Over Head
)及びAUポインタ部である。残りの261×9バイ
ト長がペイロード部である。ペイロード部には、POH
(Path Over Head)が付加されたデータ(VC3,VC
4)が搭載される。
As means for notifying the receiving end of the upstream failure,
H among H1 byte, H2 byte and H3 byte of AU (Administrative Unit) pointer of SDH multiplex frame
Uses 3 bytes. FIG. 3 shows an SDH signal (STM-
The frame configuration of N) is shown. The size of the SDH signal is N × 270 × 9 bytes. The 9 × 9 byte portion is SOH (Section Over Head).
) And the AU pointer section. The remaining 261 × 9 byte length is the payload section. In the payload, POH
(VC3, VC) with (Path Over Head) added
4) is mounted.

【0019】同図中のAU部には、通常、H1〜H3バ
イトが含まれている(図示せず)。そのH1バイトのb
1〜b4はポインタ値の変更を表すニューデータフラ
グ、H1バイトのb5及びb6はAUタイプ表示、H1
のb7及びb8並びにH2バイトはポインタ値、H3バ
イトは基準クロックと装置の多重化用クロックの周波数
がずれた場合スタッフ動作を行う負スタッフアクション
バイトとして定義されている。AIS(Alarm Indicati
on Signal )は、H1バイト,H2バイトがオール
“1”である場合、検出条件であり、下流にAISを転
送する場合もH1バイト,H2バイトの値をオール
“1”として送出する。負スタッフ用のH3バイトは信
号が正常な場合において使用されるので、AIS送信の
場合に上流故障情報バイトとして使用することは可能で
ある。
The AU section in FIG. 1 usually contains H1 to H3 bytes (not shown). B of the H1 byte
1 to b4 are new data flags indicating a change in pointer value, b5 and b6 of the H1 byte are AU type display, H1
The b7 and b8 and H2 bytes are defined as pointer values, and the H3 byte is defined as a negative stuff action byte for performing a stuff operation when the frequency of the reference clock and the frequency of the multiplexing clock of the apparatus are shifted. AIS (Alarm Indicati
on Signal) is a detection condition when the H1 byte and the H2 byte are all “1”, and the value of the H1 byte and the H2 byte is transmitted as all “1” when the AIS is transferred downstream. Since the H3 byte for negative stuff is used when the signal is normal, it can be used as an upstream failure information byte in the case of AIS transmission.

【0020】ここで、H3バイト値の定義を行う。信号
が正常(H1バイト,H2バイトはオール“1”でない
とき)な場合、H3バイトは負スタッフアクションバイ
ト(従来通り)。AIS(H1バイト,H2バイトがオ
ール“1”)の場合、H3=“01010101”
(“55h”)であれば上流故障情報を表すものとす
る。上流故障でないAISは、H3バイトを従来通りオ
ール“1”とする。なお、“h”は16進数であること
を示すものとする。
Here, the H3 byte value is defined. When the signal is normal (when the H1 byte and H2 byte are not all "1"), the H3 byte is a negative stuff action byte (as before). In the case of AIS (H1 byte and H2 byte are all “1”), H3 = “01010101”
("55h") indicates upstream failure information. The AIS that is not an upstream failure sets the H3 byte to all “1” as in the past. Note that "h" indicates a hexadecimal number.

【0021】図4は、送信ノードでの上流故障送信機能
を示すブロック図である。同図に示されているように、
送信ノードは、端点Taよりの低速のSDHフレーム信
号のSOHを終端するSOH処理部301と、AUポイ
ンタを終端するAUポインタ処理部302と、AUポイ
ンタのAIS情報を監視するAIS監視部303と、上
流故障情報を挿入するH3バイト挿入部304と、信号
を2方向に分岐する分岐部305と、高速のSDHフレ
ーム信号のSOHを生成するSOH処理部306及び3
07とを含んで構成されている。
FIG. 4 is a block diagram showing an upstream failure transmission function in the transmission node. As shown in the figure,
The transmitting node includes an SOH processing unit 301 that terminates the SOH of the low-speed SDH frame signal from the end point Ta, an AU pointer processing unit 302 that terminates the AU pointer, an AIS monitoring unit 303 that monitors AIS information of the AU pointer, H3 byte insertion unit 304 for inserting upstream failure information, branch unit 305 for branching a signal in two directions, and SOH processing units 306 and 3 for generating SOH of a high-speed SDH frame signal
07 is included.

