Prior art keywords
resource
work
management system
process management
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001121729A
Other languages
Japanese (ja)
Other versions
JP4831882B2 (en
Inventor
Kenji Oyama
堅司 大山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEING KK
Being Co Ltd
Original Assignee
BEING KK
Being Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEING KK, Being Co Ltd filed Critical BEING KK
Priority to JP2001121729A priority Critical patent/JP4831882B2/en
Publication of JP2002318947A publication Critical patent/JP2002318947A/en
Application granted granted Critical
Publication of JP4831882B2 publication Critical patent/JP4831882B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To solve the problem that the adjustment of a process schedule is difficult with respect to a minute adjustment in site level including the diligent preparation of a necessary resource every day in a conventional construction site mostly having only a cellular phone and a daily report as information sharing means in the present circumference. SOLUTION: This process management system using a network comprises a field terminal, a center server, and an external resource server. This system further comprises a means for ordering an external resource from the field terminal, and a confirmation means thereof. This system also comprises an external master to be connected to the outside such as Internet or the like to add an order means for personnel or material, whereby daily order and order receipt can be smoothened.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、土木工事などの工
程管理、プロジェクト管理を、管理業務側および現場側
の連携技術に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technology for coordinating process management and project management for civil engineering work and the like on a management work side and a site side.

【0002】[0002]

【従来の技術】土木工事などの工事予算を立てる場合に
は、見積もりで作成した積算データである設計書と過去
の工事の実績データ等に基づいて実行予算を作成してい
た。「実行予算」とは、土木工事などの請負工事の各作
業をコスト面からみた具体的な実行計画であり、工事の
開始から終了に至るまでの全期間のコスト管理の目標値
となるものである。実行予算書においては、請け負った
工事を自社において実際いくらでできるかを算出する。
2. Description of the Related Art When setting up a construction budget for civil engineering work or the like, an execution budget is created based on a design document, which is integrated data created by estimation, and actual data of past construction work. The “execution budget” is a concrete execution plan from the viewpoint of cost for each work of contract work such as civil engineering work, and it is the target value of cost management for the entire period from the start to the end of the work. is there. In the execution budget, the amount of actual contracted work can be calculated by the company.

【0003】即ち、設計書は、例えば行政機関等によっ
て定められている一般的な材料、機械、単価等を使って
作成されるが、実行予算では、自社で実際に使う材料、
機械等の単価を用いて計算することにより、自社のコス
トを予測する。
[0003] That is, a design document is created using, for example, general materials, machines, unit prices, and the like, which are determined by an administrative agency or the like.
By calculating using the unit price of the machine, etc., the cost of the company is predicted.

【0004】次に、実行予算を基に、工事に含まれる各
工種の期間を決定する。そして、各工種や資源の投入期
間を表した表が工程表である。従来の工程表作成システ
ムは、実行予算を参考にして工程表を作成するものであ
り、工種別、資源別に実行予算から工程表を作成してい
た。
Next, the period of each type of work included in the construction is determined based on the execution budget. Then, a table showing the input period of each type of construction and resources is the process chart. The conventional process schedule creation system creates a process schedule with reference to an execution budget, and creates a process schedule from an execution budget for each process type and resource.

【0005】[0005]

【発明が解決しようとする課題】特開2000−250
975号公報には、同じ出願人による「工程表作成シス
テム」が開示されている。これによれば、工程表の作成
は実行予算から起こされている。しかしながら、予算を
作成する管理部門とは別に、土木、建築工事の作業の8
0%以上は現場においてなされている。現場において
は、臨機応変に監督者は対処しなければならず、また、
外での作業がメインであるので、天候などの外的要因に
よって、作成された工程表どおりにこなすことは難し
い。これは、現場監督が翌日ないしは2,3日後の工程を
考えて必要な機材、人員を確保しなければならないこと
を意味する。
Problems to be Solved by the Invention JP-A-2000-250
Japanese Patent Application Publication No. 975 discloses a "process table creation system" by the same applicant. According to this, the creation of the process chart is derived from the execution budget. However, apart from the management department that creates the budget, the civil engineering and construction work 8
More than 0% is done on site. In the field, supervisors must respond on a flexible basis,
Since the work outside is the main, it is difficult to work according to the created schedule due to external factors such as weather. This means that the site supervisor must secure the necessary equipment and personnel considering the process the next day or a few days later.

【0006】また、建設工事につきものとして、直近の
人員、機材、資源の確保を行わなければならないが、通
常稼働率を上げるため、外注や請負(日雇い)、リース
などその日一日のための発注などの業務が頻繁に発生す
る。しかしながら、現場での情報共有手段は携帯電話と
日報のみというのが大方の建設現場の現状であり、1日
ごとに必要な資源手当てをこまめにすることをはじめと
して、現場レベルでの微調整に関して受発注を伴う、工
程表の調整は困難であるという課題があった。
[0006] In connection with construction work, it is necessary to secure the latest personnel, equipment and resources, but in order to raise the operating rate, outsourcing, contracting (daily employment), leasing such as leasing, etc. Such operations frequently occur. However, most of the current construction sites have only a mobile phone and a daily report as the only means of sharing information at the site. Regarding fine adjustments at the site level, including frequent diligence of necessary resources every day, There was a problem that it was difficult to adjust the process schedule with ordering.

【0007】[0007]

【課題を解決するための手段】そこで、本発明の発明者
は、現場端末とセンターサーバと外部リソースサーバと
からなる工程管理システムにおいて、現場端末から外部
リソースの発注手段と確認手段を有することを特徴とす
るネットワークを用いた工程管理システムを考え出し
た。これはインターネットなど外部に接続する外部マス
タを設けて人材や資材の発注手段を付加することによ
り、日々の受発注を円滑にすることを特徴とする。
Therefore, the inventor of the present invention has a process management system comprising a site terminal, a center server, and an external resource server. A process management system using the characteristic network was devised. This is characterized by providing an external master connected to the outside such as the Internet and adding means for ordering human resources and materials to facilitate daily ordering.

【0008】さらに、外部リソースとは、人材データベ
ースや建機ならびに資材データベースを保有することを
特徴とする。この人材データベースには、スキル、有資
格、年齢、過去の利用日、過去の支払実績などの種別が
設定されており、そのキーに基づいてマッチングさせる
ことを特徴とする。また、資源の発注に関しては、建機
などの業者DBに地域区分を持つデータが設定され、こ
れに、各種資源の運搬範囲のDBを備え、これらをあら
かじめ使用することにより、発注者側が近隣の可能な範
囲で見積り額にそった発注を可能にすることを特徴とす
る。
Further, the external resource is characterized by having a human resource database, a construction machine, and a material database. In this human resource database, types such as skills, qualifications, ages, past usage dates, past payment results, and the like are set, and matching is performed based on the keys. In addition, regarding ordering of resources, data having a region classification is set in a contractor DB such as a construction machine, and a DB of a transportation range of various resources is provided in the DB, and by using these in advance, the orderer side can use the data in the vicinity. It is characterized in that it is possible to place an order according to the estimated amount as much as possible.

【0009】加えて、該現場端末から外部リソースの発
注手段と確認手段においては、同一地域内における登録
業者が共同で外部リソースを発注するする手段を有し、
その確認手段を有することを特徴とする。これにより、
中小零細企業がある一定地域において共同購買行動を円
滑に行うことにより、決済の円滑化と価格の引き下げに
寄与するものである。
[0009] In addition, the ordering means and the confirming means for the external resource from the site terminal have means for a registered trader in the same area to jointly order the external resource,
It is characterized by having the confirmation means. This allows
Small and medium-sized enterprises can smoothly carry out joint purchasing activities in a certain area, thereby contributing to smooth settlement and price reduction.

【0010】[0010]

【発明の実施の形態】図1は、この発明に用いられるネ
ットワークの全体図を示す。図1において、1はインタ
ーネットであって、クライアントが用いるPC3、携帯
電話6また携帯電話につながれた個人情報端末(PD
A)9が、それぞれモデム2、ルータ7で接続されたLA
N8、携帯電話基地局5と携帯電話ネットワーク4に接
続されている。このインターネット1に本発明で用いる
工程管理サーバのシステムが接続され、接続点にファイ
アウォール10、WWWサーバ11が用意されている。こ
の先にLANによってアプリケーションサーバ12、人材
管理サーバ13、資材管理サーバ14、地域管理サーバ
15、それぞれの必要なDBが格納されているDB1(1
6)〜DB3(18)、が接続される。なお、このサーバ
ー群においては、周知のOSが具備され、この上で本発明
のアプリケーションサーバプログラムが動作する。ま
た、このほかにも必要に応じて各種のサーバ、例えば決
済サーバーなどが接続され、このサーバ群は、インター
ネットを通じて外部に配置されていても良い。
FIG. 1 shows an overall view of a network used in the present invention. In FIG. 1, reference numeral 1 denotes the Internet, which is a PC 3 used by a client, a mobile phone 6, or a personal information terminal (PD) connected to the mobile phone.
A) 9 is LA connected by modem 2 and router 7 respectively
N8, connected to mobile phone base station 5 and mobile phone network 4. A process management server system used in the present invention is connected to the Internet 1, and a firewall 10 and a WWW server 11 are provided at connection points. Beyond this, the application server 12, the human resources management server 13, the material management server 14, the regional management server 15, and the DB1 (1
6) to DB3 (18) are connected. The server group includes a well-known OS on which the application server program of the present invention operates. In addition, various servers, such as a settlement server, may be connected as necessary, and the server group may be arranged outside via the Internet.

【0011】図2は、本発明における全体のシステムの
連関を示す図である。20において工程管理ツールがイ
ンターネット上のサーバに備えられている。ここには、
自社資源の登録マスタ21とインターネット上に参照を
かける外部マスタ22が備えられている。この外部マス
タ22は、人材斡旋サーバ23、と資材発注サーバ24
と連携をとっており、人材斡旋サーバ23は民間の職業
DB30と職安DB31に接続されている。また資材発
注サーバ24は、マーケットプレース28に接続されて
おり、登録業者26と発注業者25のマッチングを行っ
ている。またマーケットプレース28においては、地域
性をあらわすDB27が備えられており、資材により運
搬距離が変更できるよう、地域をあらかじめ変数として
DBに備えられている。あるいは、郵便番号などによっ
て資材ごとに地域マッチングテーブルを備えていてもよ
い。
FIG. 2 is a diagram showing the linkage of the entire system according to the present invention. At 20, a process management tool is provided on a server on the Internet. here,
A registration master 21 for own resources and an external master 22 for referencing on the Internet are provided. The external master 22 includes a staffing server 23 and a material ordering server 24
The job placement server 23 is connected to a private occupation DB 30 and a employment security DB 31. The material ordering server 24 is connected to the marketplace 28 and performs matching between the registered trader 26 and the order trader 25. Further, the marketplace 28 is provided with a DB 27 representing regionality, and the DB is provided in advance with the area as a variable so that the transport distance can be changed depending on the material. Alternatively, a regional matching table may be provided for each material by a zip code or the like.

【0012】図3は人材発注を例に全体の連携をさらに
説明する。現場側には端末30が備えられている。この
端末で日々の工程管理を行っている。次の日に、たとえ
ば請負人が2人、バックホーが1台自社以外に必要であ
るとすると、工程管理サーバ31にオーダが転送され
る。このとき2人の請負人を調達するに当たり、工程管
理サーバ31は、複数の人材管理サーバ32に照会を行
う。それぞれの人材管理サーバ32には、人材が登録さ
れており、この人材情報は、スキル、有資格、年齢、利
用日、支払実績などの種別が設定されており、そのキー
に基づいてマッチングさせることができる。
FIG. 3 further explains the overall coordination, taking human resource ordering as an example. A terminal 30 is provided on the site side. This terminal manages daily processes. On the next day, for example, if two contractors and one backhoe other than the company are required, the order is transferred to the process management server 31. At this time, in procuring two contractors, the process management server 31 makes an inquiry to a plurality of personnel management servers 32. Human resources are registered in each of the human resource management servers 32, and in this human resource information, types such as skills, qualifications, ages, use dates, and payment results are set, and matching is performed based on the keys. Can be.

【0013】図4は、人材派遣を利用する際の流れを示
すフローチャートである。S1においてスタートする
と、S2において山崩し(後述)の実行を行うことを指
示をする。次にS3において、人材派遣を利用するかど
うか選択を行い、行う場合はS4に移行し、行わない場
合には、通常の山崩しの状態に移行する(S10)。S
4においては、現場端末がサーバへ問い合わせを行い、
S5において、利用可能な人材サーバのアドレスを現場
端末は受信する。S6において必要な人材情報を人材サ
ーバに問い合わせ、S7において、人材サーバからの受
信をうける。このとき、人材サーバから条件にあった人
材情報を受信している。このうち、必要な人材の情報を
送信し(S8)終了する(S9)。
FIG. 4 is a flowchart showing a flow when utilizing the temporary staffing. When the process is started in S1, an instruction is given to execute a mountain landslide (described later) in S2. Next, in S3, a selection is made as to whether or not to use temporary staffing. If so, the flow shifts to S4. If not, the flow shifts to a normal landslide state (S10). S
In 4, the on-site terminal makes an inquiry to the server,
In S5, the site terminal receives the address of the available human resource server. In S6, the required personnel information is inquired to the personnel server, and in S7, the information is received from the personnel server. At this time, the human resource information meeting the conditions is received from the human resource server. Among them, information on necessary human resources is transmitted (S8), and the process ends (S9).

【0014】図5は、人材が確保されてからのフローチ
ャートである。S20において、人材情報を受信する
と、S21において山崩しを行う。S22において人材
が派遣されるかどうかチェックを行い、S23におい
て、人材情報の中から派遣を依頼する人を選択する。S
24においてその情報をサーバに送信を行い、S25に
おいて人材サーバが処理した情報を受信する。その後、
結果をS26において端末に送信し、S27において完
了表示し、S28において実行予算に反映させるかどう
か確認をおこない、実行予算に送信を行い、S29にお
いて終了する。
FIG. 5 is a flowchart after human resources are secured. When the human resource information is received in S20, a mountain slide is performed in S21. In S22, it is checked whether or not a human resource is dispatched, and in S23, a person who requests the dispatch is selected from the human resource information. S
At 24, the information is transmitted to the server, and at S25, the information processed by the human resource server is received. afterwards,
The result is transmitted to the terminal in S26, completion is displayed in S27, it is confirmed whether or not the result is reflected in the execution budget in S28, and the result is transmitted to the execution budget, and the process ends in S29.

【0015】実際どのようにシステムを使用するのか図
を用いて説明する。図6〜図15は、予算データから工
程表を作成する一連の処理例を示す説明図である。図6
は、予算データから施工日数を算出する処理を示す説明
図である。「予算DB 」は例えば予算データベースか
ら特定の工事に関する予算項目を抽出し、表示したもの
である。例えば、図示された工事には工種として「舗装
工」、「法面工」、「側溝工」があり、それの工種の下
位「作業員A 」等の単価(資源)項目が存在する。
How the system is actually used will be described with reference to the drawings. 6 to 15 are explanatory diagrams showing a series of processing examples for creating a process chart from budget data. FIG.
FIG. 4 is an explanatory diagram showing a process of calculating the number of construction days from budget data. “Budget DB” is, for example, a budget item related to a specific construction extracted from a budget database and displayed. For example, in the illustrated construction, there are “paving work”, “slope work”, and “groove work” as work types, and there are unit price (resource) items such as “worker A” below the work types.

【0016】例えば「舗装工」の施工日数を算出する場
合には、日当たり施工量マスタの同じ工種コードを検索
し、日当たり施工量200m2/日を得る。次に「舗装工」
の数量1200を200で割って、施工日数6日を得る。得ら
れた施工日数は工程DB の該当工種およびその下位の
単価項目の施工日数欄に書き込まれる。工程DB は、
予算DB と対応した工程表データを格納するDBであ
り、この中から任意のデータを選択し表示可能である。
For example, when calculating the number of days required for the “paving work”, the same work type code in the daily work amount master is searched to obtain a work amount per day of 200 m 2 / day. Next, "paving work"
Divide the quantity 1200 by 200 to get 6 days of construction. The obtained construction days are written in the construction days column of the pertinent type of work and the unit price item under it in the process DB. Process DB is
This is a DB for storing process chart data corresponding to the budget DB, and any data can be selected and displayed from the DB.

【0017】図7は、工程の開始日、終了日を決定する
処理例を示す説明図である。図7(a)で施工日数が求ま
ると、次に図7(b)の工種工程表を画面に表示する。工
程表の工程名は予算DBから抽出する。工種工程表にお
いては、各工種の工事期間を工程バー(表右側のハッチ
ングされた横棒)で表し、初期状態では開始日は同じ日
(当処理を行った日)となっている。使用者は、工程表
の工程バーを例えばマウスによって操作することによ
り、期間の移動等を行う。
FIG. 7 is an explanatory diagram showing an example of processing for determining a start date and an end date of a process. When the number of construction days is determined in FIG. 7 (a), the construction type process chart of FIG. 7 (b) is displayed on the screen. The process name in the process chart is extracted from the budget DB. In the construction process schedule, the construction period of each construction is represented by a process bar (a hatched horizontal bar on the right side of the table), and in the initial state, the start date is the same day (the date on which this process was performed). The user moves the period, for example, by operating the process bar of the process chart with, for example, a mouse.

