JP2005284818A - Productivity evaluation method and apparatus - Google Patents

Productivity evaluation method and apparatus Download PDF

Info

Publication number
JP2005284818A
JP2005284818A JP2004099125A JP2004099125A JP2005284818A JP 2005284818 A JP2005284818 A JP 2005284818A JP 2004099125 A JP2004099125 A JP 2004099125A JP 2004099125 A JP2004099125 A JP 2004099125A JP 2005284818 A JP2005284818 A JP 2005284818A
Authority
JP
Japan
Prior art keywords
value
production
actual value
plan
displayed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004099125A
Other languages
Japanese (ja)
Inventor
Osamu Sonoyama
修 園山
Kazuo Aichi
一男 相地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Priority to JP2004099125A priority Critical patent/JP2005284818A/en
Publication of JP2005284818A publication Critical patent/JP2005284818A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a productivity evaluation method and a productivity evaluation apparatus that increase productivity by facilitating the update of planned values necessary for production planning. <P>SOLUTION: The productivity evaluation method includes a planned value acquisition step of acquiring planned values from a plan accumulation part 201 storing planned values of time used for production planning (Step S200), an actual value acquisition step of acquiring actual values corresponding to the planned values (Step S202), a display step of displaying the planned values and the actual values comparatively in a single screen (Step S210), a determination step of determining whether or not there is a command to update the planned values (Step S212), and an update step of updating the planned values in the plan accumulation part 201 to the actual values if an update command is found (Step S214). <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、電子機器などの生産性を評価する生産性評価方法及び生産性評価装置に関する。   The present invention relates to a productivity evaluation method and a productivity evaluation apparatus for evaluating the productivity of electronic devices and the like.

従来より、電子機器の生産の計画を行う生産計画装置が提供されている。
電子機器は、例えばプリント基板に対して半田付けや電子部品の実装などの各作業が行われることにより生産され、これらの各作業はその作業に適した個別のマシンによって行われる。電子機器の生産工場には、このようなマシンが数多く設置されており、これらのマシンは、一連の流れ作業を行う一群のマシンから構成されるライン(生産ライン)ごとに管理される。
2. Description of the Related Art Conventionally, production planning apparatuses that plan production of electronic equipment have been provided.
An electronic device is produced, for example, by performing various operations such as soldering and mounting electronic components on a printed circuit board, and each of these operations is performed by an individual machine suitable for the operation. Many such machines are installed in an electronic device production factory, and these machines are managed for each line (production line) composed of a group of machines that perform a series of flow operations.

上記生産計画装置は、電子機器の品番、生産数、及び納期を含む出荷計画を取得して、予め記憶している蓄積データを参照することで、その出荷計画に応じた生産計画を作成する。蓄積データには、例えば各品番の電子機器に応じた工程順序や、ライン、そのラインの稼動可能日時、生産数などの計画値が含まれている。生産計画装置により作成された生産計画には、不良品を含む生産数や、生産開始予定時刻、終了予定時刻などが含まれている。電子機器の生産工場では、このような生産計画装置によって作成された生産計画に基づいて各マシンを稼動させて電子機器を生産する。   The production planning apparatus acquires a shipping plan including the product number, the number of productions, and the delivery date of the electronic device, and creates a production plan corresponding to the shipping plan by referring to stored data stored in advance. The accumulated data includes, for example, planned values such as a process sequence corresponding to each electronic device of each product number, a line, an operation date / time of the line, and the number of productions. The production plan created by the production planning apparatus includes the number of productions including defective products, the scheduled production start time, the planned end time, and the like. In an electronic equipment production factory, each machine is operated based on a production plan created by such a production planning apparatus to produce electronic equipment.

また近年、このような生産計画装置によって作成された生産計画である生産ロット順序計画と、各ロットに対する材料準備状況などの生産実績とを表示する生産性評価装置が提案されている(例えば、特許文献1参照。)。
特開2002−312015号公報
In recent years, a productivity evaluation apparatus has been proposed that displays a production lot order plan, which is a production plan created by such a production planning apparatus, and production results such as the material preparation status for each lot (for example, patents). Reference 1).
JP 2002-312015 A

しかしながら、上記特許文献1の生産性評価装置では、生産計画と生産実績とを限られた項目において表示するのみであって、生産計画を行うために要する計画値のメンテナンスを行わず、その結果、生産計画の精度が低くなり生産性が悪くなってしまうという問題がある。   However, the productivity evaluation apparatus of Patent Document 1 only displays the production plan and production results in limited items, and does not perform maintenance of the plan value required for performing the production plan. There is a problem that the accuracy of the production plan is lowered and the productivity is deteriorated.

即ち、生産計画装置の作成する生産計画が生産実績に近づくように計画精度を高めるためには、蓄積データの計画値を実績値に基づいて更新する必要がある。しかし、上記特許文献1の生産性評価装置は、そのような蓄積データの計画値を更新することができないのである。   That is, in order to increase the planning accuracy so that the production plan created by the production planning device approaches the production result, it is necessary to update the plan value of the accumulated data based on the result value. However, the productivity evaluation apparatus of Patent Document 1 cannot update the planned value of such accumulated data.

そこで、本発明は、このような問題に鑑みてなされたものであって、生産計画を行うために要する計画値の更新を容易にして生産性を向上する生産性評価方法及び生産性評価装置を提供することを目的とする。   Therefore, the present invention has been made in view of such problems, and a productivity evaluation method and a productivity evaluation apparatus that improve the productivity by facilitating the update of the plan value required for performing the production plan. The purpose is to provide.

上記目的を達成するために、本発明に係る生産性評価方法は、複数の生産装置による一連の作業によって行われる生産対象品の生産を評価する方法であって、前記生産の計画を行うために用いられる時間に関する計画値が格納されている記憶媒体から、前記計画値を取得する計画値取得ステップと、前記計画値に対応する実績値を取得する実績値取得ステップと、前記計画値取得ステップ及び実績値取得ステップでそれぞれ取得された計画値及び実績値を対比し得る態様で一画面に表示する表示ステップと、前記計画値の更新の指示があったか否かを判別する判別ステップと、前記判別ステップで更新の指示があったと判別されたときには、前記記憶媒体の計画値を実績値に合わせるように更新する更新ステップとを含むことを特徴とする。   In order to achieve the above object, a productivity evaluation method according to the present invention is a method for evaluating production of a product to be produced by a series of operations by a plurality of production apparatuses, and for planning the production A plan value acquisition step for acquiring the plan value from a storage medium storing a plan value for the time to be used; an actual value acquisition step for acquiring an actual value corresponding to the plan value; and the plan value acquisition step; A display step for displaying on one screen in a manner capable of comparing the plan value and the actual value acquired in the actual value acquisition step, a determination step for determining whether or not there is an instruction to update the planned value, and the determination step And an update step of updating the storage medium so as to match the planned value with the actual value when it is determined that there is an update instruction.

これにより、生産計画に用いられる時間に関する計画値が実績値とともに一画面に表示され、更新の指示があったときには、その計画値を実績値に合わせるように更新されるため、生産を行う作業者は、表示された計画値と実績値とを容易に見比べることができ、その計画値を更新すべきか否かを容易に判断して更新することができる。その結果、生産計画において重要な時間に関する計画値の更新が適切に行われて生産計画の精度を高め、生産性の向上を図ることができる。   As a result, the planned value for the time used for the production plan is displayed on one screen together with the actual value, and when there is an instruction to update, the planned value is updated to match the actual value. Can easily compare the displayed plan value with the actual value, and can easily determine whether or not the plan value should be updated. As a result, it is possible to appropriately update the plan value relating to the important time in the production plan, thereby improving the accuracy of the production plan and improving the productivity.

また、前記計画値取得ステップでは、前記複数の生産装置に含まれる一群の生産装置に対する計画値を取得し、前記実績値取得ステップでは、前記一群の生産装置に対する実績値を取得し、前記表示ステップでは、前記計画値及び実績値を前記一群の生産装置に関連付けて表示することを特徴としても良い。例えば、前記計画値及び実績値はそれぞれ、1つの生産対象品に対する前記一群の生産装置の作業に要するサイクル時間を示す。   Further, in the planned value acquisition step, a planned value for a group of production devices included in the plurality of production devices is acquired, and in the actual value acquisition step, an actual value for the group of production devices is acquired, and the display step Then, the plan value and the actual value may be displayed in association with the group of production apparatuses. For example, each of the planned value and the actual value indicates a cycle time required for the operation of the group of production apparatuses for one production target product.

これにより、例えばラインなどの一群の生産装置に関連付けて計画値及び実績値が表示されるため、生産を行う作業者は、表示された計画値及び実績値に対応するラインを容易に特定し、そのラインに対するサイクル時間などの計画値を更新すべきか否かを容易に判断することができる。   Thereby, for example, because the plan value and the actual value are displayed in association with a group of production devices such as a line, the worker who performs the production easily identifies the line corresponding to the displayed planned value and the actual value, It is possible to easily determine whether or not a plan value such as a cycle time for the line should be updated.

また、前記生産性評価方法は、さらに、前記計画値取得ステップで取得された計画値と、前記実績値取得ステップで取得された実績値とを履歴として履歴用記録媒体に書き込む書き込みステップを含み、前記表示ステップでは、前記履歴用記録媒体に書き込まれている履歴を表示することを特徴としても良い。   Further, the productivity evaluation method further includes a writing step of writing the planned value acquired in the planned value acquiring step and the actual value acquired in the actual value acquiring step as a history to a history recording medium, In the display step, the history written in the history recording medium may be displayed.

これにより、計画値及び実績値の履歴が表示されるため、生産を行う作業者は、表示された過去の履歴を参考にして、計画値を更新すべきか否かを容易に判断することができる。   Thereby, since the history of the plan value and the actual value is displayed, the worker who performs the production can easily determine whether or not the plan value should be updated with reference to the displayed past history. .

ここで、本発明に係る生産性評価方法は、複数の生産装置による一連の作業によって行われる生産対象品の生産を評価する方法であって、前記生産の計画を行うために用いられる時間に関する計画値が格納されている記憶媒体から、前記計画値を取得する計画値取得ステップと、前記計画値に対応する実績値を取得する実績値取得ステップと、前記計画値取得ステップで取得された計画値、及び前記実績値取得ステップで取得された実績値を履歴として履歴用記録媒体に書き込む書き込みステップと、前記履歴用記録媒体に書き込まれた履歴に基づいて、所定期間分の計画値及び実績値を対比し得る態様で表示する表示ステップとを含むことを特徴とする。   Here, the productivity evaluation method according to the present invention is a method for evaluating the production of a product to be produced that is performed by a series of operations by a plurality of production apparatuses, and is a plan related to time used for planning the production. A plan value acquisition step for acquiring the plan value from a storage medium storing values, an actual value acquisition step for acquiring an actual value corresponding to the plan value, and the plan value acquired in the plan value acquisition step And a writing step of writing the actual value acquired in the actual value acquisition step to the history recording medium as a history, and a plan value and an actual value for a predetermined period based on the history written to the history recording medium. And a display step of displaying in a manner that can be compared.

これにより、所定期間分の計画値及び実績値が対比し得る態様で表示されるため、生産を行う作業者は、表示された所定期間分の計画値と実績値との相違を容易に把握することができる。その結果、作業者は、その相違に基づいて生産工程を見直すことができ、生産性の向上を図ることができる。   Thereby, since the plan value and the actual value for the predetermined period are displayed in a manner that can be compared, the worker who performs the production easily grasps the difference between the displayed plan value and the actual value for the predetermined period. be able to. As a result, the worker can review the production process based on the difference, and can improve productivity.

また、前記計画値取得ステップでは、前記複数の生産装置に含まれる一群の生産装置に対する計画値を取得し、前記実績値取得ステップでは、前記一群の生産装置に対する実績値を取得し、前記表示ステップでは、前記所定期間分の計画値及び実績値を前記一群の生産装置に関連付けて表示することを特徴としても良い。例えば、前記計画値取得ステップでは、生産工程のうち前記一群の生産装置が稼動していないロス時間に対する計画値を取得し、前記実績値取得ステップでは、前記ロス時間に対する実績値を取得し、前記表示ステップでは、前記ロス時間に対する前記所定期間分の計画値及び実績値を表示する。   Further, in the planned value acquisition step, a planned value for a group of production devices included in the plurality of production devices is acquired, and in the actual value acquisition step, an actual value for the group of production devices is acquired, and the display step Then, the plan value and the actual value for the predetermined period may be displayed in association with the group of production apparatuses. For example, in the planned value acquisition step, a planned value for a loss time during which the group of production apparatuses are not operating in the production process is acquired, and in the actual value acquisition step, an actual value for the loss time is acquired, In the display step, the plan value and the actual value for the predetermined period with respect to the loss time are displayed.

これにより、例えばラインなどの一群の生産装置に関連付けて所定期間分の計画値及び実績値が表示されるため、生産を行う作業者は、表示された計画値及び実績値に対応するラインを容易に特定し、そのラインに対する生産工程を、例えばロス時間の観点から見直すことができる。   As a result, for example, the plan value and the actual value for a predetermined period are displayed in association with a group of production devices such as a line, so that the worker who performs the production can easily use the line corresponding to the displayed planned value and the actual value. The production process for the line can be reviewed from the viewpoint of loss time, for example.

また、前記生産性評価方法は、さらに、前記履歴用記録媒体に書き込まれた履歴に基づいて、所定期間の実績値を表示する実績表示ステップを含むことを特徴としても良い。例えば、前記実績値取得ステップでは、前記一群の生産装置に対する生産対象品の切替えに要した段取時間を実績値として取得し、前記実績表示ステップでは、前記所定期間ごとの前記段取時間の推移を表示する。   The productivity evaluation method may further include a result display step of displaying a result value for a predetermined period based on the history written in the history recording medium. For example, in the actual value acquisition step, a setup time required for switching the production target product for the group of production apparatuses is acquired as an actual value, and in the actual result display step, the transition of the setup time for each predetermined period Is displayed.

これにより、例えば段取時間などの実績値の推移が表示されるため、生産を行う作業者はその推移から生産工程を見直すことができ、生産性の向上を図ることができる。
なお、本発明は、上述の生産性評価方法により生産性を評価する生産性評価装置やプログラム、そのプログラムを格納する記憶媒体としても実現することができる。
Thereby, for example, since the transition of the actual value such as the setup time is displayed, the worker who performs the production can review the production process based on the transition, and the productivity can be improved.
Note that the present invention can also be realized as a productivity evaluation apparatus or program for evaluating productivity by the above-described productivity evaluation method, or as a storage medium for storing the program.

本発明の生産性評価方法及び生産性評価装置は、生産計画を行うために要する計画値の更新を容易にして生産性を向上することができるという作用効果を奏する。   INDUSTRIAL APPLICABILITY The productivity evaluation method and the productivity evaluation apparatus according to the present invention have an operational effect that it is possible to easily update a planned value required for performing a production plan and improve productivity.

以下、本発明の実施の形態における生産計画評価装置について図面を参照しながら説明する。
図1は、本発明の実施の形態における生産計画評価装置の外観を示す外観図である。
Hereinafter, a production plan evaluation apparatus according to an embodiment of the present invention will be described with reference to the drawings.
FIG. 1 is an external view showing an external appearance of a production plan evaluation apparatus according to an embodiment of the present invention.

この生産計画評価装置1は、予め記憶している計画値を用いて生産対象品に対する生産計画を行うとともに、その生産対象品の生産性を評価するものであって、例えばパーソナルコンピュータなどの汎用コンピュータに専用のソフトウェアがインストールされることによって構成される。   The production plan evaluation apparatus 1 performs a production plan for a production target product using a plan value stored in advance, and evaluates the productivity of the production target product. For example, a general-purpose computer such as a personal computer is used. Is configured by installing dedicated software.

即ち、本実施の形態の生産計画評価装置1は、一連の作業を行う一群のマシンから構成されるラインごとに、生産対象の電子機器に対する生産計画を行う生産計画装置としての機能と、その生産性を評価する生産性評価装置としての機能とを兼ね備える。   That is, the production plan evaluation apparatus 1 according to the present embodiment has a function as a production plan apparatus that performs a production plan for an electronic device to be produced for each line composed of a group of machines that perform a series of operations, and its production. It also has a function as a productivity evaluation device for evaluating productivity.

図2は、本実施の形態の生産計画評価装置1の構成を示すブロック図である。
生産計画評価装置1は、キーボードやマウスなどから構成される入力部2と、入力部2の操作に応じて情報の演算などを行う装置本体3と、装置本体3からの制御に応じた画像を表示する表示部4とを備える。
FIG. 2 is a block diagram showing a configuration of the production plan evaluation apparatus 1 according to the present embodiment.
The production plan evaluation apparatus 1 includes an input unit 2 composed of a keyboard, a mouse, and the like, an apparatus main body 3 that performs calculation of information according to the operation of the input unit 2, and an image according to control from the apparatus main body 3. And a display unit 4 for displaying.

装置本体3は、生産計画を行う生産計画部200と、生産性の評価を行う生産性評価部100とから構成される。
即ち、本実施の形態では、入力部2と装置本体3の生産性評価部100と表示部4とから生産性評価装置が構成されている。
The apparatus main body 3 includes a production planning unit 200 that performs production planning and a productivity evaluation unit 100 that evaluates productivity.
In other words, in the present embodiment, the productivity evaluation apparatus is configured by the input unit 2, the productivity evaluation unit 100 of the apparatus main body 3, and the display unit 4.

生産計画部200は、生産計画を行うのに要する計画値を予め記憶している計画蓄積部201と、計画蓄積部201に蓄積された計画値を用いて生産計画を作成するスケジューラー部203とを備える。   The production planning unit 200 includes a plan storage unit 201 that stores in advance a plan value required for performing a production plan, and a scheduler unit 203 that creates a production plan using the plan value stored in the plan storage unit 201. Prepare.

計画蓄積部201は、計画値として、電子機器の機種品番、工程順序、稼動可能日時、及び生産数を蓄積するとともに、後述するサイクルタイム、段取ロス、及び性能稼動率なども蓄積する。   The plan accumulating unit 201 accumulates the model number of the electronic device, the process order, the operation possible date and time, and the number of productions as a planned value, and also accumulates a cycle time, a setup loss, a performance operating rate, and the like, which will be described later.

生産性評価部100は、入力部2から実績値を取得する実績取得部101と、計画蓄積部201から計画値を取得する計画取得部102と、その取得された実績値及び計画値を蓄積する評価蓄積部103と、評価蓄積部103に蓄積されたデータを集計する集計部104と、生産計画部200を起動させるスケジューラー起動部105と、計画蓄積部201に蓄積されている計画値を更新する更新部106と、更新部106などの上記各構成要素を制御する主制御部107とを備える。   The productivity evaluation unit 100 accumulates the actual result value and the plan value acquired from the input unit 2, the plan acquisition unit 102 that acquires the plan value from the plan storage unit 201, and the acquired actual value and the plan value. The evaluation storage unit 103, the totaling unit 104 that totals the data stored in the evaluation storage unit 103, the scheduler starting unit 105 that starts the production planning unit 200, and the plan value stored in the plan storage unit 201 are updated. An update unit 106 and a main control unit 107 that controls each of the above components such as the update unit 106 are provided.

入力部2は、ユーザによって操作されることにより、生産性評価部100及び生産計画部200に対して、その操作に応じた信号を出力する。例えば、ユーザが入力部2に対して実績値を入力すると、入力部2はその実績値を示す信号を実績取得部101に出力する。   The input unit 2 outputs a signal corresponding to the operation to the productivity evaluation unit 100 and the production planning unit 200 when operated by the user. For example, when the user inputs a record value to the input unit 2, the input unit 2 outputs a signal indicating the record value to the record acquisition unit 101.

実績取得部101は、入力部2から出力された信号により示される実績値を取得して、その実績値を主制御部107に出力する。
計画取得部102は、計画蓄積部201に蓄積されている計画値を取得して、その計画値を主制御部107に出力する。
The achievement acquisition unit 101 acquires the achievement value indicated by the signal output from the input unit 2, and outputs the achievement value to the main control unit 107.
The plan acquisition unit 102 acquires the plan value stored in the plan storage unit 201 and outputs the plan value to the main control unit 107.

主制御部107は、実績取得部101及び計画取得部102から実績値及び計画値を取得すると、その実績値及び計画値を並べて表示部4に表示させる。そして、主制御部107は、ユーザによる入力部2の操作に応じて更新部106を制御し、計画蓄積部201に蓄積されている計画値を、表示部4に表示された実績値に合わせるように更新させる。さらに、主制御部107は、その取得された実績値及び計画値の履歴を作成し、その履歴を評価蓄積部103に格納する。   When the main control unit 107 acquires the actual value and the plan value from the actual acquisition unit 101 and the plan acquisition unit 102, the main control unit 107 displays the actual value and the plan value side by side on the display unit 4. Then, the main control unit 107 controls the update unit 106 according to the operation of the input unit 2 by the user so that the planned value stored in the planned storage unit 201 matches the actual value displayed on the display unit 4. To update. Further, the main control unit 107 creates a history of the acquired actual value and plan value, and stores the history in the evaluation accumulation unit 103.

また、主制御部107は、入力部2から実績取得部101を介して取得した信号に応じて、評価蓄積部103から履歴を抽出して集計部104に出力し、その集計部104に対して月又は日などの単位で実績値及び計画値を集計させる。集計部104によって集計が行われると、主制御部107は、その集計結果を集計部104から取得して、表示部4にグラフなどの図表によりその集計結果を表示部4に表示させる。また、主制御部107は、入力部2から実績取得部101を介して取得した信号に応じて、スケジューラー起動部105を制御することで、生産計画部200を起動させる。   Further, the main control unit 107 extracts a history from the evaluation storage unit 103 in accordance with a signal acquired from the input unit 2 via the result acquisition unit 101, outputs the history to the totaling unit 104, and outputs the history to the totaling unit 104. The actual value and the planned value are aggregated in units such as month or day. When aggregation is performed by the aggregation unit 104, the main control unit 107 acquires the aggregation result from the aggregation unit 104, and causes the display unit 4 to display the aggregation result on the display unit 4 using a chart such as a graph. Further, the main control unit 107 activates the production planning unit 200 by controlling the scheduler activation unit 105 in accordance with the signal acquired from the input unit 2 via the result acquisition unit 101.

このような本実施の形態の生産性評価部100は、生産計画部200の計画蓄積部201に蓄積されている計画値の更新をユーザに対して容易に行わせるとともに、所定期間分の計画値と実績値とを図表により表示することとによって、生産性を向上することができる点に特徴がある。   The productivity evaluation unit 100 according to the present embodiment makes it easy for the user to update the plan value stored in the plan storage unit 201 of the production plan unit 200, and the plan value for a predetermined period. It is characterized in that productivity can be improved by displaying the actual value and the actual value as a chart.

図3は、本実施の形態に係る生産計画評価装置1を用いた生産工程を説明するための説明図である。
まず、ユーザは入力部2を操作することにより、生産対象品である電子機器の機器品番や生産数や納期などを示す出荷計画を生産計画評価装置1に入力する。即ち、生産計画評価装置1は出荷計画を取得する(ステップS100)。出荷計画を取得した生産計画評価装置1は、その出荷計画に基づいて、計画蓄積部201に蓄積された計画値を用い、各ラインの生産開始時刻や終了時刻などを示す生産計画を作成する(ステップS102)。このようなステップS100,S102の生産計画評価装置1の動作は、生産計画部200によって行われる。
FIG. 3 is an explanatory diagram for explaining a production process using the production plan evaluation apparatus 1 according to the present embodiment.
First, the user operates the input unit 2 to input a shipment plan indicating the device part number, the number of production, the delivery date, and the like of the electronic device that is the production target product to the production plan evaluation apparatus 1. That is, the production plan evaluation apparatus 1 acquires a shipment plan (step S100). The production plan evaluation apparatus 1 that has acquired the shipment plan creates a production plan that indicates the production start time, end time, etc. of each line using the plan value accumulated in the plan accumulation unit 201 based on the shipment plan ( Step S102). The operation of the production plan evaluation apparatus 1 in steps S100 and S102 is performed by the production plan unit 200.

このように生産計画評価装置1によって生産計画が作成されると、ユーザは、その生産計画に基づいて各ラインを稼動させて電子機器の生産を行う(ステップS104)。
電子機器の生産が行われた後、ユーザは再び入力部2を操作することにより、生産の実績値を生産計画評価装置1に入力する。即ち、生産計画評価装置1は稼働時間などの実績値の収集を行う(ステップS106)。そして、生産計画評価装置1は、その収集した実績値から性能稼働率やラインバランスなどを算出し(ステップS108)、その算出結果を含む実績値と計画値とを対比し得るような態様で表示する(ステップS110)。
When a production plan is created by the production plan evaluation device 1 in this way, the user operates each line based on the production plan to produce electronic devices (step S104).
After the production of the electronic device is performed, the user operates the input unit 2 again to input the actual production value to the production plan evaluation apparatus 1. That is, the production plan evaluation apparatus 1 collects actual values such as operating hours (step S106). Then, the production plan evaluation apparatus 1 calculates a performance utilization rate, a line balance, and the like from the collected actual values (step S108), and displays the result values including the calculation results in a manner that can be compared with the planned values. (Step S110).

このような実績値と計画値を閲覧したユーザは、入力部2を操作することにより、生産計画評価装置1に対して計画値を更新するように指示すると、生産計画評価装置1は、その指示に応じて、計画蓄積部201の計画値を実績値に合わせるように更新する(ステップS112)。このようなステップS106〜S112の生産計画評価装置1の動作は、生産性評価部100によって行われる。   When the user who has viewed such actual values and plan values operates the input unit 2 to instruct the production plan evaluation apparatus 1 to update the plan values, the production plan evaluation apparatus 1 Accordingly, the plan value of the plan accumulation unit 201 is updated to match the actual value (step S112). The operations of the production plan evaluation apparatus 1 in steps S106 to S112 are performed by the productivity evaluation unit 100.

図4は、主制御部107によって表示部4に表示される画面の遷移状態を示す図である。
主制御部107は、表示部4に対して、メインメニュー画面D10と、実績入力画面D20と、スケジューラー画面D30と、生産性評価画面D40と、データメンテナンス画面D50とを表示させる。
FIG. 4 is a diagram illustrating a transition state of a screen displayed on the display unit 4 by the main control unit 107.
The main control unit 107 causes the display unit 4 to display a main menu screen D10, a result input screen D20, a scheduler screen D30, a productivity evaluation screen D40, and a data maintenance screen D50.

主制御部107は、自らの起動とともにメインメニュー画面D10を表示させる。そのメインメニュー画面D10には、「スケジューラー起動」と記されたボタンBt1と、「生産実績入力」と記されたボタンBt2と、「生産性評価」と記されたボタンBt3と、「データメンテナンス」と記されたボタンBt4とが表示される。   The main control unit 107 displays the main menu screen D10 along with its activation. The main menu screen D10 includes a button Bt1 labeled “Scheduler activation”, a button Bt2 labeled “Production record input”, a button Bt3 labeled “Productivity evaluation”, and “Data maintenance”. And a button Bt4 marked with.

ユーザによる入力部2の操作によってボタンBt1が選択されると、主制御部107は、スケジューラー起動部105を制御することにより、生産計画部200を起動させる。その結果、生産計画部200のスケジューラー部203は表示部4に対して生産計画を行うためのスケジューラー画面D30を表示させる。このスケジューラー画面D30は、出荷計画を受け付けるための画面や、作成された生産計画などを表す。   When the button Bt1 is selected by an operation of the input unit 2 by the user, the main control unit 107 activates the production planning unit 200 by controlling the scheduler activation unit 105. As a result, the scheduler unit 203 of the production planning unit 200 causes the display unit 4 to display a scheduler screen D30 for performing a production plan. The scheduler screen D30 represents a screen for receiving a shipping plan, a created production plan, and the like.

ユーザによる入力部2の操作によってボタンBt2が選択されると、主制御部107は、生産の実績を受け付けるための実績入力画面D20を表示部4に表示させる。この実績入力画面D20は、計画蓄積部201に蓄積されている計画値と、ユーザによる入力部2の操作により実績取得部101で取得された実績値とを示す入力メイン画面D21と、入力メイン画面D21に表示される項目を選択するための設定画面D22とから構成される。設定画面D22は、入力メイン画面D21の「詳細設定」と記されたボタンが選択されることによって表示部4に表示される。   When the button Bt2 is selected by the operation of the input unit 2 by the user, the main control unit 107 causes the display unit 4 to display a result input screen D20 for receiving a production result. The actual result input screen D20 includes an input main screen D21 indicating the planned value accumulated in the plan accumulating unit 201 and the actual value obtained by the actual result obtaining unit 101 by the operation of the input unit 2 by the user, and the input main screen. It is comprised from the setting screen D22 for selecting the item displayed on D21. The setting screen D22 is displayed on the display unit 4 when the button labeled “Detailed setting” on the input main screen D21 is selected.

ユーザによる入力部2の操作によってメインメニュー画面D10のボタンBt3が選択されると、主制御部107は、評価蓄積部103に蓄積されたデータを読み出し、集計部104にそのデータの集計処理を実行させることにより、その集計結果である生産性評価画面D40を表示部4に表示させる。この生産性評価画面D40は、月単位で生産性が評価された結果を示す月単位評価画面D41、日単位で生産性が評価された結果を示す日単位評価画面D42、及び後述するタクトバランスを示すタクトバランス画面D43のうちの何れかである。   When the button Bt3 on the main menu screen D10 is selected by the operation of the input unit 2 by the user, the main control unit 107 reads the data accumulated in the evaluation accumulation unit 103 and executes the aggregation process of the data in the aggregation unit 104 As a result, the productivity evaluation screen D40, which is a result of the aggregation, is displayed on the display unit 4. This productivity evaluation screen D40 includes a monthly evaluation screen D41 showing a result of evaluating productivity in units of months, a daily evaluation screen D42 showing a result of evaluating productivity in units of days, and a tact balance described later. One of the tact balance screens D43 shown.

ユーザによる入力部2の操作によってメインメニュー画面D10のボタンBt4が選択されると、主制御部107は、評価蓄積部103に蓄積されたデータを、例えばサイクルタイム、段取ロス、又は性能稼働率ごとに読み出して、その読み出した内容をデータメンテナンス画面D50として表示する。このデータメンテナンス画面D50は、サイクルタイムを示すサイクルタイム画面D51、段取ロスを示す段取ロス画面D52、及び性能稼働率を示す性能稼働率画面D53のうちの何れかである。このようなデータメンテナンス画面D50が表示部4に表示された状態で、ユーザが入力部2を操作して表示内容を変更すると、主制御部300は、その変更内容に応じて、生産計画部200の計画蓄積部201に蓄積された計画値を更新部106に更新させる。   When the button Bt4 on the main menu screen D10 is selected by an operation of the input unit 2 by the user, the main control unit 107 uses the data accumulated in the evaluation accumulation unit 103 as, for example, cycle time, setup loss, or performance availability. Each time it is read out, the read content is displayed as a data maintenance screen D50. The data maintenance screen D50 is any one of a cycle time screen D51 indicating a cycle time, a setup loss screen D52 indicating a setup loss, and a performance availability screen D53 showing a performance availability. When the user changes the display content by operating the input unit 2 in a state where the data maintenance screen D50 is displayed on the display unit 4, the main control unit 300 changes the production planning unit 200 according to the change content. The plan value accumulated in the plan accumulation unit 201 is updated by the update unit 106.

図5は、実績入力画面D20の入力メイン画面D21の一例を示す画面表示図である。
入力メイン画面D21は、ラインごとの実績値を受け付けてその実績値及び計画値を示す画面である。具体的に、この入力メイン画面D21には、入力対象となるラインの名称が表示されるライン名称欄a1と、そのラインによって生産される電子機器の機種品番が表示される機種品番欄a2と、生産台数に関する欄a3〜a6と、規定ロスに関する欄a7〜a10と、管理ロスに関する欄a11〜a14と、段取ロスに関する欄a15〜a19と、稼働時間に関する欄a20〜a22と、サイクルタイムが表示されるサイクルタイム欄a23〜a26と、最遅サイクルタイムに関する欄a27〜a29と、性能稼働率に関する欄a30〜a32と、設備性能ロスに関する欄a33〜a38とがある。
FIG. 5 is a screen display diagram illustrating an example of the input main screen D21 of the result input screen D20.
The input main screen D21 is a screen that receives the actual value for each line and displays the actual value and the planned value. Specifically, on the input main screen D21, a line name field a1 in which the name of the line to be input is displayed, a model part number field a2 in which the model part number of the electronic device produced by the line is displayed, Columns a3 to a6 relating to the number of production units, columns a7 to a10 relating to specified losses, columns a11 to a14 relating to management losses, columns a15 to a19 relating to setup losses, columns a20 to a22 relating to operating hours, and cycle times are displayed. Cycle time columns a23 to a26, columns a27 to a29 related to the latest cycle time, columns a30 to a32 related to performance availability, and columns a33 to a38 related to equipment performance loss.

ここで規定ロスとは、例えばユーザの会社によって定められている生産を行わない時間であって、具体的に、休憩や食事、行事、朝夕会、シフト引継ぎなどに要する時間を示す。   Here, the specified loss is, for example, a time during which production determined by the user's company is not performed, and specifically indicates a time required for a break, a meal, an event, a morning and evening party, a shift takeover, or the like.

段取ロスとは、生産対象の電子機器の機種を切り替えるのに要する時間であって、詳細には、切り替え後の最初の1つの電子機器を生産して確認するまでの時間(立ち上がり時間)を含む。   The setup loss is the time required to switch the model of the electronic device to be produced. Specifically, the setup loss is the time (rise time) required to produce and check the first electronic device after switching. Including.

管理ロスとは、上記規定ロス及び段取ロス以外の要因でラインが稼動していない時間であって、具体的に、棚卸やメンテナンス、欠品による生産待ちなどに要する時間を示す。
規定ロス及び段取ロス並びに管理ロスからなる時間は、ラインを所有する工場が電子機器の生産のためにその工場を運転する操業時間のうち、ラインが稼動している稼動時間を差し引いた時間となる。
The management loss is a time during which the line is not operating due to factors other than the above-mentioned specified loss and setup loss, and specifically indicates a time required for inventory, maintenance, waiting for production due to a shortage, and the like.
The time consisting of regulation loss, setup loss and management loss is the time obtained by subtracting the operating time during which the line is operating from the operating time when the factory owning the line operates the factory for the production of electronic equipment. Become.

サイクルタイムとは、生産対象品の電子機器が1つ生産されるのに要する時間を示す。
最遅サイクルタイムとは、1つのラインに含まれる各マシンのサイクルタイムのうち、最も長いサイクルタイムを示す。なお、この最遅サイクルタイムがラインのサイクルタイムに相当する。
The cycle time indicates the time required to produce one electronic device as a production target product.
The latest cycle time indicates the longest cycle time among the cycle times of the machines included in one line. This latest cycle time corresponds to the cycle time of the line.

性能稼働率とは、稼働時間に対する正味の稼働時間の割合を示す。
設備性能ロスとは、稼働時間に含まれる正味の稼働時間以外の時間である。即ち、設備性能ロスは、マシン自身の要因で生産工程が停止している時間であって、トラブル停止時間や、前工程の待ち時間、後工程の待ち時間などを示す。
The performance operating rate indicates the ratio of the net operating time to the operating time.
The equipment performance loss is a time other than the net operation time included in the operation time. That is, the equipment performance loss is a time during which the production process is stopped due to the factor of the machine itself, and indicates a trouble stop time, a waiting time for the previous process, a waiting time for the subsequent process, and the like.

生産台数に関する欄a3〜a6は、電子機器の不良品も含めた生産数が表示される生産台数欄a3と、計画値として計画蓄積部201に蓄積されている生産数が表示される生産計画数欄a4と、入力部2から実績値として入力された電子機器の良品の生産数が表示される生産実績数欄a5と、入力部2から実績値として入力された電子機器の不良品の台数が表示される不良数欄a6とから構成される。   In the columns a3 to a6 relating to the number of production, the number of production column a3 in which the number of production including defective products of the electronic device is displayed and the number of production plans in which the number of production accumulated in the plan accumulation unit 201 is displayed as the plan value. The column a4, the production result number column a5 in which the number of non-defective products of the electronic device input as the actual value from the input unit 2 is displayed, and the number of defective electronic devices input as the actual value from the input unit 2 It is comprised from the defect number column a6 displayed.

規定ロスに関する欄a7〜a10は、入力部2の操作に応じて規定ロスの詳細項目(休憩や食事など)が選択的に表示される規定ロス項目欄a8と、その詳細項目の開始日時と終了日時が表示される規定ロス欄a7と、その詳細項目に要した時間が実績値として表示される規定ロス実績欄a9と、その詳細項目に要する時間が計画値として表示される規定ロス計画欄a10とから構成される。   Columns a7 to a10 related to the specified loss include a specified loss item column a8 in which detailed items (such as breaks and meals) of the specified loss are selectively displayed according to the operation of the input unit 2, and the start date and time and end of the detailed items A specified loss field a7 in which the date and time are displayed, a specified loss result field a9 in which the time required for the detailed item is displayed as an actual value, and a specified loss plan field a10 in which the time required for the detailed item is displayed as a planned value It consists of.

規定ロス欄a7には、例えば規定ロス項目欄a8に「休憩」が表示されているときには、計画蓄積部201に蓄積されている休憩の開始日時と終了日時とがデフォルトで表示される。ユーザは、入力部2を操作することにより、その規定ロス欄a7にデフォルトで表示された開始日時と終了日時とを実績にあわせて修正する。   For example, when “rest” is displayed in the specified loss item column a8, the start date and end date and time of the break stored in the plan storage unit 201 are displayed by default in the specified loss column a7. The user operates the input unit 2 to correct the start date and time and the end date and time displayed by default in the specified loss column a7 according to the actual results.

規定ロス実績欄a9には、規定ロス欄a7に表示された開始日時と終了日時の間の時間が、規定ロス項目欄a8に表示された項目に対応する実績値として表示される。
規定ロス計画欄a10には、規定ロス項目欄a8に表示された項目に対する計画値として、計画蓄積部201に蓄積されている時間が表示される。
In the specified loss result column a9, the time between the start date and time and the end date and time displayed in the specified loss column a7 is displayed as an actual value corresponding to the item displayed in the specified loss item column a8.
In the prescribed loss plan column a10, the time accumulated in the plan accumulation unit 201 is displayed as a planned value for the item displayed in the prescribed loss item column a8.

管理ロスに関する欄a11〜a14は、入力部2の操作に応じて管理ロスの詳細項目(棚卸やメンテナンスなど)が選択的に表示される管理ロス項目欄a12と、その詳細項目の開始日時と終了日時が表示される管理ロス欄a11と、その詳細項目に要した時間が実績値として表示される管理ロス実績欄a13と、その詳細項目に要する時間が計画値として表示される管理ロス計画欄a14とから構成される。   The management loss columns a11 to a14 are a management loss item column a12 in which detailed items (inventory, maintenance, etc.) of the management loss are selectively displayed according to the operation of the input unit 2, and the start date and time and end of the detailed item Management loss column a11 in which the date and time are displayed, management loss result column a13 in which the time required for the detailed item is displayed as an actual value, and management loss plan column a14 in which the time required for the detailed item is displayed as a planned value It consists of.

管理ロス欄a11には、例えば管理ロス項目欄a12に「メンテナンス」が表示されているときには、計画蓄積部201に蓄積されているメンテナンスの開始日時と終了日時とがデフォルトで表示される。ユーザは、入力部2を操作することにより、その管理ロス欄a11にデフォルトで表示された開始日時と終了日時とを実績にあわせて修正する。   In the management loss column a11, for example, when “maintenance” is displayed in the management loss item column a12, the maintenance start date and time and end date and time stored in the plan storage unit 201 are displayed by default. The user operates the input unit 2 to correct the start date and time and the end date and time displayed by default in the management loss column a11 according to the actual results.

管理ロス実績欄a13には、管理ロス欄a11に表示された開始日時と終了日時の間の時間が、管理ロス項目欄a12に表示された項目に対応する実績値として表示される。
管理ロス計画欄a14には、管理ロス項目欄a12に表示された項目に対する計画値として、計画蓄積部201に蓄積されている時間が表示される。
In the management loss result column a13, the time between the start date and time and the end date and time displayed in the management loss column a11 is displayed as a result value corresponding to the item displayed in the management loss item column a12.
In the management loss plan column a14, the time accumulated in the plan accumulation unit 201 is displayed as a plan value for the item displayed in the management loss item column a12.

段取ロスに関する欄a15〜a19は、入力部2の操作に応じて段取ロスの詳細項目(切替えや立ち上がりなど)が選択的に表示される段取ロス項目欄a16と、その詳細項目の開始日時と終了日時が表示される段取ロス欄a15と、その詳細項目に要した時間が実績値として表示される段取ロス実績欄a17と、その詳細項目に要する時間が計画値として表示される段取ロス計画欄a18と、段取ロス計画欄a18に表示された計画値を実績値に更新することを推奨するか否かが表示される更新チェック欄a19とから構成される。   In the columns a15 to a19 relating to the setup loss, the setup loss item column a16 in which detailed items (such as switching and rising) of the setup loss are selectively displayed according to the operation of the input unit 2, and the start of the detailed items The setup loss field a15 in which the date and time and the end date and time are displayed, the setup loss result field a17 in which the time required for the detailed item is displayed as the actual value, and the time required for the detailed item are displayed as the planned value. The setup loss plan column a18 and an update check column a19 that displays whether or not it is recommended to update the plan value displayed in the setup loss plan column a18 to the actual value.

段取ロス欄a15には、例えば段取ロス項目欄a16に「切替え」が表示されているときには、計画蓄積部201に蓄積されている「切替え」の開始日時と終了日時とがデフォルトで表示される。ユーザは、入力部2を操作することにより、その段取ロス欄a15にデフォルトで表示された開始日時と終了日時とを実績にあわせて修正する。   In the setup loss column a15, for example, when “switching” is displayed in the setup loss item column a16, the start date and time and end date and time of “switching” stored in the plan storage unit 201 are displayed by default. The The user operates the input unit 2 to correct the start date and time and the end date and time displayed by default in the setup loss field a15 according to the actual results.

段取ロス実績欄a17には、段取ロス欄a15に表示された開始日時と終了日時の間の時間が、段取ロス項目欄a16に表示された項目に対応する実績値として表示される。
段取ロス計画欄a18には、段取ロス項目欄a16に表示された項目に対する計画値として、計画蓄積部201に蓄積されている時間が表示される。
In the setup loss result column a17, the time between the start date and time and the end date and time displayed in the setup loss column a15 is displayed as a record value corresponding to the item displayed in the setup loss item column a16.
In the setup loss plan column a18, the time accumulated in the plan accumulation unit 201 is displayed as a plan value for the item displayed in the setup loss item column a16.

更新チェック欄a19には、入力部2の操作に応じて、更新を推奨するか否かが表示される。
稼働時間に関する欄a20〜a22は、入力部2の操作に応じて稼働の開始日時と終了日時が表示される稼働日時欄a20と、その稼動日時欄a20に表示された開始日時と終了日時の間の稼働時間が実績値として表示される稼動実績欄a21と、計画蓄積部201に蓄積されている稼働時間が計画値として表示される稼動計画欄a22とから構成される。
In the update check column a19, whether or not to recommend an update is displayed according to the operation of the input unit 2.
The columns a20 to a22 related to the operation time are between the operation date and time column a20 in which the operation start date and time and the end date and time are displayed according to the operation of the input unit 2, and between the start date and time and the end date and time displayed in the operation date and time column a20. The operation result column a21 displays the operation time as the actual value, and the operation plan column a22 displays the operation time stored in the plan storage unit 201 as the plan value.

稼動日時欄a20には、計画蓄積部201に蓄積されている稼動の開始日時と終了日時とがデフォルトで表示される。ユーザは、入力部2を操作することにより、その稼動日時欄a20にデフォルトで表示された開始日時と終了日時とを実績にあわせて修正する。   In the operation date / time column a20, the operation start date / time and end date / time stored in the plan storage unit 201 are displayed by default. The user operates the input unit 2 to correct the start date and time and the end date and time displayed by default in the operation date and time column a20 according to the actual results.

サイクルタイム欄a23〜a26には、ユーザによる入力部2の操作によって、例えば印刷を行うマシンのサイクルタイムの実績値として「30.5秒」などが表示される。
最遅サイクルタイムに関する欄a27〜a29は、最遅サイクルタイムが実績値として表示される最遅実績欄a27と、最遅サイクルタイムが計画値として表示される最遅計画欄a28と、その最遅計画欄a28に表示された計画値を実績値に更新することを推奨するか否かが表示される更新チェック欄a29とから構成される。
In the cycle time fields a23 to a26, for example, “30.5 seconds” is displayed as the actual value of the cycle time of the machine that performs printing by the operation of the input unit 2 by the user.
The columns a27 to a29 relating to the latest cycle time include a latest result column a27 in which the latest cycle time is displayed as an actual value, a latest plan column a28 in which the latest cycle time is displayed as a planned value, and the latest It consists of an update check field a29 that displays whether or not it is recommended to update the plan value displayed in the plan field a28 to the actual value.

最遅実績欄a27には、各サイクルタイム欄a23〜a26に表示されたサイクルタイムの中で最も長いサイクルタイムが表示される。最遅計画欄a28には、計画蓄積部201に蓄積されている最遅サイクルタイムの計画値が表示される。   The latest cycle time a27 displays the longest cycle time among the cycle times displayed in the cycle time columns a23 to a26. In the latest plan column a28, the plan value of the latest cycle time accumulated in the plan accumulation unit 201 is displayed.

更新チェック欄a29には、ユーザによる入力部2の操作に応じて、更新を推奨するか否かが表示される。
性能稼働率に関する欄a30〜a32は、性能稼働率の実績値が表示される性能稼働率実績欄a30と、性能稼働率の計画値が表示される性能稼働率計画欄a31と、性能稼働率計画欄a31に表示された計画値を実績値に更新することを推奨するか否かが表示される更新チェック欄a32とから構成される。
In the update check field a29, whether or not to recommend an update is displayed according to the operation of the input unit 2 by the user.
The columns a30 to a32 related to the performance utilization rate include a performance utilization rate result column a30 in which the actual value of the performance utilization rate is displayed, a performance utilization rate plan column a31 in which the planned value of the performance utilization rate is displayed, and the performance utilization rate plan. The update check column a32 is displayed for displaying whether or not it is recommended to update the planned value displayed in the column a31 to the actual value.

性能稼働率実績欄a30には、(最遅実績欄a27に表示された最遅サイクルタイム)×(生産台数欄a3に表示された生産台数)/(稼働実績欄a21に表示された稼動時間)/60×100によって算出された性能稼働率が表示される。性能稼働率計画欄a31には、計画蓄積部201に蓄積されている性能稼働率の計画値が表示される。更新チェック欄a32には、ユーザによる入力部2の操作に応じて、更新を推奨するか否かが表示される。   In the performance utilization rate result column a30, (the latest cycle time displayed in the latest result column a27) × (production number displayed in the production number column a3) / (operation time displayed in the operation result column a21) The performance availability calculated by / 60 × 100 is displayed. In the performance availability plan column a31, a planned value of the performance availability stored in the plan storage unit 201 is displayed. In the update check column a32, whether or not to recommend an update is displayed according to the operation of the input unit 2 by the user.

設備性能ロスに関する欄a33〜a38は、前工程待ちに要した時間が実績値として表示される前待ち欄a33と、後工程待ちに要した時間が実績値として表示される後待ち欄a34と、メンテナンスに要した時間が実績値として表示されるメンテナンス欄a35と、トラブルによって費やした時間が実績値として表示されるトラブル欄a36と、部品切れによって費やした時間が実績値として表示される部品切れ欄a37と、その他の要因によって要した時間が実績値として表示されるその他欄a38とから構成される。このような前待ち欄a33などには、ユーザによる入力部2の操作によって時間が表示される。   The columns a33 to a38 relating to the equipment performance loss include a previous waiting field a33 in which the time required for waiting for the previous process is displayed as an actual value, a later waiting field a34 in which the time required for waiting for the subsequent process is displayed as an actual value, Maintenance field a35 in which the time required for maintenance is displayed as an actual value, trouble field a36 in which the time spent due to trouble is displayed as an actual value, and the part out of service field in which the time spent due to out of parts is displayed as an actual value a37 and the other field a38 in which the time required for other factors is displayed as the actual value. In such a pre-waiting field a33, the time is displayed by the operation of the input unit 2 by the user.

このような入力メイン画面D21が表示部4に表示されているときに、生産計画評価装置1の生産性評価部100は、ユーザによる入力部2の操作によって生産の実績値を取得する。   When such an input main screen D <b> 21 is displayed on the display unit 4, the productivity evaluation unit 100 of the production plan evaluation device 1 acquires the actual production value by operating the input unit 2 by the user.

図6は、実績入力画面D20の設定画面D22の一例を示す画面表示図である。
この設定画面D22は、入力メイン画面D21の「機種品番」や「ライン名称」、「規定ロス」などの項目、即ち上述の機種品番欄a2やライン名称欄a1、規定ロスに関する欄a7〜a10などを入力メイン画面D21に表示するか否かを選択的に表示する。
FIG. 6 is a screen display diagram illustrating an example of the setting screen D22 of the result input screen D20.
This setting screen D22 includes items such as “model part number”, “line name”, and “specified loss” on the input main screen D21, that is, the above-described model part number column a2, line name column a1, columns a7 to a10 regarding specified loss, and the like. Is selectively displayed on the input main screen D21.

具体的に、設定画面D22には、入力メイン画面D21の各項目が表示される項目欄b1と、その項目の表示を行うか否かが表示される表示欄b2と、その項目に対する詳細項目の表示を行うか否かが表示される詳細選択欄b3と、その項目に対して計画値の表示を行うか否かが表示される計画表示欄b4と、上述の詳細項目の内容が表示される区分欄b5〜b14とがある。   Specifically, the setting screen D22 includes an item column b1 in which each item of the input main screen D21 is displayed, a display column b2 in which whether or not to display the item is displayed, and detailed items for the item. A detail selection field b3 that displays whether or not to perform display, a plan display field b4 that displays whether or not to display a plan value for the item, and the contents of the above-described detailed items are displayed. There are division fields b5 to b14.

表示欄b2及び詳細選択欄b3並びに計画表示欄b4には、ユーザによる入力部2の操作によって「する」又は「しない」が選択的に表示される。また、区分欄b5〜b14には、ユーザによる入力部2の操作によって、所望の詳細項目の名称が表示される。   In the display column b2, the detailed selection column b3, and the plan display column b4, “Yes” or “No” is selectively displayed by the operation of the input unit 2 by the user. In addition, in the classification columns b5 to b14, names of desired detailed items are displayed by the operation of the input unit 2 by the user.

例えば、項目欄b1には「機種品番」や「ライン名称」や「規定ロス」などの項目が表示されており、表示欄b2にはこれらの項目に対応づけて「する」が表示される。「機種品番」に対応付けられた表示欄b2に「する」が表示されているときには、入力メイン画面D21には「機種品番」の項目、つまり機種品番欄a2が表示され、表示欄b2に「しない」が表示されているときには、入力メイン画面D21には「機種品番」の項目が表示されない。   For example, items such as “model part number”, “line name”, and “specified loss” are displayed in the item column b1, and “Yes” is displayed in association with these items in the display column b2. When “YES” is displayed in the display field b2 associated with “model part number”, the item “model part number”, that is, the model part number field a2 is displayed on the input main screen D21. When “NO” is displayed, the “model part number” item is not displayed on the input main screen D21.

また、項目欄b1の「規定ロス」に対応付けて詳細選択欄b3に「する」が表示されているときには、その「規定ロス」に対応付けて区分欄b5〜b14に表示されている「休憩」や「食事」などの詳細項目が、入力メイン画面D21の規定ロス項目欄a8に選択的に表示される。   Further, when “Yes” is displayed in the detail selection field b3 in association with the “specified loss” in the item field b1, the “break” displayed in the classification fields b5 to b14 in association with the “specified loss”. Detailed items such as “” and “meal” are selectively displayed in the specified loss item column a8 of the input main screen D21.

ユーザは、このような設定画面D22への入力によって入力メイン画面D21の表示項目を選択することができるのである。
図7は、データメンテナンス画面D50のサイクルタイム画面D51の一例を示す画面表示図である。
The user can select the display item of the input main screen D21 by inputting to the setting screen D22.
FIG. 7 is a screen display diagram showing an example of the cycle time screen D51 of the data maintenance screen D50.

このサイクルタイム画面D51は、ラインごとのサイクルタイムの計画値及び実績値を履歴として表示する。
具体的に、サイクルタイム画面D51には、生産対象品の電子機器が生産された日付が表示される生産日欄c1と、その電子機器の機種品番が表示される品番欄c2と、その電子機器の生産を行ったラインのライン名称が表示されるライン名称欄c3と、同一ライン名称のラインを区別するためのコードが表示されるコード欄c4と、ラインに対するサイクルタイムの計画値が表示される計画値欄c5と、ラインに対するサイクルタイムの実績値が表示される実績値欄c6と、計画値の更新を推奨するか否かが表示される推奨欄c7と、更新をするか否かが表示される更新欄c8とがある。
This cycle time screen D51 displays the planned value and actual value of the cycle time for each line as a history.
Specifically, on the cycle time screen D51, a production date column c1 in which the date when the electronic device of the production target product is produced is displayed, a product number column c2 in which the model number of the electronic device is displayed, and the electronic device The line name field c3 in which the line name of the line where the production was performed is displayed, the code field c4 in which the code for distinguishing the line having the same line name is displayed, and the plan value of the cycle time for the line is displayed. Plan value column c5, actual value column c6 where the actual value of the cycle time for the line is displayed, recommendation column c7 where whether or not to update the plan value is recommended, and whether or not to update are displayed And an update column c8.

生産日欄c1や品番欄c2、ライン名称欄c3、実績値欄c6、推奨欄c7には、入力メイン画面D21に入力された内容が表示される。例えば推奨欄c7には、入力メイン画面D21の更新チェック欄a29に表示されていた内容が表示される。即ち、入力メイン画面D21の更新チェック欄a29にチェックを入れていたときには、推奨欄c7には、更新を推奨することを示す「○」が表示される。   In the production date column c1, the product number column c2, the line name column c3, the actual value column c6, and the recommendation column c7, the contents input on the input main screen D21 are displayed. For example, in the recommendation column c7, the content displayed in the update check column a29 of the input main screen D21 is displayed. That is, when the update check column a29 on the input main screen D21 is checked, “○” indicating that the update is recommended is displayed in the recommendation column c7.

計画値欄c5には、生産計画部200の計画蓄積部201に蓄積されているサイクルタイムの計画値が表示される。
更新欄c8には、ユーザによる入力部2の操作により、更新することを示す「○」が表示される。
In the plan value column c5, the plan value of the cycle time accumulated in the plan accumulation unit 201 of the production planning unit 200 is displayed.
In the update column c8, “◯” indicating that the update is performed by the operation of the input unit 2 by the user is displayed.

ユーザは、このようなサイクルタイム画面D51に表示された計画値と実績値とを見比べて、計画値が実績値と大きく異なると判断したときには、入力部2を操作して、更新欄c8に「○」を表示させる。具体的に、ユーザが入力部2を操作して「推奨→選択」と表示されたボタンを選択すると、推奨欄c7に「○」と表示されたラインに該当する更新欄c8に「○」が表示される。また、ユーザが「一括解除」と表示されたボタンを選択すると、更新欄c8に表示された全ての「○」が消去される。   When the user compares the plan value displayed on the cycle time screen D51 with the actual value and determines that the plan value is significantly different from the actual value, the user operates the input unit 2 to display “ “○” is displayed. Specifically, when the user operates the input unit 2 to select a button displayed as “recommended → select”, “○” is displayed in the update column c8 corresponding to the line displayed as “◯” in the recommendation column c7. Is displayed. When the user selects a button displayed as “collective release”, all “◯” displayed in the update column c8 are deleted.

ここで、ユーザが入力部2を操作して「更新確定」と表示されたボタンを選択すると、更新欄c8に「○」が表示されたラインに対してサイクルタイムの計画値の更新が行われる。   Here, when the user operates the input unit 2 and selects a button displayed as “update confirmed”, the planned value of the cycle time is updated with respect to the line where “◯” is displayed in the update column c8. .

例えば、生産日「2004年2月15日」に機種品番「MODEL2」の生産を行ったライン名称「組立01」のラインに対応する更新欄c8に「○」が表示されているときに、「更新確定」と表示されたボタンが選択されると、主制御部107は、生産計画部200の計画蓄積部201に蓄積されているサイクルタイムの計画値「50」が実績値の「58.0」となるように、更新部106に計画値の更新を実行させる。   For example, when “O” is displayed in the update column c8 corresponding to the line of the line name “Assembly 01” that produced the model part number “MODEL2” on the production date “February 15, 2004”, “ When the button displayed as “update confirmed” is selected, the main control unit 107 determines that the plan value “50” of the cycle time stored in the plan storage unit 201 of the production plan unit 200 is the actual value “58.0”. The plan value is updated by the updating unit 106 so that

このように本実施の形態では、サイクルタイムの計画値と実績値とが対比し得る態様で表示さるため、ユーザは両値を容易に見比べて更新すべきか否かを判断し、その計画値を更新することができる。その結果、生産計画において重要なサイクルタイムの計画値の更新が適切に行われて生産計画の精度を高め、生産性の向上を図ることができる。   Thus, in this embodiment, since the plan value and the actual value of the cycle time are displayed in a manner that can be compared, the user can easily compare both values and determine whether or not to update, and the plan value can be determined. Can be updated. As a result, it is possible to appropriately update the plan value of the important cycle time in the production plan, increase the accuracy of the production plan, and improve the productivity.

図8は、データメンテナンス画面D50の段取ロス画面D52の一例を示す画面表示図である。
この段取ロス画面D52は、複数のラインから構成されるライングループごとの段取ロスの計画値及び実績値を履歴として表示する。
FIG. 8 is a screen display diagram illustrating an example of the setup loss screen D52 of the data maintenance screen D50.
The setup loss screen D52 displays setup loss plan values and actual values for each line group including a plurality of lines as a history.

具体的に、段取ロス画面D52には、生産の日付が表示される生産日欄d1と、ライングループの名称が表示されるライングループ欄d2と、そのライングループで生産されていた電子機器の品番グループの名称が表示される前品番グループ欄d3と、その品番グループの電子機器の後にライングループで生産された電子機器の品番グループの名称が表示される後品番グループ欄d4と、ライングループに対する段取ロスの計画値が表示される計画値欄d5と、ライングループに対する段取ロスの実績値が表示される実績値欄d6と、計画値の更新を推奨するか否かが表示される推奨欄d7と、更新をするか否かが表示される更新欄d8とがある。ここで、品番グループとは、それぞれ異なる種類の複数の電子機器が所定の共通性などに基づいて分別された1つのグループをいう。   Specifically, on the setup loss screen D52, the production date column d1 in which the date of production is displayed, the line group column d2 in which the name of the line group is displayed, and the electronic devices produced in the line group are displayed. A previous product number group column d3 in which the name of the product number group is displayed, a subsequent product number group column d4 in which the name of the product number group of the electronic device produced in the line group after the electronic device in the product number group is displayed, and the line group A planned value field d5 in which the planned value of the setup loss is displayed, an actual value field d6 in which the actual value of the setup loss for the line group is displayed, and a recommendation in which whether or not to update the planned value is recommended is displayed. There is a column d7 and an update column d8 in which whether or not to update is displayed. Here, the product number group refers to one group in which a plurality of different types of electronic devices are sorted based on predetermined commonality.

生産日欄d1やライングループ欄d2、前品番グループ欄d3、後品番グループ欄d4、実績値欄d6、推奨欄d7には、入力メイン画面D21に入力された内容に基づいて各事項が表示される。例えば、上述のサイクルタイム画面D51と同様、推奨欄d7には、入力メイン画面D21の更新チェック欄a19に表示されていた内容が表示される。即ち、入力メイン画面D21の更新チェック欄a19にチェックを入れていたときには、推奨欄d7には、更新を推奨することを示す「○」が表示される。   In the production date column d1, the line group column d2, the previous product number group column d3, the subsequent product number group column d4, the actual value column d6, and the recommendation column d7, items are displayed based on the contents input on the input main screen D21. The For example, the content displayed in the update check column a19 of the input main screen D21 is displayed in the recommendation column d7 as in the cycle time screen D51 described above. That is, when the update check column a19 on the input main screen D21 is checked, “○” indicating that the update is recommended is displayed in the recommendation column d7.

計画値欄d5には、生産計画部200の計画蓄積部201に蓄積されている段取ロスの計画値が表示される。
更新欄d8には、ユーザによる入力部2の操作により、更新することを示す「○」が表示される。
In the plan value column d5, the plan value of the setup loss accumulated in the plan accumulation unit 201 of the production planning unit 200 is displayed.
In the update column d8, “◯” indicating that updating is performed by the operation of the input unit 2 by the user is displayed.

ユーザは、このような段取ロス画面D52に表示された計画値と実績値とを見比べて、計画値が実績値と大きく異なると判断したときには、入力部2を操作して、更新欄d8に「○」を表示させる。ここで、ユーザが入力部2を操作して「更新確定」と表示されたボタンを選択すると、更新欄d8に「○」が表示されたライングループに対して計画値の更新が行われる。   When the user compares the plan value displayed on the setup loss screen D52 with the actual value and determines that the plan value is significantly different from the actual value, the user operates the input unit 2 to enter the update field d8. “○” is displayed. Here, when the user operates the input unit 2 to select a button displayed as “update confirmed”, the planned value is updated for the line group whose “O” is displayed in the update field d8.

例えば、生産日「2004年2月15日」に前品番グループ「PCB1」の電子機器から後品番グループ「PCB2」の電子機器の生産に切替えたライングループ「INS」に対応する更新欄d8に「○」が表示されているときに、「更新確定」ボタンが選択されると、主制御部107は、生産計画部200の計画蓄積部201に蓄積されている段取ロスの計画値「5」が実績値の「4」となるように、更新部106に計画値の更新を実行させる。   For example, the update column d8 corresponding to the line group “INS” switched from the electronic device of the previous product number group “PCB1” to the production of the electronic device of the subsequent product number group “PCB2” on the production date “February 15, 2004” When the “update confirmation” button is selected when “O” is displayed, the main control unit 107 causes the planned loss plan value “5” accumulated in the plan accumulation unit 201 of the production planning unit 200 to be displayed. Causes the update unit 106 to update the planned value so that the actual value becomes “4”.

このように本実施の形態では、段取ロスの計画値と実績値とが対比し得る態様で表示さるため、ユーザは両値を容易に見比べて更新すべきか否かを判断し、その計画値を更新することができる。その結果、生産計画において重要な段取ロスの計画値の更新が適切に行われて生産計画の精度を高め、生産性の向上を図ることができる。   As described above, in the present embodiment, since the planned value and actual value of the setup loss are displayed in a manner that can be compared, the user can easily compare both values to determine whether or not to update them, and the planned value Can be updated. As a result, the plan value of the important setup loss in the production plan can be appropriately updated to improve the accuracy of the production plan and improve the productivity.

図9は、データメンテナンス画面D50の性能稼働率画面D53の一例を示す画面表示図である。
この性能稼働率画面D53は、ラインごとの性能稼働率の計画値及び実績値を履歴として表示する。
FIG. 9 is a screen display diagram illustrating an example of the performance utilization rate screen D53 of the data maintenance screen D50.
The performance availability screen D53 displays the planned performance value and the actual value of the performance availability for each line as a history.

具体的に、性能稼働率画面D53には、生産対象の電子機器が生産された日付が表示される生産日欄e1と、その電子機器の機種品番が表示される品番欄e2と、その電子機器の生産を行ったラインのライン名称が表示されるライン名称欄e3と、同一ライン名称のラインを区別するためのコードが表示されるコード欄e4と、ラインに対する性能稼働率の計画値が表示される計画値欄e5と、ラインに対する性能稼働率の実績値が表示される実績値欄e6と、計画値の更新を推奨するか否かが表示される推奨欄e7と、更新をするか否かが表示される更新欄e8とがある。   Specifically, the performance availability screen D53 includes a production date column e1 in which the date on which the electronic device to be produced is produced, a product number column e2 in which the model number of the electronic device is displayed, and the electronic device. The line name field e3 in which the line name of the line where the production was performed is displayed, the code field e4 in which the code for distinguishing the line with the same line name is displayed, and the planned value of the performance availability for the line are displayed. Planned value column e5, actual value column e6 for displaying the actual value of the performance utilization rate for the line, recommendation column e7 for displaying whether or not to update the planned value, and whether to update And an update field e8 in which is displayed.

生産日欄e1や品番欄e2、ライン名称欄e3、実績値欄e6、推奨欄e7には、入力メイン画面D21に入力された内容が表示される。例えば推奨欄e7には、入力メイン画面D21の更新チェック欄a32に表示されていた内容が表示される。即ち、入力メイン画面D21の更新チェック欄a32にチェックを入れていたときには、推奨欄e7には、更新を推奨することを示す「○」が表示される。   In the production date column e1, the product number column e2, the line name column e3, the actual value column e6, and the recommendation column e7, the contents input on the input main screen D21 are displayed. For example, in the recommendation column e7, the contents displayed in the update check column a32 of the input main screen D21 are displayed. That is, when the update check column a32 of the input main screen D21 is checked, “○” indicating that the update is recommended is displayed in the recommendation column e7.

計画値欄e5には、生産計画部200の計画蓄積部201に蓄積されている性能稼働率の計画値が表示される。
更新欄e8には、ユーザによる入力部2の操作により、更新することを示す「○」が表示される。
In the plan value column e5, the plan value of the performance utilization rate accumulated in the plan accumulation unit 201 of the production planning unit 200 is displayed.
In the update column e8, “◯” indicating that updating is performed by the operation of the input unit 2 by the user is displayed.

ユーザは、このような性能稼働率画面D53に表示された設定値と実績値とを見比べて、計画値が実績値と大きくことなると判断したときには、入力部2を操作して、更新欄e8に「○」を表示させる。ここで、ユーザが入力部2を操作して「更新確定」と表示されたボタンを選択すると、更新欄e8に「○」が表示されたラインに対して計画値の更新が行われる。   When the user compares the set value displayed on the performance availability screen D53 with the actual value and determines that the plan value is different from the actual value, the user operates the input unit 2 to enter the update field e8. “○” is displayed. Here, when the user operates the input unit 2 to select a button displayed as “update confirmed”, the plan value is updated for the line where “◯” is displayed in the update field e8.

例えば、生産日「2004年2月15日」に機種品番「MODEL1」の生産を行ったライン名称「梱包01」のラインに対応する更新欄e8に「○」が表示されているときに、「更新確定」ボタンが選択されると、主制御部107は、生産計画部200の計画蓄積部201に蓄積されている性能稼働率の計画値「79.0%」が実績値の「82.0%」となるように、更新部106に計画値の更新を実行させる。   For example, when “O” is displayed in the update column e8 corresponding to the line of the line name “Packing 01” which has produced the model part number “MODEL1” on the production date “February 15, 2004”, “ When the “confirm update” button is selected, the main control unit 107 sets the performance availability rate plan value “79.0%” stored in the plan storage unit 201 of the production planning unit 200 to the actual value “82.0”. % "Is executed by the updating unit 106 so that the planned value is updated.

このように本実施の形態では、性能稼働率の計画値と実績値とが対比し得る態様で表示さるため、ユーザは両値を容易に見比べて更新すべきか否かを判断し、その計画値を更新することができる。その結果、生産計画において重要な性能稼働率の計画値の更新が適切に行われて生産計画の精度を高め、生産性の向上を図ることができる。   As described above, in the present embodiment, since the planned value and the actual value of the performance utilization rate are displayed in a manner that can be compared, the user can easily compare both values and determine whether or not to update the planned value. Can be updated. As a result, it is possible to appropriately update the planned value of the performance utilization rate that is important in the production plan, increase the accuracy of the production plan, and improve the productivity.

図10は、生産性評価画面D40のタクトバランス画面D43の一例を示す画面表示図である。
このタクトバランス画面D43は、ラインごとのタクトバランスの実績値を履歴として表示する。ここで、タクトバランスは、最速サイクルタイム/最遅サイクルタイムで表される。最速サイクルタイムは、1つのラインに含まれる各マシンのサイクルタイムの中で、最も短いサイクルタイムを示す。
FIG. 10 is a screen display diagram illustrating an example of the tact balance screen D43 of the productivity evaluation screen D40.
This tact balance screen D43 displays the actual value of tact balance for each line as a history. Here, the tact balance is expressed by the fastest cycle time / latest cycle time. The fastest cycle time indicates the shortest cycle time among the cycle times of each machine included in one line.

具体的に、タクトバランス画面D43には、生産対象の電子機器が生産された日付が表示される生産日欄f1と、その電子機器の機種品番が表示される品番欄f2と、その電子機器の生産を行ったラインのライン名称が表示されるライン名称欄f3と、同一ライン名称のラインを区別するためのコードが表示されるコード欄f4と、そのラインに含まれる各マシンのサイクルタイムが表示されるタクト欄f5〜f9と、タクトバランスが表示されるタクトバランス欄f10とがある。上記各欄f1〜f9には、入力メイン画面D21に入力された内容が表示され、タクトバランス欄f10には、入力メイン画面D21に入力されたサイクルタイムに基づいて主制御部107が算出したタクトバランスが表示される。   Specifically, on the tact balance screen D43, a production date column f1 in which the date of production of the electronic device to be produced is displayed, a product number column f2 in which the model number of the electronic device is displayed, and the electronic device A line name field f3 in which the line name of the line where the production was performed is displayed, a code field f4 in which a code for distinguishing lines having the same line name is displayed, and the cycle time of each machine included in the line is displayed. There are tact fields f5 to f9 that are displayed, and a tact balance field f10 that displays the tact balance. The contents input on the input main screen D21 are displayed in the respective fields f1 to f9, and the tact balance calculated by the main control unit 107 based on the cycle time input on the input main screen D21 is displayed in the tact balance field f10. The balance is displayed.

図11は、生産性評価画面D40の日単位評価画面D42の一例を示す画面表示図である。
この日単位評価画面D42は、所定のラインにおける規定ロスや管理ロスなどの日ごとの推移を示す時間推移グラフg1と、時間稼働率と性能稼働率などの日ごとの推移を示すレート推移グラフg2とを表示する。ここで、時間稼働率とは、生産工程の全てにかかる時間、つまり工場が運転している時間に対する、ラインの稼働時間の割合を示す。
FIG. 11 is a screen display diagram illustrating an example of the daily evaluation screen D42 of the productivity evaluation screen D40.
This daily unit evaluation screen D42 includes a time transition graph g1 indicating daily transitions such as a prescribed loss and a management loss in a predetermined line, and a rate transition graph g2 indicating daily transitions such as a time operating rate and a performance operating rate. Is displayed. Here, the time operation rate indicates the ratio of the operation time of the line to the time required for all production processes, that is, the time during which the factory is operating.

時間推移グラフg1は、規定ロスと、管理ロスと、段取ロスと、設備性能ロスと、正味稼働時間との日ごとの推移を棒グラフで示す。
レート推移グラフg2は、時間稼働率と、性能稼働率と、良品率と、設備総合効率と、ラインバランスとの日ごとの推移を折れ線グラフで示す。ここで、良品率とは、生産対象となる電子機器の全ての生産数に対する良品の生産数の割合を示す。設備総合効率とは、時間稼働率と性能稼働率と良品率との積を示す。
The time transition graph g1 shows a daily transition of the specified loss, the management loss, the setup loss, the equipment performance loss, and the net operation time with a bar graph.
The rate transition graph g2 is a line graph showing the daily transition of the hourly operation rate, the performance operation rate, the non-defective product rate, the overall equipment efficiency, and the line balance. Here, the non-defective product rate indicates the ratio of the number of non-defective products produced to the total number of produced electronic devices. The total equipment efficiency is the product of the time utilization rate, the performance utilization rate, and the non-defective product rate.

このような時間推移グラフg1及びレート推移グラフg2は、主制御部107が評価蓄積部103に蓄積された履歴を集計部104に出力し、その履歴に含まれる実績値を日単位で集計部104に集計させることによって作成される。また、ユーザによる入力部2の操作によってラインが選択されると、主制御部107はその選択されたラインに対する上記各グラフを表示部4に表示させる。   In such time transition graph g1 and rate transition graph g2, the main control unit 107 outputs the history accumulated in the evaluation accumulation unit 103 to the aggregation unit 104, and the actual values included in the history are aggregated in units of days. It is created by letting it total. When a line is selected by the user's operation of the input unit 2, the main control unit 107 causes the display unit 4 to display the respective graphs for the selected line.

このように本実施の形態では、規定ロスや時間稼働率などの実績値の推移が日単位で表示されるため、ユーザはその推移から生産工程を見直すことができ、その結果、生産性の向上を図ることができる。   As described above, in the present embodiment, since the transition of the actual value such as the specified loss and the hourly operation rate is displayed on a daily basis, the user can review the production process from the transition, and as a result, the productivity is improved. Can be achieved.

図12は、生産性評価画面D40の日単位評価画面D42の他の例を示す画面表示図である。
この日単位評価画面D42は、所定の日(例えば「2004年3月5日」)における規定ロスや管理ロスなどの内訳を示す内訳グラフh1〜h4と、所定の日における規定ロスなどの各ロスの計画値と実績値とを比較して示す比較グラフh5とをラインごとに表示する。
FIG. 12 is a screen display diagram showing another example of the daily evaluation screen D42 of the productivity evaluation screen D40.
This daily unit evaluation screen D42 includes breakdown graphs h1 to h4 showing a breakdown of prescribed loss and management loss on a predetermined day (for example, “March 5, 2004”), and each loss such as prescribed loss on the prescribed day. A comparison graph h5 showing a comparison between the planned value and the actual value is displayed for each line.

内訳グラフh1は、規定ロスに含まれる休憩や食事などの詳細項目に要した時間の内訳を円グラフで示す。内訳グラフh2は、管理ロスに含まれるメンテナンスや棚卸などの詳細項目に要した時間の内訳を円グラフで示す。内訳グラフh3は、段取ロスに含まれる切り替えや立ち上がりなどの詳細項目に要した時間の内訳を円グラフで示す。内訳グラフh4は、設備性能ロスに含まれる前工程待ちや後工程待ちなどの詳細項目に要した時間の内訳を円グラフで示す。   The breakdown graph h1 shows a breakdown of time required for detailed items such as breaks and meals included in the specified loss as a pie chart. The breakdown graph h2 shows a breakdown of time required for detailed items such as maintenance and inventory included in the management loss as a pie chart. The breakdown graph h3 shows a breakdown of time required for detailed items such as switching and rising included in the setup loss in a pie chart. The breakdown graph h4 shows a breakdown of time required for detailed items such as waiting for the previous process and waiting for the subsequent process included in the equipment performance loss as a pie chart.

比較グラフh5は、正味稼働時間と、設備性能ロスと、段取ロスと、管理ロスと、規定ロスとのそれぞれに対する計画値と実績値とを帯グラフで示す。
このような内訳グラフh1〜h4及び比較グラフh5は、主制御部107が評価蓄積部103に蓄積されている所定の日における計画値と実績値を集計部104に出力し、その計画値及び実績値を集計部104に集計させることによって作成される。また、ユーザによる入力部2の操作によって上記所定の日やラインが選択されると、主制御部107はその選択された日及びラインに対する上記各グラフを表示部4に表示させる。
The comparison graph h5 shows the planned value and the actual value for the net operation time, the equipment performance loss, the setup loss, the management loss, and the specified loss in a band graph.
The breakdown graphs h1 to h4 and the comparison graph h5 are such that the main control unit 107 outputs the planned value and the actual value on a predetermined day accumulated in the evaluation accumulating unit 103 to the totaling unit 104, and the planned value and actual result It is created by causing the totaling unit 104 to total the values. When the predetermined day or line is selected by the user operating the input unit 2, the main control unit 107 causes the display unit 4 to display the respective graphs for the selected day and line.

このように本実施の形態では、所定の日における正味時間などの計画値と実績値とが比較グラフh5として表示されるため、ユーザは、その表示された比較グラフh5から計画値と実績値との相違を容易に把握することができる。その結果、その相違に基づいて生産工程を見直すことができ、生産性の向上を図ることができる。   As described above, in the present embodiment, since the planned value such as the net time on a predetermined day and the actual value are displayed as the comparison graph h5, the user can calculate the planned value and the actual value from the displayed comparison graph h5. Can be easily grasped. As a result, the production process can be reviewed based on the difference, and productivity can be improved.

また本実施の形態では、所定の日における規定ロスなどの実績値の内訳が内訳グラフh1〜h4として表示されるため、ユーザはその内訳から生産工程を見直すことができ、その結果、生産性の向上を図ることができる。   In the present embodiment, since the breakdown of the actual values such as the prescribed loss on the predetermined date is displayed as the breakdown graphs h1 to h4, the user can review the production process from the breakdown, and as a result, the productivity Improvements can be made.

図13は、生産性評価画面D40の月単位評価画面D41の一例を示す画面表示図である。
この月単位評価画面D41は、所定のラインにおける規定ロスや管理ロスなどの月ごとの推移を示す時間推移グラフi1と、時間稼働率と性能稼働率などの月ごとの推移を示すレート推移グラフi2とを表示する。
FIG. 13 is a screen display diagram illustrating an example of the monthly evaluation screen D41 of the productivity evaluation screen D40.
This monthly unit evaluation screen D41 includes a time transition graph i1 indicating a monthly transition such as a prescribed loss and a management loss in a predetermined line, and a rate transition graph i2 indicating a monthly transition such as a time operating rate and a performance operating rate. Is displayed.

時間推移グラフi1は、規定ロスと、管理ロスと、段取ロスと、設備性能ロスと、正味稼働時間との月ごとの推移を棒グラフで示す。
レート推移グラフi2は、時間稼働率と、性能稼働率と、良品率と、設備総合効率と、ラインバランスとの月ごとの推移を折れ線グラフで示す。
The time transition graph i1 shows a monthly transition of the specified loss, the management loss, the setup loss, the equipment performance loss, and the net operation time in a bar graph.
The rate transition graph i <b> 2 is a line graph showing the monthly transition of the hourly operation rate, the performance operation rate, the non-defective product rate, the overall equipment efficiency, and the line balance.

このような時間推移グラフi1及びレート推移グラフi2は、主制御部107が評価蓄積部103に蓄積された履歴を集計部104に出力し、その履歴に含まれる実績値を日単位で集計部104に集計させることによって作成される。また、ユーザによる入力部2の操作によってラインが選択されると、主制御部107はその選択されたラインに対する上記各グラフを表示部4に表示させる。   In such a time transition graph i1 and rate transition graph i2, the main control unit 107 outputs the history accumulated in the evaluation accumulation unit 103 to the aggregation unit 104, and the actual values included in the history are aggregated on a daily basis. It is created by letting it total. When a line is selected by the user's operation of the input unit 2, the main control unit 107 causes the display unit 4 to display the respective graphs for the selected line.

このように本実施の形態では、規定ロスや時間稼働率などの実績値の推移が月単位で表示されるため、ユーザはその推移から生産工程を見直すことができ、その結果、生産性の向上を図ることができる。   As described above, in this embodiment, since the transition of the actual value such as the specified loss and the hourly operation rate is displayed on a monthly basis, the user can review the production process from the transition, and as a result, the productivity is improved. Can be achieved.

図14は、生産性評価画面D40の月単位評価画面D41の他の例を示す画面表示図である。
この月単位評価画面D41は、所定の月(例えば「2004年3月」)における規定ロスや管理ロスなどの内訳を示す内訳グラフj1〜j4と、所定の月における規定ロスなどの各ロスの計画値と実績値とを比較して示す比較グラフj5とをラインごとに表示する。
FIG. 14 is a screen display diagram showing another example of the monthly evaluation screen D41 of the productivity evaluation screen D40.
This monthly unit evaluation screen D41 includes breakdown graphs j1 to j4 showing a breakdown of prescribed loss and management loss in a predetermined month (for example, “March 2004”), and plans for each loss such as prescribed loss in a predetermined month. A comparison graph j5 showing a comparison between the value and the actual value is displayed for each line.

内訳グラフj1は、規定ロスに含まれる休憩や食事などの詳細項目に要した時間の内訳を円グラフで示す。内訳グラフj2は、管理ロスに含まれるメンテナンスや棚卸などの詳細項目に要した時間の内訳を円グラフで示す。内訳グラフj3は、段取ロスに含まれる機種切り替えや立ち上がりなどの詳細項目に要した時間の内訳を円グラフで示す。内訳グラフj4は、設備性能ロスに含まれる前工程待ちや後工程待ちなどの詳細項目に要した時間の内訳を円グラフで示す。   The breakdown graph j1 shows a breakdown of time required for detailed items such as breaks and meals included in the specified loss as a pie chart. The breakdown graph j2 shows a breakdown of time required for detailed items such as maintenance and inventory included in the management loss as a pie chart. The breakdown graph j3 shows a breakdown of time required for detailed items such as model switching and startup included in the setup loss as a pie chart. The breakdown graph j4 shows a breakdown of time required for detailed items such as waiting for the previous process and waiting for the subsequent process included in the equipment performance loss as a pie chart.

比較グラフj5は、正味稼働時間と、設備性能ロスと、段取ロスと、管理ロスと、規定ロスとのそれぞれに対する計画値と実績値とを帯グラフで示す。
このような内訳グラフj1〜j4及び比較グラフj5は、主制御部107が評価蓄積部103に蓄積されている所定の月における計画値と実績値を集計部104に出力し、その計画値及び実績値を集計部104に集計させることによって作成される。また、ユーザによる入力部2の操作によって上記所定の月やラインが選択されると、主制御部107はその選択された月及びラインに対する上記各グラフを表示部4に表示させる。
The comparison graph j5 shows the planned value and the actual value for the net operation time, the equipment performance loss, the setup loss, the management loss, and the specified loss in a band graph.
The breakdown graphs j1 to j4 and the comparison graph j5 are such that the main control unit 107 outputs the planned value and actual value for a predetermined month stored in the evaluation accumulating unit 103 to the totaling unit 104, and the planned value and actual result It is created by causing the totaling unit 104 to total the values. When the predetermined month or line is selected by the user operating the input unit 2, the main control unit 107 causes the display unit 4 to display the respective graphs for the selected month and line.

このように本実施の形態では、所定の月における正味時間などの計画値と実績値とが比較グラフj5として表示されるため、ユーザは、その表示された比較グラフj5から計画値と実績値との相違を容易に把握することができる。その結果、その相違に基づいて生産工程を見直すことができ、生産性の向上を図ることができる。   As described above, in the present embodiment, since the planned value such as the net time in a predetermined month and the actual value are displayed as the comparison graph j5, the user can calculate the planned value and the actual value from the displayed comparison graph j5. Can be easily grasped. As a result, the production process can be reviewed based on the difference, and productivity can be improved.

また本実施の形態では、所定の月における規定ロスなどの実績値の内訳が内訳グラフj1〜j4として表示されるため、ユーザはその内訳から生産工程を見直すことができ、その結果、生産性の向上を図ることができる。   In the present embodiment, since the breakdown of the actual values such as the prescribed loss in a predetermined month is displayed as the breakdown graphs j1 to j4, the user can review the production process from the breakdown, and as a result, the productivity Improvements can be made.

このような生産性評価部100の動作について図15を用いて説明する。
図15は、本実施の形態の生産性評価部100の動作を示すフロー図である。
まず生産性評価部100は、表示部4に表示されたメインメニュー画面D10のボタンBt2(「生産実績入力」ボタン)が選択されると、生産計画部200の計画蓄積部201に蓄積されている計画値を収集し(ステップS200)、その計画値を含む入力メイン画面D21を表示部4に表示させて、ユーザによる実績値の入力を受け付ける。
The operation of the productivity evaluation unit 100 will be described with reference to FIG.
FIG. 15 is a flowchart showing the operation of the productivity evaluation unit 100 of the present embodiment.
First, when the button Bt2 (“production result input” button) on the main menu screen D10 displayed on the display unit 4 is selected, the productivity evaluation unit 100 is stored in the plan storage unit 201 of the production planning unit 200. Plan values are collected (step S200), and an input main screen D21 including the plan values is displayed on the display unit 4 to accept input of actual values by the user.

生産性評価部100は、入力メイン画面D21の表示に基づいてユーザが入力部2を操作することにより実績値を収集する(ステップS202)。また、生産性評価部100は、このように実績値を収集すると、そのユーザによって直接入力された実績値から性能稼働率などを算出し、その算出結果を含めた実績値を、ステップS200で収集した計画値とともに履歴として蓄積する(ステップS204)。   The productivity evaluation unit 100 collects performance values by the user operating the input unit 2 based on the display of the input main screen D21 (step S202). Further, when the performance evaluation unit 100 collects the actual values in this way, it calculates the performance utilization rate from the actual values directly input by the user, and collects the actual values including the calculation results in step S200. It accumulates as a history together with the planned value (step S204).

次に、生産性評価部100は、メインメニュー画面D10のボタンBt4(「データメンテナンス」ボタン)又はボタンBt3(「生産性評価」ボタン)が選択されたか否か、即ちユーザからの何らかの指示があったか否かを判別する(ステップS206)。   Next, the productivity evaluation unit 100 determines whether or not the button Bt4 (“data maintenance” button) or the button Bt3 (“productivity evaluation” button) on the main menu screen D10 is selected, that is, whether there is any instruction from the user. It is determined whether or not (step S206).

ここで、生産性評価部100は、指示があったと判別すると(ステップS206のYes)、さらに、その指示がデータメンテナンス画面D50を表示する内容の指示か、生産性評価画面D40を表示する内容の指示かを判別する(ステップS208)。一方、指示がないと判別すると(ステップS206のNo)、生産性評価部100はステップS200からの動作を繰り返し実行する。   When the productivity evaluation unit 100 determines that there is an instruction (Yes in step S206), the productivity evaluation unit 100 further determines whether the instruction is an instruction for displaying the data maintenance screen D50 or a content for displaying the productivity evaluation screen D40. It is determined whether it is an instruction (step S208). On the other hand, if it is determined that there is no instruction (No in step S206), the productivity evaluation unit 100 repeatedly executes the operations from step S200.

生産性評価部100は、ステップS208でユーザからの指示がデータメンテナンス画面D50を表示する内容の指示であると判別すると、データメンテナンス画面D50を計画値と実績値とが対比可能なように表示部4に表示させる(ステップS210)。   When the productivity evaluation unit 100 determines in step S208 that the instruction from the user is an instruction of the content for displaying the data maintenance screen D50, the display unit displays the data maintenance screen D50 so that the planned value and the actual value can be compared. 4 is displayed (step S210).

このような計画値及び実績値が表示されると、生産性評価部100は、データメンテナンス画面D50の「更新確定」ボタンが選択されたか否か、即ち計画値の更新の指示があったか否かを判別する(ステップS212)。   When such planned values and actual values are displayed, the productivity evaluation unit 100 determines whether or not the “update confirmation” button on the data maintenance screen D50 is selected, that is, whether or not there is an instruction to update the planned values. A determination is made (step S212).

ここで、生産性評価部100は、更新の指示があったと判別すると(ステップS212のYes)、生産計画部200の計画蓄積部201の計画値を実績値に合わせるように更新する(ステップS214)。一方、更新の指示がないと判別すると(ステップS212のNo)、生産性評価部100は処理を終了する。   If the productivity evaluation unit 100 determines that an update instruction has been received (Yes in step S212), the productivity evaluation unit 100 updates the plan value of the plan storage unit 201 of the production plan unit 200 to match the actual value (step S214). . On the other hand, if it is determined that there is no update instruction (No in step S212), the productivity evaluation unit 100 ends the process.

生産性評価部100は、ステップS208でユーザからの指示が生産性評価画面D40を表示する内容の指示であると判別すると、ステップS204で蓄積されたデータを収集し(ステップS216)、その結果を示す生産性評価画面D40を表示部4に表示させる(ステップS218)。   When the productivity evaluation unit 100 determines in step S208 that the instruction from the user is an instruction of the content for displaying the productivity evaluation screen D40, the productivity evaluation unit 100 collects the data accumulated in step S204 (step S216), and obtains the result. The productivity evaluation screen D40 shown is displayed on the display unit 4 (step S218).

なお、本実施の形態では、ユーザによる入力部2の操作によって実績値を収集したが、装置本体3が各ラインのマシンに接続されている場合には、その各マシンから実績値を直接収集しても良い。この場合には、ユーザによる入力操作を省くことができ、生産性をより向上することができる。   In the present embodiment, the actual value is collected by the operation of the input unit 2 by the user. However, when the apparatus main body 3 is connected to the machine of each line, the actual value is directly collected from each machine. May be. In this case, the input operation by the user can be omitted, and the productivity can be further improved.

また、本実施の形態では、生産計画装置としての機能と生産性評価装置としての機能とを1台のコンピュータに備えたが、生産計画装置と生産性評価装置とを別個のコンピュータで構成しても良い。   In this embodiment, the function as the production planning device and the function as the productivity evaluation device are provided in one computer. However, the production planning device and the productivity evaluation device are configured by separate computers. Also good.

また、本実施の形態では、時間に関する計画値を更新する機能と、所定期間分の時間に関する計画値や実績値を表示する機能とを1台のコンピュータに備えたが、これらの機能を別個のコンピュータで構成しても良い。この場合、上記表示を行う1台のコンピュータだけであっても、生産性を向上することができる。即ち、従来では、時間に関する実績値と計画値とを表示するような生産性評価装置が無く、その実績値と計画値との観点から生産工程を見直すことが困難であった。したがって、上記表示を行うコンピュータ(生産性評価装置)によって、時間に関する計画値や実績値の観点から生産工程を容易に見直すことができ、生産性を向上することができるのである。
(変形例)
ここで、入力部2に関する変形例について説明する。
In this embodiment, a single computer is provided with a function for updating a planned value for time and a function for displaying a planned value and actual value for a predetermined period of time. You may comprise with a computer. In this case, productivity can be improved even with only one computer that performs the above display. That is, conventionally, there is no productivity evaluation apparatus that displays the actual value and the planned value regarding time, and it has been difficult to review the production process from the viewpoint of the actual value and the planned value. Therefore, the computer (productivity evaluation apparatus) that performs the display can easily review the production process from the viewpoint of the planned value and the actual value related to time, and the productivity can be improved.
(Modification)
Here, the modification regarding the input part 2 is demonstrated.

本実施の形態では、入力部2をキーボードやマウスなどから構成したが、例えばバーコードリーダーなどから構成しても良く、キーボート及びマウス並びにバーコードリーダーを組み合わせて構成しても良い。このような場合、バーコードリーダーは、図16に示すシートに記載されたバーコードを読み込み、そのバーコードに示される内容を装置本体3に出力する。   In the present embodiment, the input unit 2 is configured by a keyboard, a mouse, or the like, but may be configured by, for example, a bar code reader or the like, or may be configured by combining a keyboard, a mouse, and a bar code reader. In such a case, the barcode reader reads the barcode described on the sheet shown in FIG. 16 and outputs the content indicated by the barcode to the apparatus main body 3.

図16は、バーコードリーダーに読み取られるバーコードが記載されたシートの一例を示す図である。
このシートStには、上述のバーコードBc、機種品番、ライン名称、作業指示No、仕掛り品番、計画値などが記載されている。バーコードBcは、シートStに記載されているバーコードBc以外の機種品番やライン名称、計画値などを示す。また、計画値には、生産数や段取ロスなどの各時間が含まれている。
FIG. 16 is a diagram illustrating an example of a sheet on which a barcode read by a barcode reader is written.
On this sheet St, the above-described barcode Bc, model product number, line name, work instruction number, work-in-progress number, planned value, and the like are described. The bar code Bc indicates a model number, line name, planned value, etc. other than the bar code Bc described on the sheet St. Further, the planned value includes each time such as the number of productions and setup loss.

バーコードリーダーは、シートStのバーコードBcを読み込むことにより、そのシートStに記載されている上述の機種品番や計画値などを装置本体3に出力する。これにより、そのバーコードリーダーで読み込まれた計画値が計画蓄積部201に格納されたり、バーコードリーダーで読み込まれた機種品番やライン名称などが入力メイン画面D21の機種品番欄a2やライン名称欄a1などに表示されたりする。   The bar code reader reads the bar code Bc of the sheet St, and outputs the above-described model product number, planned value, and the like described on the sheet St to the apparatus main body 3. As a result, the plan value read by the bar code reader is stored in the plan accumulating unit 201, or the model part number or line name read by the bar code reader is entered in the model part number column a2 or line name column of the input main screen D21. displayed on a1 or the like.

また、バーコードの内容に実績値を含めることで、バーコードリーダーで実績値を読み取らせても良い。   Further, the actual value may be read by a bar code reader by including the actual value in the content of the barcode.

本発明は、生産計画を行うために要する計画値の更新を容易にして生産性を向上することができるという効果を有し、例えば工場での電子機器などの生産性を評価する生産性評価装置などに適用することができる。   The present invention has an effect that it is possible to improve the productivity by facilitating the update of a plan value required for performing a production plan, and for example, a productivity evaluation apparatus for evaluating the productivity of electronic equipment in a factory. Etc.

本発明の実施の形態における生産計画評価装置の外観を示す外観図である。It is an external view which shows the external appearance of the production plan evaluation apparatus in embodiment of this invention. 同上の生産計画評価装置の構成を示すブロック図である。It is a block diagram which shows the structure of a production plan evaluation apparatus same as the above. 同上の生産計画評価装置を用いた生産工程を説明するための説明図である。It is explanatory drawing for demonstrating the production process using the production plan evaluation apparatus same as the above. 同上の主制御部によって表示部に表示される画面の遷移状態を示す図である。It is a figure which shows the transition state of the screen displayed on a display part by the main control part same as the above. 同上の実績入力画面の入力メイン画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the input main screen of a performance input screen same as the above. 同上の実績入力画面の設定画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the setting screen of a performance input screen same as the above. 同上のデータメンテナンス画面のサイクルタイム画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the cycle time screen of a data maintenance screen same as the above. 同上のデータメンテナンス画面の段取ロス画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the setup loss screen of a data maintenance screen same as the above. 同上のデータメンテナンス画面の性能稼働率画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the performance utilization rate screen of a data maintenance screen same as the above. 同上の生産性評価画面のタクトバランス画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the tact balance screen of a productivity evaluation screen same as the above. 同上の生産性評価画面の日単位評価画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the daily unit evaluation screen of a productivity evaluation screen same as the above. 同上の生産性評価画面の日単位評価画面の他の例を示す画面表示図である。It is a screen display figure which shows the other example of the daily unit evaluation screen of a productivity evaluation screen same as the above. 同上の生産性評価画面の月単位評価画面の一例を示す画面表示図である。It is a screen display figure which shows an example of the monthly evaluation screen of a productivity evaluation screen same as the above. 同上の生産性評価画面の月単位評価画面の他の例を示す画面表示図である。It is a screen display figure which shows the other example of the monthly evaluation screen of a productivity evaluation screen same as the above. 同上の生産性評価部の動作を示すフロー図である。It is a flowchart which shows operation | movement of a productivity evaluation part same as the above. 同上の入力部に読み取られるバーコードが記載されたシートの一例を示す図である。It is a figure which shows an example of the sheet | seat with which the barcode read by the input part same as the above was described.

符号の説明Explanation of symbols

1 生産計画評価装置
2 入力部
3 装置本体
4 表示部
100 生産性評価部
101 実績取得部
102 計画取得部
103 評価蓄積部
104 集計部
105 スケジューラー起動部
200 生産計画部
201 計画蓄積部
203 スケジューラー部
DESCRIPTION OF SYMBOLS 1 Production plan evaluation apparatus 2 Input part 3 Apparatus main body 4 Display part 100 Productivity evaluation part 101 Performance acquisition part 102 Plan acquisition part 103 Evaluation accumulation part 104 Aggregation part 105 Scheduler starting part 200 Production planning part 201 Plan accumulation part 203 Scheduler part

Claims (19)

複数の生産装置による一連の作業によって行われる生産対象品の生産を評価する方法であって、
前記生産の計画を行うために用いられる時間に関する計画値が格納されている記憶媒体から、前記計画値を取得する計画値取得ステップと、
前記計画値に対応する実績値を取得する実績値取得ステップと、
前記計画値取得ステップ及び実績値取得ステップでそれぞれ取得された計画値及び実績値を対比し得る態様で一画面に表示する表示ステップと、
前記計画値の更新の指示があったか否かを判別する判別ステップと、
前記判別ステップで更新の指示があったと判別されたときには、前記記憶媒体の計画値を実績値に合わせるように更新する更新ステップと
を含むことを特徴とする生産性評価方法。
A method for evaluating production of a product to be produced by a series of operations by a plurality of production devices,
A plan value obtaining step for obtaining the plan value from a storage medium storing a plan value related to time used for planning the production;
An actual value acquisition step of acquiring an actual value corresponding to the planned value;
A display step for displaying on a single screen in a manner capable of comparing the plan value and the actual value acquired in the planned value acquisition step and the actual value acquisition step, respectively;
A determination step of determining whether or not there is an instruction to update the plan value;
An update step of updating the storage medium so as to match the planned value with the actual value when it is determined in the determination step that there is an update instruction.
前記計画値取得ステップでは、前記複数の生産装置に含まれる一群の生産装置に対する計画値を取得し、
前記実績値取得ステップでは、前記一群の生産装置に対する実績値を取得し、
前記表示ステップでは、前記計画値及び実績値を前記一群の生産装置に関連付けて表示する
ことを特徴とする請求項1記載の生産性評価方法。
In the plan value acquisition step, a plan value for a group of production apparatuses included in the plurality of production apparatuses is acquired,
In the actual value acquisition step, an actual value for the group of production apparatuses is acquired;
The productivity evaluation method according to claim 1, wherein in the display step, the planned value and the actual value are displayed in association with the group of production apparatuses.
前記計画値及び実績値はそれぞれ、1つの生産対象品に対する前記一群の生産装置の作業に要するサイクル時間を示す
ことを特徴とする請求項2記載の生産性評価方法。
The productivity evaluation method according to claim 2, wherein each of the plan value and the actual value indicates a cycle time required for the operation of the group of production apparatuses for one production target product.
前記計画値及び実績値はそれぞれ、前記一群の生産装置に対する生産対象品の切替えに要する段取時間を示す
ことを特徴とする請求項2記載の生産性評価方法。
The productivity evaluation method according to claim 2, wherein each of the planned value and the actual value indicates a setup time required for switching a production target product for the group of production apparatuses.
前記計画値及び実績値はそれぞれ、前記一群の生産装置の稼働時間のうち、生産対象品の生産に寄与する時間の割合である性能稼働率を示す
ことを特徴とする請求項2記載の生産性評価方法。
The productivity according to claim 2, wherein each of the planned value and the actual value indicates a performance availability ratio that is a ratio of a time that contributes to the production of the production target product among the operating hours of the group of production apparatuses. Evaluation methods.
前記生産性評価方法は、さらに、
前記計画値取得ステップで取得された計画値と、前記実績値取得ステップで取得された実績値とを履歴として履歴用記録媒体に書き込む書き込みステップを含み、
前記表示ステップでは、前記履歴用記録媒体に書き込まれている履歴を表示する
ことを特徴とする請求項1〜5の何れか1項に記載の生産性評価方法。
The productivity evaluation method further includes:
Including a writing step of writing the planned value acquired in the planned value acquiring step and the actual value acquired in the actual value acquiring step into a history recording medium as a history,
The productivity evaluation method according to any one of claims 1 to 5, wherein in the display step, a history written in the history recording medium is displayed.
複数の生産装置による一連の作業によって行われる生産対象品の生産を評価する方法であって、
前記生産の計画を行うために用いられる時間に関する計画値が格納されている記憶媒体から、前記計画値を取得する計画値取得ステップと、
前記計画値に対応する実績値を取得する実績値取得ステップと、
前記計画値取得ステップで取得された計画値、及び前記実績値取得ステップで取得された実績値を履歴として履歴用記録媒体に書き込む書き込みステップと、
前記履歴用記録媒体に書き込まれた履歴に基づいて、所定期間分の計画値及び実績値を対比し得る態様で表示する表示ステップと
を含むことを特徴とする生産性評価方法。
A method for evaluating production of a product to be produced by a series of operations by a plurality of production devices,
A plan value obtaining step for obtaining the plan value from a storage medium storing a plan value related to time used for planning the production;
An actual value acquisition step of acquiring an actual value corresponding to the planned value;
A writing step of writing the planned value acquired in the planned value acquiring step and the actual value acquired in the actual value acquiring step as a history to a recording medium for history;
And a display step of displaying the planned value and the actual value for a predetermined period on the basis of the history written in the history recording medium.
前記計画値取得ステップでは、前記複数の生産装置に含まれる一群の生産装置に対する計画値を取得し、
前記実績値取得ステップでは、前記一群の生産装置に対する実績値を取得し、
前記表示ステップでは、前記所定期間分の計画値及び実績値を前記一群の生産装置に関連付けて表示する
ことを特徴とする請求項7記載の生産性評価方法。
In the plan value acquisition step, a plan value for a group of production apparatuses included in the plurality of production apparatuses is acquired,
In the actual value acquisition step, an actual value for the group of production apparatuses is acquired;
The productivity evaluation method according to claim 7, wherein in the display step, the plan value and the actual value for the predetermined period are displayed in association with the group of production apparatuses.
前記計画値取得ステップでは、生産工程のうち前記一群の生産装置が稼動していないロス時間に対する計画値を取得し、
前記実績値取得ステップでは、前記ロス時間に対する実績値を取得し、
前記表示ステップでは、前記ロス時間に対する前記所定期間分の計画値及び実績値を表示する
ことを特徴とする請求項8記載の生産性評価方法。
In the planned value acquisition step, a planned value for a loss time during which the group of production devices are not operating in the production process is acquired,
In the actual value acquisition step, an actual value for the loss time is acquired,
The productivity evaluation method according to claim 8, wherein in the display step, a plan value and an actual value for the predetermined period with respect to the loss time are displayed.
前記ロス時間は、前記一群の生産装置に対する生産対象品の切替えに要する段取時間と、生産管理に要する管理時間と、予め規定された人的行為に要する規定時間と、前記一群の生産装置に起因する事象に要する設備性能時間とを含み、
前記表示ステップでは、前記ロス時間に対する前記所定期間分の計画値及び実績値を、前記段取時間、管理時間、規定時間、及び設備性能時間のそれぞれに分別して表示する
ことを特徴とする請求項9記載の生産性評価方法。
The loss time includes a setup time required for switching a production target product for the group of production apparatuses, a management time required for production management, a specified time required for a predetermined human action, and the group of production apparatuses. Including equipment performance time required for the event
In the display step, the planned value and the actual value for the predetermined period with respect to the loss time are displayed separately for each of the setup time, management time, specified time, and facility performance time. 9. The productivity evaluation method according to 9.
前記生産性評価方法は、さらに、
前記履歴用記録媒体に書き込まれた履歴に基づいて、所定期間の実績値を表示する実績表示ステップを含む
ことを特徴とする請求項8〜10の何れか1項に記載の生産性評価方法。
The productivity evaluation method further includes:
The productivity evaluation method according to any one of claims 8 to 10, further comprising a result display step of displaying a result value for a predetermined period based on a history written in the history recording medium.
前記実績値取得ステップでは、前記一群の生産装置に対する生産対象品の切替えに要した段取時間を実績値として取得し、
前記実績表示ステップでは、前記所定期間ごとの前記段取時間の推移を表示する
ことを特徴とする請求項11記載の生産性評価方法。
In the actual value acquisition step, the setup time required for switching the production target product for the group of production apparatuses is acquired as the actual value,
The productivity evaluation method according to claim 11, wherein, in the result display step, a transition of the setup time for each predetermined period is displayed.
前記実績値取得ステップでは、前記一群の生産装置の稼働時間のうち、前記生産対象品の生産に寄与した時間の割合である性能稼働率を実績値として取得し、
前記実績表示ステップでは、前記所定期間ごとの前記性能稼働率の推移を表示する
ことを特徴とする請求項11記載の生産性評価方法。
In the actual value acquisition step, out of the operating time of the group of production apparatuses, a performance operating rate that is a ratio of time that contributed to the production of the production target product is acquired as an actual value,
The productivity evaluation method according to claim 11, wherein in the result display step, a transition of the performance availability for each predetermined period is displayed.
前記実績値取得ステップでは、前記一群の生産装置が稼動している時間の生産工程に占める割合である時間稼働率を実績値として取得し、
前記実績表示ステップでは、前記所定時間ごとの前記時間稼働率の推移を表示する
ことを特徴とする請求項11記載の生産性評価方法。
In the actual value acquisition step, a time operation rate that is a ratio of a time during which the group of production apparatuses are operating to a production process is acquired as an actual value,
The productivity evaluation method according to claim 11, wherein, in the result display step, a transition of the hourly operation rate for each predetermined time is displayed.
前記実績値取得ステップでは、前記一群の生産装置に対する生産対象品の切替えに要する段取時間を、人的な切替え作業に要する切替え時間と、切替え後の生産対象品の生産の確認のために要する立ち上がり時間とに分けて実績値として取得し、
前記実績表示ステップでは、前記所定期間における前記切替え時間と立ち上がり時間の割合を表示する
ことを特徴とする請求項11記載の生産性評価方法。
In the actual value acquisition step, the setup time required for switching the production target product for the group of production apparatuses is required for confirming the switching time required for the human switching work and the production of the production target product after the switching. Acquired as a result value divided into rise time,
The productivity evaluation method according to claim 11, wherein in the result display step, a ratio between the switching time and the rising time in the predetermined period is displayed.
前記実績値取得ステップでは、予め規定された人的行為によって前記一群の生産装置が稼動していない規定時間を、休憩、食事、行事、会合、及び引継ぎのそれぞれに要した時間に分けて実績値として取得し、
前記実績表示ステップでは、前記所定期間における休憩、食事、行事、会合、及び引継ぎのそれぞれに要した時間の割合を表示する
ことを特徴とする請求項11記載の生産性評価方法。
In the actual value acquisition step, the predetermined time when the group of production apparatuses are not operating due to a predetermined human action is divided into the time required for each of a break, a meal, an event, a meeting, and a handover, and the actual value Get as
The productivity evaluation method according to claim 11, wherein in the result display step, a ratio of time required for each of a break, a meal, an event, a meeting, and a handover in the predetermined period is displayed.
複数の生産装置による一連の作業によって行われる生産対象品の生産を評価する生産性評価装置であって、
前記生産の計画を行うために用いられる時間に関する計画値が格納されている記憶媒体から、前記計画値を取得する計画値取得手段と、
前記計画値に対応する実績値を取得する実績値取得手段と、
前記計画値取得手段及び実績値取得手段でそれぞれ取得された計画値及び実績値を対比し得る態様で一画面に表示する表示手段と、
前記計画値の更新の指示があったか否かを判別する判別手段と、
前記判別手段で更新の指示があったと判別されたときには、前記記憶媒体の計画値を実績値に合わせるように更新する更新手段と
を備えることを特徴とする生産性評価装置。
A productivity evaluation device that evaluates the production of a product to be produced by a series of operations by a plurality of production devices,
Plan value acquisition means for acquiring the plan value from a storage medium in which a plan value related to time used for planning the production is stored;
Actual value acquisition means for acquiring an actual value corresponding to the planned value;
Display means for displaying on one screen in a manner capable of comparing the plan value and the actual value acquired by the planned value acquisition means and the actual value acquisition means, respectively;
Determining means for determining whether or not there is an instruction to update the planned value;
An updater comprising: an updater for updating the storage medium so as to match the planned value with the actual value when it is determined that the update is instructed by the determining unit.
複数の生産装置による一連の作業によって行われる生産対象品の生産を評価する生産性評価装置であって、
前記生産の計画を行うために用いられる時間に関する計画値が格納されている記憶媒体から、前記計画値を取得する計画値取得手段と、
前記計画値に対応する実績値を取得する実績値取得手段と、
前記計画値取得手段で取得された計画値、及び前記実績値取得手段で取得された実績値を履歴として履歴用記録媒体に書き込む書き込み手段と、
前記履歴用記録媒体に書き込まれた履歴に基づいて、所定期間分の計画値及び実績値を対比し得る態様で表示する表示手段と
を備えることを特徴とする生産性評価装置。
A productivity evaluation device that evaluates the production of a product to be produced by a series of operations by a plurality of production devices,
Plan value acquisition means for acquiring the plan value from a storage medium in which a plan value related to time used for planning the production is stored;
Actual value acquisition means for acquiring an actual value corresponding to the planned value;
A writing unit for writing the planned value acquired by the planned value acquiring unit and the actual value acquired by the actual value acquiring unit as a history to a recording medium for history;
A productivity evaluation apparatus, comprising: a display unit configured to display a plan value and an actual value for a predetermined period in a manner capable of being compared based on a history written in the history recording medium.
請求項1〜16のうち何れか1項に記載の生産性評価方法に含まれるステップをコンピュータに実行させることを特徴とするプログラム。
A program for causing a computer to execute the steps included in the productivity evaluation method according to any one of claims 1 to 16.
JP2004099125A 2004-03-30 2004-03-30 Productivity evaluation method and apparatus Pending JP2005284818A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004099125A JP2005284818A (en) 2004-03-30 2004-03-30 Productivity evaluation method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004099125A JP2005284818A (en) 2004-03-30 2004-03-30 Productivity evaluation method and apparatus

Publications (1)

Publication Number Publication Date
JP2005284818A true JP2005284818A (en) 2005-10-13

Family

ID=35183115

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004099125A Pending JP2005284818A (en) 2004-03-30 2004-03-30 Productivity evaluation method and apparatus

Country Status (1)

Country Link
JP (1) JP2005284818A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008015738A (en) * 2006-07-05 2008-01-24 Nec Electronics Corp Facility management system
KR100859436B1 (en) * 2006-11-03 2008-09-23 세메스 주식회사 Semiconductor manufacturing equipment and method for measuring unit per equipment hour
JP2014035683A (en) * 2012-08-09 2014-02-24 Toshiba Corp Evaluation value calculation device, evaluation value calculation method, and program
JP2017134798A (en) * 2016-01-31 2017-08-03 株式会社龍コーポレーション Plan formulation support system
JPWO2019155669A1 (en) * 2018-02-07 2021-01-28 日本電気株式会社 Information processing equipment, control methods, and programs
JP2021022232A (en) * 2019-07-29 2021-02-18 コニカミノルタ株式会社 Production result recording system and production result recording program
JPWO2021095264A1 (en) * 2019-11-15 2021-05-20
CN113917896A (en) * 2020-07-07 2022-01-11 株式会社日立制作所 Work instruction device, work instruction system, and work instruction method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008015738A (en) * 2006-07-05 2008-01-24 Nec Electronics Corp Facility management system
KR100859436B1 (en) * 2006-11-03 2008-09-23 세메스 주식회사 Semiconductor manufacturing equipment and method for measuring unit per equipment hour
JP2014035683A (en) * 2012-08-09 2014-02-24 Toshiba Corp Evaluation value calculation device, evaluation value calculation method, and program
JP2017134798A (en) * 2016-01-31 2017-08-03 株式会社龍コーポレーション Plan formulation support system
JP7040541B2 (en) 2018-02-07 2022-03-23 日本電気株式会社 Information processing equipment, control methods, and programs
JPWO2019155669A1 (en) * 2018-02-07 2021-01-28 日本電気株式会社 Information processing equipment, control methods, and programs
JP2021022232A (en) * 2019-07-29 2021-02-18 コニカミノルタ株式会社 Production result recording system and production result recording program
JP7392312B2 (en) 2019-07-29 2023-12-06 コニカミノルタ株式会社 Production performance recording system and production performance recording program
JPWO2021095264A1 (en) * 2019-11-15 2021-05-20
WO2021095264A1 (en) * 2019-11-15 2021-05-20 株式会社Fuji Operation status display device and operation status display method
EP4060575A4 (en) * 2019-11-15 2022-11-30 Fuji Corporation Operation status display device and operation status display method
JP7277603B2 (en) 2019-11-15 2023-05-19 株式会社Fuji Operation status display device and operation status display method
US11822846B2 (en) 2019-11-15 2023-11-21 Fuji Corporation Operation status display device and operation status display method
CN113917896A (en) * 2020-07-07 2022-01-11 株式会社日立制作所 Work instruction device, work instruction system, and work instruction method
CN113917896B (en) * 2020-07-07 2024-04-26 株式会社日立制作所 Work instruction device, work instruction system, and work instruction method

Similar Documents

Publication Publication Date Title
EP2755096A1 (en) Work management system, work management terminal, program and work management method
JP5379261B2 (en) Scheduling apparatus, scheduling method, and computer program
JP2008299762A (en) Production management program
JP5885637B2 (en) Scheduling method, scheduling program, and scheduling apparatus
WO2019142225A1 (en) Display control device, program, and display control method
JP5309882B2 (en) Schedule creation system, schedule creation method, and schedule creation program
JP2005284818A (en) Productivity evaluation method and apparatus
JP2019102093A (en) Work management device, work management method, and work management program
JP5196991B2 (en) Manufacturing process management apparatus, manufacturing process management method, and computer program
JPH11120248A (en) System and method for scheduling production
US8170703B2 (en) Method for controlling a plurality of production processes
US11099553B2 (en) Operation plan creation device, operation plan creation system, operation plan creation method, and program
CA2983686C (en) Gas facility operation management system
JP5539829B2 (en) Job scheduling apparatus and job scheduling program
JP6475429B2 (en) Demand prediction apparatus and program
US20090125342A1 (en) Disposition method and disposition module
JP2005063084A (en) Method and system for managing process plan, progress performance and productivity using multiviewer gantt chart
JPH04184602A (en) System and method for preparation of production schedule
Iranpoor et al. Order acceptance and due-date quotation in low machine rates
JP2005352934A (en) Production process management system and its device
JP3296318B2 (en) Demand forecasting method, demand forecasting device, and storage medium storing demand forecasting program
JP2014002428A (en) Production plan adjusting apparatus
JP6063764B2 (en) Product development management program and product development management apparatus using the same
CN114365053B (en) Management device, management system, and program
JP2018106581A (en) Work improvement support system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090526

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20091006