JP2003154935A - Method and device for train control - Google Patents

Method and device for train control

Info

Publication number
JP2003154935A
JP2003154935A JP2001352950A JP2001352950A JP2003154935A JP 2003154935 A JP2003154935 A JP 2003154935A JP 2001352950 A JP2001352950 A JP 2001352950A JP 2001352950 A JP2001352950 A JP 2001352950A JP 2003154935 A JP2003154935 A JP 2003154935A
Authority
JP
Japan
Prior art keywords
train
control device
stop limit
ground control
limit position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001352950A
Other languages
Japanese (ja)
Inventor
Keiji Maekawa
景示 前川
Yasushi Yokosuka
靖 横須賀
Naohiro Kasuya
直大 糟谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2001352950A priority Critical patent/JP2003154935A/en
Publication of JP2003154935A publication Critical patent/JP2003154935A/en
Pending legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method and a device for train control capable of accurately calculating the stop limit position of a train advancing in the control range of adjacent ground control devices even when the capacity of signal lines between the ground control devices by reducing the amount of information communication between the ground control devices. SOLUTION: When determining that the calculated stop limit position of the train 103 located in the control thereof exceeds the control range thereof, the ground control device 10 transmits a position calculation request 107 for the stop limit position 110 of the train 103 to the adjacent ground control device 102 using, as a control range, a next district in which the train 103 advances, and receives the stop limit position 110 calculated by the adjacent ground control device 102.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は列車が走行する軌道
を所定長で区切った区間を列車の制御範囲とする地上制
御装置を各区間毎に設置し、地上制御装置で自制御範囲
に在線している列車の停止限界位置を算出する列車制御
方法および装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention installs a ground control device for each section in which a train control track is a section obtained by dividing a track on which a train travels by a predetermined length, and the ground control device is used to stay in its own control range. The present invention relates to a train control method and device for calculating a stop limit position of a running train.

【0002】[0002]

【従来の技術】一般に、列車の運行管理を行うには軌道
を所定長で区切った区間を列車の制御範囲とする地上制
御装置を各区間毎に設置している。地上制御装置は自制
御範囲に在線している列車と無線などによって情報通信
を行い、列車の位置情報を取込んだり、列車に制御情報
を与えたりしている。
2. Description of the Related Art Generally, in order to manage the operation of a train, a ground control device is installed in each section in which a section of a track divided by a predetermined length is set as a control range of the train. The ground control device performs information communication with a train existing in its own control range by radio or the like to take in position information of the train and give control information to the train.

【0003】地上制御装置は、通常、駅に設けられてお
り、列車が自制御範囲に在線しているときに列車位置を
把握できる。また、地上制御装置は隣接する区間を制御
範囲とする他の地上制御装置と信号線で接続され情報通
信できるようになっている。
The ground control device is usually provided in a station, and can grasp the train position when the train is in its own control range. Further, the ground control device is connected to another ground control device having a control range in an adjacent section by a signal line so that information communication can be performed.

【0004】ところで、地上制御装置は、列車が自制御
範囲に在線しているときに列車の停止限界位置を周期的
に算出している。算出周期は、例えば、1秒程度であ
る。自制御範囲に複数の列車が在線しているときには列
車毎に停止限界位置を算出する。停止限界位置を算出す
るには列車位置情報と転てつ器状態、進路状態などの軌
道状態情報を必要とする。地上制御装置は、停止限界位
置を算出するための列車位置情報と転てつ器状態、進路
状態などの軌道状態情報は連動装置から得るようにして
いる。
By the way, the ground control device periodically calculates the stop limit position of the train when the train is in its own control range. The calculation cycle is, for example, about 1 second. When there are multiple trains in the control range, the stop limit position is calculated for each train. In order to calculate the stop limit position, train position information and track condition information such as rolling device condition and track condition are required. The ground control device obtains the train position information for calculating the stop limit position and the track condition information such as the rolling device condition and the track condition from the interlock device.

【0005】地上制御装置は自制御範囲に在線している
列車の算出した停止限界位置が自制御範囲、つまり、隣
接する地上制御装置との制御範囲境界を越えると判断す
ると、当該列車が進行する次区間を制御範囲とする隣接
地上制御装置から次区間における列車在線情報や軌道状
態情報を信号線を介して送信してもらい、自制御範囲に
在線している列車の停止限界位置を算出している。
When the ground control device judges that the calculated stop limit position of the train existing in the own control range exceeds the own control range, that is, the control range boundary with the adjacent ground control device, the train advances. The adjacent ground control device with the next section as the control range is asked to transmit the train presence information and track condition information in the next section via the signal line, and the stop limit position of the train in the own control range is calculated. There is.

【0006】[0006]

【発明が解決しようとする課題】従来技術は、隣接する
地上制御装置の制御範囲に進入する列車の停止限界位置
を算出するために、隣接する地上制御装置から列車の在
線状態や進路状態を受信する必要がある。地上制御装置
間の情報通信量が多くなる。たとえば、数十kbps程度
が必要になる。
In the prior art, in order to calculate the stop limit position of a train entering the control range of an adjacent ground control device, the on-rail status and the track condition of the train are received from the adjacent ground control device. There is a need to. The amount of information communication between ground controllers increases. For example, several tens of kbps is required.

【0007】ところが、既設の地上制御装置間の信号線
は容量が小さく、列車の停止限界位置を正確に算出でき
ないという問題点を有する。
However, there is a problem in that the capacity of the signal line between the existing ground control devices is small and the train stop limit position cannot be accurately calculated.

【0008】本発明の目的は、地上制御装置間の情報通
信量を低減し地上制御装置間の信号線の容量が小さくて
も隣接する地上制御装置の制御範囲に進入する列車の停
止限界位置を正確に算出できる列車制御方法および装置
を提供することにある。
An object of the present invention is to reduce the stoppage limit position of a train entering the control range of an adjacent ground control device even if the amount of information communication between the ground control devices is reduced and the capacity of the signal line between the ground control devices is small. An object of the present invention is to provide a train control method and device that can be accurately calculated.

【0009】[0009]

【課題を解決するための手段】本発明の特徴とするとこ
ろは、地上制御装置は自制御範囲に在線している列車の
算出した停止限界位置が自制御範囲を越えると判断する
と当該列車が進行する次区間を制御範囲とする隣接地上
制御装置に当該列車の停止限界位置の位置算出要求を送
信し、隣接地上制御装置で算出した当該列車の停止限界
位置を受信するようにしたことにある。具体的に、位置
算出要求は列車IDと列車位置情報だけでよくなる。
The feature of the present invention resides in that the ground control device advances the train when it determines that the calculated stop limit position of the train existing in the own control range exceeds the own control range. The position calculation request for the stop limit position of the train is transmitted to the adjacent ground control device whose control range is the next section, and the stop limit position of the train calculated by the adjacent ground control device is received. Specifically, the position calculation request only requires the train ID and train position information.

【0010】本発明は停止限界位置を算出するための情
報通信量を少なくできるので、地上制御装置間の信号線
の容量を小さくでき、結局、既設の地上制御装置間の信
号線でも列車の停止限界位置を正確に算出することがで
きる。
According to the present invention, since the amount of information communication for calculating the stop limit position can be reduced, the capacity of the signal line between the ground control devices can be reduced, and eventually the train stops even with the signal line between the existing ground control devices. The limit position can be calculated accurately.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施例を図面に基
づいて説明する。図1、図2に本発明の一実施例を示
し、図1は全体構成図で、図2は地上制御装置の一例構
成図である。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. 1 and 2 show an embodiment of the present invention, FIG. 1 is an overall configuration diagram, and FIG. 2 is an example configuration diagram of a ground control device.

【0012】まず、図1において、列車が隣接する地上
制御装置の制御範囲に進入する時の動作を説明する。
First, referring to FIG. 1, the operation when the train enters the control range of the adjacent ground control device will be described.

【0013】列車103は軌道100上を走行してい
る。軌道100は所定長で区切られており、区間Aに地
上制御装置101が設置され、区間Bに地上制御装置1
02が設置されている。地上制御装置101と地上制御
装置102は情報通信を行うために信号線で接続されて
いる。
The train 103 runs on the track 100. The track 100 is divided into a predetermined length, the ground control device 101 is installed in the section A, and the ground control device 1 is installed in the section B.
02 is installed. The ground control device 101 and the ground control device 102 are connected by a signal line to perform information communication.

【0014】列車103は速度を積算して移動距離を算
出する等の方法により現在位置を算出し、列車103の
現在位置を表す情報である位置情報106を発生する。
位置情報106のフォーマットは通常の情報伝送技術で
用いられる手法で簡単に実現できる。位置情報106は
無線で地上側に送信される。列車103から送信された
位置情報106は地上側無線伝送装置104によって受
信され、地上制御装置101に加えられる。
The train 103 calculates the current position by a method such as integrating the speed to calculate the moving distance, and generates position information 106 which is information indicating the current position of the train 103.
The format of the position information 106 can be easily realized by a method used in a normal information transmission technique. The position information 106 is wirelessly transmitted to the ground side. The position information 106 transmitted from the train 103 is received by the ground-side wireless transmission device 104 and added to the ground control device 101.

【0015】地上制御装置101は位置情報106を入
力すると列車103の現在位置を認識し、列車103に
対する停止限界(停止限界位置)110を算出する。停
止限界110は、列車103が他の列車に衝突する、あ
るいは脱線するといった危険なく、安全に走行できる限
界点である。
When the ground control device 101 inputs the position information 106, it recognizes the current position of the train 103 and calculates a stop limit (stop limit position) 110 for the train 103. The stop limit 110 is a limit point at which the train 103 can travel safely without danger of colliding with another train or derailing.

【0016】停止限界110の算出には地上制御装置1
01で認識している他の列車の位置と、軌道設備の状態
情報が用いられる。列車103の位置から当該列車前方
の未開通の進路端、または先行列車などの列車103の
走行の支障となるものが見つかるまで検索する。検索の
結果、見つかった支障の位置を停止限界110とする。
The ground control device 1 is used to calculate the stop limit 110.
Positions of other trains recognized in 01 and state information of track equipment are used. The search is performed from the position of the train 103 until an unopened route end in front of the train or a preceding train or the like that hinders the running of the train 103 is found. As a result of the search, the position of the obstacle found is set as the stop limit 110.

【0017】地上制御装置101は算出した停止限界1
04が制御範囲境界109を越えているかを判断する。
その結果、越えていれば、当該列車103は隣接する地
上制御装置102の制御範囲に進入しようとしていると
判断し、隣接する地上制御装置102に信号線112を
介して停止限界の位置算出要求107を送信して、当該
列車103の隣接する地上制御装置102の制御範囲内
での停止限界の算出を要求する。位置算出要求107は
当該列車103の列車IDと当該列車位置からなる。
The ground control device 101 calculates the calculated stop limit 1
It is determined whether 04 exceeds the control range boundary 109.
As a result, if it exceeds, it is determined that the train 103 is about to enter the control range of the adjacent ground control device 102, and the stop limit position calculation request 107 is issued to the adjacent ground control device 102 via the signal line 112. To request calculation of the stop limit within the control range of the adjacent ground control device 102 of the train 103. The position calculation request 107 includes the train ID of the train 103 and the train position.

【0018】停止限界の位置算出要求107を受信した
地上制御装置102は当該列車103の位置情報をもと
に当該列車103の自制御範囲B内での停止限界を算出
し、停止限界位置情報108として信号線112を介し
て地上制御装置101に送信する。
Upon receiving the stop limit position calculation request 107, the ground control device 102 calculates the stop limit of the train 103 within its own control range B based on the position information of the train 103, and the stop limit position information 108. Is transmitted to the ground control apparatus 101 via the signal line 112.

【0019】地上制御装置101は停止限界位置情報1
08を受信すると停止限界位置情報108に基づいて列
車103の制御情報105を作成して列車103に送信
する。
The ground control device 101 uses the stop limit position information 1
When 08 is received, the control information 105 of the train 103 is created based on the stop limit position information 108 and transmitted to the train 103.

【0020】制御情報105を受信した列車103は受
信した停止限界110を越えないように列車速度を制御
しながら、隣接する地上制御装置102の制御範囲Bに
進入する。
The train 103 having received the control information 105 enters the control range B of the adjacent ground control device 102 while controlling the train speed so as not to exceed the received stop limit 110.

【0021】このように、地上制御装置101の制御範
囲Aに在線する列車103の停止限界位置110を列車
103が進入する隣接区間Bを制御範囲とする地上制御
装置102で算出するようにしているので、地上制御装
置101、102間で通信するデータ量は列車の停止限
界位置算出要求信号あるいは停止限界位置情報のみとな
り、従来の隣接制御範囲内の停止限界を算出するために
必要とする列車位置信号や進路開通状態信号等に比較し
て大幅に低減することができる。
As described above, the stop limit position 110 of the train 103 existing in the control range A of the ground control device 101 is calculated by the ground control device 102 having the adjacent section B where the train 103 enters as the control range. Therefore, the amount of data communicated between the ground control devices 101 and 102 is only the train stop limit position calculation request signal or the stop limit position information, and the train position required to calculate the stop limit within the conventional adjacent control range. It can be significantly reduced as compared with a signal or a route opening state signal.

【0022】図2に地上制御装置101の一例詳細構成
図を示す。図2において、無線通信手段201は列車1
03の図示しない車上側無線通信装置から位置情報10
6を受信し記憶媒体202に格納する。記憶媒体202
は地上制御装置101が制御する全列車の位置と、進
路、信号機、転てつ器、軌道回路等の軌道設備の状態を
記憶する。
FIG. 2 shows an example detailed configuration diagram of the ground control device 101. In FIG. 2, the wireless communication means 201 is the train 1
The position information 10
6 is received and stored in the storage medium 202. Storage medium 202
Stores the positions of all trains controlled by the ground control device 101 and the states of track facilities such as routes, traffic lights, turning devices and track circuits.

【0023】停止限界算出手段204は記憶媒体202
を参照し、列車位置と軌道設備状態を元に地上制御装置
101が制御する全列車の停止限界110を算出する。
算出した停止限界104は列車状態判断手段206と制
御情報発生手段205に加えられる。停止限界位置11
0の算出は、列車103に対する支障を検索し、その位
置をもとに算出される。停止限界位置110の算出は良
く知られているので詳細説明を省略する。
The stop limit calculating means 204 is a storage medium 202.
, The stop limit 110 of all trains controlled by the ground control device 101 is calculated based on the train position and the track facility state.
The calculated stop limit 104 is added to the train state determination means 206 and the control information generation means 205. Stop limit position 11
The calculation of 0 is calculated based on the position of the obstacle 103 searched for the train 103. Since the calculation of the stop limit position 110 is well known, detailed description thereof will be omitted.

【0024】列車状態判断手段206は停止限界算出手
段203から入力した停止限界110をもとに当該列車
103が隣接する地上制御装置102の制御範囲B内に
進入していようとしているのか判断する。列車状態判断
手段206は停止限界位置110と制御範囲境界109
を比較し、停止限界位置110が制御範囲境界109越
えていれば当該列車103は隣接する地上制御装置10
2の制御範囲B内に進入しようとしていると判断する。
列車状態判断手段206は地上通信手段203から当該
列車103の停止限界の算出を隣接する地上制御装置1
02に要求するように指示する。
The train condition judging means 206 judges whether the train 103 is about to enter the control range B of the adjacent ground control device 102 based on the stop limit 110 input from the stop limit calculating means 203. The train state determination means 206 determines the stop limit position 110 and the control range boundary 109.
If the stop limit position 110 exceeds the control range boundary 109, the train 103 is adjacent to the ground control device 10
It is determined that the vehicle is about to enter the control range B of No.2.
The train state determination means 206 calculates the stop limit of the train 103 from the ground communication means 203, and the adjacent ground control device 1
02 to request.

【0025】地上通信手段203は列車状態判断手段2
06からの指示を受けて、当該列車103の停止限界を
算出するように隣接する地上制御装置102に停止限界
算出要求107を信号線112を介して送信する。
The ground communication means 203 is the train state judging means 2
In response to the instruction from 06, a stop limit calculation request 107 is transmitted to the adjacent ground control device 102 via the signal line 112 so as to calculate the stop limit of the train 103.

【0026】地上制御装置102は地上制御装置101
と同様に構成されており、地上通信手段203を介して
地上制御装置101が送信した停止限界位置算出要求1
07を受信する。地上制御装置102は停止限界位置算
出要求107を受信すると、当該列車103の位置情報
を記憶媒体202に格納し、停止限界算出手段203で
当該列車103の停止限界104を算出し、地上通信手
段203にあたえる。
The ground control device 102 is the ground control device 101.
And the stop limit position calculation request 1 transmitted by the ground control device 101 via the ground communication unit 203.
07 is received. Upon receiving the stop limit position calculation request 107, the ground control device 102 stores the position information of the train 103 in the storage medium 202, the stop limit calculation unit 203 calculates the stop limit 104 of the train 103, and the ground communication unit 203. Give.

【0027】地上制御装置102の地上通信手段203
は地上制御装置102の停止限界算出手段204で算出
した停止限界110を停止限界位置情報108として信
号線112を介して地上制御装置101に送信する。
Ground communication means 203 of the ground control device 102
Transmits the stop limit 110 calculated by the stop limit calculating means 204 of the ground control device 102 to the ground control device 101 via the signal line 112 as the stop limit position information 108.

【0028】地上制御装置101は地上通信手段203
を介して地上制御装置102が送信した停止限界位置情
報108を受信する。地上通信手段203は停止限界位
置情報108を受信すると、停止限界算出手段204を
介して制御情報発生手段205に与える。制御情報発生
手段205は停止限界位置110に基づき列車103の
制御情報105を作成し、無線通信手段201を介して
列車103に送信する。
The ground control device 101 is a ground communication means 203.
The stop limit position information 108 transmitted by the ground control device 102 is received via the. Upon receiving the stop limit position information 108, the ground communication means 203 gives it to the control information generating means 205 via the stop limit calculating means 204. The control information generation means 205 creates the control information 105 of the train 103 based on the stop limit position 110, and transmits it to the train 103 via the wireless communication means 201.

【0029】図3に列車判断手段206の処理フローを
示す。列車判断手段206はステップS1において地上
制御装置101で制御中の全列車についてステップS
2、S3の処理を実行する。ステップS2では列車10
3の停止限界104と隣接する地上制御装置102との
制御範囲境界109を比較し、停止限界104が制御範
囲境界109を越えていればステップS3に移行する。
ステップS3では列車103に対する停止限界位置算出
要求107を地上通信手段203から隣接する地上制御
装置102に送信する。
FIG. 3 shows a processing flow of the train judging means 206. The train determination means 206 performs step S1 for all trains controlled by the ground control device 101 in step S1.
2. The processing of S3 is executed. Train 10 at step S2
The control range boundary 109 between the stop limit 104 of No. 3 and the adjacent ground control device 102 is compared. If the stop limit 104 exceeds the control range boundary 109, the process proceeds to step S3.
In step S3, the stop limit position calculation request 107 for the train 103 is transmitted from the ground communication means 203 to the adjacent ground control device 102.

【0030】図4は停止限界位置算出要求107のフォ
ーマットを示し、停止限界位置算出要求107は列車ID
と列車位置からなる。また、図5は停止限界位置情報1
08のフォーマットを示し、停止限界位置情報108は
列車IDと停止限界からなる。
FIG. 4 shows the format of the stop limit position calculation request 107. The stop limit position calculation request 107 is the train ID.
And train position. Further, FIG. 5 shows stop limit position information 1
08, the stop limit position information 108 includes a train ID and a stop limit.

【0031】以上のようにして列車の停止限界位置を算
出するのであるが、地上制御装置は自制御範囲に在線し
ている列車の算出した停止限界位置が自制御範囲を越え
ると判断すると当該列車が進行する次区間を制御範囲と
する隣接地上制御装置に当該列車の停止限界位置の位置
算出要求を送信し、隣接地上制御装置で算出した当該列
車の停止限界位置を受信するようにしている。したがっ
て、停止限界位置を算出するための情報通信量を少なく
できるので、地上制御装置間の信号線の容量を小さくで
き、結局、既設の地上制御装置間の信号線でも列車の停
止限界位置を正確に算出することができる。
The stop limit position of the train is calculated as described above. However, if the ground control device determines that the calculated stop limit position of the train existing in its own control range exceeds the own control range, the train concerned A position calculation request for the stop limit position of the train is transmitted to the adjacent ground control device whose control range is the next section in which the train travels, and the stop limit position of the train calculated by the adjacent ground control device is received. Therefore, since the amount of information communication for calculating the stop limit position can be reduced, the capacity of the signal line between the ground control devices can be reduced, and even after all, the train stop limit position can be accurately determined even with the signal line between the existing ground control devices. Can be calculated.

【0032】なお、上述の実施例は地上制御装置と列車
の通信を無線で行っているが、漏洩同軸ケーブルや軌道
回路を用いる信号伝送でも同様にして停止限界の算出を
行うことができることは明らかなことである。
In the above-mentioned embodiment, the communication between the ground control device and the train is performed wirelessly, but it is clear that the stop limit can be calculated in the same manner by signal transmission using a leaky coaxial cable or a track circuit. That's right.

【0033】[0033]

【発明の効果】以上説明したように本発明によれば、停
止限界位置を算出するための情報通信量を少なくできる
ので、地上制御装置間の信号線の容量を小さくでき、結
局、既設の地上制御装置間の信号線でも列車の停止限界
位置を正確に算出することができる。
As described above, according to the present invention, since the amount of information communication for calculating the stop limit position can be reduced, the capacity of the signal line between the ground control devices can be reduced, and as a result, the existing ground can be used. The signal line between the control devices can also accurately calculate the train stop limit position.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の一実施例を示す構成図である。FIG. 1 is a configuration diagram showing an embodiment of the present invention.

【図2】 本発明における地上制御装置の一例詳細構成
図である。
FIG. 2 is a detailed configuration diagram of an example of a ground control device according to the present invention.

【図3】 本発明の動作を説明するための処理フロー図
である。
FIG. 3 is a processing flow chart for explaining the operation of the present invention.

【図4】 本発明の実施例における停止限界位置算出要
求信号のフォーマット図である。
FIG. 4 is a format diagram of a stop limit position calculation request signal in the embodiment of the present invention.

【図5】 本発明の実施例における停止限界位置情報の
フォーマット図である。
FIG. 5 is a format diagram of stop limit position information in the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

100…軌道 101、102…地上制御装置 103…列車 104…地上側無線伝送装置 105…制御情報 106…位置情報 107…停止限界位置算出要求 108…停止限界位置情報 109…制御範囲境界 110…停止限界位置 201…地上側無線通信手段 202…記憶媒体 203…地上通信手段 204…停止限界算出手段 205…制御情報発生手段 206…列車状態判断手段 100 ... orbit 101, 102 ... Ground control device 103 ... train 104 ... Ground-side wireless transmission device 105 ... Control information 106 ... Positional information 107 ... Request for stop limit position calculation 108 ... Stop limit position information 109 ... Control range boundary 110 ... Stop limit position 201 ... Ground side wireless communication means 202 ... Storage medium 203 ... Ground communication means 204 ... Stop limit calculation means 205 ... Control information generating means 206 ... Train status determination means

───────────────────────────────────────────────────── フロントページの続き (72)発明者 糟谷 直大 茨城県ひたちなか市市毛1070番地 株式会 社日立製作所交通システム事業部水戸交通 システム本部内 Fターム(参考) 5H161 AA01 BB02 BB13 CC11 CC13 DD21 EE20 FF01    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Naohiro Kasuya             1070 Ichimo, Hitachinaka City, Ibaraki Prefecture Stock Association             Hitachi, Ltd. Transportation Systems Division Mito Transportation             System headquarters F term (reference) 5H161 AA01 BB02 BB13 CC11 CC13                       DD21 EE20 FF01

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】列車が走行する軌道を所定長で区切った区
間を列車の制御範囲とする地上制御装置を各区間毎に設
置し、前記地上制御装置は自制御範囲に在線している列
車と情報通信を行い列車の停止限界位置を算出し、隣接
区間を制御範囲とする他の地上制御装置と信号線で接続
されているものであって、前記地上制御装置は自制御範
囲に在線している列車の算出した停止限界位置が自制御
範囲を越えると判断すると当該列車が進行する次区間を
制御範囲とする隣接地上制御装置に前記当該列車の停止
限界位置の位置算出要求を送信し、前記隣接地上制御装
置で算出した前記当該列車の停止限界位置を受信するよ
うにしたことを特徴とする列車制御方法。
1. A ground control device having a train control range defined by dividing a track on which a train travels by a predetermined length is installed in each section, and the ground control device is a train located in its own control range. Information communication is performed to calculate the stop limit position of the train, and the train is connected to another ground control device that has an adjacent section as a control range by a signal line, and the ground control device is in its own control range. If it is determined that the calculated stop limit position of the train exceeds the own control range, the position calculation request of the stop limit position of the train is transmitted to the adjacent ground control device whose control range is the next section where the train advances, A train control method, wherein the stop limit position of the train calculated by the adjacent ground control device is received.
【請求項2】列車が走行する軌道を所定長で区切った区
間を列車の制御範囲とする地上制御装置を各区間毎に設
置し、前記地上制御装置は自制御範囲に在線している列
車の位置情報と前記軌道の軌道情報に基づき列車の停止
限界位置を周期的に算出し、隣接区間を制御範囲とする
他の地上制御装置と情報通信を行う信号線で接続されて
いるものであって、前記地上制御装置は自制御範囲に在
線している列車の算出した停止限界位置が隣接する地上
制御装置との制御範囲境界を越えると判断すると当該列
車が進行する次区間を制御範囲とする隣接地上制御装置
に前記当該列車の停止限界位置の位置算出要求を送信
し、前記隣接地上制御装置で算出した前記当該列車の停
止限界位置を受信するようにしたことを特徴とする列車
制御方法。
2. A ground control device having a train control range defined by dividing a track on which a train travels by a predetermined length is installed for each section, and the ground control device is provided for trains located in its own control range. A train that periodically calculates the stop limit position of the train based on the position information and the track information of the track, and is connected to another ground control device whose control range is an adjacent section by a signal line for information communication. When the ground control device determines that the calculated stop limit position of a train in its own control range exceeds the control range boundary with the adjacent ground control device, the next section in which the train advances is adjacent to the control range. A train control method comprising transmitting a position calculation request for a stop limit position of the train to a ground control device, and receiving the stop limit position of the train calculated by the adjacent ground control device.
【請求項3】列車が走行する軌道を所定長で区切った区
間を列車の制御範囲とする地上制御装置を各区間毎に設
置し、前記地上制御装置は自制御範囲に在線している複
数の列車の在線状況情報と前記軌道の開通状態情報に基
づき列車の停止限界位置を周期的に算出し、隣接区間を
制御範囲とする他の地上制御装置と情報通信を行う信号
線で接続されているものであって、前記地上制御装置
は、自制御範囲に在線している列車の算出した停止限界
位置が隣接する地上制御装置との制御範囲境界を越える
と判断すると当該列車が進行する次区間を制御範囲とす
る隣接地上制御装置に、前記当該列車の列車IDと列車
位置情報を含む停止限界位置の位置算出要求を前記信号
線を介して送信し、前記隣接地上制御装置で算出した前
記当該列車の停止限界位置を前記信号線を介して受信
し、前記当該列車に制御情報を送信するようにしたこと
を特徴とする列車制御方法。
3. A ground control device having a train control range defined by dividing a track on which a train travels by a predetermined length is installed for each section, and the ground control device is provided in a plurality of lines which are located within the own control range. It is connected by a signal line that periodically calculates the stop limit position of the train based on the on-rail status information of the train and the open state information of the track, and performs information communication with other ground control devices whose control range is the adjacent section. The ground control device, when it determines that the calculated stop limit position of the train located in its own control range exceeds the control range boundary with the adjacent ground control device, the next section in which the train advances To the adjacent ground control device as a control range, a position calculation request for a stop limit position including the train ID and train position information of the train is transmitted via the signal line, and the train is calculated by the adjacent ground control device. Stop limit Train control method positions received via the signal line, characterized in that so as to transmit the control information to the relevant train.
【請求項4】列車が走行する軌道を所定長で区切った区
間を列車の制御範囲とする地上制御装置を各区間毎に設
置し、前記地上制御装置は前記列車と情報通信を行うと
共に、隣接区間を制御範囲とする他の地上制御装置と信
号線で接続されている列車制御装置において、 前記地上制御装置は、自制御範囲に在線している列車の
停止限界位置を算出する停止限界算出手段と、前記停止
限界算出手段で算出した停止限界位置が自制御範囲を越
えると判断すると当該列車が進行する次区間を制御範囲
とする隣接地上制御装置に前記当該列車の停止限界位置
の位置算出要求を出力する列車状態判断手段と、前記停
止限界算出手段あるいは前記隣接地上制御装置で算出し
た停止限界位置を入力して前記列車に与える制御情報を
発生する制御情報発生手段とを具備していることを特徴
とする列車制御装置。
4. A ground control device having a train control range defined by dividing a track on which a train travels by a predetermined length is installed for each section, and the ground control device communicates with the train and is adjacent to the train. In a train control device connected to another ground control device having a section as a control range by a signal line, the ground control device calculates a stop limit position for calculating a stop limit position of a train located in the own control range. When it is determined that the stop limit position calculated by the stop limit calculating means exceeds the control range of the train, a request for calculating the position of the stop limit position of the train is made to the adjacent ground control device whose control range is the next section in which the train travels. And a control information generation means for generating control information to be given to the train by inputting the train state determination means and the stop limit position calculated by the stop limit calculation means or the adjacent ground control device. A train control device comprising:
【請求項5】列車が走行する軌道を所定長で区切った区
間を列車の制御範囲とする地上制御装置を各区間毎に設
置し、前記地上制御装置は前記列車と情報通信を行うと
共に、隣接区間を制御範囲とする他の地上制御装置と信
号線で接続されている列車制御装置において、 前記地上制御装置は、自制御範囲に在線している列車の
位置情報と前記軌道の軌道情報に基づき列車の停止限界
位置を周期的に算出する停止限界算出手段と、前記停止
限界算出手段で算出した停止限界位置が隣接する隣接地
上制御装置との制御範囲境界を越えると判断すると当該
列車が進行する次区間を制御範囲とする隣接地上制御装
置に前記当該列車の停止限界位置の位置算出要求を出力
する列車状態判断手段と、前記停止限界算出手段あるい
は前記隣接地上制御装置で算出した停止限界位置を入力
して前記列車に与える制御情報を発生する制御情報発生
手段とを具備していることを特徴とする列車制御装置。
5. A ground control device having a train control range defined by dividing a track on which a train runs by a predetermined length is installed in each section, and the ground control device communicates with the train and is adjacent to the train. In a train control device that is connected to another ground control device having a section as a control range by a signal line, the ground control device is based on position information of a train that is in its own control range and track information of the track. When it is determined that the stop limit calculating means for periodically calculating the stop limit position of the train and the stop limit position calculated by the stop limit calculating means exceed the control range boundary between the adjacent ground control devices, the train advances. The train state determination means for outputting a position calculation request for the stop limit position of the train to the adjacent ground control device having the next section as the control range, and the stop limit calculation means or the adjacent ground control device. A train control device comprising: a control information generating unit that inputs the calculated stop limit position and generates control information to be given to the train.
【請求項6】列車が走行する軌道を所定長で区切った区
間を列車の制御範囲とする地上制御装置を各区間毎に設
置し、前記地上制御装置は前記列車と情報通信を行うと
共に、隣接区間を制御範囲とする他の地上制御装置と信
号線で接続されている列車制御装置において、 前記地上制御装置は、自制御範囲に在線している複数の
列車の在線状況情報と前記軌道の開通状態情報に基づき
列車の停止限界位置を周期的に算出する停止限界算出手
段と、前記停止限界算出手段で算出した停止限界位置が
隣接する隣接地上制御装置との制御範囲境界を越えると
判断すると当該列車が進行する次区間を制御範囲とする
隣接地上制御装置に、前記当該列車の列車IDと列車位
置情報を含む停止限界位置の位置算出要求を前記信号線
を介して送信する列車状態判断手段と、前記停止限界算
出手段あるいは前記隣接地上制御装置で算出した停止限
界位置を入力して前記列車に与える制御情報を発生する
制御情報発生手段とを具備していることを特徴とする列
車制御装置。
6. A ground control device having a train control range defined by dividing a track on which a train travels by a predetermined length is installed for each section, and the ground control device communicates with the train and is adjacent to the train. In a train control device that is connected to another ground control device that has a section as a control range by a signal line, the ground control device is in-rail status information of a plurality of trains that are in the own control range and opening of the track. When it is determined that the stop limit calculating unit that periodically calculates the stop limit position of the train based on the state information and the stop limit position calculated by the stop limit calculating unit exceeds the control range boundary between the adjacent adjacent ground control devices, A train state in which a position calculation request for a stop limit position including the train ID and train position information of the train is transmitted to the adjacent ground control device whose control range is the next section in which the train travels via the signal line. A train comprising: a determining unit; and a control information generating unit that inputs the stop limit position calculated by the stop limit calculating unit or the adjacent ground control device and generates control information to be given to the train. Control device.
JP2001352950A 2001-11-19 2001-11-19 Method and device for train control Pending JP2003154935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001352950A JP2003154935A (en) 2001-11-19 2001-11-19 Method and device for train control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001352950A JP2003154935A (en) 2001-11-19 2001-11-19 Method and device for train control

Publications (1)

Publication Number Publication Date
JP2003154935A true JP2003154935A (en) 2003-05-27

Family

ID=19165057

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001352950A Pending JP2003154935A (en) 2001-11-19 2001-11-19 Method and device for train control

Country Status (1)

Country Link
JP (1) JP2003154935A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008017463A (en) * 2006-06-07 2008-01-24 Hitachi Ltd Radio control security system
JP2011235744A (en) * 2010-05-10 2011-11-24 Toshiba Corp System for controlling train
JP2012178884A (en) * 2006-06-07 2012-09-13 Hitachi Ltd Radio control security system
JP2014111431A (en) * 2012-10-29 2014-06-19 Mitsubishi Electric Corp Train control device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008017463A (en) * 2006-06-07 2008-01-24 Hitachi Ltd Radio control security system
JP2012178884A (en) * 2006-06-07 2012-09-13 Hitachi Ltd Radio control security system
JP2011235744A (en) * 2010-05-10 2011-11-24 Toshiba Corp System for controlling train
JP2014111431A (en) * 2012-10-29 2014-06-19 Mitsubishi Electric Corp Train control device

Similar Documents

Publication Publication Date Title
US8548654B2 (en) Signaling system
US20190225246A1 (en) Wireless Train Management System
JPH10105880A (en) Mobile object control system
CN110843871A (en) Method and system for automatically identifying train station entering stock track number
JP2020106980A (en) Vehicle control device, vehicle control method and vehicle control system
JP2000168556A (en) Base station deciding method for moving destination of mobile station and mobile object communication system
KR100283828B1 (en) Train operation management system
RU2651333C1 (en) Method of trains movement regulation on the transfer without floating light-flowers and rail circuits
KR20020018771A (en) Automatic train stopper using telemetering system
JP2009096405A (en) Train control device
JP2003154935A (en) Method and device for train control
RU2411147C2 (en) Method and system of train handling
JP3848541B2 (en) Security system selection system, train control device, ground control device and on-vehicle control device
JP4564214B2 (en) Wireless decentralized train control system
RU2248899C1 (en) Complex unified locomotive safety device
JP2001158356A (en) Train control system and train operation support system
JP2004203177A (en) Train control system
JP2004122900A (en) Operation management system
US11912318B2 (en) Wireless vehicle management system
JP2003047112A (en) On-board principal automatic train control system
CN114766046A (en) Method for operating a transport system
JP2002330502A (en) On-vehicle main-body type automatic train control device
US4132379A (en) Method for improving the stopping accuracy at railway stations of track-bound vehicles
JP2002225711A (en) Digital atc device
JP2005082054A (en) Train control device