【0018】複数の作業が関連し、他の作業が終わらな
いと次の作業ができない場合などには、使用者は作業の
接続を行う。また、工程表上の一つの作業を何回かに分
けて行う場合には、作業の分解を行う。更に、工程表に
新たに作業を追加することができる。例えば使用者が図
7(c)に図示するように工程バーを動かしたとする
と、例えば最初の工種の開始日を当処理を行った日とし
て各工種の開始日および終了日が算出され、工程表およ
びサーバ上にある工程DB(図7(d))に書き込まれ
る。
In the case where a plurality of works are related and the next work cannot be performed unless the other work is completed, the user connects the works. In addition, when one operation on the process chart is to be performed several times, the operation is disassembled. Further, a new work can be added to the process chart. For example, if the user moves the process bar as shown in FIG. 7C, the start date and the end date of each type of work are calculated, for example, with the start date of the first type of work as the date on which this process was performed, and the process schedule And written in the process DB (FIG. 7D) on the server.

【0019】図8から図9は、山積み表示処理を示す説
明図である。各工種の工事期間が決定/更新されると、
各単価(資源)項目の日当たり資源量を求める。例えば
「舗装工」の「作業員A」は数量が6人であり(図8
(b))、施工日数が6日(図8(a))であるので、
日当たり資源量は1人/日となる(図8(c))。次に
同一資源、同一日付毎の資源量を合計する(図9)。ワ
ークエリア上で各資源の日付毎の資源量を書き出し、同
一日付、同一単価コードのものを集計する。例えば3月
4日の単価コードA0001(作業員A)の資源量は1+6
=7人となる。(図9(b))
FIGS. 8 and 9 are explanatory diagrams showing the pile display process. When the construction period of each construction type is determined / updated,
The daily resource quantity of each unit price (resource) item is obtained. For example, the number of “workers A” of “pavers” is six (see FIG. 8).
(B)) Since the construction period is 6 days (FIG. 8 (a)),
The daily resource amount is 1 person / day (FIG. 8 (c)). Next, the resource amounts for the same resource and the same date are totaled (FIG. 9). On the work area, write out the resource amount of each resource for each date, and total those with the same date and the same unit price code. For example, the resource amount of the unit price code A0001 (worker A) on March 4 is 1 + 6.
= 7 people. (FIG. 9B)

【0020】集計結果は、図9(d)に図示されている
ように、資源一覧表のカーソルのある項目の山積みが表
示され、カーソルを切り替えると、山積みも連動して切
り替わる。これにより、作業員などが、工事全体で何人
必要かを見ることができる。また、山積みが予め設定さ
れている最大値を超えている項目は赤色表示され、山均
しが必要なことを示している。他工事も合わせた山積み
を見るには、複数工事の抽出条件を作成する。工事の指
定は山積みだけでなく工程表、資源工程に対しても同じ
ように機能する。
As shown in FIG. 9 (d), the tally result indicates a pile of items with the cursor in the resource list, and when the cursor is switched, the pile is also switched. Thereby, it is possible to see how many workers and the like are required in the entire construction. Items for which the piles exceed the preset maximum value are displayed in red, indicating that leveling is required. To see piles that include other works, create extraction conditions for multiple works. The designation of construction works not only for piles but also for schedules and resource processes.

【0021】図10 は、山均し処理を示す説明図であ
る。山積み表示をチェックした結果、例えば作業員の配
分を変更したい場合には、工種工程表の工程バーを操作
することによって、各工種の工事期間の移動/延長/短
縮を行う。山均し作業においては、工程DB および予
算DB のデータに基づき工種工程表を生成/表示さ
せ、工程バーを操作する。例えば図10において、法面
工の工程を前後に延ばして施工日数を8日から4日(図
10(d))に短縮した場合について説明すると、この
場合、図11へ移行する。
FIG. 10 is an explanatory diagram showing the mountain leveling process. As a result of checking the pile display, for example, when it is desired to change the distribution of the workers, the operation period of each construction type is moved / extended / reduced by operating the process bar of the construction type schedule. In the leveling operation, a process schedule is generated / displayed based on the data in the process DB and the budget DB, and the process bar is operated. For example, referring to FIG. 10, a description will be given of a case where the number of construction days is shortened from eight days to four days (FIG. 10D) by extending the steps of the slope work back and forth.

【0022】図11は、山均し更新処理を示す説明図で
ある。日当たり資源量(図11(b))を固定する場合
には、工程DBの日当たり資源量は変更されずに、工種
および単価項目の施工日数、開始日および終了日が更新
される。この結果は予算DBにも反映する必要があるが
この場合で、予算DBの法面工における作業員Aの数量
が4日×12人/日=48人(図11(c))で更新の
必要はない。
FIG. 11 is an explanatory diagram showing a mountain leveling update process. When the daily resource amount (FIG. 11B) is fixed, the number of construction days, the start date, and the end date of the type of work and unit price are updated without changing the daily resource amount in the process DB. This result needs to be reflected in the budget DB. In this case, the number of workers A in the slope work of the budget DB is 4 days × 12 persons / day = 48 persons (FIG. 11C). No need.

【0023】図12,13は、山均し更新結果の表示処
理を示す説明図である。工程DBが更新されると、図9
における処理と同様の処理によって山積み表示が行わ
れる。このとき、自社の資源計画においては、10人が最
大値である。この作業工程表を実施しようとすると図1
2(c)の3月4日から3月7日において法面工が3人
足りなくなってくる。このとき、画面上では警告表示
(図12(d))が出て、外部リソースを使用するかど
うかを選択する。
FIGS. 12 and 13 are explanatory views showing the display processing of the mountain leveling update result. When the process DB is updated, FIG.
The pile display is performed by the same processing as the processing in. At this time, 10 people have the maximum value in the company's resource plan. When trying to implement this work schedule, FIG.
From March 4 to March 7, 2 (c), three slope workers will be short. At this time, a warning display (FIG. 12D) appears on the screen, and a selection is made as to whether to use an external resource.

【0024】図13においては外部リソースが選択され
た後、ワークエリアの変化を表している。このとき、外
部リソースを活用するとデータフィールドX0001が
付け加えられ、予算書(図14(a))のDBにおいて
も、派遣社員の人件費分だけ多く算定される。そして、
図14(a)にあるように、山積みの画面に、作業人数
が、自社および外部に分けられて表示される。
FIG. 13 shows a change in the work area after the external resource is selected. At this time, if an external resource is used, a data field X0001 is added, and even in the DB of the budget document (FIG. 14A), it is calculated by the amount corresponding to the personnel cost of the temporary staff. And
As shown in FIG. 14A, the number of workers is displayed separately for the company and the outside on the piled screen.

【0025】また、必要に応じて予算書も表示可能であ
る。更に、必要に応じて特定の資源のみについて、工程
を表示した資源工程表を表示させ、かつ修正することも
可能である。
Also, a budget document can be displayed if necessary. Furthermore, it is also possible to display and correct a resource process chart in which processes are displayed only for specific resources as needed.

【0026】以下に、図15に示す資源工程表の説明を
する。資源工程表は特定の資源についての工程を表示し
た表である。工程計画においては、自社の資源をいかに
有効に使うかが重要となる。通常、複数の工事が同時に
走る場合が多く、現場の枠を超えた人員調整が必要とな
る。複数の工事の工程、山積み、資源工程を同時に表示
し、工程、人員の調整を行うことができる。他工事も合
わせた工程を見るには、抽出条件の作成にて、現在の工
事名表より工事を選択する。
The resource schedule shown in FIG. 15 will be described below. The resource schedule is a table displaying the process for a specific resource. In the process planning, it is important how to use the company's resources effectively. Usually, a plurality of works are performed at the same time in many cases, and it is necessary to adjust the personnel beyond the site. Multiple construction processes, piles, and resource processes can be displayed at the same time, and the processes and personnel can be adjusted. To view the process that includes other works, select the work from the current work name table when creating extraction conditions.

【0027】資源工程表では、各作業で使用されている
項目について、さらに詳細な計画を立てたり、実際の調
達計画に合わせて数量の調整を行う。調整は、必要とな
る項目に対してのみ行う。詳細計画を立てない場合は、
資源工程を調整する必要はない。資源工程表の最初の状
態は、項目別の山積みを平面化し、一覧表示したもので
ある。バーチャートは資源の所要期間、所要数量を示し
ている。最終的には、調整後の数量にて、月別のコスト
を算出する。
In the resource schedule, a more detailed plan is made for items used in each operation, and the quantity is adjusted in accordance with an actual procurement plan. Adjustments are made only for necessary items. If you do n’t have a detailed plan,
There is no need to adjust resource processes. The first state of the resource process chart is a list of piles for each item, which are flattened. The bar chart shows the required period of the resource and the required quantity. Finally, the monthly cost is calculated based on the adjusted quantity.

【0028】資源工程表の各項目のバーチャート内部に
は資源の所要数量が表示される。資源工程のバーチャー
トは、資源を使用する期間を示している。工程を作成し
た時点では、一つの作業の作業期間と資源の期間は一致
している。一つの作業でのみ使用されている項目は、背
景に作業期間が表示される。基本的には、この作業期間
内で、期間、数量の編集を行う。複数の作業で使われて
いる資源は他の色で表示され、内訳があることを示して
いる。内訳では、指定された資源がどの作業でどれだけ
使われているかが表示される。
The required quantity of resources is displayed inside the bar chart of each item in the resource schedule. The bar chart of the resource process shows a period in which the resource is used. When the process is created, the operation period of one operation and the period of the resource are the same. For the items used only in one operation, the operation period is displayed in the background. Basically, the period and quantity are edited within this work period. Resources used in multiple tasks are displayed in other colors, indicating that they have a breakdown. The breakdown shows how much and how much of the specified resource is used.

【0029】機械などを使う作業の場合、工程表の作業
期間と機械の稼動期間は必ずしも一致するとは限らな
い。特殊な機械を使う場合などには、機械を主体とした
工程を考える必要がある。資源工程では、作業バーのな
かでどれだけ機械を使用するかを計画できる。工程計画
を立てた時点では、資源は平均して必要となる数量が表
示されている。予測される数量に偏りがある場合、数量
の内訳を作成することができる。
In the case of an operation using a machine or the like, the operation period of the process chart does not always match the operation period of the machine. When a special machine is used, it is necessary to consider a process mainly for the machine. In the resource process, you can plan how much machinery you will use in the work bar. At the time of making the process plan, the required quantity of resources is displayed on average. If there is a bias in the expected quantity, a breakdown of the quantity can be created.

【0030】資源工程の変更により、総数量が変わる揚
合は、変更後の数量が予算書に反映される。同じように
材料などを月毎にどれだけ投入するかといった計画を立
てることもできる。資源工程表では、各工事の期間別の
合計数量が表示される。各ケースの内訳を表示する場
合、工事名、作業名が表示される。各資源の調整は、単
一工事の場合と同じ様に各工事、各作業単位に行う。
If the total quantity changes due to a change in the resource process, the changed quantity is reflected in the budget. In the same way, it is possible to make a plan on how much material is to be put in each month. In the resource schedule, the total quantity of each construction period is displayed. When the breakdown of each case is displayed, the construction name and the work name are displayed. Coordination of each resource is performed for each work and each work unit as in the case of single work.

【0031】山積みや資源工程では工事単位でなく、会
社全体での計画を立てることができる。工事名表でのグ
ループ分けによって、監督ごとなど任意の表示が可能で
ある。工程表と予算書とは密接に連動する。工程表で編
集した内容は、予算書にも反映され、予算書で編集した
内容は工程表にも反映される。予算書・工程表データ
は、集計表、工程表の双方から更新する。
In a pile or resource process, a plan can be made not for each construction unit but for the entire company. Arbitrary display such as for each director is possible by grouping in the construction name table. The process schedule and the budget document are closely linked. The content edited in the process chart is also reflected in the budget document, and the content edited in the budget document is also reflected in the process chart. The budget and process schedule data is updated from both the summary table and process schedule.

【0032】次に、手配計画の説明をする。工程表がで
きると、これに基づき材料・労務・機械などを手配する
計画を作成する。手配計画は、山積みを見ながら納入予
定日を設定していく。設定された納入計画は山積み上に
プロットされ、山積みに対しての納入予定を確認でき
る。工事全体で必要となる量を把握し、事前に計画を立
てることにより、より有利な方法で資源を調達すること
ができる。山積みで選択された項目に対して、業者、数
量、納入予定日を設定する。納入予定日が点となって山
積み上に表示される。労務・機械の場合は線で表示され
る。立てられた手配計画は一覧表示される。また、業者
別、月別に集計することができる。
Next, the arrangement plan will be described. When the process schedule is completed, a plan for arranging materials, labor, machines, etc. is created based on this. In the arrangement plan, the delivery date is set while looking at the pile. The set delivery plan is plotted on the pile, and the delivery schedule for the pile can be confirmed. By grasping the amount required for the entire construction and planning in advance, resources can be procured in a more advantageous manner. Set the supplier, quantity, and expected delivery date for the items selected in the pile. The expected delivery date is displayed as a dot on the pile. In the case of labor / machinery, it is displayed as a line. The arranged arrangement plans are listed. In addition, data can be totaled by vendor and by month.

【0033】また本発明の工程管理システムを用いれ
ば、地域別のDBに基づいた最適な手配計画の自動発注
や同様の同時期、同地域に起こっている工事を何件かま
とめる形でマーケットプレースを用いた共同発注も可能
になり、中小規模の工事においても大規模工事なみの資
材の調達も可能になる。
Further, if the process management system of the present invention is used, an automatic ordering of an optimal arrangement plan based on a regional DB and a similar marketplace at the same time during the same period are performed. It is also possible to order jointly using, and it is possible to procure materials similar to large-scale construction even in small and medium-sized construction.

【0034】たとえば、図16においては、本発明で用
いられる地域DBの例である。ここで販売登録業者は、業
者登録番号、業種、取扱品種、販売範囲、郵便番号、地
域ID(図16(a))を持ち、業者登録番号において
は、業種、要求物品、数量、郵便番号、地域IDを持ち合
わせている(図16(b))。このとき、図2のマーケ
ットプレイス28においては、品種、距離、表示許可地
域のマッチングデータベースを持ち合わせており(図1
6(c))、マッチングにおいて当該距離の部分におい
てのみ表示される。図17はそのときのフローチャート
である。
For example, FIG. 16 shows an example of an area DB used in the present invention. Here, the sales registration company has the company registration number, the type of business, the type of product handled, the sales range, the postal code, and the region ID (FIG. 16 (a)). They have a regional ID (FIG. 16 (b)). At this time, the marketplace 28 of FIG. 2 has a matching database of varieties, distances, and display permitted areas (FIG. 1).
6 (c)), it is displayed only in the part of the distance in the matching. FIG. 17 is a flowchart at that time.

【0035】図17のS30において、サーバ側の処理
がスタートすると、S31において、発注情報を受信
し、その情報からS32において、発注者の地域IDと要
求品種コードを抽出する。S33においては、受注業者
を発注者の地域IDと要求品種コードから地域に適合した
業者をスクリーニングして抽出する。S34において
は、抽出が終わった情報の画面を生成して発注者に表示
し、S35にいたりて終了する。S34においては、安
値の業者を1社だけ表示してもよいし、地域情報に適合
する業者を表示に発注側に任意に選択させてもよい。
In S30 of FIG. 17, when the processing on the server side is started, in S31, order information is received, and in S32, the orderer's area ID and required type code are extracted in S32. In step S33, the contractor is screened and extracted from the orderer based on the region ID and the required product code of the orderer. In S34, a screen of the information whose extraction has been completed is generated and displayed to the orderer, and the process ends in S35. In S34, only one low-priced trader may be displayed, or a trader matching the regional information may be arbitrarily selected by the ordering side for display.

【0036】工程表立案後は、立てられた工程表が工事
管理の指針となり、工程の進捗、投入資源のフォローを
行う。立案した実行予算とのずれが生じた場合、常に変
更、軌道修正を行う。変更した内容は、自社実績として
蓄積され、今後の予算書立案にフイードバックされる。
After drafting the process schedule, the established process schedule serves as a guideline for construction management, and the progress of the process and follow-up of input resources are performed. When there is a deviation from the planned execution budget, change and trajectory correction are always performed. The changed contents will be accumulated as company results and will be fed back to future budget planning.

【0037】当然のことながら、これらの工程管理に使
用されたデータは、自社内での実行予算や原価管理シス
テムと連携して、会社全体の予算管理、原価管理に使用
することが可能である。
Naturally, the data used for the process management can be used for the budget management and cost management of the entire company in cooperation with the execution budget and the cost management system in the company. .

【発明の効果】【The invention's effect】

【0038】上記のように、本発明の実施の形態では、
工程表作成システムが外部リソースと連動する工程表を
作成し、工程表に基づいて山積みを行い、山積みのデー
タを山均しにより調整して工程を変更し、資源の配置を
調整して実際のコストを算出し、材料・労務・機械など
を手配する計画を作成する構成としたので、工程を最適
化することにより、コストダウンを図ることができる。
As described above, in the embodiment of the present invention,
The process schedule creation system creates a process schedule linked with external resources, stacks based on the process schedule, adjusts the data of the stack by averaging to change the process, adjusts the arrangement of resources, and Since the cost is calculated and a plan for arranging materials, labor, machines, and the like is created, the cost can be reduced by optimizing the process.

【0039】さらに、人材情報データベースや資材用デ
ータベースを備える外部リソースを利用することによ
り、いままで固定費として抱えていた部分を変動費化で
きるだけでなく、地域共同購買を電子的に行うことによ
り、よりいっそうのコストダウンを図ることができる。
また、地域データベースを用いることによって、近隣の
業者から競争力のある価格を容易に参照できるという効
果がある。
Further, by using external resources including a human resource information database and a material database, not only the portion previously held as fixed costs can be changed to variable costs, but also by performing regional joint purchasing electronically, Further cost reduction can be achieved.
In addition, by using the regional database, there is an effect that a competitive price can be easily referred to from a nearby trader.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、全体のネットワークの構成図である。FIG. 1 is a configuration diagram of an entire network.

【図2】図2は、本発明の概念図である。FIG. 2 is a conceptual diagram of the present invention.

【図3】図3は、本発明の人材管理サーバが外部にある
場合の一例である。
FIG. 3 is an example of a case where a human resource management server of the present invention is external.

【図4】図4は、外部リソースを用いた山崩しのフロー
チャートである。
FIG. 4 is a flowchart of mountain landslide using an external resource.

【図5】図5は、現場端末が人材派遣に人員を発注する
際のフローチャートである。
FIG. 5 is a flowchart when a site terminal places an order for personnel dispatching.

【図6】図6は、予算データから施工日数を算出する処
理を示す説明図である。
FIG. 6 is an explanatory diagram illustrating a process of calculating the number of construction days from budget data.

【図7】図7は、工程の開始日、終了日を決定する処理
例を示す説明図である。
FIG. 7 is an explanatory diagram illustrating an example of processing for determining a start date and an end date of a process;

【図8】図8は、工程の開始日、終了日を決定する処理
例を示す説明図である。
FIG. 8 is an explanatory diagram illustrating an example of processing for determining a start date and an end date of a process.

【図9】図9は、山積未表示処理を示す説明図である。FIG. 9 is an explanatory diagram illustrating pile accumulation non-display processing.

【図10】図10は、山均し処理を示す説明図である。FIG. 10 is an explanatory diagram illustrating a mountain leveling process;

【図11】図11は、山均し処理を示す説明図であるFIG. 11 is an explanatory diagram illustrating a mountain leveling process;

【図12】図12は、外部リソースを用いた山均し更新
処理を示す説明図である。
FIG. 12 is an explanatory diagram illustrating a mountain leveling update process using an external resource;

【図13】図12は、外部リソースを用いた山均し更新
処理を示す説明図である。
FIG. 13 is an explanatory diagram illustrating a mountain leveling update process using an external resource;

【図14】図14は、山均し更新結果の表示処理を示す
説明図である。
FIG. 14 is an explanatory diagram of a display process of a mountain leveling update result;

【図15】図15は図14で導き出された資源工程表で
ある。
FIG. 15 is a resource process chart derived in FIG. 14;

【図16】図16は、地域DBの一例である。FIG. 16 is an example of a regional DB.

【図17】図17は、地域DBを用いたスクリーニングの
フローチャートである。
FIG. 17 is a flowchart of a screening using an area DB.

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】現場端末とセンターサーバと外部リソース
サーバとでなる工程管理システムにおいて、 現場端末から外部リソースの発注手段と確認手段を有す
ることを特徴とするネットワークを用いた工程管理シス
テム。
1. A process management system comprising a field terminal, a center server, and an external resource server, comprising a means for ordering and confirming an external resource from the field terminal, and using a network.
【請求項2】外部リソースとは、人材データベースを保
有することを特徴とする請求項1記載の工程管理システ
ム。
2. The process management system according to claim 1, wherein the external resource has a human resource database.
【請求項3】外部リソースとは、建機ならびに資材デー
タベースを保有することを特徴とする請求項1記載の工
程管理システム。
3. The process management system according to claim 1, wherein the external resources include a construction machine and a material database.
【請求項4】人材データベースには、スキル、資格、年
齢、過去の利用日および過去の支払実績を含むことを特
徴とする請求項2記載の工程管理システム。
4. The process management system according to claim 2, wherein the human resources database includes skills, qualifications, ages, past use dates, and past payment results.
【請求項5】建機ならびに資材データベースとは、登録
業者の地域性情報のデータベースをともに保持すること
を特徴とする請求項3記載の工程管理システム。
5. The process management system according to claim 3, wherein the construction machine and material database both hold a database of regionality information of the registered trader.
【請求項6】前期現場端末から外部リソースの発注手段
と確認手段においては、同一地域内における登録業者が
共同で外部リソースを発注する手段および、その受注確
認手段を有することを特徴とする請求項1より5のう
ち、いずれか1項記載の工程管理システム。
6. The means for ordering and confirming an external resource from the terminal device in the previous term includes means for ordering external resources jointly by a registrant in the same area, and means for confirming the order. 6. The process management system according to any one of 1 to 5.
JP2001121729A 2001-04-19 2001-04-19 Process management system using network Expired - Fee Related JP4831882B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001121729A JP4831882B2 (en) 2001-04-19 2001-04-19 Process management system using network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001121729A JP4831882B2 (en) 2001-04-19 2001-04-19 Process management system using network

Publications (2)

Publication Number Publication Date
JP2002318947A true JP2002318947A (en) 2002-10-31
JP4831882B2 JP4831882B2 (en) 2011-12-07

Family

ID=18971534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001121729A Expired - Fee Related JP4831882B2 (en) 2001-04-19 2001-04-19 Process management system using network

Country Status (1)

Country Link
JP (1) JP4831882B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009237988A (en) * 2008-03-27 2009-10-15 Computer System Kenkyusho:Kk Unit price type process control system, and method and program thereof
JP2016071499A (en) * 2014-09-29 2016-05-09 株式会社富士通エフサス Work process supervising device, work process supervising method, and work process supervising program

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7230315B2 (en) * 2019-03-14 2023-03-01 株式会社ニフコ Construction support device and construction support program

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0978831A (en) * 1995-07-10 1997-03-25 Shimazu Network Syst Kk Onsite management system
JPH10131491A (en) * 1996-10-31 1998-05-19 Shimazu Network Syst Kk Control system of materials and machinery for construction work
JPH10232893A (en) * 1997-02-18 1998-09-02 Rikuruuto:Kk Information exchange medication system to be functioned as www server on internet
JPH1139390A (en) * 1997-07-23 1999-02-12 Minoru Yoneda Method for managing building cost
JPH1166149A (en) * 1997-08-22 1999-03-09 Takiya Kensetsu Kogyo Kk Processor and method for information processing
JP2000034835A (en) * 1998-05-12 2000-02-02 Takiya Kensetsu Kogyo Kk Construction management system and method, and computer readable medium
JP2000226937A (en) * 1999-02-09 2000-08-15 Tetsutaro Takatsu Schedule control table and preparation system therefor
JP2000356040A (en) * 1999-04-15 2000-12-26 Shimizu Corp Physical distribution system for use in construction work
JP2001207644A (en) * 2000-01-26 2001-08-03 Takenaka Komuten Co Ltd Recording medium on which material data is recorded, method of derivation quantity of material, and recording medium on which data for lifting plan is recorded

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0978831A (en) * 1995-07-10 1997-03-25 Shimazu Network Syst Kk Onsite management system
JPH10131491A (en) * 1996-10-31 1998-05-19 Shimazu Network Syst Kk Control system of materials and machinery for construction work
JPH10232893A (en) * 1997-02-18 1998-09-02 Rikuruuto:Kk Information exchange medication system to be functioned as www server on internet
JPH1139390A (en) * 1997-07-23 1999-02-12 Minoru Yoneda Method for managing building cost
JPH1166149A (en) * 1997-08-22 1999-03-09 Takiya Kensetsu Kogyo Kk Processor and method for information processing
JP2000034835A (en) * 1998-05-12 2000-02-02 Takiya Kensetsu Kogyo Kk Construction management system and method, and computer readable medium
JP2000226937A (en) * 1999-02-09 2000-08-15 Tetsutaro Takatsu Schedule control table and preparation system therefor
JP2000356040A (en) * 1999-04-15 2000-12-26 Shimizu Corp Physical distribution system for use in construction work
JP2001207644A (en) * 2000-01-26 2001-08-03 Takenaka Komuten Co Ltd Recording medium on which material data is recorded, method of derivation quantity of material, and recording medium on which data for lifting plan is recorded

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009237988A (en) * 2008-03-27 2009-10-15 Computer System Kenkyusho:Kk Unit price type process control system, and method and program thereof
JP2016071499A (en) * 2014-09-29 2016-05-09 株式会社富士通エフサス Work process supervising device, work process supervising method, and work process supervising program

Also Published As

Publication number Publication date
JP4831882B2 (en) 2011-12-07

Similar Documents

Publication Publication Date Title
Tarantilis et al. A Web-based ERP system for business services and supply chain management: Application to real-world process scheduling
US20040186763A1 (en) System for real-time monitoring and cost management of construction projects
JP6839521B2 (en) Project progress management system
US20140278703A1 (en) Enterprise resource management system and method
KR20130047776A (en) Stand alone domain each construction web site with auto maker and using it for the group system
US20060161470A1 (en) Method and system for creating and maintaining customer tailored marketing plans
Tommelein et al. Supply chain management for lean project delivery
US20140229213A1 (en) Automated system and method for job estimating, scheduling and administration
WO2016100469A1 (en) User interactive on-site job management system and uses thereof
KR19990088345A (en) Construction management system and construction management method
Ratajczak et al. Collaborative tool for the construction site to enhance lean project delivery
KR100945523B1 (en) On-line construction management method
JP4831882B2 (en) Process management system using network
US20150213397A1 (en) Construction computer software related method and apparatus
Kasim et al. Enhancing material tracking practices of material management in construction project
JP2000250975A (en) Progress schedule generation system
KR102356330B1 (en) Construction process automatic management system using qr code
Soosaimuthu et al. Interface with Scheduling, Estimation, Costing, and Forecasting Applications
KR101491011B1 (en) Every day working order and weekly work making method for united working management system of ship building
CN101151628A (en) Procurement preparation system and procurement preparation method
JP4282980B2 (en) Order support system and program
Crutcher et al. Effects of a preferred vendor relationship on an electrical component supplier and an electrical contractor: A case study
JP2003122813A (en) Field control system
Tesha Factors Affecting Performance & Time Schedule for Multi-Unit Residential Building Construction in Dar-es-Salaam, Tanzania.
Venkadesan et al. Planning and Scheduling of Commercial Projects Using Advanced Management Software

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080415

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20080415

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080416

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100813

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100824

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101020

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101020

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110531

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110728

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110823

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110920

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140930

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees