JP2008009509A - Process information management system by department - Google Patents

Process information management system by department Download PDF

Info

Publication number
JP2008009509A
JP2008009509A JP2006176602A JP2006176602A JP2008009509A JP 2008009509 A JP2008009509 A JP 2008009509A JP 2006176602 A JP2006176602 A JP 2006176602A JP 2006176602 A JP2006176602 A JP 2006176602A JP 2008009509 A JP2008009509 A JP 2008009509A
Authority
JP
Japan
Prior art keywords
process information
information
department
information management
detailed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2006176602A
Other languages
Japanese (ja)
Inventor
Makihito Nakano
牧仁 中野
Takeshi Tanabe
壮史 田辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2006176602A priority Critical patent/JP2008009509A/en
Publication of JP2008009509A publication Critical patent/JP2008009509A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a process information management system by department for performing the Gantt chart display of a whole process whose consistency with department information is acquired. <P>SOLUTION: A database server 2 copies and collects process information of each department by a copy function 2h, and converts it into an intermediate file by an intermediate file conversion function 2e, and stores this in a detail information management database 2k, and aggregates it into aggregate process information by an aggregation function 2b, and stores it in an aggregate information management database 2i, and a Gantt chart display device 3 displays the aggregate process information in a Gantt chart display terminal 4 by a Gantt chart display function 3a, and reflects the process information of each department when the aggregate process information is corrected by operating this display. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

この発明は、ガントチャートによる工事の全体工程を管理する部門別工程情報管理システムに関するものである。   The present invention relates to a departmental process information management system for managing the entire construction process using a Gantt chart.

従来では、工事の全体工程を把握するために、特許文献1には、ガントチャートによる表示が行われている。また、特許文献1には、工程上の問題をアラームする機能をも有していた。   Conventionally, in order to grasp the entire construction process, Patent Document 1 displays using a Gantt chart. Patent Document 1 also has a function of alarming a problem in the process.

特開2005−63084号公報(第4〜9頁、図1)Japanese Patent Laying-Open No. 2005-63084 (pages 4-9, FIG. 1)

しかしながら、特許文献1のものでは、ガントチャート表示機能は、詳細な部門情報から集約した情報を保持する機能しか有していないため、部門情報との整合が取れない、という問題があった。
また、特許文献1のアラーム機能については、アラームは、異常値判断や単独項目が遅れたかどうかという後手の判断によるものであり、工程全体としての見込の判断ができない、という問題があった。
However, since the Gantt chart display function has only a function of holding information aggregated from detailed department information, the one in Patent Document 1 has a problem that it cannot be matched with department information.
Further, the alarm function of Patent Document 1 has a problem that the alarm is based on an abnormal value determination or a subsequent determination as to whether a single item is delayed or not, so that it is impossible to determine the expectation of the entire process.

この発明は、上述のような課題を解決するためになされたものであり、部門情報との整合性が取れる全体工程のガントチャート表示を行うことができる部門別工程情報管理システムを得ることを目的にしている。  The present invention has been made to solve the above-described problems, and an object thereof is to obtain a department-specific process information management system capable of displaying a Gantt chart of an entire process that can be consistent with department information. I have to.

この発明に係わる部門別工程情報管理システムにおいては、各部門の工程情報を収集して全体工程のガントチャート表示を行う部門別工程情報管理システムにおいて、各部門の工程情報を収集する収集手段、この収集手段によって収集された各部門の工程情報から作成した詳細工程情報を格納した詳細情報管理データベース、この詳細情報管理データベースに格納された詳細工程情報を集約して集約工程情報を作成する集約手段、この集約手段により作成された集約工程情報を格納した集約情報管理データベース、詳細情報管理データベース及び集約情報管理データベースをリンク付けするリンク手段、集約工程情報に基き、ガントチャート表示を行うガントチャート表示手段、及びガントチャート表示が操作されることにより、集約工程情報を修正する工程情報修正手段を備え、
工程情報修正手段による集約工程情報の修正が、リンク手段により集約工程情報に対応する詳細工程情報に反映されるものである。
In the departmental process information management system according to the present invention, in the departmental process information management system for collecting the process information of each department and displaying the Gantt chart of the entire process, a collecting means for collecting the process information of each department, A detailed information management database storing detailed process information created from the process information of each department collected by the collecting means, an aggregating means for aggregating detailed process information stored in the detailed information management database to create aggregated process information; An aggregate information management database storing aggregate process information created by the aggregate means, a link means for linking the detailed information management database and the aggregate information management database, a Gantt chart display means for displaying a Gantt chart based on the aggregate process information, And the Gantt chart display is operated, Comprising the step information correcting means for correcting,
The correction of the aggregate process information by the process information correction means is reflected in the detailed process information corresponding to the aggregate process information by the link means.

この発明は、以上説明したように、各部門の工程情報を収集して全体工程のガントチャート表示を行う部門別工程情報管理システムにおいて、各部門の工程情報を収集する収集手段、この収集手段によって収集された各部門の工程情報から作成した詳細工程情報を格納した詳細情報管理データベース、この詳細情報管理データベースに格納された詳細工程情報を集約して集約工程情報を作成する集約手段、この集約手段により作成された集約工程情報を格納した集約情報管理データベース、詳細情報管理データベース及び集約情報管理データベースをリンク付けするリンク手段、集約工程情報に基き、ガントチャート表示を行うガントチャート表示手段、及びガントチャート表示が操作されることにより、集約工程情報を修正する工程情報修正手段を備え、
工程情報修正手段による集約工程情報の修正が、リンク手段により集約工程情報に対応する詳細工程情報に反映されるので、各部門の工程情報を集約してガントチャートに表示するとともに、集約工程情報の修正を、各部門の工程情報に反映させることができる。
As described above, according to the department-specific process information management system for collecting the process information of each department and displaying the Gantt chart of the entire process, the collection means for collecting the process information of each department, Detailed information management database storing detailed process information created from the collected process information of each department, aggregating means for aggregating detailed process information stored in the detailed information management database to create aggregated process information, and this aggregating means Information management database storing the aggregated process information created by the above, a detailed information management database, a link means for linking the aggregated information management database, a Gantt chart display means for displaying a Gantt chart based on the aggregated process information, and a Gantt chart Process information correction that corrects aggregated process information by operating the display Equipped with a means,
The correction of the aggregate process information by the process information correction means is reflected in the detailed process information corresponding to the aggregate process information by the link means, so that the process information of each department is aggregated and displayed on the Gantt chart. The correction can be reflected in the process information of each department.

実施の形態1.
図1は、この発明の実施の形態1による部門別工程情報管理システムの概略を示す概略構成図である。
図1において、工場全体の工程管理に用いられる部門別工程情報管理システムは、部門毎の詳細工程情報を格納した部門情報ファイルを蓄積する部門管理情報蓄積端末1と、部門管理情報蓄積端末1との間で詳細工程情報をやりとりし、この詳細工程情報を管理するとともにこの詳細工程情報から集約した集約工程情報を管理するデータベースサーバ2と、データベースサーバ2から集約工程情報を取得し、この取得した集約工程情報に基きガントチャート用の集約工程情報を作成して管理するガントチャート表示装置3と、ガントチャート表示装置3にガントチャートを照会して、ガントチャートを表示するガントチャート表示端末4から構成される。ガントチャート表示装置3は、表示部を有していてもいなくてもよい。
ガントチャート表示端末4でデータ修正された場合には、ガントチャート表示装置3を介して、データベースサーバ2の詳細工程情報が修正され、部門管理情報蓄積端末1の部門情報ファイルに反映される。
なお、1〜4はいずれも複数台の設置が可能である。
また、ガントチャート表示装置4と、データベースサーバ2を上述では分けて記述したが、一体の装置でもよく、これらの装置の有する機能さえあればよい。
Embodiment 1 FIG.
FIG. 1 is a schematic configuration diagram showing an outline of a departmental process information management system according to Embodiment 1 of the present invention.
In FIG. 1, a departmental process information management system used for process management of the entire factory includes a department management information storage terminal 1 that stores a department information file that stores detailed process information for each department, a department management information storage terminal 1, Detailed process information is exchanged between the database server 2 for managing the detailed process information and managing the aggregated process information aggregated from the detailed process information, and acquiring the aggregated process information from the database server 2 A Gantt chart display device 3 that creates and manages aggregated process information for a Gantt chart based on the aggregated process information, and a Gantt chart display terminal 4 that displays the Gantt chart by referring to the Gantt chart display device 3 Is done. The Gantt chart display device 3 may or may not have a display unit.
When the data is corrected at the Gantt chart display terminal 4, the detailed process information of the database server 2 is corrected via the Gantt chart display device 3 and reflected in the department information file of the department management information storage terminal 1.
In addition, as for all 1-4, installation of multiple units | sets is possible.
Further, although the Gantt chart display device 4 and the database server 2 are described separately in the above description, they may be integrated devices as long as they have functions.

図2は、この発明の実施の形態1による部門別工程情報管理システムの機能を示す機能構成図である。
図2において、部門管理情報蓄積端末1は、部門管理の詳細な工程情報1x(部門毎に種々の形式のデータ)を格納する所定のフォルダ1aを有している。
データベースサーバ2には、部門管理情報蓄積端末1の所定のフォルダ1aから取得した部門の詳細な工程情報1xを格納する部門情報格納フォルダ2mと、この部門情報格納フォルダ2mの情報から得られる共通形式の中間ファイル2xを格納する中間ファイル格納フォルダ2lと、この中間ファイル2xから変換した詳細工程情報を格納する詳細情報管理データベース2kと、詳細工程情報から集約した工程情報である集約工程情報を管理する集約情報管理データベース2iとを有する。
部門の詳細工程情報を格納する部門管理情報蓄積端末1の所定のフォルダ1aと、部門情報格納フォルダ2mとの間で双方向にコピーするコピー機能2hがある。また、部門情報格納フォルダ2mから中間ファイル格納フォルダ2lの中間ファイル2xを作成するため、部門情報格納フォルダ2mの部門の工程情報を読み書きする読込機能2f、書出機能2g、中間ファイル変換機能2e(変換手段)がある。コピー機能2h、読込機能2f、書出機能2g、中間ファイル変換機能2eが、各部門の詳細工程情報を収集する収集手段を構成する。
また、中間ファイルから変換した詳細工程情報を格納する詳細情報管理データベース2kを管理する詳細工程情報管理機能2dがある。
さらに、詳細工程情報を集約して集約工程情報を作成する集約機能2b(集約手段)、集約情報管理データベース2iを管理する集約工程情報管理機能2aがある。また、詳細工程情報の評価・判定を行なうアラーム判定機能2c(アラーム判定手段)がある。
また、リンク機能2jは、集約情報管理データベース2iと詳細情報管理データベース2kを関連付け、集約情報管理データベース2iの修正を詳細情報管理データベース2kに反映させることができる。
FIG. 2 is a functional configuration diagram showing functions of the departmental process information management system according to Embodiment 1 of the present invention.
In FIG. 2, the department management information storage terminal 1 has a predetermined folder 1a for storing detailed process information 1x (data in various formats for each department) for department management.
The database server 2 includes a department information storage folder 2m for storing detailed process information 1x of a department acquired from a predetermined folder 1a of the department management information storage terminal 1, and a common format obtained from information in the department information storage folder 2m. The intermediate file storage folder 21 for storing the intermediate file 2x, the detailed information management database 2k for storing the detailed process information converted from the intermediate file 2x, and the aggregated process information that is the process information aggregated from the detailed process information are managed. And an aggregate information management database 2i.
There is a copy function 2h for bi-directional copying between a predetermined folder 1a of the department management information storage terminal 1 for storing detailed process information of the department and the department information storage folder 2m. Further, in order to create the intermediate file 2x of the intermediate file storage folder 2l from the department information storage folder 2m, a read function 2f for reading / writing process information of the department in the department information storage folder 2m, an export function 2g, and an intermediate file conversion function 2e ( Conversion means). The copy function 2h, the read function 2f, the write function 2g, and the intermediate file conversion function 2e constitute a collection unit that collects detailed process information of each department.
Further, there is a detailed process information management function 2d for managing a detailed information management database 2k that stores detailed process information converted from the intermediate file.
Furthermore, there is an aggregation function 2b (aggregation means) for aggregating detailed process information to create aggregated process information, and an aggregated process information management function 2a for managing an aggregated information management database 2i. Further, there is an alarm determination function 2c (alarm determination means) for evaluating and determining detailed process information.
Further, the link function 2j associates the aggregate information management database 2i with the detailed information management database 2k, and can reflect the correction of the aggregate information management database 2i in the detailed information management database 2k.

ガントチャート表示装置3は、ガントチャートとして表示するようにした集約工程情報を保持するガントチャート表示情報管理データベース3dと、これを管理する工程情報保持機能3bとを有する。さらに、ガントチャートを表示させるためのガントチャート表示機能3a(ガントチャート表示手段)と、ガントチャートを修正するための工程情報修正機能3cとを有している。
ガントチャート表示端末4は、ガントチャート照会機能4aを有し、ガントチャート表示装置3にガントチャートを照会して、これを取得して自身の画面に表示する。また、その画面で修正を加えることにより、ガントチャート表示装置3の工程情報修正機能3c(工程情報修正手段)がその修正を行う。
The Gantt chart display device 3 includes a Gantt chart display information management database 3d that holds aggregated process information that is displayed as a Gantt chart, and a process information holding function 3b that manages this. Furthermore, it has a Gantt chart display function 3a (Gantt chart display means) for displaying a Gantt chart and a process information correction function 3c for correcting the Gantt chart.
The Gantt chart display terminal 4 has a Gantt chart inquiry function 4a, inquires the Gantt chart display device 3 for the Gantt chart, acquires it, and displays it on its own screen. Further, by making corrections on the screen, the process information correction function 3c (process information correction means) of the Gantt chart display device 3 performs the correction.

図3は、この発明の実施の形態1による部門別工程情報管理システムの部門情報の集約処理を示すフローチャートである。
図4は、この発明の実施の形態1による部門別工程情報管理システムの工程情報の修正処理を示すフローチャートである。
FIG. 3 is a flowchart showing department information aggregation processing of the departmental process information management system according to Embodiment 1 of the present invention.
FIG. 4 is a flowchart showing process information correction processing of the departmental process information management system according to Embodiment 1 of the present invention.

図5は、この発明の実施の形態1による部門別工程情報管理システムの部門管理の工程情報のファイル構成を示す図である。
図5において、製品構成小区分(またはタスク)毎に、計画開始日、計画完了日、実績開始日、実績完了日、進捗率、進捗遅れ区分、着手遅れ、完了遅れ、計画不十分が示されている。ここで、製品構成小区分(またはタスク)が、管理単位の工程である。
進捗遅れ、着手遅れ、完了遅れ、計画不十分の○、△、×は、アラームである。×、△、○の順にリスク大である。このアラームは、アラーム判定機能2cにより、実績の進捗率と、計画の進捗率(シミュレートによる値)との比較により、一定基準でアラームを出す。
従来は、完了日を過ぎてからアラームを出していたが、本発明では、完了日を待たずとも作業途中でアラームを出すことにより、計画を見直すことができる。
FIG. 5 is a diagram showing a file structure of department management process information in the departmental process information management system according to Embodiment 1 of the present invention.
In FIG. 5, the plan start date, the plan completion date, the actual start date, the actual completion date, the progress rate, the progress delay category, the start delay, the completion delay, and the insufficient plan are shown for each product configuration subdivision (or task). ing. Here, the product configuration subdivision (or task) is a process of the management unit.
○, Δ, and × that indicate progress delay, delay in launch, completion delay, and insufficient plan are alarms. The risk increases in the order of ×, △, ○. The alarm is issued on a constant basis by comparing the actual progress rate with the planned progress rate (value by simulation) by the alarm determination function 2c.
Conventionally, an alarm is issued after the completion date has passed, but in the present invention, the plan can be reviewed by issuing an alarm in the middle of work without waiting for the completion date.

図6は、この発明の実施の形態1による部門別工程情報管理システムの中間ファイルのファイル構成を示す図である。
図6において、工事番号、製品構成小区分、タスク、ファイル番号、ファイル名、計画開始日、計画完了日、実績開始日、実績完了日、計画期間、実績期間、出来高計画値、出来高実績値、進捗遅れ区分、着手遅れ区分、完了遅れ区分、計画不十分区分、取得元番号(部門番号と同じ)が含まれる。
FIG. 6 is a diagram showing a file structure of an intermediate file of the departmental process information management system according to the first embodiment of the present invention.
In FIG. 6, construction number, product configuration subdivision, task, file number, file name, plan start date, plan completion date, actual start date, actual completion date, planned period, actual period, planned volume value, actual volume value, Includes progress delay category, launch delay category, completion delay category, insufficient plan category, and acquisition source number (same as department number).

図7は、この発明の実施の形態1による部門別工程情報管理システムの詳細情報管理データベースの構成を示す図である。
図7において、工事番号、製品構成大区分、製品構成小区分、ファイル番号、計画開始日、計画完了日、実績開始日、実績完了日、計画期間、実績期間、出来高計画値、出来高実績値、進捗遅れ区分、着手遅れ区分、完了遅れ区分、計画不十分区分がある。
FIG. 7 is a diagram showing the configuration of the detailed information management database of the departmental process information management system according to Embodiment 1 of the present invention.
In FIG. 7, construction number, product configuration major category, product configuration minor category, file number, plan start date, plan completion date, actual start date, actual completion date, planned period, actual period, planned volume value, actual volume value, There are progress delay categories, launch delay categories, completion delay categories, and insufficient planning categories.

図8は、この発明の実施の形態1による部門別工程情報管理システムの集約情報管理データベースの構成を示す図である。
図8において、工事番号、製品構成大区分、フェーズ番号(設計、加工、組立、試験の各フェーズ)、計画開始日、計画完了日、実績開始日、実績完了日、計画期間、実績期間、出来高計画値、出来高実績値、進捗遅れ区分、着手遅れ区分、完了遅れ区分、計画不十分区分、取得元番号が含まれる。ここで、製品構成大区分が、管理単位の工程である。
FIG. 8 is a diagram showing a configuration of an aggregate information management database of the departmental process information management system according to Embodiment 1 of the present invention.
In FIG. 8, the construction number, product category, phase number (design, processing, assembly, and test phases), plan start date, plan completion date, actual start date, actual completion date, planned period, actual period, volume The plan value, actual volume value, progress delay category, launch delay category, completion delay category, insufficient plan category, and acquisition source number are included. Here, the product configuration major category is the process of the management unit.

図9は、この発明の実施の形態1による部門別工程情報管理システムのガントチャート表示情報管理データベースの構成を示す図である。
図9において、工事番号、製品構成大区分、フェーズ番号、基準開始日、基準完了日、実績開始日、実績完了日、達成率、進捗遅れ区分、着手遅れ区分、完了遅れ区分、計画不十分区分が含まれる。
FIG. 9 is a diagram showing a configuration of a Gantt chart display information management database of the departmental process information management system according to Embodiment 1 of the present invention.
In Fig. 9, the construction number, product category, phase number, standard start date, standard completion date, actual start date, actual completion date, achievement rate, progress delay category, delayed start category, completion delay category, unplanned category Is included.

次に、動作について説明する。
まず、各部門の部門情報への新規追加・変更が発生した場合について説明する。
部門情報蓄積端末1に部門情報を格納し、データベースサーバ2にインタフェースし、ガントチャート表示装置3を通じて、ガントチャート表示端末4で工程全体を示す集約工程のガントチャートとアラーム情報を見られるようになるまでの流れが、図3のステップ101〜111である。
Next, the operation will be described.
First, a case where a new addition / change to the department information of each department occurs will be described.
The department information storage terminal 1 stores department information, interfaces with the database server 2, and through the Gantt chart display device 3, the Gantt chart display terminal 4 makes it possible to see the Gantt chart and alarm information of the aggregate process showing the entire process. The flow up to is steps 101 to 111 in FIG.

次に、工程全体を示す集約工程のガントチャートを見ながら、ガントチャート表示端末4から、ガントチャート表示装置3の持つ集約工程情報と、データベースサーバ2の持つ詳細工程情報と、部門管理情報蓄積端末1の持つ部門管理の詳細な工程情報を修正する流れについて説明したのが、図4のステップ201〜207である。   Next, while looking at the Gantt chart of the aggregation process showing the entire process, from the Gantt chart display terminal 4, the aggregation process information possessed by the Gantt chart display device 3, the detailed process information possessed by the database server 2, and the department management information storage terminal Steps 201 to 207 in FIG. 4 have been described for correcting the detailed process information of department management 1.

次に図3のフローチャートにより、部門情報の集約とガントチャート表示について説明する。
まず、部門管理情報蓄積端末1の所定のフォルダ1aに、部門管理の詳細な工程情報である工程情報ファイル1xを格納する(ステップ101)。次いで、データベースサーバ2のコピー機能2hが、部門情報格納フォルダ2mに工程情報ファイル1xのコピーであるコピーx′を作成する(ステップ102)。次いで、読込機能2fが、部門情報格納フォルダ2mより部門情報のコピー1x′を読み込み、中間ファイル変換機能2eにデータを渡す(ステップ103)。中間ファイル変換機能2eが、コピー1x′から、共通形式の中間ファイル2xを作成し、中間ファイル格納フォルダ21に格納する(ステップ104)。
次いで、詳細工程情報管理機能2dが、中間ファイルの情報を中間ファイル変換機能2eを介してデータ変換し、詳細情報管理データベース2kに格納する(ステップ105)。
Next, department information aggregation and Gantt chart display will be described with reference to the flowchart of FIG.
First, a process information file 1x, which is detailed process information for department management, is stored in a predetermined folder 1a of the department management information storage terminal 1 (step 101). Next, the copy function 2h of the database server 2 creates a copy x ′ that is a copy of the process information file 1x in the department information storage folder 2m (step 102). Next, the read function 2f reads the department information copy 1x 'from the department information storage folder 2m, and passes the data to the intermediate file conversion function 2e (step 103). The intermediate file conversion function 2e creates an intermediate file 2x having a common format from the copy 1x 'and stores it in the intermediate file storage folder 21 (step 104).
Next, the detailed process information management function 2d converts the data of the intermediate file through the intermediate file conversion function 2e and stores it in the detailed information management database 2k (step 105).

次に、アラーム判定機能2cが、詳細工程情報管理機能2dを介して詳細情報管理データベース2kのアラーム項目に評価・判定値を入れる(ステップ106)。 このアラーム判定機能2cは、工程遅れ・入力値異常判断等の後手の工程判断だけでなく、工程遅れの見込、全体工程での日程変更・工程遅れの部門の工程への影響判断という先手の工程判断を行うものである。
次いで、集約機能2bが、詳細工程情報管理機能2dを介して詳細工程情報を集約し、集約工程情報管理機能2aを介して集約情報管理データベース2iに格納する(ステップ107)。
Next, the alarm determination function 2c enters an evaluation / determination value into the alarm item of the detailed information management database 2k via the detailed process information management function 2d (step 106). This alarm judgment function 2c is not only a process delay, such as a process delay / input value abnormality determination, but also a preceding process such as an estimation of a process delay, a schedule change in the whole process, and an influence determination of a process delay on a department process. Judgment is made.
Next, the aggregation function 2b aggregates the detailed process information via the detailed process information management function 2d, and stores it in the aggregate information management database 2i via the aggregation process information management function 2a (step 107).

次いで、集約工程情報管理機能2aは、ガントチャート表示装置3の工程情報保持機能3bにデータ提供する(ステップ108)。次に、ガントチャート表示装置3の工程情報保持機能3bは、ガントチャート表示情報管理データベース3dにガントチャート表示する集約した工程情報3xの元データを格納する(ステップ109)。次いで、ガントチャート表示機能3aは、工程情報保持機能3bを介して集約工程情報を変換し、集約した工程情報3xを作成する(ステップ110)。次いで、ガントチャート表示端末4のガントチャート照会機能4aを用いて、集約した工程情報3xを照会する(ステップ111)。
これにより、ガントチャート表示端末4にガントチャートが表示される。
Next, the aggregated process information management function 2a provides data to the process information holding function 3b of the Gantt chart display device 3 (step 108). Next, the process information holding function 3b of the Gantt chart display device 3 stores the original data of the aggregated process information 3x displayed in the Gantt chart in the Gantt chart display information management database 3d (Step 109). Next, the Gantt chart display function 3a converts the aggregated process information via the process information holding function 3b and creates aggregated process information 3x (step 110). Next, the aggregated process information 3x is inquired using the Gantt chart inquiry function 4a of the Gantt chart display terminal 4 (step 111).
As a result, the Gantt chart is displayed on the Gantt chart display terminal 4.

次に、図4のフローチャートにより、工程情報の修正及び部門情報への反映について説明する。
まず、ガントチャート表示端末4は、ガントチャート照会機能4aを介して工程情報修正機能3cを呼び出し、集約工程情報管理機能2aの管理する集約情報管理データベース2iの修正を行なう(ステップ201)。次いで、工程情報修正機能3cからの修正について、集約情報管理データベース2iと同期を取るためのリンク機能2jを通じて詳細情報管理データベース2kに反映させる(ステップ202)。この場合、集約工程情報のスライド(後ろ倒し、前倒し)に対応して、そのスライド期間分、詳細工程情報をスライドさせることによって行ってもよい。
次いで、アラーム判定機能2cが、修正箇所のアラームの再判定を行ない、詳細工程情報管理機能2dが、その情報を詳細情報管理データベース2kへ反映させる(ステップ203)。
Next, correction of process information and reflection on department information will be described with reference to the flowchart of FIG.
First, the Gantt chart display terminal 4 calls the process information correction function 3c via the Gantt chart inquiry function 4a, and corrects the aggregate information management database 2i managed by the aggregate process information management function 2a (step 201). Next, the correction from the process information correction function 3c is reflected in the detailed information management database 2k through the link function 2j for synchronizing with the aggregate information management database 2i (step 202). In this case, it may be performed by sliding the detailed process information for the slide period corresponding to the slide of the aggregation process information (backward and forward).
Next, the alarm determination function 2c redetermines the alarm at the correction location, and the detailed process information management function 2d reflects the information in the detailed information management database 2k (step 203).

集約機能2bは、詳細情報管理データベース2kの情報を再集約し、集約工程情報管理機能2aで整合性チェックを行ない、集約情報管理データベース2iの更新を行なう(ステップ204)。次いで、中間ファイル変換機能2eが、詳細工程情報管理機能2dを介して修正された詳細情報管理データベース2kのデータから中間ファイル2xへの反映を行なう(ステップ205)。
次いで、書出機能2gが、中間ファイル変換機能2eを介して中間ファイル2xをアラーム情報を含めて変換し、コピーした部門管理の詳細な工程情報であるコピー1x′に更新する(ステップ206)。
さらに、コピー機能2hが、部門情報格納フォルダ2mよりコピー1x′をコピーし、各部門の工程情報ファイル1xと置き換える(ステップ207)。
これにより、工程情報の修正及び部門情報への反映が完了する。
The aggregation function 2b re-aggregates information in the detailed information management database 2k, performs a consistency check with the aggregation process information management function 2a, and updates the aggregation information management database 2i (step 204). Next, the intermediate file conversion function 2e reflects the data in the detailed information management database 2k corrected through the detailed process information management function 2d to the intermediate file 2x (step 205).
Next, the writing function 2g converts the intermediate file 2x including the alarm information through the intermediate file conversion function 2e, and updates it to the copy 1x ′ which is the detailed process information of the department management copied (step 206).
Further, the copy function 2h copies the copy 1x ′ from the department information storage folder 2m and replaces it with the process information file 1x of each department (step 207).
Thereby, the correction of the process information and the reflection to the department information are completed.

最後に、本実施の形態1のデータベースおよびファイル構成(一例)について説明する。
ガントチャート表示装置3の工程情報保持機能3bの保持するガントチャート表示情報管理データベース3d(図9)と、データベースサーバ2の集約情報管理データベース2i(図8)は、製品別に持つ工事番号、製品構成大区分などの大きな項目でデータを保持する。
詳細工程情報管理データベース2k(図7)と、部門管理情報蓄積端末1の工程情報ファイル1x(図5)は、製品構成小区分以下のレベルに合わせた単位で、工程情報を持つ。
このように、各レベルで階層を意識したデータ保持を努めることで、閲覧/データ変更でのボトムアップ・ドリルダウンが柔軟にできるものである。
Finally, the database and file configuration (one example) of the first embodiment will be described.
The Gantt chart display information management database 3d (FIG. 9) held by the process information holding function 3b of the Gantt chart display device 3 and the aggregated information management database 2i (FIG. 8) of the database server 2 have construction numbers and product configurations for each product. Retain data in large items such as major categories.
The detailed process information management database 2k (FIG. 7) and the process information file 1x (FIG. 5) of the department management information storage terminal 1 have process information in units according to the level below the product configuration subdivision.
In this way, by striving to hold data in consideration of the hierarchy at each level, bottom-up / drill-down in browsing / data change can be flexibly performed.

実施の形態1によれば、各部門の工程情報を集約してガントチャートに表示するとともに、集約工程情報の修正を、各部門の工程情報に反映させることができる。
また、計画策定/計画変更/実績消込の最新の状態が、集約情報だけでなく、各部門情報への自動反映が可能となることで、従来、整合が取れていなかったガントチャート表示機能が表示する集約情報と、様々な形式の各部門情報の整合を常に取ることが可能である。
また、ガントチャート表示機能および詳細工程情報に、アラーム機能を有することで、熟練者でなくとも問題工程を把握でき、作業者が共通の見方で問題工程を確認することができる。
さらに、ガントチャート表示機能および詳細工程情報および部門情報に、アラーム情報を追加することで、全体工程から各部門の工程情報への影響把握、工程上の問題が発生する原因の特定が即座にでき、事前に対策を打つことが可能となる。
According to the first embodiment, the process information of each department can be aggregated and displayed on the Gantt chart, and the correction of the aggregate process information can be reflected in the process information of each department.
In addition, the latest state of plan formulation / plan change / actual clearing can be automatically reflected in each department information as well as aggregated information. It is possible to always match the aggregated information to be displayed with each department information in various formats.
In addition, since the Gantt chart display function and the detailed process information have an alarm function, the problem process can be grasped even by an unskilled person, and the operator can confirm the problem process from a common viewpoint.
In addition, by adding alarm information to the Gantt chart display function, detailed process information, and department information, it is possible to immediately grasp the influence of the entire process on the process information of each department and identify the cause of the problem in the process. It becomes possible to take measures in advance.

この発明の実施の形態1による部門別工程情報管理システムの概略を示す概略構成図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a schematic block diagram which shows the outline of the division | segmentation process information management system by Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムの機能を示す機能構成図である。It is a function block diagram which shows the function of the process information management system classified by department by Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムの部門情報の集約処理を示すフローチャートである。It is a flowchart which shows the aggregation process of the department information of the process information management system according to Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムの工程情報の修正処理を示すフローチャートである。It is a flowchart which shows the correction process of the process information of the process information management system classified by department by Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムの部門管理の工程情報のファイル構成を示す図である。It is a figure which shows the file structure of the process information of the division | segmentation management of the division | segmentation process information management system by Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムの中間ファイルのファイル構成を示す図である。It is a figure which shows the file structure of the intermediate | middle file of the process information management system classified by department by Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムの詳細情報管理データベースの構成を示す図である。It is a figure which shows the structure of the detailed information management database of the process information management system according to department by Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムの集約情報管理データベースの構成を示す図である。It is a figure which shows the structure of the integrated information management database of the process information management system according to department by Embodiment 1 of this invention. この発明の実施の形態1による部門別工程情報管理システムのガントチャート表示情報管理データベースの構成を示す図である。It is a figure which shows the structure of the Gantt chart display information management database of the process information management system according to Embodiment 1 of this invention.

符号の説明Explanation of symbols

1 部門管理情報蓄積端末
1a 工程情報
1x 所定のフォルダ
2 データベースサーバ
2a 集約工程情報管理機能
2b 集約機能
2c アラーム判定機能
2d 詳細工程情報管理機能
2e 中間ファイル変換機能
2f 読込機能
2g 書出機能
2h コピー機能
2i 集約情報管理データベース
2j リンク機能
2k 詳細情報管理データベース
2l 中間ファイル格納フォルダ
2m 部門情報格納フォルダ
2x 中間ファイル
3 ガントチャート表示装置
3a ガントチャート表示機能
3b 工程情報保持機能
3c 工程情報修正機能
3d ガントチャート表示情報管理データベース
4 ガントチャート表示端末
4a ガントチャート照会機能
1 Department management information storage terminal 1a Process information 1x Predetermined folder 2 Database server 2a Aggregated process information management function 2b Aggregation function 2c Alarm determination function 2d Detailed process information management function 2e Intermediate file conversion function 2f Reading function 2g Writing function 2h Copy function 2i Integrated information management database 2j Link function 2k Detailed information management database 2l Intermediate file storage folder 2m Department information storage folder 2x Intermediate file 3 Gantt chart display device 3a Gantt chart display function 3b Process information holding function 3c Process information correction function 3d Gantt chart display Information management database 4 Gantt chart display terminal 4a Gantt chart inquiry function

Claims (4)

各部門の工程情報を収集して全体工程のガントチャート表示を行う部門別工程情報管理システムにおいて、各部門の工程情報を収集する収集手段、この収集手段によって収集された各部門の工程情報から作成した詳細工程情報を格納した詳細情報管理データベース、この詳細情報管理データベースに格納された上記詳細工程情報を集約して集約工程情報を作成する集約手段、この集約手段により作成された集約工程情報を格納した集約情報管理データベース、上記詳細情報管理データベース及び集約情報管理データベースをリンク付けするリンク手段、上記集約工程情報に基き、ガントチャート表示を行うガントチャート表示手段、及び上記ガントチャート表示が操作されることにより、上記集約工程情報を修正する工程情報修正手段を備え、
上記工程情報修正手段による上記集約工程情報の修正が、上記リンク手段により上記集約工程情報に対応する上記詳細工程情報に反映されることを特徴とする部門別工程情報管理システム。
In the departmental process information management system that collects process information of each department and displays the Gantt chart of the entire process, it is created from the process information of each department collected by the collection means that collects process information of each department. Detailed information management database storing the detailed process information, aggregation means for aggregating the detailed process information stored in the detailed information management database to create aggregate process information, and storing the aggregate process information created by the aggregation means The aggregated information management database, the link means for linking the detailed information management database and the aggregated information management database, the Gantt chart display means for displaying the Gantt chart based on the aggregated process information, and the Gantt chart display being operated The process information correcting means for correcting the aggregated process information is provided.
The divisional process information management system according to claim 1, wherein the correction of the aggregate process information by the process information correction means is reflected in the detailed process information corresponding to the aggregate process information by the link means.
上記収集手段は、各部門の工程情報を共通形式の詳細工程情報に変換する変換手段を有し、この共通形式に変換された詳細工程情報が上記詳細情報管理データベースに格納されるとともに、上記詳細工程情報の修正時には、上記変換手段を用いて上記各部門の工程情報に反映されることを特徴とする請求項1記載の部門別工程情報管理システム。   The collection means has conversion means for converting the process information of each department into detailed process information in a common format, and the detailed process information converted into the common format is stored in the detailed information management database, and the details 2. The departmental process information management system according to claim 1, wherein the process information is reflected in the process information of each department using the conversion means. 上記詳細工程情報または集約工程情報に基き、工程遅れ及び工程遅れの見込を含む工程判断を行い、アラーム情報を上記詳細工程情報または集約工程情報に付加するアラーム判定手段を備えたことを特徴とする請求項1または請求項2記載の部門別工程情報管理システム。   Based on the detailed process information or the aggregated process information, a process judgment including a process delay and an estimate of the process delay is provided, and alarm determination means for adding alarm information to the detailed process information or the aggregated process information is provided. The departmental process information management system according to claim 1 or 2. 上記アラーム判定手段は、上記アラーム情報を各部門の工程情報に反映させることを特徴とする請求項3記載の部門別工程情報管理システム。   The departmental process information management system according to claim 3, wherein the alarm determination means reflects the alarm information in the process information of each department.
JP2006176602A 2006-06-27 2006-06-27 Process information management system by department Withdrawn JP2008009509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006176602A JP2008009509A (en) 2006-06-27 2006-06-27 Process information management system by department

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006176602A JP2008009509A (en) 2006-06-27 2006-06-27 Process information management system by department

Publications (1)

Publication Number Publication Date
JP2008009509A true JP2008009509A (en) 2008-01-17

Family

ID=39067701

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006176602A Withdrawn JP2008009509A (en) 2006-06-27 2006-06-27 Process information management system by department

Country Status (1)

Country Link
JP (1) JP2008009509A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6871585B1 (en) * 2020-10-02 2021-05-12 了平 ▲高▼橋 Project management system and programs

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6871585B1 (en) * 2020-10-02 2021-05-12 了平 ▲高▼橋 Project management system and programs
JP2022060060A (en) * 2020-10-02 2022-04-14 了平 ▲高▼橋 Project management system and program

Similar Documents

Publication Publication Date Title
US20090327921A1 (en) Animation to visualize changes and interrelationships
US7805284B2 (en) Simulation model defining system for generating a simulation program for a simulator simulating a behavior of economy or society regarded as a system of phenomena and events
CN107992275A (en) Document Method of printing, device, computer equipment and storage medium
US20130067379A1 (en) Graphical comparison of geographic information system data
JP2007183857A (en) Business day contrast report output method and its system
JP2007004349A (en) Field investigation report creation support system
JP6639334B2 (en) Business process flow generation system, generation method and apparatus
JP6530330B2 (en) Loan administration automatic check system and method
JP2022073420A (en) Information management system
JP2007305051A (en) System and method for supporting creation of software requirement specification
JP2008009509A (en) Process information management system by department
JP2011170587A (en) Software development support apparatus and method
JP7098382B2 (en) Data management device and data management method
JP2007318277A (en) Data backup method and device in data management system
JP5447082B2 (en) Accounting support apparatus, accounting support program, and accounting support method
JP2010026750A (en) Automatic definition system for data retrieval item information in electronic business form system
JP2008257286A (en) Project progress management system and method
JP2007193581A (en) Operation time calculation system
JP4909811B2 (en) Dynamic integrated monitoring system for business processes
JP2011090452A (en) Information processor, information processing system, and information processing program
US20070296735A1 (en) System for and method of managing drawings
JP3837284B2 (en) Time difference system
AU2018339076B2 (en) Method, apparatus and computer program product for document change management in original and tailored documents
JP5479389B2 (en) Information processing system, program modification device, program modification method, and program
JP2005316778A (en) Plant monitoring controller

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090601

A761 Written withdrawal of application

Free format text: JAPANESE INTERMEDIATE CODE: A761

Effective date: 20091208