JP2014203130A - Safe treatment work management system - Google Patents

Safe treatment work management system Download PDF

Info

Publication number
JP2014203130A
JP2014203130A JP2013076348A JP2013076348A JP2014203130A JP 2014203130 A JP2014203130 A JP 2014203130A JP 2013076348 A JP2013076348 A JP 2013076348A JP 2013076348 A JP2013076348 A JP 2013076348A JP 2014203130 A JP2014203130 A JP 2014203130A
Authority
JP
Japan
Prior art keywords
safety treatment
safety
work
management
portable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013076348A
Other languages
Japanese (ja)
Inventor
浩平 岡田
Kohei Okada
浩平 岡田
渡辺 英二
Eiji Watanabe
英二 渡辺
克基 長瀬
Katsumoto Nagase
克基 長瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2013076348A priority Critical patent/JP2014203130A/en
Publication of JP2014203130A publication Critical patent/JP2014203130A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

PROBLEM TO BE SOLVED: To confirm an operation state after safe treatment work and to determine a work stop instruction against an inverse safe treatment instruction without changing current facilities.SOLUTION: An identification display body 4 is given a number 4-1 assigned while linked to a number 4-3 of a safe treatment object 4-2, and fitted to the safe treatment object 4-2 when safe treatment work is carried out. Before the safe treatment work, a portable PC 2 collates a number 4-3 obtained from an image by photographing the safe treatment object 4-2 by a camera 2-2 with a number 3-1-1 in safe treatment work management information 3-1. After the safe treatment work, the portable PC 2 collates numbers 4-3, 4-1 obtained from an image by photographing the safe treatment object 4-2 and identification display body 4 by the camera 2-2 with the number 3-1-1 and a number 3-1-3 in the safe treatment work management information 3-1, and displays a message based upon a collation result.

Description

本発明の実施形態は、発電プラントの安全処置作業を管理する安全処置作業管理システムに関する。   Embodiments described herein relate generally to a safety treatment work management system that manages safety treatment work of a power plant.

発電プラントでは定期的に盤や機器の試験・点検を行う必要がある。その際に作業員やプラントの安全を確保するために行う安全処置として、機器の操作や、配線・ケーブルの解線や、強制接続、電源の隔離が行なわれる。しかし、プラントの大型化に伴い、定期点検において機器・配線・ケーブル等の安全処置対象の物量は増してしまう。   It is necessary to periodically test and inspect panels and equipment at power plants. At that time, as safety measures to be taken in order to ensure the safety of workers and plants, operation of equipment, wiring / cable disconnection, forced connection, and power supply isolation are performed. However, with the increase in the size of the plant, the quantity of items subject to safety measures such as equipment, wiring, and cables in regular inspections increases.

現状の発電プラントにおける安全処置の管理は、印字された紙のタグ札を取り付けることで実施している。例として、1箇所に複数枚の紙タグ札が取付けられていたり、多くの紙タグ札が近接して取付けられていたりする。このため、改造・試験・点検時に紙タグ札が邪魔をして作業の効率が低下したり、多数の紙タグ札が1箇所に取付けられている場合は、作業対象の間違いを起こす可能性がある。また、紙タグ札は取付け・取外しを人間作業で実施する必要があり、ヒューマンエラー発生の可能性がある。   Management of safety measures in current power plants is carried out by attaching printed paper tag tags. As an example, a plurality of paper tag tags are attached at one place, or many paper tag tags are attached in close proximity. For this reason, paper tag tags may interfere with work during remodeling, testing, and inspection, and work efficiency may be reduced, or if many paper tag tags are installed in one place, there is a possibility of causing an error in the work target. is there. In addition, the paper tag tag needs to be mounted / removed manually, which may cause human error.

これらの問題点を解決する手法の一つにRFIDタグを利用する方法がある。例えば、特許文献1に提示されている。   One method for solving these problems is to use an RFID tag. For example, it is presented in Patent Document 1.

特開2006−146749号公報JP 2006-146749 A

特許文献1に記載された技術では、機器の情報管理をPDA装置と機器に個別に設置されているRFIDと、操作時に一時的に設置されるRFIDタグ札により、誤操作を防止する効果がある。しかし、上記技術では、次のような問題点が挙げられる。   The technique described in Patent Document 1 has an effect of preventing erroneous operation by using the RFID that is individually installed in the PDA device and the device, and the RFID tag tag that is temporarily installed at the time of operation, for information management of the device. However, the above technique has the following problems.

まず、安全処置対象に対してRFIDが取付けられている必要があり、既存設備の場合には、RFIDが適用されていないと運用することができない。また、RFID自体の故障や、電波・電磁場の影響による保存データの異常の発生により、データが上手く読書きできない可能性がある。また、RFIDタグ札を安全処置対象へ重複して取付けるような場合、操作作業の支障になる可能性や、RFIDタグ札自体の紛失の可能性がある。   First, the RFID needs to be attached to the safety treatment target. In the case of an existing facility, the RFID cannot be operated unless the RFID is applied. In addition, there is a possibility that data cannot be read and written well due to a failure of the RFID itself or an abnormality of stored data due to the influence of radio waves or electromagnetic fields. In addition, when the RFID tag tag is attached to the safety treatment target, there is a possibility that the operation work may be hindered or the RFID tag tag itself may be lost.

さらに、機器に個別に設置されているRFIDと、操作時に一時的に設置するRFIDタグとにより、操作対象機器の間違いを防ぐことはできるが、ONの操作指示に対して、OFFの操作をしてしまうというような操作ミスを防ぐ対策が従来の紙タグ札での運用と同一であり、新規対策されていない。また、現状の機器の実状態の認識は人間系で実施するため、思い込みによる操作により操作指示と違った操作の実施や、現状の安全処置状態を無視した逆の安全処置を実施してしまう可能性がある。   Furthermore, the RFID that is individually installed in the device and the RFID tag that is temporarily installed at the time of operation can prevent mistakes in the operation target device. However, an OFF operation is performed in response to an ON operation instruction. Measures to prevent operational mistakes such as that are the same as the operation with conventional paper tag tags, and no new measures have been taken. In addition, since the actual state of the current device is recognized by the human system, it is possible to perform an operation that differs from the operation instruction due to a presumed operation, or to perform a reverse safety measure ignoring the current safety measure state. There is sex.

本発明の実施形態が解決しようとする課題は、現状設備を変えることなく、安全処置作業後の操作状態の確認、逆安全処置指示に対する作業中止指示を判断することにある。   The problem to be solved by the embodiment of the present invention is to confirm the operation state after the safety treatment work and determine the work stop instruction for the reverse safety treatment instruction without changing the current equipment.

実施形態の安全処置作業管理システムは、プラント機器の試験・点検時に作業員やプラントの安全を確保するために行う安全処置作業を管理するシステムにおいて、個体識別子が表記された安全処置対象と、前記安全処置対象の個体識別子に対応付けられた安全処置管理識別子が表記され、安全処置作業が実施されたときに前記安全処置対象に取り付けられる識別表示物と、前記安全処置対象の個体識別子と同一の個体識別子、前記識別表示物の安全処置管理識別子と同一の安全処置管理識別子、および、予定している安全処置作業の内容を識別する予定作業情報を含む安全処置作業管理情報を格納するデータベースを備える管理装置と、前記安全処置対象を撮影するカメラと、撮影した画像から文字および安全処置状態を認識する画像認識部と、照合部と、表示部とを備えるポータブルPCと、を具備し、安全処置作業の実施前において、前記照合部は、前記カメラで前記安全処置対象を撮影することにより画像から得られた個体識別子と、前記安全処置作業管理情報内の個体識別子とを照合し、安全処置作業の実施後において、前記照合部は、前記カメラで前記安全処置対象および前記識別表示物を撮影することにより画像からそれぞれ得られた個体識別子および安全処置管理識別子と、前記安全処置作業管理情報内の個体識別子および安全処置管理識別子とを照合し、前記カメラで前記安全処置対象を撮影することにより得られた画像から、前記安全処置対象の現在の状態と、前記安全処置作業管理情報内の予定作業情報が表す状態とを照合し、前記表示部は、前記照合部の照合結果に基づいてメッセージを表示することを特徴とする。   The safety treatment work management system of the embodiment is a system for managing safety treatment work performed to ensure the safety of workers and plants during testing and inspection of plant equipment. The safety treatment management identifier associated with the individual identifier of the safety treatment target is written, and the identification display attached to the safety treatment target when the safety treatment work is performed, and the same identifier as the individual identifier of the safety treatment target A database for storing safety action work management information including an individual identifier, a safety action management identifier identical to the safety action management identifier of the identification display object, and scheduled work information for identifying the content of the scheduled safety action work; Image recognition for recognizing characters and safety treatment status from the taken image, a management device, a camera for photographing the safety treatment target And a portable PC including a collation unit and a display unit, and before performing the safety treatment work, the collation unit is an individual obtained from the image by photographing the safety treatment target with the camera. The identifier and the individual identifier in the safety treatment work management information are collated, and after the safety treatment work is performed, the collation unit captures the safety treatment object and the identification display object from the image by photographing the safety treatment object and the identification display object. From the images obtained by collating the individual identifier and the safety treatment management identifier obtained respectively with the individual identifier and the safety treatment management identifier in the safety treatment work management information and photographing the safety treatment object with the camera The current state of the safety treatment target is collated with the state represented by the scheduled work information in the safety treatment work management information, and the display unit And displaying the message on the basis of the focus result.

実施形態の安全処置作業管理方法は、個体識別子が表記された安全処置対象と、前記安全処置対象の個体識別子に対応付けられた安全処置管理識別子が表記され、安全処置作業が実施されたときに前記安全処置対象に取り付けられる識別表示物と、前記安全処置対象の個体識別子と同一の個体識別子、前記識別表示物の安全処置管理識別子と同一の安全処置管理識別子、および、予定している安全処置作業の内容を識別する予定作業情報を含む安全処置作業管理情報を格納するデータベースを備える管理装置と、前記安全処置対象を撮影するカメラを備えるポータブルPCと、を具備し、プラント機器の試験・点検時に作業員やプラントの安全を確保するために行う安全処置作業を管理する方法であって、安全処置作業の実施前において、前記ポータブルPCは、前記カメラで前記安全処置対象を撮影することにより画像から得られた個体識別子と、前記安全処置作業管理情報内の個体識別子とを照合し、安全処置作業の実施後において、前記ポータブルPCは、前記カメラで前記安全処置対象および前記識別表示物を撮影することにより画像からそれぞれ得られた個体識別子および安全処置管理識別子と、前記安全処置作業管理情報内の個体識別子および安全処置管理識別子とを照合し、前記カメラで前記安全処置対象を撮影することにより得られた画像から、前記安全処置対象の現在の状態と、前記安全処置作業管理情報内の予定作業情報が表す状態とを照合し、前記ポータブルPCは、照合結果に基づいてメッセージを表示することを特徴とする。   In the safety treatment work management method of the embodiment, when a safety treatment object in which an individual identifier is written and a safety treatment management identifier associated with the individual identifier of the safety treatment object are written and the safety treatment work is performed An identification display attached to the safety treatment target, an individual identifier identical to the individual identifier of the safety treatment target, a safety treatment management identifier identical to the safety treatment management identifier of the identification display, and a planned safety treatment A management apparatus including a database for storing safety treatment work management information including scheduled work information for identifying work contents, and a portable PC including a camera for photographing the safety treatment target, and testing / inspecting plant equipment A method for managing safety action work that is sometimes performed to ensure the safety of workers and plants. The portable PC collates the individual identifier obtained from the image obtained by photographing the safety treatment target with the camera and the individual identifier in the safety treatment work management information, and after performing the safety treatment work, the portable PC The PC includes an individual identifier and a safety treatment management identifier respectively obtained from images obtained by photographing the safety treatment object and the identification display object with the camera, and an individual identifier and a safety treatment management identifier in the safety treatment work management information. And the current state of the safety treatment object is compared with the state represented by the scheduled work information in the safety treatment work management information from the image obtained by photographing the safety treatment object with the camera. The portable PC displays a message based on the collation result.

本発明の実施形態によれば、現状設備を変えることなく、安全処置作業後の操作状態の確認、逆安全処置指示に対する作業中止指示を判断することができる。   According to the embodiment of the present invention, it is possible to check the operation state after the safety treatment work and determine the work stop instruction for the reverse safety treatment instruction without changing the current equipment.

