JP2791197B2 - Prefabricated construction process control device - Google Patents

Prefabricated construction process control device

Info

Publication number
JP2791197B2
JP2791197B2 JP21472690A JP21472690A JP2791197B2 JP 2791197 B2 JP2791197 B2 JP 2791197B2 JP 21472690 A JP21472690 A JP 21472690A JP 21472690 A JP21472690 A JP 21472690A JP 2791197 B2 JP2791197 B2 JP 2791197B2
Authority
JP
Japan
Prior art keywords
date
work
construction
prefabricated
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21472690A
Other languages
Japanese (ja)
Other versions
JPH0497072A (en
Inventor
哲夫 金岩
良和 佐々木
裕 吉岡
斎 長谷部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP21472690A priority Critical patent/JP2791197B2/en
Publication of JPH0497072A publication Critical patent/JPH0497072A/en
Application granted granted Critical
Publication of JP2791197B2 publication Critical patent/JP2791197B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明はプレハブ工事の工程を管理するプレハブ工事
工程管理装置に関する。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a prefabricated construction process management device for managing a prefabricated construction process.

〔従来の技術〕[Conventional technology]

近年、建設工事量の増大、作業員の不足等の原因によ
り、工場で製作したプレハブ部材を使用した建設工事、
所謂プレハブ工事が増加している。このプレハブ部材の
うち、特にプレキヤストコンクリート部材(以下、PC部
材という)は需要が急増し、PC部材製作メーカの工場
(以下、固定工場という)のPC部材供給量が充分でない
場合がある。これを解決するために現場内に設けたサイ
ト工場でPC部材等を製作するサイト生産方式を採用し、
このサイト工場で製作されたPC部材を用いたプレハブ工
事が行われている。
In recent years, construction work using prefabricated members manufactured at the factory due to the increase in the amount of construction work, shortage of workers, etc.
So-called prefabricated works are increasing. Among these prefabricated members, in particular, demand for precast concrete members (hereinafter, referred to as PC members) has rapidly increased, and the supply of PC members at a plant (hereinafter, referred to as a fixed plant) of a PC member maker may not be sufficient. In order to solve this, we adopted a site production method of manufacturing PC members etc. at a site factory set up on the site,
Prefabricated works using PC members manufactured at this site factory are being performed.

このサイト生産方式は、PC部材を組み立てる所謂建方
工程の作業の進捗状況に合わせて部材を供給することが
可能であり、また、PC部材を輸送する費用を削減するこ
とができる。また前記固定工場で製作したPC部材は道路
輸送するため大きさの制限があるが、サイト工場で製作
したPC部材はこのような制限を受けないため大型のPC部
材を採用でき、PC部材の数が減少することによって建方
工程の作業量を低減できるという利点もある。
According to this site production system, it is possible to supply members in accordance with the progress of work in a so-called construction process for assembling PC members, and it is possible to reduce the cost of transporting PC members. In addition, although the size of the PC members manufactured at the fixed factory is limited by road transportation, the PC members manufactured at the site factory are not subject to such restrictions, so that large PC members can be adopted, and the number of PC members can be reduced. There is also an advantage that the amount of work in the erecting process can be reduced by reducing the amount of work.

ところで、PC部材を含めたプレハブ部材は建方工程で
寸法等を合わせることが困難であるので、外形寸法等に
高い精度を必要とする。しかしながら、サイト生産方式
では屋外作業が多く作業者の習熟度も低いため、固定工
場と比較して生産性が低いという問題がある。また、建
方工程では多数の部材を使用して作業するため、作業日
程の計画、工程管理等の作業が煩雑であった。
By the way, it is difficult to adjust the dimensions and the like of the prefabricated members including the PC members in the construction process, so that high precision is required for the external dimensions and the like. However, the site production method has a problem that the productivity is low as compared with the fixed factory because the outdoor work is often performed and the skill of the worker is low. In addition, since many works are used in the construction process, work such as work schedule planning and process management is complicated.

上記のようなサイト生産方式を採用したプレハブ工事
の問題点を解消するため、本出願人はプレハブ工事工程
管理装置を提案している。このプレハブ工事工程管理装
置は、建方工程を含む各工程の作業と作業日程とを対応
させた工程表及びプレハブ部材毎の製作予定日を示す製
作表を画面等に表示する。工程表を参照することによっ
て建方工程を含む全体的な工程の流れを把握することが
でき、工程管理を支援することができる。また、製作表
を参照することによってPC部材等の製作側で作業の量及
び内容を把握することができるので、生産管理が容易に
なり生産性を向上させることができる。
In order to solve the problems of the prefabricated construction employing the site production method as described above, the present applicant has proposed a prefabricated construction process management device. The prefabrication work process management apparatus displays, on a screen or the like, a process chart in which work of each process including a construction process and a work schedule are associated with each other and a production table indicating a planned production date for each prefabricated member. By referring to the process chart, the flow of the entire process including the construction process can be grasped, and the process management can be supported. Also, by referring to the production table, it is possible to grasp the amount and contents of the work on the production side of the PC member and the like, so that the production management becomes easy and the productivity can be improved.

ところで、建方工程の作業日程を前記プレハブ工事工
程管理装置へ入力する際、前記作業日程と共に建方工程
の作業で使用するPC部材毎の建方予定日も入力する。PC
部材はPC部材の建方日より前に製作を完了していなけれ
ばならない。従って、PC部材の製作側ではPC部材毎の建
方予定日に基づいて各PC部材の製作予定日を定め、生産
管理を行っている。
By the way, when the work schedule of the erection process is input to the prefabricated construction process management device, the planned erection date for each PC member used in the work of the erection process is also input together with the work schedule. PC
The component must have been manufactured before the date of construction of the PC component. Therefore, the production side of the PC member determines the production date of each PC member based on the planned construction date of each PC member, and performs production management.

〔発明が解決しようとする課題〕[Problems to be solved by the invention]

しかしながら、建方工程において作業を行う日と該作
業で使用するPC部材の建方予定日とは同一であるが、従
来のプレハブ工事工程管理装置では建方工程の作業日程
の入力と建方予定日の入力とを別々に行う必要があり、
建方工程の入力は煩雑な作業であった。
However, the date when the work is performed in the construction process is the same as the planned construction date of the PC member used in the work, but with the conventional prefabricated construction process management device, the work schedule of the construction process is input and the construction schedule is calculated. Must be entered separately from the day,
Inputting the construction process was a complicated task.

本発明は上記事実を考慮して成されたもので、建方工
程を入力する作業を容易に行うことができるプレハブ工
事工程管理装置を得ることが目的である。
The present invention has been made in view of the above facts, and has as its object to obtain a prefabricated construction process management device capable of easily performing an operation of inputting a construction process.

〔課題を解決するための手段〕[Means for solving the problem]

上記目的を達成するために本発明に係るプレハブ工事
工程管理装置は、建方工程を含む各工程の作業日程及び
プレハブ部材の製作予定日のデータを入力するための入
力手段と、建方工程の作業と該作業に使用するプレハブ
部材とを対応させて記憶した記憶手段と、建方工程を含
む各工程の作業と作業日程とを対応させた工程表を作成
する工程表作成手段と、プレハブ部材とプレハブ部材の
建方予定日とを対応させた製作表を表示する表示手段
と、を備え、前記製作表を参照しながら前記入力手段に
よってプレハブ部材の製作予定日データを入力して前記
製作表を完成させるプレハブ工事工程管理装置におい
て、建方工程の作業日程と記憶手段の記憶内容とに基づ
いて前記プレハブ部材の建方予定日を判断する判断手段
を設けたことを特徴としている。
In order to achieve the above object, a prefabricated construction process management device according to the present invention includes: an input unit for inputting data of a work schedule of each process including a construction process and a date of production of a prefabricated member; Storage means for storing work and prefabricated members used for the work in association with each other; process table creation means for creating a work schedule corresponding to work of each process including the construction process and work schedule; And display means for displaying a production table in which the construction date of the prefabricated member is made to correspond to the production table. In the prefabricated construction process management device for completing the above, it is characterized by having provided a judgment means for judging the planned construction date of the prefabricated member based on the work schedule of the construction process and the storage content of the storage means There.

〔作用〕[Action]

本発明では、建方工程の作業と該作業に使用するプレ
ハブ部材とを対応させて記憶し、建方工程の作業日程と
前記記憶内容とに基づいてプレハブ部材の建方予定日を
判断する。このため、建方工程を入力するオペレータは
建方工程の作業で使用する各プレハブ部材の建方予定日
を入力する必要がなく、建方工程を入力する作業を容易
に行うことができる。
According to the present invention, the work of the construction process and the prefabricated members used for the work are stored in association with each other, and the planned construction date of the prefabricated member is determined based on the work schedule of the construction process and the stored contents. For this reason, the operator who inputs the erection process does not need to input the estimated erection date of each prefabricated member used in the operation of the erection process, and can easily perform the operation of inputting the erection process.

〔実施例〕〔Example〕

以下図面を参照して本発明の実施例を詳細に説明す
る。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

第1図に示すように、本実施例に係るプレハブ工事工
程管理装置10は、パーソナルコンピユータ12と、パーソ
ナルコンピユタ12の入出力ポート20に接続される各種の
入出力機器と、から構成される。パーソナルコンピユー
タ12は、CPU14、ROM16、RAM18及び入出力ポート20を備
え、これらは互いにバスによって接続されている。本実
施例では入出力ポート20に接続される入出力装置とし
て、フロツピーデイスク、ハードテイスク等の記憶媒体
で構成され記憶したプログラム、データが読出されると
共にデータが書込まれる外部記憶装置32と、オペレータ
がデータ等を入力するためのキーボード24及びマウス26
と、処理結果を表示するデイスプレイ28と、処理結果を
印刷するためのプリンタ30と、を用いている。
As shown in FIG. 1, a prefabricated construction process management device 10 according to the present embodiment includes a personal computer 12 and various input / output devices connected to an input / output port 20 of the personal computer 12. . The personal computer 12 includes a CPU 14, a ROM 16, a RAM 18, and an input / output port 20, which are connected to each other by a bus. In this embodiment, as an input / output device connected to the input / output port 20, a program stored and stored in a storage medium such as a floppy disk or a hard disk, an external storage device 32 from which data is read and data is written, Keyboard 24 and mouse 26 for the operator to input data etc.
And a display 28 for displaying the processing result, and a printer 30 for printing the processing result.

パーソナルコンピユータ12及び各入出力機器をプレハ
ブ工事工程管理装置10として作用させるためのプログラ
ムは前記外部記憶装置32の記憶媒体に記憶されている。
このプログラムはプレハブ工事工程管理装置10を構成す
る各機器に電源が投入されると読出され、実行される。
A program for causing the personal computer 12 and each input / output device to operate as the prefabricated construction process management device 10 is stored in the storage medium of the external storage device 32.
This program is read out and executed when the power of each device constituting the prefabricated construction process management device 10 is turned on.

次に本実施例の作用を説明する。 Next, the operation of the present embodiment will be described.

本実施例のプレハブ工事工程管理装置10は第14図のフ
ローチヤートに示すような処理を行って工程計画の立
案、工程管理を支援する。すなわち、ステツプ100では
プレハブ工事を行う作業所固有のデータを入力するよう
オペレータに指示する。これによりオペレータは、作業
所固有のデータ、例えばプレハブ工事で使用する全ての
プレハブ部材を特定するデータ、すなわちプレハブ部材
毎に付与される呼称を表す呼称データを入力する。ま
た、例えば、第2図に示すような各階毎のPC部材等の位
置を表すデータ、建方工程の作業と該作業で使用するPC
部材との対応を示すデータ、作業期間中の休日を示すデ
ータ等を入力する。なお、第2図において「○」は柱と
して使用されるPC部材、「□」は梁として使用されるPC
部材を表しており、A、B、C・・の符号及び1、2、
3・・の符号は各部材の位置を座標で表すためのもので
ある。また、建方工程の作業と該作業で使用するPC部材
との対応を示すデータは外部記憶装置32に記憶される。
The prefabricated construction process management apparatus 10 of this embodiment performs the processing shown in the flowchart of FIG. 14 to support the planning of the process plan and the process management. That is, in step 100, the operator is instructed to input data unique to the work site where the prefabrication work is performed. Accordingly, the operator inputs data unique to the workplace, for example, data specifying all prefabricated members used in the prefabricated work, that is, name data representing a name given to each prefabricated member. Further, for example, data indicating the position of the PC member and the like for each floor as shown in FIG. 2, the work of the construction process and the PC used in the work
Data indicating correspondence with members, data indicating holidays during the work period, and the like are input. In Fig. 2, "○" indicates a PC member used as a pillar, and "□" indicates a PC member used as a beam.
Represents members, A, B, C,.
The symbols 3... Represent the position of each member by coordinates. Further, data indicating the correspondence between the work in the construction process and the PC members used in the work is stored in the external storage device 32.

ステツプ102では例として第3図に示すような工程表
の原図40を表示し、建方工程を含む各工程の作業日程、
すなわち全体工程を入力するようオペレータに指示す
る。なお、第3図の工程表の原図40は例として3階のA
−1工区を表している。全体工程の入力は、各階の工区
毎に各作業の開始と終了を指定する処理を繰り返すこと
によって行われる。各作業の指定はマウス26を用い、工
程表の原図40上に作業の開始日を示す始点42と作業の終
了日を示す終点44とを描画し、作業名を選択することに
よって簡単に行うことができる(第4図参照)。これに
より、第4図に示す工程表46が作成される。また、工程
表の原図40上には多様なスクロール処理を容易に行うた
めの複数の選択肢48が表示されている。例えばオペレー
タがマウス26を操作して上段側の「1月」と表示された
選択肢48を選択するとデイスプレイ28の画面には1ヵ月
後の工程表の原図40が表示され、下段側の「1週」と表
示された選択肢48を選択するとデイスプレイ28の画面に
は1週間前の工程表の原図40が表示される。このよう
に、スクロール量の大きいスクロール処理を行う場合で
あっても簡単な操作で行うことができるため操作性が良
い。上記の処理を繰り返して工事期間の開始から終了ま
での全体工程を入力する。プレハブ工事工程管理装置10
はこのようにして入力された建方工程を含む各工程の作
業日程等に関するデータを工程フアイルとして定義した
外部記憶装置32内の記憶領域に記憶する。
In step 102, the original drawing 40 of the process chart as shown in FIG. 3 is displayed as an example, and the work schedule of each process including the construction process,
That is, the operator is instructed to input the entire process. In addition, the original drawing 40 of the process chart of FIG.
-1 construction section. The input of the whole process is performed by repeating the process of designating the start and end of each work for each work section on each floor. Designation of each work can be easily performed by using the mouse 26, drawing the start point 42 indicating the start date of the work and the end point 44 indicating the end date of the work on the original drawing 40 of the process chart, and selecting the work name. (See FIG. 4). Thus, a process chart 46 shown in FIG. 4 is created. A plurality of options 48 for easily performing various scroll processes are displayed on the original drawing 40 of the process chart. For example, when the operator operates the mouse 26 and selects the option 48 indicating “January” in the upper row, the original drawing 40 of the process chart one month later is displayed on the screen of the display 28, and the “1 week” in the lower row is displayed. Is displayed on the screen of the display 28, the original drawing 40 of the process chart one week ago is displayed. As described above, even when the scroll processing with a large scroll amount is performed, the scroll processing can be performed by a simple operation, so that the operability is good. The above process is repeated to input the entire process from the start to the end of the construction period. Prefabricated construction process control device 10
Stores the data relating to the work schedule and the like of each process including the construction process input in this manner in a storage area in the external storage device 32 defined as a process file.

ステツプ104では工程フアイルを参照し、ステツプ102
で入力された全体工程中からPC部材の建方工程の作業を
抽出する。例えば第4図では矢印A、矢印Bで示す「柱
梁建方」作業が抽出される。ステツプ106では建方工程
の作業日程を示すデータ及び外部記憶装置32に記憶され
た建方工程の作業と該作業で使用するPC部材との対応を
示すデータに基づいて、抽出した建方工程の作業で使用
するPC部材の建方予定日を判断し、オペレータが操作す
ることなく自動的に設定する。例えば、第4図に矢印A
で示す建方工程の作業で作用する全てのPC部材には建方
予定日に1989年3月10日を設定し、矢印Bで示す建方工
程の作業で使用する全てのPC部材には建方予定日に1989
年月15日を設定する。なお、設定した建方予定日データ
は建方工程に従属するデータとして工程フアイルに登録
される。
In step 104, the process file is referred to, and
The work of the PC member construction process is extracted from the whole process input in. For example, in FIG. 4, the “column construction” work indicated by arrows A and B is extracted. In step 106, the extraction of the construction process based on the data indicating the work schedule of the construction process and the data indicating the correspondence between the operation of the construction process stored in the external storage device 32 and the PC member used in the operation is performed. Judgment date of PC building to be used in the work is determined and automatically set without operator operation. For example, in FIG.
The scheduled construction date is set to March 10, 1989 for all PC members that operate in the construction process indicated by, and all PC members used in the construction process indicated by arrow B are to be constructed. 1989
Set the date 15 Note that the set planned erection date data is registered in the process file as data dependent on the erection process.

ステツプ108ではPC部材の特性を表すデータ、すなわ
ちPC部材毎の部材情報データを入力するよう指示する。
オペレータは部材情報データを入力するPC部材が配置さ
れる階、柱または梁等の部位を指定する。これにより、
デイスプレイ28の画面には第5図に示すような配置図50
が表示される。なお第5図に示す配置図50は、例として
階が2階で部位が梁の場合の配置図である。また、同様
に建物の立面図あういは断面図を表示することもでき
る。
In step 108, an instruction is given to input data representing the characteristics of the PC members, that is, member information data for each PC member.
The operator specifies a site such as a floor, a column or a beam where the PC member for inputting the member information data is arranged. This allows
The screen of display 28 has a layout diagram 50 as shown in FIG.
Is displayed. The layout diagram 50 shown in FIG. 5 is a layout diagram in the case where the floor is the second floor and the part is a beam as an example. Similarly, an elevational view or a sectional view of a building can be displayed.

オペレータはマウス26の操作によって移動するマーク
52の先端部を配置図50に表示された部材情報データの入
力を行う部材と一致させてクリツクする。これによって
画面上に部材情報データの入力用のウインドウ54が表示
され、オペレータはパネル面積、必要コンクリート量等
の部材情報データを入力する。上記マウス26の操作と部
材情報データの入力とを繰り返して各PC部材の部材情報
データを入力する。外部記憶装置32の記憶領域の一部は
部材フアイルとして使用される。部材フアイルは、PC部
材の呼称を表す呼称データを記憶するエリア、PC部材の
建方予定日データを記憶するエリアPC部材の製作予定日
を記憶するエリア、PC部材の部材情報データを記憶する
エリア等を一単位とする複数の記憶領域として定義され
ている。入力された部材情報データは前記呼称データと
対応されて部材フアイル内に記憶される。
The mark that the operator moves by operating the mouse 26
The tip of 52 is clicked so as to coincide with the member for inputting the member information data displayed in the layout diagram 50. As a result, a window 54 for inputting member information data is displayed on the screen, and the operator inputs member information data such as a panel area and a required amount of concrete. The operation of the mouse 26 and the input of the member information data are repeated to input the member information data of each PC member. Part of the storage area of the external storage device 32 is used as a member file. The member file is an area for storing name data representing the name of the PC member, an area for storing the planned date of building the PC member, an area for storing the planned production date of the PC member, and an area for storing member information data of the PC member. Etc. are defined as a plurality of storage areas having one unit. The input member information data is stored in the member file in correspondence with the name data.

ステツプ110ではステツプ106で設定された建方予定日
データを個々のPC部材毎に変更するか否かを判定する。
特に変更が必要でない場合、オペレータは建方予定日の
入力を省略する意味のデータを入力する。これによって
ステツプ110の判定が否定されステツプ114へ移行する。
このように建方予定日データの入力を省略することがで
きるので、建方工程を入力するためのオペレータの作業
量を低減することができる。
In step 110, it is determined whether or not the planned erection date data set in step 106 is changed for each PC member.
If no change is necessary, the operator inputs data meaning that input of the planned erection date is omitted. As a result, the determination at step 110 is denied, and the routine proceeds to step 114.
In this manner, the input of the planned erection date data can be omitted, so that the amount of work of the operator for inputting the erection process can be reduced.

また、個々のPC部材毎に建方予定日を細かく変更する
場合には、オペレータは建方予定日の入力を意味するデ
ータを入力し、ステツプ110の判定が肯定される。これ
によりステツプ112へ移行し、建方予定日データの入力
を行う。すなわち、オペレータは建方予定日データを入
力するPC部材が配置される階、部位を指定する。これに
より、デイスプレイ28の画面には配置図50が表示され
る。次にオペレータは、前記と同様にマウス26の操作に
よって移動するマーク52の先端部を配置図50に表示され
た建方予定日データの入力を行う部材と一致させてクリ
ツクする。これによって、第6図に示すように、画面上
に建方予定日の入力用のウインドウ56が表示され、オペ
レータは建方予定日データを入力する。これにより、ス
テツプ106で自動設定し工程フアイルに登録した建方予
定日データを今回入力された建方予定日データに変更す
る。
Further, when the planned erection date is to be finely changed for each PC member, the operator inputs data indicating the input of the erected premises date, and the determination in step 110 is affirmed. As a result, the flow shifts to step 112 to input the planned erection date data. That is, the operator designates the floor and site where the PC member for inputting the planned erection date data is to be arranged. As a result, the layout diagram 50 is displayed on the screen of the display 28. Next, the operator clicks the tip of the mark 52 moved by the operation of the mouse 26 in the same manner as described above so that the tip of the mark 52 matches the member for inputting the estimated date of construction displayed in the layout drawing 50. As a result, as shown in FIG. 6, a window 56 for inputting the expected erection date is displayed on the screen, and the operator inputs the expected erection date data. As a result, the planned erection date data automatically set in step 106 and registered in the process file is changed to the erected cubic date data input this time.

次のステツプ113では、工程フアイルを参照して第10
図に示すような配置図及ひ第11図に示すような部材毎の
建方予定実績等を示す表を建方工程の指示書として編集
し、印刷する。以上で建方工程の工程の計画は終了する
ので、一旦処理を終了してもよい。以下のステツプでは
製作工程を工程の計画を行う。
In the next step 113, referring to the process file, the tenth
A layout table as shown in the figure and a table showing the planned construction results for each member as shown in FIG. 11 are edited and printed as instructions for the construction process. As described above, the planning of the construction process is completed, so the process may be temporarily terminated. In the following steps, the manufacturing process is planned.

ステツプ114では工程フアイルに登録された建方予定
日データを部材フアイルへ転送する。これにより、前記
部材フアイル内の建方予定日データを記憶するエリアに
は、建方予定日データが呼称データを対応されて記憶さ
れる。例えばPC部材の建方を行う側の事務所と、PC部材
の製作を行う側の事務所と、が離れている場合、プレハ
ブ工事工程管理装置10の運用方法として各々の事務所内
にプレハブ工事工程管理装置10を設置し、建方側のプレ
ハブ工事工程管理装置10では工程フアイルを記憶させて
全体工程の管理等を行い、製作側のプレハブ工事工程管
理装置10では部材フアイルを記憶させて製作作業の管理
を行うことが考えられる。このような場合には、2台の
プレハブ工事工程管理装置10間をオンラインで接続する
ことにより工程フアイルから部材フアイルへ建方予定日
データが転送されるので、製作側は最新の建方予定日デ
ータを参照してPC部材の製作予定日の設定を行うことが
できる。
At step 114, the planned construction date data registered in the process file is transferred to the member file. Thus, in the area for storing the planned erection date data in the member file, the planned erection date data is stored in association with the name data. For example, when the office that builds the PC member and the office that manufactures the PC member are separated from each other, the prefab construction The management device 10 is installed, and the prefabricated construction process management device 10 on the erection side stores the process file and manages the entire process, etc., and the prefabricated construction process management device 10 on the production side stores the member file and performs the production work. It is conceivable to manage In such a case, the planned construction date data is transferred from the process file to the member file by connecting the two prefabricated construction process management devices 10 online, so that the production side can provide the latest planned construction date. It is possible to set the production date of the PC member by referring to the data.

次のステツプ116ではPC部材の製作予定日の入力処理
を行う。この入力処理について第15図のフローチヤート
を参照して詳細に説明すると、ステツプ130ではPC部材
を製作するためにサイト工場内に設置される型枠ベツド
割付け表58(第7図参照)を表示する。型枠ベツド割付
け表58の左端の1、2・・、14の符号は各型枠ベツドの
番号を示している。本実施例ではPC部材を製作する型枠
ベツドとして14台の型枠ベツドが用意されている。型枠
ベツド割付け表58の上端の日付はPC部材の製作予定日を
示している。また、型枠ベツド割付け表58の入力部分60
には各型枠ベツドで製作されるPC部材の呼称が入力さ
れ、例えば6番の型枠ベツドでは3月29日に呼称「03G4
G1A2」のPC部材が製作予定であることを示している。
In the next step 116, a process of inputting the planned production date of the PC member is performed. This input processing will be described in detail with reference to the flowchart of FIG. 15. In step 130, a form bed allocation table 58 (see FIG. 7) installed in the site factory for manufacturing PC members is displayed. I do. Reference numerals 1, 2,..., 14 at the left end of the formwork assignment table 58 indicate the numbers of the formwork pads. In the present embodiment, 14 mold beads are prepared as mold beads for manufacturing PC members. The date at the upper end of the formwork bead assignment table 58 indicates the date when the PC member is to be manufactured. Also, input part 60 of formwork bead assignment table 58
Is entered with the name of the PC member manufactured by each formwork head. For example, in the case of the 6th formwork head, the name "03G4
G1A2 ”is planned to be manufactured.

ステツプ132ではPC製作予定日及び型枠ベツドの番号
が指定されたか否か判定する。この指定は入力部分60の
いずれかの欄にカーソルが位置した状態で入力を示すデ
ータが入力されることによって行われる。PC製作予定日
及び型枠ベツドの番号が指定されるとステツプ134へ移
行し、部材フアイルを前記一単位毎に参照し、製作予定
日が未設定でかつ建方予定日が前記指定された製作予定
日よりも後である領域を検索、判断し、該領域のPC部材
の型枠ベツド割付け候補部材として抽出する。
At step 132, it is determined whether or not the scheduled PC production date and the number of the mold bead have been designated. This designation is performed by inputting data indicating an input in a state where the cursor is positioned in any of the fields of the input portion 60. When the PC production schedule date and the mold frame number are designated, the process proceeds to step 134, and the member files are referred to for each unit, and the production schedule date is not set and the planned construction date is the designated production date. An area that is later than the scheduled date is searched and determined, and is extracted as a candidate for formwork bead assignment of the PC member in the area.

ステツプ136では第8図に示すように、抽出された型
枠ベツド割付け候補部材の呼称を候補部材表示用のウイ
ンドウ62内に建方予定日毎に表示する。第8図では例と
して製作予定日を設定するPC部材の候補として、製作予
定日が未設定でかつ建方予定日が3月30日であるPC部材
をウインドウ62内に表示している。オペレータはこの表
示を参照し表示されたPC部材の中から割付けるPC部材を
選択すればよいので、PC部材の製作予定日の設定、すな
わち型枠ベツドへの割付けを容易に行うことができる。
また、単一のPC部材に対し複数の製作予定日を設定する
等の誤りが発生することもない。このとき、第12図下方
に示すようにストツクヤードにおけるPC部材のストツク
量が自動計算されて計算結果が表示されるので、前記ス
トツクヤードの許容ストツク量の範囲内であるか否かを
チエツクすることができる。
At step 136, as shown in FIG. 8, the names of the extracted formwork assignment candidate members are displayed in the candidate member display window 62 for each planned construction date. In FIG. 8, as an example, a PC member whose production date is not set and whose erection date is March 30 is displayed in the window 62 as a PC member candidate for which the production date is set. Since the operator only has to refer to this display and select the PC member to be assigned from the displayed PC members, it is possible to easily set the planned production date of the PC member, that is, to assign the PC member to the formwork bead.
Further, there is no error such as setting a plurality of scheduled production dates for a single PC member. At this time, as shown in the lower part of FIG. 12, the stock amount of the PC member in the stockyard is automatically calculated and the calculation result is displayed. Therefore, it is possible to check whether or not the stock amount is within the allowable stock amount of the stockyard. it can.

ステツプ138では割付けるPC部材が選択されたか否か
判定する。PC部材が選択されるまではステツプ138を繰
り返す。PC部材が選択されるとステツプ140では、部材
フアイル内の選択されたPC部材の製作予定日を登録す
る。
In step 138, it is determined whether the PC member to be allocated has been selected. Step 138 is repeated until the PC member is selected. When the PC member is selected, in step 140, the planned production date of the selected PC member in the member file is registered.

ステツプ142では製作日の入力処理が終了したか否か
判定する。処理が終了していない場合はステツプ132へ
戻る。上記処理を繰り返すことによって各PC部材の製作
予定日が設定される。製作予定日の設定処理が終了した
場合はステツプ142の判定が肯定され、第14図のフロー
チヤートのステツプ118へ移行する。
In step 142, it is determined whether the input processing of the production date has been completed. If the processing is not completed, the process returns to step 132. By repeating the above process, the scheduled production date of each PC member is set. When the process of setting the scheduled production date is completed, the determination in step 142 is affirmed, and the flow shifts to step 118 in the flowchart of FIG.

上記の処理によってデータの入力処理は完了し、ステ
ツプ118では工程表等の図表を表示する処理を行う。こ
の表示処理について、第16図のフローチヤートを参照し
て説明する。
With the above processing, the data input processing is completed, and in step 118, processing for displaying a chart such as a process chart is performed. This display process will be described with reference to the flowchart of FIG.

すなわち、ステツプ150では表示する図表を指定する
よう指示し、指示された図表が配置図50か否か判定す
る。ステツプ150の判定が否定された場合にはステツプ1
52で指示された図表、例えば工程表46、型枠ベツド割付
け表58等を表示する。配置図50の表示を指示された場合
は、ステツプ154で表示を行う階及び工区の指定を行う
ようオペレータに指示し、オペレータから指定が有った
か否か判定する。階及び工区が指定されるとステツプ15
4の判定が肯定され、ステツプ156で指定された階及び工
区に対応する配置図50を画面上に表示する。
That is, in step 150, an instruction is given to designate a chart to be displayed, and it is determined whether or not the designated chart is the layout map 50. If the determination in step 150 is denied, step 1
A chart designated by 52, for example, a process chart 46, a formwork assignment table 58, and the like are displayed. When the display of the layout drawing 50 is instructed, the operator is instructed to specify the floor and the construction section to be displayed in step 154, and it is determined whether or not the operator has specified. Step 15 when floor and construction section are specified
The determination of 4 is affirmative, and the layout map 50 corresponding to the floor and the work section designated in step 156 is displayed on the screen.

ステツプ158では部材情報データを表示する指示がさ
れたか否か判定する。オペレータは特定のPC部材の部材
情報データを参照する場合、マウス26の操作によって移
動するマーク52の先端部を配置図50に表示された部材情
報データを参照する部材と一致させてクリツクし、特定
のPC部材を指定する。これによりステツプ158の判定が
肯定され、次のステツプ160では指定されたPC部材を判
断し、部材フアイルの中から指定された部材の部材情報
データを検索する。ステツプ162では第9図に示すよう
に、検索した部材情報データを部材情報表示用のウイン
ドウ64内に表示する。これにより、配置図50とPC部材の
部材情報データが同じ画面に表示される。従って、表示
を切り替える等の操作が不要になるので操作性が良い。
ステツプ162実行後はステツプ614へ移行する。なお、ス
テツプ158の判定が否定された場合にはステツプ160及び
162を実行することなくステツプ164へ移行する。
At step 158, it is determined whether or not an instruction to display the member information data has been given. When referring to the member information data of the specific PC member, the operator clicks the tip of the mark 52 that is moved by operating the mouse 26 so as to match the member referring to the member information data displayed in the layout diagram 50, and specifies Specify the PC member of. As a result, the determination in step 158 is affirmed, and in the next step 160, the designated PC member is determined, and the member information data of the designated member is searched from the member file. At step 162, the retrieved member information data is displayed in the member information display window 64, as shown in FIG. Thereby, the layout drawing 50 and the member information data of the PC members are displayed on the same screen. Therefore, the operation such as switching the display becomes unnecessary, so that the operability is good.
After execution of step 162, the process proceeds to step 614. If the determination at step 158 is negative, steps 160 and
The process proceeds to step 164 without executing 162.

ステツプ164では配置図50の表示を終了するか否か判
定する。配置図の表示を継続する場合にはステツプ158
へ戻り、ステツプ158乃至ステツプ164繰り返す。オペレ
ータは必要に応じて任意のPC部材の部材情報データを表
示させ、例えばPC部材をクレーンで吊り上げて配置する
場合に重量を判断して吊り上げ可能か否かを判定する等
の作業を容易に行うことができる。
In step 164, it is determined whether the display of the layout drawing 50 is to be ended. Step 158 to continue displaying the layout drawing
Returning to step 158, steps 158 to 164 are repeated. The operator displays the member information data of an arbitrary PC member as necessary, and easily performs operations such as judging the weight and determining whether or not the PC member can be lifted when the PC member is lifted and arranged by a crane. be able to.

ステツプ164で配置図の表示を終了すると判定した場
合にはステツプ166で表示処理を終了するか否かを判定
する。表示処理を継続すると判定した場合はステツプ15
0へ戻り、他の階及び工区の配置図50または工程表46、
型枠ベツド割付け表58等の図表を表示する。表示処理を
終了すると判定した場合には第14図のフローチヤートの
ステツプ120へ戻る。
If it is determined in step 164 that the display of the layout drawing is to be ended, it is determined in step 166 whether the display processing is to be ended. If it is determined that display processing should be continued,
Return to 0, layout plan 50 of other floor and construction section or process chart 46,
A chart such as a formwork assignment table 58 is displayed. If it is determined that the display processing is to be ended, the process returns to the flowchart of FIG.

ステツプ120では入力されたデータの修正が有るか否
か判定する。例えば、天候の影響を受けて各作業全体が
遅延した場合、全体工程を修正する必要がある。このよ
うな場合にはステツプ120の判定が肯定され、ステツプ1
02へ戻ってデータの修正を行う。この場合でもステツプ
114で工程の変更に伴って修正された建方予定日データ
が工程フアイルから部材フアイルへ転送され、ステツプ
116の製作予定日入力処理において画面上に表示される
ので、型枠ベツドの割付け等の製作側の作業の設定を正
確に行うことができる。
At step 120, it is determined whether or not the input data has been corrected. For example, if the entire operation is delayed due to the weather, it is necessary to correct the entire process. In such a case, the determination in step 120 is affirmative, and step 1 is performed.
Return to 02 and correct the data. Even in this case, step
The estimated cubic date data modified in accordance with the process change in 114 is transferred from the process file to the member file, and the
Since it is displayed on the screen in the production schedule date input processing of 116, it is possible to accurately set the work on the production side such as the layout of the formwork bead.

ステツプ120でデータの修正無しと判定されると、ス
テツプ122では部材フアイルを参照して製作作業の指示
書を編集し、第12図に示すように前記型枠ベツド割付け
表58に類似した製作指示書A及び第13図に示すように製
作するPC部材の部材情報データも表示した製作指示書B
を印刷する。なお、製作指示書A及びBには1日毎に必
要なコンクリート量が表示され、製作指示書AにはPC部
材のストツク量も表示される。
If it is determined in step 120 that the data is not corrected, in step 122 the production work instruction is edited with reference to the member file, and as shown in FIG. 12, a production instruction similar to the formwork bead assignment table 58 is displayed. 13 and a production instruction B which also displays the member information data of the PC member to be produced as shown in FIG.
Print. The production instructions A and B indicate the amount of concrete required every day, and the production instruction A also indicates the stock amount of the PC member.

また、作業の進行に伴ってPC部材の製作実績、建方実
績等のデータが入力され、プレハブ工事工程管理装置10
はこれらのデータに基づいて工事全体の進捗を示す帳票
等を出力することもできる。この帳票等を参照すること
によって作業全体の工程管理を行うこともできる。
In addition, as the work progresses, data such as the production results of the PC members and the construction results are input, and the prefabricated construction process management device 10
Can output a form or the like indicating the progress of the entire construction based on these data. The process management of the entire operation can be performed by referring to the form and the like.

このように、本実施例では建方工程の作業と該作業に
使用するプレハブ部材とを対応させて外部記憶装置32に
記憶し、建方工程の作業日程と前記記憶内容とに基づい
てPC部材の建方予定日を判断し、自動設定するようにし
たので、建方工程の入力作業を容易に行うことができ
る。また、工程フアイルに登録された建方予定日データ
を部材フアイルへ転送するようにしたので、製作側は部
材フアイルに転送された最新の建方予定日データを参照
してPC部材の製作予定日の設定を行うことができる。
As described above, in the present embodiment, the work of the construction process and the prefabricated member used for the work are stored in the external storage device 32 in association with each other, and the PC member is stored based on the work schedule of the construction process and the stored contents. Since the planned construction date is determined and automatically set, the input work of the construction process can be easily performed. In addition, since the planned construction date data registered in the process file is transferred to the member file, the manufacturing side refers to the latest planned construction date data transferred to the member file, and the production date of the PC member. Can be set.

また、本実施例ではPC部材の配置図50を表示した状態
で、指定されたPC部材の部材情報データをウインドウ64
内に同時に表示するようにしたので、表示を切り替える
等の操作が不要となり操作性が良い。また、PC部材の配
置図50を表示した状態でいずれかのPC部材を指定して処
理を行う場合、マウス26の操作によって移動するマーク
52の先端部を配置図50に表示された任意のPC部材と一致
させてクリツクすればよいので、指定するPC部材を視覚
的に容易に認識できる。
Further, in the present embodiment, the member information data of the designated PC member is displayed in the window 64 with the arrangement drawing 50 of the PC member displayed.
Are displayed at the same time, there is no need to perform operations such as switching the display, and the operability is good. In addition, when any of the PC members is designated and the processing is performed in a state where the arrangement drawing 50 of the PC members is displayed, the mark which is moved by operating the mouse 26 is displayed.
The user may click on the tip of 52 so that it matches the arbitrary PC member displayed in the layout diagram 50, so that the designated PC member can be easily recognized visually.

さらに、本実施例ではPC部材の型枠ベツドへの割付け
時に製作予定日が未設定でかつ建方予定日が前記指定さ
れた製作予定日よりも後であるPC部材を型枠ベツド割付
け候補部材として部材フアイルの中から検索し、ウイン
ドウ62内に表示するようにしたので、PC部材の型枠ベツ
ドへの割付けを容易に行うことができる。
Furthermore, in the present embodiment, when the PC member is assigned to the formwork bead, the PC member whose scheduled production date is not set and the planned erection date is later than the designated planned production date is a formwork bead assignment candidate member. Is searched from the member file and displayed in the window 62, so that the PC members can be easily assigned to the formwork bead.

なお、本実施例では製作作業でPC部材を製作し、建方
作業でこのPC部材を組付けるプレハブ工事を例に説明し
たが、プレハブ部材としてPC部材以外の部材を採用した
プレハブ工事に適用することも可能である。
In the present embodiment, a PC member is manufactured in a manufacturing operation, and a prefabrication work in which the PC member is assembled in an erecting work is described as an example. However, the present invention is applied to a prefabrication work in which a member other than the PC member is adopted as the prefabricated member. It is also possible.

また、第3図乃至第9図では実際に画面上に表示され
るイメージで示したが、本発明はこれらのイメージ等に
限定されるものではなく、他のレイアウトや表示方法等
を採用することもできる。
Although FIGS. 3 to 9 show images actually displayed on the screen, the present invention is not limited to these images and the like, and other layouts and display methods may be adopted. Can also.

さらに本実施例では配置図を表示した画面と同じ画面
に表示する部材情報データとして、第9図に示すように
工区、呼称、位置、割付ける型枠ベツドの候補、コンク
リート量を表示した例を示したが、例えば、部材長、パ
ネル面積、建方予定日、製作予定日等も表示するように
してもよい。
Further, in the present embodiment, as the member information data to be displayed on the same screen as the screen on which the layout drawing is displayed, as shown in FIG. 9, an example in which a construction section, a name, a position, a candidate for a formwork bed to be allocated, and an amount of concrete are displayed. Although shown, for example, a member length, a panel area, a planned construction date, a planned production date, and the like may be displayed.

〔発明の効果〕〔The invention's effect〕

以上説明したよう本発明では、建方工程の作業と該作
業に使用するプレハブ部材とを対応させて記憶し、建方
工程の作業日程と前記記憶内容とに基づいてプレハブ部
材の建方予定日を判断するようにしたので、建方工程を
入力する作業を容易に行うことができる、という優れた
効果が得られる。
As described above, in the present invention, the work of the erecting step and the prefabricated member used for the work are stored in association with each other, and the scheduled date of the prefabricated member is estimated based on the work schedule of the erecting step and the stored contents. Therefore, an excellent effect that the operation of inputting the construction process can be easily performed is obtained.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本実施例に係るプレハブ工事工程管理装置の概
略構成図、第2図は部材の配置を示す概念図、第3図及
び第4図は画面に表示される工程表を示す概念図、第5
図及び第6図は画面に表示される配置図を示す概念図、
第7図及び第8図は画面に表示される型枠ベツド割付け
表を示す概念図、第9図は画面に表示される配置図を示
す概念図、第10図及び第11図は印刷される建方指示書の
例を示す概念図、第12図及び第13図は印刷される製作指
示書の例を示す概念図、第14図乃至第16図は本実施例の
作用を説明するフローチヤートである。 10……プレハブ工事工程管理装置、 12……パーソナルコンピユータ、 24……キーボード、 26……マウス、 28……デイスプレイ、 30……プリンタ。
FIG. 1 is a schematic configuration diagram of a prefabricated construction process management device according to the present embodiment, FIG. 2 is a conceptual diagram showing the arrangement of members, and FIGS. 3 and 4 are conceptual diagrams showing a process chart displayed on a screen. , Fifth
FIG. 6 and FIG. 6 are conceptual diagrams showing layouts displayed on the screen,
Fig. 7 and Fig. 8 are conceptual diagrams showing the form bedding layout table displayed on the screen, Fig. 9 is a conceptual diagram showing the layout diagram displayed on the screen, Figs. 10 and 11 are printed. FIG. 12 and FIG. 13 are conceptual diagrams showing examples of a production instruction to be printed, and FIGS. 14 to 16 are flow charts for explaining the operation of this embodiment. It is. 10: Prefabricated construction process control device, 12: Personal computer, 24: Keyboard, 26: Mouse, 28: Display, 30: Printer.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 長谷部 斎 東京都江東区南砂2丁目5番14号 株式 会社竹中工務店技術研究所内 (56)参考文献 特開 平2−311664(JP,A) 特開 平1−175072(JP,A) (58)調査した分野(Int.Cl.6,DB名) E04G 21/14 E04G 21/00──────────────────────────────────────────────────続 き Continuation of the front page (72) Inventor Sai Hasebe 2-5-14 Minamisuna, Koto-ku, Tokyo Inside Takenaka Corporation Technical Research Institute (56) References JP-A-2-311664 (JP, A) Kaihei 1-175072 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) E04G 21/14 E04G 21/00

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】建方工程を含む各工程の作業日程及びプレ
ハブ部材の製作予定日のデータを入力するための入力手
段と、建方工程の作業と該作業に使用するプレハブ部材
とを対応させて記憶した記憶手段と、建方工程を含む各
工程の作業と作業日程とを対応させた工程表を作成する
工程表作成手段と、プレハブ部材とプレハブ部材の建方
予定日とを対応させた製作表を表示する表示手段と、を
備え、前記製作表を参照しながら前記入力手段によって
プレハブ部材の製作予定日データを入力して前記製作表
を完成させるプレハブ工事工程管理装置において、建方
工程の作業日程と記憶手段の記憶内容とに基づいて前記
プレハブ部材の建方予定日を判断する判断手段を設けた
ことを特徴とするプレハブ工事工程管理装置。
1. An input means for inputting data of a work schedule of each process including a construction process and a production date of a prefabricated member, and a process of the construction process and a prefabricated member used for the work are associated with each other. Storage means for storing and storing, a process chart creating means for creating a process chart for associating the work of each process including the construction process and the work schedule, and a prefabricated member and a planned construction date of the prefabricated member. Display means for displaying a production table; and a prefabrication work process management device for completing the production table by inputting production date data of the prefabricated member by the input means while referring to the production table. A prefabricated construction process management device, further comprising: a judging means for judging a planned construction date of the prefabricated member based on the work schedule and the contents stored in the storage means.
JP21472690A 1990-08-14 1990-08-14 Prefabricated construction process control device Expired - Fee Related JP2791197B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21472690A JP2791197B2 (en) 1990-08-14 1990-08-14 Prefabricated construction process control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21472690A JP2791197B2 (en) 1990-08-14 1990-08-14 Prefabricated construction process control device

Publications (2)

Publication Number Publication Date
JPH0497072A JPH0497072A (en) 1992-03-30
JP2791197B2 true JP2791197B2 (en) 1998-08-27

Family

ID=16660603

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21472690A Expired - Fee Related JP2791197B2 (en) 1990-08-14 1990-08-14 Prefabricated construction process control device

Country Status (1)

Country Link
JP (1) JP2791197B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0642182A (en) * 1992-06-10 1994-02-15 Misawa Homes Co Ltd Method of execution for prefabricated building
GB9314098D0 (en) * 1993-07-08 1993-08-18 Unilever Plc Apparatus and methods for producing packets
JP4520070B2 (en) * 2001-04-27 2010-08-04 イビケン株式会社 Standard type building materials transportation management system
JP7184235B1 (en) * 2021-07-14 2022-12-06 住友大阪セメント株式会社 Ready-mixed concrete shipment adjustment system and ready-mixed concrete shipment adjustment method

Also Published As

Publication number Publication date
JPH0497072A (en) 1992-03-30

Similar Documents

Publication Publication Date Title
JPH09268760A (en) Schedule control support system
JP3337207B2 (en) Construction system support system
JP2791197B2 (en) Prefabricated construction process control device
JP3772814B2 (en) Structural design support system
JP2791198B2 (en) Prefabricated construction process control device
JP2791199B2 (en) Prefabricated construction process control device
JPH0953324A (en) Device for supporting construction work
JP3067099B2 (en) Bar arrangement design support apparatus and method
JP2791201B2 (en) Construction work schedule management system
JP2791202B2 (en) Construction work schedule management system
KR100469832B1 (en) automation method of making process schedule using space hierarchy and work hierarchy information
JP2791200B2 (en) Construction work schedule management system
JP2000231582A (en) Drawing producing device for temporary work material layout and its recording medium
JP2000170379A (en) Construction schedule control instrument and recording medium
JP3001297B2 (en) Drawing equipment for PC parts
JPH06332909A (en) Plan managing system
JPH10205130A (en) Finishing work schedule control device and its using method
JP3001295B2 (en) Drawing equipment for PC parts
JP2994827B2 (en) Construction plan creation device
JP2000242677A (en) Work execution scheme supporting system
JP3746095B2 (en) Input method and system for inner balconi of CAD for unit type building design
JP3375043B2 (en) Input display method of beam on computer screen
JPH11315637A (en) Construction method selection support device and recording medium
JP3001296B2 (en) Drawing equipment for PC parts
JP4262861B2 (en) Equipment / equipment management device, equipment / equipment management method, and recording medium recording equipment / equipment management program

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees