JP2002105989A - Construction site management system - Google Patents

Construction site management system

Info

Publication number
JP2002105989A
JP2002105989A JP2000296984A JP2000296984A JP2002105989A JP 2002105989 A JP2002105989 A JP 2002105989A JP 2000296984 A JP2000296984 A JP 2000296984A JP 2000296984 A JP2000296984 A JP 2000296984A JP 2002105989 A JP2002105989 A JP 2002105989A
Authority
JP
Japan
Prior art keywords
construction
construction site
terminal device
information
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000296984A
Other languages
Japanese (ja)
Inventor
Masahito Kageyama
雅人 影山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP2000296984A priority Critical patent/JP2002105989A/en
Publication of JP2002105989A publication Critical patent/JP2002105989A/en
Pending legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction site management system capable of using effectively a construction machine. SOLUTION: The construction site management system 1 relative to the invention is provided with a plurality of construction machines E1, E2,..., equipped with a positional measure and a wireless communication device and terminal devices T1, T2,... connected to these construction machines E1, E2... through a communication means 10. Positional information in these construction machines E1, E2... are shown by these terminal devices T1, T2... and the positional information in a plurality of construction fields F1, F2... is indicated.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、位置計測装置およ
び無線通信装置を備えた複数の建設機械と、通信手段を
介して複数の建設機械と接続された複数の端末装置とを
具備し、端末装置に施工現場および建設機械の情報を表
示することによって、施工現場の管理を行うよう構成し
た施工現場管理システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a terminal comprising: a plurality of construction machines provided with a position measuring device and a wireless communication device; and a plurality of terminal devices connected to the plurality of construction machines via communication means. The present invention relates to a construction site management system configured to manage a construction site by displaying information on the construction site and construction machines on a device.

【0002】[0002]

【従来の技術】建設機械により施工を行っている施工現
場を管理する手段として、管理部等に置かれた端末装置
と各建設機械との間を通信手段によって双方向通信自在
に接続し、建設機械に関する情報を端末装置に表示する
よう構成した施工現場管理システムが提供されている。
2. Description of the Related Art As means for managing a construction site where construction is being carried out by construction machines, a terminal device placed in a management unit and the like and each construction machine are connected by communication means so as to be capable of two-way communication. There is provided a construction site management system configured to display information about a machine on a terminal device.

【0003】この施工現場管理システムは、各建設機械
に位置計測装置と無線通信装置とを搭載し、現在位置や
稼働時間等の各建設機械に関する情報を管理センターに
送信してデータベースに記憶させ、管理部や施工現場等
に置かれたパーソナルコンピュータ等の端末装置に、管
理センターのデータベースからインターネットを経由し
て、各建設機械に関する情報、例えば建設機械の位置情
報を地図上にアイコンで表示することで、施工現場の管
理における建設機械の管理を行なうよう構成されてい
る。
In this construction site management system, a position measuring device and a wireless communication device are mounted on each construction machine, and information on each construction machine such as a current position and an operation time is transmitted to a management center and stored in a database. Displaying information on each construction machine, for example, the position information of the construction machine, on a map on a terminal device such as a personal computer placed at a management section or a construction site via a database from a management center via the Internet. The construction site is configured to manage construction machines in the construction site management.

【0004】[0004]

【発明が解決しようとする課題】ところで、建設機械の
配車された施工現場が複数箇所に及ぶ場合でも、施工現
場の管理は従来から各施工現場毎に行われており、また
同じ施工業者であっても建設機械は各施工現場毎に管理
されている。
By the way, even when the construction site where the construction machine is dispatched reaches a plurality of locations, the management of the construction site has been conventionally performed for each construction site, and the same contractor is also used. Even so, construction machines are managed at each construction site.

【0005】このため、施工現場相互間における建設機
械の融通が難しく、例えば1つの施工現場において建設
機械の仕事がないのに、隣接している施工現場では建設
機械が不足しているために外部からレンタルしていると
いった、極めて不合理な状況が生じることも間々あっ
た。
[0005] For this reason, it is difficult to accommodate construction machines between construction sites. For example, there is no construction machine work at one construction site, but there is a shortage of construction machines at an adjacent construction site. Often there was an unreasonable situation, such as renting from.

【0006】これに併せて、油圧ショベル等の汎用建設
機械の平均稼働時間は、良くて1000時間/年程度であ
り、施工現場において建設機械が有効に利用されている
とは言い難い状況にあった。
At the same time, the average operating time of general-purpose construction machines such as hydraulic excavators is about 1000 hours / year at best, and it is difficult to say that construction machines are being used effectively at construction sites. Was.

【0007】本発明は上記実状に鑑みて、建設機械の効
率的な使用を可能とする施工現場管理システムの提供を
目的とするものである。
The present invention has been made in view of the above circumstances, and has as its object to provide a construction site management system that enables efficient use of construction machines.

【0008】[0008]

【課題を解決するための手段および効果】上記目的を達
成すべく、請求項1の発明に関わる施工現場管理システ
ムは、建設機械の位置情報と施工現場の位置情報とを記
憶保存するデータベースを備えて成ることを特徴として
いる。上記構成によれば、建設機械の位置情報と、施工
現場の位置情報とを、施工現場管理システム内で一括し
て記憶保存することより、施工現場における建設機械の
配車状況に基づいて、全体の建設機械を一括して管理す
ることができる。また、施工現場および建設機械の位置
情報により、施工現場間の距離や建設機械の所要動時間
に基づいて、効率の良い配車計画を立案することができ
る。もって、請求項1の発明に関わる施工現場管理シス
テムによれば、建設機械を施工現場に効率よく配車し、
建設機械の「遊び」を減少させることによって、建設機
械を効率的に使用することができる。
In order to achieve the above object, a construction site management system according to the first aspect of the present invention includes a database for storing and storing position information of construction machines and position information of the construction site. It is characterized by comprising. According to the above configuration, the position information of the construction machine and the position information of the construction site are collectively stored and stored in the construction site management system. Construction machines can be managed collectively. Further, based on the position information of the construction site and the construction machine, an efficient vehicle allocation plan can be made based on the distance between the construction sites and the required operating time of the construction machine. Therefore, according to the construction site management system according to the first aspect of the invention, the construction machine is efficiently dispatched to the construction site,
By reducing the "play" of the construction machine, the construction machine can be used efficiently.

【0009】請求項2の発明に関わる施工現場管理シス
テムは、位置計測装置および通信装置を備えた建設機械
と、前記通信手段を介して前記建設機械と接続された端
末装置とを具備し、前記端末装置に建設機械の位置情報
を表示するとともに、施工現場の位置情報を表示するこ
とを特徴としている。上記構成によれば、建設機械の位
置情報と、施工現場の位置情報とが、端末装置に表示さ
れることにより、施工現場における建設機械の配車状況
に基づいて、全体の建設機械を一括して管理することが
できる。また、施工現場および建設機械の位置情報によ
り、施工現場間の距離や建設機械の所要動時間に基づい
て、効率の良い配車計画を立案することができる。もっ
て、請求項2の発明に関わる施工現場管理システムによ
れば、建設機械を施工現場に効率よく配車し、建設機械
の「遊び」を減少させることによって、建設機械を効率
的に使用することができる。
A construction site management system according to a second aspect of the present invention includes a construction machine having a position measuring device and a communication device, and a terminal device connected to the construction machine via the communication means. In addition to displaying the position information of the construction machine on the terminal device, the position information of the construction site is displayed. According to the above configuration, the position information of the construction machines and the position information of the construction site are displayed on the terminal device, so that the entire construction machine is collectively collected based on the distribution status of the construction machines at the construction site. Can be managed. Further, based on the position information of the construction site and the construction machine, an efficient vehicle allocation plan can be made based on the distance between the construction sites and the required operating time of the construction machine. Therefore, according to the construction site management system according to the second aspect of the present invention, the construction machine can be efficiently used by efficiently allocating the construction machine to the construction site and reducing "play" of the construction machine. it can.

【0010】請求項3の発明に関わる施工現場管理シス
テムは、位置計測装置および通信装置を備えた建設機械
と、前記通信手段を介して前記建設機械と接続された端
末装置とを具備し、前記端末装置に表示した地図上に、
建設機械の位置情報を表示するとともに、施工現場の位
置情報を表示することを特徴としている。上記構成によ
れば、建設機械の位置情報と、施工現場の位置情報と
が、地図上に表示されることにより、施工現場における
建設機械の配車状況に基づいて、全体の建設機械を一括
して管理することができる。また、地図上に複数の施工
現場の位置情報を表示することにより、施工現場間の距
離や建設機械の所要動時間に基づいて、効率の良い配車
計画を立案することができる。もって、請求項3の発明
に関わる施工現場管理システムによれば、建設機械を施
工現場に効率よく配車し、建設機械の「遊び」を減少さ
せることによって、建設機械を効率的に使用することが
できる。
A construction site management system according to a third aspect of the present invention includes a construction machine having a position measuring device and a communication device, and a terminal device connected to the construction machine via the communication means. On the map displayed on the terminal device,
In addition to displaying the position information of the construction machine, it is characterized by displaying the position information of the construction site. According to the above configuration, the position information of the construction machines and the position information of the construction site are displayed on a map, so that the entire construction machines are collectively collected based on the allocation status of the construction machines at the construction site. Can be managed. In addition, by displaying position information of a plurality of construction sites on a map, an efficient vehicle allocation plan can be made based on the distance between the construction sites and the required operating time of the construction machine. Therefore, according to the construction site management system according to the third aspect of the present invention, the construction machine can be efficiently used in the construction site by efficiently allocating vehicles to the construction site and reducing "play" of the construction machine. it can.

【0011】請求項4の発明に関わる施工現場管理シス
テムは、請求項2または請求項3の発明に関わる施工現
場管理システムにおいて、前記建設機械から稼働情報を
取得し、前記端末装置に前記稼働情報を表示することを
特徴としている。上記構成によれば、端末装置に建設機
械の稼働情報が表示されるため、上記建設機械の利用度
を知ることができ、もって施工現場に対する建設機械の
最適な配置計画を立案することが可能となる。
A construction site management system according to a fourth aspect of the present invention is the construction site management system according to the second or third aspect, wherein operation information is acquired from the construction machine, and the operation information is stored in the terminal device. Is displayed. According to the above configuration, since the operation information of the construction machine is displayed on the terminal device, it is possible to know the utilization of the construction machine, and it is possible to draft an optimal arrangement plan of the construction machine with respect to the construction site. Become.

【0012】請求項5の発明に関わる施工現場管理シス
テムは、請求項2または請求項3の発明に関わる施工現
場管理システムにおいて、前記端末装置に施工現場の状
況を示す現場情報を表示することを特徴としている。上
記構成によれば、端末装置に施工現場の現場情報が表示
されるため、施工現場における作業状況や、建設機械の
使用状況を把握することが可能となる。
A construction site management system according to a fifth aspect of the present invention is the construction site management system according to the second or third aspect, wherein site information indicating the status of the construction site is displayed on the terminal device. Features. According to the above configuration, since the site information of the construction site is displayed on the terminal device, it is possible to grasp the work status at the construction site and the usage status of the construction machine.

【0013】請求項6の発明に関わる施工現場管理シス
テムは、施工地点の位置情報を表示するとともに、資材
供給業者の位置情報を表示することを特徴としている。
上記構成によれば、施工地点の位置情報と、資材供給業
者の位置情報とが表示されることにより、施工地点にお
いて必要とする近くの資材供給業者を容易に見い出すこ
とができる。
The construction site management system according to the invention of claim 6 is characterized in that the position information of the construction point is displayed and the position information of the material supplier is displayed.
According to the above configuration, the position information of the construction point and the position information of the material supplier are displayed, so that a nearby material supplier required at the construction point can be easily found.

【0014】請求項7の発明に関わる施工現場管理シス
テムは、位置計測装置および通信装置を備えた施工地点
位置管理手段を設けた施工地点と、通信手段を介して前
記施工地点と接続された端末装置とを具備し、前記端末
装置に資材を供給するための施工地点を表示することを
特徴としている。上記構成によれば、資材を供給すべき
施工地点が、端末装置において明確に指示されることと
なる。
According to a seventh aspect of the present invention, there is provided a construction site management system, comprising: a construction point provided with a construction point position management means having a position measuring device and a communication device; and a terminal connected to the construction point via the communication means. And a construction point for supplying a material to the terminal device. According to the above configuration, the construction point to which the material is to be supplied is clearly indicated on the terminal device.

【0015】請求項8の発明に関わる施工現場管理シス
テムは、位置計測装置および通信装置を備えた施工地点
位置管理手段を設けた施工地点と、位置計測装置および
通信装置を備えた資材搬送車輌位置管理手段を設けた資
材搬送車輌と、通信手段を介して前記施工地点および前
記資材搬送車輌と接続された端末装置とを具備し、前記
端末装置に前記施工地点の位置情報を表示するととも
に、前記資材搬送車輌の位置情報を表示することを特徴
としている。上記構成によれば、施工地点の位置情報
と、資材搬送車輌の位置情報とを、端末装置において表
示することにより、施工現場と資材搬送車輌との位置情
報に基づいて、資材搬送車輌による資材の到着時間を予
想することができ、もって施工現場における効率的な作
業計画を立案することができる。
According to an eighth aspect of the present invention, there is provided a construction site management system, comprising: a construction point provided with a construction point position management means having a position measuring device and a communication device; and a material transfer vehicle position provided with the position measuring device and the communication device. Material transport vehicle provided with management means, comprising a terminal device connected to the construction point and the material transport vehicle via communication means, while displaying the position information of the construction point on the terminal device, It is characterized by displaying the position information of the material transport vehicle. According to the above configuration, the position information of the construction point and the position information of the material transport vehicle are displayed on the terminal device, and based on the position information between the construction site and the material transport vehicle, The arrival time can be estimated, and an efficient work plan at the construction site can be made.

【0016】請求項9の発明に関わる施工現場管理シス
テムは、請求項7または請求項8記載の発明に関わる施
工現場管理システムにおいて、前記施工地点位置管理手
段が、建設機械に搭載された携帯情報端末であることを
特徴とするものである。上記構成によれば、建設機械に
搭載した携帯情報端末を施工地点位置管理手段としてい
るので、建設機械を施工現場管理システムに特化させて
製造する必要がなく、また施工現場管理システムを安価
に構築することが可能となる。
A construction site management system according to a ninth aspect of the present invention is the construction site management system according to the seventh or eighth aspect, wherein the construction point position management means is a portable information device mounted on a construction machine. It is a terminal. According to the above configuration, since the portable information terminal mounted on the construction machine is used as the construction point position management means, there is no need to specially manufacture the construction machine for the construction site management system, and the construction site management system is inexpensive. It is possible to build.

【0017】[0017]

【発明の実施の形態】以下、実施例を示す図面に基づい
て、本発明を詳細に説明する。図1に示すように、本発
明に関わる施工現場管理システム1は、ブルドーザや油
圧ショベル等の複数の建設機械E1,E2…と、施工業
者や資材供給業者の事務所等に置かれた複数の端末装置
T1,T2…とを、通信衛星Sc、衛星地球局Sa、お
よびインターネットI等から成る通信手段10を介し
て、相互に通信可能に接続することによって構成されて
いる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail with reference to the drawings showing embodiments. As shown in FIG. 1, a construction site management system 1 according to the present invention includes a plurality of construction machines E1, E2,... Such as bulldozers and hydraulic shovels, and a plurality of construction machines and offices of material suppliers. The terminal devices T1, T2,... Are communicably connected to each other via communication means 10 including a communication satellite Sc, a satellite earth station Sa, and the Internet I.

【0018】なお、複数の端末装置T1,T2…は、上
述した施工業者および資材供給業者のみならず、建設機
械に対してメインテナンス等を行うためのサービスカー
の車内、建設機械を運搬するための移動作業機械運搬車
(トレーラ)の車内、建設機械E1,E2…を所有するユ
ーザの事務所、建設機械E1,E2…の販売店または営
業所等にも置かれている。
The plurality of terminal devices T1, T2,... Are used not only for the above-mentioned contractor and material supplier, but also for transporting the inside of a service car for carrying out maintenance and the like to the construction machine. Mobile work machine
(Trailer), the office of the user who owns the construction machines E1, E2,..., And the dealer or sales office of the construction machines E1, E2,.

【0019】複数の施工現場F1,F2…に配車されて
いる、複数の建設機械E1,E2…には、それぞれGP
S衛星Sgを用いたグローバル・ポジショニング・シス
テムによる位置計測装置(図示せず)と、通信衛星Scを
用いた衛星通信による無線通信装置(図示せず)とが搭載
されている。
A plurality of construction machines E1, E2,... Assigned to a plurality of construction sites F1, F2,.
A position measuring device (not shown) based on a global positioning system using the S satellite Sg and a wireless communication device (not shown) based on satellite communication using the communication satellite Sc are mounted.

【0020】上記位置計測装置によって検出された、各
建設機械E1,E2…における位置情報は、上記無線通
信装置(図示せず)によってデータベース管理センター2
0に向けて送信される。
The position information of each of the construction machines E1, E2,... Detected by the position measuring device is transmitted to the database management center 2 by the radio communication device (not shown).
Sent toward zero.

【0021】また、各建設機械E1,E2…における稼
働時間、エンジン負荷状況、油圧負荷状況、エラー情
報、およびサイクルタイム情報等も、位置情報とともに
データベース管理センター20に向けて送信される。
The operating time, engine load condition, hydraulic load condition, error information, cycle time information, etc. of each of the construction machines E1, E2... Are transmitted to the database management center 20 together with the position information.

【0022】データベース管理センター20に送信され
た、各建設機械E1,E2…における位置情報等の各種
情報は、データベース管理センター20におけるデータ
ベース20Dに記憶される。
Various kinds of information, such as positional information on the construction machines E1, E2,... Transmitted to the database management center 20, are stored in a database 20D in the database management center 20.

【0023】ここで、データベース管理センター20の
データベース20Dは、以下に示す複数のデータベース
から構成されている。
Here, the database 20D of the database management center 20 is composed of a plurality of databases described below.

【0024】・建設機械位置データベース 建設機械ID、機種形式(接続オプション)、建設機械の
位置、稼働時間、稼働負荷情報、利用予約(予約者、予
約期間、利用施工現場ID)、メンテナンス予定、故障
状況を記憶。 ・施工業者データベース 施工業者ID、業務内容、連絡先を記憶。 ・施工現場情報データベース 利用現場ID、施工業者ID、位置、工事種類、日程、
施主名、施主連絡先、作業工程表、作業進捗、担当作業
班(作業班ID)、利用機材、資材、人員を記憶。 ・資材供給業者データーベース 資材供給業者ID、業務内容、連絡先を記憶。 ・資材搬送車輌位置データベース 車輌ID、機種形式、車輌のトン数、車輌位置、移動速
度、配送計画(日時、目標配送先)、情報公開先施工業者
IDを記憶。 ・作業班生産性情報データベース 作業班ID、作業班メンバー、利用建設機械ID、作業
時間、生産量、作業時間内訳、待ち時間内訳を記憶。
Construction machine position database Construction machine ID, model type (connection option), construction machine position, operation time, operation load information, use reservation (reserved person, reservation period, use construction site ID), maintenance schedule, failure Remember the situation. -Contractor database Stores contractor IDs, business contents, and contact information.・ Construction site information database Utilization site ID, contractor ID, location, construction type, schedule,
Stores the owner's name, owner's contact information, work schedule, work progress, assigned work group (work group ID), equipment used, materials, and personnel. -Material supplier database Stores material supplier IDs, business details, and contact information.・ Material transfer vehicle position database Stores vehicle ID, model type, tonnage of vehicle, vehicle position, moving speed, delivery plan (date and time, target delivery destination), and information disclosure destination construction company ID.・ Work group productivity information database Stores work group IDs, work group members, used construction machine IDs, work time, production volume, work time breakdown, and waiting time breakdown.

【0025】一方、施工業者の事務所や、現場作業所、
施工現場等に置かれた端末装置(例えばパーソナルコン
ピュータ)T1からは、データベース管理センター20
のデータベース20Dに記憶されている各建設機械E
1,E2…の各種情報を、インターネットIを介して閲
覧参照することができる。
On the other hand, the office of the contractor,
From a terminal device (for example, a personal computer) T1 placed at a construction site, a database management center 20 is provided.
Construction machines E stored in the database 20D of the
.. Can be browsed and referenced via the Internet I.

【0026】また、施工業者の端末装置T1からは、各
施工現場F1,F2…における施工管理情報の入力およ
び参照を行うことができ、さらに各建設機械E1,E2
…の利用予約および予約状況の確認を行うことができ
る。
Further, the terminal T1 of the contractor can input and refer to the construction management information at each of the construction sites F1, F2,.
Can be used and the reservation status can be confirmed.

【0027】図2は、端末装置T1に表示された地図M
の概念図であり、この地図Mには複数の建設機械E(E
1,E2…)と、複数の施工現場F(F1,F2…)と
が、それぞれアイコンによって表示されている。
FIG. 2 shows a map M displayed on the terminal device T1.
Is a conceptual diagram of a plurality of construction machines E (E
1, E2...) And a plurality of construction sites F (F1, F2...) Are displayed by icons.

【0028】複数の建設機械E(E1,E2…)は、油圧
ショベルやブルドーザをデザインしたアイコンにより、
地図M上において種類(車種)とともにその位置が表示さ
れている。
A plurality of construction machines E (E1, E2...) Are designed by using icons for designing excavators and bulldozers.
The position is displayed on the map M together with the type (vehicle type).

【0029】また、複数の施工現場F(F1,F2…)
は、「施工予定」、「施工中」、および「施工完了」等
の状況別、かつ「道路工事」、「架橋工事」、「擁壁工
事」等の工事種類別のアイコンによって、地図M上にお
いて施工の状況とともにその位置が表示されている。
Further, a plurality of construction sites F (F1, F2...)
Is displayed on the map M by icons such as “planned”, “under construction”, and “completion completed” and by type of construction such as “road construction”, “bridge construction”, and “retaining wall construction”. , The position is displayed together with the construction status.

【0030】ここで、図2の地図Mは、道路工事を実施
している施工現場Fを選択して表示した例であり、施工
現場Fを示すアイコンが「道路工事」であって「施工完
了」を表現するデザインとなっている。
Here, the map M in FIG. 2 is an example in which the construction site F where the road construction is being performed is selected and displayed, and the icon indicating the construction site F is “road construction” and the “construction completed”. "Is designed to express.

【0031】地図M上における各施工現場F(F1,F
2…)のアイコンは、端末装置T1の入力デバイス(マウ
スやトラックボール等)によって地図M上の位置を指定
するとともに、プルダウンメニューから施工の状況(施
工予定、施工中、施工完了)を選択することにより、地
図M上の所定位置に上書き(貼付け)して表示される。
Each construction site F (F1, F1) on the map M
The icon (2 ...) designates a position on the map M by an input device (mouse, trackball, or the like) of the terminal device T1, and selects the construction status (planning, construction, construction completion) from a pull-down menu. As a result, it is overwritten (pasted) at a predetermined position on the map M and displayed.

【0032】なお、施工現場Fの工事種別には、道路舗
装、橋梁、上水道、下水道、擁壁、法面保護、排水、ト
ンネル等があり、これらの工事種別を選択することによ
って地図M上における施工現場Fの位置には、工事種別
に応じたデザインのアイコンが表示される。
The construction types of the construction site F include road pavement, bridge, water supply, sewerage, retaining wall, slope protection, drainage, tunnel, and the like. At the position of the construction site F, an icon of a design corresponding to the construction type is displayed.

【0033】ここで、地図M上においては、特定の工事
種別の施工現場Fのみを表示し得るとともに、上述した
各種工事種別の施工現場Fを同時に表示させることも可
能である。
Here, on the map M, it is possible to display only the construction sites F of a specific construction type, and it is also possible to simultaneously display the construction sites F of the various construction types described above.

【0034】また、地図M上においては、建設機械Eの
種類(車種)あるいはサイズ(能力)を限定し、この条件に
合致した建設機械Eの配車されている施工現場のみを表
示させることも可能であり、さらには指定した特定の日
時に施工を行っている施工現場Fのみを地図M上に表示
させることもできる。
On the map M, it is also possible to limit the type (vehicle type) or size (capability) of the construction machine E and display only the construction site where the construction machine E meeting the conditions is dispatched. In addition, it is also possible to display on the map M only the construction site F where the construction is being performed at the specified specific date and time.

【0035】なお、1つの施工現場Fに多数の建設機械
Eが配車されている場合、地図M上において建設機械E
を示すアイコンが幾重にも重なって表示されるが、この
ような場合でも地図Mを拡大表示することにより、各々
の建設機械Eにおける位置および種類を明瞭に表示し得
ることは言うまでもない。
If a large number of construction machines E are dispatched to one construction site F, the construction machines E
It is needless to say that even in such a case, the position and type of each construction machine E can be clearly displayed by enlarging and displaying the map M in such a case.

【0036】このように、複数の施工現場F(F1,F
2…)と、複数の建設機械E(E1,E2…)とが、同
一の地図M上において表示されることにより、複数の施
工現場F(F1,F2…)に及ぶ全体の建設機械E(E
1,E2…)を一括して管理することができる。
As described above, a plurality of construction sites F (F1, F
2) and a plurality of construction machines E (E1, E2...) Are displayed on the same map M, so that the entire construction machine E (F1, F2. E
1, E2...) Can be managed collectively.

【0037】また、各建設機械E(E1,E2…)は、上
述の如く稼働時間を始めとする各種情報と併せ、エンジ
ン回転数、エンジントルク、油圧ポンプ出力、アームブ
ームの動作速度、掘削深さ、クレーン用フックの利用の
有無等を時間的に連続して記憶した稼働負荷情報、さら
には燃料消費量や燃料残量等の各種情報をも含んだ稼働
情報を、データベース管理センター20(図1参照)に向
けて送信している。
Each of the construction machines E (E1, E2,...) Has an engine speed, an engine torque, a hydraulic pump output, an operating speed of an arm boom, an excavation depth, together with various information including the operating time as described above. The operating load information which continuously stores the use of the crane hook and the like over time is further stored in the database management center 20 (see FIG. 1). 1).

【0038】これにより、図2の地図M上において、建
設機械Eのアイコンをクリックすることにより、該当す
る建設機械Eの稼働時間に基づく動作時間情報や、稼働
負荷情報を始めとする各種の稼働情報を参照することが
できる。
By clicking the icon of the construction machine E on the map M shown in FIG. 2, various kinds of operation information including the operation time information based on the operation time of the construction machine E and the operation load information are displayed. Information can be referenced.

【0039】もって、各建設機械Fが実際に稼働してい
るのか否か、もっと低い能力の建設機械への置き換えが
可能なのか、あるいはもっと高い能力の建設機械への書
き換えが可能なのか等をモニタすることができる。
Thus, it is determined whether each construction machine F is actually operating, whether it can be replaced with a construction machine having a lower capacity, or whether it can be rewritten to a construction machine having a higher capacity. Can be monitored.

【0040】また、地図M上に表示されている施工現場
Fのアイコンをクリックする、あるいは施工現場FのI
Dナンバーを入力することにより、該当する施工現場F
を管理する管理ソフトのホームページにジャンプするこ
とができる。
Clicking the icon of the construction site F displayed on the map M, or clicking the icon of the construction site F
By inputting the D number, the relevant construction site F
You can jump to the homepage of the management software that manages.

【0041】ここで、上記ホームページは、データベー
ス管理センター20(図1参照)に保管されているデータ
より、アクティブ・サーバ・ページ等の技術によって動
的に生成されたものである。なお、各施工業者が別途プ
ロバイダ等と契約し、管理/作成している静的なホーム
ページであっても良い。
Here, the home page is dynamically generated from data stored in the database management center 20 (see FIG. 1) by a technique such as an active server page. In addition, a static homepage that each contractor separately contracts with a provider or the like and manages / creates may be used.

【0042】上述の如く、ホームぺージにジャンプする
ことにより、端末装置T1には図3に示す如く、地図M
に併せて施工現場Fの状況を撮影した写真Pを表示させ
ることができ、また図4に示す如く、施工作業の進捗状
況を示した工程表Gを表示させることができる。
As described above, by jumping to the home page, the terminal device T1 displays the map M as shown in FIG.
In addition, it is possible to display a photograph P photographing the situation of the construction site F, and to display a process chart G indicating the progress of the construction work as shown in FIG.

【0043】このように、特定の施工現場Fに関する写
真Pや工程表G等の、詳細な施工現場情報を閲覧参照す
ることができるため、複数の施工現場F(F1,F2…)
に関する作業の状況を一元的に管理することが可能とな
る。
As described above, since detailed construction site information such as the photograph P and the process chart G relating to the specific construction site F can be browsed and referred to, a plurality of construction sites F (F1, F2,...)
It is possible to centrally manage the status of work related to

【0044】一方、上述した如く、端末装置T1からは
建設機械E1,E2…の利用予約、および予約状況の確
認を行うことができ、端末装置T1から利用予約を申し
込む場合には、利用したい建設機械のクラスと、利用し
たい期間とを入力すると、各々の施工現場F(F1,F
2…)における建設機械E(E1,E2…)の交換の回数
が最も少なく、かつ各々の建設機械E(E1,E2…)の
移動距離が最も少ない配車方法を自動的に計算する。
On the other hand, as described above, the use of the construction machines E1, E2,... And the reservation status can be confirmed from the terminal device T1, and when the use reservation is applied from the terminal device T1, the construction to be used is desired. When the class of the machine and the period to be used are inputted, each construction site F (F1, F1
2) automatically calculates a vehicle allocation method in which the number of times of replacement of the construction machine E (E1, E2...) Is the smallest and the moving distance of each construction machine E (E1, E2.

【0045】具体的には、図5(a)に示す如く、同種類
かつ同サイズの建設機械E1,E2があり、建設機械E
1が1日〜4日に施工現場F1に配車され、かつ6日〜
10日に施工現場F3に配車されている一方、建設機械
E2が3日〜6日に施工現場F2に配車されている状況
において、5日〜10日の間に施工現場F4で建設機械
を使いたい場合、図5(b)の如く施工現場F4において
途中で建設機械E1と建設機械E2とが交換されること
は極めて効率が悪く、図5(c)の如く1台の建設機械E
2が連続して配車できれば最も効率が良いものとなる。
More specifically, as shown in FIG. 5A, there are construction machines E1 and E2 of the same type and the same size.
1 is dispatched to the construction site F1 from 1st to 4th, and from 6th to
In the situation where the vehicle is dispatched to the construction site F3 on the 10th, while the construction machine E2 is dispatched to the construction site F2 on the 3rd to 6th, the construction machine is used at the construction site F4 for 5 to 10 days. In such a case, it is extremely inefficient that the construction machine E1 and the construction machine E2 are exchanged halfway in the construction site F4 as shown in FIG. 5 (b), and one construction machine E as shown in FIG. 5 (c).
2 is the most efficient if the vehicles can be dispatched continuously.

【0046】すなわち、特定の建設機械nにおいて、 Pn=A×(施工現場間の移動回数)+B×(施工現場間
の移動距離) を評価し(A,Bは定数)、指定する建設機械のクラスに
対する全ての予約の組合せにおいて、 P=ΣPn が最小となる予約方法を選択するものである。
That is, for a specific construction machine n, Pn = A × (number of movements between construction sites) + B × (movement distance between construction sites) is evaluated (A and B are constants), and In the combination of all reservations for the class, a reservation method that minimizes P = ΣPn is selected.

【0047】このとき、端末装置T1における選択スイ
ッチによって、以下の如く立案の種類を選択することが
できる。 1.既に施工現場に配車されている建設機械を含めて配
車計画を立案する。
At this time, the type of planning can be selected as follows by the selection switch in the terminal device T1. 1. Make a vehicle allocation plan that includes construction equipment that has already been allocated to the construction site.

【0048】2.稼働負荷情報により、さらに小型の建
設機械への置き換えが可能な別のクラスの建設機械も含
め配車計画を立案する。 3.上位のクラスの建設機械も施工現場において使用可
能として、上位のクラスの建設機械も含めて配車計画を
立案する。 4.建設機械をレンタルすることをも含めて、配車計画
を立案する。
2. Based on the operational load information, a vehicle allocation plan will be drafted for another class of construction machinery that can be replaced with smaller construction machinery. 3. A higher-class construction machine is also usable at the construction site, and a vehicle allocation plan including the higher-class construction machine is made. 4. Develop a dispatch plan, including renting construction equipment.

【0049】ここで、建設機械をレンタルして使用する
場合には、 Pn=C×(レンタル費用) として評価される。なお、一般的には、レンタル期間が
最小化されるように評価するが、レンタル期間による各
種割引を加味して立案することも可能である。
Here, when renting a construction machine, it is evaluated as Pn = C × (rental cost). In general, the evaluation is made so that the rental period is minimized, but it is also possible to make a plan in consideration of various discounts according to the rental period.

【0050】一方、図1に示したデータベース管理セン
ター20のデータベース20Dには、申し込みによって
各資材供給業者の業務内容、連絡先、さらにホームペー
ジを持っている場合のリンク情報等が記憶されている。
On the other hand, the database 20D of the database management center 20 shown in FIG. 1 stores the business contents of each material supplier, contact information, and link information in the case where the user has a homepage by applying.

【0051】これら資材供給業者のデータに基づいて、
図6に示す如く、施工業者に置かれた端末装置T1に
は、1つの地図M上において、複数の建設機械Eの位置
を示すアイコンとともに、資材供給業者Sの位置を示す
アイコンを表示させることができる。
Based on the data of these material suppliers,
As shown in FIG. 6, an icon indicating the position of the material supplier S and an icon indicating the position of the plurality of construction machines E are displayed on one map M on the terminal device T1 placed by the contractor. Can be.

【0052】ここで、図6の地図Mは、道路工事を実施
している施工現場を選択するとともに、資材供給業者と
して生コン業者を選択して表示させたものである。ま
た、図6の地図Mにおいては、建設機械Eの居る位置が
施工現場であると見なし、建設機械Eを表すアイコンに
より作業現場Fの位置を指示している。勿論、建設機械
Eを表すアイコンとともに、施工現場Fを示すアイコン
(図2参照)を地図M上に表示させても良い。
Here, the map M in FIG. 6 is displayed by selecting a construction site where road construction is being performed and selecting a ready-mixed concrete contractor as a material supplier. In the map M of FIG. 6, the position where the construction machine E is located is regarded as the construction site, and the position of the work site F is indicated by the icon representing the construction machine E. Of course, an icon indicating the construction site F (see FIG. 2) may be displayed on the map M together with the icon indicating the construction machine E.

【0053】図6に示した地図M上において、資材供給
業者Sを示すアイコンをクリックすることにより、該当
する資材供給業者Sに関する業務内容等の情報が表示さ
れ、さらに資材供給業者Sのホームページにジャンプす
ることよって詳細な情報を閲覧することができる。
By clicking on the icon indicating the material supplier S on the map M shown in FIG. 6, information such as the business contents of the corresponding material supplier S is displayed. Detailed information can be viewed by jumping.

【0054】また、端末装置T1の表示画面には、建設
機械/施工現場の現在位置、あるいは別途登録した施工
現場の位置に基づいて、任意の建設機械あるいは施工現
場、言い換えれば資材供給先である施工地点に近い順
に、適宜な数(例えば5社まで)の資材供給業者Sを、地
図M上にアイコンによって表示することができる。
The display screen of the terminal device T1 shows an arbitrary construction machine or construction site, in other words, a material supply destination, based on the current position of the construction machine / construction site or the position of the construction site registered separately. An appropriate number (for example, up to five) of the material suppliers S can be displayed on the map M by icons in order of proximity to the construction point.

【0055】このように、施工業者に置かれた端末装置
T1に、資材供給業者の位置情報が表示されることによ
り、施工業者においては施工地点近くの資材供給業者、
すなわち効率良く資材を調達し得る資材供給業者を素早
く発見することができ、また資材供給業者においては新
たなビジネスチャンスが与えられることとなる。
As described above, the position information of the material supplier is displayed on the terminal device T1 placed by the contractor, so that the contractor can view the material supplier near the construction point,
That is, a material supplier who can efficiently procure materials can be quickly found, and a new business opportunity is given to the material supplier.

【0056】また、地図M上においては、複数の建設機
械E/施工現場F(施工地点)のうち、資材の供給を必要
としている特定の建設機械E/施工現場F(施工地点)の
みを選択して表示することができる。
Further, on the map M, of the plurality of construction machines E / construction sites F (construction points), only a specific construction machine E / construction site F (construction points) requiring supply of materials is selected. Can be displayed.

【0057】この場合、特定の建設機械E/施工現場F
(施工地点)を示すアイコンのみを表示しても良いし、あ
るいは複数のアイコンの内、特定の建設機械E/施工現
場F(施工地点)を示すアイコンのみを点滅させる等によ
り特異に表示しても良い。
In this case, a specific construction machine E / construction site F
Only the icon indicating the (construction point) may be displayed, or among the plurality of icons, only the icon indicating the specific construction machine E / construction site F (construction point) may be blinked or the like to be displayed in a unique manner. Is also good.

【0058】このように、資材の供給を必要としている
特定の建設機械E/施工現場F(施工地点)のみを選択
して表示した地図Mは、資材供給業者Sに置かれた端末
装置T2から閲覧することが可能である。
As described above, the map M in which only the specific construction machine E / construction site F (construction point) requiring the supply of the material is selected and displayed is obtained from the terminal device T2 placed at the material supplier S. It is possible to browse.

【0059】また、施工業者に置かれた端末装置T1か
らは、指定した資材供給業者に対して、施工地点の位
置、すなわち資材供給先を表示している地図Mを添付し
て資材発注のメールを送付することができる。
Further, the terminal device T1 placed at the contractor attaches a map M indicating the position of the construction point, that is, the material supply destination, to the designated material supplier, and sends a material ordering mail. Can be sent.

【0060】上述したメールの送付により、施工業者は
資材の発注を容易に行える一方、資材供給業者は資材供
給先の位置を明確に把握することができる。
By sending the above-mentioned mail, the contractor can easily order materials, while the material supplier can clearly grasp the position of the material supply destination.

【0061】例えば、林道工事等のように資材の供給先
を住所(地番)で表すことが困難な場合でも、地図上に資
材供給先の位置が表示されていることで、数kmに及ぶ
林道の何処へ資材を供給すべきかを具体的に知ることが
でき、これによって資材供給先を探す時間を節約できる
とともに、資材の供給に要する時間を具体的に見積もる
ことができる。
For example, even when it is difficult to represent the material supply destination by an address (lot number) as in the case of forest road construction or the like, the location of the material supply destination is displayed on a map. It is possible to specifically know where to supply the material, thereby saving time for searching for a material supply destination and estimating the time required for material supply.

【0062】また、資材供給業者が管理しているトラッ
クやコンクリートミキサー車等の資材搬送車輌C(図1
参照)には、GPS衛星Sgを用いたグローバル・ポジ
ショニング・システムによる位置計測装置(図示せず)
と、通信衛星Scを用いた衛星通信による無線通信装置
(図示せず)とが搭載されている。
A material transporting vehicle C (see FIG. 1) such as a truck or a concrete mixer truck managed by a material supplier.
), A position measuring device (not shown) by a global positioning system using a GPS satellite Sg
Communication device by satellite communication using communication satellite Sc
(Not shown).

【0063】資材搬送車輌Cからは、一定の時間頻度で
現在位置と移動速度とが、上記無線通信装置(図示せず)
によって、データベース管理センター20に送信され、
データベース20Dに記憶される。
From the material transport vehicle C, the current position and the moving speed are transmitted at a constant time frequency from the wireless communication device (not shown).
Is transmitted to the database management center 20,
Stored in the database 20D.

【0064】資材搬送車輌Cからは、上記無線通信装置
(図示せず)によって、資材搬送車輌Cの現在位置と移動
速度とが、一定の時間頻度でデータベース管理センター
20に送信され、データベース20Dに記憶される。
From the material transfer vehicle C, the wireless communication device
(Not shown), the current position and the moving speed of the material transport vehicle C are transmitted to the database management center 20 at a fixed time frequency, and stored in the database 20D.

【0065】一方、資材供給業者に置かれた端末装置T
2からの指示により、資材搬送車輌Cにはインターネッ
トIを介して資材の供給先の情報が送られ、資材搬送車
輌Cに搭載されたカーナビゲーション装置の表示画面
に、資材の供給先を指示した地図が表示される。
On the other hand, the terminal device T placed at the material supplier
In accordance with the instruction from 2, the information of the material supply destination is sent to the material transport vehicle C via the Internet I, and the material supply destination is instructed on the display screen of the car navigation device mounted on the material transport vehicle C. A map is displayed.

【0066】ここで、カーナビゲーション装置とは、G
PSセンサで検出された自己の車輌の現在位置を、表示
画面の地図上に表示する装置のことであり、端末装置T
1,T2と同様の端末装置として機能するものである。
Here, the car navigation device is G
A device that displays the current position of the vehicle detected by the PS sensor on a map on a display screen.
1 and 2 function as terminal devices.

【0067】上記カーナビゲーション装置の表示画面に
は、図7に示す如く資材の供給先を建設機械E/施工現
場F(施工地点)のアイコンで指示した地図Mが表示さ
れ、この地図M上には自己(資材搬送車輌C)の現在位置
とともに、各資材供給先への最良の搬送経路(図示せず)
が表示され、また複数の資材供給先がある場合には、各
々の資材供給先に対する供給の順番(図8参照)が表示さ
れる。
On the display screen of the car navigation device, as shown in FIG. 7, a map M in which the supply destination of the material is indicated by the icon of the construction machine E / construction site F (construction point) is displayed. Is the best transport route (not shown) to each material destination along with the current position of the self (material transport vehicle C)
Is displayed, and when there are a plurality of material supply destinations, the order of supply to each material supply destination (see FIG. 8) is displayed.

【0068】なお、上記カーナビゲーション装置の表示
画面に表示されている地図Mを、施工業者に置かれた端
末装置T1や、資材供給業者に置かれた端末装置T2か
らも参照し得ることは言うまでもない。
It is needless to say that the map M displayed on the display screen of the car navigation device can be referred to from the terminal device T1 placed at the contractor and the terminal device T2 placed at the material supplier. No.

【0069】また、資材供給業者からの指示によって、
資材搬送車輌Cによる搬送の情報を、どの施工業者に対
して公開するかを指定することができる。
Also, according to the instruction from the material supplier,
It is possible to specify to which contractor the information on the transportation by the material transportation vehicle C is disclosed.

【0070】具体例として、図7に示す如く資材搬送車
輌Cによる資材の供給先に、施工業者(A)の建設機械E
と施工業者(B)の建設機械Eとが含まれており、(A)、
(B)の両施工業者ともに建設機械Eの位置を相手方に知
られたくないような場合、施工業者(A)に対しては、図
8(a)の如く自社の建設機械E以外の資材供給先を単な
る搬送場所を示すアイコンiで示した地図Mを公開し、
また施工業者(B)に対しては、図8(b)に示す如く自社
の建設機械E以外の資材供給先を単なる搬送場所位置を
示すアイコンiで示した地図Mを公開することができ
る。
As a specific example, as shown in FIG. 7, the material supply vehicle C supplies a material to a construction machine E of a contractor (A).
And the construction machine E of the contractor (B).
In the case where both the contractors (B) do not want to know the location of the construction machine E to the other party, supply the contractor (A) with materials other than the construction machine E as shown in FIG. A map M indicated by an icon i indicating a mere transfer place is disclosed,
Further, as shown in FIG. 8 (b), a map M in which a material supply destination other than the company's construction machine E is simply indicated by an icon i indicating a transfer position can be disclosed to the contractor (B).

【0071】なお、図8(a),(b)中の矢印a,b,
c,cは、複数の資材供給先に対する資材搬送車輌Cの
立ち寄り順、すなわち各々の資材供給先に対する供給の
順番を示すものである。
Note that arrows a, b, and b in FIGS. 8 (a) and 8 (b)
“c” and “c” indicate the order in which the material transport vehicle C stops at a plurality of material supply destinations, that is, the order of supply to each material supply destination.

【0072】上述した構成によれば、資材供給業者は保
有する資材搬送車輌を有効に管理することができ、空い
ている資材搬送車輌の管理によって急な配送要請に対し
ても柔軟に応じることが可能となる。
According to the above-described configuration, the material supplier can effectively manage the material transport vehicles owned by the material supplier, and can flexibly respond to a sudden delivery request by managing the empty material transport vehicles. It becomes possible.

【0073】また、地図M上に資材の配送先である建設
機械E/施工現場F(施工地点)と、資材搬送車輌Cの現
在位置とが表示されることによって、生コンやアスファ
ルト等、時間とともに品質の劣化する製品の配送時間を
正確に管理することができ、品質の良好な製品(資材)を
供給することが可能となる。
Further, the construction machine E / construction site F (construction point) to which the material is delivered and the current position of the material transport vehicle C are displayed on the map M, so that the ready-mixed concrete and asphalt, etc. It is possible to accurately manage the delivery time of a product having deteriorated quality, and to supply a product (material) having good quality.

【0074】さらに、特定の施工地点に対して何台の資
材搬送車輌により何回資材を供給したのか、どの工場か
ら資材を供給したのか等の管理は、従来、各々の資材搬
送車輌に持たせた紙の文書により行っているが、上述し
た如く、施工地点の位置情報と資材搬送車輌の位置情報
とを一元化することによって、上述した如き資材の搬送
に関わる様々な情報の管理を電子化することが可能とな
る。
Further, management of how many materials are supplied by a material transport vehicle and how many materials are supplied to a specific construction point, and from which factory the material is supplied, are conventionally assigned to each material transport vehicle. As described above, by unifying the position information of the construction point and the position information of the material transport vehicle as described above, the management of various information related to the material transport as described above is digitized. It becomes possible.

【0075】一方、施工業者にとっては、地図M上に資
材の配送先と資材搬送車輌の現在位置とが表示されるこ
とで、複数の資材の搬送経路とともに資材の正確な到着
時間を把握でき、これによって効率的な施工計画を立案
することが可能となる。
On the other hand, for the contractor, the delivery destination of the material and the current position of the material transporting vehicle are displayed on the map M, so that the accurate arrival time of the material together with the transport routes of the plurality of materials can be grasped. This makes it possible to draft an efficient construction plan.

【0076】ここで、地図M上に表示される資材搬送車
輌の経路は、単に位置(経路自体)を表示するだけでな
く、経路上の距離を表示することも、資材の搬送に要す
る時間を管理する上では有効である。
Here, the route of the material transport vehicle displayed on the map M not only indicates the position (route itself) but also the distance on the route, and the time required for material transport is not limited. It is effective in managing.

【0077】また、VICS(道路交通情報通信システ
ム)や、本件特許出願人が先に出願した渋滞監視システ
ム(特願 2000-235024)によりモニタした渋滞情報を加味
して、移動予想時間(資材到着時間)を表示しても良い。
なお、資材搬送車輌の現在位置に基づく資材供給先への
到着時間を、資材搬送車輌、資材供給業者、施工業者に
よって閲覧可能としても良い。
Further, taking into account the traffic congestion information monitored by a VICS (road traffic information communication system) or a traffic congestion monitoring system (Japanese Patent Application No. 2000-235024) previously filed by the present applicant, the estimated travel time (material arrival time) Time) may be displayed.
The arrival time at the material supply destination based on the current position of the material transport vehicle may be viewed by the material transport vehicle, the material supplier, and the installer.

【0078】因みに、上記渋滞監視システム(特願 2000
-235024)は、道路工事の交互通行区間において車輌が進
入する入口にそれぞれ設けた信号機と、交互通行区間を
通過する車輌の有無を検出する車輌検出装置とを具備
し、さらに信号機の表示を切り換えて交互通行区間への
車輌の進入許可方向を制御するとともに、交互通行区間
を通過する車輌が通過許可時間継続して通過するか否か
を判定し、継続して通過した事象が同一進行方向におい
て通過許可毎に連続して発生した場合に、渋滞が発生し
ているものと判定する制御装置を具備して成るものであ
る。
Incidentally, the traffic congestion monitoring system (Japanese Patent Application No. 2000
-235024) is equipped with a traffic signal provided at the entrance where vehicles enter in the alternating traffic section of road construction, a vehicle detection device that detects the presence or absence of vehicles passing through the alternating traffic section, and further switches the display of the traffic signal. Control the direction in which vehicles can enter the alternating traffic section, and determine whether vehicles passing through the alternating traffic section continue to pass for the permitted time. The control device is provided with a control device that determines that traffic congestion has occurred when the traffic continuously occurs for each passage permission.

【0079】また、施工業者において、施工現場に搬
入、搬出する資材搬送車輌の管理は、土木施工の出来高
の目安となるが、施工現場に立ち寄った車輌の台数と時
刻とをモニターすることによって、特別な装置を用いる
ことなく1日の中での施工の進捗状況を管理することが
できる。
Further, the management of the material transport vehicles that are carried in and out of the construction site by the contractor is a measure of the amount of civil engineering work, but by monitoring the number and time of vehicles that have stopped at the construction site, It is possible to manage the progress of construction in one day without using special equipment.

【0080】ここで、資材搬送車輌が施工現場に到着し
たことを証明するには、資材搬送車輌がが施工現場の近
傍に到着したことを管理すればよく、例えば、施工業者
側の作業者が、施工現場への資材搬送車輌の到着を確認
して確認ボタンを押し、その信号を近距離通信手段を用
いて資材搬送車輌に送信することによって、施工現場と
車輌との間で直接的に相互確認する方法が考えられる。
Here, in order to prove that the material transport vehicle has arrived at the construction site, it is only necessary to manage the fact that the material transport vehicle has arrived near the construction site. By confirming the arrival of the material transport vehicle at the construction site, pressing the confirmation button, and transmitting the signal to the material transport vehicle using short-range communication means, the direct interaction between the construction site and the vehicle is possible. There is a way to check.

【0081】また、各施工現場の進捗状況を管理する方
法としては、各作業員の位置をモニタする方法もある。
例えば、各作業員および建設機械に、GPS装置と無線
通信装置とを携帯/装着させることにより、建設機械か
ら各作業員の位置を監視することができる。
As a method of managing the progress of each construction site, there is a method of monitoring the position of each worker.
For example, by carrying / attaching a GPS device and a wireless communication device to each worker and the construction machine, the position of each worker can be monitored from the construction machine.

【0082】これにより、以下の如く作業の状況を自動
的に判定することができる。 (a) 作業員が建設機械の近傍に存在し、建設機械が稼
働している場合は、掘削(埋め戻し)作業中である。 (b) 作業員が建設機械の近傍に存在し、建設機械が稼
働していない場合は、管等の構造物の設置作業中であ
る。 (c) 作業員が建設機械から離れており、建設機械が稼
働している場合は、休憩中である。
As a result, the status of the work can be automatically determined as follows. (a) When a worker is near the construction machine and the construction machine is operating, excavation (backfilling) is in progress. (b) If the worker is near the construction machine and the construction machine is not operating, installation work of a structure such as a pipe is in progress. (c) If the worker is away from the construction machine and the construction machine is operating, it is taking a break.

【0083】このようにして判定した作業の状況を、前
日までの進捗状況と比較することによって、例えば下水
道工事の場合、管の埋設が通常より早い/遅いといった
進捗状況を知ることができる。
By comparing the status of the work determined in this way with the progress up to the previous day, for example, in the case of sewage works, it is possible to know the progress of pipe burial earlier or later than usual.

【0084】また、各作業員および建設機械に携帯/装
着させたGPS装置と無線通信装置とは、建設機械と作
業員との干渉を回避するための安全装置にもなる。すな
わち、建設機械のオペレータに他の作業員の位置を知ら
せることにより、オペレータが気付かずに建設機械の作
業機動作範囲内に他の作業員が入り込んでしまう事故
や、オペレータが他の作業員の位置を誤認していた為に
発生する事故を未然に防止することができる。
Further, the GPS device and the radio communication device carried / mounted on each worker and the construction machine also serve as safety devices for avoiding interference between the construction machine and the worker. That is, by notifying the operator of the construction machine of the position of another worker, an accident in which the other worker enters the working machine operation range of the construction machine without noticing the operator, or the operator's It is possible to prevent an accident occurring due to misidentification of the position.

【0085】ところで、上述した実施例においては、施
工地点の位置を管理するために、複数の建設機械の各々
に、施工地点位置管理手段としての位置計測装置および
無線通信装置を搭載しているが、この施工地点位置管理
手段(位置計測装置+無線通信装置)として、複数の携
帯電話基地局からの距離に基づいて位置を特定する位置
計測装置と、携帯電話通信を用いた無線通信装置とを備
えて成る携帯電話機を採用し、この携帯電話機を建設機
械に搭乗する作業員に携帯させるようにしてもよい。
In the above-described embodiment, a position measuring device and a radio communication device as construction point position management means are mounted on each of a plurality of construction machines in order to manage the position of the construction point. As the construction point position management means (position measurement device + wireless communication device), a position measurement device for specifying a position based on a distance from a plurality of mobile phone base stations and a wireless communication device using mobile phone communication are used. The mobile phone provided may be employed, and the mobile phone may be carried by a worker who is on a construction machine.

【0086】また、施工地点位置管理手段としては、上
述した携帯電話機のみならず、位置計測装置と無線通信
装置とを備えて成る、各種のPDA(パーソナル・デー
タ・アシスタンス)をも採用し得ることは言うまでもな
い。
Further, as the construction point position management means, not only the above-mentioned portable telephone, but also various types of PDAs (personal data assistance) comprising a position measuring device and a radio communication device can be adopted. Needless to say.

【0087】また、上述した各実施例においては、端末
装置に表示した地図上に、建設機械や施工現場の位置を
グラフィカルに表示しているが、建設機械や施工現場の
位置を、住所を記述した文字情報で端末装置に表示する
ことも可能であるし、住所を音声により読み上げて表示
することも可能である。あるいは、建設機械と施工現場
との相互の移動距離を、端末装置に文字や音声によって
表示するようにしてもよい。
In each of the above embodiments, the position of the construction machine or the construction site is graphically displayed on the map displayed on the terminal device, but the position of the construction machine or the construction site is described by the address. The displayed character information can be displayed on the terminal device, or the address can be read out by voice and displayed. Alternatively, the mutual movement distance between the construction machine and the construction site may be displayed on the terminal device by text or voice.

【0088】さらに、建設機械の予約情報を端末装置か
ら入力し、データベースに記憶されている施工現場や建
設機械の位置情報から求められる距離情報により、シス
テムが求めた建設機械の最適な配車指示を、文字や音声
によって表示するように構成することも可能である。
Further, the reservation information of the construction machine is inputted from the terminal device, and based on the distance information obtained from the construction site and the position information of the construction machine stored in the database, the optimum dispatch instruction of the construction machine obtained by the system is obtained. , Can be configured to be displayed by characters or voice.

【0089】このように、各種の情報を文字や音声によ
って表示することにより、大形の表示装置を有していな
い小さな携帯情報端末を採用することができ、また運転
中にハンズフリーで使用する端末装置にも対応すること
できる。
As described above, by displaying various kinds of information by characters and voices, a small portable information terminal having no large-sized display device can be employed, and the portable information terminal can be used hands-free during driving. It can also support terminal devices.

【0090】また、上述した実施例においては、資材搬
送車輌の位置を管理するために、該資材搬送車輌に資材
搬送車輌位置管理手段としての位置計測装置および無線
通信装置を搭載しているが、この資材搬送車輌位置管理
手段に換えて携帯電話機、あるいは各種PDAを採用
し、資材搬送車輌に搭乗する作業員に携帯させることも
可能である。
Further, in the above-described embodiment, in order to manage the position of the material transporting vehicle, the position measuring device and the radio communication device as the material transporting vehicle position managing means are mounted on the material transporting vehicle. A mobile phone or various types of PDAs may be employed in place of the material transporting vehicle position management means and carried by an operator boarding the material transporting vehicle.

【0091】さらに、道路工事区間等の実際の施工現場
にいる作業員に、携帯電話機や各種PDAを携帯させる
ことによって、直接的に施工現場の位置管理を行うこと
も可能となる。
Further, it is possible to directly control the position of the construction site by carrying a mobile phone or various PDAs to a worker at an actual construction site such as a road construction section.

【0092】このように、建設機械、施工現場、および
資材搬送車輌の位置管理に、携帯電話機を代表とする携
帯端末を利用することによって、施工現場管理システム
における構成の簡易化および低コスト化を達成し得ると
ともに、様々な業種への転用に際しての自由度が極めて
大きなものとなる。
As described above, by using the portable terminal typified by the portable telephone for the position management of the construction machine, the construction site, and the material transporting vehicle, the configuration of the construction site management system can be simplified and the cost can be reduced. This can be achieved, and the degree of freedom in diverting to various industries becomes extremely large.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に関わる施工現場管理システムの一実施
例を示す全体構成図。
FIG. 1 is an overall configuration diagram showing an embodiment of a construction site management system according to the present invention.

【図2】端末装置における地図の表示例を示す概念図。FIG. 2 is a conceptual diagram showing a display example of a map on a terminal device.

【図3】端末装置における地図と現場情報との表示例を
示す概念図。
FIG. 3 is a conceptual diagram showing a display example of a map and site information on a terminal device.

【図4】端末装置における地図と現場情報との表示例を
示す概念図。
FIG. 4 is a conceptual diagram showing a display example of a map and site information on a terminal device.

【図5】(a)〜(c)は、複数の建設機械に対する利用予
約の態様を示す概念図。
FIGS. 5A to 5C are conceptual diagrams showing modes of use reservation for a plurality of construction machines.

【図6】端末装置における地図の表示例を示す概念図。FIG. 6 is a conceptual diagram showing a display example of a map on a terminal device.

【図7】端末装置における地図の表示例を示す概念図。FIG. 7 is a conceptual diagram showing a display example of a map on a terminal device.

【図8】(a)および(b)は、端末装置における地図の表
示例を示す概念図。
FIGS. 8A and 8B are conceptual diagrams showing a display example of a map on a terminal device.

【符号の説明】[Explanation of symbols]

1:施工現場管理システム、 10:通信手段、 20:データベース管理センター、 E(E1,E2…):建設機械、 F(F1,F2…):施工現場、 T1,T2…:端末装置、 M:地図。 1: Construction site management system, 10: Communication means, 20: Database management center, E (E1, E2 ...): Construction machine, F (F1, F2 ...): Construction site, T1, T2 ...: Terminal device, M: map.

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 建設機械の位置情報と施工現場の位置情
報とを記憶保存するデータベースを備えて成ることを特
徴とする施工現場管理システム。
1. A construction site management system comprising a database for storing and storing position information of construction machines and position information of a construction site.
【請求項2】 位置計測装置および通信装置を備えた建
設機械と、前記通信手段を介して前記建設機械と接続さ
れた端末装置とを具備し、前記端末装置に建設機械の位
置情報を表示するとともに、施工現場の位置情報を表示
することを特徴とする施工現場管理システム。
2. A construction machine comprising a position measuring device and a communication device, and a terminal device connected to the construction machine via the communication means, wherein the terminal device displays position information of the construction machine. A construction site management system characterized by displaying position information of the construction site.
【請求項3】 位置計測装置および通信装置を備えた建
設機械と、前記通信手段を介して前記建設機械と接続さ
れた端末装置とを具備し、前記端末装置に表示した地図
上に、建設機械の位置情報を表示するとともに、施工現
場の位置情報を表示することを特徴とする施工現場管理
システム。
3. A construction machine having a position measuring device and a communication device, and a terminal device connected to the construction machine via the communication means, wherein the construction machine is displayed on a map displayed on the terminal device. A construction site management system characterized by displaying the position information of the construction site and the position information of the construction site.
【請求項4】 前記建設機械から稼働情報を取得し、前
記端末装置に前記稼働情報を表示することを特徴とする
請求項2または請求項3記載の施工現場管理システム。
4. The construction site management system according to claim 2, wherein operation information is acquired from the construction machine, and the operation information is displayed on the terminal device.
【請求項5】 前記端末装置に、施工現場の状況を示す
現場情報を表示することを特徴とする請求項2または請
求項3記載の施工現場管理システム。
5. The construction site management system according to claim 2, wherein site information indicating a condition of the construction site is displayed on said terminal device.
【請求項6】 施工地点の位置情報を表示するととも
に、資材供給業者の位置情報を表示することを特徴とす
る施工現場管理システム。
6. A construction site management system for displaying position information of a construction point and displaying position information of a material supplier.
【請求項7】 位置計測装置および通信装置を備えた施
工地点位置管理手段を設けた施工地点と、通信手段を介
して前記施工地点と接続された端末装置とを具備し、前
記端末装置に資材を供給するための施工地点を表示する
ことを特徴とする施工現場管理システム。
7. A construction point provided with a construction point position management means provided with a position measuring device and a communication device, and a terminal device connected to the construction point via communication means, wherein the terminal device has a material. A construction site management system characterized by displaying a construction point for supplying the construction.
【請求項8】 位置計測装置および通信装置を備えた施
工地点位置管理手段を設けた施工地点と、位置計測装置
および通信装置を備えた資材搬送車輌位置管理手段を設
けた資材搬送車輌と、通信手段を介して前記施工地点お
よび前記資材搬送車輌と接続された端末装置とを具備
し、前記端末装置に前記施工地点の位置情報を表示する
とともに、前記資材搬送車輌の位置情報を表示すること
を特徴とする施工現場管理システム。
8. A construction point provided with a construction point position management means provided with a position measuring device and a communication device, and a material transfer vehicle provided with a material conveyance vehicle position management means provided with a position measurement device and a communication device, A terminal device connected to the construction point and the material transport vehicle via means, and displaying the position information of the construction point on the terminal device, and displaying the position information of the material transport vehicle. Characteristic construction site management system.
【請求項9】 前記施工地点位置管理手段は、建設機械
に搭載された携帯情報端末であることを特徴とする請求
項7または請求項8記載の施工現場管理システム。
9. The construction site management system according to claim 7, wherein said construction point position management means is a portable information terminal mounted on a construction machine.
JP2000296984A 2000-09-28 2000-09-28 Construction site management system Pending JP2002105989A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000296984A JP2002105989A (en) 2000-09-28 2000-09-28 Construction site management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000296984A JP2002105989A (en) 2000-09-28 2000-09-28 Construction site management system

Publications (1)

Publication Number Publication Date
JP2002105989A true JP2002105989A (en) 2002-04-10

Family

ID=18779169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000296984A Pending JP2002105989A (en) 2000-09-28 2000-09-28 Construction site management system

Country Status (1)

Country Link
JP (1) JP2002105989A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007026212A (en) * 2005-07-19 2007-02-01 Hitachi Constr Mach Co Ltd Work information management system and mobile terminal device
JP2010073031A (en) * 2008-09-19 2010-04-02 Hitachi Constr Mach Co Ltd Execution management system
JP2010196315A (en) * 2009-02-24 2010-09-09 Enzan Kobo:Kk Method for measuring cycle time in tunnel construction
WO2014177755A1 (en) * 2013-04-30 2014-11-06 Tana Oy Work machine control
JP2015209718A (en) * 2014-04-28 2015-11-24 住友建機株式会社 Construction machine safe operation support system
JP2015535992A (en) * 2012-09-24 2015-12-17 キャタピラー インコーポレイテッドCaterpillar Incorporated Control and inspection of mining operations
JP2016089388A (en) * 2014-10-30 2016-05-23 日立建機株式会社 Work support image generation device and work machine remote control system equipped with the same
JP2017163541A (en) * 2017-03-02 2017-09-14 株式会社クボタ Work machine and application program
WO2019031551A1 (en) * 2017-08-08 2019-02-14 住友建機株式会社 Excavator and excavator assist device
JP2019056214A (en) * 2017-09-20 2019-04-11 日立建機株式会社 Construction management system
JP2019145020A (en) * 2018-02-23 2019-08-29 株式会社竹中工務店 Management system and management program
JP2019179359A (en) * 2018-03-30 2019-10-17 高砂熱学工業株式会社 Fixed beacon management system and program
JP2019179357A (en) * 2018-03-30 2019-10-17 高砂熱学工業株式会社 Shared construction equipment amount management system and program
WO2020067411A1 (en) * 2018-09-27 2020-04-02 三井物産株式会社 Information processing device and program
JP2021026695A (en) * 2019-08-08 2021-02-22 株式会社日立製作所 Rental equipment management system and rental equipment management method
JP2021080787A (en) * 2019-11-21 2021-05-27 株式会社小松製作所 Operating area presentation apparatus and operating area presentation method
US11994397B2 (en) 2017-08-08 2024-05-28 Sumitomo Construction Machinery Co., Ltd. Shovel and assist device for shovel

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS629500A (en) * 1985-07-05 1987-01-17 日産自動車株式会社 Map information display controller for vehicle
JPH02112100A (en) * 1988-10-21 1990-04-24 Hitachi Ltd Vehicle dispatching system
JPH05181866A (en) * 1991-12-27 1993-07-23 Kibi Kotsu Kk Full-automatic car operation system for taxi or the like
JPH06215297A (en) * 1993-01-13 1994-08-05 Matsushita Electric Ind Co Ltd Tracking device
JPH085394A (en) * 1994-06-21 1996-01-12 Hitachi Ltd Portable terminal device and communication system using the device
JPH08212490A (en) * 1994-11-29 1996-08-20 Nippon Signal Co Ltd:The Traffic obstacle positional information processor
JPH1074298A (en) * 1996-08-30 1998-03-17 Mitsubishi Denki Eng Kk Vehicle moving state managing system
JPH10105889A (en) * 1996-09-25 1998-04-24 Sharp Corp Car navigation system
JP2000027585A (en) * 1998-03-05 2000-01-25 Caterpillar Inc Method for obtaining and displaying position of truck in material-transportation
JP2000048030A (en) * 1998-07-27 2000-02-18 Toshiba Corp Information collection system
JP2000076505A (en) * 1998-08-31 2000-03-14 Yutani Heavy Ind Ltd Operating device and its information management system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS629500A (en) * 1985-07-05 1987-01-17 日産自動車株式会社 Map information display controller for vehicle
JPH02112100A (en) * 1988-10-21 1990-04-24 Hitachi Ltd Vehicle dispatching system
JPH05181866A (en) * 1991-12-27 1993-07-23 Kibi Kotsu Kk Full-automatic car operation system for taxi or the like
JPH06215297A (en) * 1993-01-13 1994-08-05 Matsushita Electric Ind Co Ltd Tracking device
JPH085394A (en) * 1994-06-21 1996-01-12 Hitachi Ltd Portable terminal device and communication system using the device
JPH08212490A (en) * 1994-11-29 1996-08-20 Nippon Signal Co Ltd:The Traffic obstacle positional information processor
JPH1074298A (en) * 1996-08-30 1998-03-17 Mitsubishi Denki Eng Kk Vehicle moving state managing system
JPH10105889A (en) * 1996-09-25 1998-04-24 Sharp Corp Car navigation system
JP2000027585A (en) * 1998-03-05 2000-01-25 Caterpillar Inc Method for obtaining and displaying position of truck in material-transportation
JP2000048030A (en) * 1998-07-27 2000-02-18 Toshiba Corp Information collection system
JP2000076505A (en) * 1998-08-31 2000-03-14 Yutani Heavy Ind Ltd Operating device and its information management system

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007026212A (en) * 2005-07-19 2007-02-01 Hitachi Constr Mach Co Ltd Work information management system and mobile terminal device
JP2010073031A (en) * 2008-09-19 2010-04-02 Hitachi Constr Mach Co Ltd Execution management system
JP2010196315A (en) * 2009-02-24 2010-09-09 Enzan Kobo:Kk Method for measuring cycle time in tunnel construction
JP2015535992A (en) * 2012-09-24 2015-12-17 キャタピラー インコーポレイテッドCaterpillar Incorporated Control and inspection of mining operations
WO2014177755A1 (en) * 2013-04-30 2014-11-06 Tana Oy Work machine control
US10663955B2 (en) 2013-04-30 2020-05-26 Tana Oy Work machine control
JP2015209718A (en) * 2014-04-28 2015-11-24 住友建機株式会社 Construction machine safe operation support system
JP2016089388A (en) * 2014-10-30 2016-05-23 日立建機株式会社 Work support image generation device and work machine remote control system equipped with the same
JP2017163541A (en) * 2017-03-02 2017-09-14 株式会社クボタ Work machine and application program
KR20200038884A (en) * 2017-08-08 2020-04-14 스미토모 겐키 가부시키가이샤 Shovel and shovel support device
CN110446817A (en) * 2017-08-08 2019-11-12 住友建机株式会社 The assisting system of excavator and excavator
WO2019031551A1 (en) * 2017-08-08 2019-02-14 住友建機株式会社 Excavator and excavator assist device
JPWO2019031551A1 (en) * 2017-08-08 2020-08-27 住友建機株式会社 Shovel and shovel support device
US11994397B2 (en) 2017-08-08 2024-05-28 Sumitomo Construction Machinery Co., Ltd. Shovel and assist device for shovel
KR102575200B1 (en) 2017-08-08 2023-09-05 스미토모 겐키 가부시키가이샤 Shovel and shovel support device
JP7258758B2 (en) 2017-08-08 2023-04-17 住友建機株式会社 Excavator and excavator support equipment
JP2019056214A (en) * 2017-09-20 2019-04-11 日立建機株式会社 Construction management system
JP2019145020A (en) * 2018-02-23 2019-08-29 株式会社竹中工務店 Management system and management program
JP2019179359A (en) * 2018-03-30 2019-10-17 高砂熱学工業株式会社 Fixed beacon management system and program
JP2019179357A (en) * 2018-03-30 2019-10-17 高砂熱学工業株式会社 Shared construction equipment amount management system and program
JP7250430B2 (en) 2018-03-30 2023-04-03 高砂熱学工業株式会社 Information processing system and program
JP7304136B2 (en) 2018-03-30 2023-07-06 高砂熱学工業株式会社 Information processing system, information processing device, program and information processing method
WO2020067411A1 (en) * 2018-09-27 2020-04-02 三井物産株式会社 Information processing device and program
JPWO2020067411A1 (en) * 2018-09-27 2021-02-15 三井物産株式会社 Information processing equipment and programs
JP2021026695A (en) * 2019-08-08 2021-02-22 株式会社日立製作所 Rental equipment management system and rental equipment management method
JP7455530B2 (en) 2019-08-08 2024-03-26 株式会社日立ケーイーシステムズ Rental equipment management system and rental equipment management method
CN114729523A (en) * 2019-11-21 2022-07-08 株式会社小松制作所 Work area presentation device and work area presentation method
WO2021100785A1 (en) * 2019-11-21 2021-05-27 株式会社小松製作所 Operation area presentation device and operation area presentation method
JP7264795B2 (en) 2019-11-21 2023-04-25 株式会社小松製作所 Operating area presentation device and operating area presentation method
JP2021080787A (en) * 2019-11-21 2021-05-27 株式会社小松製作所 Operating area presentation apparatus and operating area presentation method
CN114729523B (en) * 2019-11-21 2023-09-01 株式会社小松制作所 Work area presentation device and work area presentation method

Similar Documents

Publication Publication Date Title
JP2002105989A (en) Construction site management system
JP3788910B2 (en) Mobile communication device
JP5052468B2 (en) Construction management system
US9460051B2 (en) Method for utilization calculation on equipment including independent component
JP6013739B2 (en) Transport vehicle operation support system and transport vehicle operation support method
US20070179709A1 (en) Navigation data quality feedback
WO2007011839A2 (en) Mobile resource location-based customer contact systems and methods
WO2000055828A1 (en) Device for presenting information to mobile
JP4350717B2 (en) Mobile communication device
CN111008810B (en) System and method for monitoring paving system components
JP6651105B1 (en) Garbage collection business management system and its management server
JP5303794B2 (en) Work machine management device
JP2002108975A (en) Construction quantity managing system
US11687852B2 (en) Management device, construction management system, and position information management method
CN112673137A (en) On-site management system
JP4532789B2 (en) Work machine management device
JP4656772B2 (en) Mobile communication device
KR20220167426A (en) Construction vehicle allocation system for multi construction sites in the downtown area using artificial intelligence (ai), and method for the same
CN109074614B (en) Construction management device, construction management system, and construction management method
JP5806690B2 (en) Work machine management device
JP2006104933A (en) Communication device for construction machine
JP2010143581A (en) Start lock device of mobile body
US11870823B2 (en) Call sharing system and call sharing method for construction work
JP4198177B2 (en) Communication equipment for construction machinery
JP2003085315A (en) System, method for administrating vehicle for repair and program for executing the method on computer, and system, method for administrating machine repair and program for executing the method on computer

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060227

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080626

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080708

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20081104