JP2003091588A - Method and system for supporting medical examination business - Google Patents

Method and system for supporting medical examination business

Info

Publication number
JP2003091588A
JP2003091588A JP2001284819A JP2001284819A JP2003091588A JP 2003091588 A JP2003091588 A JP 2003091588A JP 2001284819 A JP2001284819 A JP 2001284819A JP 2001284819 A JP2001284819 A JP 2001284819A JP 2003091588 A JP2003091588 A JP 2003091588A
Authority
JP
Japan
Prior art keywords
work
medical examination
information
management file
health
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001284819A
Other languages
Japanese (ja)
Inventor
Tomonao Kounoe
知直 鴻江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Software Engineering Co Ltd
Original Assignee
Hitachi Software Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Software Engineering Co Ltd filed Critical Hitachi Software Engineering Co Ltd
Priority to JP2001284819A priority Critical patent/JP2003091588A/en
Publication of JP2003091588A publication Critical patent/JP2003091588A/en
Pending legal-status Critical Current

Links

Landscapes

  • Medical Treatment And Welfare Office Work (AREA)

Abstract

PROBLEM TO BE SOLVED: To achieve efficiency of medical examination businesses by automatically grasping proceeding situations of the businesses based on data input and output specified to the businesses, totally grasping progress of a plurality of medical examination businesses, and precisely grasp the situations of progress of the medical examination businesses. SOLUTION: This invention is provided with a step of forming management information for medical examination schedule in a management file in a work situation grasping device through a medical examination business terminal in forming medical examination schedule for medical diagnosis at the medical examination business terminal, a step to record output situations in the management file when prescribed documents are outputted in an output device, and a step to record reading situations in the management file.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、医療機関やこれに
類する機関(学校や工場付属の診療保健施設)等で行わ
れる健康診断業務の作業進行状況を自動的に把握する健
康診断業務支援方法およびシステムに関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for supporting a health checkup work for automatically grasping the progress of work of a health checkup work performed in a medical institution or similar institutions (medical health facilities attached to schools and factories). And the system.

【0002】[0002]

【従来の技術】従来、健康診断業務の進捗を管理する技
術として、例えば、特開平8−233825号公報に記
載のものが知られている。また、一般的な業務の進捗管
理法としては、特開平7−230501号公報および特
開2000−242713号公報に記載のものが知られ
ている。特開平8−233825公報に記載の技術は医
療機関等で使用される分析装置に接続され、その分析装
置で得られたデータを管理するデータ管理装置に関し、
複数台の分析装置を統合管理するものである。入力され
た測定データが表わす測定結果の正常、異常を弁別する
手段を持ち複数台の分析装置を管理するデータ管理装置
より構成され、各分析装置における測定の進捗状況を、
各分析装置および各検体に対応づけて、複数台の分析装
置にわたって1つの工程管理画面に表示すると共に、当
該工程管理画面内の進捗状況の表示を逐次更新する表示
手段とを備えたことを特徴に持つデータ管理装置であ
る。
2. Description of the Related Art Conventionally, as a technique for managing the progress of health checkup work, for example, one disclosed in Japanese Patent Laid-Open No. 8-233825 is known. Further, as a general work progress management method, those described in JP-A-7-230501 and JP-A-2000-242713 are known. The technique described in JP-A-8-233825 relates to a data management device that is connected to an analyzer used in a medical institution or the like and manages data obtained by the analyzer.
This is the integrated management of multiple analyzers. It consists of a data management device that manages multiple analyzers with a means for distinguishing between normal and abnormal measurement results represented by the input measurement data.
In addition to displaying on one process control screen across a plurality of analyzers in association with each analyzer and each sample, a display means for sequentially updating the display of the progress status in the process control screen is provided. Data management device.

【0003】特開平7−230501号公報記載の技術
は、進捗管理に必要な実績データをシステム側で自動抽
出して実績管理計算やグラフの作成に反映させるもので
ある。プログラムの設計、製造、試験の各工程でプログ
ラム作成ツールが起動されると各工程でのシステムの稼
働時間とステップ数を実績工数として抽出してライブラ
リにて管理し、実績管理時には進捗管理に必要な実績デ
ータを前記プログラム作成ツールから自動抽出し、実績
管理の自動計算や実績管理のグラフ、帳表の作成を行う
ことを特徴とする実績管理装置である。
The technique described in Japanese Patent Laid-Open No. 7-230501 discloses that the system side automatically extracts the record data required for progress management and reflects it in the record management calculation and graph creation. When the program creation tool is started in each process of program design, manufacturing, and testing, the system operation time and the number of steps in each process are extracted as actual man-hours and managed in the library. The performance management device is characterized in that various performance data is automatically extracted from the program creation tool, and automatic performance management calculation, performance management graphs, and charts are created.

【0004】特開2000−242713号公報に記載
の技術は、管理用サーバと端末サーバとをネットワーク
で接続して構築される業務管理支援システムであって営
業日報等の定型書式データに従って入力された情報デー
タを蓄積し、報告書データの更新履歴を把握できるよう
にすることによって進捗状況を把握し、また、ネットワ
ークを通じて作業依頼書等を送受信して業務の依頼を行
う際、その作業依頼書の転送履歴を把握することによっ
て、業務管理を行うことが可能となる業務管理支援シス
テムである。
The technique described in Japanese Patent Laid-Open No. 2000-242713 is a business management support system constructed by connecting a management server and a terminal server via a network, and is input according to standard format data such as a daily business report. By accumulating information data and grasping the update history of report data, the progress status can be grasped, and when requesting work by sending and receiving work request forms etc. through the network, the work request forms This is a business management support system that enables business management by grasping the transfer history.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、特開平
8−233825公報に記載の技術は、健康診断業務に
おける検査行為について、受診者の測定結果を格納する
複数の分析装置を統合管理するデータ管理装置であり、
受診者および検体の進捗状況の把握し、ならびにデータ
管理およびデータの正常、異常を統合的に管理する事は
可能であるものの進捗を管理する範囲が検査行為のみに
限定されてしまい、健康診断に付随する事前準備や検査
結果の報告など他の進捗管理と同一に管理することが出
来ず、かつ進捗情報を取得するものが、測定装置に限ら
れる点も進捗情報の把握として用いるには十分ではない
という問題がある。
However, the technique disclosed in Japanese Unexamined Patent Publication No. 8-233825 is a data management device that integrally manages a plurality of analyzers that store the measurement results of the examinees regarding the inspection action in the health checkup work. And
Although it is possible to grasp the progress status of the examinees and specimens and to manage data management and normality / abnormality of data in an integrated manner, the scope of managing the progress is limited to only the inspection act, and it is used for medical examinations. It cannot be managed in the same way as other progress management such as accompanying preparations and report of inspection results, and the fact that progress information is acquired is limited to the measuring device. There is a problem that there is no.

【0006】また、特開平7−230501号公報に記
載の技術では、プログラムの起動時間、動作時間および
そのプログラム開発ステップを実績情報として自動的に
取得し、現在の進捗状況を自動的に算出することが可能
ではあるが、進捗情報を得るものがプログラム開発ツー
ルで収集される起動や利用状況ならびに利用時間という
ものに限られており、健康診断業務のように特定業務プ
ログラムの利用だけではなく帳票の出力および顧客情報
の入力が重要な進捗情報となるようなものに用いるには
十分ではないという問題がある。
Further, in the technique disclosed in Japanese Patent Laid-Open No. 7-230501, the program start time, operation time and its program development step are automatically acquired as performance information, and the current progress is automatically calculated. However, it is possible to obtain progress information only from the start, usage status and usage time collected by the program development tool. There is a problem in that the output of and the input of customer information are not enough to be used as important progress information.

【0007】また、特開2000−242713号公報
では定型書式データの作成、更新、ならびにネットワー
クを用いた転送におけるそれぞれの履歴をサーバにて管
理することで自動的に進捗状況を算出することが可能で
あるものの、進捗状況を得るものがプログラム利用の結
果として扱われた特定書式データに限られ、上記特開平
7−230501公報と同様に進捗管理対象者が行った
作業による結果を情報源とすることでは同じであり、同
様に健康診断業務の進行状況把握として用いるには十分
ではないという問題がある。
Further, in Japanese Patent Laid-Open No. 2000-242713, the progress status can be automatically calculated by managing the history of each of the creation and update of the fixed form data and the transfer using the network in the server. However, what obtains the progress status is limited to the specific format data handled as a result of the use of the program, and the result of the work performed by the progress management target person is used as the information source as in the above-mentioned Japanese Patent Laid-Open No. 7-230501. However, there is a problem that it is not enough to use it for grasping the progress of health checkup work.

【0008】本発明の目的は、健康診断を実施する施設
において、業務の進行状況を業務特有のデータの入力お
よび出力から自動的に把握し、また複数の健康診断業務
の進捗を一括して把握し、これにより健康診断業務の進
捗状況を精度良く把握し、健康診断業務の効率化に貢献
することができる健康診断業務支援方法およびシステム
を提供することにある。
An object of the present invention is to automatically grasp the progress of work at a facility for carrying out a health check from the input and output of data peculiar to the work, and also to grasp the progress of a plurality of health check works at once. Therefore, it is to provide a method and system for supporting the health checkup work, which can accurately grasp the progress of the health checkup work and contribute to the efficiency of the health checkup work.

【0009】[0009]

【課題を解決するための手段】上記目的を達成させるた
めに、本発明は、ネットワークによって接続された複数
の健康診断業務の健診計画ならびに事前準備計画ならび
に事後処理行う健診業務端末と、帳票を出力する出力装
置と、健康診断を受診する対象者情報を読み込む情報読
取装置と、健康診断の受診者受付を行う受付端末と、受
診者の検査を自動的に行う計測装置と、受診者より採取
した検体の自動解析を行う分析装置と、健康診断業務の
作業状況を把握する作業状況把握装置とによって構成さ
れる健康診断業務システムにおける健康診断業務支援方
法であって、前記健診業務端末における健康診断の健診
計画作成時に前記作業状況把握装置内の管理ファイルに
当該健診計画の管理情報を前記健診業務端末より作成す
るステップと、前記出力装置における規定帳票の出力時
に、その出力状況を前記管理ファイルに記録するステッ
プと、前記情報読取装置における規定記録媒体の情報読
取時に、その読取り状況を前記管理ファイルに記録する
ステップとを備えることを特徴とする。
In order to achieve the above-mentioned object, the present invention provides a medical examination work terminal for conducting a medical examination plan and advance preparation plan and post-processing of a plurality of medical examination works connected by a network, and a form. An output device that outputs, an information reading device that reads information on the target person who undergoes a medical examination, a reception terminal that accepts the medical examinee, a measuring device that automatically examines the medical examinee, A medical examination work support method in a medical examination work system configured by an analysis device that automatically analyzes a collected sample and a work situation grasping device that grasps the work situation of the medical examination work, and in the medical examination work terminal A step of creating management information of the medical examination plan in the management file in the work status grasping device from the medical examination work terminal when creating a medical examination plan of the medical examination; When outputting the specified form in the output device, the step of recording the output condition in the management file, and the step of recording the reading condition in the management file when reading the information of the specified recording medium in the information reading device Is characterized by.

【0010】また、前記受付端末における受診者の受付
時に、その受診者数を前記管理ファイルに記録するステ
ップと、前記計測装置による受診者の検査時に検査を行
った受診者数を前記管理ファイルに記録するステップ
と、前記分析装置における検体の分析時に、その分析数
を前記管理ファイルに記録するステップとをさらに備え
ることを特徴とする。
[0010] Further, at the time of receiving the examinees at the reception terminal, a step of recording the number of the examinees in the management file, and the number of examinees who have been examined at the time of the examination of the examinees by the measuring device in the management file The method is further provided with a step of recording and a step of recording the number of analyzes in the management file when the sample is analyzed by the analyzer.

【0011】また、前記管理ファイル内の全ての健康診
断業務の作業進捗状況を所定時間毎に検査し、期限時期
を過ぎている作業については警告情報を作成し、予定時
期よりも遅れている作業については注意情報を作成し、
関係者に通知するステップをさらに備えることを特徴と
する。
Further, the work progress status of all the medical examination work in the management file is inspected at every predetermined time, and the warning information is created for the work overdue, and the work delayed for the scheduled time. Create cautionary information about
It is characterized by further comprising a step of notifying a person concerned.

【0012】また、本発明に係る健康診断業務支援シス
テムは、ネットワークによって接続された複数の健康診
断業務の健診計画ならびに事前準備計画ならびに事後処
理行う健診業務端末と、帳票を出力する出力装置と、健
康診断を受診する対象者情報を読み込む情報読取装置
と、健康診断の受診者受付を行う受付端末と、受診者の
検査を自動的に行う計測装置と、受診者より採取した検
体の自動解析を行う分析装置と、健康診断業務の作業状
況を把握する作業状況把握装置とによって構成される健
康診断業務システムにおける健康診断業務支援方法であ
って、前記健診業務端末が、健康診断の健診計画作成時
に前記作業状況把握装置内の管理ファイルに当該健診計
画の管理情報を作成する手段を備え、前記出力装置が、
規定帳票の出力時に、その出力状況を前記管理ファイル
に記録する手段と、前記情報読取装置が、規定記録媒体
の情報読取時に、その読取り状況を前記管理ファイルに
記録する手段とを備えることを特徴とする。
Further, the health examination service support system according to the present invention comprises a health examination service terminal for performing health examination plans and advance preparation plans and post-processing of a plurality of health examination services connected by a network, and an output device for outputting a form. An information reading device that reads the information of the person who receives the medical examination, a reception terminal that accepts the medical examination recipient, a measuring device that automatically examines the medical examinee, and an automatic sample collection from the medical examinee. A health check service support method in a health check service system configured by an analysis device for performing analysis and a work condition checking device for checking the work condition of the health check work, wherein the health check service terminal is a health check service. A means for creating management information of the medical examination plan in a management file in the work status grasping device at the time of creating a medical examination plan, and the output device,
When outputting the prescribed form, a means for recording the output situation in the management file and a means for recording the reading situation in the management file when the information reading device reads the information on the prescribed recording medium are provided. And

【0013】また、前記受付端末が受診者の受付時にそ
の受診者数を前記管理ファイルに記録する手段と、前記
計測装置が受診者の検査時に検査を行った受診者数を前
記管理ファイルに記録する手段と、前記分析装置が検体
の分析時にその分析数を前記管理ファイルに記録する手
段と備えることを特徴とする。
[0013] Further, the reception terminal records the number of examinees in the management file at the time of reception of the examinees, and the measuring device records the number of examinees inspected in the examination of the examinees in the management file. And a means for recording the analysis number in the management file when the sample is analyzed.

【0014】また、前記作業状況把握装置が、前記管理
ファイル内の全ての健康診断業務の作業進捗状況を所定
時間毎に検査し、期限時期を過ぎている作業については
警告情報を作成し、予定時期よりも遅れている作業につ
いては注意情報を作成し、関係者に通知する手段を備え
ることを特徴とする。
Further, the work status grasping apparatus inspects the work progress status of all the health check jobs in the management file at every predetermined time, and creates warning information for the work which is over the deadline, and schedules it. It is characterized by the provision of means for creating caution information and notifying relevant persons regarding work that is behind schedule.

【0015】[0015]

【発明の実施の形態】以下、本発明を実施する場合の一
形態について図面を参照して具体的に説明する。図1
は、本発明を適用した健康診断業務支援システムの実施
形態を示システム構成図である。本実施形態の健康診断
業務支援システムは、健康診断業務の作業状況を把握す
るための各種の情報処理を行う健診業務作業状況把握装
置1と、作業情報を格納する管理ファイル1Aと健診業
務作業状況把握装置1が管理する情報を表示する表示装
置1B、健康診断の健診計画作成ならびに事前準備計画
作成ならびに事後情報処理行う健診業務端末2、健康診
断業務に関する帳票を出力するための印刷装置3、健康
診断を受診する対象者の情報を読み込む情報読取装置4
と、健康診断の実施において受診者の受付けを行う受付
端末5、受診者の計測を自動的に行う計測装置6、受診
者より採取した検体の自動解析を行う分析装置7とから
構成され、各装置および端末は有線または無線のネット
ワーク8より接続されている。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, one mode for carrying out the present invention will be specifically described with reference to the drawings. Figure 1
[Fig. 1] is a system configuration diagram showing an embodiment of a health examination service support system to which the present invention is applied. The medical examination work support system of the present embodiment includes a medical examination work work situation grasping apparatus 1 for performing various information processing for grasping the work situation of the medical examination work, a management file 1A for storing work information, and a medical examination work. A display device 1B for displaying information managed by the work status grasping device 1, a medical examination work terminal 2 for conducting a medical checkup plan preparation and a preparatory work plan preparation and post information processing, and a print for outputting a form relating to the medical examination work. Device 3, information reading device 4 for reading the information of the person who undergoes the medical examination
And a reception terminal 5 for accepting the examinee in carrying out the medical examination, a measuring device 6 for automatically measuring the examinee, and an analyzer 7 for automatically analyzing a sample collected from the examinee, The device and the terminal are connected via a wired or wireless network 8.

【0016】図2は、図1の構成を具体的な機器構成と
して示した図であり、ここでは、管理ファイル1Aは格
納装置1C内に格納するようになっている。また、印刷
装置3は、印刷装置本体3Aと印刷制御装置3Bとから
構成されている。また、情報読取装置4はマークシート
読取装置4Aとフロッピィディスク読取装置(FDD)
4Bとその制御装置4Cとから構成されている。さら
に、計測装置6は、身長、体重などの健診項目を自動ま
たは半自動で測定する測定器具6Aとその制御装置6B
とから構成されている。また、分析装置7は、血液等の
検体を分析する分析機7Bとその制御装置7Aとから構
成されている。健診業務作業状況把握装置1と、格納装
置1C,印刷制御装置3B,読取制御装置4C、計測制
御装置6B、分析制御装置7Aは、ネットワーク8によ
って接続されている。
FIG. 2 is a diagram showing the configuration of FIG. 1 as a concrete device configuration. Here, the management file 1A is stored in the storage device 1C. The printing device 3 is composed of a printing device main body 3A and a printing control device 3B. The information reading device 4 includes a mark sheet reading device 4A and a floppy disk reading device (FDD).
4B and its control device 4C. Further, the measuring device 6 includes a measuring instrument 6A for automatically or semi-automatically measuring health checkup items such as height and weight and a control device 6B therefor.
It consists of and. Further, the analyzer 7 is composed of an analyzer 7B for analyzing a sample such as blood and a controller 7A thereof. The medical examination work status recognizing device 1, the storage device 1C, the print control device 3B, the reading control device 4C, the measurement control device 6B, and the analysis control device 7A are connected by a network 8.

【0017】管理ファイル1Bに格納される情報は、検
査情報、企業団体情報、健診結果情報、健診契約情報な
どであり、格納装置1Cが、健診業務端末2、刷装置制
御装置3および読取制御装置4C、受付端末5、計測制
御装置6B、分析制御装置7Aとの間において健康診断
に関する情報の受渡しを行って格納する。
The information stored in the management file 1B includes examination information, company group information, medical examination result information, medical examination contract information, and the like, and the storage device 1C includes a medical examination work terminal 2, a printing device control device 3, and Information related to physical examination is stored and stored between the reading control device 4C, the reception terminal 5, the measurement control device 6B, and the analysis control device 7A.

【0018】図3は、健康診断業務の流れを示すフロー
チャートである。以下のフローは一般的な健康診断業務
の流れを示すものである。まず、1つの健康診断業務は
初めに健診計画作成行い(ステップ301)、次に健康
診断実施に必要な事前準備行い(ステップ302)、次
に健康診断実施を行い(ステップ303)、次に健康診
断実施後の事後処理を行う(ステップ304)。図4は
管理ファイル内に格納される健康診断管理計画の内容を
示す図である。管理ファイル1A内には複数の健康診断
に対応する健診計画情報が格納されている。1つの健診
計画には作業状況把握を行うための工程情報(工程1〜
n)が格納され、1つの工程情報には工程の内容を示す
工程コードおよび工程の開始日、終了日、工程の工数と
進捗および当該工程の前に必要となる前工程の情報を格
納する必要工程、および該当工程の作業状況として未着
手または作業中または完了を示す状況の各情報によって
構成されている。
FIG. 3 is a flow chart showing the flow of the medical examination work. The following flow shows the flow of general health checkup work. First, for one health checkup work, first a health checkup plan is created (step 301), then preliminary preparations necessary for the health checkup execution (step 302), then a health checkup execution (step 303), and then Post-processing after the health check is performed (step 304). FIG. 4 is a diagram showing the contents of the medical examination management plan stored in the management file. The management file 1A stores medical examination plan information corresponding to a plurality of medical examinations. Process information (process 1 to process 1) for grasping the work status is included in one medical examination plan.
n) is stored, and one process information needs to store the process code indicating the process content, the process start date, the process end date, the process man-hour and progress, and the previous process information required before the process. It is composed of each information of a process and a work status of the corresponding process, which indicates that the work has not been started or is in the process of being completed.

【0019】図4における工程情報は、開始日および終
了日および工数を設定することで期間の存在する工程と
して定義し、かつ工数に対する進捗を記述することで該
当工程の作業状況を記録するものである。これに対し、
開始日および工数および進捗を用いないことで期間が存
在しない期限のみの工程として定義するものもある。
The process information in FIG. 4 is defined as a process having a period by setting a start date, an end date, and man-hours, and records the work status of the process by describing the progress with respect to the man-hour. is there. In contrast,
In some cases, a start date, a man-hour, and a progress are not used, and thus a process is defined as a deadline only process that has no period.

【0020】図5は健診業務の作業状況の把握および作
業状況の表示処理を説明する図である。健診業務作業状
況把握装置1は、所定時間毎に管理ファイル1Aの内容
の判定処理を行い、健康診断業務の作業について作業期
限が過ぎている工程あるいは計算より求められる作業進
捗よりも遅れている場合に、注意情報あるいは警告情報
を作成し、表示装置1Bに表示すると共に、現在の健診
業務作業状況を表示装置1Bに表示する。
FIG. 5 is a diagram for explaining the process of grasping the work status and displaying the work status of the medical examination work. The medical examination work status recognizing device 1 determines the contents of the management file 1A at predetermined time intervals, and is behind the work progress required by the process or calculation for which the work deadline has passed for the work of the health examination work. In this case, caution information or warning information is created and displayed on the display device 1B, and the current health check work status is displayed on the display device 1B.

【0021】図6は健診状況の表示例を示す図である。
健診業務作業状況把握装置1が出力する画面情報は、健
康診断業務の作業状況を図示のように表示する健診状況
表示部21A、および健康診断業務の作業の遅れを示す
注意情報表示部21B、および健康診断業務の作業の期
限超過を示す警告情報表示部21Cより構成される。健
診状況表示部21Aでは、指定した複数の健診業務の作
業状況を表示可能であり、また注意情報表示部21Bお
よび警告情報表示部21Cでは全ての健診業務における
情報を一括表示可能になっている。
FIG. 6 is a diagram showing a display example of the medical examination status.
The screen information output by the medical examination work work status grasping device 1 includes a medical examination status display section 21A for displaying the work status of the medical examination work as shown in the figure, and a caution information display section 21B showing the delay of the medical examination work. , And a warning information display section 21C indicating that the work of the health checkup work is overdue. The medical examination status display unit 21A can display work statuses of a plurality of designated medical examination tasks, and the caution information display unit 21B and the warning information display unit 21C can collectively display information on all medical examination tasks. ing.

【0022】図7は健診状況表示部21Aの詳細を示す
図であり、ここでは健康診断業務内の作業状況を日付と
関連付けて表示する例を示している。まず、図4に示し
た管理ファイル1A内の各健診計画の開始日および終了
日の情報を読出し、開始日の早いものから順に整理し、
横軸を時間軸とする図示するような工程管理図22の中
に、各健診計画の開始日と終了日とを結ぶ線を描画す
る。
FIG. 7 is a diagram showing the details of the health checkup status display section 21A, and here shows an example in which the work status in the health checkup work is displayed in association with the date. First, the information on the start date and end date of each medical examination plan in the management file 1A shown in FIG. 4 is read out, and the information is sorted in order from the earliest start date,
A line connecting the start date and the end date of each medical examination plan is drawn in the process control chart 22 with the horizontal axis as the time axis.

【0023】図7における工程を示す線は22Aで表さ
れるように工程の作業状況により、作業済あるいは作業
残の工数を区別して表示されるものでこれら作業の状況
は図4に示す管理ファイル1A内の開始日および終了日
および工数および工数の進捗を元に、作業期間の全体の
工数に占める進捗工数の割合を用いて表示を行う。例え
ば、作業済みの工程の割合は帯状の枠線の中に斜線を入
れて表し、残りの工程の割合は帯状の枠線の中に網点を
入れて表わすようになっている。
The line indicating the process in FIG. 7 is displayed by distinguishing the number of man-hours that have been worked or the number of work remaining depending on the work status of the process as indicated by 22A. The status of these works is shown in the management file shown in FIG. Based on the start date and end date in 1A, the man-hours, and the progress of the man-hours, the display is performed by using the ratio of the progress man-hours to the total man-hours of the work period. For example, the percentage of completed processes is represented by hatching in a strip-shaped frame line, and the percentage of remaining processes is represented by inserting dots in a strip-shaped frame line.

【0024】図8は図6の健診状況表示部21Aの他の
例を示す図である。これは、工程Dにおいて、その前に
実施する必要がある必要工程として工程Aの指定を行っ
た場合の例を示すものであり、工程Dは工程Aの完了を
必要とすることを示す関連線23Aによって描画する。
FIG. 8 is a diagram showing another example of the medical examination status display portion 21A of FIG. This shows an example in which the process A is designated as a necessary process that needs to be performed before the process D, and the process D requires the completion of the process A. 23A for drawing.

【0025】図9は健診業務作業状況について作業判定
処理を示すフローチャートである。まず、管理ファイル
内1Aの健診計画情報を取得し(ステップ901)、そ
の取得した健診計画情報内の工程情報を取得し(ステッ
プ902)、当該工程の作業が完了しているか否かの判
断を行う(ステップ903)。当該工程の状況が完了以
外の未着手あるいは作業中である場合はシステム内の該
当日の日付が工程完了日を過ぎているかの判定を行い
(ステップ904)、日付が経過している場合は警告情
報の作成を行い(ステップ905)、工程完了日以前で
あれば管理ファイル1A内の工程情報の開始日および終
了日および工数および進捗より期間における当該日の予
定進捗を全体工数からの比率で求める(ステップ90
6)。予定進捗よりも遅れが生じているかを判断し(ス
テップ907)、遅れが生じている場合は注意情報の作
成を行う(ステップ908)。これら1つの工程の判定
処理が終了下ならば、当該健診計画の残り工程の判定処
理を行い(ステップ908)、さらに当該健診計画の全
工程の判定を行った場合は次の健診計画の判定処理を行
い(ステップ909)これらの処理を繰り返すことで全
ての健診計画の判定処理を行う。
FIG. 9 is a flow chart showing the work judging process for the health check work status. First, the medical examination plan information of 1A in the management file is acquired (step 901), the process information in the acquired medical examination plan information is acquired (step 902), and whether or not the work of the relevant process is completed. A judgment is made (step 903). If the status of the process is not yet completed or is in the process of being processed, it is judged whether the date of the relevant date in the system is past the process completion date (step 904), and if the date has passed, a warning is issued. Information is created (step 905), and if it is before the process completion date, the scheduled progress of the process date in the management file 1A is calculated as a ratio from the total man-hour based on the start date and end date and the man-hour and progress. (Step 90
6). It is judged whether or not there is a delay from the scheduled progress (step 907), and if there is a delay, caution information is created (step 908). If the determination process of one of these processes is completed, the determination process of the remaining processes of the medical examination plan is performed (step 908), and if the determination of all the processes of the medical examination plan is performed, the next medical examination plan is performed. (Step 909) By repeating these processes, the determination process for all medical examination plans is performed.

【0026】次に、図3の健康診断業務の流れにおける
図1の健診業務作業状況把握装置1の作業把握処理につ
いて説明する。図3の健診計画作成の段階(ステップ3
01)は、図1の健診業務端末2を用いて行うものであ
り、新規に健診計画の作成を行うと、この健診計画作成
時に、健診業務端末2上の業務処理プログラムにより健
診業務作業状況把握装置1内の管理ファイル1Aに健診
計画情報が作成される。このとき、健診計画作成業務で
定める健診計画として検査内容および検査方法および受
診者数および健診実施日を記録すると同時に、これら検
査内容および検査方法に関連付けられている必要工程を
管理ファイル1A内の該当健診計画内の工程情報として
記録する。
Next, the work grasping process of the health checkup work state grasping apparatus 1 of FIG. 1 in the flow of the health examination work of FIG. 3 will be described. Stage of medical examination plan creation in Figure 3 (Step 3
01) is performed by using the medical examination work terminal 2 of FIG. 1. When a new medical examination plan is created, the health checkup program is executed by the business processing program on the medical examination work terminal 2 when the new medical examination plan is created. Medical examination plan information is created in the management file 1A in the medical examination work status grasping apparatus 1. At this time, the inspection content, the inspection method, the number of examinees, and the date of the medical examination are recorded as a medical examination plan defined in the medical examination plan creation work, and at the same time, the necessary steps associated with these inspection contents and the inspection method are managed in the management file 1A. It is recorded as the process information in the applicable medical examination plan.

【0027】前述の必要工程は、健診計画と関連付けて
予め健診情報マスタファイルとして定義されるものであ
り、健診計画作成時に健診業務端末2は健診情報マスタ
ファイルを参照して必要工程を管理ファイル内1Aに記
録する。ここで必要工程の開始日および終了日および工
数は、健診計画情報より期間が定まる工程であれば自動
的に定めることが出来るが、自動算出が不可能である場
合は期限入力を要求するものとする。また同時に、健康
診断の実施に必要となる書類および記録媒体の提出ある
いは受取など健康診断規定業務の工程についても、開始
日および工数が存在しない終了日のみの工程として管理
ファイル1A上に記録される。
The above-mentioned necessary steps are defined in advance as a medical examination information master file in association with the medical examination plan, and the medical examination operation terminal 2 needs to refer to the medical examination information master file when creating the medical examination plan. The process is recorded in the management file 1A. Here, the start date, end date, and man-hour of the required process can be automatically determined if the process has a period determined from the medical examination plan information, but if automatic calculation is not possible, a deadline input is required. And At the same time, the process of the health checkup regulation work such as the submission or receipt of documents and recording media necessary for the health checkup is also recorded in the management file 1A as a process of only the start date and the end date with no man-hours. .

【0028】図10および図11は、前述の健診計画の
必要工程について示す図である。図10に示すように健
診業務端末2にて健診計画34の作成を行う場合におい
て、該当健康診断にて健康診断実施日および受診者数お
よび検査内容の登録を行うと同時に、実施する検査に従
い健診情報マスタファイル35を参照して必要となる工
程情報を図11の管理ファイル1A内の工程情報36に
格納する。また同様に、健診計画に規定される必要帳
票、および必要となる情報読込みに関する工程について
も健診情報マスタファイル35に定める情報を参照して
管理ファイル1A内の当該健診計画の工程情報として格
納する。
FIG. 10 and FIG. 11 are diagrams showing necessary steps of the above-mentioned medical examination plan. As shown in FIG. 10, when the medical examination plan 34 is created by the medical examination work terminal 2, the medical examination execution date, the number of examinees, and the examination content are registered at the same medical examination, and the examination to be performed at the same time. Accordingly, the required process information is stored in the process information 36 in the management file 1A of FIG. 11 by referring to the medical examination information master file 35. Similarly, with respect to the necessary forms specified in the medical examination plan and the process related to the necessary information reading, the information specified in the medical examination information master file 35 is referred to as the process information of the medical examination plan in the management file 1A. Store.

【0029】図3の事前準備の段階(ステップ302)
は、健診業務端末2を用いて健康診断実施に必要となる
事前準備を行う業務であり、健康診断実施における検査
スケジュールの作成や検査機器の用意、および健康診断
実施のスタッフのスケジュールなどを行い、また同時に
健康診断を受診する受診者の個人情報の情報読込を行
う。このとき、該当健診計画の事前準備工程として定め
られた規定帳票、例えば作業指示書などを図1の印刷装
置3にて出力を行った場合、印刷制御装置3Bは管理フ
ァイル1A内の該当健診計画の該当工程の状況を「完
了」と記録することにより、該当工程の作業状況の情報
管理を行う。
Pre-preparation stage of FIG. 3 (step 302)
Is a task to perform the necessary preparations for the health checkup using the health checkup terminal 2, creating an inspection schedule for the health checkup, preparing inspection equipment, and scheduling the staff for the health checkup. Also, at the same time, the personal information of the examinees who undergo the medical examination is read. At this time, when the specified form defined as the preparatory process of the relevant medical examination plan, for example, the work instruction sheet, is output by the printing device 3 in FIG. 1, the print control device 3B causes the corresponding health information in the management file 1A. By recording the status of the relevant process in the examination plan as "completed", the work status information of the relevant process is managed.

【0030】また、健康診断を受診する対象者の情報を
取り込む工程では、該当工程の作業の工数を対象者数と
して設定し、かつ情報読取装置4より該当健診計画の対
象者情報として取り込んだ場合に該当工程の進捗を進め
ることで該当工程の作業状況を管理し、進捗が作業工数
と同じになったときに該当工程の状況を完了とする。こ
こで、対象者の総数は健診業務端末2における健診計画
作成処理時の対象者数の設定を行う際に自動的に管理フ
ァイル1Aの該当工程に記録される。
Further, in the process of taking in the information of the target person who receives the medical examination, the man-hours of the work of the relevant process are set as the number of target persons, and the information reading device 4 fetches the target person information of the relevant medical examination plan. In this case, the work status of the relevant process is managed by advancing the progress of the relevant process, and the status of the relevant process is completed when the progress becomes equal to the work man-hour. Here, the total number of target persons is automatically recorded in the corresponding process of the management file 1A when setting the number of target persons during the medical examination plan creation processing in the medical examination work terminal 2.

【0031】さらに、健康診断実施に必要となる受診票
の出力作業においても、受診対象者数を該当工程の工数
として健診計画作成時に定め、印刷装置3における受診
票の出力枚数を印刷装置3が進捗として管理ファイル1
Aに記録することにより該当工程の作業状況を管理し、
全ての出力枚数が工数として定められた印刷枚数に達し
たときに該当工程状況を「完了」とする。
Further, also in the work of outputting the medical examination sheet necessary for conducting the medical examination, the number of persons to be examined is set as the man-hour of the relevant process at the time of the medical examination plan preparation, and the number of sheets of the medical examination sheet output by the printing apparatus 3 is determined by the printing apparatus 3. Management file 1 as progress
By recording in A, the work status of the relevant process is managed,
When all the output sheets have reached the number of printed sheets set as the man-hour, the corresponding process status is set to “completed”.

【0032】図3の健診実施の段階は、健康診断を実際
に行うものであり、対象者の受付、対象者の計測および
検査あるいは医師の診察などの検査行為が行われる。こ
のとき、該当健診計画の受付端末5における受付工程の
工数を該当健診の受診者数とし、また該当健診計画の計
測装置6における計測工程の工数を計測対象者数とし、
また該当健診計画の分析装置7における分析数を分析対
象者数として、該当健診計画作成時に健診業務端末2が
管理ファイル1Aに記録する。
At the stage of the medical examination shown in FIG. 3, the physical examination is actually performed, and the medical examination is performed such as reception of the subject, measurement and examination of the subject, or examination by a doctor. At this time, the man-hours of the reception process at the reception terminal 5 of the relevant medical examination plan are taken as the number of people receiving the corresponding medical examination, and the man-hours of the measuring process at the measuring device 6 of the relevant medical examination plan is taken as the number of measurement subjects,
In addition, the number of analysis subjects in the analysis device 7 of the relevant medical examination plan is recorded in the management file 1A by the medical examination work terminal 2 when the corresponding medical examination plan is created.

【0033】健康診断の受診者が受付端末5にて受付を
行うと、受付端末5は該当工程の進捗を1つ進め、該当
進捗が工数として設定された受診対象者数に達すると該
当工程の状況を「完了」とする。同様に、計測装置6お
よび分析装置7においても、対象者の計測および分析の
実施数を進捗として記録することで該当業務の作業状況
を管理し、進捗が工数として設定された対象数に達した
ならば該当工程の状況を「完了」とする。
When the person who receives the medical examination receives the information at the reception terminal 5, the reception terminal 5 advances the progress of the corresponding process by one, and when the progress reaches the number of people to be examined set as the man-hour, The status is “completed”. Similarly, the measuring device 6 and the analyzing device 7 also manage the work status of the relevant work by recording the number of measurement and analysis performed by the target person as the progress, and the progress reaches the target number set as the man-hour. If so, the status of the relevant process is set to “complete”.

【0034】図3の事後処理の段階では、健診実施の段
階における各種健康診断情報の情報処理、および情報処
理結果の出力および受診者への結果発送、および健康診
断に関する請求などの工程が存在する。このとき、該当
健診計画の受診者数を健康診断情報の情報処理工数と
し、同時に情報処理結果出力の工数としても設定し、ま
た発送ならびに請求は開始日および工数が存在しない終
了日のみの工程として健診計画作成時に健診業務端末2
が管理ファイル1Aに記録する。
At the stage of the post-processing shown in FIG. 3, there are processes such as information processing of various types of health checkup information at the stage of health checkup, output of information processing results and sending of the results to the examinee, and request for health checkup. To do. At this time, the number of examinees in the relevant medical examination plan is set as the information processing man-hour of the medical examination information, and at the same time, set as the man-hour of the information processing result output. As a medical examination work terminal 2 at the time of making a medical examination plan
Records in the management file 1A.

【0035】また、健康診断受診者の健診情報を図1の
健診業務端末2にて情報処理する毎に管理ファイル1A
の該当工程の進捗として記録し、また同様に受診者の健
康診断結果を図1の印刷装置3にて出力する毎に管理フ
ァイル1Aの該当工程の進捗を記録することで該当工程
の作業状況を管理し、進捗が工数として設定された対象
数に達すると該当工程の状況を「完了」とする。また、
これら結果の発送および健診計画実施に伴う請求などの
手続きが完了したならば、管理ファイル1Aの該当工程
の状況を「完了」に変更する。
Further, every time the health checkup information of the health checkup examiner is processed by the health checkup operation terminal 2 shown in FIG.
The progress of the corresponding process in the management file 1A is recorded every time the health checkup result of the examinee is output by the printing apparatus 3 in FIG. When the progress reaches the number of targets set as man-hours, the status of the relevant process is set to “complete”. Also,
When the procedures such as the shipping of these results and the billing accompanying the implementation of the medical examination plan are completed, the status of the corresponding process in the management file 1A is changed to "completed".

【0036】前述の工程情報の状況について、健診計画
の作成、および事前準備に伴う帳票の出力および情報読
取装置4での情報入力、および健康診断実施に伴う受付
および計測および検体の分析、および事後処理に伴う健
診情報処理および健康診断結果の出力については自動的
に管理ファイル1Aの該当工程に進捗と同時に状況が記
録されるが、これ以外の書類の受渡あるいは健康診断の
契約に関する交渉など自動的に作業の把握が出来ない工
程の管理については、人為的に管理ファイル1Aに該当
工程の進捗が記録され、その記録された進捗情報を元に
健診業務作業状況把握装置1が作業状況の把握を行う。
Regarding the status of the above-mentioned process information, preparation of a medical examination plan, output of a form accompanying the advance preparation and information input in the information reading device 4, reception and measurement and analysis of a sample accompanying the execution of the physical examination, and Regarding post-processing health check information processing and output of health check results, the status is automatically recorded in the relevant process of management file 1A at the same time as progress is made, but delivery of other documents or negotiation regarding health check contracts, etc. Regarding the management of the process that cannot automatically grasp the work, the progress of the relevant process is artificially recorded in the management file 1A, and the health check work work situation grasping device 1 makes the work situation based on the recorded progress information. To understand.

【0037】以上のように、本実施形態によれば、健康
診断業務に特有なデータの入力および出力に着目した健
康診断業務の作業状況把握を行うことにより、健康診断
業務の作業状況を自動的に把握することが可能となる。
また、表示装置画面に、健診計画の作業状況が理解しや
すい工程管理図として表示され、また複数健診計画の作
業状況を比較することで複数の健診計画の進捗管理が容
易になると同時に、工程の遅延を示す注意情報および警
告情報の出力(表示)により、遅延工程の発見が容易に
なる。また、自動的に作業状況を把握できない書類の受
渡および打合せなどの工程について、人為的に進捗状況
を入力することにより、これらの工程も管理対象とする
ことができ、健康診断業務の幅広い範囲について作業状
況の把握を行うことが可能となるなど、複数の健康診断
業務の進捗を一括して把握し、これにより健康診断業務
の進捗状況を精度良く把握し、健康診断業務の効率化に
貢献することができる。
As described above, according to the present embodiment, the work status of the health check job is automatically identified by grasping the work status of the health check job focusing on the input and output of the data peculiar to the health check job. It becomes possible to grasp.
In addition, the work status of the health checkup plan is displayed on the display screen as an easy-to-understand process control chart, and the work status of multiple health checkup plans can be compared to facilitate the progress management of multiple health checkup plans. The output (display) of the caution information and the warning information indicating the delay of the process facilitates the discovery of the delayed process. In addition, for processes such as delivery and meetings of documents for which the work status cannot be automatically grasped, by manually entering the progress status, these processes can also be subject to management. It is possible to grasp the progress of multiple health checkups collectively, such as by being able to grasp the work status, thereby accurately grasping the progress of health checkups and contributing to the efficiency of health checkups. be able to.

【0038】[0038]

【発明の効果】以上説明したように、本発明によれば、
業務の進行状況を業務特有のデータの入力および出力か
ら自動的に把握し、また複数の健康診断業務の進捗を一
括して把握し、これにより健康診断業務の進捗状況を精
度良く把握し、健康診断業務の効率化に貢献することが
できる。
As described above, according to the present invention,
Automatically grasp the progress of work from the input and output of data specific to the work, and collectively grasp the progress of multiple health checkups, thereby accurately grasping the progress of health checkups It can contribute to the efficiency of diagnostic work.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態を示すシステム構成図であ
る。
FIG. 1 is a system configuration diagram showing an embodiment of the present invention.

【図2】図1の構成における具体的な機器構成を示す図
である。
FIG. 2 is a diagram showing a specific device configuration in the configuration of FIG.

【図3】健康診断業務の流れを示した図である。FIG. 3 is a diagram showing a flow of health checkup work.

【図4】健康診断管理計画に用いる情報の例を示す図で
ある。
FIG. 4 is a diagram showing an example of information used for a health checkup management plan.

【図5】健診業務の作業状況を把握する処理の説明図で
ある。
FIG. 5 is an explanatory diagram of a process of grasping the work status of the medical examination work.

【図6】健診状況の表示例を示す図である。FIG. 6 is a diagram showing a display example of a medical examination status.

【図7】図6の健診状況表示部の詳細を示す図である。FIG. 7 is a diagram showing details of a medical examination status display unit in FIG.

【図8】図6の健診状況表示部の他の例を示す図であ
る。
8 is a diagram showing another example of the medical examination status display unit of FIG.

【図9】健診業務作業状況について作業判定処理を示す
フローチャート
FIG. 9 is a flowchart showing work determination processing for health check work status.

【図10】健診業務端末における健診計画作成と関連す
る工程情報を示す図である。
FIG. 10 is a diagram showing process information related to a medical examination plan creation in the medical examination work terminal.

【図11】管理ファイルへの情報格納例を示す図であ
る。
FIG. 11 is a diagram showing an example of information storage in a management file.

【符号の説明】[Explanation of symbols]

1…健診業務作業状況把握装置、1A…管理ファイル、
1B…表示装置、2…健診業務端末、3…印刷装置、4
…情報読取装置、5…受付端末、6…計測装置、7…分
析装置、8…ネットワーク、10…健診業務端末、11
A…印刷装置、21A…健診状況表示部、21B…注意
情報表示部、21C…警告情報表示部。
1 ... Medical checkup work status grasping device, 1A ... Management file,
1B ... Display device, 2 ... Medical checkup terminal, 3 ... Printing device, 4
... information reading device, 5 ... reception terminal, 6 ... measurement device, 7 ... analysis device, 8 ... network, 10 ... medical examination service terminal, 11
A ... Printing device, 21A ... Health checkup status display section, 21B ... Attention information display section, 21C ... Warning information display section.

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 ネットワークによって接続された複数の
健康診断業務の健診計画ならびに事前準備計画ならびに
事後処理行う健診業務端末と、帳票を出力する出力装置
と、健康診断を受診する対象者情報を読み込む情報読取
装置と、健康診断の受診者受付を行う受付端末と、受診
者の検査を自動的に行う計測装置と、受診者より採取し
た検体の自動解析を行う分析装置と、健康診断業務の作
業状況を把握する作業状況把握装置とによって構成され
る健康診断業務システムにおける健康診断業務支援方法
であって、 前記健診業務端末における健康診断の健診計画作成時に
前記作業状況把握装置内の管理ファイルに当該健診計画
の管理情報を前記健診業務端末より作成するステップ
と、 前記出力装置における規定帳票の出力時に、その出力状
況を前記管理ファイルに記録するステップと、 前記情報読取装置における規定記録媒体の情報読取時
に、その読取り状況を前記管理ファイルに記録するステ
ップとを備えることを特徴とする健康診断業務支援方
法。
1. A health checkup terminal for conducting a health checkup plan and preparatory plan and post-processing for a plurality of health checkups connected by a network, an output device for outputting a form, and information on a person who receives a health checkup. An information reading device to read, a reception terminal for receiving medical checkups, a measuring device that automatically examines the medical examinee, an analyzer that automatically analyzes the samples collected from the medical examinee, and a medical examination service. A method for supporting a health checkup work in a health checkup work system configured with a work situation checker for checking the work situation, wherein management in the work situation checker at the time of creating a health checkup plan for the health checkup at the checkup work terminal A step of creating management information of the medical examination plan in a file from the medical examination work terminal; And recording the serial management file, when reading information specified recording medium in the information reading apparatus, medical examination service support method characterized by comprising the step of recording the read status to the management file.
【請求項2】 前記受付端末における受診者の受付時
に、その受診者数を前記管理ファイルに記録するステッ
プと、前記計測装置による受診者の検査時に検査を行っ
た受診者数を前記管理ファイルに記録するステップと、
前記分析装置における検体の分析時に、その分析数を前
記管理ファイルに記録するステップとをさらに備えるこ
とを特徴とする請求項1に記載の健康診断業務支援方
法。
2. A step of recording the number of examinees in the management file at the time of accepting the examinees at the reception terminal, and the number of examinees who have been examined at the time of the examination of the examinees by the measuring device in the management file. The steps to record,
The method according to claim 1, further comprising the step of recording the number of analyzes in the management file when the sample is analyzed by the analyzer.
【請求項3】 前記管理ファイル内の全ての健康診断業
務の作業進捗状況を所定時間毎に検査し、期限時期を過
ぎている作業については警告情報を作成し、予定時期よ
りも遅れている作業については注意情報を作成し、関係
者に通知するステップをさらに備えることを特徴とする
請求項1または2に記載の健康診断業務支援方法。
3. The work progress status of all the medical examination work in the management file is inspected at predetermined time intervals, warning information is created for the work overdue, and work behind the scheduled time 3. The method according to claim 1 or 2, further comprising a step of creating caution information and notifying relevant persons.
【請求項4】 ネットワークによって接続された複数の
健康診断業務の健診計画ならびに事前準備計画ならびに
事後処理行う健診業務端末と、帳票を出力する出力装置
と、健康診断を受診する対象者情報を読み込む情報読取
装置と、健康診断の受診者受付を行う受付端末と、受診
者の検査を自動的に行う計測装置と、受診者より採取し
た検体の自動解析を行う分析装置と、健康診断業務の作
業状況を把握する作業状況把握装置とによって構成され
る健康診断業務システムにおける健康診断業務支援方法
であって、 前記健診業務端末が、健康診断の健診計画作成時に前記
作業状況把握装置内の管理ファイルに当該健診計画の管
理情報を作成する手段を備え、 前記出力装置が、規定帳票の出力時に、その出力状況を
前記管理ファイルに記録する手段と、 前記情報読取装置が、規定記録媒体の情報読取時に、そ
の読取り状況を前記管理ファイルに記録する手段とを備
えることを特徴とする健康診断業務支援システム。
4. A health checkup terminal for conducting a health checkup plan and advance preparation plan and post-processing for a plurality of health checkups connected by a network, an output device for outputting a form, and information on a target person for a health checkup. An information reading device to read, a reception terminal for receiving medical checkups, a measuring device that automatically examines the medical examinee, an analyzer that automatically analyzes the samples collected from the medical examinee, and a medical examination service. A method for supporting health checkup work in a health checkup work system configured with a work situation checker for checking the work situation, wherein the health checkup work terminal has a function A means for creating management information of the medical examination plan in a management file is provided, and the output device records the output status in the management file when the prescribed form is output. When the information reading device, medical examination service support system, characterized in that it comprises at reading information specified recording medium, and means for recording the read status to the management file.
【請求項5】 前記受付端末が受診者の受付時にその受
診者数を前記管理ファイルに記録する手段と、前記計測
装置が受診者の検査時に検査を行った受診者数を前記管
理ファイルに記録する手段と、前記分析装置が検体の分
析時にその分析数を前記管理ファイルに記録する手段と
備えることを特徴とする請求項4に記載の健康診断業務
支援方法。
5. The means for the reception terminal to record the number of examinees in the management file at the time of reception of the examinees, and the number of the examinees examined by the measuring device during the examination of the examinees in the management file. 5. The medical examination work support method according to claim 4, further comprising means for performing the analysis, and means for recording the analysis number in the management file when the analysis device analyzes the sample.
【請求項6】 前記作業状況把握装置が、前記管理ファ
イル内の全ての健康診断業務の作業進捗状況を所定時間
毎に検査し、期限時期を過ぎている作業については警告
情報を作成し、予定時期よりも遅れている作業について
は注意情報を作成し、関係者に通知する手段を備えるこ
とを特徴とする請求項4または5に記載の健康診断業務
支援システム。
6. The work status ascertaining device inspects the work progress statuses of all the health check jobs in the management file at predetermined time intervals, creates warning information for the work that is overdue, and schedules the work. The health check service support system according to claim 4 or 5, further comprising means for creating caution information for a work that is behind the time and notifying the concerned person.
JP2001284819A 2001-09-19 2001-09-19 Method and system for supporting medical examination business Pending JP2003091588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001284819A JP2003091588A (en) 2001-09-19 2001-09-19 Method and system for supporting medical examination business

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001284819A JP2003091588A (en) 2001-09-19 2001-09-19 Method and system for supporting medical examination business

Publications (1)

Publication Number Publication Date
JP2003091588A true JP2003091588A (en) 2003-03-28

Family

ID=19108077

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001284819A Pending JP2003091588A (en) 2001-09-19 2001-09-19 Method and system for supporting medical examination business

Country Status (1)

Country Link
JP (1) JP2003091588A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009276830A (en) * 2008-05-12 2009-11-26 Toshiba Corp Medical image diagnostic apparatus and control program thereof
JP2017107616A (en) * 2012-09-14 2017-06-15 東日本メディコム株式会社 Progress state management system and program
JP2019212264A (en) * 2018-05-31 2019-12-12 一般社団法人テレメディーズ Medical examination support system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09138823A (en) * 1995-09-11 1997-05-27 Hitachi Ltd Progress control method for design and development and its system, control method for designing and developing project and its system
JPH10162077A (en) * 1996-11-26 1998-06-19 Syst:Kk Medical management system
JP2000048098A (en) * 1998-07-28 2000-02-18 Canon Inc Data management device, image photographing device, image processor, data management system, and recording medium
JP2001184420A (en) * 1999-12-27 2001-07-06 Toshiba Logistics Corp System and device for distribution

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09138823A (en) * 1995-09-11 1997-05-27 Hitachi Ltd Progress control method for design and development and its system, control method for designing and developing project and its system
JPH10162077A (en) * 1996-11-26 1998-06-19 Syst:Kk Medical management system
JP2000048098A (en) * 1998-07-28 2000-02-18 Canon Inc Data management device, image photographing device, image processor, data management system, and recording medium
JP2001184420A (en) * 1999-12-27 2001-07-06 Toshiba Logistics Corp System and device for distribution

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009276830A (en) * 2008-05-12 2009-11-26 Toshiba Corp Medical image diagnostic apparatus and control program thereof
JP2017107616A (en) * 2012-09-14 2017-06-15 東日本メディコム株式会社 Progress state management system and program
JP2019036355A (en) * 2012-09-14 2019-03-07 東日本メディコム株式会社 Information display system, information display method and program
JP2019212264A (en) * 2018-05-31 2019-12-12 一般社団法人テレメディーズ Medical examination support system

Similar Documents

Publication Publication Date Title
JP3656692B2 (en) Clinical examination system and examination status management method
US11250936B1 (en) Universal application integrator
WO2012002287A1 (en) Medical care support system and method of supporting medical care
Yusof et al. Evaluation of the clinical process in a critical care information system using the Lean method: a case study
CA2560934A1 (en) System for processing and planning treatment data
JP5613495B2 (en) Clinical laboratory information system and computer program
US20120245954A1 (en) Medical Record Collection System
Rotondi et al. Benchmarking the perioperative process. I. Patient routing systems: a method for continual improvement of patient flow and resource utilization
JP2003329690A (en) Clinical examination system
WO2020174895A1 (en) Management system
CN106030647A (en) Gene/chromosome test management system, test management server, client terminal, method for gene/chromosome test management method, and program
US6401055B1 (en) Method and system of measuring and quantifying inefficiencies in a healthcare facility
JP2002236744A (en) System for supporting medical management
JP2006031264A (en) Clinical inspection information control device, clinical inspection information control method, and clinical inspection information control program
JP2003091588A (en) Method and system for supporting medical examination business
JP2009168731A (en) Approval system of automatic analysis result, automatic analysis system capable of approving analysis result, and approval method of automatic analysis result
TWI313168B (en) Systems for health examination results processing, systems for health examination, and methods for processing health examination
JPWO2003017162A1 (en) Inspection request management device
JP2004030143A (en) System and apparatus for clinical trial information processing management, and method for clinical trial information processing
US20140129244A1 (en) Modifying time data values based on segment rules
JP2002049692A (en) Data processing system and method for medical checkup, and computer readable recording medium
JP2003108663A (en) System, device, method and program for clinical trial information management, and recording medium
DK1455305T3 (en) PROCEDURE FOR PROVIDING QUANTITATIVE DATA AND PICTURES FOR USE IN PATHOLOGICAL ANALYSIS
JP7282820B2 (en) Processing data from medical analyzers
Sermeus et al. Updating the Belgian nursing minimum data set: framework and methodology

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040517

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061016

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061018

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070227