第1実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 1st Embodiment. 第2実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 2nd Embodiment. 第3実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 3rd Embodiment. 第4実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 4th Embodiment. 第5実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 5th Embodiment. 第6実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 6th Embodiment. 第7実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 7th Embodiment. 第8実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 8th Embodiment. 第9実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 9th Embodiment. 第10実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 10th Embodiment. 第11実施形態に係る安全処置作業管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of the safety treatment work management system which concerns on 11th Embodiment. 第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。It is a flowchart which shows the implementation operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 1st Embodiment. 第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作の中の安全処置作業実施処理(STEP:1−1−20)を示すフローチャートである。It is a flowchart which shows the safety treatment work implementation process (STEP: 1-1-20) in the implementation operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 1st Embodiment. 第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。It is a flowchart which shows cancellation | release operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 1st Embodiment. 第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作の中の安全処置作業解除処理(STEP:1−2−16)を示すフローチャートである。It is a flowchart which shows the safety treatment work cancellation | release process (STEP: 1-2-16) in the cancellation | release operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 1st Embodiment. 第6実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。It is a flowchart which shows the implementation operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 6th Embodiment. 第6実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。It is a flowchart which shows cancellation | release operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 6th Embodiment. 第7実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。It is a flowchart which shows the implementation operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 7th Embodiment. 第7実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。It is a flowchart which shows cancellation | release operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 7th Embodiment. 第8実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。It is a flowchart which shows the implementation operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 8th Embodiment. 第8実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。It is a flowchart which shows cancellation | release operation | movement of safety treatment work as operation | movement of the safety treatment work management system which concerns on 8th Embodiment. 第1実施形態に係る安全処置作業管理システムの管理装置のデータベースに格納されている安全処置作業管理情報の詳細を示す図である。It is a figure which shows the detail of the safety treatment work management information stored in the database of the management apparatus of the safety treatment work management system which concerns on 1st Embodiment. 第1実施形態に係る安全処置作業管理システムのポータブルPCの画像認識部の処理を説明するための図である。It is a figure for demonstrating the process of the image recognition part of portable PC of the safety treatment work management system which concerns on 1st Embodiment.

以下、本発明に係る安全処置作業管理システムの実施形態について、図面を参照して説明する。   Embodiments of a safety treatment work management system according to the present invention will be described below with reference to the drawings.

安全処置とは、発電プラントの機器や盤の試験・点検時に、作業員やプラントの安全を守るために実施することであり、安全処置作業とは、その実施のために、機器操作や、ケーブル・配線の解線および強制接続を行うことである。ここで、安全処置作業を行う対象の機器・配線・ケーブルのことを安全処置対象と称する。   Safety measures are performed to protect the safety of workers and plants during testing and inspection of power plant equipment and panels, and safety treatment work refers to equipment operations and cable operation. • To perform wiring disconnection and forced connection. Here, a device, wiring, or cable that is subjected to safety treatment work is referred to as a safety treatment target.

[第1実施形態]
<構成>
図1は、第1実施形態に係る安全処置作業管理システムの構成を示すブロック図である。図22は、第1実施形態に係る安全処置作業管理システムの管理装置のデータベースに格納されている安全処置作業管理情報の詳細を示す図である。図23は、第1実施形態に係る安全処置作業管理システムのポータブルパーソナルコンピュータ(以下、ポータブルPCと称する)の画像認識部の処理を説明するための図である。
[First Embodiment]
<Configuration>
FIG. 1 is a block diagram showing the configuration of the safety treatment work management system according to the first embodiment. FIG. 22 is a diagram showing details of the safety treatment work management information stored in the database of the management device of the safety treatment work management system according to the first embodiment. FIG. 23 is a diagram for explaining processing of the image recognition unit of the portable personal computer (hereinafter referred to as portable PC) of the safety measure work management system according to the first embodiment.

図1に示されるように、第1実施形態に係る安全処置作業管理システムは、管理装置1と、ポータブルPC2と、安全処置対象4−2と、識別表示物4と、を具備している。   As shown in FIG. 1, the safety treatment work management system according to the first embodiment includes a management device 1, a portable PC 2, a safety treatment object 4-2, and an identification display object 4.

管理装置1は、安全処置作業管理情報3−1を格納するデータベース1−2と、安全処置作業管理情報3−1を表示する表示部1−3と、管理装置1全体の制御を行う制御部1−1と、各装置と通信するための通信部1−4と、安全処置作業管理情報3−1を入力する入力部1−5と、を備えている。   The management device 1 includes a database 1-2 that stores the safety treatment work management information 3-1, a display unit 1-3 that displays the safety treatment work management information 3-1, and a control unit that controls the entire management device 1. 1-1, a communication unit 1-4 for communicating with each device, and an input unit 1-5 for inputting safety treatment work management information 3-1.

図22に示されるように、安全処置作業管理情報3−1は、発電プラントにおける機器・配線・ケーブルを識別するための識別子である個体識別番号3−1−1と、安全処置の状態を示すステータス情報3−1−2と、安全処置を管理するための識別子である安全処置管理番号3−1−3と、安全処置作業管理情報を登録した人、または安全処置を実施する人を識別するための識別子である担当者3−1−4と、予定している安全処置作業の内容(状態)を識別するための識別子である予定作業情報3−1−8と、実際に行った安全処置作業の内容(状態)を識別するための識別子である実施作業情報3−1−9と、を含んでいる。なお、安全処置管理番号3−1−3は、個体識別番号3−1−1に紐付けられて採番される。   As shown in FIG. 22, the safety treatment work management information 3-1 indicates an individual identification number 3-1-1 that is an identifier for identifying equipment, wiring, and cables in the power plant, and the state of the safety treatment. The status information 3-1-2, the safety treatment management number 3-1-3 that is an identifier for managing the safety measures, and the person who registered the safety treatment work management information or the person who performs the safety measures are identified. Person 3-1-4, which is an identifier for the purpose, scheduled work information 3-1-8, which is an identifier for identifying the content (state) of the planned safety treatment work, and the safety measures actually performed And execution work information 3-1-9, which is an identifier for identifying the content (state) of the work. The safety treatment management number 3-1-3 is numbered in association with the individual identification number 3-1-1.

また、図1に示されるように、安全処置対象4−2には、個体識別番号3−1−1と同一の個体識別番号4−3が表記されている。または、その個体識別番号4−3が表記された表記物(板、シールなど)が取り付けられている。   Further, as shown in FIG. 1, an individual identification number 4-3 identical to the individual identification number 3-1-1 is written in the safety treatment object 4-2. Alternatively, a notation (plate, sticker, etc.) on which the individual identification number 4-3 is indicated is attached.

図1に示されるように、識別表示物4には、安全処置管理番号3−1−3と同一の安全処置管理番号4−1が表記されている。または、その安全処置管理番号4−1が表記された表記物(板、シールなど)が取り付けられている。識別表示物4とは、安全処置実施状態を表すための識別表示物であり、安全処置対象4−2の安全処置の実施後に一時的に取付ける安全処置の実施状態を表す識別表示物である。具体例として、操作スイッチの操作を禁止させるもので、識別表示物4として色のついたカバーを用意し、そのカバーに安全処置管理番号4−1を取り付け、操作スイッチに取付けるものである(図23参照)。   As shown in FIG. 1, the identification display object 4 has the same safety measure management number 4-1 as the safety measure management number 3-1-3. Alternatively, a notation (plate, seal, etc.) on which the safety measure management number 4-1 is indicated is attached. The identification display object 4 is an identification display object for representing the safety treatment implementation state, and is an identification display object representing the implementation state of the safety treatment that is temporarily attached after the safety treatment of the safety treatment object 4-2. As a specific example, operation of the operation switch is prohibited, and a colored cover is prepared as the identification display object 4, and the safety measure management number 4-1 is attached to the cover and attached to the operation switch (FIG. 23).

図1に示されるように、ポータブルPC2は、安全処置作業における作業指示や画像を表示する表示部2−1と、安全処置対象4−2を撮影するカメラ2−2と、各装置と通信するための通信部2−3と、ポータブルPC2全体の制御を行う制御部2−4と、撮影した画像の中から文字と現状の安全処置状態を認識する画像認識部2−5と、通信部2−3にて管理装置1から転送される安全処置作業管理情報3−1や撮影した画像を保管するデータ保管部2−6と、カメラ2−2で撮影して得た個体識別番号4−3と安全処置作業管理情報3−1内の個体識別番号3−1−1とを照合するための照合部2−7と、ポータブルPC2を操作するための入力部2−8と、を備えている。   As shown in FIG. 1, the portable PC 2 communicates with each device, a display unit 2-1 that displays work instructions and images in safety treatment work, a camera 2-2 that photographs a safety treatment object 4-2, and the like. A communication unit 2-3 for controlling the portable PC 2 as a whole, an image recognizing unit 2-5 for recognizing characters and the current safe treatment state from the captured image, and a communication unit 2 -3, the safety treatment work management information 3-1 transferred from the management apparatus 1 and the data storage unit 2-6 for storing the captured image, and the individual identification number 4-3 acquired by the camera 2-2. And a collation unit 2-7 for collating the individual identification number 3-1-1 in the safety treatment work management information 3-1, and an input unit 2-8 for operating the portable PC 2. .

画像認識部2−5は、文字の認識として、撮影した画像から、文字を認識することで、安全処置対象機器の個体識別番号4−3と、識別表示物の安全処置管理番号4−1とを読み取る。また、配線・ケーブル類7−1の配線・解線状態の判断を、解線時に取付ける識別表示物4の色認識により行う(図23参照)。例えば、識別表示物の色(赤)が認識されたら、解線状態と判断し、認識されなかった場合、配線状態であると判断する。さらに、強制接続に使う配線も識別された色(青)のものを使用し、その配線色(青)の認識により、強制接続されていることを判別する。   The image recognizing unit 2-5 recognizes the character from the captured image as character recognition, so that the individual identification number 4-3 of the safety treatment target device, the safety treatment management number 4-1 of the identification display object, Read. Further, the determination of the wiring / disconnection state of the wiring / cables 7-1 is performed by color recognition of the identification display object 4 attached at the time of disconnection (see FIG. 23). For example, when the color (red) of the identification display object is recognized, it is determined that the line is disconnected, and when it is not recognized, it is determined that the wiring state is established. Further, the wiring used for forced connection is also used with the identified color (blue), and it is determined that the wiring is forcibly connected by recognizing the wiring color (blue).

さらに、画像認識部2−5は、現状の安全処置状態の認識として、スイッチ類7−2において、スイッチポジションを認識することで運転・停止等の現状態を判断する。MCCB類7−3において、操作位置に表示される操作表示を認識することで、ON・OFFの現状態を判断する。弁・ポンプ類7−4において、運転表示ランプのランプ色の認識により運転・停止の現状態を判別する。   Furthermore, the image recognizing unit 2-5 determines the current state such as driving / stopping by recognizing the switch position in the switches 7-2 as recognition of the current safety measure state. The MCCB class 7-3 recognizes the operation display displayed at the operation position to determine the current state of ON / OFF. In the valves / pumps 7-4, the current state of operation / stop is determined by recognizing the lamp color of the operation display lamp.

<作用>
第1実施形態に係る安全処置作業管理システムの動作としては、<安全処置実施作業>と<安全処置解除作業>とが挙げられる。
<Action>
The operation of the safety treatment work management system according to the first embodiment includes <safety action execution work> and <safety action release work>.

<安全処置作業実施>
図12は、第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。図13は、第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作の中の安全処置作業実施処理(STEP:1−1−20)を示すフローチャートである。
<Implementation of safety measures>
FIG. 12 is a flowchart showing the operation of performing the safety treatment operation as the operation of the safety treatment operation management system according to the first embodiment. FIG. 13 is a flowchart showing a safety treatment work execution process (STEP: 1-1-20) in the safety action work execution operation as the operation of the safety treatment work management system according to the first embodiment.

<作業前準備>
(STEP:1−1−0)
まず、管理装置1は、入力部1−5の操作に応じて安全処置作業管理情報3−1をデータベース1−2に格納しておく。次に、管理装置1の通信部1−4とポータブルPC2の通信部2−3とを通信可能状態にする。その後、管理装置1は、入力部1−5の操作に応じて、データベース1−2に格納された安全処置作業管理情報3−1をポータブルPC2に転送する。このとき、ポータブルPC2は、管理装置1からの安全処置作業管理情報3−1をデータ保管部2−6に格納する。
<Preparation before work>
(STEP: 1-1-0)
First, the management apparatus 1 stores the safety treatment work management information 3-1 in the database 1-2 according to the operation of the input unit 1-5. Next, the communication unit 1-4 of the management apparatus 1 and the communication unit 2-3 of the portable PC 2 are brought into a communicable state. Thereafter, the management device 1 transfers the safety treatment work management information 3-1 stored in the database 1-2 to the portable PC 2 in accordance with the operation of the input unit 1-5. At this time, the portable PC 2 stores the safety treatment work management information 3-1 from the management apparatus 1 in the data storage unit 2-6.

(STEP:1−1−1)
作業を開始する。
(STEP: 1-1-1)
Start work.

(STEP:1−1−20)
次に、以下に示す安全処置作業実施処理(STEP:1−1−2〜STEP:1−1−16)を実施する。
(STEP: 1-1-20)
Next, the following safety treatment work execution process (STEP: 1-1-2 to STEP: 1-1-16) is performed.

(STEP:1−1−2)
安全処置作業者3−4は、ポータブルPC2を操作して、データ保管部2−6に格納された安全処置作業管理情報3−1の中から実施対象の安全処置作業管理情報3−1を選択する。
(STEP: 1-1-2)
The safety treatment worker 3-4 operates the portable PC 2 and selects the safety treatment work management information 3-1 to be implemented from the safety treatment work management information 3-1 stored in the data storage unit 2-6. To do.

(STEP:1−1−3)
安全処置作業者3−4は、ポータブルPC2を操作して、カメラ2−2で安全処置対象4−2を撮影する。
(STEP: 1-1-3)
The safety treatment worker 3-4 operates the portable PC 2 and photographs the safety treatment target 4-2 with the camera 2-2.

<安全処置作業実施前の対象確認>
(STEP:1−1−4)
ポータブルPC2は、(STEP:1−1−3)にてカメラ2−2で安全処置対象4−2を撮影することにより画像から得られた個体識別番号4−3と、(STEP:1−1−2)にて選択した実施対象の安全処置作業管理情報3−1内の個体識別番号3−1−1とを照合する。照合の結果、一致した場合(STEP:1−1−4のYes)は(STEP:1−1−5)へ進み、照合の結果、一致しなかった場合(STEP:1−1−4のNo)は、実施対象を間違えたケースであり、(STEP:1−1−2)へ戻る。
<Confirmation of target before performing safety measures>
(STEP: 1-1-4)
The portable PC 2 includes (STEP: 1-1-3) an individual identification number 4-3 obtained from an image obtained by photographing the safety treatment target 4-2 with the camera 2-2 (STEP: 1-1-3), and (STEP: 1-1). -2) is collated with the individual identification number 3-1-1 in the safety treatment work management information 3-1 to be executed selected. If they match as a result of the collation (STEP: 1-1-4 Yes), the process proceeds to (STEP: 1-1-5). If they do not match as a result of the collation (STEP: 1-1-4 No) ) Is a case where the execution target is wrong, and the process returns to (STEP: 1-1-2).

(STEP:1−1−5)
ポータブルPC2は、(STEP:1−1−2)で選択した実施対象の安全処置作業管理情報3−1内のステータス情報3−1−2が表す安全処置の状態を確認して、安全処置対象4−2が既に実施状態である場合(STEP:1−1−5のYes)は、(STEP:1−1−13)へ進み、実施されていない場合(STEP:1−1−5のNo)は、(STEP:1−1−6)へ進む。この処理は、安全処置対象箇所が既に他件名等で実施されている場合は、安全処置作業を実施する必要がないので、その要否を判断処理するものである。
(STEP: 1-1-5)
The portable PC 2 confirms the state of the safety action indicated by the status information 3-1-2 in the safety action work management information 3-1 to be executed selected in (STEP: 1-1-2), and is subject to the safety action. If 4-2 is already in the implementation state (STEP: 1-1-5 Yes), proceed to (STEP: 1-1-13) and if not implemented (STEP: 1-1-5 No) ) Proceeds to (STEP: 1-1-6). This process is a process for determining whether or not the safety treatment target part is necessary because it is not necessary to carry out the safety treatment work when the safety treatment target part has already been implemented with another subject name or the like.

(STEP:1−1−6)
安全処置作業者3−4は、ポータブルPC2の表示部2−1に「対象を確認しました。」等のメッセージと、「確認」のボタンとが表示されるので、「確認」ボタンをタッチする。
(STEP: 1-1-6)
The safety treatment worker 3-4 touches the “confirm” button because a message such as “confirmed target” and a “confirm” button are displayed on the display unit 2-1 of the portable PC 2. .

(STEP:1−1−7)
安全処置作業者3−4は、安全処置対象4−2の安全処置作業を実施する。
(STEP: 1-1-7)
The safety treatment worker 3-4 performs the safety treatment work of the safety treatment target 4-2.

(STEP:1−1−8)
安全処置作業者3−4は、安全処置対象4−2へ識別表示物4を取付ける。
(STEP: 1-1-8)
The safety treatment worker 3-4 attaches the identification display item 4 to the safety treatment target 4-2.

(STEP:1−1−9)
安全処置作業者3−4は、ポータブルPC2を操作して、カメラ2−2で安全処置対象4−2と識別表示物4とを撮影する。
(STEP: 1-1-9)
The safety treatment worker 3-4 operates the portable PC 2 and photographs the safety treatment target 4-2 and the identification display object 4 with the camera 2-2.

<安全処置作業実施後の対象確認>
(STEP:1−1−10)
ポータブルPC2は、(STEP:1−1−9)にてカメラ2−2で安全処置対象4−2および識別表示物4を撮影することにより画像からそれぞれ得られた個体識別番号4−3および安全処置管理番号4−1と、(STEP:1−1−2)にて選択した実施対象の安全処置作業管理情報3−1内の個体識別番号3−1−1および安全処置管理番号3−1−3とを照合する。照合の結果、一致した場合(STEP:1−1−10のYes)は、(STEP:1−1−11)へ進み、照合の結果、一致しなかった場合(STEP:1−1−10のNo)は、実施対象を間違えたケースであり、実施した安全処置作業を作業前の状態へ戻し、(STEP:1−1−2)へ戻る。
<Confirmation of target after performing safety measures>
(STEP: 1-1-10)
The portable PC 2 has the individual identification number 4-3 and the safety obtained from the images obtained by photographing the safety treatment object 4-2 and the identification display object 4 with the camera 2-2 in (STEP: 1-1-9). Treatment management number 4-1, individual identification number 3-1-1 and safety treatment management number 3-1 in safety treatment work management information 3-1 to be implemented selected in (STEP: 1-1-2) -3. If they match as a result of the collation (STEP: 1-1-10 Yes), proceed to (STEP: 1-1-11). If the collation results in a mismatch (STEP: 1-1-10) No) is a case where the execution target is wrong, and the implemented safety treatment work is returned to the state before the work, and the process returns to (STEP: 1-1-2).

<安全処置作業の確認>
(STEP:1−1−11)
ポータブルPC2は、(STEP:1−1−9)にてカメラ2−2で安全処置対象4−2および識別表示物4を撮影することにより得られた画像から、安全処置対象4−2の現在の状態を判別し、判別された現状態と、(STEP:1−1−2)にて選択した実施対象の安全処置作業管理情報3−1内の予定作業情報3−1−8が表す状態とを照合する。照合の結果、一致した場合(STEP:1−1−11のYes)は、(STEP:1−1−12)へ進む。照合の結果、一致しなかった場合(STEP:1−1−11のNo)は、予定作業と相違した安全処置作業を行ってしまったケースであり、実施した安全処置作業を作業前の状態へ戻し、(STEP:1−1−2)へ戻る。
<Confirmation of safety treatment work>
(STEP: 1-1-11)
The portable PC 2 detects the current state of the safety treatment object 4-2 from the image obtained by photographing the safety treatment object 4-2 and the identification display object 4 with the camera 2-2 in (STEP: 1-1-9). And the state represented by the scheduled work information 3-1-8 in the safety treatment work management information 3-1 to be executed selected in (STEP: 1-1-2). And match. If they match as a result of the collation (STEP: 1-1-11, Yes), the process proceeds to (STEP: 1-1-12). As a result of the collation, if they do not match (STEP: 1-1-11 No), this is a case where the safety treatment work different from the scheduled work has been performed, and the implemented safety treatment work is returned to the state before the work. Return to (STEP: 1-1-2).

(STEP:1−1−12)
安全処置作業者3−4は、ポータブルPC2の表示部2−1に「安全処置が完了しました。」等のメッセージと、「確認」のボタンとが表示されるので、「確認」ボタンをタッチする。
(STEP: 1-1-12)
The safety treatment worker 3-4 touches the “Confirm” button because a message such as “Safety treatment has been completed” and a “Confirm” button are displayed on the display unit 2-1 of the portable PC 2. To do.

<逆状態への安全処置作業指示の実施防止>
(STEP:1−1−13)
ポータブルPC2は、(STEP:1−1−3)にてカメラ2−2で安全処置対象4−2を撮影することにより得られた画像から、安全処置対象4−2の現在の状態を判別し、判別された現状態と、(STEP:1−1−2)にて選択した実施対象の安全処置作業管理情報3−1内の予定作業情報3−1−8が表す状態とを照合する。照合の結果、一致した場合(STEP:1−1−13のYes)は、(STEP:1−1−14)へ進む。照合の結果、一致しなかった場合(STEP:1−1−13のNo)は、現状態に対して、逆の安全処置作業指示が出ている場合であり、(STEP:1−1−15)へ進む。
<Preventing the implementation of safety treatment work instructions for reverse conditions>
(STEP: 1-1-13)
The portable PC 2 determines the current state of the safety treatment object 4-2 from the image obtained by photographing the safety treatment object 4-2 with the camera 2-2 in (STEP: 1-1-3). The determined current state is collated with the state represented by the scheduled work information 3-1-8 in the safety treatment work management information 3-1 to be executed selected in (STEP: 1-1-2). If they match as a result of the collation (STEP: 1-1-13, Yes), the process proceeds to (STEP: 1-1-14). If they do not match as a result of the collation (STEP: 1-1-13 No), this is a case where a reverse safety treatment work instruction is issued with respect to the current state (STEP: 1-1-15). Go to).

(STEP:1−1−14)
安全処置作業者3−4は、ポータブルPC2の表示部2−1に、安全処置作業管理情報3−1内の実施期間3−1−10および担当者3−1−4と、「確認」のボタンとが表示されるので、内容を確認の上、「確認」ボタンをタッチする。
(STEP: 1-1-14)
The safety treatment worker 3-4 displays the “confirmation” on the display unit 2-1 of the portable PC 2 with the implementation period 3-1-10 and the person in charge 3-1-4 in the safety treatment work management information 3-1. Button is displayed. Check the contents and touch the “Confirm” button.

(STEP:1−1−15)
現状態の安全処置が解除されるまで、作業を中止する。
(STEP: 1-1-15)
Suspend work until the current safety measures are released.

(STEP:1−1−16)
(STEP:1−1−14)の後に、安全処置作業者3−4は、ポ−タブルPC2の表示部2−1に「既に安全処置が実施されています。」のメッセージと、実施されている安全処置作業管理情報3−1と、「確認」のボタンとが表示されるので、内容を確認の上、「確認」ボタンをタッチする。
(STEP: 1-1-16)
After (STEP: 1-1-14), the safety treatment worker 3-4 performs the message “Safety treatment has already been carried out” on the display section 2-1 of the portable PC 2. The safety action work management information 3-1 and the “confirm” button are displayed, and after confirming the contents, the “confirm” button is touched.

(STEP:1−1−17)
安全処置作業実施処理(STEP:1−1−20)内の(STEP:1−1−12)または(STEP:1−1−16)の後に、ポータブルPC2は、データ保管部2−6に格納されている実施対象の安全処置作業管理情報3−1内のステータス情報3−1−2が表す安全処置の状態として実施中であることを格納し、実施作業情報3−1−9が表す安全処置作業の状態としてSTEP:(1−1−11)で判別した安全処置対象4−2の現在の状態を格納する。
(STEP: 1-1-17)
After (STEP: 1-1-12) or (STEP: 1-1-16) in the safety measure work execution process (STEP: 1-1-20), the portable PC 2 is stored in the data storage unit 2-6. Is stored as the state of the safety measure represented by the status information 3-1-2 in the safety management work management information 3-1 to be implemented, and the safety represented by the implementation work information 3-1-9. The current state of the safety treatment object 4-2 determined in STEP: (1-1-11) is stored as the state of the treatment work.

(STEP:1−1−18)
以上により、作業を終了する。
(STEP: 1-1-18)
Thus, the work is finished.

<実施後作業>
(STEP:1−1−19)
管理装置1のデータベース1−2内の安全処置作業管理情報3−1へ、上記(STEP:1−1−1)から(STEP:1−1−14)までの作業結果を格納して更新するために、安全処置作業者3−4は、管理装置1の通信部1−4と、ポータブルPC2の通信部2−3とを通信可能状態にし、ポータブルPC2内の安全処置作業管理情報3−1を、管理装置1のデータベース1−2内の安全処置作業管理情報3−1に転送し、ステータス情報3−1−2を上書きする。
<Post-implementation work>
(STEP: 1-1-19)
The work results from (STEP: 1-1-1) to (STEP: 1-1-14) are stored and updated in the safety treatment work management information 3-1 in the database 1-2 of the management apparatus 1. Therefore, the safety treatment worker 3-4 sets the communication unit 1-4 of the management apparatus 1 and the communication unit 2-3 of the portable PC 2 in a communicable state, and the safety treatment work management information 3-1 in the portable PC 2 is obtained. Is transferred to the safety treatment work management information 3-1 in the database 1-2 of the management apparatus 1, and the status information 3-1-2 is overwritten.

<安全処置解除>
図14は、第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。図15は、第1実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作の中の安全処置作業解除処理(STEP:1−2−16)を示すフローチャートである。
<Safety measures cancellation>
FIG. 14 is a flowchart showing a safety treatment work releasing operation as the operation of the safety treatment work management system according to the first embodiment. FIG. 15 is a flowchart showing a safety treatment work release process (STEP: 1-2-16) in the safety treatment work release operation as the operation of the safety treatment work management system according to the first embodiment.

(STEP:1−2−0)
まず、作業前の準備は(STEP:1−1−0)と同様である。
(STEP: 1-2-0)
First, preparation before work is the same as (STEP: 1-1-0).

(STEP:1−2−1)
作業を開始する。
(STEP: 1-2-1)
Start work.

(STEP:1−2−16)
次に、以下に示す安全処置作業解除処理(STEP:1−2−2〜STEP:1−2−12)を実施する。
(STEP: 1-2-16)
Next, the following safety treatment work release processing (STEP: 1-22 to STEP: 1-2-12) is performed.

(STEP:1−2−2)
安全処置作業者3−4は、ポータブルPC2を操作して、データ保管部2−6に格納された安全処置作業管理情報3−1の中から解除対象の安全処置作業管理情報3−1を選択する。
(STEP: 1-2-2)
The safety treatment worker 3-4 operates the portable PC 2 and selects the safety treatment work management information 3-1 to be released from the safety treatment work management information 3-1 stored in the data storage unit 2-6. To do.

(STEP:1−2−3)
安全処置作業者3−4は、ポータブルPC2を操作して、カメラ2−2で安全処置対象4−2を撮影する。
(STEP: 1-2-3)
The safety treatment worker 3-4 operates the portable PC 2 and photographs the safety treatment target 4-2 with the camera 2-2.

(STEP:1−2−4)
ポータブルPC2は、(STEP:1−2−3)にてカメラ2−2で安全処置対象4−2を撮影することにより画像から得られた個体識別番号4−3と、(STEP:1−2−2)にて選択した解除対象の安全処置作業管理情報3−1内の個体識別番号3−1−1とを照合する。照合の結果、一致した場合(STEP:1−2−4のYes)は(STEP:1−2−5)へ進み、照合の結果、一致しなかった場合(STEP:1−2−4のNo)は、解除対象を間違えたケースであり、(STEP:1−2−2)へ戻る。
(STEP: 1-2-4)
The portable PC 2 includes (STEP: 1-2-3) an individual identification number 4-3 obtained from an image obtained by photographing the safety treatment target 4-2 with the camera 2-2 (STEP: 1-2-3). -2) is collated with the individual identification number 3-1-1 in the safety treatment work management information 3-1 to be released selected. If they match as a result of the collation (STEP: 1-2-4 Yes), proceed to (STEP: 1-2-5). If the collation results in a mismatch (STEP: 1-2-4 No) ) Is a case where the release target is wrong, and the process returns to (STEP: 1-2-2).

(STEP:1−2−5)
ポータブルPC2は、(STEP:1−2−2)で選択した解除対象の安全処置作業管理情報3−1内のステータス情報3−1−2が表す安全処置の状態を確認して、「実行中」ステータスの安全処置対象4−2を検索して、複数ある場合(STEP:1−2−5のYes)は(STEP:1−2−12)へ進み、単独で実施されている場合(STEP:1−2−5のNo)は(STEP:1−2−6)へ進む。この処理は、安全処置対象箇所が、他にも安全処置が実施されている場合は、安全処置作業を解除する必要がないので、その要否を判断処理するものである。
(STEP: 1-2-5)
The portable PC 2 confirms the state of the safety measure indicated by the status information 3-1-2 in the safety measure work management information 3-1 to be canceled selected in (STEP: 1-2-2), When the safety treatment target 4-2 having the status is searched and there are a plurality of items (STEP: 1-2-5, Yes), the process proceeds to (STEP: 1-2-12). : No. 1-2-5 proceeds to (STEP: 1-2-6). This process is a process for determining whether or not the safety treatment target location is necessary because it is not necessary to cancel the safety treatment work when other safety measures are being implemented.

(STEP:1−2−6)
安全処置作業者3−4は、ポータブルPC2の表示部2−1に「安全処置対象を確認しました。」等のメッセージと、「確認」等のボタンが表示されるので、「確認」ボタンをタッチする。
(STEP: 1-2-6)
The safety treatment worker 3-4 displays a message such as “Confirmed safety treatment target” and a button such as “Confirm” on the display section 2-1 of the portable PC 2. touch.

(STEP:1−2−7)
安全処置作業者3−4は、安全処置対象4−2の識別表示物4を取り外す。
(STEP: 1-2-7)
The safety treatment worker 3-4 removes the identification display object 4 of the safety treatment target 4-2.

(STEP:1−2−8)
安全処置作業者3−4は、安全処置対象4−2の安全処置作業を解除する。
(STEP: 1-2-8)
The safety treatment worker 3-4 releases the safety treatment work of the safety treatment target 4-2.

(STEP:1−2−9)
安全処置作業者3−4は、ポータブルPC2を操作して、カメラ2−2で、(STEP:1−2−7)で取り外した識別表示物4と、(STEP:1−2−8)で解除した安全処置対象4−2とを撮影する。
(STEP: 1-2-9)
The safety treatment worker 3-4 operates the portable PC 2 with the camera 2-2, the identification display item 4 removed in (STEP: 1-2-7), and (STEP: 1-2-8). The released safety treatment object 4-2 is photographed.

(STEP:1−2−10)
ポータブルPC2は、(STEP:1−2−9)にてカメラ2−2で安全処置対象4−2および識別表示物4を撮影することにより画像からそれぞれ得られた個体識別番号4−3および安全処置管理番号4−1と、(STEP:1−2−2)にて選択した解除対象の安全処置作業管理情報3−1内の個体識別番号3−1−1および安全処置管理番号3−1−3とを照合する。照合の結果、一致した場合(STEP:1−2−10のYes)は、(STEP:1−2−11)へ進み、照合の結果、一致しなかった場合(STEP:1−2−10のNo)は、解除対象を間違えたケースであり、解除した安全処置作業を解除前の状態へ戻し(STEP:1−2−2)へ戻る。
(STEP: 1-2-10)
The portable PC 2 has the individual identification number 4-3 and the safety obtained from the images obtained by photographing the safety treatment object 4-2 and the identification display object 4 with the camera 2-2 in (STEP: 1-2-9). The treatment management number 4-1 and the individual identification number 3-1-1 and the safety treatment management number 3-1 in the safety treatment work management information 3-1 to be canceled selected in (STEP: 1-2-2) -3. If they match as a result of the collation (STEP: 1-2-10 Yes), proceed to (STEP: 1-2-11), and if the collation results in a mismatch (STEP: 1-2-10 No) is a case where the release target is wrong, and the released safety treatment work is returned to the state before the release (STEP: 1-2-2).

(STEP:1−2−11)
安全処置作業者3−4は、ポータブルPC2の表示部2−1に「安全処置の解除が完了しました。」等のメッセージと「確認」のボタンが表示されるので、「確認」ボタンをタッチする。
(STEP: 1-2-11)
The safety treatment worker 3-4 touches the “confirm” button because a message such as “The release of safety measures has been completed” and a “confirm” button are displayed on the display unit 2-1 of the portable PC 2. To do.

(STEP:1−2−12)
安全処置作業者3−4は、ポータブルPC2の表示部2−1に「他件名で安全処置が実施されています。」のメッセージと、実施されている安全処置作業管理情報3−1と、「確認」のボタンが表示されるので、「確認」ボタンをタッチする。
(STEP: 1-2-12)
The safety treatment worker 3-4 displays a message “Safety treatment is being performed under another subject” on the display unit 2-1 of the portable PC 2, the safety treatment work management information 3-1 being implemented, The “Confirm” button is displayed. Touch the “Confirm” button.

(STEP:1−2−13)
安全処置作業解除処理(STEP:1−2−16)内の(STEP:1−2−11)または(STEP:1−2−12)の後に、ポータブルPC2は、データ保管部2−6に格納されている解除対象の安全処置作業管理情報3−1内のステータス情報3−1−2が表す安全処置の状態として解除済であることを格納する。
(STEP: 1-2-13)
After (STEP: 1-2-11) or (STEP: 1-2-12) in the safety measure work release process (STEP: 1-2-16), the portable PC 2 is stored in the data storage unit 2-6. It is stored that it is already released as the state of the safety measure represented by the status information 3-1-2 in the safety treatment work management information 3-1 to be released.

(STEP:1−2−14)
以上により、作業を終了する。
(STEP: 1-2-14)
Thus, the work is finished.

(STEP:1−2−15)
解除後作業は(STEP:1−1−15)と同様である。
(STEP: 1-2-15)
The work after release is the same as (STEP: 1-1-15).

<効果>
以上の説明により、第1実施形態に係る安全処置作業管理システムによれば、現状設備を変えることなく、安全処置作業後の操作状態の確認、逆安全処置指示に対する作業中止指示を機械的に判断することができる。このため、特許文献1に記載されたRFIDを利用しないことにより安全処置作業管理の作業品質が向上する。また、RFID故障などによるデータ異常の削減を期待できる。また、安全処置作業(操作)のミス(ヒューマンエラー)や、逆安全処置作業の実施を防止できる。
<Effect>
As described above, according to the safety treatment work management system according to the first embodiment, the operation state confirmation after the safety treatment work and the work stop instruction for the reverse safety treatment instruction are mechanically determined without changing the current equipment. can do. For this reason, the work quality of the safety treatment work management is improved by not using the RFID described in Patent Document 1. In addition, a reduction in data abnormality due to an RFID failure can be expected. Further, it is possible to prevent the safety treatment operation (operation) from being mistaken (human error) and the reverse safety treatment operation.

[第2実施形態]
第2実施形態について、第1実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第1実施形態と同じである。
[Second Embodiment]
In the second embodiment, only the changes from the first embodiment will be described. Here, the parts other than the explanation part are the same as in the first embodiment.

<構成>
図2は、第2実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 2 is a block diagram showing the configuration of the safety treatment work management system according to the second embodiment.

図2に示されるように、第2実施形態に係る安全処置作業管理システムのポータブルPC2は、第1実施形態の構成に対して、さらに、文字補正機能2−9を備えている。文字補正機能2−9は画像認識部2−5に内蔵されていてもよい。   As shown in FIG. 2, the portable PC 2 of the safety treatment work management system according to the second embodiment is further provided with a character correction function 2-9 in addition to the configuration of the first embodiment. The character correction function 2-9 may be incorporated in the image recognition unit 2-5.

<作用>
ポータブルPC2の画像認識部2−5は、安全処置対象4−2が撮影された画像から文字認識をする際に、安全処置対象4−2が歪曲しているような場合においても文字補正機能2−9により自動修正して、安全処置対象4−2の個体識別番号4−3を正確に認識する。
<Action>
The image recognition unit 2-5 of the portable PC 2 performs the character correction function 2 even when the safety treatment object 4-2 is distorted when character recognition is performed from an image of the safety treatment object 4-2. It is automatically corrected by -9 to accurately recognize the individual identification number 4-3 of the safety treatment target 4-2.

<効果>
第2実施形態に係る安全処置作業管理システムによれば、歪曲している文字も正確に文字認識することができるので、例えば、安全処置対象が配線・ケーブルで、個体識別番号が曲がっていても、正確に文字認識することができる。
<Effect>
According to the safety treatment work management system according to the second embodiment, even a distorted character can be accurately recognized. For example, even if the safety treatment target is a wiring / cable and the individual identification number is bent. , Can recognize characters accurately.

[第3実施形態]
第3実施形態について、第1実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第1実施形態と同じである。
[Third Embodiment]
In the third embodiment, only changes from the first embodiment will be described. Here, the parts other than the explanation part are the same as in the first embodiment.

<構成>
図3は、第3実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 3 is a block diagram showing the configuration of the safety treatment work management system according to the third embodiment.

図3に示されるように、第3実施形態に係る安全処置作業管理システムのポータブルPC2は、第1実施形態の構成に対して、さらに、情報選択機能2−10を備えている。情報選択機能2−10は画像認識部2−5に内蔵されていてもよい。   As shown in FIG. 3, the portable PC 2 of the safety treatment work management system according to the third embodiment is further provided with an information selection function 2-10 in addition to the configuration of the first embodiment. The information selection function 2-10 may be built in the image recognition unit 2-5.

<作用>
ポータブルPC2の画像認識部2−5は、安全処置対象4−2が撮影された画像2−1−1を表示部2−1に表示したときに安全処置対象4−2の個体識別番号4−3を含む複数の個体識別番号4−3が存在する場合、情報選択機能2−10により自動で文字認識し、複数の個体識別番号4−3の中から安全処置作業者3−4が安全処置対象4−2の個体識別番号4−3のみを選択するための認識後画面2−1−2を表示部2−1に表示する。画像認識部2−5は、安全処置作業者3−4が認識後画面2−1−2から安全処置対象4−2の個体識別番号4−3のみを選択した場合に、安全処置対象4−2の個体識別番号4−3を認識する。
<Action>
The image recognition unit 2-5 of the portable PC 2 displays the image 2-1-1 obtained by photographing the safety treatment object 4-2 on the display unit 2-1, and the individual identification number 4- of the safety treatment object 4-2. When there are a plurality of individual identification numbers 4-3 including 3, the information selection function 2-10 automatically recognizes characters, and the safety treatment worker 3-4 performs safety treatment from the plurality of individual identification numbers 4-3. A post-recognition screen 2-1-2 for selecting only the individual identification number 4-3 of the object 4-2 is displayed on the display unit 2-1. When the safety treatment worker 3-4 selects only the individual identification number 4-3 of the safety treatment target 4-2 from the post-recognition screen 2-1-2, the image recognition unit 2-5 selects the safety treatment target 4- 2 identification number 4-3 is recognized.

<効果>
第3実施形態に係る安全処置作業管理システムによれば、認識した複数の個体識別番号の中から、任意の個体識別番号を選択することができるので、例えば、機器が密集して設置されている中の一つに安全処置対象があるような場合においても、安全処置対象の個体識別番号のみを選択することができる。
<Effect>
According to the safety treatment work management system according to the third embodiment, an arbitrary individual identification number can be selected from a plurality of recognized individual identification numbers. For example, devices are densely installed. Even in the case where one of the safety treatment targets is present, only the individual identification number of the safety treatment target can be selected.

[第4実施形態]
第4実施形態について、第1実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第1実施形態と同じである。
[Fourth Embodiment]
In the fourth embodiment, only changes from the first embodiment will be described. Here, the parts other than the explanation part are the same as in the first embodiment.

<構成>
図4は、第4実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 4 is a block diagram showing the configuration of the safety treatment work management system according to the fourth embodiment.

図4に示されるように、第4実施形態に係る安全処置作業管理システムのポータブルPC2は、第1実施形態の構成に対して、さらに、認識範囲指定機能2−11を備えている。認識範囲指定機能2−11は画像認識部2−5に内蔵されていてもよい。   As shown in FIG. 4, the portable PC 2 of the safety treatment work management system according to the fourth embodiment is further provided with a recognition range designation function 2-11 in addition to the configuration of the first embodiment. The recognition range designation function 2-11 may be incorporated in the image recognition unit 2-5.

<作用>
ポータブルPC2の画像認識部2−5は、安全処置対象4−2が撮影された画像2−1−1を表示部2−1に表示したときに安全処置対象4−2の個体識別番号4−3を含む複数の個体識別番号4−3が存在する場合、認識範囲指定機能2−11により画像2−1−1上で複数の個体識別番号4−3をハイライトするなどして認識範囲の指定を促す。画像認識部2−5は、安全処置作業者3−4が画像2−1−1から安全処置対象4−2の個体識別番号4−3を含む認識範囲2−1−3を指定した場合、認識範囲2−1−3が指定された安全処置対象4−2の個体識別番号4−3を認識する。
<Action>
The image recognition unit 2-5 of the portable PC 2 displays the image 2-1-1 obtained by photographing the safety treatment object 4-2 on the display unit 2-1, and the individual identification number 4- of the safety treatment object 4-2. When there are a plurality of individual identification numbers 4-3 including 3, the recognition range designation function 2-11 highlights the plurality of individual identification numbers 4-3 on the image 2-1-1. Prompt for specification. The image recognition unit 2-5, when the safety treatment worker 3-4 designates the recognition range 2-1-3 including the individual identification number 4-3 of the safety treatment target 4-2 from the image 2-1-1, The individual identification number 4-3 of the safety treatment object 4-2 in which the recognition range 2-1-3 is designated is recognized.

<効果>
第4実施形態に係る安全処置作業管理システムによれば、撮影した画像の中から、文字認識する範囲を指定することができるので、例えば、機器が密集して設置されている中の一つに安全処置対象があるような場合においても、安全処置対象のみを文字認識範囲に指定することで、安全処置対象のみの個体識別番号を文字認識させることができる。
<Effect>
According to the safety treatment work management system according to the fourth embodiment, the range of character recognition can be specified from the captured image. For example, one of the densely installed devices is Even when there is a safety treatment target, by designating only the safety treatment target in the character recognition range, the individual identification number of only the safety treatment target can be recognized.

[第5実施形態]
第5実施形態について、第1実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第1実施形態と同じである。
[Fifth Embodiment]
In the fifth embodiment, only the changes from the first embodiment will be described. Here, the parts other than the explanation part are the same as in the first embodiment.

<構成>
図5は、第5実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 5 is a block diagram showing the configuration of the safety treatment work management system according to the fifth embodiment.

図5に示されるように、第5実施形態に係る安全処置作業管理システムのポータブルPC2は、第1実施形態の構成に対して、さらに、認識規則設定機能2−12を備えている。認識規則設定機能2−12は画像認識部2−5に内蔵されていてもよい。   As shown in FIG. 5, the portable PC 2 of the safety treatment work management system according to the fifth embodiment is further provided with a recognition rule setting function 2-12 in addition to the configuration of the first embodiment. The recognition rule setting function 2-12 may be incorporated in the image recognition unit 2-5.

<作用>
安全処置実施者3−2は、認識規則設定機能2−12により認識ルール(ポータブルPC2へ画像の認識規則2−12−1またはプラント機器付番規則2−12−2)を画像認識部2−5に設定しておき、画像認識部2−5は、その認識ルールに基づいて、安全処置対象4−2が撮影された画像から安全処置対象4−2の個体識別番号4−3を認識する。
<Action>
The safety measure practitioner 3-2 sends the recognition rule (the image recognition rule 2-12-1 to the portable PC 2 or the plant equipment numbering rule 2-12-2) by the recognition rule setting function 2-12. 5 and the image recognition unit 2-5 recognizes the individual identification number 4-3 of the safety treatment object 4-2 from the image of the safety treatment object 4-2 based on the recognition rule. .

<効果>
第5実施形態に係る安全処置作業管理システムによれば、画像の認識規則を入力する事で、その規則に沿った画像認識させることができるので、規則に沿って付番されている個体識別番号の画像認識精度を向上することができる。例えば、ある機器は、「○○−△△△」と付番された個体識別番号がつけられている。○○は機器の種類により固定された英数字、△△△は連続した数字、という原則に基づいていれば、その規則をポータブルPCへ入力する事で、文字認識の精度を向上することができる。また、発電プラントには、発電プラント毎の機器の付番原則があり、その付番原則に従って機器は個体識別番号が付番されるので、その原則を入力することでの文字認識の精度向上も可能である。
<Effect>
According to the safety treatment work management system according to the fifth embodiment, by inputting an image recognition rule, the image can be recognized according to the rule. Therefore, the individual identification number assigned according to the rule. Image recognition accuracy can be improved. For example, a certain device is assigned an individual identification number assigned “XX-ΔΔΔ”. If ○○ is based on the principle that alphanumeric characters are fixed according to the type of device, and △△△ is a continuous number, the rule can be input to a portable PC to improve the accuracy of character recognition. . In addition, the power plant has a device numbering principle for each power plant, and the device is assigned an individual identification number in accordance with the numbering principle, so that the accuracy of character recognition can be improved by inputting that principle. Is possible.

[第6実施形態]
第6実施形態について、第1〜第5実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第1〜第5実施形態と同じである。
[Sixth Embodiment]
In the sixth embodiment, only changes from the first to fifth embodiments will be described. Here, parts other than the explanation part are the same as those in the first to fifth embodiments.

<構成>
図6は、第6実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 6 is a block diagram showing the configuration of the safety treatment work management system according to the sixth embodiment.

図6に示されるように、第6実施形態に係る安全処置作業管理システムは、第1〜第5実施形態の構成に対して、さらに、発電所内ネットワーク6と、事務所3とを具備している。   As shown in FIG. 6, the safety treatment work management system according to the sixth embodiment further includes a power plant network 6 and an office 3 in addition to the configurations of the first to fifth embodiments. Yes.

事務所3には、発電所内ネットワーク6に接続可能なPCを持つ安全処置作業者3−4と、安全処置作業の承認者3−3とが在席している。管理装置1の通信部1−4と、ポータブルPC2の通信部2−3と、安全処置作業者3−4および承認者3−3のPCは、発電所内ネットワーク6へ接続できる構成である。ここで言う発電所内ネットワーク6とは、発電所のイントラネットへ接続する手段の事を指し、有線LANまたは、無線LANにて実現される。   In the office 3, a safety treatment worker 3-4 having a PC connectable to the power plant network 6 and a safety treatment work approver 3-3 are present. The communication unit 1-4 of the management device 1, the communication unit 2-3 of the portable PC 2, and the PCs of the safety treatment worker 3-4 and the approver 3-3 are configured to be connectable to the power plant network 6. The power plant network 6 here refers to means for connecting to the power plant intranet, and is realized by a wired LAN or a wireless LAN.

管理装置1は、第1〜第5実施形態の構成を組み合わせることができ、その第1〜第5実施形態の構成に対して、さらに、情報検索機能1−9を備えている。   The management apparatus 1 can combine the configurations of the first to fifth embodiments, and further includes an information search function 1-9 in addition to the configurations of the first to fifth embodiments.

<作用>
第6実施形態に係る安全処置作業管理システムにおいては、管理装置1とポータブルPC2とが発電所内ネットワーク6へ接続されているため、第1実施形態における作業前準備(STEP:1−1−0)と実施後作業(STEP:1−1−19)は省略できる。また、発電所内ネットワーク6へ接続できることで、安全処置作業管理情報3−1の入力を事務所3から安全処置作業者3−4が入力し、それを受けて承認者3−3が承認することが可能となる。
<Action>
In the safety treatment work management system according to the sixth embodiment, since the management device 1 and the portable PC 2 are connected to the network 6 in the power plant, preparation before work in the first embodiment (STEP: 1-1-0) And post-implementation work (STEP: 1-1-19) can be omitted. In addition, by being able to connect to the network 6 in the power plant, the safety treatment worker 3-4 inputs the safety treatment work management information 3-1 from the office 3, and the approver 3-3 approves the input. Is possible.

<安全処置作業実施>
図16は、第6実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。
<Implementation of safety measures>
FIG. 16 is a flowchart showing an operation of performing a safety treatment operation as the operation of the safety treatment operation management system according to the sixth embodiment.

(STEP:2−1−1)
まず、安全処置作業者3−4は、ポータブルPC2を持って安全処置対象4−2まで行き、作業を開始する。
(STEP: 2-1-1)
First, the safety treatment worker 3-4 takes the portable PC 2 to the safety treatment target 4-2 and starts work.

(STEP:2−1−2)
安全処置作業者3−4は、自分のID番号でポータブルPC2へログインする。
(STEP: 2-1-2)
The safety treatment worker 3-4 logs into the portable PC 2 with his / her ID number.

(STEP:2−1−3)
ポータブルPC2は、ログインID番号から、安全処置作業者3−4を認識して、管理装置内1のデータベース1−2へ直接アクセスし、データベース1−2に格納されている情報である担当者3−1−4を情報検索機能1−9にて検索する。
(STEP: 2-1-3)
The portable PC 2 recognizes the safety treatment worker 3-4 from the login ID number, directly accesses the database 1-2 in the management apparatus 1, and assigns the person in charge 3 as information stored in the database 1-2. 1-4 is searched by the information search function 1-9.

(STEP:2−1−4)
ポータブルPC2は、検索された安全処置作業管理情報3−1を表示部2−1に表示する。
(STEP: 2-1-4)
The portable PC 2 displays the searched safety treatment work management information 3-1 on the display unit 2-1.

次に、第1実施形態における安全処置作業実施処理(STEP:1−1−20)、すなわち(STEP:1−1−2〜STEP:1−1−16)を実施する。   Next, safety treatment work execution processing (STEP: 1-1-20) in the first embodiment, that is, (STEP: 1-1-2 to STEP: 1-1-16) is performed.

(STEP:2−1−5)
ポータブルPC2は、管理装置1内のデータベース1−2にアクセスし、データベース1−2に格納されているステータス情報3−1−2を「実施中」へ変更する。
(STEP: 2-1-5)
The portable PC 2 accesses the database 1-2 in the management apparatus 1 and changes the status information 3-1-2 stored in the database 1-2 to “in progress”.

(STEP:2−1−6)
以上により、作業を終了する。
(STEP: 2-1-6)
Thus, the work is finished.

<安全処置解除>
図17は、第6実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。
<Safety measures cancellation>
FIG. 17 is a flowchart showing a safety treatment work releasing operation as the operation of the safety treatment work management system according to the sixth embodiment.

(STEP:2−2−1)
まず、安全処置作業者3−4は、ポータブルPC2を持って安全処置対象4−2まで行き、作業を開始する。
(STEP: 2-2-1)
First, the safety treatment worker 3-4 takes the portable PC 2 to the safety treatment target 4-2 and starts work.

(STEP:2−2−2)
安全処置作業者3−4は、自分のID番号でポータブルPC2へログインする。
(STEP: 2-2-2)
The safety treatment worker 3-4 logs into the portable PC 2 with his / her ID number.

(STEP:2−2−3)
ポータブルPC2は、ログインID番号から、安全処置作業者3−4を認識して、管理装置内1のデータベース1−2へ直接アクセスし、データベース1−2に格納されている情報である担当者3−1−4を情報検索機能1−9にて検索する。
(STEP: 2-2-3)
The portable PC 2 recognizes the safety treatment worker 3-4 from the login ID number, directly accesses the database 1-2 in the management apparatus 1, and assigns the person in charge 3 as information stored in the database 1-2. 1-4 is searched by the information search function 1-9.

(STEP:2−2−4)
ポータブルPC2は、検索された安全処置作業管理情報3−1を表示部2−1に表示する。
(STEP: 2-2-4)
The portable PC 2 displays the searched safety treatment work management information 3-1 on the display unit 2-1.

次に、第1実施形態における安全処置作業解除処理(STEP:1−2−16)、すなわち(STEP:1−2−2〜STEP:1−2−12)を実施する。   Next, the safety treatment work release processing (STEP: 1-2-16) in the first embodiment, that is, (STEP: 1-22 to STEP: 1-2-12) is performed.

(STEP:2−2−5)
ポータブルPC2は、管理装置1内のデータベース1−2にアクセスし、データベース1−2に格納されているステータス情報3−1−2を「解除済」へ変更する。
(STEP: 2-2-5)
The portable PC 2 accesses the database 1-2 in the management apparatus 1 and changes the status information 3-1-2 stored in the database 1-2 to “released”.

(STEP:2−2−6)
以上により、作業を終了する。
(STEP: 2-2-6)
Thus, the work is finished.

<効果>
第6実施形態に係る安全処置作業管理システムによれば、管理装置1とポータブルPC2は、発電所内ネットワーク6を介して通信可能となるので、管理装置1とポータブルPC2は、リアルタイムの通信が可能となり、ポータブルPC2側で、管理装置1内のデータベース1−2の情報変更が可能となる。さらに、データベース1−2から必要情報のみをソートして参照すること、最新のデータベース1−2内の情報を参照する事が可能となる。また、安全処置作業管理情報3−1の入力を事務所から入力することが可能となる。
<Effect>
According to the safety treatment work management system according to the sixth embodiment, since the management device 1 and the portable PC 2 can communicate via the power plant network 6, the management device 1 and the portable PC 2 can communicate in real time. On the portable PC 2 side, the information in the database 1-2 in the management apparatus 1 can be changed. Further, it is possible to sort and refer to only necessary information from the database 1-2 and to refer to the latest information in the database 1-2. Moreover, it becomes possible to input the safety treatment work management information 3-1 from the office.

[第7実施形態]
第7実施形態について、第6実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第6実施形態と同じである。
[Seventh Embodiment]
In the seventh embodiment, only changes from the sixth embodiment will be described. Here, the parts other than the explanation part are the same as in the sixth embodiment.

<構成>
図7は、第7実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 7 is a block diagram showing the configuration of the safety treatment work management system according to the seventh embodiment.

図7に示されるように、第7実施形態に係る安全処置作業管理システムの管理装置1は、第6実施形態の構成に対して、さらに、作業エビデンス登録部1−6を備えている。   As FIG. 7 shows, the management apparatus 1 of the safety treatment work management system which concerns on 7th Embodiment is further provided with the work evidence registration part 1-6 with respect to the structure of 6th Embodiment.

図22に示されるように、安全処置作業管理情報3−1は、さらに、作業エビデンス3−1−7を含んでいる。   As shown in FIG. 22, the safety treatment work management information 3-1 further includes work evidence 3-1-7.

<作用>
<安全処置作業実施>
図18は、第7実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。
<Action>
<Implementation of safety measures>
FIG. 18 is a flowchart showing an operation of performing a safety treatment operation as the operation of the safety treatment operation management system according to the seventh embodiment.

(STEP:3−1−1)
まず、安全処置作業者3−4は、ポータブルPC2を持って安全処置対象4−2まで行き、作業を開始する。
(STEP: 3-1-1)
First, the safety treatment worker 3-4 takes the portable PC 2 to the safety treatment target 4-2 and starts work.

次に、第6実施形態における(STEP:2−1−2)〜(STEP:2−1−4)を実施する。   Next, (STEP: 2-1-2) to (STEP: 2-1-4) in the sixth embodiment are performed.

次に、第1実施形態における安全処置作業実施処理(STEP:1−1−20)、すなわち(STEP:1−1−2〜STEP:1−1−16)を実施する。   Next, safety treatment work execution processing (STEP: 1-1-20) in the first embodiment, that is, (STEP: 1-1-2 to STEP: 1-1-16) is performed.

次に、第6実施形態における(STEP:2−1−5)を実施する。   Next, (STEP: 2-1-5) in the sixth embodiment is performed.

(STEP:3−1−2)
安全処置作業者3−4は、安全処置対象4−2に識別表示物4が取りついている状態で、ポータブルPC2のカメラ2−2で、安全処置対象4−2と識別表示物4とを撮影する。
(STEP: 3-1-2)
The safety treatment worker 3-4 photographs the safety treatment object 4-2 and the identification display object 4 with the camera 2-2 of the portable PC 2 in a state where the identification display object 4 is attached to the safety treatment object 4-2. To do.

(STEP:3−1−3)
安全処置作業者3−4は、ポータブルPC2を操作して、撮影した画像を、発電所内ネットワーク6を介して転送し、管理装置1の作業エビデンス登録部1−6は、その画像をデータベース1−2の実施対象の安全処置作業管理情報3−1内の作業エビデンス3−1−7として格納する。
(STEP: 3-1-3)
The safety treatment worker 3-4 operates the portable PC 2 to transfer the captured image via the power plant network 6, and the work evidence registration unit 1-6 of the management apparatus 1 stores the image in the database 1- 2 is stored as work evidence 3-1-7 in the safety treatment work management information 3-1.

(STEP:3−1−4)
以上により、作業を終了する。
(STEP: 3-1-4)
Thus, the work is finished.

<安全処置解除>
図19は、第7実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。
<Safety measures cancellation>
FIG. 19 is a flowchart showing a safety treatment work releasing operation as the operation of the safety treatment work management system according to the seventh embodiment.

(STEP:3−2−1)
まず、安全処置作業者3−4は、ポータブルPC2を持って安全処置対象4−2まで行き、作業を開始する。
(STEP: 3-2-1)
First, the safety treatment worker 3-4 takes the portable PC 2 to the safety treatment target 4-2 and starts work.

次に、第6実施形態における(STEP:2−2−2)〜(STEP:2−2−4)を実施する。   Next, (STEP: 2-2-2) to (STEP: 2-2-4) in the sixth embodiment are performed.

次に、第1実施形態における安全処置作業実施処理(STEP:1−2−16)、すなわち(STEP:1−2−2〜STEP:1−2−12)を実施する。   Next, the safety treatment work execution process (STEP: 1-2-16) in the first embodiment, that is, (STEP: 1-22 to STEP: 1-2-12) is performed.

次に、第6実施形態における(STEP:2−2−5)を実施する。   Next, (STEP: 2-2-5) in the sixth embodiment is performed.

(STEP:3−2−2)
安全処置作業者3−4は、安全処置対象4−2に、識別表示物4が取外されている状態で、ポータブルPC2のカメラ2−2で、安全処置対象4−2と識別表示物4とを撮影する。
(STEP: 3-2-2)
The safety treatment worker 3-4, with the identification display object 4 removed from the safety treatment object 4-2, uses the camera 2-2 of the portable PC 2 and the safety treatment object 4-2 and the identification display object 4. And shoot.

(STEP:3−2−3)
安全処置作業者3−4は、ポータブルPC2を操作して、撮影した画像を、発電所内ネットワーク6を介して転送し、管理装置1の作業エビデンス登録部1−6は、その画像をデータベース1−2の実施対象の安全処置作業管理情報3−1内の作業エビデンス3−1−7として格納する。
(STEP: 3-2-3)
The safety treatment worker 3-4 operates the portable PC 2 to transfer the captured image via the power plant network 6, and the work evidence registration unit 1-6 of the management apparatus 1 stores the image in the database 1- 2 is stored as work evidence 3-1-7 in the safety treatment work management information 3-1.

(STEP:3−2−4)
以上により、作業を終了する。
(STEP: 3-2-4)
Thus, the work is finished.

<効果>
第7実施形態に係る安全処置作業管理システムによれば、作業後の安全処置対象4−2の画像をエビデンスとして残せるので、安全処置作業者3−4が安全処置対象4−2を間違いなく、正しい作業をした履歴を残すことができる。
<Effect>
According to the safety treatment work management system according to the seventh embodiment, the image of the safety treatment target 4-2 after the work can be left as evidence, so the safety treatment worker 3-4 definitely has the safety treatment target 4-2, You can keep a history of correct work.

[第8実施形態]
第8実施形態について、第7実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第7実施形態と同じである。
[Eighth Embodiment]
In the eighth embodiment, only changes from the seventh embodiment will be described. Here, the parts other than the explanation part are the same as in the seventh embodiment.

<構成>
図8は、第8実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 8 is a block diagram showing the configuration of the safety treatment work management system according to the eighth embodiment.

図8に示されるように、第8実施形態に係る安全処置作業管理システムのポータブルPC2は、第7実施形態の構成に対して、さらに、時間記録機能2−13を備えている。   As shown in FIG. 8, the portable PC 2 of the safety treatment work management system according to the eighth embodiment is further provided with a time recording function 2-13 in addition to the configuration of the seventh embodiment.

図22に示されるように、安全処置作業管理情報3−1は、さらに、安全処置実施時刻3−1−5と、安全処置解除時刻3−1−6とを含んでいる。   As shown in FIG. 22, the safety treatment work management information 3-1 further includes a safety treatment execution time 3-1-5 and a safety treatment release time 3-1-6.

<作用>
<安全処置作業実施>
図20は、第8実施形態に係る安全処置作業管理システムの動作として、安全処置作業の実施動作を示すフローチャートである。
<Action>
<Implementation of safety measures>
FIG. 20 is a flowchart showing the operation of performing the safety treatment operation as the operation of the safety treatment operation management system according to the eighth embodiment.

(STEP:4−1−1)
まず、安全処置作業者3−4は、ポータブルPC2を持って安全処置対象4−2まで行き、作業を開始する。
(STEP: 4-1-1)
First, the safety treatment worker 3-4 takes the portable PC 2 to the safety treatment target 4-2 and starts work.

次に、第6実施形態における(STEP:2−1−2)〜(STEP:2−1−4)を実施する。   Next, (STEP: 2-1-2) to (STEP: 2-1-4) in the sixth embodiment are performed.

次に、第1実施形態における安全処置作業実施処理(STEP:1−1−20)、すなわち(STEP:1−1−2〜STEP:1−1−16)を実施する。   Next, safety treatment work execution processing (STEP: 1-1-20) in the first embodiment, that is, (STEP: 1-1-2 to STEP: 1-1-16) is performed.

次に、第6実施形態における(STEP:2−1−5)を実施する。   Next, (STEP: 2-1-5) in the sixth embodiment is performed.

(STEP:4−1−2)
ポータブルPC2の時間記録機能2−13は、管理装置1内のデータベース1−2にアクセスし、(STEP:1−1−11)における時刻をデータベース1−2の実施対象の安全処置作業管理情報3−1内の実施時刻3−1−5として格納する。
(STEP: 4-1-2)
The time recording function 2-13 of the portable PC 2 accesses the database 1-2 in the management apparatus 1, and sets the time in (STEP: 1-1-11) to the safety treatment work management information 3 to be implemented in the database 1-2. -1 is stored as implementation time 3-1-5.

(STEP:4−1−3)
以上により、作業を終了する。
(STEP: 4-1-3)
Thus, the work is finished.

<安全処置解除>
図21は、第8実施形態に係る安全処置作業管理システムの動作として、安全処置作業の解除動作を示すフローチャートである。
<Safety measures cancellation>
FIG. 21 is a flowchart showing a safety treatment work release operation as the operation of the safety treatment work management system according to the eighth embodiment.

(STEP:4−2−1)
まず、安全処置作業者3−4は、ポータブルPC2を持って安全処置対象4−2まで行き、作業を開始する。
(STEP: 4-2-1)
First, the safety treatment worker 3-4 takes the portable PC 2 to the safety treatment target 4-2 and starts work.

次に、第6実施形態における(STEP:2−2−2)〜(STEP:2−2−4)を実施する。   Next, (STEP: 2-2-2) to (STEP: 2-2-4) in the sixth embodiment are performed.

次に、第1実施形態における安全処置作業実施処理(STEP:1−2−16)、すなわち(STEP:1−2−2〜STEP:1−2−12)を実施する。   Next, the safety treatment work execution process (STEP: 1-2-16) in the first embodiment, that is, (STEP: 1-22 to STEP: 1-2-12) is performed.

次に、第6実施形態における(STEP:2−2−5)を実施する。   Next, (STEP: 2-2-5) in the sixth embodiment is performed.

(STEP:4−2−2)
ポータブルPC2の時間記録機能2−13は、管理装置1内のデータベース1−2にアクセスし、(STEP:1−2−11)における時刻をデータベース1−2の実施対象の安全処置作業管理情報3−1内の安全処置解除時刻3−1−6として更新する。
(STEP: 4-2-2)
The time recording function 2-13 of the portable PC 2 accesses the database 1-2 in the management apparatus 1, and sets the time in (STEP: 1-2-11) to the safety treatment work management information 3 to be implemented in the database 1-2. The safety measure release time 3-1-6 in -1 is updated.

(STEP:4−2−3)
以上により、作業を終了する。
(STEP: 4-2-3)
Thus, the work is finished.

<効果>
第8実施形態に係る安全処置作業管理システムによれば、安全処置作業の実施時刻、安全処置解除時刻の管理をすることができるので、機器の操作や信号隔離時の時刻を記録・報告する場合に管理装置1のデータベース1−2を参照する事で実施することができる。
<Effect>
According to the safety treatment work management system according to the eighth embodiment, it is possible to manage the execution time of the safety treatment work and the safety treatment release time. It can be implemented by referring to the database 1-2 of the management device 1.

[第9実施形態]
第9実施形態について、第8実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第8実施形態と同じである。
[Ninth Embodiment]
In the ninth embodiment, only the changes from the eighth embodiment will be described. Here, the parts other than the explanation part are the same as in the eighth embodiment.

<構成>
図9は、第9実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 9 is a block diagram showing the configuration of the safety measure work management system according to the ninth embodiment.

図9に示されるように、第9実施形態に係る安全処置作業管理システムの管理装置1は、第8実施形態の構成に対して、さらに、図面呼出機能1−7を備えている。   As shown in FIG. 9, the management apparatus 1 of the safety treatment work management system according to the ninth embodiment further includes a drawing calling function 1-7 in addition to the configuration of the eighth embodiment.

管理装置1のデータベース1−2は、図面3−2−1が格納された図面保管部3−2を備えている。   The database 1-2 of the management apparatus 1 includes a drawing storage unit 3-2 that stores drawings 3-2-1.

<作用>
データベース1−2内の図面保管部3−2に格納されている図面3−2−1は、個体識別番号4−3を含む機器・配線・ポンプ・弁等の情報が格納されていて、機器や信号線・配線を選択すると、それらが持つ情報を参照することができるデータ図面であり、安全処置作業時、若しくは安全処置対象箇所の確認時に、ポータブルPC2で個体識別番号4−3を画像認識すると、その個体識別番号4−3に関連する上記データ図面を管理装置1の図面保管部3−2から図面呼出機能1−7にて呼び出し、ポータブルPC2へ表示させる。安全処置作業者3−4は、そのデータ図面で作業上に必要な情報を参照する。
<Action>
The drawing 3-2-1 stored in the drawing storage unit 3-2 in the database 1-2 stores information such as equipment, wiring, pumps, valves and the like including the individual identification number 4-3. This is a data drawing that allows you to refer to the information that you have when you select a signal line or wiring, and recognize the individual identification number 4-3 on the portable PC 2 during safety treatment work or when confirming the location of the safety treatment target Then, the data drawing related to the individual identification number 4-3 is called by the drawing call function 1-7 from the drawing storage unit 3-2 of the management apparatus 1 and displayed on the portable PC 2. The safety treatment worker 3-4 refers to information necessary for work in the data drawing.

<効果>
第9実施形態に係る安全処置作業管理システムによれば、ポータブルPC2上で、必要な図面の表示および、情報収集を行うことができるので、大量の図面を持ち歩く必要がなく、また、安全処置対象4−2以外の安全処置状態を知りたい場合でも、ポータブルPC2のみで実現することができる。
<Effect>
According to the safety treatment work management system according to the ninth embodiment, since necessary drawings can be displayed and information can be collected on the portable PC 2, it is not necessary to carry a large number of drawings, and the safety treatment target is provided. Even when it is desired to know a safety measure state other than 4-2, it can be realized only by the portable PC 2.

[第10実施形態]
第10実施形態について、第9実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第9実施形態と同じである。
[Tenth embodiment]
Only the changes from the ninth embodiment will be described for the tenth embodiment. Here, the parts other than the explanation part are the same as in the ninth embodiment.

<構成>
図10は、第10実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 10 is a block diagram showing the configuration of the safety treatment work management system according to the tenth embodiment.

図10に示されるように、第10実施形態に係る安全処置作業管理システムの管理装置1は、第9実施形態の構成に対して、さらに、安全処置作業管理情報作成機能1−8を備えている。   As shown in FIG. 10, the management device 1 of the safety treatment work management system according to the tenth embodiment further includes a safety treatment work management information creation function 1-8 in addition to the configuration of the ninth embodiment. Yes.

<作用>
安全処置作業者3−4が、安全処置作業管理情報3−1を管理装置1のデータベース1−2へ入力・格納する際に、図面保管部3−2に格納されているデータ図面上の安全処置対象を選択することで、安全処置作業管理情報作成機能1−8が、データ図面がもつ各情報を利用して、安全処置対象4−2の安全処置作業管理情報3−1を作成し、データベース1−2内へ格納する。
<Action>
When the safety treatment worker 3-4 inputs / stores the safety treatment work management information 3-1 to the database 1-2 of the management apparatus 1, the safety on the data drawing stored in the drawing storage unit 3-2 By selecting the treatment target, the safety treatment work management information creation function 1-8 creates the safety treatment work management information 3-1 of the safety treatment target 4-2 using each information included in the data drawing, Store in database 1-2.

<効果>
第10実施形態に係る安全処置作業管理システムによれば、安全処置作業管理情報3−1の入力を、データ図面から選択することで、実施できるので、入力情報ミスの削減が図られる。
<Effect>
According to the safety treatment work management system according to the tenth embodiment, the input of the safety treatment work management information 3-1 can be performed by selecting from the data drawing, so that input information errors can be reduced.

[第11実施形態]
第11実施形態について、第10実施形態からの変更点のみ説明する。ここで、説明部分以外の部分は第10実施形態と同じである。
[Eleventh embodiment]
Only the changes from the tenth embodiment will be described for the eleventh embodiment. Here, parts other than the explanation part are the same as those in the tenth embodiment.

<構成>
図11は、第11実施形態に係る安全処置作業管理システムの構成を示すブロック図である。
<Configuration>
FIG. 11 is a block diagram showing a configuration of a safety measure work management system according to the eleventh embodiment.

図11に示されるように、第11実施形態に係る安全処置作業管理システムのポータブルPC2は、第10実施形態の構成に対して、さらに、安全処置作業管理情報3−1に関する安全処置対象4−2の位置情報を検索するGPS2−14と、位置情報に基づいて安全処置作業者3−4を安全処置対象4−2まで誘導案内するナビゲーション機能2−15と、を備えている。   As shown in FIG. 11, the portable PC 2 of the safety treatment work management system according to the eleventh embodiment further includes a safety treatment target 4- related to the safety treatment work management information 3-1 with respect to the configuration of the tenth embodiment. GPS 2-14 that searches the position information of 2 and a navigation function 2-15 that guides and guides the safety treatment worker 3-4 to the safety treatment target 4-2 based on the position information.

<作用>
安全処置作業者3−4は、ポータブルPC2で、安全処置作業管理情報3−1の中から、これから実施する安全処置対象4−2を選択すると、ポータブルPC2は、画面上に、対象までの道順を表示し、安全処置作業者3−4を誘導案内する。なお、道順の表示は、図面保管部3−2に保管されている、プラントレイアウト図を呼出して、そのプラントレイアウト図上に連動させて、表示する。
<Action>
When the safety treatment worker 3-4 selects the safety treatment target 4-2 to be executed from the safety treatment work management information 3-1, the portable PC 2 displays a route to the target on the screen. Is displayed to guide the safety treatment worker 3-4. The route is displayed by calling a plant layout diagram stored in the drawing storage unit 3-2 and interlocking with the plant layout diagram.

<効果>
第11実施形態に係る安全処置作業管理システムによれば、選択した安全処置対象4−2を選択する事で、対象までの道順が表示されるので、安全処置作業者3−4の経験に係わらず、誰であっても作業対象まで到達する事ができる。
<Effect>
According to the safety treatment work management system according to the eleventh embodiment, by selecting the selected safety treatment object 4-2, the route to the object is displayed, so it is related to the experience of the safety treatment worker 3-4. Anyone can reach the work target.

[他の実施形態]
以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更、また各実施形態の特徴を組み合わせることができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
[Other Embodiments]
As mentioned above, although several embodiment of this invention was described, these embodiment is shown as an example and is not intending limiting the range of invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, modifications, and features of the embodiments can be combined without departing from the spirit of the invention. . These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof.

1 … 管理装置
1−1 … 制御部
1−2 … データベース
1−3 … 表示部
1−4 … 通信部
1−5 … 入力部
1−6 … 作業エビデンス登録部
1−7 … 図面呼出機能
1−8 … 安全処置作業管理情報作成機能
1−9 … 情報検索機能
2 … ポータブルPC(携帯端末)
2−1 … 表示部
2−1−1 … 画像
2−1−2 … 認識後画面
2−1−3 … 認識範囲
2−2 … カメラ
2−3 … 通信部
2−4 … 制御部
2−5 … 画像認識部
2−6 … データ保管部
2−7 … 照合部
2−8 … 入力部
2−9 … 文字補正機能
2−10 … 情報選択機能
2−11 … 認識範囲指定機能
2−12 … 認識規則設定機能
2−12−1 … 画像の認識規則
2−12−2 … プラント機器付番規則
2−13 … 時間記録機能
2−14 … GPS
2−15 … ナビゲーション機能
3 … 事務所
3−1 … 安全処置作業管理情報
3−1−1 … 個体識別番号
3−1−2 … ステータス情報
3−1−3 … 安全処置管理番号
3−1−4 … 担当者
3−1−5 … 安全処置実施時刻
3−1−6 … 安全処置解除時刻
3−1−7 … 作業エビデンス
3−1−8 … 予定作業情報
3−1−9 … 実施作業情報
3−1−10 … 実施期間
3−2 … 図面保管部
3−2−1 … 図面
3−3 … 承認者
3−4 … 安全処置作業者
4 … 識別表示物
4−1 … 安全処置管理番号
4−2 … 安全処置対象
4−3 … 個体識別番号
6 … 発電所内ネットワーク
7−1 … 配線・ケーブル類
7−2 … スイッチ類
7−3 … MCCB類
7−4 … 弁・ポンプ類
DESCRIPTION OF SYMBOLS 1 ... Management apparatus 1-1 ... Control part 1-2 ... Database 1-3 ... Display part 1-4 ... Communication part 1-5 ... Input part 1-6 ... Work evidence registration part 1-7 ... Drawing call function 1- 8 ... Safety treatment work management information creation function 1-9 ... Information retrieval function 2 ... Portable PC (portable terminal)
2-1 ... Display section 2-1-1 ... Image 2-1-2 ... Screen after recognition 2-1-3 ... Recognition range 2-2 ... Camera 2-3 ... Communication section 2-4 ... Control section 2-5 … Image recognition unit 2-6… Data storage unit 2-7… Verification unit 2-8… Input unit 2-9… Character correction function 2-10… Information selection function 2-11… Recognition range specification function 2-12… Recognition Rule setting function 2-12-1 Image recognition rule 2-12-2 Plant plant numbering rule 2-13 Time recording function 2-14 GPS
2-15 ... Navigation function 3 ... Office 3-1 ... Safety action work management information 3-1-1 ... Individual identification number 3-1-2 ... Status information 3-1-3 ... Safety action management number 3-1 4 ... Person in charge 3-1-5 ... Safety action execution time 3-1-6 ... Safety action release time 3-1-7 ... Work evidence 3-1-8 ... Scheduled work information 3-1-9 ... Implementation work information 3-1-10 ... Implementation period 3-2 ... Drawing storage section 3-2-1 ... Drawing 3-3 ... Approver 3-4 ... Safety treatment worker 4 ... Identification display 4-1 ... Safety treatment management number 4 -2 ... Safety treatment target 4-3 ... Individual identification number 6 ... Power plant network 7-1 ... Wiring and cables 7-2 ... Switches 7-3 ... MCCBs 7-4 ... Valves and pumps

Claims (12)

プラント機器の試験・点検時に作業員やプラントの安全を確保するために行う安全処置作業を管理するシステムにおいて、
個体識別子が表記された安全処置対象と、
前記安全処置対象の個体識別子に対応付けられた安全処置管理識別子が表記され、安全処置作業が実施されたときに前記安全処置対象に取り付けられる識別表示物と、
前記安全処置対象の個体識別子と同一の個体識別子、前記識別表示物の安全処置管理識別子と同一の安全処置管理識別子、および、予定している安全処置作業の内容を識別する予定作業情報を含む安全処置作業管理情報を格納するデータベースを備える管理装置と、
前記安全処置対象を撮影するカメラと、撮影した画像から文字および安全処置状態を認識する画像認識部と、照合部と、表示部とを備えるポータブルPCと、
を具備し、
安全処置作業の実施前において、前記照合部は、前記カメラで前記安全処置対象を撮影することにより画像から得られた個体識別子と、前記安全処置作業管理情報内の個体識別子とを照合し、
安全処置作業の実施後において、前記照合部は、前記カメラで前記安全処置対象および前記識別表示物を撮影することにより画像からそれぞれ得られた個体識別子および安全処置管理識別子と、前記安全処置作業管理情報内の個体識別子および安全処置管理識別子とを照合し、前記カメラで前記安全処置対象を撮影することにより得られた画像から、前記安全処置対象の現在の状態と、前記安全処置作業管理情報内の予定作業情報が表す状態とを照合し、
前記表示部は、前記照合部の照合結果に基づいてメッセージを表示することを特徴とする安全処置作業管理システム。
In a system that manages the safety treatment work performed to ensure the safety of workers and plants during testing and inspection of plant equipment,
A safe treatment target with an individual identifier,
A safety treatment management identifier associated with the individual identifier of the safety treatment object is described, and an identification display attached to the safety treatment object when a safety treatment work is performed,
Safety including an individual identifier that is the same as the individual identifier of the safety treatment target, a safety treatment management identifier that is the same as the safety treatment management identifier of the identification display object, and scheduled work information that identifies the content of the scheduled safety treatment work A management device comprising a database for storing treatment work management information;
A portable PC including a camera for photographing the safety treatment target, an image recognition unit for recognizing characters and a safety treatment state from the photographed image, a verification unit, and a display unit;
Comprising
Before performing safety treatment work, the collation unit collates the individual identifier obtained from the image by photographing the safety treatment target with the camera, and the individual identifier in the safety treatment work management information,
After the safety treatment work is performed, the collation unit includes an individual identifier and a safety treatment management identifier obtained from an image obtained by photographing the safety treatment target and the identification display object with the camera, and the safety treatment work management. The individual identifier and the safety treatment management identifier in the information are collated, and from the image obtained by photographing the safety treatment target with the camera, the current state of the safety treatment target and the safety treatment work management information Match the status indicated by the scheduled work information
The said display part displays a message based on the collation result of the said collation part, The safety treatment work management system characterized by the above-mentioned.
前記ポータブルPCは、前記安全処置対象が撮影された画像から文字認識をする際に、前記安全処置対象が歪曲しているような場合においても自動修正して、前記安全処置対象の個体識別子を認識する機能をさらに備えていることを特徴とする請求項1に記載の安全処置作業管理システム。   The portable PC recognizes an individual identifier of the safety treatment object by automatically correcting the safety treatment object even when the safety treatment object is distorted when character recognition is performed from an image of the safety treatment object. The safety treatment work management system according to claim 1, further comprising a function of 前記ポータブルPCは、前記安全処置対象が撮影された画像を前記表示部に表示したときに前記安全処置対象の個体識別子を含む複数の個体識別子が存在する場合、自動で文字認識し、複数の個体識別子の中から安全処置作業者が前記安全処置対象の個体識別子を選択するための認識後画面を前記表示部に表示し、安全処置作業者が前記認識後画面から前記安全処置対象の個体識別子を選択した場合に、前記安全処置対象の個体識別子を認識する機能をさらに備えていることを特徴とする請求項1に記載の安全処置作業管理システム。   The portable PC automatically recognizes characters when there are a plurality of individual identifiers including the individual identifier of the safety treatment target when an image of the safety treatment target is displayed on the display unit. A post-recognition screen for selecting a safety treatment target individual identifier from among the identifiers is displayed on the display unit, and the safety treatment worker displays the individual identifier of the safety treatment target from the post-recognition screen. The safety treatment work management system according to claim 1, further comprising a function of recognizing the individual identifier of the safety treatment target when selected. 前記ポータブルPCは、前記安全処置対象が撮影された画像を前記表示部に表示したときに前記安全処置対象の個体識別子を含む複数の個体識別子が存在する場合、前記画像上で認識範囲の指定を促し、安全処置作業者が前記画像から前記安全処置対象の個体識別子を含む認識範囲を指定した場合、前記認識範囲が指定された前記安全処置対象の個体識別子を認識する機能をさらに備えていることを特徴とする請求項1に記載の安全処置作業管理システム。   The portable PC designates a recognition range on the image when there are a plurality of individual identifiers including the individual identifiers of the safety treatment target when the image of the safety treatment target is displayed on the display unit. And when the safety treatment worker designates a recognition range including the individual identifier of the safety treatment target from the image, it further has a function of recognizing the individual identifier of the safety treatment target designated by the recognition range. The safety treatment work management system according to claim 1. 前記ポータブルPCは、認識ルールがユーザーにより設定され、前記認識ルールに基づいて前記安全処置対象の個体識別子を認識する機能をさらに備えていることを特徴とする請求項1に記載の安全処置作業管理システム。   The safety treatment work management according to claim 1, wherein the portable PC further includes a function in which a recognition rule is set by a user and the individual identifier of the safety treatment target is recognized based on the recognition rule. system. 前記管理装置および前記ポータブルPCはネットワークへ接続可能な通信部をさらに備え、
前記管理装置への前記安全処置作業管理情報の入力は前記ネットワークに接続されている機器から入力され、
前記ポータブルPCは、前記管理装置内の前記データベースへ直接アクセスして前記安全処置作業管理情報をダウンロードすることを特徴とする請求項1ないし請求項5のいずれか一項に記載の安全処置作業管理システム。
The management device and the portable PC further include a communication unit connectable to a network,
Input of the safety treatment work management information to the management device is input from a device connected to the network,
The safety treatment work management system according to any one of claims 1 to 5, wherein the portable PC downloads the safety treatment work management information by directly accessing the database in the management apparatus. .
前記管理装置は、安全処置作業の実施後に前記安全処置対象に前記識別表示物が取りついている状態で前記ポータブルPCの前記カメラにより撮影された画像を前記管理装置の前記データベースの前記安全処置作業管理情報内の作業エビデンスとして格納する手段をさらに備えていることを特徴とする請求項1ないし請求項6のいずれか一項に記載の安全処置作業管理システム。   The management device manages the safety treatment work management in the database of the management device with an image taken by the camera of the portable PC in a state where the identification display object is attached to the safety treatment target after the safety treatment work is performed. The safety treatment work management system according to any one of claims 1 to 6, further comprising means for storing work evidence in the information. 前記ポータブルPCは、安全処置作業を実施した時間を前記管理装置の前記データベースの前記安全処置作業管理情報内の実施時刻として記録する機能をさらに備えていることを特徴とする請求項1ないし請求項7のいずれか一項に記載の安全処置作業管理システム。   The portable PC is further provided with a function of recording a time when a safety treatment work is performed as an execution time in the safety treatment work management information of the database of the management device. The safety treatment work management system according to any one of 7 above. 前記管理装置は、図面を参照する手段をさらに備え、
前記データベースは、前記図面を保管する図面保管部を備え、
前記図面は、図面内に個体識別子を含む情報が格納されているデータ図面であり、前記ポータブルPCで認識した個体識別子に対応する図面を、前記図面保管部から呼出し、前記ポータブルPCへ表示させることを特徴とする請求項1ないし請求項8のいずれか一項に記載の安全処置作業管理システム。
The management device further comprises means for referring to the drawings,
The database includes a drawing storage unit for storing the drawings,
The drawing is a data drawing in which information including an individual identifier is stored in the drawing, and a drawing corresponding to the individual identifier recognized by the portable PC is called from the drawing storage unit and displayed on the portable PC. The safety treatment work management system according to any one of claims 1 to 8, wherein
前記管理装置は、前記安全処置作業管理情報の入力時に、前記図面内の個体識別子を選択することにより前記安全処置作業管理情報を作成することを特徴とする請求項9に記載の安全処置作業管理システム。   The safety management work management according to claim 9, wherein the management device creates the safety management work management information by selecting an individual identifier in the drawing when the safety management work management information is input. system. 前記ポータブルPCは、前記安全処置作業管理情報に関する前記安全処置対象の位置情報を検索するGPS機能と、前記位置情報に基づいて安全処置作業者を前記安全処置対象まで誘導案内する手段と、をさらに備えていることを特徴とする請求項1ないし請求項10のいずれか一項に記載の安全処置作業管理システム。   The portable PC further includes a GPS function that searches for position information of the safety treatment target related to the safety treatment work management information, and means for guiding and guiding the safety treatment worker to the safety treatment target based on the position information. The safety treatment work management system according to any one of claims 1 to 10, further comprising: 個体識別子が表記された安全処置対象と、前記安全処置対象の個体識別子に対応付けられた安全処置管理識別子が表記され、安全処置作業が実施されたときに前記安全処置対象に取り付けられる識別表示物と、前記安全処置対象の個体識別子と同一の個体識別子、前記識別表示物の安全処置管理識別子と同一の安全処置管理識別子、および、予定している安全処置作業の内容を識別する予定作業情報を含む安全処置作業管理情報を格納するデータベースを備える管理装置と、前記安全処置対象を撮影するカメラを備えるポータブルPCと、を具備し、プラント機器の試験・点検時に作業員やプラントの安全を確保するために行う安全処置作業を管理する方法であって、
安全処置作業の実施前において、前記ポータブルPCは、前記カメラで前記安全処置対象を撮影することにより画像から得られた個体識別子と、前記安全処置作業管理情報内の個体識別子とを照合し、
安全処置作業の実施後において、前記ポータブルPCは、前記カメラで前記安全処置対象および前記識別表示物を撮影することにより画像からそれぞれ得られた個体識別子および安全処置管理識別子と、前記安全処置作業管理情報内の個体識別子および安全処置管理識別子とを照合し、前記カメラで前記安全処置対象を撮影することにより得られた画像から、前記安全処置対象の現在の状態と、前記安全処置作業管理情報内の予定作業情報が表す状態とを照合し、
前記ポータブルPCは、照合結果に基づいてメッセージを表示することを特徴とする安全処置作業管理方法。
A safety treatment object in which an individual identifier is written, a safety treatment management identifier associated with the individual identifier of the safety treatment object, and an identification display attached to the safety treatment object when the safety treatment work is performed And an individual identifier identical to the individual identifier of the safety treatment target, a safety treatment management identifier identical to the safety treatment management identifier of the identification display object, and scheduled work information for identifying the content of the planned safety treatment work Including a management apparatus having a database for storing safety treatment work management information, and a portable PC having a camera for photographing the safety treatment object, to ensure the safety of workers and plants during testing and inspection of plant equipment A method for managing safety action work to be performed for
Before carrying out the safety treatment work, the portable PC collates the individual identifier obtained from the image by photographing the safety treatment target with the camera and the individual identifier in the safety treatment work management information,
After carrying out the safety treatment work, the portable PC uses the camera to photograph the safety treatment object and the identification display object, respectively, and the individual identifier and the safety treatment management identifier obtained from the images, and the safety treatment work management. The individual identifier and the safety treatment management identifier in the information are collated, and from the image obtained by photographing the safety treatment target with the camera, the current state of the safety treatment target and the safety treatment work management information Match the status indicated by the scheduled work information
The portable PC displays a message based on a collation result, and a safety treatment work management method.
JP2013076348A 2013-04-01 2013-04-01 Safe treatment work management system Pending JP2014203130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013076348A JP2014203130A (en) 2013-04-01 2013-04-01 Safe treatment work management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013076348A JP2014203130A (en) 2013-04-01 2013-04-01 Safe treatment work management system

Publications (1)

Publication Number Publication Date
JP2014203130A true JP2014203130A (en) 2014-10-27

Family

ID=52353550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013076348A Pending JP2014203130A (en) 2013-04-01 2013-04-01 Safe treatment work management system

Country Status (1)

Country Link
JP (1) JP2014203130A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017062685A (en) * 2015-09-25 2017-03-30 横河電機株式会社 Inspection work support device, system, and method
CN111856994A (en) * 2020-06-28 2020-10-30 国家电网有限公司 System and method for safely overhauling substation equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006146749A (en) * 2004-11-24 2006-06-08 Kyushu Electric Power Co Inc Facility erroneous operation prevention system of plant or the like
JP2007334438A (en) * 2006-06-12 2007-12-27 Hitachi Ltd Portable plant maintenance/monitoring system and method
JP2013003863A (en) * 2011-06-17 2013-01-07 Hitachi Engineering & Services Co Ltd On-site equipment erroneous operation prevention method and on-site equipment erroneous operation prevention system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006146749A (en) * 2004-11-24 2006-06-08 Kyushu Electric Power Co Inc Facility erroneous operation prevention system of plant or the like
JP2007334438A (en) * 2006-06-12 2007-12-27 Hitachi Ltd Portable plant maintenance/monitoring system and method
JP2013003863A (en) * 2011-06-17 2013-01-07 Hitachi Engineering & Services Co Ltd On-site equipment erroneous operation prevention method and on-site equipment erroneous operation prevention system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017062685A (en) * 2015-09-25 2017-03-30 横河電機株式会社 Inspection work support device, system, and method
CN111856994A (en) * 2020-06-28 2020-10-30 国家电网有限公司 System and method for safely overhauling substation equipment

Similar Documents

Publication Publication Date Title
CN106453551B (en) The planning of article delivery robot task and executive device and method in a kind of office
JP2023526362A (en) Article processing method, device, system, electronic device, storage medium and computer program
TWI474144B (en) Job management system, job management terminal, computer program products and job management methods
WO2015001611A1 (en) Network construction assistance system and method
US11090808B2 (en) Control device, picking system, distribution system, program, control method and production method
JP6912150B2 (en) Work support equipment, work support methods and programs
CN110210628A (en) A kind of automation equipment intelligence O&amp;M upkeep operation method of augmented reality
US20110313734A1 (en) Model Assembly of a Production Plant With True-To-Scale Models of Production Devices and Method for Inputting a Spatial Assembly of Production Devices Into a Computer-Assisted Planning Program
CN113119099A (en) Computer device and method for controlling mechanical arm to clamp and place object
JP4953656B2 (en) Appliance management system and appliance management method
TWI490796B (en) System and method for handing over job
WO2023132555A1 (en) Augmented reality-based construction site management method and server
JP2014203130A (en) Safe treatment work management system
WO2012108188A1 (en) Plant assistance system
US20070288923A1 (en) Work assisting apparatus, method, and program
CN112621765B (en) Automatic equipment assembly control method and device based on manipulator
JP6440485B2 (en) Plant maintenance operation support system
JP2006209259A (en) Operation support system, operation support method and computer program
JP2006146749A (en) Facility erroneous operation prevention system of plant or the like
CN208399951U (en) The equipment and system that the test result of circuit board is marked
CN112632088B (en) Agricultural machinery equipment monitoring method and system and computer readable storage medium
JP6770424B2 (en) Nursing care service support system
CN108108895A (en) Method, system, equipment and the storage medium of task status dynamic management and control
CN108957384A (en) A kind of turnover box and electric energy measuring equipment discriminating direction method and apparatus
JP2008261803A (en) Valve inspection support system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170116

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170131

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20170725