JP3074965B2 - Data transfer method from spinning machine to central control device - Google Patents

Data transfer method from spinning machine to central control device

Info

Publication number
JP3074965B2
JP3074965B2 JP04277249A JP27724992A JP3074965B2 JP 3074965 B2 JP3074965 B2 JP 3074965B2 JP 04277249 A JP04277249 A JP 04277249A JP 27724992 A JP27724992 A JP 27724992A JP 3074965 B2 JP3074965 B2 JP 3074965B2
Authority
JP
Japan
Prior art keywords
spinning machine
data
status
control device
yarn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04277249A
Other languages
Japanese (ja)
Other versions
JPH06128822A (en
Inventor
一彦 中出
修二郎 鈴木
正克 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Priority to JP04277249A priority Critical patent/JP3074965B2/en
Publication of JPH06128822A publication Critical patent/JPH06128822A/en
Application granted granted Critical
Publication of JP3074965B2 publication Critical patent/JP3074965B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、多数の紡績機を集中管
理装置で管理する紡績機の集中管理システムに係り、特
に、所定時間毎の紡績機の操業結果が集計できるだけで
なく、全紡績機のリアルタイムの運転状態が把握できる
紡績機から集中管理装置へのデータ転送方法に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a centralized control system for a spinning machine in which a large number of spinning machines are managed by a centralized control device. The present invention relates to a method of transferring data from a spinning machine to a centralized management device, which can grasp the real-time operation state of the machine.

【0002】[0002]

【従来の技術】紡績機は、粗糸またはスライバを糸に加
工する錘を多数備えている。各錘での糸の走行状態や糸
の切れている状態を把握するために、紡績機は各錘にお
ける現在の運転状態(以下ステータスという)をリアル
タイムで検知している。また、紡績機はこのステータス
の時間的変化を検知して得られた変化の回数や累積時間
からなる操業データを作成している。この操業データや
操業データを基にした各錘の操業効率を計算すれば、そ
の結果から錘の良・不良を判定することができる。
2. Description of the Related Art A spinning machine is provided with a large number of weights for processing roving or sliver into yarn. In order to grasp the running state of the yarn at each weight and the broken state of the yarn, the spinning machine detects the current operation state (hereinafter referred to as status) of each weight in real time. Further, the spinning machine creates operation data including the number of times of change obtained by detecting the time change of the status and the accumulated time. If the operation data and the operation efficiency of each weight based on the operation data are calculated, it is possible to determine whether the weight is good or defective from the result.

【0003】紡績機を多数備えた工場等では、これらの
紡績機を一括的に集中管理するために集中管理装置を設
けることが考えられている。集中管理装置を各紡績機に
通信線で接続し、例えば、ポーリングにより各紡績機か
ら上記操業データを収集するように構成する。集中管理
装置において、表示画面に各紡績機から収集したデータ
を基にした各種統計値の一覧表やグラフや分析結果を示
し、印字装置で一定期間毎のレポートを出力するように
すれば、多数の紡績機を効率よく管理することができ
る。
[0003] In a factory or the like equipped with a large number of spinning machines, it has been considered to provide a centralized control device for centralized control of these spinning machines. A centralized control device is connected to each spinning machine via a communication line, and the operation data is collected from each spinning machine by polling, for example. In a centralized management device, if the display screen shows a list of various statistical values based on data collected from each spinning machine, graphs and analysis results, and a printer outputs reports at regular intervals, a large number of Can be managed efficiently.

【0004】また、集中管理装置を設けると、錘や紡績
機に不良があるときには、そのことを表示したり、不良
を取り除くための作業指示を表示することもできる。従
って、紡績機を監視する作業者は、常時実際に紡績機を
監視する必要はなく、普段は集中管理装置を見ておれば
よい。そして、一定時間おきに紡績機の列を巡回監視す
る以外は作業指示が表示された場合にのみ、その錘或い
は紡績機のところへ行けばよい。
If a centralized control device is provided, when there is a defect in the spindle or the spinning machine, it is possible to display the fact or to display a work instruction for removing the defect. Therefore, the worker who monitors the spinning machine does not need to always monitor the spinning machine at all times, and only needs to look at the centralized control device in usual times. Then, except for patrol monitoring of the row of the spinning machine at regular intervals, it is only necessary to go to the spindle or the spinning machine only when a work instruction is displayed.

【0005】[0005]

【発明が解決しようとする課題】ところで、紡績機は各
錘におけるステータスをリアルタイムで把握しているの
で、この情報を操業データと共に集中管理装置に伝達す
れば、集中管理装置において各錘におけるステータスを
一覧表示することもできる。ステータスには異常警告信
号のように作業者が復帰作業を施すまで錘が停止するこ
とを示す信号が含まれているので、全錘ステータスの一
覧表示によって、集中管理装置の位置にいる作業者がこ
れを発見し、現場へ急行したり現場近くの作業者に指示
することが可能である。
By the way, since the spinning machine grasps the status of each spindle in real time, if this information is transmitted to the central control unit together with the operation data, the status of each spindle in the central control unit is determined. List display is also possible. Since the status includes a signal indicating that the weight stops until the operator performs the return work, such as an abnormal warning signal, the list display of all weight status allows the worker at the position of the central control device to display It is possible to discover this and rush to the site or instruct workers near the site.

【0006】ところが、集中管理装置が全部の紡績機か
らステータスデータと操業データとを収集するためには
多大な時間を必要とする。これは、主に操業データの情
報量が多いためである。即ち、管理に役立てるために錘
毎の操業データの内容が多岐に亘り情報量が多いことに
加えて、1台の紡績機に多数の錘があるため、1台の紡
績機が1回に送信する情報量が非常に多い。さらに、1
台の集中管理装置の下には紡績機が30台もあるので、
集中管理装置が一通り紡績機からデータ収集を終えるの
に、例えば、10分を費やしてしまう。
However, it takes a lot of time for the centralized control device to collect status data and operation data from all spinning machines. This is mainly because the information amount of the operation data is large. In other words, the operation data of each spindle is diversified and has a large amount of information to be useful for management. In addition, since one spinning machine has many spindles, one spinning machine transmits at one time. The amount of information to be done is very large. In addition, 1
There are 30 spinning machines under one centralized control device,
It takes, for example, 10 minutes for the central control device to finish collecting data from the spinning machine.

【0007】データ収集に10分を費やすということ
は、集中管理装置の表示画面に表示されているステータ
スは、最悪10分前のステータスである。従って、集中
管理装置に頼っていると、作業者が気付くまでに錘が1
0分間停止して復帰待ちをしていることが起きる。これ
は紡績機の稼動効率を下げることになり問題である。
[0007] To spend 10 minutes for data collection means that the status displayed on the display screen of the central control device is the status 10 minutes before the worst. Therefore, when relying on the centralized control device, the weight must be 1 before the operator notices.
It happens that it is stopped for 0 minutes and waiting for return. This is a problem because it lowers the operation efficiency of the spinning machine.

【0008】また、実際には停止錘が運転状態(紡糸)
となっても、画面表示は、10分間停止のままというこ
とも発生する。
Further, the stop weight is actually in the operating state (spinning).
May occur, the screen display may remain stopped for 10 minutes.

【0009】そこで、本発明の目的は、上記課題を解決
し、所定時間毎の紡績機の操業結果が集計できるだけで
なく、全紡績機のリアルタイムの状況が把握できる紡績
から集中管理装置へのデータ転送方法を提供すること
にある。
[0009] Therefore, an object of the present invention is to solve the above-mentioned problems, and not only to collect the operation results of the spinning machines at predetermined time intervals, but also to realize a real-time status of all the spinning machines from the spinning machine to the centralized control device. It is to provide a data transfer method .

【0010】[0010]

【課題を解決するための手段】上記目的を達成するため
に本発明は、紡績機を多数設け、紡績機は各錘について
ステータスデータとステータスデータの時間集計による
操業データとを作成し、集中管理装置は、紡績機の稼働
中に各紡績機からステータスデータを収集し、シフトエ
ンド等の非稼働時に操業データを収集するようにしたも
のである。
In order to achieve the above-mentioned object, the present invention provides a large number of spinning machines, and the spinning machine uses status data and time data of status data for each spindle.
Operation data is created, and the central control device operates the spinning machine.
Collect status data from each spinning machine during
Operation data is collected during non-operation of a computer or the like.

【0011】[0011]

【作用】上記構成により、集中管理装置は常時各紡績機
からステータスデータを常時収集する。ステータスデー
タのみのデータ転送は、比較的短時間で実行できるので
集中管理装置は全紡績機のリアルタイムのステータスを
表示できることになる。従って、異常警告に対する処置
を迅速に行うことができる。
With the above arrangement, the central control device constantly collects status data from each spinning machine. Since the data transfer of only the status data can be performed in a relatively short time, the central control device can display the real-time status of all the spinning machines. Therefore, it is possible to promptly take a measure for the abnormality warning.

【0012】一方、操業データはステータスデータを時
間的集計することによって作成されるので、一定時間毎
に収集すれば充分である。
On the other hand, since the operation data is created by totalizing the status data over time, it is sufficient to collect the operation data at regular intervals.

【0013】[0013]

【実施例】以下本発明の一実施例を添付図面に基づいて
詳述する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below in detail with reference to the accompanying drawings.

【0014】図1に示されるように、紡績機の集中管理
システムは、多数の紡績機1と1台の集中管理装置2と
からなる。紡績機1は、列状に並べられた多数の錘と解
析装置3とを有している。
As shown in FIG. 1, the centralized control system for a spinning machine includes a large number of spinning machines 1 and one centralized control device 2. The spinning machine 1 has a large number of weights arranged in a row and the analyzing device 3.

【0015】詳しく説明すると、紡績機1は図3に示さ
れるように、多数の紡績ユニット(錘)31が直線状に
並設され、その一端に解析装置3が設けられている。図
では、一点鎖線の右側は錘が省略してある。それぞれの
錘31には、粗糸またはスライバ32を引伸するドラフ
ト装置33と、粗糸またはスライバ32を糸38に加工
して繰り出す紡績ノズル34を備え、紡績ノズル34の
下方にはデリバリローラ35、スラックチューブ36、
ヤーンクリアラ(スラブキャッチャ)37が順に設けら
れている。ヤーンクリアラ37は、糸の良否を検出して
糸が不良(スラブ)の場合は糸を切る働きをする。ヤー
ンクリアラ37の下方には、糸38をボビン39に巻き
取る巻取装置40が設けられている。各錘31には、後
述する異常警告信号に伴って作動する異常警告部材41
とボビン39が満管になったことを表示する満管ランプ
42が設けられている。異常警告部材41は、赤い突起
部を有した部材であり、作動時に錘31の表面から突起
部を突き出すので、赤旗41と呼ばれる。
More specifically, as shown in FIG. 3, the spinning machine 1 has a large number of spinning units (weights) 31 arranged in a straight line, and an analysis device 3 is provided at one end thereof. In the figure, the weight is omitted on the right side of the alternate long and short dash line. Each of the weights 31 includes a draft device 33 for extending a roving or sliver 32 and a spinning nozzle 34 for processing the roving or sliver 32 into a yarn 38 and feeding the yarn 38. A delivery roller 35 is provided below the spinning nozzle 34, Slack tube 36,
A yarn clearer (slab catcher) 37 is provided in order. The yarn clearer 37 detects the quality of the yarn and functions to cut the yarn if the yarn is defective (slab). A winding device 40 for winding the yarn 38 around the bobbin 39 is provided below the yarn clearer 37. Each weight 31 has an abnormality warning member 41 that operates according to an abnormality warning signal described later.
And a full lamp 42 indicating that the bobbin 39 is full. The abnormality warning member 41 is a member having a red protrusion, and is called a red flag 41 because the protrusion protrudes from the surface of the weight 31 during operation.