【0022】図5は、中継ノードでの上流故障転送機能
を示すブロック図である。同図に示されているように、
中継ノードは、高速SDHフレーム信号の終端・生成を
行うSOH処理部401及び404と、AUポインタの
終端を行うAUポインタ処理部402と、AISを検出
するAIS監視部405と、H3バイト値をモニタする
H3バイト監視部406と、上流故障を検出する上流故
障検出部407と、上流故障情報を挿入するH3バイト
挿入部403とを含んで構成されている。
FIG. 5 is a block diagram showing an upstream failure transfer function in the relay node. As shown in the figure,
The relay node monitors the SOH processing units 401 and 404 for terminating and generating the high-speed SDH frame signal, the AU pointer processing unit 402 for terminating the AU pointer, the AIS monitoring unit 405 for detecting the AIS, and monitors the H3 byte value. An H3 byte monitoring unit 406 that detects an upstream fault, an upstream fault detection unit 407 that detects an upstream fault, and an H3 byte insertion unit 403 that inserts upstream fault information are configured.

【0023】図6は、受信ノードでの上流故障判定機能
を示すブロック図である。同図に示されているように、
受信ノードは、高速SDHフレーム信号の終端を行うS
OH処理部501及び502と、AUポインタを終端す
るAUポインタ処理部503及び504と、パス信号の
誤り監視バイト(B3バイト)をモニタするPOHモニ
タ部505及び506と、H3バイト値をモニタするH
3バイト監視部507及び508と、AUポインタのA
IS情報を監視するAIS監視部511及び512と、
上流故障を検出する上流故障検出部509及び510
と、パス切替のトリガを検出するパス切替トリガ監視部
513及び514と、パス切替の制御を行うパス切替制
御部515と、ルートA又はルートBの信号の選択を行
う選択部516とを含んで構成されている。
FIG. 6 is a block diagram showing an upstream failure judgment function at the receiving node. As shown in the figure,
The receiving node performs termination S of the high-speed SDH frame signal.
OH processing units 501 and 502, AU pointer processing units 503 and 504 for terminating the AU pointer, POH monitoring units 505 and 506 for monitoring the error monitoring byte (B3 byte) of the path signal, and H for monitoring the H3 byte value.
3-byte monitoring units 507 and 508 and AU pointer A
AIS monitoring units 511 and 512 for monitoring IS information,
Upstream fault detectors 509 and 510 for detecting an upstream fault
And path switching trigger monitoring units 513 and 514 for detecting a path switching trigger, a path switching control unit 515 for controlling path switching, and a selecting unit 516 for selecting a route A or route B signal. It is configured.

【0024】かかる構成からなる本システムの動作につ
いて説明する。図4において、端点Taからの低速SD
Hフレーム信号をノードA201が受信すると、ノード
A内のSOH処理部301でSOHが終端されAU部が
分離される。このときAUポインタ処理部302で終端
されたAUポインタをAIS監視部303で監視し、A
Uポインタがオール“1”の場合にAISと判定する。
AISと判定したときは、上流故障情報として定義した
H3バイト値“55h”をH3バイト挿入部404で挿
入する。そして、分岐点305で分岐された信号は、S
OH処理部306、307で高速のSDHフレーム信号
に多重化されルートA又はルートBに送出される。
The operation of the present system having such a configuration will be described. In FIG. 4, the low speed SD from the end point Ta
When the node A 201 receives the H frame signal, the SOH processing unit 301 in the node A terminates the SOH and separates the AU unit. At this time, the AU pointer terminated by the AU pointer processing unit 302 is monitored by the AIS monitoring unit 303.
If the U pointer is all "1", it is determined to be AIS.
When it is determined to be AIS, the H3 byte value “55h” defined as the upstream failure information is inserted by the H3 byte insertion unit 404. The signal branched at the branch point 305 is S
The OH processing units 306 and 307 multiplex the signal with a high-speed SDH frame signal and transmit the multiplexed signal to a route A or route B.

【0025】ノードB又はノードCでは、高速SDHフ
レームは終端されAUポインタの終端も行われるので、
受信ノードへ上流故障情報を転送する処理が必要であ
る。上流故障情報転送機能は、上流故障を検出した場合
には、通常のAUポインタ生成処理がなされたあとに上
流故障定義値を挿入することで実現できる。その動作に
ついて図5を参照して説明すると、SOH処理部401
で終端された信号は、AUポインタ処理部402でAU
ポインタが終端される。上流故障検出部407で、AI
S監視部405からのAIS情報とH3バイト監視部4
06からのH3バイト情報により上流故障であるか判定
し、上流故障であればH3バイト挿入部403で上流故
障定義値“55h”を挿入する。上流故障検出部407
での上流故障判定は、AIS(AUポインタのH1バイ
ト及びH2バイトがオール“1”)かつH3バイトが
“55h”であるときである。そして、SOH処理部4
04でSOH処理され伝送路に送出される。
In the node B or the node C, the high-speed SDH frame is terminated and the AU pointer is terminated.
Processing for transferring the upstream failure information to the receiving node is required. The upstream failure information transfer function can be realized by inserting an upstream failure definition value after normal AU pointer generation processing is performed when an upstream failure is detected. The operation will be described with reference to FIG.
The signal terminated by the AU pointer processing unit 402
The pointer is terminated. In the upstream failure detection unit 407, the AI
AIS information from S monitor 405 and H3 byte monitor 4
It is determined based on the H3 byte information from 06 whether an upstream fault has occurred, and if it is an upstream fault, the H3 byte insertion unit 403 inserts an upstream fault definition value “55h”. Upstream failure detector 407
Is determined when the AIS (the H1 and H2 bytes of the AU pointer are all “1”) and the H3 byte is “55h”. Then, the SOH processing unit 4
At S04, the data is subjected to SOH processing and transmitted to the transmission path.

【0026】次に、図6を参照して説明する。ノードD
において、ルートA及びルートBからのSDH信号を受
信すると、これらの信号はSOH処理部501、502
で終端される。次に、AUポインタ処理部503、50
4でAUポインタが終端され、H3バイトはH3バイト
監視部507、508に、H1バイト,H2バイトはA
IS監視部511、512に渡される。そして、これら
H1バイト,H2バイトの値(AIS情報)及びH3バ
イトの値は、上流故障検出部509、510に渡され、
AIS(H1バイト,H2バイトがオール“1”)かつ
H3バイト値が“55h”のとき上流故障あり、AIS
(H1バイト,H2バイトがオール“1”)でH3バイ
ト値もオール“1”であるときは上流故障なしと判定さ
れる。つまり、AISでない(信号が正常)ときは、H
3バイトは負スタッフ用のバイトで、H3バイトが“5
5h”でも上流故障を意味しない。
Next, a description will be given with reference to FIG. Node D
Receives the SDH signals from route A and route B, these signals are sent to SOH processing units 501 and 502.
Terminated by Next, the AU pointer processing units 503 and 50
4, the AU pointer is terminated, the H3 byte is sent to the H3 byte monitoring units 507 and 508, and the H1 byte and H2 byte are sent to the A
The information is passed to IS monitoring units 511 and 512. The values of the H1 and H2 bytes (AIS information) and the value of the H3 byte are passed to the upstream failure detection units 509 and 510,
If the AIS (H1 byte and H2 byte are all "1") and the H3 byte value is "55h", there is an upstream fault, and AIS
When the H1 byte and the H2 byte are all “1” and the H3 byte value is also all “1”, it is determined that there is no upstream failure. That is, when the signal is not AIS (the signal is normal), H
The 3 bytes are bytes for negative stuff, and the H3 byte is “5”.
5h "does not mean an upstream failure.

【0027】また、AUポインタ処理後のVC(Virtua
l Container)信号はPOHモニタ部でモニタされVC
信号の符号誤り情報を示すB3バイトはパス切替トリガ
監視部513,514に渡される。パス切替トリガは、
AISかB3バイトの誤り検出時である。切替制御部5
15は、パス切替トリガにより選択部516の切替を制
御するが、上流故障検出部509,510で上流故障情
報を検出した場合には、パス切替トリガがあっても切替
制御を行わない。
The VC (Virtua after the AU pointer processing)
l Container) signal is monitored by the POH monitor
The B3 byte indicating the code error information of the signal is passed to the path switching trigger monitoring units 513 and 514. The path switching trigger is
AIS or B3 byte error is detected. Switching control unit 5
Reference numeral 15 controls the switching of the selection unit 516 by the path switching trigger. However, when the upstream failure detecting units 509 and 510 detect the upstream failure information, the switching control is not performed even if the path switching trigger is present.

【0028】次に、本発明によるパス切替制御システム
の他の実施形態について図7を参照して説明する。上述
した実施例では上流障害情報の通知手段としてH3バイ
トを用いているのに対し、本例ではAUポインタのSS
ビット(H1バイトの第5ビット及び第6ビット)を用
いる。このSSビットは、AUのタイプを表示するため
に用いられるビットである。
Next, another embodiment of the path switching control system according to the present invention will be described with reference to FIG. In the above-described embodiment, the H3 byte is used as the upstream fault information notifying means.
Bits (the fifth and sixth bits of the H1 byte) are used. This SS bit is a bit used to indicate the type of AU.

【0029】AUポインタのH1バイト,H2バイト
は、AISのときにオール“1”が代入される。SSビ
ットについては、上流障害情報の通知ビットと定義す
る。
All "1" s are substituted into the H1 byte and H2 byte of the AU pointer at the time of AIS. The SS bit is defined as a notification bit of upstream fault information.

【0030】本実施例におけるシステムの構成及び動作
は、ほぼ上述の実施例と同じであるので異なる部分につ
いて図7を参照して説明する。具体的には、SSビット
の挿入,転送,判定の機能について説明する。
The configuration and operation of the system according to this embodiment are almost the same as those of the above-described embodiment, and therefore, different parts will be described with reference to FIG. Specifically, the functions of inserting, transferring, and determining the SS bit will be described.

【0031】まず、最初に上流故障情報のSSビットの
定義を行う。通常、H1バイト,H2バイトは、AIS
のときオール“1”であるが、リングネットワーク内で
は、SSビットを含めない他のビットをオール“1”と
する。そして、SS=“00”のとき上流故障情報を示
し、それ以外の場合は“11”とする。すなわち、受信
端でAIS受信時、切替トリガとなるH1バイトは“1
1110011”で、切替トリガとならないH1バイト
は“11111111”である。なお、この定義はリン
グネットワークシステムに閉じたものであり、送信ノー
ドでのAIS受信及び受信ノードでの低速側へのAIS
送信は、通常の定義に基づくAISの送受信を行うもの
とする。
First, the SS bit of the upstream failure information is defined. Normally, H1 byte and H2 byte are AIS
In the ring network, all bits except the SS bit are all "1". When SS = “00”, it indicates upstream failure information, and otherwise, it is “11”. That is, when the receiving end receives the AIS, the H1 byte serving as a switching trigger is "1
The H1 byte that does not become a switching trigger in “1110011” is “11111111”. This definition is closed to the ring network system, and the AIS reception at the transmission node and the AIS to the low-speed side at the reception node are performed.
For transmission, AIS is transmitted and received based on a normal definition.

【0032】AIS監視部601でAISを検出した場
合、SSビット挿入部602でSSビットに“00”を
挿入した後、分岐部603を介して転送する。中継ノー
ドにおいて、AIS監視部604によるAIS監視とS
Sビット監視部605によるSSビットの監視とを行
い、AISかつSSビット=“00”であれば、SSビ
ット挿入部606でSSビットに“00”を挿入し転送
する。受信ノードではAIS監視部607とSSビット
監視部608でAISかつSSビット=“00”を検出
した場合には切替トリガ監視部609で切替トリガを検
出しても切替制御部610は選択部611の切替えを行
わない。
When the AIS is detected by the AIS monitoring unit 601, the SS bit insertion unit 602 inserts “00” into the SS bit, and then transfers it via the branch unit 603. At the relay node, AIS monitoring by the AIS monitoring unit 604 and S
The S bit monitoring unit 605 monitors the SS bit. If the AIS and the SS bit are “00”, the SS bit insertion unit 606 inserts “00” into the SS bit and transfers the SS bit. In the receiving node, when the AIS monitoring unit 607 and the SS bit monitoring unit 608 detect AIS and SS bit = “00”, the switching control unit 610 determines whether the switching trigger is detected by the switching trigger monitoring unit 609 or not. Do not switch.

【0033】以上説明した2つの実施例においては、以
下のようなパス切替制御方法が実現されていることにな
る。すなわち、分岐され現用及び予備のパスとなる2つ
の伝送ルートの切替えを障害発生に応答して行うパス切
替制御方法であり、その制御方法は、2つの伝送ルート
に分岐される直前のパスにおける障害を検出する障害検
出ステップと、この障害検出結果を分岐される2つの伝
送ルートによるパスにそれぞれ出力する分岐ステップ
と、この分岐された2つの伝送ルートによるパスに出力
された障害検出結果が共にパスに障害があることを示し
たとき2つの伝送ルートの切替えを抑止する切替え抑止
ステップとを含んでいるのである。
In the two embodiments described above, the following path switching control method is realized. In other words, this is a path switching control method that switches between two transmission routes that are branched and becomes a working path and a protection path in response to the occurrence of a failure. The control method includes a failure in a path immediately before branching into two transmission routes. And a branching step of outputting the result of the fault detection to each of the paths of the two branched transmission routes, and a fault detection result output of the path of the two branched transmission routes. A switching inhibition step of inhibiting the switching of two transmission routes when it is indicated that there is a failure in the transmission route.

【0034】この制御方法について、図8を参照してさ
らに説明する。同図に示されているように、まず、2つ
の伝送ルートに分岐される直前のパスにおける障害を検
出する(ステップS701)。そして、この障害検出結
果を分岐される2つの伝送ルートによるパスにそれぞれ
出力する(ステップS702)。
This control method will be further described with reference to FIG. As shown in the figure, first, a failure in a path immediately before branching into two transmission routes is detected (step S701). Then, the failure detection result is output to each of the paths based on the two branched transmission routes (step S702).

【0035】次に、この分岐された2つの伝送ルートに
よるパスに出力された障害検出結果が共にパスに障害が
あることを示しているかどうかを判断する(ステップS
703)。この判断の結果、障害検出結果が2つのパス
に共に障害があることを示している場合には、2つの伝
送ルートの切替えを抑止し(ステップS703→S70
4)、処理は終了となる(ステップS706)。また、
ステップS703の判断の結果、2つのパスの少なくと
も一方に障害がないことを示している場合には、切替え
は抑止されず、通常通り、正常なパスを選択するように
パスの切替えが行われ(ステップS705)、処理は終
了となる(ステップS706)。
Next, it is determined whether or not the failure detection results output to the path by the two branched transmission routes both indicate that the path has a failure (step S).
703). If the result of this determination indicates that both paths have a failure, the switching of the two transmission routes is suppressed (step S703 → S70).
4), the process ends (step S706). Also,
If the result of the determination in step S703 indicates that at least one of the two paths has no failure, the switching is not suppressed, and the path switching is performed as usual to select a normal path ( The process ends (step S705) (step S706).

【0036】[0036]

【発明の効果】以上説明したように本発明は、送信点で
の故障発生時に上流障害情報を転送することにより、上
流故障から波及した両方向のルート障害であるのか、切
替を必要とするルート障害であるのかを判定できるの
で、両方向のルート障害発生時に起きる不要な切替動作
を防止でき、不要な切替通知によるネットワーク管理者
の誤判断を抑止できるという効果がある。
As described above, according to the present invention, by transferring upstream fault information when a fault occurs at a transmission point, it is possible to determine whether the fault is a two-way route fault that has spread from the upstream fault or a route fault that requires switching. Therefore, it is possible to prevent an unnecessary switching operation that occurs when a route failure occurs in both directions, and to suppress an erroneous determination by a network administrator due to an unnecessary switching notification.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の一形態によるパス切替制御シス
テムの構成を示すブロック図である。
FIG. 1 is a block diagram illustrating a configuration of a path switching control system according to an embodiment of the present invention.

【図2】SDH伝送装置による4ノードのリング型ネッ
トワークシステムの構成例を示すブロック図である。
FIG. 2 is a block diagram illustrating a configuration example of a four-node ring network system using an SDH transmission device.

【図3】SDH信号のフレームを示す図である。FIG. 3 is a diagram showing a frame of an SDH signal.

【図4】送信ノードでの上流故障送信機能を示すブロッ
ク図である。
FIG. 4 is a block diagram illustrating an upstream failure transmission function in a transmission node.

【図5】中継ノードでの上流故障転送機能を示すブロッ
ク図である。
FIG. 5 is a block diagram showing an upstream failure transfer function in a relay node.

【図6】受信ノードでの上流故障判定機能を示すブロッ
ク図である。
FIG. 6 is a block diagram illustrating an upstream failure determination function in a receiving node.

【図7】本発明の実施の他の形態によるパス切替制御シ
ステムの構成を示すブロック図である。
FIG. 7 is a block diagram showing a configuration of a path switching control system according to another embodiment of the present invention.

【図8】本発明によるパス切替制御システムのパス切替
動作を示すフローチャートである。
FIG. 8 is a flowchart showing a path switching operation of the path switching control system according to the present invention.

【図9】従来のパス切替制御システムの構成を示すブロ
ック図である。
FIG. 9 is a block diagram illustrating a configuration of a conventional path switching control system.

【図10】従来のパス切替制御システムにおけるパス切
替動作を示すタイムチャートである。
FIG. 10 is a time chart showing a path switching operation in a conventional path switching control system.

【符号の説明】[Explanation of symbols]

101 障害検出部 102 障害情報挿入部 103 分岐部 104,105 上流障害情報転送部 106,107 上流障害情報検出部 108,109 障害検出部 110 切替制御部 111 選択部 201 送信ノード 202,203 中継ノード 204 受信ノード Reference Signs List 101 failure detection unit 102 failure information insertion unit 103 branch unit 104, 105 upstream failure information transfer unit 106, 107 upstream failure information detection unit 108, 109 failure detection unit 110 switching control unit 111 selection unit 201 transmission node 202, 203 relay node 204 Receiving node

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) H04L 1/22 H04J 3/00 H04L 12/00 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) H04L 1/22 H04J 3/00 H04L 12/00

Claims (10)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 分岐され現用及び予備のパスとなる第1
及び第2の伝送ルートの切替えを障害発生に応答して行
うパス切替制御システムであって、前記第1及び第2の
伝送ルートに分岐される直前のパスにおける障害を検出
する障害検出手段と、この障害検出結果を分岐される前
記第1及び第2の伝送ルートによるパスにそれぞれ出力
する分岐手段と、この分岐された前記第1及び第2の伝
送ルートによるパスに出力された障害検出結果が共にパ
スに障害があることを示したとき前記第1及び第2の伝
送ルートの切替えを抑止する切替え抑止手段とを含むこ
とを特徴とするパス切替制御システム。
1. A first branch which is branched and becomes a working and protection path.
A path switching control system that performs switching of a second transmission route in response to occurrence of a failure, and a failure detection unit that detects a failure in a path immediately before branching to the first and second transmission routes; A branching means for outputting the failure detection result to the path of the first and second transmission routes that are branched, and a failure detection result output to the path of the first and second transmission routes that are branched. A path switching control system comprising: a switching inhibiting unit that inhibits switching of the first and second transmission routes when both indicate that a path has a failure.
【請求項2】 前記分岐手段は、前記障害検出結果を前
記パスに挿入する挿入部と、この挿入後に前記第1及び
第2の伝送ルートの分岐を行う分岐部とを含むことを特
徴とする請求項1記載のパス切替制御システム。
2. The method according to claim 1, wherein the branching unit includes an insertion unit that inserts the failure detection result into the path, and a branching unit that branches the first and second transmission routes after the insertion. The path switching control system according to claim 1.
【請求項3】 前記パスはSDH信号を伝送するパスで
あり、前記障害検出結果は前記SDH信号のAU部の特
定部分に挿入されることを特徴とする請求項2記載のパ
ス切替制御システム。
3. The path switching control system according to claim 2, wherein the path is a path for transmitting an SDH signal, and the failure detection result is inserted into a specific part of an AU section of the SDH signal.
【請求項4】 前記AU部の特定部分は、H3バイトで
あることを特徴とする請求項3記載のパス切替制御シス
テム。
4. The path switching control system according to claim 3, wherein the specific part of the AU unit is an H3 byte.
【請求項5】 前記AU部の特定部分は、H1バイトの
SSビットであることを特徴とする請求項3記載のパス
切替制御システム。
5. The path switching control system according to claim 3, wherein the specific part of the AU section is an SS bit of an H1 byte.
【請求項6】 分岐され現用及び予備のパスとなる第1
及び第2の伝送ルートの切替えを障害発生に応答して行
うパス切替制御方法であって、前記第1及び第2の伝送
ルートに分岐される直前のパスにおける障害を検出する
障害検出ステップと、この障害検出結果を分岐される前
記第1及び第2の伝送ルートによるパスにそれぞれ出力
する分岐ステップと、この分岐された前記第1及び第2
の伝送ルートによるパスに出力された障害検出結果が共
にパスに障害があることを示したとき前記第1及び第2
の伝送ルートの切替えを抑止する切替え抑止ステップと
を含むことを特徴とするパス切替制御方法。
6. A first path that is branched and becomes a working path and a protection path.
And a path switching control method for switching the second transmission route in response to the occurrence of a failure, comprising: a failure detection step of detecting a failure in a path immediately before branching to the first and second transmission routes; A branching step of outputting the fault detection result to a path based on the first and second transmission routes to be branched, respectively; and the first and second branches.
When the failure detection result output to the path by the transmission route indicates that the path has a failure, the first and the second
And a switching inhibition step of inhibiting the switching of the transmission route.
【請求項7】 前記分岐ステップにおいては、前記障害
検出結果を前記パスに挿入し、この挿入後に前記第1及
び第2の伝送ルートの分岐を行うことを特徴とする請求
項6記載のパス切替制御方法。
7. The path switching according to claim 6, wherein in the branching step, the fault detection result is inserted into the path, and after the insertion, the first and second transmission routes are branched. Control method.
【請求項8】 前記パスはSDH信号を伝送するパスで
あり、前記障害検出結果は前記SDH信号のAU部の特
定部分に挿入されることを特徴とする請求項7記載のパ
ス切替制御方法。
8. The path switching control method according to claim 7, wherein the path is a path for transmitting an SDH signal, and the failure detection result is inserted into a specific part of an AU section of the SDH signal.
【請求項9】 前記AU部の特定部分は、H3バイトで
あることを特徴とする請求項8記載のパス切替制御方
法。
9. The path switching control method according to claim 8, wherein the specific part of the AU section is an H3 byte.
【請求項10】 前記AU部の特定部分は、H1バイト
のSSビットであることを特徴とする請求項8記載のパ
ス切替制御方法。
10. The path switching control method according to claim 8, wherein the specific portion of the AU section is an SS bit of an H1 byte.
JP14576999A 1999-05-26 1999-05-26 Path switching control system and path switching control method Expired - Fee Related JP3246473B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14576999A JP3246473B2 (en) 1999-05-26 1999-05-26 Path switching control system and path switching control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14576999A JP3246473B2 (en) 1999-05-26 1999-05-26 Path switching control system and path switching control method

Publications (2)

Publication Number Publication Date
JP2000341253A JP2000341253A (en) 2000-12-08
JP3246473B2 true JP3246473B2 (en) 2002-01-15

Family

ID=15392749

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14576999A Expired - Fee Related JP3246473B2 (en) 1999-05-26 1999-05-26 Path switching control system and path switching control method

Country Status (1)

Country Link
JP (1) JP3246473B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002056513A1 (en) * 2000-12-27 2002-07-18 Fujitsu Limited Path error detecting method and device therefor
JP5757113B2 (en) * 2011-03-16 2015-07-29 日本電気株式会社 Signal transmission system, signal transmission method and signal transmission control program used in the system
US20190268452A1 (en) * 2018-02-27 2019-08-29 Microchip Technology Incorporated Scramble of Payload and Preamble in 10SPE

Also Published As

Publication number Publication date
JP2000341253A (en) 2000-12-08

Similar Documents

Publication Publication Date Title
US7372807B2 (en) Method and apparatus for multiplex transmission
US5757774A (en) Network traffic protection system
CA2252807C (en) Bundled protection switching in a wide area network
US6038678A (en) Path switching method, path switching apparatus and nodes of UPSR
JP3195461B2 (en) Ring node
JP3775859B2 (en) Path switch ring controller in synchronous (SDH) network including asynchronous (PDH) subnetwork
EP0984574B1 (en) Backwards-compatible failure restoration in bidirectional multiplex section-switched ring transmission systems
US7346081B2 (en) Traffic handling in a protected synchronous communication network
US5822299A (en) Path protection in a telecommunications network
US6452906B1 (en) Fault detection and isolation in a synchronous optical network (SONET) and in a synchronous digital hierarchy (SDH) network
JPWO2002056513A1 (en) Path error monitoring method and device
JP2988440B2 (en) Terminal equipment
JP4244150B2 (en) Bidirectional track switching ring network
JP2001016240A (en) Optical ring network
JP3246473B2 (en) Path switching control system and path switching control method
JP2874112B2 (en) Device and method for instantaneous interruption switching of transmission line
JP2004522336A (en) Alarm signal suppression in telecommunications networks
KR100298968B1 (en) Generalized Deterministic Squenching of Ring Transfer Systems
JP2798631B2 (en) Path switching method for SDH ring network
JP2850827B2 (en) Automatic transmission line rescue system
JP3496536B2 (en) Multiplexing transmission method and apparatus
JPH08223130A (en) Switching system without short break
JP3267527B2 (en) Package failure information transfer method
JP2762579B2 (en) Transmission device loopback method
JPH1093536A (en) Inter-unit interface system for transmitter

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees