JP2876910B2 - Corrugated tube molding method - Google Patents

Corrugated tube molding method

Info

Publication number
JP2876910B2
JP2876910B2 JP21116192A JP21116192A JP2876910B2 JP 2876910 B2 JP2876910 B2 JP 2876910B2 JP 21116192 A JP21116192 A JP 21116192A JP 21116192 A JP21116192 A JP 21116192A JP 2876910 B2 JP2876910 B2 JP 2876910B2
Authority
JP
Japan
Prior art keywords
metal tube
molding
corrugated tube
tube
chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP21116192A
Other languages
Japanese (ja)
Other versions
JPH0655225A (en
Inventor
雅彦 三林
昌澄 大西
徹 島田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP21116192A priority Critical patent/JP2876910B2/en
Publication of JPH0655225A publication Critical patent/JPH0655225A/en
Application granted granted Critical
Publication of JP2876910B2 publication Critical patent/JP2876910B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、金型を使用しないコル
ゲートチューブの成形方法に関し、とくに金属管への冷
却液の付着に起因する成形精度の悪化および成形不良の
発生を防止するようにしたコルゲートチューブ成形方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of forming a corrugated tube without using a mold, and in particular, to prevent the deterioration of molding accuracy and the occurrence of molding defects due to the adhesion of a cooling liquid to a metal tube. The present invention relates to a corrugated tube molding method.

【0002】[0002]

【従来の技術】コルゲートチューブの製造方法の一例と
して、従来、液圧バルジ加工と、金型を使用しない実開
昭63−85319号公報が知られている。本公報の加
工装置は、金属管の両端を支持し、金属管を局部的に加
熱した後軸方向から荷重を付与し、その直後冷却し1山
の成形を終了し、これを順次繰り返しコルゲートチュー
ブを成形するものである。
2. Description of the Related Art As an example of a method for manufacturing a corrugated tube, there is conventionally known a hydraulic bulging process and Japanese Utility Model Application Laid-Open No. 63-85319, which does not use a mold. The processing apparatus disclosed in this publication supports both ends of a metal pipe, locally applies heat to the metal pipe, applies a load from the axial direction, cools the steel pipe immediately after that, finishes forming one crest, and repeats this process sequentially and repeatedly. Is formed.

【0003】また、長尺の金属管の場合でも、精度よ
く、かつ装置の大型化、複雑化をほとんど伴うことなく
コルゲートチューブの成形が可能な長尺コルゲートチュ
ーブ成形装置が知られている(特開平4−91824号
公報)。
Also, a long corrugated tube forming apparatus is known which can form a corrugated tube with high accuracy and with almost no increase in the size and complexity of the apparatus, even in the case of a long metal tube. JP-A-4-91824).

【0004】上記公報によるコルゲートチューブの成形
においては、加熱、圧縮によって形成された膨出部を冷
却する際の冷媒として冷却水が用いられており、加熱、
圧縮直後には膨出部に向けて冷却水が噴射される。
[0004] In the molding of the corrugated tube according to the above-mentioned publication, cooling water is used as a refrigerant for cooling the bulging portion formed by heating and compression.
Immediately after compression, cooling water is injected toward the bulging portion.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記公
報によるコルゲートチューブの成形においては、生産性
を高めるため成形サイクルタイムを短縮すると、図3お
よび図4に示すように、コルゲートチューブ21の成形
精度の悪化や成形不良が生じる。図3は、コルゲートチ
ューブ21の膨出部21aの径にばらつきが生じた場合
を示しており、図4は、コルゲートチューブ21が矢印
A方向に湾曲した場合を示している。
However, in the molding of the corrugated tube according to the above publication, if the molding cycle time is shortened in order to increase the productivity, the molding accuracy of the corrugated tube 21 is reduced as shown in FIGS. Deterioration and molding failure occur. FIG. 3 shows a case where the diameter of the bulging portion 21a of the corrugated tube 21 varies, and FIG. 4 shows a case where the corrugated tube 21 is curved in the direction of arrow A.

【0006】このような成形不良の原因についての詳細
は明らかでないが、成形サイクルタイムが短かくなる
と、前回の膨出部の成形の際に用いた冷却水が金属管の
表面に残留した状態で次の膨出部を成形するための加熱
が行われるため、冷却水の付着のばらつきがそのまま次
の加熱温度の不均一性となって表われるためと考えられ
る。したがって、金属管の加熱部には変形しやすい部分
と変形しにくい部分が生じることになり、結果的に金属
管の周方向および軸方向の成形精度の悪化や成形不良を
招くことになる。
Although the details of the cause of such a molding failure are not clear, if the molding cycle time is shortened, the cooling water used in the previous molding of the bulging portion may remain on the surface of the metal tube. It is considered that since the heating for forming the next bulging portion is performed, the variation in the adhesion of the cooling water directly appears as the non-uniformity of the next heating temperature. Therefore, a portion that is easily deformed and a portion that is hardly deformed are generated in the heating portion of the metal tube, and as a result, the molding accuracy in the circumferential direction and the axial direction of the metal tube is deteriorated and molding failure is caused.

【0007】冷却水の付着のばらつきを解消するには、
冷却水に代えて圧縮エアなどの気体による冷却を行えば
よいが、この場合は冷却能力が極端に低下し、逆に成形
サイクルタイムが長くなってしまうという問題がある。
[0007] In order to eliminate the variation in the adhesion of cooling water,
It is sufficient to perform cooling with a gas such as compressed air instead of the cooling water. However, in this case, there is a problem that the cooling capacity is extremely reduced and the molding cycle time is prolonged.

【0008】本発明は、上記の問題に着目し、成形精度
の悪化や成形不良の発生を招くことなく、成形サイクル
タイムの短縮が可能なコルゲートチューブ成形方法を提
供することを目的とする。
An object of the present invention is to provide a corrugated tube molding method capable of shortening the molding cycle time without causing deterioration in molding accuracy or occurrence of molding defects, focusing on the above problems.

【0009】[0009]

【課題を解決するための手段】この目的を達成するため
の本発明に係るコルゲートチューブ成形方法は、金属管
をチャック部により保持し、該金属管を局部的に加熱し
た後に、チャック部の移動により金属管を軸方向に圧縮
して加熱部を半径方向外方に膨出させ、つぎに該膨出部
に冷却液を噴射して該膨出部を冷却し、その後、冷却液
が付着した金属管の部分に向けて気体を吹きつける方法
からなる。
According to the present invention, there is provided a method of forming a corrugated tube, comprising: holding a metal tube by a chuck portion; heating the metal tube locally; By compressing the metal tube in the axial direction, the heating portion is bulged radially outward, and then the cooling liquid is sprayed on the bulging portion to cool the bulging portion. It consists of a method of blowing gas toward the metal tube.

【0010】[0010]

【作用】このように構成されたコルゲートチューブ成形
方法においては、金属管に半径方向外方に膨出する膨出
部が形成されると、膨出部に向けて冷却液が噴射され
る。膨出部が冷却液によって冷却されると、冷却液が付
着した部分に向けて気体が吹きつけられる。そのため、
金属管に付着していた冷却液が気体によって吹き飛ばさ
れ、冷却液はほぼ完全に除去される。
In the corrugated tube forming method thus constituted, when a bulging portion bulging outward in the radial direction is formed in the metal tube, a cooling liquid is sprayed toward the bulging portion. When the bulging portion is cooled by the cooling liquid, gas is blown toward the portion where the cooling liquid has adhered. for that reason,
The coolant adhering to the metal pipe is blown off by the gas, and the coolant is almost completely removed.

【0011】したがって、つぎの膨出部を成形する際の
加熱温度が不均一となることもなくなり、金属管の加熱
部に変形しやすい部分と変形しにくい部分とが生じるこ
ともなくなる。これにより、加熱部は均一に変形するこ
とになり、成形精度の悪化および成形不良の発生が防止
される。
Therefore, the heating temperature at the time of forming the next swollen portion does not become non-uniform, and the heated portion of the metal tube does not have easily deformable portions and hardly deformable portions. As a result, the heating section is uniformly deformed, and deterioration of molding accuracy and occurrence of molding failure are prevented.

【0012】[0012]

【実施例】以下に、本発明に係るコルゲートチューブ成
形方法の望ましい実施例を、図面を参照して説明する。
まず、本発明を実施するための成形装置について説明す
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the method for forming a corrugated tube according to the present invention will be described below with reference to the drawings.
First, a forming apparatus for carrying out the present invention will be described.

【0013】図1において、1は架台で、架台1上に
は、サーボモータ5a、5bとボールネジ7a、7bが
支持されている。サーボモータ5a、5bとボールネジ
7a、7bはそれぞれギヤ機構6a、6bを介して連結
されている。また、ボールネジ7a、7bには、それぞ
れ、油圧チャック2a、2b(エアチャック、電磁チャ
ック等のチャックであってもよい)が支持されている。
In FIG. 1, reference numeral 1 denotes a gantry on which servo motors 5a and 5b and ball screws 7a and 7b are supported. The servo motors 5a, 5b and the ball screws 7a, 7b are connected via gear mechanisms 6a, 6b, respectively. The ball screws 7a and 7b respectively support hydraulic chucks 2a and 2b (which may be chucks such as an air chuck and an electromagnetic chuck).

【0014】ここで、油圧チャック2bは金属管9を長
手方向途中部で外周からチャックする第1のチャック部
を構成し、油圧チャック2aは金属管9を長手方向途中
部で外周からチャックする第2のチャック部を構成す
る。また、ボールネジ7b、ギヤ機構6b、サーボモー
タ5bは、第1のチャック部を金属管軸方向に駆動する
駆動手段を構成し、ボールネジ7a、ギヤ機構6a、サ
ーボモータ5aは、第2のチャック部を金属管軸方向に
駆動する駆動手段を構成する。
Here, the hydraulic chuck 2b constitutes a first chuck portion for chucking the metal tube 9 from the outer periphery at a middle portion in the longitudinal direction, and the hydraulic chuck 2a chucks the metal tube 9 from the outer periphery at a middle portion in the longitudinal direction. 2 constitute the chuck portion. The ball screw 7b, the gear mechanism 6b, and the servo motor 5b constitute driving means for driving the first chuck section in the axial direction of the metal tube. The ball screw 7a, the gear mechanism 6a, and the servo motor 5a are connected to the second chuck section. Is configured in the axial direction of the metal tube.

【0015】両チャック部間の間には、高周波コイル3
と、冷却液噴射管8とを備えた加熱、冷却手段が設けら
れている。高周波コイル3は、金属管9を周方向にとり
まき、軸方向に局部的に、金属管9を加熱するようにな
っている。冷却液噴射管8は、加熱直後に、局部的加熱
部に冷却液としての冷却水を噴射して冷却するようにな
っている。
A high frequency coil 3 is provided between the two chuck portions.
Heating and cooling means provided with a cooling liquid injection pipe 8. The high-frequency coil 3 surrounds the metal tube 9 in the circumferential direction, and heats the metal tube 9 locally in the axial direction. Immediately after heating, the cooling liquid injection pipe 8 is configured to inject cooling water as a cooling liquid to a local heating unit to cool the local heating unit.

【0016】なお、4a、4bは、それぞれ金属管、コ
ルゲートチューブの受台である。受台4a、4b、油圧
チャック2a、2b、高周波コイル3は、長尺金属管9
の送り方向に軸心を合せて配置されている。
Reference numerals 4a and 4b denote bases for a metal tube and a corrugated tube, respectively. The receiving tables 4a and 4b, the hydraulic chucks 2a and 2b, and the high-frequency coil 3
Are arranged with their axes aligned in the feed direction.

【0017】高周波コイル3と冷却液噴射管8とを備え
た加熱、冷却手段の隣には、冷却水が付着した金属管9
の部分に向けて圧縮エアを吹きつける円環状の気体噴射
管11が配置されている。気体噴射管11は、金属管9
の膨出部9aに向けて開口する複数の斜噴孔11aを有
している。気体噴射管11は、通路12を介してエアコ
ンプレッサ13と接続されている。通路12の途中に
は、電磁弁14が配置されている。電磁弁14は図示さ
れない制御部からの信号によって開閉し、電磁弁14が
開弁したときのみエアコンプレッサ13からの圧縮エア
が気体噴射管11から金属管9の全周面に向けて噴射さ
れるようになっている。
Next to the heating and cooling means provided with the high-frequency coil 3 and the cooling liquid injection pipe 8, a metal pipe 9 with cooling water adhered thereto is provided.
An annular gas injection pipe 11 for blowing compressed air toward the portion is disposed. The gas injection tube 11 is a metal tube 9
It has a plurality of oblique injection holes 11a opening toward the bulging portion 9a. The gas injection pipe 11 is connected to an air compressor 13 via a passage 12. An electromagnetic valve 14 is arranged in the middle of the passage 12. The electromagnetic valve 14 is opened and closed by a signal from a control unit (not shown), and compressed air from the air compressor 13 is injected from the gas injection pipe 11 toward the entire peripheral surface of the metal pipe 9 only when the electromagnetic valve 14 is opened. It has become.

【0018】つぎに、上記装置を用いたコルゲートチュ
ーブの製造方法およびその作用について説明する。ま
ず、長尺の金属管9を受台4aから油圧チャック2aお
よび高周波コイル3へ挿入して、油圧チャック2bで金
属管9の挿入方向先端側をチャックする。次に、油圧チ
ャック2aで金属管9の途中部をチャックする。続い
て、高周波コイル3に高周波電流を流し、金属管9を軸
方向には局部的に、周方向には全周にわたって、所定温
度に加熱する。
Next, a method of manufacturing a corrugated tube using the above apparatus and its operation will be described. First, the long metal tube 9 is inserted from the receiving table 4a into the hydraulic chuck 2a and the high-frequency coil 3, and the front end side of the metal tube 9 in the insertion direction is chucked by the hydraulic chuck 2b. Next, the middle part of the metal pipe 9 is chucked by the hydraulic chuck 2a. Subsequently, a high-frequency current is applied to the high-frequency coil 3 to heat the metal tube 9 to a predetermined temperature locally in the axial direction and over the entire circumference in the circumferential direction.

【0019】加熱部が所定の温度に加熱され次第、サー
ボモータ5aが作動し、ギヤ6aを介してボールネジ7
aが作動し、油圧チャック2aが所定の距離軸方向に移
動して金属管9に荷重を付与し、加熱部を局部的に膨出
変形させる。膨出部9aは、その後直ちに冷却液噴射管
8から噴射される冷却水によって冷却され、1山の成形
が行われる。
As soon as the heating section is heated to a predetermined temperature, the servo motor 5a operates and the ball screw 7 is connected via the gear 6a.
a is actuated, the hydraulic chuck 2a moves in the axial direction for a predetermined distance to apply a load to the metal tube 9, and locally expands and deforms the heating unit. Immediately thereafter, the bulging portion 9a is cooled by the cooling water injected from the cooling liquid injection pipe 8, and a single crest is formed.

【0020】冷却水によって膨出部9aが冷却される
と、電磁弁14が開弁し、気体噴射管11の斜噴孔11
aから圧縮エアが金属管9の膨出部9aに向けて噴射さ
れる。これにより、金属管9に付着していた冷却水が吹
き飛ばされ、金属管9の表面から冷却水がほぼ完全に除
去される。
When the swelling portion 9a is cooled by the cooling water, the solenoid valve 14 is opened, and the oblique injection hole 11 of the gas injection pipe 11 is opened.
a, compressed air is injected toward the bulging portion 9 a of the metal tube 9. Thereby, the cooling water adhering to the metal pipe 9 is blown off, and the cooling water is almost completely removed from the surface of the metal pipe 9.

【0021】つぎに、油圧チャック2aを開放した後、
サーボモータ5bを作動させ、ギヤ6bを介してボール
ネジ7bを移動させ、油圧チャック2bを金属管送り方
向に1ピッチ分だけ移動させて、金属管9を1ピッチ分
だけ金属管送り方向に進ませる。油圧チャック2aはこ
れと同時に原位置に戻される。
Next, after releasing the hydraulic chuck 2a,
The servo motor 5b is operated, the ball screw 7b is moved via the gear 6b, the hydraulic chuck 2b is moved by one pitch in the metal pipe feed direction, and the metal pipe 9 is advanced by one pitch in the metal pipe feed direction. . The hydraulic chuck 2a is simultaneously returned to the original position.

【0022】金属管9が1ピッチ分だけ送られると、油
圧チャック2aにより金属管9がチャックされる。続い
て、油圧チャック2bを開放し、サーボモータ5bを作
動させて、ギヤ6bを介して、ボールネジ7b、油圧チ
ャック2bを金属管送り方向と反対方向に1ピッチ分だ
け移動させ、この状態で油圧チャック2bでコルゲート
成形部(長尺金属管9の途中分でコルゲート管に成形さ
れた部分)をチャックする。
When the metal tube 9 is fed by one pitch, the metal tube 9 is chucked by the hydraulic chuck 2a. Subsequently, the hydraulic chuck 2b is released, the servomotor 5b is operated, and the ball screw 7b and the hydraulic chuck 2b are moved by one pitch in the direction opposite to the metal pipe feed direction via the gear 6b. The chuck 2b chucks the corrugated portion (the portion formed on the corrugated tube in the middle of the long metal tube 9).

【0023】金属管9の送り方向の位置決めが終了する
と、高周波コイル3によって金属管9のつぎに成形する
部分が加熱される。ここで、先の膨出部9aの成形時に
圧縮エアの噴射によって金属管9の表面に付着していた
冷却水が十分に除去されているので、冷却水の付着によ
る加熱部の温度のばらつきが解消される。したがって、
加熱部は均一に加熱された状態となり、圧縮力による膨
出部の成形時における成形精度の悪化および成形不良の
発生が解消される。
When the positioning of the metal tube 9 in the feed direction is completed, the portion to be formed next to the metal tube 9 is heated by the high-frequency coil 3. Here, since the cooling water adhering to the surface of the metal tube 9 has been sufficiently removed by the injection of the compressed air at the time of forming the bulging portion 9a, the temperature variation of the heating section due to the adhesion of the cooling water is reduced. Will be resolved. Therefore,
The heating unit is uniformly heated, so that the deterioration of molding accuracy and the occurrence of molding defects during molding of the bulging portion due to the compressive force are eliminated.

【0024】このような工程を繰返すことにより膨出部
を1山づつ成形し、成形後1山づつ金属管9を送るサイ
クルを、必要な山の数だけ繰返して、コルゲートチュー
ブを成形する。
By repeating such a process, the bulging portion is formed one by one, and the cycle of feeding the metal pipe 9 one by one after forming is repeated by the required number of peaks to form the corrugated tube.

【0025】本実施例では、冷却液として冷却水を使用
したがこれに限定されるものではなく、たとえば水溶性
焼入液等を用いる構成としてもよい。また、気体として
圧縮エアを用いたが、窒素や二酸化炭素などを用いる構
成としてもよく、さらに低温の気体を用いて膨出部の冷
却と冷却液の除去とを同時に行う構成としてもよい。
In this embodiment, cooling water is used as the cooling liquid. However, the present invention is not limited to this. For example, a structure using a water-soluble quenching liquid or the like may be used. Although compressed air is used as the gas, a configuration using nitrogen, carbon dioxide, or the like may be used. Alternatively, a configuration may be used in which cooling of the bulging portion and removal of the cooling liquid are performed simultaneously using a low-temperature gas.

【0026】[0026]

【発明の効果】本発明によれば、つぎの効果が得られ
る。
According to the present invention, the following effects can be obtained.

【0027】(1)金属管をチャック部により保持し、
金属管を局部的に加熱した後に、チャック部の移動によ
り金属管を軸方向に圧縮して加熱部を半径方向外方に膨
出させ、つぎに膨出部に冷却液を噴射して膨出部を冷却
し、その後、冷却液が付着した金属管の部分に向けて気
体を吹きつけるようにしたので、加熱部の温度にばらつ
きが生じなくなり、加熱部全体を均一に加熱することが
できる。
(1) The metal tube is held by the chuck portion,
After the metal tube is locally heated, the chuck is moved to compress the metal tube in the axial direction to expand the heating portion radially outward, and then inject the cooling liquid into the expanded portion to expand it. Since the part is cooled and then the gas is blown toward the part of the metal pipe to which the cooling liquid has adhered, the temperature of the heating part does not vary, and the entire heating part can be uniformly heated.

【0028】(2)したがって、金属管に作用する圧縮
力によって加熱部を均一に成形することが可能となり、
成形精度の向上および成形不良の発生を防止することが
できる。
(2) Therefore, the heating portion can be formed uniformly by the compressive force acting on the metal tube,
It is possible to improve molding accuracy and prevent molding defects.

【0029】(3)従来方法で成形精度の悪化および成
形不良を防止するには、冷却液の乾燥を待ってからつぎ
の成形部分の加熱をすることになるが、本発明では気体
の噴射によって金属管に付着した冷却水が強制的に除去
されるので、付着した冷却水の乾燥を待つことなく、つ
ぎの膨出部の成形が可能となる。したがって、膨出部の
成形サイクルタイムを短縮することができ、コルゲート
チューブの生産性を高めることができる。
(3) In order to prevent deterioration of molding accuracy and molding defects by the conventional method, the next molding portion is heated after the cooling liquid is dried, but in the present invention, the gas is injected by gas injection. Since the cooling water adhering to the metal pipe is forcibly removed, the next bulging portion can be formed without waiting for the adhering cooling water to dry. Therefore, the molding cycle time of the bulging portion can be shortened, and the productivity of the corrugated tube can be increased.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を実施するためのコルゲートチューブ成
形装置の平面図である。
FIG. 1 is a plan view of a corrugated tube forming apparatus for carrying out the present invention.

【図2】図1の部分拡大断面図である。FIG. 2 is a partially enlarged sectional view of FIG.

【図3】従来の成形方法による成形精度の低下したコル
ゲートチューブの部分拡大正面図である。
FIG. 3 is a partially enlarged front view of a corrugated tube in which molding accuracy is reduced by a conventional molding method.

【図4】従来の成形方法による成形不良が生じたコルゲ
ートチューブの部分拡大正面図である。
FIG. 4 is a partially enlarged front view of a corrugated tube in which molding failure has occurred by a conventional molding method.

【符号の説明】[Explanation of symbols]

1 架台 2a、2b チャック部 3 高周波コイル 4a、4b 受台 5a、5b サーボモータ 6a、6b ギヤ機構 7a、7b ボールネジ 8 冷却液噴射管 9 金属管 11 気体噴射管 DESCRIPTION OF SYMBOLS 1 Stand 2a, 2b Chuck part 3 High-frequency coil 4a, 4b Receiver 5a, 5b Servo motor 6a, 6b Gear mechanism 7a, 7b Ball screw 8 Coolant injection pipe 9 Metal pipe 11 Gas injection pipe

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平1−192425(JP,A) 特開 昭63−203217(JP,A) (58)調査した分野(Int.Cl.6,DB名) B21D 15/06,19/08 B21C 37/00 C21D 9/08 ────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-1-192425 (JP, A) JP-A-63-203217 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) B21D 15 / 06,19 / 08 B21C 37/00 C21D 9/08

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 金属管をチャック部により保持し、該金
属管を局部的に加熱した後に、チャック部の移動により
金属管を軸方向に圧縮して加熱部を半径方向外方に膨出
させ、つぎに該膨出部に冷却液を噴射して該膨出部を冷
却し、その後、冷却液が付着した金属管の部分に向けて
気体を吹きつけることを特徴とするコルゲートチューブ
成形方法。
1. A metal tube is held by a chuck portion, and after the metal tube is locally heated, the metal tube is axially compressed by movement of the chuck portion to expand the heating portion radially outward. Next, a cooling liquid is injected into the bulging portion to cool the bulging portion, and thereafter, a gas is blown toward a portion of the metal pipe to which the cooling liquid has adhered, thereby forming a corrugated tube.
JP21116192A 1992-08-07 1992-08-07 Corrugated tube molding method Expired - Lifetime JP2876910B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21116192A JP2876910B2 (en) 1992-08-07 1992-08-07 Corrugated tube molding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21116192A JP2876910B2 (en) 1992-08-07 1992-08-07 Corrugated tube molding method

Publications (2)

Publication Number Publication Date
JPH0655225A JPH0655225A (en) 1994-03-01
JP2876910B2 true JP2876910B2 (en) 1999-03-31

Family

ID=16601413

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21116192A Expired - Lifetime JP2876910B2 (en) 1992-08-07 1992-08-07 Corrugated tube molding method

Country Status (1)

Country Link
JP (1) JP2876910B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5711177A (en) * 1996-06-27 1998-01-27 Toyota Jidosha Kabushiki Kaisha Method for corrugating a metallic pipe
CN106623485B (en) * 2017-03-07 2018-11-16 福州诺贝尔福基机电有限公司 Turbocharging oil return pipe forming apparatus and its moulding process
CN113305190A (en) * 2021-05-26 2021-08-27 哈尔滨工业大学 Device and method for local beneficial wrinkles of prefabricated pipe

Also Published As

Publication number Publication date
JPH0655225A (en) 1994-03-01

Similar Documents

Publication Publication Date Title
JPS6240181B2 (en)
US5522247A (en) Method and apparatus for manufacturing a corrugated tube
US6199419B1 (en) Method for manufacturing a dome from an undersized blank
AU3828297A (en) Linear friction welding process for making wheel rims
JP2876910B2 (en) Corrugated tube molding method
US6006569A (en) Method for manufacturing a dome from an undersized blank
US3198926A (en) Method for upsetting elongated articles
US6253597B1 (en) Body-necking a wall-ironed can
JP2815599B2 (en) Method and apparatus for manufacturing small diameter bellows tube
JPH1157872A (en) Plate material forming method
JPH06238380A (en) Device for expanding diameter of pipe for heat exchanger by hydraulic pressure
JPH10118719A (en) Double tube bending method and its device
JPH10158742A (en) Method for hardening member having complete roundness part and deformed part
EP1189711B1 (en) Method of manufacturing a dome from an undersized blank
JPH07124671A (en) Hydraulic tube expanding device for heat exchanger
JP2001047127A (en) Manufacture of intermediate drawn tube
JP3405129B2 (en) Spinning processing method and processing roll used for the processing method
JP2003181545A (en) Molding method for bellows tube
JP3295127B2 (en) How to size a ring
JPS63157724A (en) Manufacture of flare tube
JP2945461B2 (en) Post-molding treatment method for resin boots
JPH0890053A (en) Production of special shaped hollow tube and device therefor
JP2504100B2 (en) Flare tube manufacturing method
JPH06126366A (en) Prespinning method for ring, plate and strip materials having modified cross section shape
JP2768118B2 (en) Straightening method of cylindrical work