【0016】紡績機1には、ヤーンクリアラ37と巻取
装置40との間の糸38が走行するべき空間に背後から
臨み錘31の列に沿って往復移動する作業台車43が設
けられている。作業台車43には、満管のボビン39を
取り外して系外に送り出し、新たな空紙管を巻取装置4
0に供給する玉揚装置44と、糸継ぎを行う台継装置4
5と、これらの制御を行う制御装置46とが搭載されて
いる。作業台車43は、往復移動中に糸切れや満管の錘
31の位置で停止して必要な動作を行うものである。
The spinning machine 1 is provided with a work carriage 43 which faces the space where the yarn 38 should travel between the yarn clearer 37 and the winding device 40 from behind and reciprocates along the row of the weights 31. . The work bogie 43 has the full bobbin 39 removed and sent out of the system, and a new empty paper tube is taken up by the winding device 4.
Doffing device 44 for supplying the piecing device 0 and a piecing device 4 for piecing
5 and a control device 46 for performing these controls are mounted. The work vehicle 43 stops at the position of the thread 31 or the full weight 31 during the reciprocating movement and performs necessary operations.

【0017】錘31から解析装置3に対して、ヤーンク
リアラ37で糸を切ったことを示す信号、赤旗41を伴
う異常警告信号、満管ランプ42と同期した信号等が送
られる。即ち、各錘31は、糸が走行している(糸走
行)、スラブを発見して糸を切った(スラブ切)、スラ
ブ以外の原因で糸が切れた(赤旗切れ)、満管になった
(満管)等の状態を検知し、これらの検知結果を解析装
置3に常時伝えている。ここで赤旗切れとは、欠点(ス
ラブ)がないのに糸が切れたことを示しており、これは
糸詰まり等の異常があるためで、作業者が来て処理を行
うまで糸を出してはいけないという状態のことである。
A signal indicating that the yarn has been cut by the yarn clearer 37, an abnormality warning signal accompanied by a red flag 41, a signal synchronized with the full lamp 42, and the like are sent from the weight 31 to the analyzer 3. That is, each of the weights 31 is running full (yarn running), finding a slab and cutting the yarn (slab cutting), cutting the yarn for a cause other than the slab (cutting the red flag), and becoming full. (Full), and the results of these detections are constantly transmitted to the analyzer 3. Here, the red flag break indicates that the yarn has broken without any defect (slab). This is because there is an abnormality such as yarn clogging. It is a state that should not be done.

【0018】解析装置3は、上記4つの状態(ステータ
ス)を、巻取機が回転していることを示す糸走行信号
と、錘が処理を待っていることを示す異常警告信号との
2ビットを組み合わせることによりコード化して表した
ステータスデータを作成する。即ち、ステータスデータ
とステータスとの関係は、表1のようになる。表1で
は、糸走行信号はFW、異常警告信号は赤旗と記されて
いる。
The analyzing device 3 stores the above four states (status) in two bits of a yarn running signal indicating that the winding machine is rotating and an abnormal warning signal indicating that the weight is waiting for processing. To create coded status data. That is, the relationship between the status data and the status is as shown in Table 1. In Table 1, the yarn running signal is marked as FW, and the abnormality warning signal is marked with a red flag.

【0019】[0019]

【表1】 [Table 1]

【0020】解析装置3は、ステータスデータの時間的
集計からなる操業データを作成する。操業データは、こ
れまでに糸が正常に走行した時間、スラブ切れで糸が停
止した時間、赤旗切れで糸が停止した時間、満管で処理
待ちした時間、赤旗回数スラブ切れ回数、赤旗になった
回数、満管になった回数から構成される。操業データの
内訳とそのデータ長が、表2に示されている。表1のス
テータスデータ及び表2の操業データは、1錘毎のもの
であるから、解析装置は、これに錘の数を乗じたデータ
量を随時作成していることになる。
The analysis device 3 creates operation data which is made up of time data of status data. The operation data shows the time during which the yarn has run normally, the time when the yarn has stopped due to the slab break, the time when the yarn has stopped due to the red flag running out, the time when the process has been waited for the full load, the number of red flag slab breaks, and the red flag. It is composed of the number of times the vessel has been filled and the number of times the vessel has been fully filled. The breakdown of the operation data and the data length are shown in Table 2. Since the status data in Table 1 and the operation data in Table 2 are data for each spindle, the analyzer always creates a data amount obtained by multiplying the data by the number of spindles.

【0021】[0021]

【表2】 [Table 2]

【0022】これらの紡績機を集中管理するための集中
管理装置2は表示装置5を有したパーソナルコンピュー
タで構成されている。集中管理装置2は各紡績機1の解
析装置3に対して共通の通信回線4で結ばれている。集
中管理装置2は各紡績機1の解析装置3を順次ポーリン
グし、ステータスデータの送信を要求すると共に、一通
りポーリングが終わると直ぐに繰り返してポーリングを
行う。また、集中管理装置2は、一定時間おきに操業デ
ータの送信を要求する。各紡績機の解析装置3は、これ
らの要求に答えて、これまでに作成したステータスデー
タS或いは操業データGを送信することができる。
The central control device 2 for centrally controlling these spinning machines comprises a personal computer having a display device 5. The central control device 2 is connected to the analysis device 3 of each spinning machine 1 by a common communication line 4. The central control device 2 sequentially polls the analyzing device 3 of each spinning machine 1, requests transmission of status data, and repeats polling as soon as the polling is completed. Further, the central management device 2 requests transmission of operation data at regular intervals. The analysis device 3 of each spinning machine can transmit the status data S or the operation data G created so far in response to these requests.

【0023】次に実施例の作用を述べる。Next, the operation of the embodiment will be described.

【0024】図1に示されるように、集中管理装置2は
常時紡績機1の解析装置3をポーリングし、紡績機1の
解析装置3はこれに応じてステータスデータSを送信す
る。ステータスデータは、1錘当たり1バイトに収まる
ので、1台の紡績機当たりのバイト数も数十バイト程度
となる。従って、例えば30台の紡績機1のステータス
データを収集する時間は1分以内となる。
As shown in FIG. 1, the central control device 2 constantly polls the analyzing device 3 of the spinning machine 1, and the analyzing device 3 of the spinning machine 1 transmits status data S in response thereto. Since the status data is stored in one byte per spindle, the number of bytes per spinning machine is also about several tens of bytes. Therefore, the time for collecting the status data of, for example, 30 spinning machines 1 is within one minute.

【0025】集中管理装置2は全紡績機の1分以内のリ
アルタイムのステータスを把握できることになる。集中
管理装置2は、表示装置5に図2のように全錘のステー
タスを一覧表示する。図2の表示画面を説明すると、全
錘のステータスを符号で表して一覧表示するようににな
っており、縦軸に紡績機の機台番号が1,2、・・,
5,6,7・・・で示され、横軸に各機台の錘番号が
1,2,・・,40,41,42,・・・で示されてい
る。縦軸と横軸の交差する枡目には当該紡績機の当該錘
のステータスが符号で示されている。ただし、正常な運
転状態のステータスはブランク表示される。ほとんどの
錘は正常運転状態であるので、画面上には停止状態や異
常のある錘にのみ符号が現れることになる。符号は、例
えば、赤旗=3、満管=2である。赤旗のように特に注
意を要するステータスの符号は画面には赤字で表示され
る。画面上には本画面表示が全錘のステータスの表示で
あることを示す「瞬時効率」と記されたウインド6が開
かれている。図2で、7番機台の42番錘は、ステータ
ス符号3=赤旗であるから、スラブ以外の原因で糸が切
れて作業者の処理を待っている状態であることがわか
る。
The central control device 2 can grasp the real-time status of all the spinning machines within one minute. The central management device 2 displays the status of all the weights on the display device 5 as shown in FIG. 2, the status of all spindles is represented by a code and displayed in a list, and the machine numbers of the spinning machines are 1, 2,.
, And the horizontal axis indicates the weight number of each machine frame as 1, 2,..., 40, 41, 42,. The status of the weight of the spinning machine is indicated by a symbol in a grid where the vertical axis and the horizontal axis intersect. However, the status of the normal operation state is blank-displayed. Since most of the weights are in a normal operation state, the sign appears on the screen only for weights in a stopped state or in an abnormal state. The codes are, for example, red flag = 3, full = 2. Status codes that require special attention, such as a red flag, are displayed in red on the screen. On the screen, a window 6 marked "instantaneous efficiency" indicating that this screen display is a status display of all spindles is opened. In FIG. 2, since the status code 3 = red flag of the 42nd weight of the 7th machine stand, it can be understood that the thread is broken due to a cause other than the slab and is waiting for the operator's processing.

【0026】このように集中管理装置2の表示装置5に
全錘のステータスが一覧表示されていると、作業者は瞬
時にして全錘の現在の運転状態を知ることができる。そ
こで、赤旗の錘があれば直ちに現場に急行したり現場近
くの作業者に指示することができる。また、満管が表示
されている場合は、通常であれば自動的に復帰できるの
で作業者は動かなくてよいが、時間が経過しても満管が
解消しない時には玉揚げのトラブルが想定されるので、
やはり現場に行くことになる。
As described above, when the status of all the weights is displayed in a list on the display device 5 of the central control device 2, the operator can instantly know the current operating state of all the weights. Therefore, if there is a weight of the red flag, it is possible to immediately rush to the site or instruct a worker near the site. In addition, when the full vessel is displayed, the operator can return automatically under normal circumstances, so the worker does not need to move, but if the full vessel does not disappear even after a lapse of time, danger of doffing is assumed. So
After all I will go to the site.

【0027】一方、集中管理装置は、例えば、シフトエ
ンドや一日の操業終了時にステータスデータのポーリン
グに代えて操業データのために紡績機をポーリングし、
紡績機はこれに応じて操業データを送信する。操業デー
タの送信には、ステータスデータの送信に比べて長い時
間を要するが、上記全錘のステータスの監視には不都合
は生じない。
On the other hand, the central control device polls the spinning machine for operation data instead of polling status data at the shift end or at the end of operation of the day, for example.
The spinning machine transmits operation data in response to this. Although transmission of the operation data requires a longer time than transmission of the status data, monitoring of the status of the entire spindle does not cause any inconvenience.

【0028】[0028]

【発明の効果】本発明は次の如き優れた効果を発揮す
る。
The present invention exhibits the following excellent effects.

【0029】(1)集中管理装置にリアルタイムのステ
ータスが表示できるので、作業者はこの表示を監視する
ことで巡回監視に代えることができ、手間が省ける。
(1) Since the real-time status can be displayed on the centralized management device, the operator can replace this with patrol monitoring by monitoring this display, thereby saving labor.

【0030】(2)リアルタイムであることを要求され
るステータスデータの送信と、時間的集計の結果である
操業データの送信とを別途に分けたことにより、操業デ
ータを収集するための時間は、ステータスデータの送信
速度を考慮することなく、より好適な時間を選んで設定
できる。
(2) Since the transmission of status data required to be real-time and the transmission of operation data as a result of temporal aggregation are separately separated, the time for collecting operation data is as follows: A more suitable time can be selected and set without considering the transmission speed of the status data.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す紡績機の集中管理シス
テムのブロック図である。
FIG. 1 is a block diagram of a centralized management system for a spinning machine according to an embodiment of the present invention.

【図2】本発明の一実施例を示す集中管理装置の表示画
面の説明図である。
FIG. 2 is an explanatory diagram of a display screen of a centralized management device according to an embodiment of the present invention.

【図3】本発明の紡績機の詳細を示す側面図である。FIG. 3 is a side view showing details of the spinning machine of the present invention.

【符号の説明】[Explanation of symbols]

1 紡績機 2 集中管理装置 5 表示装置 G 操業データ S ステータスデータ 1 spinning machine 2 centralized control device 5 display device G operation data S status data

フロントページの続き (56)参考文献 特開 昭62−141133(JP,A) 特開 昭49−117741(JP,A) 特開 昭55−52103(JP,A) 特開 昭63−92738(JP,A) (58)調査した分野(Int.Cl.7,DB名) D01H 13/32 D01H 13/14 Continuation of the front page (56) References JP-A-62-141133 (JP, A) JP-A-49-117741 (JP, A) JP-A-55-52103 (JP, A) JP-A-63-92738 (JP) , A) (58) Fields surveyed (Int. Cl. 7 , DB name) D01H 13/32 D01H 13/14

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 紡績機を多数設け、紡績機は各錘につい
てステータスデータとステータスデータの時間集計によ
る操業データとを作成し、集中管理装置は、紡績機の稼
働中に各紡績機からステータスデータを収集し、シフト
エンド等の非稼働時に操業データを収集することを特徴
とする紡績機から集中管理装置へのデータ転送方法
1. A spinning machine is provided in a large number, and the spinning machine collects status data and time data of status data for each spindle .
Operating data, and the centralized control device operates the spinning machine.
Collect status data from each spinning machine during operation and shift
A data transfer method from a spinning machine to a centralized management device , wherein operation data is collected when an end or the like is not operating .
JP04277249A 1992-10-15 1992-10-15 Data transfer method from spinning machine to central control device Expired - Fee Related JP3074965B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04277249A JP3074965B2 (en) 1992-10-15 1992-10-15 Data transfer method from spinning machine to central control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04277249A JP3074965B2 (en) 1992-10-15 1992-10-15 Data transfer method from spinning machine to central control device

Publications (2)

Publication Number Publication Date
JPH06128822A JPH06128822A (en) 1994-05-10
JP3074965B2 true JP3074965B2 (en) 2000-08-07

Family

ID=17580898

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04277249A Expired - Fee Related JP3074965B2 (en) 1992-10-15 1992-10-15 Data transfer method from spinning machine to central control device

Country Status (1)

Country Link
JP (1) JP3074965B2 (en)

Also Published As

Publication number Publication date
JPH06128822A (en) 1994-05-10

Similar Documents

Publication Publication Date Title
US5517404A (en) Process control in the textile plant
US5347449A (en) Method for eliminating malfunctions, in particular in spinning machines
US6694211B2 (en) System and method for controlling a group of fiber processing machines
JPS6314096B2 (en)
CN110952180B (en) Spinning frame single spindle on-line measuring system
EP2573236A2 (en) Textile machine and textile machine system
EP0712949A2 (en) Process control in the textile field
JP2013044066A (en) Textile machine and information transmission system of textile machine
EP0026111B1 (en) Method and apparatus for facilitating maintenance of spinning machine information system
JP3596451B2 (en) Operation management system for single spindle drive type spinning machine
CN105734737A (en) Single spindle on-line monitoring system of spinning frame and using method thereof
US4771597A (en) Method and apparatus for automatically exchanging roving bobbins
WO2011027366A1 (en) Yarn break monitoring system
CN107675308A (en) A kind of single ingot monitor control system based on PLC
JP3074965B2 (en) Data transfer method from spinning machine to central control device
EP0026110B1 (en) Method and apparatus for displaying specific spinning machine operating conditions
CN107090627B (en) Method for detecting broken ends of fiber strands
US4563873A (en) Apparatus for controlling production in a spinning machine
DE19547068B4 (en) Service facility on a spinning machine
US4665686A (en) System for managing doffing of strand processing machines
CN105401278B (en) The yarn on-Line Monitor Device and energy-saving control method of a kind of low-power consumption
JPH0748738A (en) Monitor system of spinning machine
CN113055085A (en) Power communication network operation and maintenance device
JPH0711527A (en) System for controlling winder
JPH05186905A (en) Operation management process for textile machine and apparatus therefor

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees