JP2012095479A - Power system monitoring controller - Google Patents

Power system monitoring controller Download PDF

Info

Publication number
JP2012095479A
JP2012095479A JP2010241915A JP2010241915A JP2012095479A JP 2012095479 A JP2012095479 A JP 2012095479A JP 2010241915 A JP2010241915 A JP 2010241915A JP 2010241915 A JP2010241915 A JP 2010241915A JP 2012095479 A JP2012095479 A JP 2012095479A
Authority
JP
Japan
Prior art keywords
alarm
test
electric
alarm display
system monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2010241915A
Other languages
Japanese (ja)
Inventor
Yoshizo Fujiwara
喜三 藤原
Masakazu Sakamoto
雅一 坂本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2010241915A priority Critical patent/JP2012095479A/en
Publication of JP2012095479A publication Critical patent/JP2012095479A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a power system monitoring controller capable of discriminating an alarm display test of an electric power station from an actual accident and conducting simultaneously the alarm display tests of the plurality of electric power stations.SOLUTION: A monitoring control computer 10 lights a bell button 24, a buzzer button 25 and a chime button 26, which are displayed on a corresponding console 113, instead of ringing a bell BL, a buzzer BZ and a chime CH of a system monitoring board 112 during the alarm display test of the electric power station, and stops lighting of the bell button 24, the buzzer button 25 and the chime button 26, which are displayed on the corresponding console 113, and rings the bell BL, the buzzer BZ and the chime CH of the system monitoring board 112 when the actual accident occurs during the alarm display test of the electric power station.

Description

本発明は、電力系統監視制御装置に関し、特に、電気所単位で警報表示試験を行うのに好適な電力系統監視制御装置に関する。   The present invention relates to a power system monitoring and control device, and more particularly to a power system monitoring and control device suitable for performing an alarm display test in units of electric stations.

従来、電力会社では、電力系統の監視および制御のために電力系統監視制御装置を制御所に設置している。   Conventionally, electric power companies have installed electric power system monitoring and control devices at control stations for monitoring and controlling the electric power system.

このような電力系統監視制御装置は、たとえば図6に示す電力系統監視制御装置110のように、第1乃至第nの電気所にそれぞれ設置された第1乃至第nの遠方監視制御装置(テレコン)1201〜120nと通信回線1を介して接続された監視制御計算機111と、監視制御計算機111に接続された、かつ、電気所内の事故発生時の警報通知手段であるベルBL、ブザーBZおよびチャイムCHを1個ずつ備えた系統監視盤112と、監視制御計算機111に接続された第1乃至第3の操作卓1131〜1133とを具備する。 Such a power system monitoring control device is, for example, a first to n-th remote monitoring control device (telecom control) installed in each of the first to n-th electrical stations, such as the power system monitoring control device 110 shown in FIG. ) Monitoring control computer 111 connected to 120 1 to 120 n via communication line 1, Bell BL, buzzer BZ which is connected to monitoring control computer 111 and is an alarm notification means when an accident occurs in an electric station and it includes a system monitor board 112 having a chime CH one by one, and first to third operator console 113 1-113 3 connected to the monitor control computer 111.

ここで、監視制御計算機111は、第1乃至第nの遠方監視制御装置1201〜120nから送信されてくる第1乃至第nの機器データ(第1乃至第nの電気所にそれぞれ設置された第1乃至第nの電力機器1301〜130n(実際には、各電気所には複数の電力機器が設置されている。)の動作内容および状態などを示すデータ)に基づいて電気所内の事故発生を検出すると、事故発生個所(事故が発生した電気所および電力機器)を系統監視盤112に他と区別して表示したり、事故内容に応じてベルBL、ブザーBZまたはチャイムCHを鳴動させたりして(たとえば、変圧器の1次短絡が発生するとベルBLを鳴動させ、変圧器の重故障が発生するとブザーBZを鳴動させ、変圧器の軽故障が発生するとチャイムCHを鳴動させる。)、電気所内の事故発生を数人の当直員全員に知らせるようにしている。 Here, the monitoring control computer 111 is installed in the first to n-th device data (first to n-th electrical stations) transmitted from the first to n-th remote monitoring control devices 120 1 to 120 n , respectively. Based on the first to n-th power devices 130 1 to 130 n (actually, data indicating the operation content and state of each power station). If the occurrence of an accident is detected, the location where the accident occurred (electrical station and power equipment where the accident occurred) is displayed separately from the others on the system monitoring panel 112, or the bell BL, buzzer BZ or chime CH is sounded according to the accident content (For example, when the primary short circuit of the transformer occurs, the bell BL is sounded, when the major fault of the transformer occurs, the buzzer BZ is sounded, and when the minor fault of the transformer occurs, the chime CH is sounded. ), Is to inform the duty all members of several people the accident occurrence of an electrical plant.

数人の当直員は、系統監視盤112のベルBL、ブザーBZまたはチャイムCHが鳴動すると、いずれかの電気所内で事故が発生したとして、系統監視盤112に他と区別して表示された事故発生個所を確認したのち、直ちに事故解消手法・手順の検討と必要個所への連絡と指示・監督とを手分けして行う。   Several on-duty personnel, when the bell BL, buzzer BZ or chime CH on the system monitoring panel 112 rings, an accident occurred on the system monitoring panel 112, indicating that an accident occurred in one of the electrical stations. Immediately after confirming the location, examine accident resolution methods and procedures, and contact the necessary locations and give instructions and supervision.

また、電気所単位の警報表示試験時には、監視制御計算機111は、第1乃至第3の操作卓1131〜1133から対象電気所の対象電力機器(警報表示試験の対象である電気所および電力機器)についての警報表示試験開始指示信号が送られてくると、対象電気所の対象電力機器用の所定の警報表示試験手順(警報表示試験シーケンス)に従った操作信号を第1乃至第nの遠方監視制御装置1201〜120nに通信回線1を介して送信する。
たとえば、図7に示す第1の電気所に設置された変圧器#2についての警報表示試験の要請が第1の電気所からあると、数人の当直員のうちの1人(以下、「第1の電気所担当の当直員」と称する。)は、第1の操作卓1131を用いて、第1の電気所の変圧器#2の警報表示試験開始指示信号を監視制御計算機111に送信して、第1の電気所の変圧器#2用の警報表示試験手順に従った操作信号を第1の遠方監視制御装置1201に通信回線1を介して送信させる。
At the time of the alarm display test for each electric station, the monitoring control computer 111 receives the target electric power device (the electric station and electric power to be subjected to the alarm display test) from the first to third consoles 113 1 to 1133. When an alarm display test start instruction signal for the device) is sent, an operation signal in accordance with a predetermined alarm display test procedure (alarm display test sequence) for the target power device at the target electrical station is sent to the first to n-th operation signals. The data is transmitted to the remote monitoring control devices 120 1 to 120 n via the communication line 1.
For example, if there is a request for an alarm display test for the transformer # 2 installed in the first electric station shown in FIG. 7 from the first electric station, one of several duty staff (hereinafter, “ Is referred to as the "first duty person in charge of the electric power station"), using the first console 1131, the alarm display test start instruction signal of the transformer # 2 of the first electric power station is sent to the monitoring control computer 111. The operation signal is transmitted to the first remote monitoring control device 120 1 via the communication line 1 according to the alarm display test procedure for the transformer # 2 of the first electric station.

これにより、たとえば第1の電気所の変圧器#2の1次短絡時の警報表示試験を行うために、1次側遮断器150,152を遮断(開放)させる操作信号が監視制御計算機111から通信回線1および第1の遠方監視制御装置1201を介して過電流継電器(51P)160に送信され、1次側遮断器150,152が過電流継電器160によって遮断されると、過電流継電器160の動作内容や状態などを示す機器データ(第1の機器データ)が過電流継電器160から第1の遠方監視制御装置1201および通信回線1を介して監視制御計算機111に送信される。 Thus, for example, in order to perform an alarm display test at the time of the primary short circuit of the transformer # 2 of the first electric station, an operation signal for interrupting (opening) the primary circuit breakers 150 and 152 is received from the monitoring control computer 111. When through the communication line 1 and the first remote monitor control device 120 1 is transmitted to the overcurrent relay (51P) 160, 1 primary breaker 150, 152 is blocked by the overcurrent relay 160, the overcurrent relay 160 device data indicating, for example, the operation contents and state (first device data) is transmitted to the monitoring control computer 111 from the over current relay 160 via the first remote monitor control device 120 1 and the communication line 1.

その結果、監視制御計算機111によって第1の電気所の変圧器#2(事故発生個所)が系統監視盤112に他と区別して表示されるとともに系統監視盤112のベルBLが鳴動されるため、第1の電気所担当の当直員は、第1の電気所の変圧器#2の1次短絡の警報表示試験結果が正常であったことを確認することができる。   As a result, the supervisory control computer 111 displays the transformer # 2 (accident occurrence location) of the first electric station in the system monitoring panel 112 so as to be distinguished from the others, and the bell BL of the system monitoring panel 112 is sounded. The duty person in charge of the first electric power station can confirm that the alarm display test result of the primary short circuit of the transformer # 2 of the first electric power station is normal.

なお、下記の特許文献1には、メンテナンス担当者が電力設備の増設時にメンテナンスの終了確認を独自の試験方法にて行うことなく簡単に行えるように、電力系統機器の状態を伝送する遠方監視制御装置と電力系統機器を定義した設備データベースとこの設備データベースに従って監視制御を行う手段を備えた電力系統監視制御装置において、電力系統機器の設備種別に対応して試験手順を定義したデータベースと、この試験手順に従って試験を実施し、試験結果の良否を判定する試験手段とから構成することが開示されている。   In Patent Document 1 below, remote supervisory control that transmits the status of the power system equipment so that the maintenance staff can easily confirm the completion of the maintenance without using a unique test method when adding power equipment. In a power system monitoring and control device equipped with equipment database defining equipment and power system equipment and means for performing monitoring control according to this equipment database, a database defining test procedures corresponding to the equipment type of power system equipment, and this test It is disclosed that a test is performed according to a procedure and configured with test means for judging whether the test result is good or bad.

特開平7−7851号公報JP-A-7-7851

しかしながら、系統監視盤112はベルBL、ブザーBZおよびチャイムCHを1個ずつしか備えていないので、上述した第1の電気所の警報表示試験を行っているときには、第1の電気所担当の当直員のみがベルBL、ブザーBZまたはチャイムCHが鳴動するかを確認すればよいが、他の当直員はいずれかの電気所内の事故発生によりベルBL、ブザーBZまたはチャイムCHが鳴動したと思って現在行っている作業を中断せざるを得ないという問題があった。   However, since the system monitoring panel 112 has only one bell BL, one buzzer BZ, and one chime CH, when the alarm display test of the first electric station is performed, the duty of the first electric station person in charge is checked. Only the staff members need to check whether the bell BL, buzzer BZ or chime CH sounds, but other duty personnel think that the bell BL, buzzer BZ or chime CH ring due to an accident in one of the electric stations. There was a problem that the current work had to be interrupted.

また、第1の電気所の警報表示試験を行っているときに第2の電気所内で実際に事故が発生した場合にも事故内容に応じてベルBL、ブザーBZまたはチャイムCHが鳴動するため、第1の電気所担当の当直員および他の当直員は第1の電気所の警報表示試験によってベルBL、ブザーBZまたはチャイムCHが鳴動したのか第2の電気所内の実際の事故によってベルBL、ブザーBZまたはチャイムCHが鳴動したのかを瞬時に判別することができないという問題があった。   In addition, when an accident actually occurs in the second electric power station during the alarm display test of the first electric power station, the bell BL, buzzer BZ or chime CH rings according to the contents of the accident. The duty person in charge of the first electric power station and the other duty staff members will check whether the bell BL, buzzer BZ or chime CH sounded by the alarm display test of the first electric power station, or the bell BL, There is a problem that it cannot be instantaneously determined whether the buzzer BZ or the chime CH has ringed.

さらに、たとえば第1および第2の電気所から同一日に警報表示試験の要請があった場合には、同時に警報表示試験を行うと、第1および第2の電気所担当の当直員は第1および第2の電気所のいずれにおける警報表示試験によってベルBL、ブザーBZまたはチャイムCHが鳴動したのか瞬時に判別することができないため、第1および第2の電気所のうちの1つに限定して警報表示試験を行わざるを得ないという問題のほか、第1の電気所の警報表示試験が新設に伴うものである場合には、警報表示試験に1日かかるため、第2の電気所については長時間の待ち状態となってしまい、効率が悪くなるという問題があった。   Further, for example, when the alarm display test is requested from the first and second electric stations on the same day, the duty staff in charge of the first and second electric stations is the first when the alarm display test is performed at the same time. It is not possible to immediately determine whether the bell BL, buzzer BZ or chime CH has been ringed by the alarm display test at any of the first and second electric stations, so it is limited to one of the first and second electric stations. In addition to the problem of having to perform an alarm display test, if the alarm display test at the first electric station is associated with a new installation, the alarm display test will take one day. Has a problem that it is in a waiting state for a long time and the efficiency is lowered.

本発明の目的は、電気所の警報表示試験と実際の事故との区別が可能であるとともに複数の電気所の警報表示試験を同時に行うことができる電力系統監視制御装置を提供することにある。   An object of the present invention is to provide a power system monitoring and control device that can distinguish between an alarm display test of an electric station and an actual accident and can simultaneously perform an alarm display test of a plurality of electric stations.

本発明の電力系統監視制御装置は、第1乃至第nの電気所にそれぞれ設置された第1乃至第nの遠方監視制御装置(1201〜120n)と通信回線(1)を介して接続された監視制御計算機(10)と、該監視制御計算機に接続された、かつ、前記第1乃至第nの電気所内の事故発生時に鳴動される警報通知手段(BL,BZ,CH)を1組のみ備えた系統監視盤(112)と、前記監視制御計算機に接続された複数個の操作卓(1131〜1133)とを具備し、前記監視制御計算機が、前記第1乃至第nの電気所の少なくとも1つの電気所の警報表示試験中は、前記系統監視盤の前記警報通知手段を鳴動させる代わりに前記複数個の操作卓のうち該警報表示試験に使用している対応操作卓(113x)に表示した警報通知表示手段(24〜26)を点灯させるとともに、該警報表示試験中に実際の事故が発生した場合には、前記対応操作卓に表示した前記警報通知表示手段を点灯させることを止めて前記系統監視盤の前記警報通知手段を鳴動させる手段を備えることを特徴とする。
ここで、前記警報通知手段がベル(BL)、ブザー(BZ)およびチャイム(CH)であり、前記警報通知表示手段がベルボタン(24)、ブザーボタン(25)またはチャイムボタン(26)であってもよい。
前記監視制御計算機が、前記第1乃至第nの電気所のうち複数の電気所から同時に警報表示試験の要請があった場合には、該複数の電気所の警報表示試験中は、前記系統監視盤の前記警報通知手段を鳴動させる代わりに前記複数個の操作卓のうち該複数の電気所の警報表示試験に使用している複数個の対応操作卓に表示された警報通知表示手段を点灯させるとともに、該複数の電気所の警報表示試験中に実際の事故が発生した場合には、前記複数個の対応操作卓に表示された前記警報通知表示手段を点灯させることを止めて前記系統監視盤の前記警報通知手段を鳴動させる手段を備えてもよい。
前記監視制御計算機が、前記複数の電気所の警報表示試験のうちの1つが電気所の新設に伴うものであれば、該複数の電気所の警報表示試験中に実際の事故が発生した場合には、前記複数個の対応操作卓のうち前記新設される電気所以外の前記対応操作卓に表示された前記警報通知表示手段についてのみ点灯させることを止める手段を備えてもよい。
The power system monitoring control device of the present invention is connected to the first to n-th remote monitoring control devices (120 1 to 120 n ) installed in the first to n-th electric stations through the communication line (1). And a set of alarm notification means (BL, BZ, CH) connected to the supervisory control computer and sounded when an accident occurs in the first to n-th electric stations. And a plurality of consoles (113 1 to 113 3 ) connected to the supervisory control computer, wherein the supervisory control computer includes the first to nth electric monitors. During the alarm display test of at least one electric station, a corresponding operation console (113) used for the alarm display test among the plurality of operation consoles instead of ringing the alarm notification means of the system monitoring panel. alarm notification display means displayed on the x) (2 To 26), and when an actual accident occurs during the alarm display test, the alarm notification display means displayed on the corresponding operation console is stopped and the alarm of the system monitoring panel is stopped. A means for sounding the notification means is provided.
Here, the alarm notification means is a bell (BL), a buzzer (BZ) and a chime (CH), and the alarm notification display means is a bell button (24), a buzzer button (25) or a chime button (26). May be.
When the monitoring control computer has requested alarm display tests from a plurality of electric stations among the first to n-th electric stations simultaneously, the system monitoring is performed during the alarm display test of the plurality of electric stations. Instead of sounding the alarm notification means of the panel, the alarm notification display means displayed on the plurality of corresponding operation consoles used for the alarm display test of the plurality of electric stations among the plurality of operation consoles is turned on. In addition, when an actual accident occurs during the alarm display test of the plurality of electric stations, the system monitoring panel is stopped by turning on the alarm notification display means displayed on the plurality of corresponding operation consoles. There may be provided means for sounding the alarm notification means.
If one of the alarm display tests of the plurality of electric stations is associated with the new establishment of the electric station, the monitoring control computer may have an actual accident during the alarm display test of the plurality of electric stations. May include means for stopping lighting of only the alarm notification display means displayed on the corresponding operation console other than the newly installed electric station among the plurality of corresponding operation consoles.

本発明の電力系統監視制御装置は、以下の効果を奏する。
(1)電気所の警報表示試験中は系統監視盤の警報通知手段を鳴動させる代わりに対応操作卓に表示した警報通知表示手段を点灯させ、電気所の警報表示試験中に実際の事故が発生した場合には、対応操作卓に表示した警報通知表示手段を点灯させることを止めて系統監視盤の警報通知手段を鳴動させることにより、電気所の警報表示試験と実際の事故との区別を可能にすることができる。
(2)複数の電気所から同時に警報表示試験の要請があった場合には、複数の電気所の警報表示試験中には系統監視盤の警報通知手段を鳴動させる代わりに複数個の対応操作卓に表示した警報通知表示手段を点灯させることにより、複数の電気所の警報表示試験を同時に行うことができる。
(3)既設の電力設備を監視しながら電気所単位の警報表示試験を行うことができる。
The power system monitoring and control device of the present invention has the following effects.
(1) Instead of sounding the alarm notification means of the system monitoring panel during the alarm display test of the electric station, the alarm notification display means displayed on the corresponding operation console is turned on, and an actual accident occurs during the alarm display test of the electric station In this case, it is possible to distinguish between an alarm display test at an electric station and an actual accident by stopping the alarm notification display means displayed on the corresponding console and turning on the alarm notification means on the system monitoring panel. Can be.
(2) When there is a request for an alarm display test from a plurality of electric stations at the same time, a plurality of operation consoles are used instead of sounding the alarm notification means of the system monitoring panel during the alarm display test of a plurality of electric stations. By turning on the warning notification display means displayed in the above, it is possible to simultaneously perform a warning display test for a plurality of electric stations.
(3) It is possible to conduct an alarm display test for each electric station while monitoring existing power facilities.

本発明の一実施例による電力系統監視制御装置が具備する監視制御計算機10の構成を示すブロック図である。It is a block diagram which shows the structure of the monitoring control computer 10 with which the electric power system monitoring control apparatus by one Example of this invention comprises. 図1に示した監視制御計算機10の動作について説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of the supervisory control computer 10 shown in FIG. 第1の電気所の警報表示試験中に第1の操作卓1131に表示される対象電気所用警報表示試験画面20について説明するための図である。It is a figure for demonstrating the alarm display test screen 20 for object electric power stations displayed on the 1st console 1131 during the alarm display test of a 1st electric power station. 第1の電気所の警報表示試験中に第1の操作卓1131に表示される対象電気所用警報表示試験画面20について説明するための図である。It is a figure for demonstrating the alarm display test screen 20 for object electric power stations displayed on the 1st console 1131 during the alarm display test of a 1st electric power station. 第1の電気所の警報表示試験中に第1の操作卓1131に表示される対象電気所用警報表示試験画面20について説明するための図である。It is a figure for demonstrating the alarm display test screen 20 for object electric power stations displayed on the 1st console 1131 during the alarm display test of a 1st electric power station. 従来の電力系統監視制御装置110の構成を説明するための図である。It is a figure for demonstrating the structure of the conventional power system monitoring control apparatus 110. FIG. 図6に示した監視制御計算機111の動作について説明するための図である。It is a figure for demonstrating operation | movement of the monitoring control computer 111 shown in FIG.

上記の目的を、監視制御計算機が、電気所の警報表示試験中は、系統監視盤のベル、ブザーおよびチャイムを鳴動させる代わりに対応操作卓に表示したベルボタン、ブザーボタンおよびチャイムボタンを点灯させるとともに、電気所の警報表示試験中に実際の事故が発生した場合には、対応操作卓に表示したベルボタン、ブザーボタンおよびチャイムボタンを点灯させることを止めて系統監視盤のベル、ブザーおよびチャイムを鳴動させることにより実現した。   For the above purpose, the monitoring control computer lights up the bell button, buzzer button and chime button displayed on the corresponding console instead of ringing the bell, buzzer and chime of the system monitoring board during the alarm display test of the electric station. In addition, if an actual accident occurs during an alarm display test at an electric power station, the bell button, buzzer button and chime button displayed on the corresponding console are turned off and the bell, buzzer and chime on the system monitoring panel are stopped. Realized by ringing.

以下、本発明の電力系統監視制御装置の実施例について図面を参照して説明する。
本発明の一実施例による電力系統監視制御装置は、図1に示す監視制御計算機10が電気所の警報表示試験中は系統監視盤112のベルBL、ブザーBZおよびチャイムCHを鳴動させる代わりに第1乃至第3の操作卓1131〜1133のうち警報表示試験に使用している操作卓(以下、「対応操作卓113x」と称する。)に表示したベルボタン(BL)、ブザーボタン(BZ)およびチャイムボタン(CH)を点灯させるとともに、電気所の警報表示試験中に実際の事故が発生した場合には対応操作卓113xに表示したベルボタン、ブザーボタンおよびチャイムボタンを点灯させることを止めて系統監視盤112のベルBL、ブザーBZおよびチャイムCHを鳴動させることを特徴とする。
Embodiments of a power system monitoring and control apparatus according to the present invention will be described below with reference to the drawings.
The power system monitoring and control apparatus according to one embodiment of the present invention is not limited to ringing the bell BL, buzzer BZ, and chime CH of the system monitoring board 112 during the alarm display test of the electric station by the monitoring control computer 10 shown in FIG. Among the first to third consoles 113 1 to 1133, the bell button (BL) and buzzer button (displayed on the console used for the alarm display test (hereinafter referred to as “corresponding console 113 x ”)) BZ) and causes lighting chime button (CH), it is when the actual accident during alarm display test substation occurs bell button displayed on the corresponding console 113 x, turns on the buzzer button and chime button And the bell BL, buzzer BZ, and chime CH of the system monitoring board 112 are sounded.

そのため、監視制御計算機10は、図1に示すように、送受信部11と、監視制御部12と、表示個所切換部13と、画面表示制御部14と、警報表示試験部15と、試験手順データベース(試験手順DB)16とを具備する。   Therefore, as shown in FIG. 1, the monitoring control computer 10 includes a transmission / reception unit 11, a monitoring control unit 12, a display location switching unit 13, a screen display control unit 14, an alarm display testing unit 15, and a test procedure database. (Test Procedure DB) 16.

ここで、送受信部11は、通信回線1を介して第1乃至第nの遠方監視制御装置1201〜120n(図6参照)との間で各種のデータや信号のやり取りを行う。 Here, the transmission / reception unit 11 exchanges various data and signals with the first to nth remote monitoring control devices 120 1 to 120 n (see FIG. 6) via the communication line 1.

監視制御部12は、送受信部11を介して第1乃至第nの遠方監視制御装置1201〜120nから送信されてくる第1乃至第nの機器データに基づいて第1乃至第nの電気所内の事故発生を検出する機能や、警報表示試験部15からの操作信号を第1乃至第nの遠方監視制御装置1201〜120nに送受信部11を介して送信する機能など、図6に示した従来の監視制御装置111が具備する監視制御部と同様の機能を有する。
また、監視制御部12は、電気所の警報表示試験中に実際の事故発生を検出すると、表示個所を対応操作卓113xから系統監視盤112に切り換えるように指示する表示個所切換指示信号を表示個所切換部13に出力する。
The monitoring control unit 12 performs the first to nth electrical data based on the first to nth device data transmitted from the first to nth remote monitoring control devices 120 1 to 120 n via the transmission / reception unit 11. FIG. 6 shows a function for detecting the occurrence of an accident in the station and a function for transmitting an operation signal from the alarm display test unit 15 to the first to n-th remote monitoring control devices 120 1 to 120 n via the transmission / reception unit 11. It has the same function as the monitoring control unit included in the conventional monitoring control device 111 shown.
When the monitoring control unit 12 detects the occurrence of an actual accident during the alarm display test of the electric station, the monitoring control unit 12 displays a display position switching instruction signal for instructing to switch the display position from the corresponding console 113 x to the system monitoring panel 112. The data is output to the location switching unit 13.

表示個所切換部13は、常時は系統監視盤112を表示個所として選択しており、監視制御部12によって事故発生が検出されると、系統監視盤112に事故発生個所を他と区別して表示したり事故内容に応じて系統監視盤112のベルBL、ブザーBZまたはチャイムCHを鳴動させたりする。
また、表示個所切換部13は、対応操作卓113xから画面表示制御部14を介して警報表示試験開始指示信号が送信されてくると、表示個所を系統監視盤112から対応操作卓113xに切り換える。
さらに、表示個所切換部13は、監視制御部12から表示個所切換指示信号が入力されると、表示個所を対応操作卓113xから系統監視盤112に切り換える。
The display location switching unit 13 always selects the system monitoring board 112 as the display location, and when the occurrence of an accident is detected by the monitoring control unit 12, the system monitoring board 112 displays the accident occurrence location separately from the others. The bell BL, buzzer BZ or chime CH of the system monitoring panel 112 is sounded according to the accident content.
Further, when an alarm display test start instruction signal is transmitted from the corresponding operation console 113 x via the screen display control unit 14, the display location switching unit 13 changes the display location from the system monitoring panel 112 to the corresponding operation console 113 x . Switch.
Further, the display location switching unit 13, the display location switching instruction signal from the monitoring control unit 12 is inputted, switches the system monitoring panel 112 display points from the corresponding console 113 x.

画面表示制御部14は、対応操作卓113xから対象電気所の警報表示試験開始指示信号が入力されてくると、対象電気所における電力系統図、試験ボタンおよび試験結果表示欄を有する対象電気所用警報表示試験画面を対応操作卓113xに表示させる。
また、画面表示制御部14は、対応操作卓113xにおいて試験ボタンがクリックされたことを示す試験ボタンクリック信号が対応操作卓113xから入力されてくると、ベルボタン、ブザーボタンおよびチャイムボタンを対象電気所用警報表示試験画面に追加して対応操作卓113xに表示させる。
さらに、画面表示制御部14は、対応操作卓113xにおいて試験対象範囲がドラッグされて指定されたことを示す試験対象範囲指定信号が対応操作卓113xから入力されてくると、試験対象範囲指定信号によって示される試験対象範囲について警報表示試験を行うように指示する試験指示信号を警報表示試験部15に出力する。
さらにまた、画面表示制御部14は、試験結果表示指示信号が警報表示試験部15から入力されると、警報表示試験結果を対象電気所用警報表示試験画面に追加して対応操作卓113xに表示させるとともに、警報表示試験結果に応じて対象電気所用警報表示試験画面上のベルボタン、ブザーボタンまたはチャイムボタンを点灯させる。
When the alarm display test start instruction signal for the target electrical station is input from the corresponding console 113 x , the screen display control unit 14 is for the target electrical station having a power system diagram, a test button, and a test result display field in the target electrical station. The alarm display test screen is displayed on the corresponding console 113 x .
Also, the screen display control unit 14, when the test button click signal indicating that the test button in the corresponding console 113 x is clicked input from the corresponding console 113 x, bell buttons, a buzzer button and chime button It is added to the alarm display test screen for the target electric station and displayed on the corresponding console 113 x .
Furthermore, the screen display control unit 14, when the test target range designation signal indicates that the test target range in the corresponding console 113 x is designated by the dragged input from the corresponding console 113 x, tested range specification A test instruction signal for instructing to perform an alarm display test for the test target range indicated by the signal is output to the alarm display test unit 15.
Furthermore, the screen display control unit 14, when the test result display instruction signal is inputted from the alarm display test unit 15, displayed in the corresponding console 113 x add a warning display test results in the target electric Shoyo alarm display test screens At the same time, the bell button, buzzer button or chime button on the alarm display test screen for the target electric station is turned on according to the alarm display test result.

警報表示試験部15は、画面表示制御部14から入力されてくる試験指示信号によって示される試験対象範囲に基づいて試験手順データベース16にアクセスして、対象電気所の試験対象範囲についての警報表示試験手順データを試験手順データベース16から読み出したのち、読み出した警報表示試験手順データによって示される警報表示試験手順に従った操作信号を対象電気所の遠方監視制御装置(以下、「対応遠方監視制御装置120x」と称する。)に監視制御部12および送信部11を介して送信する。
また、警報表示試験部15は、対応遠方監視制御装置120xから送信部11および監視制御部12を介して送信されてくる機器データに基づいて警報表示試験結果を判定し、判定した警報表示試験結果を対象電気所用警報表示試験画面に追加して対応操作卓113xに表示させるように指示する試験結果表示指示信号を画面表示制御部14に出力する。
The alarm display test unit 15 accesses the test procedure database 16 based on the test target range indicated by the test instruction signal input from the screen display control unit 14, and performs an alarm display test for the test target range of the target electric station. After the procedure data is read from the test procedure database 16, an operation signal according to the alarm display test procedure indicated by the read alarm display test procedure data is sent to the remote monitoring control device (hereinafter referred to as “corresponding remote monitoring control device 120 corresponding to the target electrical station). x ")) via the monitoring control unit 12 and the transmission unit 11.
Further, the alarm display test unit 15 determines the alarm display test result based on the device data transmitted from the corresponding remote monitoring control device 120 x via the transmission unit 11 and the monitoring control unit 12, and the determined alarm display test A test result display instruction signal for instructing the result to be added to the target electric station alarm display test screen and displayed on the corresponding console 113 x is output to the screen display control unit 14.

試験手順データベース16には、第1乃至第nの電気所における警報表示試験手順データが試験対象範囲ごとに格納されている。   The test procedure database 16 stores alarm display test procedure data for the first to nth electric stations for each test target range.

次に、監視制御計算機10の動作について、図7に示した第1の電気所に設置された変圧器#2を試験対象として警報表示試験を行う場合を例として、図2乃至図5を参照して説明する。
なお、図3乃至図5において、1次側遮断器150,152などの遮断器については、投入されている状態を黒塗りで示し、遮断されている状態を灰色塗りで示す(図7においても同様である。)。
Next, referring to FIGS. 2 to 5, the operation of the supervisory control computer 10 will be described with reference to FIG. 2 to FIG. To explain.
3 to 5, for the circuit breakers such as the primary circuit breakers 150 and 152, the state of being put on is shown in black, and the state of being cut off is shown in gray (also in FIG. 7). The same).

第1の電気所に設置された変圧器#2についての警報表示試験の要請が第1の電気所からあると、第1の電気所担当の当直員は、第1の操作卓1131(図6参照)から監視制御計算機10に第1の電気所の警報表示試験開始指示信号を入力する(図2のステップS11)。 When a request for an alarm display test for the transformer # 2 installed at the first electric power station is received from the first electric power station, the duty person in charge of the first electric power station will call the first console 113 1 (FIG. 6), the alarm display test start instruction signal of the first electric station is input to the monitoring control computer 10 (step S11 in FIG. 2).

監視制御計算機10の画面表示制御部14は、第1の操作卓1131から第1の電気所の警報表示試験開始指示信号が入力されてくると、図3に示すように第1の電気所における電力系統図21、試験ボタン22および試験結果表示欄23を有する第1の電気所用警報表示試験画面20を第1の操作卓1131に表示させる。
また、表示個所切換部13は、第1の操作卓1131から画面表示制御部14を介して警報表示試験開始指示信号が送信されてくると、表示個所を系統監視盤112から第1の操作卓1131に切り換える(以上、ステップS12)。
Screen display control unit 14 of the monitoring control computer 10, when the first operator console 113 1 alarm indicator test start instruction signal of the first electrical plant comes is input, a first substation shown in FIG. 3 The first electric station alarm display test screen 20 having the power system diagram 21, the test button 22, and the test result display field 23 is displayed on the first console 113 1 .
Further, when an alarm display test start instruction signal is transmitted from the first console 1131 via the screen display control unit 14, the display location switching unit 13 changes the display location from the system monitoring panel 112 to the first operation. Switch to the console 113 1 (step S12).

第1の電気所担当の当直員は、第1の電気所用警報表示試験画面20が第1の操作卓1131に表示されると、図4に網掛で示すように試験ボタン22をクリックする。
これにより、第1の操作卓1131において試験ボタン22がクリックされたことを示す試験ボタンクリック信号が第1の操作卓1131から監視制御計算機10に入力される(ステップS13)。
When the first electric station alarm display test screen 20 is displayed on the first console 1131, the duty person in charge of the first electric station clicks the test button 22 as shown by shading in FIG. 4.
Thus, the test button click signal indicating that the test button 22 in the first console 113 1 is clicked is input to the supervisory control computer 10 from the first operator console 113 1 (step S13).

画面表示制御部14は、試験ボタンクリック信号が第1の操作卓1131から入力されてくると、図4に示すようにベルボタン24、ブザーボタン25およびチャイムボタン26を第1の電気所用警報表示試験画面20に追加して第1の操作卓1131に表示させる(ステップS14)。 When the test button click signal is input from the first console 113 1 , the screen display control unit 14 turns the bell button 24, the buzzer button 25, and the chime button 26 to the first alarm for electric station as shown in FIG. 4. In addition to the display test screen 20, it is displayed on the first console 1131 (step S14).

第1の電気所担当の当直員は、ベルボタン24、ブザーボタン25およびチャイムボタン26が第1の操作卓1131に表示されると、第1の操作卓1131に表示された電力系統図21の変圧器#2を取り囲む試験対象範囲をドラッグする(図4に示す破線の四角枠参照)。
これにより、第1の操作卓1131において試験対象範囲がドラッグされて指定されたことを示す試験対象範囲指定信号が第1の操作卓1131から監視制御計算機10に入力される(ステップS15)。
When the bell button 24, the buzzer button 25 and the chime button 26 are displayed on the first console 113 1 , the duty person in charge of the first electric power station displays the power system diagram displayed on the first console 113 1 . Drag the test target area surrounding the transformer # 2 of 21 (see the dashed box shown in FIG. 4).
Thus, the test target range designation signal test target range in the first operating console 113 1 indicates that the specified being dragged is input to the supervisory control computer 10 from the first operator console 113 1 (step S15) .

画面表示制御部14は、試験対象範囲指定信号が第1の操作卓1131から入力されてくると、試験対象範囲指定信号によって示される試験対象範囲(この例では、第1の電気所の変圧器#2)について警報表示試験を行うように指示する試験指示信号を警報表示試験部15に出力する(ステップS16)。 When the test target range designation signal is input from the first console 113 1 , the screen display control unit 14 changes the test target range indicated by the test target range designation signal (in this example, the first electric station's transformation). A test instruction signal for instructing the device # 2) to perform an alarm display test is output to the alarm display test unit 15 (step S16).

警報表示試験部15は、試験指示信号が画面表示制御部14から入力されてくると、この試験指示信号によって示される第1の電気所の試験対象範囲に基づいて試験手順データベース16にアクセスして、第1の電気所の試験対象範囲についての警報表示試験手順データを試験手順データベース16から読み出したのち、読み出した警報表示試験手順データによって示される警報表示試験手順に従った操作信号を第1の遠方監視制御装置1201に監視制御部12および送信部11を介して送信する(ステップS17)。
これにより、たとえば第1の電気所の変圧器#2の警報表示試験を行うために、1次側遮断器150,152および変圧器#2と母線との間の遮断器が投入される。その結果、これらの遮断器の状態などを示す第1の機器データがこれらの遮断器から第1の遠方監視制御装置1201および通信回線1を介して監視制御計算機10に送信され、第1の電気所用警報表示試験画面20におけるこれらの遮断器の表示が図4に示すように灰色塗りから黒塗りに画面表示制御部14によって切り換えられる。その後、1次側遮断器150,152(図7参照)を遮断させる操作信号が監視制御計算機10から通信回線1および第1の遠方監視制御装置1201を介して過電流継電器160へ送信され、1次側遮断器150,152が過電流継電器160によって遮断されると、1次側遮断器150,152および過電流継電器160の動作内容や状態などを示す第1の機器データが過電流継電器160から第1の遠方監視制御装置1201および通信回線1を介して監視制御計算機10に送信される。その結果、第1の電気所用警報表示試験画面20における1次側遮断器150,152の表示が図5に示すように黒塗りから灰色塗りに画面表示制御部14によって切り換えられる。
When the test instruction signal is input from the screen display control unit 14, the alarm display test unit 15 accesses the test procedure database 16 based on the test target range of the first electric station indicated by the test instruction signal. After reading the alarm display test procedure data for the test target range of the first electric station from the test procedure database 16, the operation signal according to the alarm display test procedure indicated by the read alarm display test procedure data is sent to the first It transmits to the remote monitoring control device 120 1 via the monitoring control unit 12 and the transmission unit 11 (step S17).
Thereby, for example, in order to perform an alarm display test of the transformer # 2 of the first electric station, the primary side circuit breakers 150 and 152 and the circuit breaker between the transformer # 2 and the bus are turned on. As a result, the first device data indicating, for example, these breaker state is transmitted to the monitoring control computer 10 via the first remote monitor control device 120 1 and the communication line 1 from these circuit breakers, a first The display of these circuit breakers on the electric station alarm display test screen 20 is switched from gray to black as shown in FIG. 4 by the screen display control unit 14. Thereafter, an operation signal for interrupting the primary side circuit breakers 150 and 152 (see FIG. 7) is transmitted from the monitoring control computer 10 to the overcurrent relay 160 via the communication line 1 and the first remote monitoring control device 120 1 . When the primary side circuit breakers 150 and 152 are interrupted by the overcurrent relay 160, the first device data indicating the operation contents and states of the primary side circuit breakers 150 and 152 and the overcurrent relay 160 is the overcurrent relay 160. To the monitoring control computer 10 via the first remote monitoring control device 120 1 and the communication line 1. As a result, the display of the primary circuit breakers 150 and 152 on the first electric station alarm display test screen 20 is switched by the screen display control unit 14 from black to gray as shown in FIG.

監視制御部12は、第1の遠方監視制御装置1201から第1の機器データが送信されてきたため、実際の事故が発生したものではないと判定して、第1の機器データを警報表示試験部15に出力する(ステップS18)。 Monitoring control unit 12, since the first device data from the first remote monitor control device 120 1 is transmitted, it is determined to be other than the actual accident occurs, the alarm displays a first device data test It outputs to the part 15 (step S18).

警報表示試験部15は、第1の機器データに基づいて警報表示試験結果を判定し、判定した警報表示試験結果を第1の電気所用警報表示試験画面20に追加して第1の操作卓1131に表示させるように指示する試験結果表示指示信号を画面表示制御部14に出力する(ステップS19)。 The alarm display test unit 15 determines an alarm display test result based on the first device data, adds the determined alarm display test result to the first electric station alarm display test screen 20 and adds the first alarm display test screen 20 to the first console 113. A test result display instruction signal instructing to be displayed in 1 is output to the screen display control unit 14 (step S19).

画面表示制御部14は、試験結果表示指示信号が警報表示試験部15から入力されてくると、警報表示試験結果を第1の電気所用警報表示試験画面20に追加して第1の操作卓1131に表示させるとともに、警報表示試験結果に応じてベルボタン24、ブザーボタン25またはチャイムボタン26を点灯させる(ステップS20)。
たとえば、「第1の電気所の変圧器#2の1次短絡」という警報表示試験結果が入力されてくると、画面表示制御部14は、図5に示すように試験結果表示欄23の「変圧器#2」および「1次短絡」を黒四角とした第1の電気所用警報表示試験画面20を第1の操作卓1131に表示させるとともに、図5に網掛で示すようにベルボタン24を点灯させる。
When the test result display instruction signal is input from the alarm display test unit 15, the screen display control unit 14 adds the alarm display test result to the first electric station alarm display test screen 20 to add the first console 113. 1 and the bell button 24, the buzzer button 25 or the chime button 26 are turned on according to the alarm display test result (step S20).
For example, when the alarm display test result “Primary short circuit of transformer # 2 at the first electric station” is input, the screen display control unit 14 displays “ transformers # 2 "and the first electric Shoyo alarm display test screen 20 causes displayed on the first console 113 1 a" primary short "and a black square, bell buttons 24, as shown by shaded in FIG. 5 Lights up.

第1の電気所担当の当直員は、第1の操作卓1131に警報表示試験結果が表示されると、警報表示試験を終了するために試験ボタン21をクリックする。表示個所切換部13は、第1の操作卓1131において試験ボタン22がクリックされたことを示す試験ボタンクリック信号が第1の操作卓1131から画面表示制御部14を介して入力されると、表示個所を第1の操作卓1131から系統監視盤112に切り換える。これにより、監視制御計算機10は通常動作に戻る(ステップS21)。 When the alarm display test result is displayed on the first console 1131, the duty person in charge of the first electric power station clicks the test button 21 to end the alarm display test. Display location switching unit 13, when the test button click signal indicating that the test button 22 in the first console 113 1 is clicked is input through the screen display control unit 14 from the first operator console 113 1 The display location is switched from the first console 1131 to the system monitoring panel 112. Thereby, the supervisory control computer 10 returns to the normal operation (step S21).

一方、ステップS18において、第1の遠方監視制御装置1201から第1の機器データが送信されてくる前に第2乃至第nの遠方監視制御装置1202〜120nのいずれかから第2乃至第nの電気所内の事故発生を示す第2乃至第nの機器データが送信されてくると、監視制御部12は、実際の事故が発生したと判定して、表示個所を第1の操作卓1131から系統監視盤112に切り換えるように指示する表示個所切換指示信号を表示個所切換部13に出力する(ステップS22)。 On the other hand, in step S18, the second to the one of the second to remote monitor control device 120 2 to 120 n of the n before the first remote monitor control device 120 1 first device data is transmitted When the second to n-th device data indicating the occurrence of an accident in the nth electric station is transmitted, the monitoring control unit 12 determines that an actual accident has occurred, and sets the display location to the first console. a display point switching instruction signal for instructing to switch to the system monitoring panel 112 from 113 1 outputs to the display point switching unit 13 (step S22).

表示個所切換部13は、監視制御部12から表示個所切換指示信号が入力されてくると、表示個所を第1の操作卓1131から系統監視盤112に切り換える。これにより、監視制御計算機10は通常動作に戻る(ステップS23)。 Display location switching unit 13, when the monitor control unit 12 displays locations switching command signals being inputted, switches to the system monitoring panel 112 display points from the first console 113 1. Thereby, the supervisory control computer 10 returns to the normal operation (step S23).

なお、第1および第2の電気所から同時に警報表示試験の要請があった場合には、第1および第2の電気所担当の当直員は第1および第2の操作卓1131,1132を用いて監視制御計算機10に対して同様の動作を行わせることにより、いずれか一方の警報表示試験を遅らせることなく並行して行うことができる。
このとき、たとえば第3の電気所内で実際に事故が発生した場合には、監視制御計算機10の監視制御部12は、表示個所を第1および第2の操作卓1131,1132から系統監視盤112に切り換えるように指示する表示個所切換指示信号を表示個所切換部13に出力する(ステップS22参照)。これにより、第1および第2の電気所担当の当直員を含めた数人の当直員全員で第3の電気所内の事故に対応させることができる。
ただし、第1の電気所の警報表示試験が新設に伴うものであれば、監視制御部12は、表示個所を第2の操作卓1131のみを系統監視盤112に切り換えるように指示する表示個所切換指示信号を表示個所切換部13に出力して、第1の電気所担当の当直員はそのまま第1の電気所の警報表示試験を継続させ、第2の電気所担当の当直員を含めた他の当直員全員で第3の電気所内の事故に対応させてもよい。
When the alarm display test is requested from the first and second electric stations at the same time, the duty person in charge of the first and second electric stations is responsible for the first and second consoles 113 1 , 113 2. By causing the monitoring control computer 10 to perform the same operation using, one of the alarm display tests can be performed in parallel without delay.
At this time, for example, when an accident actually occurs in the third electric station, the monitoring control unit 12 of the monitoring control computer 10 monitors the display location from the first and second consoles 113 1 and 113 2. A display location switching instruction signal instructing switching to the panel 112 is output to the display location switching section 13 (see step S22). Thereby, all of the duty staff including the duty staff in charge of the first and second electric power stations can deal with the accident in the third electric power station.
However, as long as with the alarm display test of the first electrical plant new, the monitoring controller 12 displays an instruction to switch the display locations in a second of the console 113 1 only the systematic monitoring panel 112 places The switching instruction signal is output to the display location switching unit 13, and the duty person in charge of the first electric station continues the alarm display test of the first electric station, and includes the duty person in charge of the second electric station. All other duty personnel may respond to an accident in the third electrical station.

なお、ステップS13において試験ボタン22がクリックされると、警報表示試験の対象である電気所名(第1の電気所)を対応操作卓113xに音声で出力させることにより、担当の当直員に注意喚起するようにしてもよい。 Incidentally, when the test button 22 in step S13 is clicked, an electric station name is alarm indicator test target (first electric station) by outputting by voice the corresponding console 113 x, in charge of duty-membered You may make it alert.

1 通信回線
10 監視制御計算機
11 送受信部
12 監視制御部
13 表示個所切換部
14 画面表示制御部
15 警報表示試験部
16 試験手順データベース(試験手順DB)
20 第1の電気所用警報表示試験画面
21 電力系統図
22 試験ボタン
23 試験結果表示欄
24 ベルボタン
25 ブザーボタン
26 チャイムボタン
110 電力系統監視制御装置
111 監視制御計算機
112 系統監視盤
1131〜1133 第1乃至第3の操作卓
113x 対応操作卓
1201〜120n 第1乃至第nの遠方監視制御装置
120x 対応遠方監視制御装置
1301〜130n 第1乃至第nの電力機器
150,152 1次側遮断器
160 過電流継電器
BL ベル
BZ ブザー
CH チャイム
#1,#2 変圧器
S11〜S23 ステップ
DESCRIPTION OF SYMBOLS 1 Communication line 10 Monitoring control computer 11 Transmission / reception part 12 Monitoring control part 13 Display location switching part 14 Screen display control part 15 Alarm display test part 16 Test procedure database (test procedure DB)
20 First Electricity Station Alarm Display Test Screen 21 Power System Diagram 22 Test Button 23 Test Result Display Field 24 Bell Button 25 Buzzer Button 26 Chime Button 110 Power System Monitoring and Control Device 111 Monitoring Control Computer 112 System Monitoring Panels 113 1 to 113 3 First to third consoles 113 x corresponding consoles 120 1 to 120 n First to nth remote monitoring control devices 120 x corresponding remote monitoring control devices 130 1 to 130 n First to nth power devices 150, 152 Primary side circuit breaker 160 Overcurrent relay BL Bell BZ Buzzer CH Chime # 1, # 2 Transformer S11-S23 Step

Claims (4)

第1乃至第nの電気所にそれぞれ設置された第1乃至第nの遠方監視制御装置(1201〜120n)と通信回線(1)を介して接続された監視制御計算機(10)と、
該監視制御計算機に接続された、かつ、前記第1乃至第nの電気所内の事故発生時に鳴動される警報通知手段(BL,BZ,CH)を1組のみ備えた系統監視盤(112)と、
前記監視制御計算機に接続された複数個の操作卓(1131〜1133)とを具備し、
前記監視制御計算機が、前記第1乃至第nの電気所の少なくとも1つの電気所の警報表示試験中は、前記系統監視盤の前記警報通知手段を鳴動させる代わりに前記複数個の操作卓のうち該警報表示試験に使用している対応操作卓(113x)に表示した警報通知表示手段(24〜26)を点灯させるとともに、該警報表示試験中に実際の事故が発生した場合には、前記対応操作卓に表示した前記警報通知表示手段を点灯させることを止めて前記系統監視盤の前記警報通知手段を鳴動させる手段を備える、
ことを特徴とする、電力系統監視制御装置。
A monitoring control computer (10) connected to the first to n-th remote monitoring control devices (120 1 to 120 n ) respectively installed in the first to n-th electrical stations via the communication line (1);
A system monitoring board (112) connected to the supervisory control computer and provided with only one set of alarm notification means (BL, BZ, CH) which is sounded when an accident occurs in the first to n-th electric power stations; ,
A plurality of consoles (113 1 to 113 3 ) connected to the supervisory control computer;
During the alarm display test of at least one of the first to n-th electric power stations, the monitoring control computer, among the plurality of consoles, instead of ringing the alarm notification means of the system monitoring panel with lighting the corresponding console being used for said alarm display test (113 x) in the display and alarm notification display means (24 to 26), if the actual accident during said alarm display test occurs, the A means for stopping lighting the alarm notification display means displayed on the corresponding operation console and causing the alarm notification means of the system monitoring board to ring;
A power system monitoring and control apparatus characterized by the above.
前記警報通知手段がベル(BL)、ブザー(BZ)およびチャイム(CH)であり、
前記警報通知表示手段がベルボタン(24)、ブザーボタン(25)またはチャイムボタン(26)である、
ことを特徴とする、請求項1記載の電力系統監視制御装置。
The alarm notification means is a bell (BL), a buzzer (BZ) and a chime (CH),
The alarm notification display means is a bell button (24), a buzzer button (25) or a chime button (26).
The power system monitoring and control apparatus according to claim 1, wherein
前記監視制御計算機が、前記第1乃至第nの電気所のうち複数の電気所から同時に警報表示試験の要請があった場合には、該複数の電気所の警報表示試験中は、前記系統監視盤の前記警報通知手段を鳴動させる代わりに前記複数個の操作卓のうち該複数の電気所の警報表示試験に使用している複数個の対応操作卓に表示された警報通知表示手段を点灯させるとともに、該複数の電気所の警報表示試験中に実際の事故が発生した場合には、前記複数個の対応操作卓に表示された前記警報通知表示手段を点灯させることを止めて前記系統監視盤の前記警報通知手段を鳴動させる手段を備えることを特徴とする、請求項1または2記載の電力系統監視制御装置。   When the monitoring control computer has requested alarm display tests from a plurality of electric stations among the first to n-th electric stations simultaneously, the system monitoring is performed during the alarm display test of the plurality of electric stations. Instead of sounding the alarm notification means of the panel, the alarm notification display means displayed on the plurality of corresponding operation consoles used for the alarm display test of the plurality of electric stations among the plurality of operation consoles is turned on. In addition, when an actual accident occurs during the alarm display test of the plurality of electric stations, the system monitoring panel is stopped by turning on the alarm notification display means displayed on the plurality of corresponding operation consoles. The power system monitoring and control device according to claim 1, further comprising means for sounding the alarm notification means. 前記監視制御計算機が、前記複数の電気所の警報表示試験のうちの1つが電気所の新設に伴うものであれば、該複数の電気所の警報表示試験中に実際の事故が発生した場合には、前記複数個の対応操作卓のうち前記新設される電気所以外の前記対応操作卓に表示された前記警報通知表示手段についてのみ点灯させることを止める手段を備えることを特徴とする、請求項3記載の電力系統監視制御装置。   If one of the alarm display tests of the plurality of electric stations is associated with the new establishment of the electric station, the monitoring control computer may have an actual accident during the alarm display test of the plurality of electric stations. The apparatus further comprises means for stopping lighting only the alarm notification display means displayed on the corresponding operation console other than the newly installed electric power station among the plurality of corresponding operation consoles. 3. The power system monitoring and control device according to 3.
JP2010241915A 2010-10-28 2010-10-28 Power system monitoring controller Withdrawn JP2012095479A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010241915A JP2012095479A (en) 2010-10-28 2010-10-28 Power system monitoring controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010241915A JP2012095479A (en) 2010-10-28 2010-10-28 Power system monitoring controller

Publications (1)

Publication Number Publication Date
JP2012095479A true JP2012095479A (en) 2012-05-17

Family

ID=46388207

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010241915A Withdrawn JP2012095479A (en) 2010-10-28 2010-10-28 Power system monitoring controller

Country Status (1)

Country Link
JP (1) JP2012095479A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110275509A (en) * 2019-05-24 2019-09-24 国网江苏省电力有限公司电力科学研究院 A kind of energy-accumulating power station test of supervisor method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110275509A (en) * 2019-05-24 2019-09-24 国网江苏省电力有限公司电力科学研究院 A kind of energy-accumulating power station test of supervisor method and system
CN110275509B (en) * 2019-05-24 2021-10-15 国网江苏省电力有限公司电力科学研究院 Energy storage power station monitoring function test method and system

Similar Documents

Publication Publication Date Title
KR101717775B1 (en) System for Analysising and Predicting Electric Fire using Intelligent Pre-signal Analysis
CN110749792B (en) Intelligent monitoring method and system for power monitoring center
KR20080026231A (en) An electric power receiving and distributing system based on digital graphic
KR20140073043A (en) Application service system of smart terminal for watching power equipment
CN110086251A (en) A kind of monitoring method and system improving electric grid operating safety
KR20190113405A (en) Management system for circuit breakers in switchboard
KR20070044419A (en) System for digital diagnosising circuit breaker motion time of measurement and method therefor
CN111724661A (en) Distribution network automation simulation system and distribution network fault simulation method
KR20160056540A (en) Apparatus and method for monitoring/controlling for maintenance of the receiving and distributing board
JP2007159220A (en) Method and system for controlling monitoring when remote monitoring control device is replaced at electric power station
JP2009273245A (en) Power system monitor control system
JP2012095479A (en) Power system monitoring controller
KR101715126B1 (en) System for monitoring and controlling electric power equipment
JP4874480B2 (en) Circuit breaker monitoring system
JP2009124853A (en) Power system monitor control system
JP5455827B2 (en) Electric railway substation monitoring and control system, electric railway substation monitoring and control apparatus, and electric railway substation monitoring and control method
JP2014016801A (en) Maintenance assistance system for power system installation
JP5116165B2 (en) Multi-line broadcasting device
KR100885036B1 (en) Simulating apparatus and simulating system of digital miniature mosaic panel
JP2017073856A (en) Power receiving and transforming facility operation support system
JP2011182532A (en) Remote control distribution board system
JP2006311763A (en) Control system for monitoring electric system
JP7451357B2 (en) Substation monitoring control system
JP2000311153A (en) Method for testing duplex supervisory and control system
CN215833580U (en) Short circuit detection device for power system

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20140107