JP2002064488A - Collective equipment operation monitoring system - Google Patents

Collective equipment operation monitoring system

Info

Publication number
JP2002064488A
JP2002064488A JP2000246245A JP2000246245A JP2002064488A JP 2002064488 A JP2002064488 A JP 2002064488A JP 2000246245 A JP2000246245 A JP 2000246245A JP 2000246245 A JP2000246245 A JP 2000246245A JP 2002064488 A JP2002064488 A JP 2002064488A
Authority
JP
Japan
Prior art keywords
monitoring device
centralized
terminal
monitoring
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000246245A
Other languages
Japanese (ja)
Inventor
Daizo Kuroyanagi
大造 黒柳
Tetsuaki Kamata
哲彰 鎌田
Ryoichi Aoyama
良一 青山
Koji Isshiki
耕治 一色
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2000246245A priority Critical patent/JP2002064488A/en
Publication of JP2002064488A publication Critical patent/JP2002064488A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a collective equipment monitoring system capable of eliminating troublesome maintenance works associated with increasing services supplied by an intelligent network and quickly flexibly responding to a plurality of signal mode specifications between an operation device and an operation terminal. SOLUTION: A given collective monitoring apparatus is connected to an operation terminal through a data transfer network and is connected to the operation device by a logic circuit or a physical circuit. The collective monitoring apparatus connects the operation terminal to the operation device based on a request of the operation terminal. Further, the apparatus converts a signal between the operation terminal and the operation device by a predetermined method, in the case where a condition defined by the signal mode specification between the operation device and the collective monitoring apparatus differs from a condition defined by the signal mode specification between the operation terminal and the collective monitoring apparatus.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、通信網における集
約的設備動作監視システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an integrated facility operation monitoring system in a communication network.

【0002】[0002]

【従来の技術】従来のインテリジェントネットワークに
おけるサービス制御装置の動作監視システムは、オペレ
ーション装置毎に設置されたサービス制御装置操作端末
に複数台のサービス制御装置が論理回線又は物理回線で
集約的に接続されており、また、操作端末も特定のオペ
レーション装置のみに論理回線又は物理回線で集約的に
接続されている。従って、サービスの数以上の動作監視
システムが構築され、動作監視システムの操作のために
動作監視システム以上の数の操作端末が設置されてい
る。
2. Description of the Related Art In a conventional operation monitoring system of a service control device in an intelligent network, a plurality of service control devices are collectively connected to a service control device operation terminal installed for each operation device by a logical line or a physical line. Also, the operation terminals are collectively connected to only specific operation devices by logical lines or physical lines. Therefore, more operation monitoring systems than the number of services are constructed, and more operation terminals than the operation monitoring system are installed for operating the operation monitoring system.

【0003】インテリジェントネットワークの本格的な
普及に伴い、更に、ユーザーに提供されるサービスの多
様化に伴って、サービス制御装置及びオペレーション装
置等の台数が著しく増加している。その場合、従来の動
作監視方法により一人の保守者が複数台のオペレーショ
ン装置について動作監視を行う場合、動作監視対象サー
ビス数以上の操作端末の操作が必要になり、保守者の作
業が非常に繁雑になるという問題があった。
[0003] With the widespread use of intelligent networks and the diversification of services provided to users, the number of service control devices and operation devices has been remarkably increasing. In this case, when one maintenance person monitors the operation of a plurality of operation devices by the conventional operation monitoring method, it is necessary to operate the operation terminals more than the number of services to be monitored and the maintenance person's work becomes very complicated. There was a problem of becoming.

【0004】また、ユーザーに提供するサービスの多様
化によりオペレーション装置と操作端末との間で送受信
される信号に対して頻繁に拡張が加えられる。そのた
め、動作監視システムでは複数のオペレーション装置と
操作端末との間の信号方式仕様に対する同時対応が要求
され、また、新たに追加される信号方式仕様に敏速且つ
柔軟に対応しなければならないという問題があった。
[0004] In addition, diversification of services provided to users frequently adds to signals transmitted and received between operation devices and operation terminals. For this reason, the operation monitoring system is required to simultaneously cope with the signaling system specifications between a plurality of operation devices and operating terminals, and also needs to respond promptly and flexibly to newly added signaling system specifications. there were.

【0005】[0005]

【発明が解決しようとする課題】本発明の目的は、イン
テリジェントネットワークで提供されるサービスの増加
に伴う保守者作業の繁雑化を解消し、オペレーション装
置と操作端末との間の信号方式仕様の複数化に対して敏
速且つ柔軟に対応することができる、集約的設備動作監
視システムを提供することにある。
SUMMARY OF THE INVENTION It is an object of the present invention to eliminate the complexity of maintenance work due to the increase in services provided by an intelligent network, and to reduce the number of signaling system specifications between an operation device and an operation terminal. It is an object of the present invention to provide an intensive equipment operation monitoring system capable of promptly and flexibly responding to a change in the system.

【0006】[0006]

【課題を解決するための手段】本発明の集約的設備動作
監視システムは、上記の目的を達成するため、音声回線
又はデータ転送回線を接続する複数の交換機、該交換機
に対して動作を指示するための一又は複数のサービス制
御装置、該サービス制御装置の動作を監視するための一
又は複数のオペレーション装置、該オペレーション装置
の操作を行うための一又は複数の操作端末、該オペレー
ション装置及び該操作端末に集約的に接続する一又は複
数の集約監視装置を具える、通信網における集約的設備
動作監視システムにおいて、任意の集約監視装置と操作
端末とがデータ転送網で接続され、集約監視装置とオペ
レーション装置とが論理回線又は物理回線で接続され、
監視を要求する操作端末とオペレーション装置とを集約
監視装置がデータ転送網及び論理回線又は物理回線によ
って接続を行い、且つ、オペレーション装置に対して許
容される任意の操作端末から操作を行う場合及び操作端
末に対して許容される任意のオペレーション装置から操
作を行う場合に、オペレーション装置と集約監視装置と
の間の信号方式仕様で規定される条件と、操作端末と集
約監視装置との間の信号方式仕様で規定される条件とが
相違する場合、集約監視装置が予め設定された方法によ
り両者間の信号変換を行うことを特徴とする。
In order to achieve the above object, a centralized facility operation monitoring system according to the present invention provides a plurality of exchanges for connecting a voice line or a data transfer line, and instructs the exchanges to operate. One or a plurality of service control devices, one or a plurality of operation devices for monitoring operation of the service control device, one or a plurality of operation terminals for operating the operation device, the operation device, and the operation In a centralized facility operation monitoring system in a communication network comprising one or more centralized monitoring devices intensively connected to terminals, any centralized monitoring device and an operation terminal are connected by a data transfer network, and the centralized monitoring device and The operation device is connected by a logical line or a physical line,
A case where the centralized monitoring device connects the operation terminal requesting monitoring and the operation device by a data transfer network and a logical line or a physical line, and operates from any operation terminal allowed for the operation device, and When operating from any operation device permitted for the terminal, the conditions specified in the signaling system specifications between the operation device and the centralized monitoring device, and the signaling system between the operating terminal and the centralized monitoring device When the condition specified in the specification is different, the centralized monitoring device performs signal conversion between the two by a preset method.

【0007】また、本発明の集約的設備動作監視システ
ムは、任意の集約監視装置を経由して接続されるオペレ
ーション装置及び操作端末について、当該集約監視装置
以外で該オペレーション装置と該操作端末との間を集約
的に接続する一又は複数の副集約監視装置を設け、操作
端末から接続要求が行われた際に集約監視装置の動作が
不正常であることが検出された場合、当該集約監視装置
が操作端末に対して応答を送信しないか又は不正常応答
を送信し、これにより操作端末は任意の副集約監視装置
にルートを切り替える構成とすることができる。
In addition, the centralized facility operation monitoring system of the present invention provides an operation device and an operation terminal connected via an arbitrary centralized monitoring device, except for the operation device and the operating terminal other than the centralized monitoring device. One or a plurality of sub-aggregate monitoring devices that collectively connect between the devices are provided, and when it is detected that the operation of the central monitoring device is abnormal when a connection request is made from the operation terminal, the central monitoring device is Does not transmit a response to the operation terminal or transmits an abnormal response, whereby the operation terminal can switch the route to an arbitrary sub-aggregate monitoring device.

【0008】また、本発明の集約的設備動作監視システ
ムは、任意の集約監視装置を経由して接続されるオペレ
ーション装置及び操作端末について、当該集約監視装置
以外で該オペレーション装置と該操作端末との間を集約
的に接続する一又は複数の副集約監視装置を設け、集約
監視装置が動作が不正常であることを自律的に検出した
場合、当該集約監視装置が副集約監視装置に対して動作
不正常の信号を送信し、当該副集約監視装置がオペレー
ション装置及び操作端末に対して動作監視業務のための
信号送信先を当該副集約監視装置に変更するように通知
する構成とすることができる。
[0008] Further, the centralized facility operation monitoring system of the present invention provides an operation device and an operation terminal connected via an arbitrary centralized monitoring device, except for the operation device and the operating terminal other than the centralized monitoring device. If one or more sub-aggregation monitoring devices are connected in an integrated manner, and the aggregation monitoring device autonomously detects that the operation is abnormal, the aggregation monitoring device operates with respect to the sub-aggregation monitoring device. A configuration may be adopted in which an abnormal signal is transmitted, and the sub-integrated monitoring device notifies the operation device and the operation terminal to change the signal transmission destination for operation monitoring work to the sub-integrated monitoring device. .

【0009】また、本発明の集約的設備動作監視システ
ムは、任意の集約監視装置を経由して接続されるオペレ
ーション装置及び操作端末について、当該集約監視装置
以外で該オペレーション装置と該操作端末との間を集約
的に接続する一又は複数の副集約監視装置を設け、集約
監視装置が動作が不正常であることを自律的に検出した
場合、当該集約監視装置がオペレーション装置及び操作
端末に対して動作監視業務のための信号送信先を任意の
副集約監視装置に変更するように通知する構成とするこ
とができる。
[0009] Further, the centralized facility operation monitoring system of the present invention provides an operating device and an operating terminal connected via an optional centralized monitoring device to the operating device and the operating terminal other than the centralized monitoring device. If one or more sub-aggregate monitoring devices are connected collectively and the autonomous detection of the abnormal operation of the centralized monitoring device is detected, the centralized monitoring device sends the operation to the operation device and the operation terminal. A configuration may be adopted in which a signal transmission destination for the operation monitoring task is notified to be changed to an arbitrary sub-aggregate monitoring device.

【0010】また、本発明の集約的設備動作監視システ
ムは、任意の集約監視装置を経由して接続されるオペレ
ーション装置及び操作端末について、当該集約監視装置
以外で該オペレーション装置と該操作端末との間を集約
的に接続する一又は複数の副集約監視装置を設け、副集
約監視装置が、定期的に集約監視装置に動作確認指示信
号を送信し、当該集約監視装置から不正常を示す信号を
受信した場合又は所定の時間確認結果を示す信号を受信
できない場合は、オペレーション装置及び操作端末に対
して動作監視業務のための信号送信先を当該副集約監視
装置に変更するように通知する構成とすることができ
る。
[0010] Further, the centralized facility operation monitoring system of the present invention provides an operation apparatus and an operation terminal connected via an arbitrary centralized monitoring apparatus, except for the operation apparatus and the operating terminal other than the centralized monitoring apparatus. One or a plurality of sub-aggregate monitoring devices that collectively connect between the devices are provided, and the sub-aggregate monitor periodically sends an operation confirmation instruction signal to the aggregate monitor, and sends a signal indicating an abnormality from the aggregate monitor. When receiving or when a signal indicating a predetermined time confirmation result cannot be received, a configuration is provided to notify the operation device and the operation terminal to change the signal transmission destination for the operation monitoring operation to the sub-aggregate monitoring device. can do.

【0011】また、本発明の集約的設備動作監視システ
ムは、任意の集約監視装置を経由して接続されるオペレ
ーション装置及び操作端末について、当該集約監視装置
以外で該オペレーション装置と該操作端末との間を集約
的に接続する一又は複数の副集約監視装置を設け、副集
約監視装置が定期的に集約監視装置に動作確認指示信号
を送信し、当該集約監視装置が、不正常であることを確
認した場合は、オペレーション装置及び操作端末に対し
て動作監視業務のための信号送信先を当該副集約監視装
置に変更するように通知する構成とすることができる。
[0011] Further, the centralized facility operation monitoring system of the present invention provides an operating device and an operating terminal connected via an optional centralized monitoring device to the operating device and the operating terminal other than the centralized monitoring device. One or a plurality of sub-aggregate monitoring devices that collectively connect the devices are provided, and the sub-aggregate monitor periodically sends an operation confirmation instruction signal to the aggregate monitor, and confirms that the aggregate monitor is abnormal. If confirmed, the operation device and the operation terminal may be configured to be notified to change the signal transmission destination for the operation monitoring operation to the sub-integrated monitoring device.

【0012】このような本発明の集約的設備動作監視シ
ステムによれば、オペレーション装置及び操作端末を集
約監視装置に集約的に接続し、操作端末を利用する保守
者の要求に合わせて操作端末とオペレーション装置とを
接続する。そのため、集約監視装置に接続している全て
の操作端末及びオペレーション装置は、いかなる組合せ
の接続も可能になる。更に、集約監視装置に、オペレー
ション装置と操作端末との間の信号方式仕様毎の信号変
換機能を具えることにより、動作監視システムが、複数
の信号方式仕様に対応することができる。また、迂回経
路とする副集約監視装置を確保しておくことにより、接
続集約点となる集約監視装置で故障が発生した場合にも
動作監視業務を継続することができる。
According to the centralized facility operation monitoring system of the present invention, the operation device and the operation terminal are connected collectively to the centralized monitoring device, and the operation terminal and the operation terminal are connected to each other in accordance with a request of a maintenance person who uses the operation terminal. Connect the operation device. Therefore, all operation terminals and operation devices connected to the centralized monitoring device can be connected in any combination. Further, by providing the centralized monitoring device with a signal conversion function for each signaling system specification between the operation device and the operation terminal, the operation monitoring system can support a plurality of signaling system specifications. In addition, by securing a sub-integration monitoring device as a bypass route, the operation monitoring operation can be continued even when a failure occurs in the aggregation monitoring device serving as a connection aggregation point.

【0013】[0013]

【発明の実施の形態】次に、図面を用いて本発明の実施
例を説明する。
Next, an embodiment of the present invention will be described with reference to the drawings.

【0014】[実施例1]図1は本発明の集約的設備動
作監視システムの実施例1の構成を説明するための図で
ある。1は本発明の集約的設備動作監視システム、5は
サービス制御装置、6は交換機、例えば公衆用交換機で
ある。本発明の集約的設備動作監視システム1は、操作
端末2、集約監視装置3、オペレーション装置4及びデ
ータ転送網7を含む。
[First Embodiment] FIG. 1 is a diagram for explaining the configuration of a first embodiment of an integrated facility operation monitoring system according to the present invention. 1 is an integrated equipment operation monitoring system of the present invention, 5 is a service control device, and 6 is an exchange, for example, a public exchange. The integrated facility operation monitoring system 1 of the present invention includes an operation terminal 2, an integrated monitoring device 3, an operation device 4, and a data transfer network 7.

【0015】操作端末2は、集約監視装置3に集約的に
接続されているオペレーション装置4を含む複数のオペ
レーション装置を1台又は同時に複数台選択して操作す
ることができる。集約監視装置3は、操作端末2を含む
1台又は複数台の操作端末及びオペレーション装置4を
含む1台又は複数台のオペレーション装置と集約的に接
続する機能を具え、操作端末2からの要求に基づいて操
作端末2とオペレーション装置4との間を接続する。オ
ペレーション装置4は、操作端末2が集約監視装置3を
経由して行う操作に従って、サービス制御装置5を含む
1台又は同時に複数台のサービス制御装置の動作監視を
行う。サービス制御装置5は、オペレーション装置4と
接続している他のサービス制御装置と共に交換機6を含
む1台又は複数台の交換機を制御し、ユーザーにサービ
スを提供する。
The operation terminal 2 can select and operate one or a plurality of operation devices including the operation device 4 collectively connected to the centralized monitoring device 3. The centralized monitoring device 3 has a function of collectively connecting to one or a plurality of operation terminals including the operation terminal 2 and one or a plurality of operation devices including the operation device 4, and to receive a request from the operation terminal 2. The operation terminal 2 and the operation device 4 are connected based on the operation. The operation device 4 monitors the operation of one or a plurality of service control devices including the service control device 5 at the same time according to the operation performed by the operation terminal 2 via the centralized monitoring device 3. The service control device 5 controls one or a plurality of exchanges including the exchange 6 together with other service control devices connected to the operation device 4 to provide services to users.

【0016】図2は実施例1における集約的設備動作監
視システム1全体の動作手順を示す図であり、図3は集
約監視装置3の動作を示すフローチャートである。ユー
ザーが操作する操作端末2は、オペレーション装置4を
指定して操作端末2と接続している集約監視装置3へ接
続要求を送信する(ステップS1)。集約監視装置3
は、接続要求を受信する(ステップS2)と、オペレー
ション装置4へ接続要求を送信する(ステップS3)。
オペレーション装置4は、接続要求を受信し(ステップ
S4)、接続が可能な状態である場合は集約監視装置3
へ応答を送信する(ステップS5)。集約監視装置3
は、応答を受信し(ステップS6)、操作端末2へ応答
を送信する(ステップS7)と共に、操作端末2とオペ
レーション装置4とを接続する。操作端末2は、応答を
受信する(ステップS8)と、集約監視装置3へ動作指
示を送信する(ステップS9)。
FIG. 2 is a diagram showing an operation procedure of the integrated facility operation monitoring system 1 in the first embodiment, and FIG. 3 is a flowchart showing an operation of the integrated monitoring apparatus 3. The operation terminal 2 operated by the user specifies the operation device 4 and transmits a connection request to the centralized monitoring device 3 connected to the operation terminal 2 (step S1). Centralized monitoring device 3
Receives the connection request (step S2), transmits a connection request to the operation device 4 (step S3).
The operation device 4 receives the connection request (step S4), and if the connection is possible, the centralized monitoring device 3
Is transmitted to the server (step S5). Centralized monitoring device 3
Receives the response (step S6), transmits the response to the operation terminal 2 (step S7), and connects the operation terminal 2 to the operation device 4. Upon receiving the response (Step S8), the operation terminal 2 transmits an operation instruction to the centralized monitoring device 3 (Step S9).

【0017】集約監視装置3は、動作指示を受信する
(ステップS10)と、操作端末2からの指示に対してオ
ペレーション装置4の対応が不可能である場合は予め設
定されたオペレーション装置4の対応が可能である信号
に変換して(ステップS11)、オペレーション装置4へ
動作指示を送信する(ステップS12)。オペレーション
装置4は、動作指示を受信し(ステップS13)、集約監
視装置3へ応答を送信する(ステップS14)と共に、指
示された動作を行う。集約監視装置3は、応答を受信し
(ステップS15)、オペレーション装置4からの応答に
対して操作端末2の対応が不可能である場合は予め設定
された操作端末2の対応が可能である信号に変換して
(ステップS16)、操作端末2へ送信する(ステップS
17)。操作端末2は、集約監視装置3から送信された応
答を受信する(ステップS18)。
When the centralized monitoring device 3 receives the operation instruction (step S10), if the operation device 4 cannot respond to the instruction from the operation terminal 2, the preset operation device 4 response is performed. (Step S11), and transmits an operation instruction to the operation device 4 (Step S12). The operation device 4 receives the operation instruction (Step S13), transmits a response to the centralized monitoring device 3 (Step S14), and performs the specified operation. The centralized monitoring device 3 receives the response (step S15), and if the response from the operation device 4 cannot be handled by the operation terminal 2, a signal indicating that the preset operation terminal 2 can handle the response. (Step S16), and transmits it to the operation terminal 2 (step S16).
17). The operation terminal 2 receives the response transmitted from the centralized monitoring device 3 (step S18).

【0018】ステップS9乃至S18を繰り返すことによ
って必要な操作を終了し、必要な監視期間が完了した
後、操作端末2は、集約監視装置3へ開放要求を送信す
る(ステップS19)。集約監視装置3は、開放要求を受
信する(ステップS20)と、オペレーション装置4へ開
放要求を送信する(ステップS21)。オペレーション装
置4は、開放要求を受信し(ステップS22)、開放が可
能な状態である場合は集約監視装置3へ応答を送信する
(ステップS23)。集約監視装置3は、応答を受信し
(ステップS24)、操作端末2へ応答を送信する(ステ
ップS25)と共に、操作端末2とオペレーション装置4
との接続を開放する。操作端末2が応答を受信する(ス
テップS26)と、一連の動作を終了する。
The necessary operations are completed by repeating steps S9 to S18, and after the necessary monitoring period is completed, the operation terminal 2 transmits a release request to the centralized monitoring device 3 (step S19). When receiving the release request (step S20), the centralized monitoring device 3 transmits the release request to the operation device 4 (step S21). The operation device 4 receives the release request (Step S22), and transmits a response to the centralized monitoring device 3 when the release is possible (Step S23). The centralized monitoring device 3 receives the response (step S24), transmits the response to the operation terminal 2 (step S25), and operates the operation terminal 2 and the operation device 4 together.
Open connection with. When the operation terminal 2 receives the response (step S26), a series of operations ends.

【0019】[実施例2]図4は本発明の集約的設備動
作監視システムの実施例2の構成を説明するための図で
ある。図4に示された本発明の集約的設備動作監視シス
テム1は、操作端末2、集約監視装置3、オペレーショ
ン装置4及びデータ転送網7の他に副集約監視装置8を
含む。
[Embodiment 2] FIG. 4 is a diagram for explaining the configuration of an embodiment 2 of an integrated facility operation monitoring system according to the present invention. The integrated facility operation monitoring system 1 of the present invention shown in FIG. 4 includes a sub-integrated monitoring device 8 in addition to the operation terminal 2, the integrated monitoring device 3, the operation device 4, and the data transfer network 7.

【0020】操作端末2は、集約監視装置3及び副集約
監視装置8に集約的に接続されているオペレーション装
置4を含む複数のオペレーション装置を1台又は同時に
複数台選択して操作することができる。集約監視装置3
及び副集約監視装置8は、操作端末2を含む1台又は複
数台の操作端末及びオペレーション装置4を含む1台又
は複数台のオペレーション装置と集約的に接続する機能
を具え、操作端末2からの要求に基づいて操作端末2と
オペレーション装置4との間を接続する。オペレーショ
ン装置4は、操作端末2が集約監視装置3又は副集約監
視装置8を経由して行う操作に従って、サービス制御装
置5を含む1台又は同時に複数台のサービス制御装置の
動作監視を行う。サービス制御装置5は、オペレーショ
ン装置4と接続している他のサービス制御装置と共に交
換機6を含む1台又は複数台の交換機を制御し、ユーザ
ーにサービスを提供する。
The operation terminal 2 can select and operate one or a plurality of operation devices including the operation device 4 which is collectively connected to the centralized monitoring device 3 and the secondary centralized monitoring device 8. . Centralized monitoring device 3
And the sub-integrated monitoring device 8 has a function of collectively connecting to one or a plurality of operation terminals including the operation terminal 2 and one or a plurality of operation devices including the operation device 4. The operation terminal 2 and the operation device 4 are connected based on the request. The operation device 4 monitors the operation of one or a plurality of service control devices including the service control device 5 simultaneously according to the operation performed by the operation terminal 2 via the centralized monitoring device 3 or the secondary centralized monitoring device 8. The service control device 5 controls one or a plurality of exchanges including the exchange 6 together with other service control devices connected to the operation device 4 to provide services to users.

【0021】図5は実施例2における集約的設備動作監
視システム1全体の動作手順を示す図であり、図6は実
施例2における操作端末2の動作を示すフローチャート
である。ユーザーが操作する操作端末2は、オペレーシ
ョン装置4を指定して操作端末2と接続している集約監
視装置3へ接続要求を送信する(ステップS27)。集約
監視装置3は、接続要求を受信し(ステップS28)、オ
ペレーション装置4へ接続要求を送信しようとするが、
集約監視装置3内の処理に不正常動作が検出される(ス
テップS29)と、集約監視装置3は、操作端末2へ不正
常動作があることを示す応答を送信するか又は応答を送
信しないことにより操作端末2に対して動作が不正常で
あることを知らせ(ステップS30)、一連の動作を終了
する(ステップS44)。
FIG. 5 is a diagram showing an operation procedure of the entire integrated facility operation monitoring system 1 in the second embodiment, and FIG. 6 is a flowchart showing an operation of the operation terminal 2 in the second embodiment. The operation terminal 2 operated by the user specifies the operation device 4 and transmits a connection request to the centralized monitoring device 3 connected to the operation terminal 2 (step S27). The centralized monitoring device 3 receives the connection request (step S28) and attempts to transmit the connection request to the operation device 4,
When an abnormal operation is detected in the processing in the central monitoring device 3 (step S29), the central monitoring device 3 transmits a response indicating that there is an abnormal operation to the operation terminal 2 or does not transmit a response. Informs the operation terminal 2 that the operation is abnormal (step S30), and terminates a series of operations (step S44).

【0022】操作端末2は、集約監視装置3から不正常
動作があることを示す応答を受信するか又は予め設定さ
れた時間内に応答を受信しない場合(ステップS31)
は、予め設定されている手順に従って接続先を副集約監
視装置8に設定し(ステップS32)、副集約監視装置8
へ接続要求を送信する(ステップS33)。副集約監視装
置8は、操作端末2からの接続要求を受信する(ステッ
プS34)。その後の操作端末2、副集約監視装置8及び
オペレーション装置4の間の動作は、集約監視装置3が
副集約監視装置8に変更されている点を除いてステップ
S3乃至S26と同一である。
The operation terminal 2 receives a response indicating that there is an abnormal operation from the centralized monitoring device 3 or does not receive a response within a preset time (step S31).
Sets the connection destination in the sub-integrated monitoring device 8 according to a preset procedure (step S32).
A connection request is transmitted to (step S33). The sub-integrated monitoring apparatus 8 receives the connection request from the operation terminal 2 (Step S34). Subsequent operations among the operation terminal 2, the sub-integrated monitoring device 8, and the operation device 4 are the same as those in steps S3 to S26 except that the integrated monitoring device 3 is changed to the sub-integrated monitoring device 8.

【0023】一方、操作端末2がオペレーション装置4
を指定して操作端末2と接続している集約監視装置3へ
接続要求を送信し(ステップS35)、集約監視装置3が
接続要求を受信した(ステップS36)時点では不正常動
作は検出されず(ステップS37)、ステップS7乃至S
10と同一のステップS38乃至S41が終了した時点で不正
常動作が検出された場合(ステップS42)は、集約監視
装置3は、操作端末2へ不正常動作があることを示す応
答を送信するか又は応答を送信しないことにより操作端
末2に対して不正常動作があることを知らせ(ステップ
S43)、一連の動作を終了する(ステップS44)。
On the other hand, the operation terminal 2 is
Is specified, the connection request is transmitted to the centralized monitoring device 3 connected to the operation terminal 2 (step S35), and the abnormal operation is not detected when the centralized monitoring device 3 receives the connection request (step S36). (Step S37), Steps S7 to S
If an abnormal operation is detected at the time when the same steps S38 to S41 as in 10 are completed (step S42), the centralized monitoring device 3 transmits a response indicating that there is an abnormal operation to the operation terminal 2. Alternatively, by not transmitting a response, the operation terminal 2 is notified of the abnormal operation (step S43), and a series of operations is terminated (step S44).

【0024】操作端末2は、集約監視装置3から不正常
動作があることを示す応答を受信するか又は予め設定さ
れた時間内に応答を受信しない場合(ステップS45)
は、上記のステップS32乃至ステップS34に続く。その
後の操作端末2、副集約監視装置8及びオペレーション
装置4の間の動作は、集約監視装置3が副集約監視装置
8に変更されている点を除いてステップS3乃至S26と
同一である。
If the operation terminal 2 receives a response indicating that there is an abnormal operation from the centralized monitoring device 3 or does not receive a response within a preset time (step S45)
Follows the above-described steps S32 to S34. Subsequent operations among the operation terminal 2, the sub-integrated monitoring device 8, and the operation device 4 are the same as those in steps S3 to S26 except that the integrated monitoring device 3 is changed to the sub-integrated monitoring device 8.

【0025】[実施例3]実施例3における本発明の集
約的設備動作監視システム1の装置構成は図4と同一で
あり、操作端末2、集約監視装置3、オペレーション装
置4及びデータ転送網7の他に副集約監視装置8を含
む。
[Embodiment 3] The apparatus configuration of the centralized facility operation monitoring system 1 of the present invention in Embodiment 3 is the same as that of FIG. 4, and the operation terminal 2, the centralized monitoring apparatus 3, the operation apparatus 4, and the data transfer network 7 In addition, a sub-integrated monitoring device 8 is included.

【0026】図7は実施例3における集約的設備動作監
視システム1全体の動作手順を示す図であり、図8は実
施例3における集約監視装置3の動作を示すフローチャ
ートであり、図9は実施例3における副集約監視装置8
の動作を示すフローチャートである。集約監視装置3が
自律的に集約監視装置3内の処理に不正常動作を検出し
た場合(ステップS46)、集約監視装置3は、予め設定
された手順に従って副集約監視装置8へ接続先切替可否
確認通知を送信する(ステップS47)。副集約監視装置
8は、接続先切替可否確認通知を受信し(ステップS4
8)、副集約監視装置8が集約監視装置3に代わること
ができる場合は、集約監視装置3へ応答を送信する(ス
テップS49)と共に、操作端末2及びオペレーション装
置4へ接続先切替指示を送信する(ステップS52)。
FIG. 7 is a diagram showing an operation procedure of the integrated facility operation monitoring system 1 in the third embodiment, FIG. 8 is a flowchart showing an operation of the integrated monitoring apparatus 3 in the third embodiment, and FIG. Secondary aggregation monitoring device 8 in Example 3
6 is a flowchart showing the operation of the first embodiment. When the centralized monitoring device 3 autonomously detects an abnormal operation in the processing in the centralized monitoring device 3 (step S46), the centralized monitoring device 3 determines whether the connection destination can be switched to the secondary centralized monitoring device 8 according to a preset procedure. A confirmation notification is transmitted (step S47). The sub-integrated monitoring apparatus 8 receives the connection destination switchability confirmation notification (step S4).
8) If the sub central monitoring device 8 can replace the central monitoring device 3, a response is transmitted to the central monitoring device 3 (step S49), and a connection destination switching instruction is transmitted to the operation terminal 2 and the operation device 4. (Step S52).

【0027】この場合に副集約監視装置8が集約監視装
置3に代わることができない場合は、集約監視装置3
は、予め設定された手順に従って対象副集約監視装置を
変更して再度接続先切替可否確認通知を送信する。集約
監視装置3に代わることができる副集約監視装置8が決
まると、集約監視装置3は、応答を受信して(ステップ
S50)動作を終了する(ステップS51)。
In this case, if the sub central monitoring device 8 cannot replace the central monitoring device 3,
Changes the target sub-integrated monitoring device according to a preset procedure, and transmits a connection destination switchability confirmation notification again. When the sub-integration monitoring device 8 that can replace the aggregation monitoring device 3 is determined, the aggregation monitoring device 3 receives the response (step S50) and ends the operation (step S51).

【0028】操作端末2は、副集約監視装置8から接続
先切替指示を受信し(ステップS53)、接続先の設定を
副集約監視装置8に変更し(ステップS54)、再接続手
順を実行する(ステップS55)。オペレーション装置4
も、副集約監視装置8から接続先切替指示を受信し(ス
テップS56)、接続先の設定を副集約監視装置8に変更
する(ステップS57)。
The operation terminal 2 receives the connection destination switching instruction from the sub-integration monitoring device 8 (step S53), changes the setting of the connection destination to the sub-integration monitoring device 8 (step S54), and executes the reconnection procedure. (Step S55). Operation device 4
Also, it receives the connection destination switching instruction from the sub-integration monitoring device 8 (step S56), and changes the setting of the connection destination to the sub-integration monitoring device 8 (step S57).

【0029】[実施例4]実施例4における本発明の集
約的設備動作監視システム1の装置構成は図4と同一で
あり、操作端末2、集約監視装置3、オペレーション装
置4及びデータ転送網7の他に副集約監視装置8を含
む。
[Embodiment 4] The apparatus configuration of the centralized facility operation monitoring system 1 of the present invention in Embodiment 4 is the same as that of FIG. 4, and the operation terminal 2, the centralized monitoring apparatus 3, the operation apparatus 4, and the data transfer network 7 In addition, a sub-integrated monitoring device 8 is included.

【0030】図10は実施例4における集約的設備動作
監視システム1全体の動作手順を示す図であり、図11
は実施例4における集約監視装置3の動作を示すフロー
チャートである。集約監視装置3が自律的に集約監視装
置3内の処理に不正常動作を検出した場合(ステップS
58)、集約監視装置3は、予め設定された手順に従って
副集約監視装置8を新たな接続先に指定し、操作端末2
及びオペレーション装置4へ接続先切替指示を送信して
(ステップS59)動作を終了する(ステップS60)。操
作端末2は、集約監視装置3から接続先切替指示を受信
し(ステップS61)、接続先の設定を副集約監視装置8
に変更し(ステップS62)、再接続手順を実行する(ス
テップS63)。オペレーション装置4も、接続先切替指
示を受信し(ステップS64)、接続先の設定を副集約監
視装置8に変更する(ステップS65)。
FIG. 10 is a diagram showing an operation procedure of the integrated facility operation monitoring system 1 according to the fourth embodiment.
13 is a flowchart illustrating the operation of the centralized monitoring device 3 according to the fourth embodiment. When the centralized monitoring device 3 autonomously detects an abnormal operation in the processing in the centralized monitoring device 3 (step S
58), the central monitoring device 3 designates the secondary central monitoring device 8 as a new connection destination according to a preset procedure, and
Then, a connection destination switching instruction is transmitted to the operation device 4 (step S59), and the operation is terminated (step S60). The operation terminal 2 receives the connection destination switching instruction from the centralized monitoring device 3 (step S61), and changes the connection destination setting to the secondary centralized monitoring device 8
(Step S62), and the reconnection procedure is executed (step S63). The operation device 4 also receives the connection destination switching instruction (step S64), and changes the setting of the connection destination to the secondary centralized monitoring device 8 (step S65).

【0031】[実施例5]実施例5における本発明の集
約的設備動作監視システム1の装置構成は図4と同一で
あり、操作端末2、集約監視装置3、オペレーション装
置4及びデータ転送網7の他に副集約監視装置8を含
む。
[Embodiment 5] The apparatus configuration of the centralized facility operation monitoring system 1 of the present invention in Embodiment 5 is the same as that of FIG. 4, and the operation terminal 2, the centralized monitoring apparatus 3, the operation apparatus 4, and the data transfer network 7 In addition, a sub-integrated monitoring device 8 is included.

【0032】図12は実施例5における集約的設備動作
監視システム1全体の動作手順を示す図であり、図13
は実施例5における副集約監視装置8の動作を示すフロ
ーチャートである。副集約監視装置8は、予め指定され
た集約監視装置3へ定期的に正常動作確認指示を送信す
る(ステップS66)。集約監視装置3は、正常動作確認
指示を受信し(ステップS67)、それを契機として正常
動作確認を実施する(ステップS68)。確認の結果が正
常であった場合は、副集約監視装置8へ正常応答を送信
する(ステップS69)。副集約監視装置8は、正常応答
を受信した場合(ステップS70)は、一定期間を経過し
た後(ステップS71)再び集約監視装置3へ正常動作確
認指示を送信する(ステップS72)。集約監視装置3
は、正常動作確認指示を受信し(ステップS73)、それ
を契機として正常動作確認を実施する(ステップS7
4)。
FIG. 12 is a diagram showing the operation procedure of the entire integrated facility operation monitoring system 1 in the fifth embodiment.
13 is a flowchart illustrating an operation of the sub-integrated monitoring apparatus 8 according to the fifth embodiment. The sub aggregation monitoring device 8 periodically transmits a normal operation confirmation instruction to the aggregation monitoring device 3 specified in advance (step S66). The centralized monitoring device 3 receives the normal operation check instruction (step S67), and executes the normal operation check (step S68). If the result of the check is normal, a normal response is transmitted to the sub-integrated monitoring apparatus 8 (step S69). When receiving the normal response (step S70), the sub-integration monitoring device 8 transmits a normal operation confirmation instruction to the aggregation monitoring device 3 again after a certain period of time (step S71) (step S72). Centralized monitoring device 3
Receives the normal operation check instruction (step S73), and executes the normal operation check in response thereto (step S7).
Four).

【0033】集約監視装置3における確認の結果が不正
常であった場合は、集約監視装置3は、副集約監視装置
8へ異常応答を送信するか又は応答を送信せず(ステッ
プS75)、動作を終了する(ステップS76)。副集約監
視装置8は、所定の時間内に応答がないか又は異常応答
を受信する(ステップS77)と、操作端末2及びオペレ
ーション装置4に対して副集約監視装置8を新たな接続
先に指定して接続先切替指示を送信する(ステップS7
8)。操作端末2は、副集約監視装置8から接続先切替
指示を受信し(ステップS79)、接続先の設定を副集約
監視装置8に変更し(ステップS80)、再接続手順を実
行する(ステップS81)。オペレーション装置4も、接
続先切替指示を受信し(ステップS82)、接続先の設定
を副集約監視装置8に変更する(ステップS83)。
If the result of the confirmation by the central monitoring apparatus 3 is abnormal, the central monitoring apparatus 3 transmits an abnormal response to the sub central monitoring apparatus 8 or does not transmit a response (step S75). Is ended (step S76). When there is no response or an abnormal response is received within a predetermined time (step S77), the sub-integrated monitoring device 8 designates the sub-integrated monitoring device 8 as a new connection destination for the operation terminal 2 and the operation device 4. To send a connection destination switching instruction (step S7
8). The operation terminal 2 receives the connection destination switching instruction from the sub-integration monitoring device 8 (step S79), changes the setting of the connection destination to the sub-integration monitoring device 8 (step S80), and executes a reconnection procedure (step S81). ). The operation device 4 also receives the connection destination switching instruction (step S82), and changes the connection destination setting to the sub-integrated monitoring device 8 (step S83).

【0034】[実施例6]実施例6における本発明の集
約的設備動作監視システム1の装置構成は図4と同一で
あり、操作端末2、集約監視装置3、オペレーション装
置4及びデータ転送網7の他に副集約監視装置8を含
む。
[Embodiment 6] The apparatus configuration of the centralized facility operation monitoring system 1 of the present invention in Embodiment 6 is the same as that of FIG. 4, and the operation terminal 2, the centralized monitoring apparatus 3, the operation apparatus 4, and the data transfer network 7 In addition, a sub-integrated monitoring device 8 is included.

【0035】図14は実施例6における集約的設備動作
監視システム1全体の動作手順を示す図であり、図15
は実施例6における副集約監視装置8の動作を示すフロ
ーチャートであり、図16は実施例6における集約監視
装置3の動作を示すフローチャートである。副集約監視
装置8は、予め指定された集約監視装置3へ定期的に正
常動作確認指示を送信する(ステップS84)。集約監視
装置3は、正常動作確認指示を受信し(ステップS8
5)、それを契機として正常動作確認を実施する(ステ
ップS86)。確認の結果が正常であった場合は、副集約
監視装置8へ正常応答を送信する(ステップS87)。副
集約監視装置8は、正常応答を受信した場合(ステップ
S88)は、一定期間を経過した後(ステップS89)再び
集約監視装置3へ正常動作確認指示を送信する(ステッ
プS90)。集約監視装置3は、正常動作確認指示を受信
し(ステップS91)、それを契機として正常動作確認を
実施する(ステップS92)。
FIG. 14 is a diagram showing an operation procedure of the centralized facility operation monitoring system 1 according to the sixth embodiment.
16 is a flowchart showing the operation of the sub-integration monitoring device 8 in the sixth embodiment, and FIG. 16 is a flowchart showing the operation of the aggregation monitoring device 3 in the sixth embodiment. The sub aggregation monitoring device 8 periodically transmits a normal operation confirmation instruction to the aggregation monitoring device 3 specified in advance (step S84). The centralized monitoring device 3 receives the normal operation confirmation instruction (step S8).
5) Then, a normal operation check is performed in response thereto (step S86). If the result of the check is normal, a normal response is transmitted to the sub-integrated monitoring apparatus 8 (step S87). When receiving the normal response (step S88), the sub-aggregation monitoring device 8 transmits a normal operation confirmation instruction to the aggregation monitoring device 3 again after a certain period of time (step S89) (step S90). The centralized monitoring device 3 receives the normal operation check instruction (step S91), and executes the normal operation check (step S92).

【0036】集約監視装置3における確認の結果が不正
常であった場合は、集約監視装置3は、副集約監視装置
8へ異常応答を送信する(ステップS93)すると共に、
操作端末2及びオペレーション装置4に対して副集約監
視装置8を新たな接続先に指定して接続先切替指示を送
信し(ステップS94)、動作を終了する(ステップS9
5)。副集約監視装置8は、異常応答を受信する(ステ
ップS96)と集約監視装置3への定期的な正常動作確認
指示の送信を停止する(ステップS97)。操作端末2
は、副集約監視装置8から接続先切替指示を受信し(ス
テップS98)、接続先の設定を副集約監視装置8に変更
し(ステップS99)、再接続手順を実行する(ステップ
S100)。オペレーション装置4も、接続先切替指示を
受信し(ステップS101)、接続先の設定を副集約監視
装置8に変更する(ステップS102)。
If the result of the confirmation by the central monitoring device 3 is abnormal, the central monitoring device 3 transmits an abnormal response to the secondary central monitoring device 8 (step S93), and
The sub aggregation monitoring device 8 is designated as a new connection destination to the operation terminal 2 and the operation device 4 and a connection destination switching instruction is transmitted (step S94), and the operation is terminated (step S9).
Five). Upon receiving the abnormal response (Step S96), the sub-integrated monitoring device 8 stops transmitting the normal operation confirmation instruction to the integrated monitoring device 3 periodically (Step S97). Operation terminal 2
Receives the connection destination switching instruction from the sub-integration monitoring device 8 (step S98), changes the setting of the connection destination to the sub-integration monitoring device 8 (step S99), and executes the reconnection procedure (step S100). The operation device 4 also receives the connection destination switching instruction (step S101), and changes the setting of the connection destination to the secondary centralized monitoring device 8 (step S102).

【0037】[0037]

【発明の効果】以上説明したように、本発明により、同
一の操作端末から複数のオペレーション装置に接続され
た全てのサービス制御装置に対して動作を監視すること
ができるため、保守者による効率的な動作監視操作を行
うことができ、更に、オペレーション装置の増設に柔軟
に対応することができるようになる。また、集約監視装
置にオペレーション装置と操作端末との間の複数の信号
方式に対応する機能を具えることにより、サービスの多
様化に伴って生じる複数の信号方式の混在及び追加に、
敏速且つ柔軟に対応することができるようになる。更
に、集約監視装置を二重化し、集約監視装置の不具合の
検出及び副集約監視装置への切替えを行うことにより、
動作監視システムの信頼性を向上させることができる。
As described above, according to the present invention, it is possible to monitor the operation of all service control devices connected to a plurality of operation devices from the same operation terminal. Operation monitoring operation, and can flexibly cope with the expansion of the operation device. In addition, by providing the centralized monitoring device with a function corresponding to a plurality of signaling systems between the operation device and the operation terminal, it is possible to mix and add a plurality of signaling systems caused by diversification of services.
It becomes possible to respond promptly and flexibly. Furthermore, by duplicating the centralized monitoring device, detecting a failure of the centralized monitoring device and switching to the secondary centralized monitoring device,
The reliability of the operation monitoring system can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の集約的設備動作監視システムの実施
例の構成を説明するための図である。
FIG. 1 is a diagram for explaining a configuration of an embodiment of an integrated facility operation monitoring system of the present invention.

【図2】 実施例1における集約的設備動作監視システ
ム全体の動作手順を示す図である。
FIG. 2 is a diagram illustrating an operation procedure of the entire intensive equipment operation monitoring system according to the first embodiment.

【図3】 実施例1の集約監視装置3の動作を示すフロ
ーチャートである。
FIG. 3 is a flowchart illustrating an operation of the centralized monitoring device 3 according to the first embodiment.

【図4】 本発明の集約的設備動作監視システムの他の
実施例の構成を説明するための図である。
FIG. 4 is a diagram for explaining a configuration of another embodiment of the integrated facility operation monitoring system of the present invention.

【図5】 実施例2における集約的設備動作監視システ
ム全体の動作手順を示す図である。
FIG. 5 is a diagram illustrating an operation procedure of the entire intensive equipment operation monitoring system according to the second embodiment.

【図6】 実施例2における操作端末の動作を示すフロ
ーチャートである。
FIG. 6 is a flowchart illustrating an operation of the operation terminal according to the second embodiment.

【図7】 実施例3における集約的設備動作監視システ
ム全体の動作手順を示す図である。
FIG. 7 is a diagram illustrating an operation procedure of the entire intensive equipment operation monitoring system according to the third embodiment.

【図8】 実施例3における集約監視装置の動作を示す
フローチャートである。
FIG. 8 is a flowchart illustrating an operation of the centralized monitoring device according to the third embodiment.

【図9】 実施例3における副集約監視装置の動作を示
すフローチャートである。
FIG. 9 is a flowchart illustrating an operation of a sub-integration monitoring device according to the third embodiment.

【図10】 実施例4における集約的設備動作監視シス
テム全体の動作手順を示す図である。
FIG. 10 is a diagram illustrating an operation procedure of the entire integrated facility operation monitoring system according to the fourth embodiment.

【図11】 実施例4における集約監視装置の動作を示
すフローチャートである。
FIG. 11 is a flowchart illustrating an operation of the centralized monitoring device according to the fourth embodiment.

【図12】 実施例5における集約的設備動作監視シス
テム全体の動作手順を示す図である。
FIG. 12 is a diagram illustrating an operation procedure of the entire intensive equipment operation monitoring system according to the fifth embodiment.

【図13】 実施例5における副集約監視装置の動作を
示すフローチャートである。
FIG. 13 is a flowchart illustrating an operation of a sub-integration monitoring device according to a fifth embodiment.

【図14】 実施例6における集約的設備動作監視シス
テム全体の動作手順を示す図である。
FIG. 14 is a diagram illustrating an operation procedure of the entire integrated facility operation monitoring system according to the sixth embodiment.

【図15】 実施例6における副集約監視装置の動作を
示すフローチャートである。
FIG. 15 is a flowchart illustrating an operation of the sub-integration monitoring device according to the sixth embodiment.

【図16】 実施例6における集約監視装置の動作を示
すフローチャートである。
FIG. 16 is a flowchart illustrating an operation of the centralized monitoring device according to the sixth embodiment.

【符号の説明】 1 集約的設備動作監視システム 2 操作端末 3 集約監視装置 4 オペレーション装置 5 サービス制御装置 6 交換機 7 データ転送網 8 副集約監視装置[Description of Signs] 1 Centralized equipment operation monitoring system 2 Operation terminal 3 Centralized monitoring device 4 Operation device 5 Service control device 6 Switch 7 Data transfer network 8 Secondary aggregation monitoring device

フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) H04M 3/42 H04L 11/08 11/00 301 (72)発明者 青山 良一 東京都千代田区大手町二丁目3番1号 日 本電信電話株式会社内 (72)発明者 一色 耕治 東京都千代田区大手町二丁目3番1号 日 本電信電話株式会社内 Fターム(参考) 5B034 BB02 CC01 DD02 5B042 GB09 JJ02 JJ08 5K024 AA79 BB08 CC09 CC10 EE06 FF03 5K030 GA14 HB11 HC01 HC13 JA10 LB13 MA01 MB01 MD02 5K101 KK12 KK13 LL01 MM07 NN03 NN18 UU19 Continued on the front page (51) Int.Cl. 7 Identification symbol FI Theme coat II (Reference) H04M 3/42 H04L 11/08 11/00 301 (72) Inventor Ryoichi Aoyama 2-3-1 Otemachi, Chiyoda-ku, Tokyo No. Nippon Telegraph and Telephone Corporation (72) Inventor Koji Isshiki 2-3-1 Otemachi, Chiyoda-ku, Tokyo Nippon Telegraph and Telephone Corporation F-term (reference) 5B034 BB02 CC01 DD02 5B042 GB09 JJ02 JJ08 5K024 AA79 BB08 CC09 CC10 EE06 FF03 5K030 GA14 HB11 HC01 HC13 JA10 LB13 MA01 MB01 MD02 5K101 KK12 KK13 LL01 MM07 NN03 NN18 UU19

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 音声回線又はデータ転送回線を接続する
複数の交換機、該交換機に対して動作を指示するための
一又は複数のサービス制御装置、該サービス制御装置の
動作を監視するための一又は複数のオペレーション装
置、該オペレーション装置の操作を行うための一又は複
数の操作端末、該オペレーション装置及び該操作端末に
集約的に接続する一又は複数の集約監視装置を具える通
信網における集約的設備動作監視システムにおいて、任
意の集約監視装置と操作端末とがデータ転送網で接続さ
れ、集約監視装置とオペレーション装置とが論理回線又
は物理回線で接続され、監視を要求する操作端末とオペ
レーション装置とを集約監視装置がデータ転送網及び論
理回線又は物理回線によって接続を行い、且つ、オペレ
ーション装置に対して許容される任意の操作端末から操
作を行う場合及び操作端末に対して許容される任意のオ
ペレーション装置から操作を行う場合に、オペレーショ
ン装置と集約監視装置との間の信号方式仕様で規定され
る条件と、操作端末と集約監視装置との間の信号方式仕
様で規定される条件とが相違する場合、集約監視装置が
予め設定された方法により両者間の信号変換を行うこと
を特徴とする集約的設備動作監視システム。
1. A plurality of exchanges for connecting a voice line or a data transfer line, one or a plurality of service control devices for instructing the exchanges to operate, and one or more for monitoring the operation of the service control device. Centralized equipment in a communication network including a plurality of operation devices, one or more operation terminals for operating the operation devices, and one or a plurality of centralized monitoring devices collectively connected to the operation devices and the operation terminals In an operation monitoring system, an arbitrary centralized monitoring device and an operation terminal are connected by a data transfer network, the centralized monitoring device and the operation device are connected by a logical line or a physical line, and an operation terminal and an operation device that request monitoring are connected to each other. The centralized monitoring device connects to the data transfer network and logical or physical lines, and Conditions specified in the signaling specifications between the operating device and the centralized monitoring device when operating from any of the allowable operating terminals and when operating from any of the allowable operating devices for the operating terminal If the conditions specified by the signaling system specifications between the operation terminal and the centralized monitoring device are different, the centralized monitoring device performs signal conversion between the two by a preset method. Equipment operation monitoring system.
【請求項2】 任意の集約監視装置を経由して接続され
るオペレーション装置及び操作端末について、当該集約
監視装置以外で該オペレーション装置と該操作端末との
間を集約的に接続する一又は複数の副集約監視装置を設
け、操作端末から接続要求が行われた際に集約監視装置
の動作が不正常であることが検出された場合、当該集約
監視装置が操作端末に対して応答を送信しないか又は不
正常応答を送信し、これにより操作端末は任意の副集約
監視装置にルートを切り替えることを特徴とする請求項
1に記載の集約的設備動作監視システム。
2. An operation device and an operation terminal connected via an arbitrary central monitoring device, wherein one or a plurality of terminals that collectively connect the operation device and the operation terminal other than the central monitoring device are connected. If a sub-aggregate monitoring device is provided and it is detected that the operation of the aggregating monitor is abnormal when a connection request is made from the operation terminal, whether or not the aggregation monitoring device sends a response to the operation terminal The intensive equipment operation monitoring system according to claim 1, wherein an abnormal response is transmitted, whereby the operation terminal switches the route to an arbitrary sub-integration monitoring device.
【請求項3】 任意の集約監視装置を経由して接続され
るオペレーション装置及び操作端末について、当該集約
監視装置以外で該オペレーション装置と該操作端末との
間を集約的に接続する一又は複数の副集約監視装置を設
け、集約監視装置が動作が不正常であることを自律的に
検出した場合、当該集約監視装置が副集約監視装置に対
して動作不正常の信号を送信し、当該副集約監視装置が
オペレーション装置及び操作端末に対して動作監視業務
のための信号送信先を当該副集約監視装置に変更するよ
うに通知することを特徴とする請求項1に記載の集約的
設備動作監視システム。
3. An operation device and an operation terminal connected via an arbitrary centralized monitoring device are connected to one or a plurality of terminals that collectively connect the operation device and the operating terminal other than the centralized monitoring device. If a sub-aggregation monitoring device is provided and the aggregation monitoring device autonomously detects that the operation is abnormal, the aggregation monitoring device transmits an operation abnormal signal to the sub-aggregation monitoring device, and The centralized facility operation monitoring system according to claim 1, wherein the monitoring device notifies the operation device and the operation terminal to change a signal transmission destination for the operation monitoring operation to the sub-integrated monitoring device. .
【請求項4】 任意の集約監視装置を経由して接続され
るオペレーション装置及び操作端末について、当該集約
監視装置以外で該オペレーション装置と該操作端末との
間を集約的に接続する一又は複数の副集約監視装置を設
け、集約監視装置が動作が不正常であることを自律的に
検出した場合、当該集約監視装置がオペレーション装置
及び操作端末に対して動作監視業務のための信号送信先
を任意の副集約監視装置に変更するように通知すること
を特徴とする請求項1に記載の集約的設備動作監視シス
テム。
4. An operation device and an operation terminal connected via an arbitrary centralized monitoring device are connected to one or a plurality of terminals that collectively connect the operation device and the operating terminal other than the centralized monitoring device. If a sub-aggregate monitoring device is provided and the centralized monitoring device autonomously detects that the operation is abnormal, the centralized monitoring device can set the signal transmission destination for operation monitoring work to the operation device and operation terminal. The centralized facility operation monitoring system according to claim 1, wherein the secondary centralized monitoring device is notified of the change.
【請求項5】 任意の集約監視装置を経由して接続され
るオペレーション装置及び操作端末について、当該集約
監視装置以外で該オペレーション装置と該操作端末との
間を集約的に接続する一又は複数の副集約監視装置を設
け、副集約監視装置が、定期的に集約監視装置に動作確
認指示信号を送信し、当該集約監視装置から不正常を示
す信号を受信した場合又は所定の時間確認結果を示す信
号を受信できない場合は、オペレーション装置及び操作
端末に対して動作監視業務のための信号送信先を当該副
集約監視装置に変更するように通知することを特徴とす
る請求項1に記載の集約的設備動作監視システム。
5. An operation device and an operation terminal connected via an arbitrary centralized monitoring device, wherein one or a plurality of devices that collectively connect the operating device and the operational terminal other than the centralized monitoring device are connected. A sub-integrated monitoring device is provided, and the sub-integrated monitoring device periodically transmits an operation confirmation instruction signal to the centralized monitoring device, and when a signal indicating an abnormality is received from the centralized monitoring device or indicates a predetermined time confirmation result. 2. The centralized management system according to claim 1, wherein when a signal cannot be received, the operation device and the operation terminal are notified to change a signal transmission destination for operation monitoring work to the sub-aggregate monitoring device. Equipment operation monitoring system.
【請求項6】 任意の集約監視装置を経由して接続され
るオペレーション装置及び操作端末について、当該集約
監視装置以外で該オペレーション装置と該操作端末との
間を集約的に接続する一又は複数の副集約監視装置を設
け、副集約監視装置が定期的に集約監視装置に動作確認
指示信号を送信し、当該集約監視装置が、不正常である
ことを確認した場合は、オペレーション装置及び操作端
末に対して動作監視業務のための信号送信先を当該副集
約監視装置に変更するように通知することを特徴とする
請求項1に記載の集約的設備動作監視システム。
6. An operation device and an operation terminal connected via an arbitrary centralized monitoring device, wherein one or a plurality of devices that collectively connect the operation device and the operational terminal other than the centralized monitoring device are connected. A sub-aggregation monitoring device is provided, and the sub-aggregation monitoring device periodically sends an operation confirmation instruction signal to the aggregation monitoring device, and when it is confirmed that the aggregation monitoring device is abnormal, the operation device and the operation terminal 2. The intensive equipment operation monitoring system according to claim 1, wherein a notification is sent to the sub-integration monitoring apparatus to change a signal transmission destination for an operation monitoring operation.
JP2000246245A 2000-08-15 2000-08-15 Collective equipment operation monitoring system Pending JP2002064488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000246245A JP2002064488A (en) 2000-08-15 2000-08-15 Collective equipment operation monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000246245A JP2002064488A (en) 2000-08-15 2000-08-15 Collective equipment operation monitoring system

Publications (1)

Publication Number Publication Date
JP2002064488A true JP2002064488A (en) 2002-02-28

Family

ID=18736600

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000246245A Pending JP2002064488A (en) 2000-08-15 2000-08-15 Collective equipment operation monitoring system

Country Status (1)

Country Link
JP (1) JP2002064488A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008524911A (en) * 2004-12-17 2008-07-10 エヌエイチエヌ コーポレーション Method for adjusting load between subsystems in a communication network system with a bus-type network structure
JP2020035163A (en) * 2018-08-29 2020-03-05 アイコム株式会社 Data setting system and data setting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008524911A (en) * 2004-12-17 2008-07-10 エヌエイチエヌ コーポレーション Method for adjusting load between subsystems in a communication network system with a bus-type network structure
JP4808731B2 (en) * 2004-12-17 2011-11-02 エヌエイチエヌ コーポレーション Method for adjusting load between subsystems in a communication network system
US8260894B2 (en) 2004-12-17 2012-09-04 Nhn Corporation Method for balancing load among subsystems in communication network system of bus network structure
JP2020035163A (en) * 2018-08-29 2020-03-05 アイコム株式会社 Data setting system and data setting method
JP7157315B2 (en) 2018-08-29 2022-10-20 アイコム株式会社 Data setting system and data setting method

Similar Documents

Publication Publication Date Title
KR940020754A (en) Device and method for transmitting and receiving data and supervised signals between end users (Emorgency local switching)
KR100794428B1 (en) The Method Of Accommodating And Using Heterogeneous Data Link In The Same No.7 Signaling Link Set
JP2002064488A (en) Collective equipment operation monitoring system
JP2017168890A (en) Communication system
KR960027838A (en) Signal Processing Method in ATM Switching Network, ATM Switching System and ATM Switching Network Controlling Transmission of Input Cell by Control Cell
US6229985B1 (en) Communication apparatus
JPH08251216A (en) Data transmitter
JPH04331550A (en) Subscriber equipment
KR19990000779A (en) Distributed Implementation Method of Resource Service Control Unit in Intelligent Information Providing System
KR100325390B1 (en) Message Trnsfer Part Restart Method In No.7 Signaling Network
JP3929212B2 (en) Communication network system
KR20030085341A (en) Method for Managing Call Resource Between Mobile Communication Switching and Base Station Controller
JP2646964B2 (en) Mobile switching system
JPH11127477A (en) Personal communication system
JP2006020143A (en) Radio base station device
JP3535673B2 (en) Multiplexer backup control method
JPH01238234A (en) Line back up system
RU2127900C1 (en) Method for transmission and method for reception of data, method for x
JP2937106B2 (en) Subscriber line transmission path abnormal state notification method and system
JP3755743B2 (en) Communication program and communication system
JPH0286244A (en) Signal link controller
JP2953183B2 (en) Maintenance operation module monitoring method
JPH0558302B2 (en)
KR100462892B1 (en) method for message processing enable voice service in access network and node therefor
JPH104440A (en) Dynamic revision system for communication control procedure and its method

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040518