JP2001265580A - Review supporting system and review supporting method used for it - Google Patents

Review supporting system and review supporting method used for it

Info

Publication number
JP2001265580A
JP2001265580A JP2000073239A JP2000073239A JP2001265580A JP 2001265580 A JP2001265580 A JP 2001265580A JP 2000073239 A JP2000073239 A JP 2000073239A JP 2000073239 A JP2000073239 A JP 2000073239A JP 2001265580 A JP2001265580 A JP 2001265580A
Authority
JP
Japan
Prior art keywords
project
development
database
information
check
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000073239A
Other languages
Japanese (ja)
Inventor
Hiroyuki Okawa
博行 大川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Engineering Ltd
Original Assignee
NEC Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Engineering Ltd filed Critical NEC Engineering Ltd
Priority to JP2000073239A priority Critical patent/JP2001265580A/en
Publication of JP2001265580A publication Critical patent/JP2001265580A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide a review supporting method capable of supporting from the designing/preparing stages to post processing of a review efficiently and precisely by preventing the omission of a check item. SOLUTION: At a step S1, information characteristic to the project is inputted to a database on the side of a client computer, and a similar project is retrieved from the database housing information on a past project on the side of a server computer based on this, is decided and registered in a database on the side of the client computer. At the step S2, the check item is decided by each stage from a database on the side of a server computer and registered in the database on the side of the client computer. Individual check items are decided at a step S3, the review is carried out in accordance with the check items at a step S4 and a problem point is extracted at a step S5. At a step S6, a dealing method is decided by referring to correcting and dealing examples.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はレビュー支援システ
ム及びそれに用いるレビュー支援方法に関し、特にソフ
トウェア製品開発の各工程の区切りで設計品質の向上を
図るために実施されるレビュー工程の支援方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a review support system and a review support method used therewith, and more particularly, to a review support method implemented to improve design quality at each step of software product development.

【0002】[0002]

【従来の技術】従来、ソフトウェア製品開発の工程とし
ては、大別して、製品計画、基本設計、機能設計、詳細
設計、コーディング、単体評価、結合・機能評価、総合
・システム評価、出荷等の各工程があり、レビュー工程
はこれらの工程の区切りで実施され、工程の設計アウト
プット、その設計手法、設計手順に対して必要な情報や
知識を収集してチェックを行い、設計品質の向上を図る
ために行われている。
2. Description of the Related Art Conventionally, software product development processes are roughly divided into product planning, basic design, functional design, detailed design, coding, unit evaluation, combination / functional evaluation, comprehensive / system evaluation, shipping, etc. The review process is implemented at the boundaries of these processes, and collects and checks necessary information and knowledge on the process design output, its design method and design procedure, and improves the design quality. It has been done.

【0003】このようなレビュー工程においては、通
常、次工程へのチェック漏れがなく、精度良く、効率的
に行うために、レビュー実施前にレビュー項目をまとめ
たレビューチェックシートを作成し、チェックの実施と
問題点・処置方法とをそれぞれ管理している。
[0003] In such a review process, a review check sheet that summarizes review items is created before a review is performed, so that the next process can be performed accurately and efficiently without omission of checks. It manages the implementation and the problems / treatments respectively.

【0004】[0004]

【発明が解決しようとする課題】上述した従来のレビュ
ー工程では、レビューに関する情報やチェックシート等
がプロジェクト毎に紙で管理されていることがほとんど
であり、またチェック項目がソフトウェア製品全プロジ
ェクトに共通するチェック項目やプロジェクトの種別に
関するチェック項目、及びプロジェクト固有のチェック
項目という形で区別されていないため、チェック項目の
内容を検討したり、チェック項目数を設定する場合にこ
れらの作業が効率よく実施されないばかりか、過去のプ
ロジェクトの情報や前工程の情報を利用/流用しにくい
ため、チェック項目漏れをひきおこす可能性が大きい。
In the above-described conventional review process, information on reviews, check sheets, and the like are mostly managed on paper for each project, and the check items are common to all software product projects. Check items to be checked, project-type check items, and project-specific check items are not distinguished, so these tasks can be performed efficiently when examining the contents of check items and setting the number of check items Not only that, but also information on past projects and information on previous processes is difficult to use / diverte, so there is a high possibility of causing omission of check items.

【0005】また、上記のレビュー工程では、レビュー
結果等の情報がプロジェクト毎に管理されているので、
レビューの結果、摘出された問題点に対する修正/処置
方法の決定も過去の情報を利用することがないので、効
率よく処置を行うことができない。
In the above-mentioned review process, information such as review results is managed for each project.
As a result of the review, the determination of the correction / treatment method for the extracted problem does not use the past information, so that the treatment cannot be performed efficiently.

【0006】そこで、本発明の目的は上記の問題点を解
消し、チェック項目漏れを防止することができ、レビュ
ーの設計/準備段階から問題点等の後処理までを効率良
くかつ精度良くサポートすることができるレビュー支援
システム及びそれに用いるレビュー支援方法を提供する
ことにある。
Accordingly, an object of the present invention is to solve the above-mentioned problems, prevent omission of check items, and efficiently and accurately support from a review design / preparation stage to post-processing of problems. It is an object of the present invention to provide a review support system and a review support method used therefor.

【0007】[0007]

【課題を解決するための手段】本発明によるレビュー支
援システムは、ソフトウェアシステム/製品を開発する
ためのプロジェクトの各工程の区切りで前記プロジェク
トの設計品質の向上を図るために実施されるレビュー工
程の支援を行うレビュー支援システムであって、開発中
及び過去の開発プロジェクトの情報を全て管理するサー
バ・コンピュータと、開発中の開発プロジェクトの情報
のみを管理する複数のクライアント・コンピュータと、
前記サーバ・コンピュータに設けられかつ前記過去の開
発プロジェクトの情報をプロジェクト単位に保管/管理
する第1のデータベースと、前記サーバ・コンピュータ
に設けられかつ前記レビュー工程で使用するチェックリ
ストの中で前記プロジェクトに関係なく共通に使用可能
なチェック項目を保管/管理する第2のデータベース
と、前記複数のクライアント・コンピュータ各々に設け
られかつ開発計画完了時に前記第1のデータベースから
検索される前記開発プロジェクトに類似のプロジェクト
の情報を保管する第3のデータベースと、前記複数のク
ライアント・コンピュータ各々に設けられかつ前記開発
計画完了時に入力される開発プロジェクトの固有情報を
保管する第4のデータベースとを備えている。
SUMMARY OF THE INVENTION A review support system according to the present invention is a review support system for improving the design quality of a project for developing a software system / product at each step of the project. A review support system that provides support, a server computer that manages all information on development projects in the past and in development, and a plurality of client computers that manage only information on development projects under development,
A first database provided in the server computer and storing / managing information of the past development projects in project units; and a checklist provided in the server computer and used in the review process. A second database for storing / managing check items that can be used in common regardless of the above, and similar to the development project provided in each of the plurality of client computers and retrieved from the first database upon completion of a development plan. And a fourth database provided in each of the plurality of client computers and storing unique information of the development project input when the development plan is completed.

【0008】本発明によるレビュー支援方法は、ソフト
ウェアシステム/製品を開発するためのプロジェクトの
各工程の区切りで前記プロジェクトの設計品質の向上を
図るために実施されるレビュー工程の支援を行うレビュ
ー支援方法であって、開発中及び過去の開発プロジェク
トの情報を全て管理するサーバ・コンピュータと、開発
中の開発プロジェクトの情報のみを管理する複数のクラ
イアント・コンピュータとを相互に通信回線で接続して
クライアント/サーバシステムを構成し、前記過去の開
発プロジェクトの情報をプロジェクト単位に保管/管理
する第1のデータベースと、前記レビュー工程で使用す
るチェックリストの中で前記プロジェクトに関係なく共
通に使用可能なチェック項目を保管/管理する第2のデ
ータベースとを前記サーバ・コンピュータに設け、開発
計画完了時に前記第1のデータベースから検索される前
記開発プロジェクトに類似のプロジェクトの情報を保管
する第3のデータベースと、前記開発計画完了時に入力
される開発プロジェクトの固有情報を保管する第4のデ
ータベースとを前記複数のクライアント・コンピュータ
各々に設けるようにしている。
A review support method according to the present invention is a review support method for supporting a review process implemented to improve the design quality of a project for developing a software system / product at each step of the project. A server computer that manages all information on development projects in the past and in the past and a plurality of client computers that manage only information on development projects under development by connecting each other with a communication line; A first database that configures a server system and stores / manages information of the past development projects in project units, and check items that can be commonly used regardless of the project in a checklist used in the review process To a second database to store / manage A third database provided on the server computer for storing information of a project similar to the development project retrieved from the first database when the development plan is completed, and unique information of the development project input when the development plan is completed And a fourth database for storing the client database is provided for each of the plurality of client computers.

【0009】すなわち、本発明のレビュー支援システム
は、ソフトウェア製品開発の工程の区切りにおいて実施
する設計アウトプットのレビューに必要なチェック項目
を決定、チェックリストを作成し、それにしたがってレ
ビューを実施し、そこで摘出した問題点の修正方法を過
去の事例を参照して決定し、処置を施すレビュー支援シ
ステムである。
That is, the review support system of the present invention determines the check items necessary for reviewing the design output to be performed at the break of the software product development process, creates a checklist, and performs the review in accordance therewith. This is a review support system that determines a method of correcting the extracted problem with reference to past cases and takes action.

【0010】本発明のレビュー支援システムは、上記の
課題を解決するために、上記の構成において、当該プロ
ジェクトのプロジェクト名称、開発目的、開発項目と機
能概要、システム/製品の種別、開発規模、動作環境、
開発工数からなる当該プロジェクトの固有情報をクライ
アントコンピュータのデータベースに入力する手段と、
入力した情報を基にサーバコンピュータのデータベース
に登録されている過去のプロジェクトから類似プロジェ
クトを検索・摘出する手段と、さらに入力した情報を基
に、各工程毎にソフトウェア製品全般に共通しているチ
ェック項目及びシステムや製品の特長からその種別毎に
考慮されるチェック項目をサーバコンピュータのデータ
ベースから検索・決定する手段と、類似プロジェクトの
情報からシステムや製品種別に関するチェック項目を摘
出する手段と、当該プロジェクトの各工程単位でインプ
ットに対するアウトプットの整合性等をチェックする固
有のチェック項目を決定し、これまで決定した全チェッ
ク項目を統合してクライアントコンピュータのデータベ
ースに入力する手段と、統合したチェック項目のチェッ
クリストを使用してレビューした結果をクライアントコ
ンピュータのデータベースに入力する手段と、レビュー
の結果摘出した問題点を類似プロジェクトの情報から検
索し、修正/処置方法の決定に役立てる手段と、問題点
等を解決した最終的な情報をクライアントコンピュータ
のデータベースに入力し、さらにサーバコンピュータの
データベースに登録する手段とを有している。
In order to solve the above-mentioned problems, the review support system according to the present invention, in the above configuration, has a project name, a development purpose, an outline of development items and functions, a system / product type, a development scale, and an operation of the project. environment,
Means for inputting the unique information of the project including the development man-hour into the database of the client computer;
A means to search and extract similar projects from past projects registered in the database of the server computer based on the input information, and a check common to all software products for each process based on the input information A means for searching and deciding from the database of the server computer check items to be considered for each type based on items, system and product features, a means for extracting check items related to system and product type from information on similar projects, A unique check item for checking the consistency of output with respect to input, etc. in each process unit, integrating all check items determined so far and inputting them to the database of the client computer; Use a checklist A means for inputting the results of the review into the database of the client computer, a means for searching for the problems identified as a result of the review from information on similar projects to help determine corrective / corrective measures, and a means for solving the problems, etc. Means for inputting information into the database of the client computer and registering the information in the database of the server computer.

【0011】本発明のレビュー支援システムは、上記の
各手段と、それぞれにデータベースとを備える複数のク
ライアントコンピュータ及びサーバコンピュータからな
るクライアント/サーバシステムとを有している。
The review support system of the present invention has a client / server system including a plurality of client computers each having the above-described means and a database, and a server computer.

【0012】上記のような構成をとり、プロジェクトの
レビューに関する情報を各プロジェクト各工程毎に一括
して管理し、情報共有を行うことによって、チェック項
目漏れを防止し、レビューの設計/準備段階から問題点
等の後処理までを効率良くかつ精度良くサポートするこ
とが可能となる。
[0012] With the above configuration, information on project reviews is collectively managed for each process in each project, and information is shared to prevent omission of check items, and from the review design / preparation stage. It is possible to efficiently and accurately support up to post-processing such as a problem.

【0013】[0013]

【発明の実施の形態】次に、本発明の一実施例について
図面を参照して説明する。図1は本発明の一実施例によ
るクライアント/サーバシステムの構成を示すブロック
図である。図1において、本発明の一実施例によるクラ
イアント/サーバシステムは組織内で運用し、開発中及
び過去の開発プロジェクトの情報を全て管理しているサ
ーバ・コンピュータ1と、開発中の開発プロジェクトの
情報のみを管理している複数のクライアント・コンピュ
ータ2−1〜2−nとをLAN回線100で接続して構
成している。複数のクライアント・コンピュータ2−1
〜2−nは常にいくつかのプロジェクトグループからア
クセスが可能なように各プロジェクト単位で複数台用意
されている。
Next, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing a configuration of a client / server system according to one embodiment of the present invention. In FIG. 1, a client / server system according to an embodiment of the present invention is operated in an organization, and manages all information on development projects in the past and past, and information on development projects under development. A plurality of client computers 2-1 to 2-n that manage only the client computers are connected by a LAN line 100. Plural client computers 2-1
.About.2-n are prepared for each project so as to always be accessible from some project groups.

【0014】図2は図1のサーバ・コンピュータ1の構
成を示すブロック図である。図2において、サーバ・コ
ンピュータ1はサーバ・コンピュータ本体11と、キー
ボード12と、ディスプレイ13と、プロジェクト情報
データベース14と、チェックリスト情報データベース
15とから構成されている。
FIG. 2 is a block diagram showing the configuration of the server computer 1 of FIG. 2, the server computer 1 includes a server computer main body 11, a keyboard 12, a display 13, a project information database 14, and a checklist information database 15.

【0015】プロジェクト情報データベース14は組織
内で過去に行われた開発プロジェクトの情報をプロジェ
クト単位に保管/管理し、過去のプロジェクトの情報を
プロジェクト毎にマスタ・プロジェクト情報テーブル1
4aとして保管している。
The project information database 14 stores and manages information on development projects performed in the organization in the past in units of projects, and stores information on past projects in the master project information table 1 for each project.
4a.

【0016】また、チェックリスト情報データベース1
5は組織内で一般的に適用される定型的なプロジェクト
のライフサイクルモデル、例えばROYCEのウォータ
フォールモデル等にしたがって区切られた各開発工程で
行うレビューで使用するチェックリストの中で、プロジ
ェクトに関係なく共通に使用することができるチェック
項目を保管/管理し、それらの情報をマスタ・チェック
リスト情報テーブル15aとして保管している。
Checklist information database 1
5 is related to the project in the checklist used in the review performed in each development process divided according to the standard project life cycle model generally applied in the organization, for example, ROYCE's waterfall model. Check items that can be used in common are stored / managed, and their information is stored as a master checklist information table 15a.

【0017】図3は図2のマスタ・プロジェクト情報テ
ーブル14aの構成例を示す図である。図3において、
マスタ・プロジェクト情報テーブル14aは各プロジェ
クトA,B,C,…毎に設けられており、例えばウォー
タフォールモデルのライフサイクルモデルでソフトウェ
アの開発を行う組織の中のAプロジェクトの場合、Aプ
ロジェクト固有情報41と、Aプロジェクト基本設計工
程チェックリスト42と、Aプロジェクト機能設計工程
チェックリスト43と、Aプロジェクト詳細設計工程チ
ェックリスト44と、Aプロジェクトコーディング工程
チェックリスト45と、Aプロジェクトテスト工程チェ
ックリスト46とから構成されている。尚、図示してい
ないが、プロジェクトB,C,…のマスタ・プロジェク
ト情報テーブル14aも上記と同様の構成となってい
る。
FIG. 3 is a diagram showing a configuration example of the master project information table 14a of FIG. In FIG.
The master project information table 14a is provided for each of the projects A, B, C,... For example, in the case of an A project in an organization that develops software using a life cycle model of a waterfall model, A project specific information 41, A project basic design process checklist 42, A project function design process checklist 43, A project detailed design process checklist 44, A project coding process checklist 45, A project test process checklist 46, It is composed of Although not shown, the master project information table 14a for the projects B, C,... Has the same configuration as described above.

【0018】図4は図3のAプロジェクト固有情報41
の構成例を示す図である。図4において、Aプロジェク
ト固有情報41はAプロジェクトの場合の情報を示して
おり、開発目的(開発の目的、開発の背景、機能
提供時の効果)411と、開発項目と機能概要(機能
と性能、信頼性と安全性、拡張性)412と、シス
テム/製品の種別[システムや製品の特長から種類分
けする(種別リストから選択する)]413と、開発規
模[開発する画面数、帳票数、ソース行数等(全体規
模で示す)]414と、動作環境(システムや製品の
環境、運用と保守形態、技術的特徴)415と、開
発工数[開発に要する人時、人日、人年等(全体規模
で示す)]416との各情報から構成されている。尚、
図示していないが、プロジェクトB,C,…のプロジェ
クト固有情報も上記と同様の構成となっている。
FIG. 4 shows the A project specific information 41 of FIG.
FIG. 3 is a diagram showing an example of the configuration. In FIG. 4, the A project specific information 41 indicates information in the case of the A project. The development purpose (the purpose of the development, the background of the development, the effect at the time of providing the function) 411, the development item and the function summary (function and performance) , Reliability and security, scalability) 412, system / product type [classify based on system and product features (select from type list)] 413, and development scale [number of screens to be developed, number of forms, Number of source lines, etc. (shown on a whole scale)] 414, operating environment (environment of systems and products, operation and maintenance form, technical characteristics) 415, and development man-hours [man hours, man days, man years, etc. required for development] (Indicated by the whole scale)] 416. still,
Although not shown, the project-specific information of the projects B, C,... Has the same configuration as described above.

【0019】ここで、開発目的411は開発の目的、開
発の背景、提供する機能による効果を示している。開発
項目と機能概要412は機能と性能、信頼性や安全性、
拡張性の概念を示している。システム/製品の種別41
3はデータベースや通信制御等の開発するシステムや製
品の種別を、本実施例によるレビュー支援システムを使
用する組織で事前に登録した種別一覧から選択して決定
するシステム/製品の種別を示している。
Here, the development purpose 411 indicates the purpose of the development, the background of the development, and the effect of the provided function. The development items and function outline 412 are for functions and performance, reliability and safety,
2 illustrates the concept of extensibility. System / Product Type 41
Reference numeral 3 denotes a system / product type that is determined by selecting a type of a system or a product to be developed such as a database or communication control from a type list registered in advance by an organization using the review support system according to the present embodiment. .

【0020】開発規模414は設計書の枚数、設計する
画面数、コーディングしたソースファイルの行数等の開
発の設計量を示している。動作環境415は開発する製
品が動作を保証するハードウェアやソフトウェアの環
境、代表的な運用と保守との形態、技術的な特徴を示し
ている。開発工数416は開発の全行程に要する時間を
示している。
The development scale 414 indicates the amount of development design such as the number of design documents, the number of screens to be designed, and the number of lines of a coded source file. The operating environment 415 indicates hardware and software environments that guarantee the operation of the product to be developed, typical modes of operation and maintenance, and technical characteristics. The development man-hour 416 indicates the time required for the entire development process.

【0021】図5は図3のAプロジェクト基本設計工程
チェックリスト42の構成例を示す図である。図5にお
いて、Aプロジェクト基本設計工程チェックリスト42
は基本設計工程共通チェック項目421と、基本設計工
程種別共通チェック項目422と、基本設計工程Aプロ
ジェクト個別チェック項目423との各情報で構成さ
れ、それぞれのチェック項目424は[チェック内容]
(チェックする内容)、[合否判定結果]{合否判
定結果(合格、不合格、条件付き合格、該当しな
い)}、[問題点](問題点の内容、原因区分、
作り込み工程、重要度、問題発生箇所)、[修正・
処置方法]{修正・処置方法の内容、修正箇所(ペ
ージ番号、仕様書項番、関数名、ライン番号)}、[修
正確認](修正完了日、修正完了Rev)の各欄か
ら構成されている。尚、図示していないが、プロジェク
トB,C,…のプロジェクト基本設計工程チェックリス
トも上記と同様の構成となっている。
FIG. 5 is a diagram showing a configuration example of the A project basic design process check list 42 in FIG. In FIG. 5, the project A basic design process checklist 42
Is composed of information of a basic design process common check item 421, a basic design process type common check item 422, and a basic design process A project individual check item 423, and each check item 424 is [check contents].
(Contents to be checked), [Pass / Fail Judgment Result] {Pass / Fail Judgment Result (Pass, Fail, Conditional Pass, Not Applicable)}, [Problem] (Problem content, cause category,
Creation process, importance, problem occurrence location),
Disposition method] {Contents of modification and disposition method, modification location (page number, specification item number, function name, line number)}, [Correction check] (Modification completion date, modification completion Rev) I have. Although not shown, the project basic design process checklists for projects B, C,... Have the same configuration as described above.

【0022】ここで、基本設計工程共通チェック項目4
21はウォータフォールモデルの基本設計工程におい
て、開発するシステムや製品に関係なく共通的なチェッ
ク項目を集めたものである。基本設計工程種別共通チェ
ック項目422はデータベースや通信制御等の開発する
システムや製品の種別に依存するチェック項目を集めた
ものである。基本設計工程Aプロジェクト個別チェック
項目423はAプロジェクト特有のチェック項目を集め
たものである。
Here, basic design process common check item 4
Reference numeral 21 is a collection of common check items in the basic design process of the waterfall model regardless of the system or product to be developed. The basic design process type common check item 422 is a collection of check items depending on the type of system or product to be developed, such as a database and communication control. The basic design process A project individual check item 423 is a collection of check items specific to the A project.

【0023】図6は図3のAプロジェクト機能設計工程
チェックリスト43の構成例を示す図である。図6にお
いて、Aプロジェクト機能設計工程チェックリスト43
は機能設計工程共通チェック項目431と、機能設計工
程種別共通チェック項目432と、機能設計工程Aプロ
ジェクト個別チェック項目433との各情報で構成さ
れ、それぞれのチェック項目434は[チェック内容]
(チェックする内容)、[合否判定結果]{合否判
定結果(合格、不合格、条件付き合格、該当しな
い)}、[問題点](問題点の内容、原因区分、
作り込み工程、重要度、問題発生箇所)、[修正・
処置方法]{修正・処置方法の内容、修正箇所(ペ
ージ番号、仕様書項番、関数名、ライン番号)}、[修
正確認](修正完了日、修正完了Rev)の各欄か
ら構成されている。尚、図示していないが、プロジェク
トB,C,…のプロジェクト機能設計工程チェックリス
トも上記と同様の構成となっている。
FIG. 6 is a diagram showing a configuration example of the A project function design process check list 43 in FIG. In FIG. 6, an A project function design process checklist 43
Is composed of information of a common check item 431 for function design process, a common check item 432 for function design process type, and a check item 433 for individual project of function design process A, and each check item 434 is [check contents].
(Contents to be checked), [Pass / Fail Judgment Result] {Pass / Fail Judgment Result (Pass, Fail, Conditional Pass, Not Applicable)}, [Problem] (Problem content, cause category,
Creation process, importance, problem occurrence location),
Disposition method] {Contents of modification and disposition method, modification location (page number, specification item number, function name, line number)}, [Correction check] (Modification completion date, modification completion Rev) I have. Although not shown, the project function design process checklists for projects B, C,... Have the same configuration as described above.

【0024】図7は図3のAプロジェクト詳細設計工程
チェックリスト44の構成例を示す図である。図7にお
いて、Aプロジェクト詳細設計工程チェックリスト44
は詳細設計工程共通チェック項目441と、詳細設計工
程種別共通チェック項目442と、詳細設計工程Aプロ
ジェクト個別チェック項目443との各情報で構成さ
れ、それぞれのチェック項目444は[チェック内容]
(チェックする内容)、[合否判定結果]{合否判
定結果(合格、不合格、条件付き合格、該当しな
い)}、[問題点](問題点の内容、原因区分、
作り込み工程、重要度、問題発生箇所)、[修正・
処置方法]{修正・処置方法の内容、修正箇所(ペ
ージ番号、仕様書項番、関数名、ライン番号)}、[修
正確認](修正完了日、修正完了Rev)の各欄か
ら構成されている。尚、図示していないが、プロジェク
トB,C,…のプロジェクト詳細設計工程チェックリス
トも上記と同様の構成となっている。
FIG. 7 is a diagram showing an example of the configuration of the project A detailed design process checklist 44 in FIG. In FIG. 7, the A project detailed design process checklist 44
The detailed design process common check item 441, the detailed design process type common check item 442, and the detailed design process A project individual check item 443 are each configured, and each check item 444 is [check content].
(Contents to be checked), [Pass / Fail Judgment Result] {Pass / Fail Judgment Result (Pass, Fail, Conditional Pass, Not Applicable)}, [Problem] (Problem content, cause category,
Creation process, importance, problem occurrence location),
Disposition method] {Contents of modification and disposition method, modification location (page number, specification item number, function name, line number)}, [Correction check] (Modification completion date, modification completion Rev) I have. Although not shown, the project detailed design process checklists of the projects B, C,... Have the same configuration as described above.

【0025】図8は図3のAプロジェクトコーディング
工程チェックリスト45の構成例を示す図である。図8
において、Aプロジェクトコーディング工程チェックリ
スト45はコーディング工程共通チェック項目451
と、コーディング工程種別共通チェック項目452と、
コーディング工程Aプロジェクト個別チェック項目45
3との各情報で構成され、それぞれのチェック項目45
4は[チェック内容](チェックする内容)、[合否
判定結果]{合否判定結果(合格、不合格、条件付き
合格、該当しない)}、[問題点](問題点の内容、
原因区分、作り込み工程、重要度、問題発生箇
所)、[修正・処置方法]{修正・処置方法の内容、
修正箇所(ページ番号、仕様書項番、関数名、ライン
番号)}、[修正確認](修正完了日、修正完了R
ev)の各欄から構成されている。尚、図示していない
が、プロジェクトB,C,…のプロジェクトコーディン
グ工程チェックリストも上記と同様の構成となってい
る。
FIG. 8 is a diagram showing an example of the configuration of the A project coding process check list 45 in FIG. FIG.
In the A project coding process checklist 45, coding process common check items 451
And coding process type common check item 452,
Coding process A project individual check item 45
3 and each check item 45
4 is [check contents] (contents to be checked), [pass / fail judgment result] {pass / fail judgment result (pass, fail, conditional pass, not applicable)}, [problem] (problem content,
Cause category, creation process, importance, location of problem occurrence), [Correction / action method] {Contents of correction / action method,
Correction (page number, specification item number, function name, line number)}, [correction confirmation] (correction completion date, correction completion R)
ev). Although not shown, the project coding process check list for the projects B, C,... Has the same configuration as described above.

【0026】図9は図3のAプロジェクトテスト工程チ
ェックリスト46の構成例を示す図である。図9におい
て、Aプロジェクトテスト工程チェックリスト46はテ
スト工程共通チェック項目461と、テスト工程種別共
通チェック項目462と、テスト工程Aプロジェクト個
別チェック項目463との各情報で構成され、それぞれ
のチェック項目464は[チェック内容](チェック
する内容)、[合否判定結果]{合否判定結果(合
格、不合格、条件付き合格、該当しない)}、[問題
点](問題点の内容、原因区分、作り込み工程、
重要度、問題発生箇所)、[修正・処置方法]{
修正・処置方法の内容、修正箇所(ページ番号、仕様
書項番、関数名、ライン番号)}、[修正確認](修
正完了日、修正完了Rev)の各欄から構成されてい
る。尚、図示していないが、プロジェクトB,C,…の
プロジェクトテスト工程チェックリストも上記と同様の
構成となっている。
FIG. 9 is a diagram showing a configuration example of the A project test process check list 46 in FIG. In FIG. 9, the A project test process check list 46 is composed of test process common check items 461, test process type common check items 462, and test process A project individual check items 463, and each check item 464. Are [Check Contents] (Contents to be checked), [Pass / Fail Judgment Result] {Pass / Fail Judgment Result (Pass, Fail, Conditional Pass, Not Applicable)}, [Problem] (Problem content, cause classification, creation Process,
Importance, problem occurrence location), [Correction / action method] {
It consists of the fields of the content of the correction / treatment method, correction location (page number, specification item number, function name, line number), and [correction confirmation] (correction completion date, correction completion Rev). Although not shown, the project test process checklists of the projects B, C,... Have the same configuration as described above.

【0027】図10は図2のマスタ・チェックリスト情
報テーブル15aの構成を示す図である。図10におい
て、マスタ・チェックリスト情報テーブル15aはウォ
ータフォールモデルのライフサイクルでソフトウェアの
開発を行う組織であれば、基本設計工程マスタ・チェッ
クリスト51と、機能設計工程マスタ・チェックリスト
52と、詳細設計工程マスタ・チェックリスト53と、
コーディング工程マスタ・チェックリスト54と、テス
ト工程マスタ・チェックリスト55とから構成される。
FIG. 10 is a diagram showing the configuration of the master checklist information table 15a of FIG. In FIG. 10, the master checklist information table 15a is a basic design process master checklist 51, a functional design process master checklist 52, and a detail if the organization develops software in the life cycle of the waterfall model. Design process master checklist 53,
It comprises a coding process master checklist 54 and a test process master checklist 55.

【0028】図11は図10の基本設計工程マスタ・チ
ェックリスト51の構成を示す図である。図11におい
て、基本設計工程マスタ・チェックリスト51は上記の
組織の場合に主にデータベース系と通信制御系とのシス
テム/製品を開発しているため、基本設計工程共通マス
タチェック項目511と、基本設計工程データベース
(DB)系種別共通マスタチェック項目512と、基本
設計工程通信制御系種別共通マスタチェック項目513
との各情報で構成され、それぞれのチェック項目514
は[チェック内容](チェックする内容)、[合否判
定結果]{合否判定結果(合格、不合格、条件付き合
格、該当しない)}、[問題点](問題点の内容、
原因区分、作り込み工程、重要度、問題発生箇
所)、[修正・処置方法]{修正・処置方法の内容、
修正箇所(ページ番号、仕様書項番、関数名、ライン
番号)}、[修正確認](修正完了日、修正完了R
ev)の各欄から構成されている。尚、[合否判定結
果]、[問題点]、[修正・処置方法]、[修正確認]
の各欄はチェック後に書込まれる。
FIG. 11 is a diagram showing the configuration of the basic design process master checklist 51 of FIG. In FIG. 11, since the basic design process master checklist 51 mainly develops a system / product of a database system and a communication control system in the case of the above organization, a basic design process common master check item 511 and a basic Design process database (DB) system type common master check item 512 and basic design process communication control system type common master check item 513
And each check item 514
Is [Check Contents] (contents to be checked), [Pass / Fail Judgment Result] {Pass / Fail Judgment Result (Pass, Fail, Conditional Pass, Not Applicable)}, [Problem] (Content of problem,
Cause category, creation process, importance, location of problem occurrence), [Correction / action method] {Contents of correction / action method,
Correction (page number, specification item number, function name, line number)}, [correction confirmation] (correction completion date, correction completion R)
ev). In addition, [Pass / Fail judgment result], [Problem], [Correction / treatment method], [Correction confirmation]
Are written after the check.

【0029】図12は図10の機能設計工程マスタ・チ
ェックリスト52の構成を示す図である。図12におい
て、機能設計工程マスタ・チェックリスト52は機能設
計工程共通マスタチェック項目521と、機能設計工程
データベース(DB)系種別共通マスタチェック項目5
22と、機能設計工程通信制御系種別共通マスタチェッ
ク項目523との各情報で構成され、それぞれのチェッ
ク項目524は[チェック内容](チェックする内
容)、[合否判定結果]{合否判定結果(合格、不合
格、条件付き合格、該当しない)}、[問題点](問
題点の内容、原因区分、作り込み工程、重要度、
問題発生箇所)、[修正・処置方法]{修正・処置
方法の内容、修正箇所(ページ番号、仕様書項番、関
数名、ライン番号)}、[修正確認](修正完了日、
修正完了Rev)の各欄から構成されている。尚、
[合否判定結果]、[問題点]、[修正・処置方法]、
[修正確認]の各欄はチェック後に書込まれる。
FIG. 12 is a diagram showing the structure of the functional design process master checklist 52 of FIG. In FIG. 12, the function design process master / checklist 52 includes a function design process common master check item 521 and a function design process database (DB) system type common master check item 5.
22 and the function design process communication control system type common master check item 523, and each check item 524 is [check content] (content to be checked), [pass / fail judgment result] {pass / fail judgment result (pass) , Fail, Conditional Pass, Not Applicable)}, [Problem] (Content of problem, cause classification, build process, importance,
Problem location), [Correction / Troubleshooting] {Contents of correction / treatment, corrections (page number, specification item number, function name, line number)}, [Correction check] (Correction completion date,
The column is composed of each column of “Correction completion Rev). still,
[Pass / Fail Judgment Result], [Problem], [Correction / Treatment Method],
Each column of [Correction Confirmation] is written after the check.

【0030】図13は図10の詳細設計工程マスタ・チ
ェックリスト53の構成を示す図である。図13におい
て、詳細設計工程マスタ・チェックリスト53は詳細設
計工程共通マスタチェック項目531と、詳細設計工程
データベース(DB)系種別共通マスタチェック項目5
32と、詳細設計工程通信制御系種別共通マスタチェッ
ク項目533との各情報で構成され、それぞれのチェッ
ク項目534は[チェック内容](チェックする内
容)、[合否判定結果]{合否判定結果(合格、不合
格、条件付き合格、該当しない)}、[問題点](問
題点の内容、原因区分、作り込み工程、重要度、
問題発生箇所)、[修正・処置方法]{修正・処置
方法の内容、修正箇所(ページ番号、仕様書項番、関
数名、ライン番号)}、[修正確認](修正完了日、
修正完了Rev)の各欄から構成されている。尚、
[合否判定結果]、[問題点]、[修正・処置方法]、
[修正確認]の各欄はチェック後に書込まれる。
FIG. 13 is a diagram showing the configuration of the detailed design process master checklist 53 of FIG. In FIG. 13, the detailed design process master checklist 53 includes a detailed design process common master check item 531 and a detailed design process database (DB) system type common master check item 5.
32, and a detailed design process communication control system type common master check item 533, and each check item 534 is [check contents] (contents to be checked), [pass / fail judgment result] {pass / fail judgment result (pass) , Fail, Conditional Pass, Not Applicable)}, [Problem] (Content of problem, cause classification, build process, importance,
Problem location), [Correction / Troubleshooting] {Contents of correction / treatment, corrections (page number, specification item number, function name, line number)}, [Correction check] (Correction completion date,
The column is composed of each column of “Correction completion Rev). still,
[Pass / Fail Judgment Result], [Problem], [Correction / Treatment Method],
Each column of [Correction Confirmation] is written after the check.

【0031】図14は図10のコーディング工程マスタ
・チェックリスト54の構成を示す図である。図14に
おいて、コーディング工程マスタ・チェックリスト54
はコーディング工程共通マスタチェック項目541と、
コーディング工程データベース(DB)系種別共通マス
タチェック項目542と、コーディング工程通信制御系
種別共通マスタチェック項目543との各情報で構成さ
れ、それぞれのチェック項目544は[チェック内容]
(チェックする内容)、[合否判定結果]{合否判
定結果(合格、不合格、条件付き合格、該当しな
い)}、[問題点](問題点の内容、原因区分、
作り込み工程、重要度、問題発生箇所)、[修正・
処置方法]{修正・処置方法の内容、修正箇所(ペ
ージ番号、仕様書項番、関数名、ライン番号)}、[修
正確認](修正完了日、修正完了Rev)の各欄か
ら構成されている。尚、[合否判定結果]、[問題
点]、[修正・処置方法]、[修正確認]の各欄はチェ
ック後に書込まれる。
FIG. 14 is a diagram showing the structure of the coding process master checklist 54 of FIG. In FIG. 14, the coding process master checklist 54
Is a coding process common master check item 541,
Coding process database (DB) system type common master check item 542 and coding process communication control system type common master check item 543 are configured, and each check item 544 is [check contents].
(Contents to be checked), [Pass / Fail Judgment Result] {Pass / Fail Judgment Result (Pass, Fail, Conditional Pass, Not Applicable)}, [Problem] (Problem content, cause category,
Creation process, importance, problem occurrence location),
Disposition method] {Contents of modification and disposition method, modification location (page number, specification item number, function name, line number)}, [Correction check] (Modification completion date, modification completion Rev) I have. Note that the columns of [Pass / Fail Judgment Result], [Problem], [Correction / Treatment Method], and [Correction Confirmation] are written after the check.

【0032】図15は図10のテスト工程マスタ・チェ
ックリスト55の構成を示す図である。図15におい
て、テスト工程マスタ・チェックリスト55はテスト工
程共通マスタチェック項目551と、テスト工程データ
ベース(DB)系種別共通マスタチェック項目552
と、テスト工程通信制御系種別共通マスタチェック項目
553との各情報で構成され、それぞれのチェック項目
554は[チェック内容](チェックする内容)、
[合否判定結果]{合否判定結果(合格、不合格、条
件付き合格、該当しない)}、[問題点](問題点の
内容、原因区分、作り込み工程、重要度、問題
発生箇所)、[修正・処置方法]{修正・処置方法の
内容、修正箇所(ページ番号、仕様書項番、関数名、
ライン番号)}、[修正確認](修正完了日、修正
完了Rev)の各欄から構成されている。尚、[合否判
定結果]、[問題点]、[修正・処置方法]、[修正確
認]の各欄はチェック後に書込まれる。
FIG. 15 is a diagram showing the structure of the test process master checklist 55 of FIG. In FIG. 15, a test process master check list 55 includes a test process common master check item 551 and a test process database (DB) system type common master check item 552.
And test process communication control system type common master check items 553, and each check item 554 includes [check contents] (contents to be checked),
[Pass / Fail Judgment Result] {Pass / Fail Judgment Result (Pass, Fail, Conditional Pass, Not Applicable)}, [Problem] (Problem Content, Cause Classification, Creation Process, Importance, Problem Occurrence Location), [ Correction / Treatment Method] {Contents of correction / treatment method, correction points (page number, specification item number, function name
Line number) @, [Correction confirmation] (Modification completion date, Modification completion Rev). Note that the columns of [Pass / Fail Judgment Result], [Problem], [Correction / Treatment Method], and [Correction Confirmation] are written after the check.

【0033】図16は図1のクライアント・コンピュー
タ2−1〜2−nの構成を示すブロック図である。図1
6において、クライアント・コンピュータ2−1〜2−
nはクライアント・コンピュータ本体21と、キーボー
ド22と、ディスプレイ23と、プリンタ24と、類似
・プロジェクト情報データベース25と、当該・プロジ
ェクト情報データベース26とから構成されている。
FIG. 16 is a block diagram showing the configuration of the client computers 2-1 to 2-n in FIG. FIG.
6, the client computers 2-1 to 2-
n is composed of a client computer main body 21, a keyboard 22, a display 23, a printer 24, a similar project information database 25, and the project information database 26.

【0034】類似・プロジェクト情報データベース25
には開発計画が完了した時点で、プロジェクトのメンバ
(プロジェクトのリーダないしそれに準ずるものが望ま
しい)が、当該・プロジェクト情報データベース26の
当該・プロジェクト情報テーブル26aに登録した当該
・プロジェクト固有情報を基にサーバ・コンピュータ1
のプロジェクト情報データベース14から類似したプロ
ジェクトを検索し、当該プロジェクトの類似・プロジェ
クトとして決定し、例えばAプロジェクト、Dプロジェ
クト、Eプロジェクトが類似・プロジェクトとして決定
された場合、プロジェクト毎に、類似・プロジェクト情
報テーブル25aとして保管されている。また、当該・
プロジェクト情報データベース26には当該・プロジェ
クト情報テーブル26aが保管されている。
Similarity / Project Information Database 25
At the time when the development plan is completed, the project members (preferably the project leader or a similar one), based on the project information registered in the project information table 26a of the project information database 26, Server computer 1
A similar project is searched from the project information database 14 of the other project, and is determined as a similar project of the relevant project. For example, if the A project, the D project, and the E project are determined as similar projects, the similar / project information It is stored as a table 25a. In addition,
The project information database 26 stores the project information table 26a.

【0035】図17は図16の類似・プロジェクト情報
テーブル25aの構成を示す図である。図17におい
て、類似・プロジェクト情報テーブル25aは各プロジ
ェクトA,D,E,…毎に設けられており、例えばAプ
ロジェクトの場合であれば、Aプロジェクト固有情報4
1と、Aプロジェクト基本設計工程チェックリスト42
と、Aプロジェクト機能設計工程チェックリスト43
と、Aプロジェクト詳細設計工程チェックリスト44
と、Aプロジェクトコーディング工程チェックリスト4
5と、Aプロジェクトテスト工程チェックリスト46と
から構成されている。
FIG. 17 is a diagram showing the configuration of the similar / project information table 25a of FIG. 17, a similarity / project information table 25a is provided for each of the projects A, D, E,...
1 and A project basic design process checklist 42
A project function design process checklist 43
A project detailed design process checklist 44
And A project coding process checklist 4
5 and an A project test process checklist 46.

【0036】尚、図示していないが、プロジェクトD,
E,…の類似・プロジェクト情報テーブル25aも上記
と同様の構成となっており、それら類似・プロジェクト
情報テーブル25aの各構成内容は、上述した図4〜図
9と同様の内容となっている。
Although not shown, project D,
The similar / project information table 25a of E,... Has the same configuration as described above, and the respective configuration contents of the similar / project information table 25a are the same as those in FIGS.

【0037】図18は図16の当該・プロジェクト情報
テーブル26aの構成を示す図である。図18におい
て、当該・プロジェクト情報テーブル26aは当該・プ
ロジェクト固有情報71と、当該・プロジェクト基本設
計工程チェックリスト72と、当該・プロジェクト機能
設計工程チェックリスト73と、当該・プロジェクト詳
細設計工程チェックリスト74と、当該・プロジェクト
コーディング工程チェックリスト75と、当該・プロジ
ェクトテスト工程チェックリスト76とから構成されて
いる。
FIG. 18 is a diagram showing the configuration of the project information table 26a of FIG. In FIG. 18, the project information table 26a includes the project specific information 71, the project basic design process checklist 72, the project function design process checklist 73, and the project detailed design process checklist 74. , The project coding process checklist 75, and the project test process checklist 76.

【0038】この当該・プロジェクト情報テーブル26
aに保管される情報は開発計画が完了した時点で、プロ
ジェクトのメンバ(プロジェクトのリーダないしそれに
準ずるものが望ましい)によって入力される。
This project information table 26
The information stored in a is input by a project member (preferably a project leader or equivalent) when the development plan is completed.

【0039】図19は図18の当該・プロジェクト固有
情報71の構成を示す図である。図19において、当該
・プロジェクト固有情報71は開発目的(開発の目
的、開発の背景、機能提供時の効果)711と、開
発項目と機能概要(機能と性能、信頼性と安全性、
拡張性)712と、システム/製品の種別[システ
ムや製品の特長から種類分けする(種別リストから選択
する)]713と、開発規模[開発する画面数、帳票
数、ソース行数等(全体規模で示す)]714と、動作
環境(システムや製品の環境、運用と保守形態、
技術的特徴)715と、開発工数[開発に要する人
時、人日、人年等(全体規模で示す)]716との各情
報で構成されている。
FIG. 19 is a diagram showing the structure of the project-specific information 71 of FIG. In FIG. 19, the project-specific information 71 includes the development purpose (the purpose of development, the background of the development, the effect at the time of providing the function) 711 and the development item and the function summary (the function and the performance, the reliability and the safety,
(Extensibility) 712, system / product type [classify from system or product features (select from type list)] 713, development scale [number of screens to be developed, number of forms, number of source lines, etc. (total scale) 714] and operating environment (system and product environment, operation and maintenance form,
(Technical characteristics) 715 and development man-hours [man hours, man days, man years, etc. required for development (shown on a whole scale)] 716.

【0040】図20は図18の当該・プロジェクト基本
設計工程チェックリスト72の構成を示す図である。図
20において、当該・プロジェクト基本設計工程チェッ
クリスト72は基本設計工程共通チェック項目721
と、基本設計工程種別共通チェック項目722と、基本
設計工程当該・プロジェクト個別チェック項目723と
の各情報で構成され、それぞれのチェック項目724は
[チェック内容](チェックする内容)、[合否判定
結果]{合否判定結果(合格、不合格、条件付き合
格、該当しない)}、[問題点](問題点の内容、
原因区分、作り込み工程、重要度、問題発生箇
所)、[修正・処置方法]{修正・処置方法の内容、
修正箇所(ページ番号、仕様書項番、関数名、ライン
番号)}、[修正確認](修正完了日、修正完了R
ev)の各欄から構成されている。
FIG. 20 is a diagram showing the structure of the relevant project basic design process check list 72 of FIG. In FIG. 20, the project basic design process checklist 72 is a basic design process common check item 721.
, A basic design process type common check item 722, and a basic design process pertinent / project individual check item 723. Each check item 724 includes [check content] (contents to be checked), [pass / fail judgment result]. ] {Pass / Fail Judgment Results (Pass, Fail, Conditional Pass, Not Applicable)}, [Issues]
Cause category, creation process, importance, location of problem occurrence), [Correction / action method] {Contents of correction / action method,
Correction (page number, specification item number, function name, line number)}, [correction confirmation] (correction completion date, correction completion R)
ev).

【0041】図21は図18の当該・プロジェクト機能
設計工程チェックリスト73の構成を示す図である。図
21において、当該・プロジェクト機能設計工程チェッ
クリスト73は機能設計工程共通チェック項目731
と、機能設計工程種別共通チェック項目732と、機能
設計工程当該・プロジェクト個別チェック項目733と
の各情報で構成され、それぞれのチェック項目734は
[チェック内容](チェックする内容)、[合否判定
結果]{合否判定結果(合格、不合格、条件付き合
格、該当しない)}、[問題点](問題点の内容、
原因区分、作り込み工程、重要度、問題発生箇
所)、[修正・処置方法]{修正・処置方法の内容、
修正箇所(ページ番号、仕様書項番、関数名、ライン
番号)}、[修正確認](修正完了日、修正完了R
ev)の各欄から構成されている。
FIG. 21 is a diagram showing the structure of the project function design process check list 73 of FIG. In FIG. 21, the project function design process check list 73 is a function design process common check item 731.
, A functional design process type common check item 732, and a function design process pertinent / project individual check item 733, and each check item 734 includes [check contents] (contents to be checked), [pass / fail judgment results]. ] {Pass / Fail Judgment Results (Pass, Fail, Conditional Pass, Not Applicable)}, [Issues]
Cause category, creation process, importance, location of problem occurrence), [Correction / action method] {Contents of correction / action method,
Correction (page number, specification item number, function name, line number)}, [correction confirmation] (correction completion date, correction completion R)
ev).

【0042】図22は図18の当該・プロジェクト詳細
設計工程チェックリスト74の構成を示す図である。図
22において、当該・プロジェクト詳細設計工程チェッ
クリスト74は詳細設計工程共通チェック項目741
と、詳細設計工程種別共通チェック項目742と、詳細
設計工程当該・プロジェクト個別チェック項目743と
の各情報で構成され、それぞれのチェック項目744は
[チェック内容](チェックする内容)、[合否判定
結果]{合否判定結果(合格、不合格、条件付き合
格、該当しない)}、[問題点](問題点の内容、
原因区分、作り込み工程、重要度、問題発生箇
所)、[修正・処置方法]{修正・処置方法の内容、
修正箇所(ページ番号、仕様書項番、関数名、ライン
番号)}、[修正確認](修正完了日、修正完了R
ev)の各欄から構成されている。
FIG. 22 is a diagram showing the structure of the relevant project detailed design process checklist 74 of FIG. In FIG. 22, the project detailed design process checklist 74 is a detailed design process common check item 741.
And detailed design process type common check items 742 and detailed design process pertinent / project individual check items 743. Each check item 744 includes [check contents] (contents to be checked), [pass / fail judgment results]. ] {Pass / Fail Judgment Results (Pass, Fail, Conditional Pass, Not Applicable)}, [Issues]
Cause category, creation process, importance, location of problem occurrence), [Correction / action method] {Contents of correction / action method,
Correction (page number, specification item number, function name, line number)}, [correction confirmation] (correction completion date, correction completion R)
ev).

【0043】図23は図18の当該・プロジェクトコー
ディング工程チェックリスト75の構成を示す図であ
る。図23において、当該・プロジェクトコーディング
工程チェックリスト75はコーディング工程共通チェッ
ク項目751と、コーディング工程種別共通チェック項
目752と、コーディング工程当該・プロジェクト個別
チェック項目753との各情報で構成され、それぞれの
チェック項目754は[チェック内容](チェックす
る内容)、[合否判定結果]{合否判定結果(合格、
不合格、条件付き合格、該当しない)}、[問題点]
(問題点の内容、原因区分、作り込み工程、重
要度、問題発生箇所)、[修正・処置方法]{修正
・処置方法の内容、修正箇所(ページ番号、仕様書項
番、関数名、ライン番号)}、[修正確認](修正完
了日、修正完了Rev)の各欄から構成されている。
FIG. 23 is a diagram showing the structure of the project coding process check list 75 of FIG. In FIG. 23, the project coding process check list 75 is composed of information of a coding process common check item 751, a coding process type common check item 752, and a coding process pertinent project check item 753. Item 754 includes [check contents] (contents to be checked), [pass / fail judgment result] 結果 pass / fail judgment result (pass,
(Fail, conditional pass, not applicable) 該当, [problem]
(Details of problem, cause category, creation process, importance, location of problem occurrence), [Correction / action method] {Contents of correction / action method, correction location (page number, specification item number, function name, line) No.)}, [Correction Confirmation] (Modification Completion Date, Modification Completion Rev).

【0044】図24は図18の当該・プロジェクトテス
ト工程チェックリスト76の構成を示す図である。図2
4において、当該・プロジェクトテスト工程チェックリ
スト76はテスト工程共通チェック項目761と、テス
ト工程種別共通チェック項目762と、テスト工程当該
・プロジェクト個別チェック項目763との各情報で構
成され、それぞれのチェック項目764は[チェック内
容](チェックする内容)、[合否判定結果]{合
否判定結果(合格、不合格、条件付き合格、該当しな
い)}、[問題点](問題点の内容、原因区分、
作り込み工程、重要度、問題発生箇所)、[修正・
処置方法]{修正・処置方法の内容、修正箇所(ペ
ージ番号、仕様書項番、関数名、ライン番号)}、[修
正確認](修正完了日、修正完了Rev)の各欄か
ら構成されている。
FIG. 24 is a diagram showing the structure of the project test process checklist 76 shown in FIG. FIG.
In 4, the project test process check list 76 is composed of test process common check items 761, test process type common check items 762, and test process pertinent / project individual check items 763. Reference numeral 764 denotes [check contents] (contents to be checked), [pass / fail judgment results] {pass / fail judgment results (pass, fail, conditional pass, not applicable)], [problem] (problem content, cause classification,
Creation process, importance, problem occurrence location),
Disposition method] {Contents of modification and disposition method, modification location (page number, specification item number, function name, line number)}, [Correction check] (Modification completion date, modification completion Rev) I have.

【0045】図25は本発明の一実施例によるレビュー
支援システムの動作を示すフローチャートであり、図2
6は本発明の一実施例によるレビュー支援システムの類
似プロジェクト決定動作を示すフローチャートであり、
図27は本発明の一実施例によるレビュー支援システム
の各工程のチェック項目の決定動作を示すフローチャー
トである。
FIG. 25 is a flowchart showing the operation of the review support system according to one embodiment of the present invention.
6 is a flowchart showing a similar project determination operation of the review support system according to one embodiment of the present invention;
FIG. 27 is a flowchart showing an operation of determining a check item in each step of the review support system according to one embodiment of the present invention.

【0046】また、図28は本発明の一実施例によるレ
ビュー支援システムの各工程のチェック項目の選出/決
定動作を示すフローチャートであり、図29は本発明の
一実施例によるレビュー支援システムのレビューによっ
て摘出した問題点の修正/処置方法の決定動作を示すフ
ローチャートであり、図30は図2のサーバ・コンピュ
ータ1の各データベース(プロジェクト情報データベー
ス14及びチェックリスト情報データベース15)の更
新動作を示すフローチャートである。これら図1〜図3
0を参照して本発明の一実施例によるレビュー支援シス
テムの動作について説明する。
FIG. 28 is a flowchart showing an operation of selecting / determining check items in each step of the review support system according to one embodiment of the present invention, and FIG. 29 is a review of the review support system according to one embodiment of the present invention. FIG. 30 is a flowchart showing an operation of determining a correction / treatment method for a problem extracted by the above-described method. FIG. 30 is a flowchart showing an operation of updating each database (the project information database 14 and the checklist information database 15) of the server computer 1 in FIG. It is. These FIGS. 1-3
The operation of the review support system according to one embodiment of the present invention will be described with reference to FIG.

【0047】まず、プロジェクトの開発計画が完了した
時点で、クライアント・コンピュータ2−1〜2−n側
の当該・プロジェクト情報データベース26の当該・プ
ロジェクト情報テーブル26aに当該・プロジェクト固
有情報71を入力し、それを基にサーバ・コンピュータ
1側の過去のプロジェクトの情報を格納しているプロジ
ェクト情報データベース14から類似・プロジェクトを
検索して決定し、クライアント・コンピュータ2−1〜
2−n側の類似・プロジェクト情報データベース25に
登録する(図25ステップS1)。
First, when the project development plan is completed, the pertinent / project specific information 71 is input to the pertinent / project information table 26a of the pertinent / project information database 26 on the client computer 2-1 to 2-n side. Based on this, similar projects are searched and determined from the project information database 14 which stores information on past projects on the server computer 1 side, and the client computers 2-1 to 2-1.
It registers in the similar / project information database 25 on the 2-n side (step S1 in FIG. 25).

【0048】続いて、サーバ・コンピュータ1側のチェ
ックリスト情報データベース15から各工程毎に共通チ
ェック項目、種別共通チェック項目を決定し、全チェッ
ク項目(内容)についてレビューした後、クライアント
・コンピュータ2−1〜2−n側の当該・プロジェクト
情報データベース26に登録する。ここで、レビューの
結果、共通チェック項目、種別共通チェック項目に修正
/追加を行った場合、サーバ・コンピュータ1側のチェ
ックリスト情報データベース15の更新を行う(図25
ステップS2)。
Subsequently, common check items and type common check items are determined for each process from the check list information database 15 of the server computer 1, and after reviewing all check items (contents), the client computer 2- The information is registered in the relevant project information database 26 on the 1-2-n side. Here, when the common check item and the type common check item are corrected / added as a result of the review, the check list information database 15 of the server computer 1 is updated (FIG. 25).
Step S2).

【0049】各工程の作業を開始する時点で、開発計画
の完了時点に決定した類似・プロジェクトの情報を参考
にインプットに対するアウトプットの整合性をチェック
する個別チェック項目を決定する(図25ステップS
3)。
At the time when the work of each process is started, individual check items for checking the consistency of the output with respect to the input are determined with reference to the information on the similarity / project determined at the time of completion of the development plan (step S in FIG. 25).
3).

【0050】その後に、各工程毎に計画されたレビュー
実施時に、それらのチェック項目にしたがってレビュー
を実施し(図25ステップS4)、問題点を摘出する
(図25ステップS5)。類似・プロジェクト情報から
同様の問題点に対する修正・処置事例を参考に、摘出し
た問題点の処置方法を決定し、処置を実施する(図25
ステップS6)。
After that, when the review planned for each process is performed, a review is performed according to the check items (step S4 in FIG. 25), and problems are extracted (step S5 in FIG. 25). Referring to a correction / treatment example for a similar problem from the similar / project information, a method of treating the extracted problem is determined, and a measure is taken (FIG. 25).
Step S6).

【0051】全ての問題点が解決された後に次工程の作
業に移行し(図25ステップS7)、開発の最後にクラ
イアント・コンピュータ2−1〜2−n側にある当該・
プロジェクト情報データベース26の情報を、サーバ・
コンピュータ1のプロジェクト情報データベース14に
登録する(図25ステップS8)。
After all the problems have been solved, the operation shifts to the operation of the next process (step S7 in FIG. 25).
The information in the project information database 26 is stored in the server
It is registered in the project information database 14 of the computer 1 (step S8 in FIG. 25).

【0052】次に、上述した個々の作業について詳細に
説明する。上記のステップS1の処理は、図26に示す
ように、まずプロジェクトの開発計画が完了した時点
で、プロジェクトのメンバ(プロジェクトのリーダない
しそれに準ずるものが望ましい)がクライアント・コン
ピュータ2−1〜2−nの当該・プロジェクト情報デー
タベース26の当該・プロジェクト情報テーブル26a
に、当該・プロジェクト固有情報71を構成している開
発目的711、開発項目と機能概要712、システム/
製品の種別713、開発規模714、動作環境715、
開発工数716の各情報について入力する(図26ステ
ップS11)。
Next, the individual operations described above will be described in detail. As shown in FIG. 26, when the project development plan is completed, the member of the project (preferably a project leader or a person similar thereto), as shown in FIG. n of the relevant / project information tables 26a of the relevant / project information database 26
The development purpose 711, development items and function outline 712, system / system
Product type 713, development scale 714, operating environment 715,
Each information of the development man-hour 716 is input (step S11 in FIG. 26).

【0053】但し、上記の各情報の中のシステム/製品
の種別713に関しては本実施例によるレビュー支援シ
ステムを使用する組織で事前に取り決めて登録された種
別一覧から選択して決定する。
However, the system / product type 713 in each of the above information is determined by selecting from a list of types previously registered and registered by the organization using the review support system according to the present embodiment.

【0054】入力した当該・プロジェクト固有情報71
の各情報をキーにしてサーバ・コンピュータ1のプロジ
ェクト情報データベース14を検索し、オペレータの判
断で類似・プロジェクト(複数ある場合には2または3
プロジェクト)を決定する(図26ステップS12)。
The entered project-specific information 71
The project information database 14 of the server computer 1 is searched using each piece of information as a key, and similar / projects (2 or 3 if there is more than one) are determined by the operator.
Project) (step S12 in FIG. 26).

【0055】さらに、サーバ・コンピュータ1のプロジ
ェクト情報データベース14のマスタ・プロジェクト情
報テーブル14aに格納され、決定された類似プロジェ
クト情報をクライアント・コンピュータ2−1〜2−n
の類似・プロジェクト情報データベース25の類似・プ
ロジェクト情報テーブル25aに、例えば決定した類似
プロジェクトがAプロジェクト、Dプロジェクト、Eプ
ロジェクトであった場合、図17に示すようにして登録
する(図26ステップS13)。
Further, similar project information stored in the master project information table 14a of the project information database 14 of the server computer 1 and determined is transmitted to the client computers 2-1 to 2-n.
For example, if the determined similar projects are the A project, the D project, and the E project, they are registered in the similarity / project information table 25a of the similarity / project information database 25 as shown in FIG. 17 (step S13 in FIG. 26). .

【0056】上記のステップS2の処理は、図27に示
すように、まずサーバ・コンピュータ1のチェックリス
ト情報データベース15のマスタ・チェックリスト情報
テーブル15aを構成している基本設計工程マスタ・チ
ェックリスト51、機能設計工程マスタ・チェックリス
ト52、詳細設計工程マスタ・チェックリスト53、コ
ーディング工程マスタ・チェックリスト54、テスト工
程マスタ・チェックリスト55の各チェックリストの中
から、各工程毎に開発するシステムや製品に関係なく共
通的なチェック項目を集めた共通マスタチェック項目
と、データベースや通信制御等の開発するシステムや製
品の種別に依存するチェック項目を集めた種別共通マス
タチェック項目とを決定する。
As shown in FIG. 27, the processing in step S2 is a basic design process master checklist 51 constituting the master checklist information table 15a of the checklist information database 15 of the server computer 1 first. From among the checklists of the functional design process master checklist 52, the detailed design process master checklist 53, the coding process master checklist 54, and the test process master checklist 55, a system developed for each process is provided. A common master check item that collects common check items irrespective of products, and a type common master check item that collects check items dependent on the type of system or product to be developed, such as a database or communication control, are determined.

【0057】種別共通マスタチェック項目は当該プロジ
ェクトに適合するものを選択して決定する。当該プロジ
ェクトがデータベース系のプロジェクトとすると、基本
設計工程の場合には基本設計工程マスタ・チェックリス
ト51の構成要素である基本設計工程共通マスタチェッ
ク項目511及び基本設計工程データベース系種別共通
マスタチェック項目512、機能設計工程の場合には機
能設計工程マスタ・チェックリスト52の構成要素であ
る機能設計工程共通マスタチェック項目521及び機能
設計工程データベース系種別共通マスタチェック項目5
22、詳細設計工程の場合には詳細設計工程マスタ・チ
ェックリスト53の構成要素である詳細設計工程共通マ
スタチェック項目531及び詳細設計工程データベース
系種別共通マスタチェック項目532、コーディング工
程の場合にはコーディング工程マスタ・チェックリスト
54の構成要素であるコーディング工程共通マスタチェ
ック項目541及びコーディング工程データベース系種
別共通マスタチェック項目542、テスト工程の場合に
はテスト工程マスタ・チェックリスト55の構成要素で
あるテスト工程共通マスタチェック項目551及びテス
ト工程データベース系種別共通マスタチェック項目55
2をそれぞれ選択して決定する(図27ステップS2
1)。
The type common master check item is determined by selecting an item suitable for the project. Assuming that the project is a database project, in the case of the basic design process, the basic design process common master check item 511 and the basic design process database type common master check item 512, which are the components of the basic design process master checklist 51. In the case of the function design process, the function design process master check item 521 and the function design process database system type common master check item 5 which are constituent elements of the function design process master checklist 52
22, in the case of the detailed design process, a detailed design process common master check item 531 and a detailed design process database type common master check item 532 which are components of the detailed design process master checklist 53, and in the case of the coding process, coding Coding process common master check item 541 and coding process database system type common master check item 542 which are components of process master checklist 54, and test process which is a component of test process master checklist 55 in the case of test process Common master check item 551 and test process database type common master check item 55
2 are selected and determined (step S2 in FIG. 27).
1).

【0058】決定したチェック項目はクライアント・コ
ンピュータ2−1〜2−nの当該・プロジェクト情報デ
ータベース26の当該・プロジェクト情報テーブル26
aの各情報である当該・プロジェクト基本設計工程チェ
ックリスト72、当該・プロジェクト機能設計工程チェ
ックリスト73、当該・プロジェクト詳細設計工程チェ
ックリスト74、当該・プロジェクトコーディング工程
チェックリスト75、当該・プロジェクトテスト工程チ
ェックリスト76の各工程毎のチェックリストに共通チ
ェック項目及び種別共通チェック項目として登録する。
The determined check items are the relevant project information table 26 of the relevant project information database 26 of the client computers 2-1 to 2-n.
The relevant project basic design process checklist 72, the relevant project function design process checklist 73, the relevant project detailed design process checklist 74, the relevant project coding process checklist 75, the relevant project test process It is registered as a common check item and a type common check item in the check list for each process in the check list 76.

【0059】例えば、基本設計工程の場合には、基本設
計工程共通マスタチェック項目511及び基本設計工程
データベース系種別共通マスタチェック項目512を、
当該・プロジェクト基本設計工程チェックリスト72の
基本設計工程共通チェック項目721及び基本設計工程
種別共通チェック項目722に登録する。
For example, in the case of the basic design process, the basic design process common master check item 511 and the basic design process database system type common master check item 512
The basic design process common check item 721 and the basic design process type common check item 722 of the project basic design process check list 72 are registered.

【0060】機能設計工程の場合には、機能設計工程共
通マスタチェック項目521及び機能設計工程データベ
ース系種別共通マスタチェック項目522を、当該・プ
ロジェクト機能設計工程チェックリスト73の機能設計
工程共通チェック項目731及び機能設計工程種別共通
チェック項目732に登録する。
In the case of the function design process, the function design process common master check item 521 and the function design process database system type common master check item 522 are replaced with the function design process common check item 731 of the relevant project function design process check list 73. And registered in the function design process type common check item 732.

【0061】詳細設計工程の場合には、詳細設計工程共
通マスタチェック項目531及び詳細設計工程データベ
ース系種別共通マスタチェック項目532を、当該・プ
ロジェクト詳細設計工程チェックリスト74の詳細設計
工程共通チェック項目741及び詳細設計工程種別共通
チェック項目742に登録する。
In the case of the detailed design process, the detailed design process common master check item 531 and the detailed design process database system type common master check item 532 are replaced with the detailed design process common check item 741 of the relevant project detailed design process check list 74. And the detailed design process type common check item 742.

【0062】コーディング工程の場合には、コーディン
グ工程共通マスタチェック項目541及びコーディング
工程データベース系種別共通マスタチェック項目542
を、当該・プロジェクトコーディング工程チェックリス
ト75のコーディング工程共通チェック項目751及び
コーディング工程種別共通チェック項目752に登録す
る。
In the case of the coding process, the coding process common master check item 541 and the coding process database system type common master check item 542
Is registered in the coding process common check item 751 and the coding process type common check item 752 of the project coding process check list 75.

【0063】テスト工程の場合には、テスト工程共通マ
スタチェック項目551及びテスト工程データベース系
種別共通マスタチェック項目552を当該・プロジェク
トテスト工程チェックリスト76はテスト工程共通チェ
ック項目761及びテスト工程種別共通チェック項目7
62に登録する(図27ステップS22)。
In the case of the test process, the test process common master check item 551 and the test process database system type common master check item 552 are included in the project test process check list 76. The test process common check item 761 and the test process type common check Item 7
62 (step S22 in FIG. 27).

【0064】この後に、クライアント・コンピュータ2
−1〜2−nの類似・プロジェクト情報データベース2
5の各類似・プロジェクト情報テーブル25aの各工程
毎のチェックリストに登録した工程共通及び種別共通の
チェック項目に関してグループ内でレビューを実施する
(図27ステップS23)。
Thereafter, the client computer 2
-1 to 2-n similar project information database 2
A review is performed within the group with respect to the check items common to the processes and the types common to each process registered in the check list for each process in the similar / project information table 25a of FIG. 5 (step S23 in FIG. 27).

【0065】上記のレビューの結果、チェック項目に修
正・追加がある場合(図27ステップS24)、チェッ
ク項目を再検討して内容の修正や過不足分の追加を行う
(図27ステップS25)。
As a result of the above-described review, if there is a correction / addition to the check item (step S24 in FIG. 27), the check item is reexamined to correct the content or add an excess or deficiency (step S25 in FIG. 27).

【0066】レビュー完了後、チェック項目の修正・追
加を行った場合、サーバ・コンピュータ1のチェックリ
スト情報データベース15のマスタ・チェックリスト情
報テーブル15a及びクライアント・コンピュータ2−
1〜2−nの当該・プロジェクト情報データベース26
の当該・プロジェクト情報テーブル26aの各工程毎の
共通チェックリスト及び種別共通チェックリストに関し
て、該当するチェック項目を修正・追加して更新する。
When the check items are corrected or added after the review is completed, the master check list information table 15a of the check list information database 15 of the server computer 1 and the client computer 2-
The relevant project information database 26 for 1-2-n
With respect to the common checklist and type common checklist for each process in the relevant / project information table 26a, the corresponding check items are modified / added and updated.

【0067】このように、タイムリにサーバコンピュー
タ1のチェックリスト情報データベース15のマスタ・
チェックリスト情報テーブル15aを更新することで、
組織内で同時に進行している別のプロジェクトへノウハ
ウが迅速に水平展開される(図27ステップS26)。
As described above, the master list of the checklist information database 15 of the server computer 1 is timely obtained.
By updating the checklist information table 15a,
The know-how is quickly and horizontally developed to another project that is simultaneously progressing in the organization (step S26 in FIG. 27).

【0068】上記のステップS3の処理は、図28に示
すように、まず各工程の作業時に、インプットとアウト
プットの整合性をチェックするため、インプットからチ
ェック項目を決定する。
In the process of step S3, as shown in FIG. 28, at the time of work in each step, a check item is determined from an input in order to check consistency between an input and an output.

【0069】この時、クライアント・コンピュータ2−
1〜2−nの類似・プロジェクト情報データベース25
の類似・プロジェクト情報テーブル25aに登録してい
る類似・プロジェクトに関する個別チェック項目、例え
ば類似・プロジェクトとしてAプロジェクトが決定され
た場合、基本設計工程ではAプロジェクト基本設計工程
チェックリスト42の構成要素である基本設計工程Aプ
ロジェクト個別チェック項目423、機能設計工程では
Aプロジェクト機能設計工程チェックリスト43の構成
要素である機能設計工程Aプロジェクト個別チェック項
目433、詳細設計工程ではAプロジェクト詳細設計工
程チェックリスト44の構成要素である詳細設計工程A
プロジェクト個別チェック項目443、コーディング工
程ではAプロジェクトコーディング工程チェックリスト
45の構成要素であるコーディング工程Aプロジェクト
個別チェック項目453、テスト工程ではAプロジェク
トテスト工程チェックリスト46の構成要素であるテス
ト工程Aプロジェクト個別チェック項目463のそれぞ
れがクライアント・コンピュータ2−1〜2−nの類似
・プロジェクト情報データベース25の類似・プロジェ
クト情報テーブル25aに登録されているので、それら
を参考にする(図28ステップS31)。
At this time, the client computer 2-
Similarity / Project Information Database 25 of 1-2-n
The individual check items related to the similarity / project registered in the similarity / project information table 25a, for example, when the A project is determined as the similarity / project, it is a component of the A project basic design process checklist 42 in the basic design process. The basic design process A project individual check item 423, the function design process A project individual check item 433 which is a component of the A project function design process checklist 43 in the function design process, and the A project detailed design process checklist 44 in the detailed design process Detailed design process A which is a component
The project individual check item 443, the coding process A project individual check item 453 which is a component of the A project coding process checklist 45 in the coding process, and the test process A project individual component of the A project test process checklist 46 which is a component in the test process Since each of the check items 463 is registered in the similarity / project information table 25a of the similarity / project information database 25 of the client computers 2-1 to 2-n, they are referred to (step S31 in FIG. 28).

【0070】決定したチェック項目をクライアント・コ
ンピュータ2−1〜2−nの当該・プロジェクト情報デ
ータベース26の当該・プロジェクト情報テーブル26
aの各工程毎のチェックリストに当該プロジェクト個別
チェック項目として登録する。
The determined check items are stored in the relevant project information table 26 of the relevant project information database 26 of the client computers 2-1 to 2-n.
A is registered as a project-specific check item in the check list for each process in a.

【0071】基本設計工程では当該・プロジェクト基本
設計工程チェックリスト72の構成要素である基本設計
工程当該・プロジェクト個別チェック項目723、機能
設計工程では当該・プロジェクト機能設計工程チェック
リスト73の構成要素である機能設計工程当該・プロジ
ェクト個別チェック項目733、詳細設計工程では当該
・プロジェクト詳細設計工程チェックリスト74の構成
要素である詳細設計工程当該・プロジェクト個別チェッ
ク項目743、コーディング工程では当該・プロジェク
トコーディング工程チェックリスト75の構成要素であ
るコーディング工程当該・プロジェクト個別チェック項
目753、テスト工程では当該・プロジェクトテスト工
程チェックリスト76の構成要素であるテスト工程当該
・プロジェクト個別チェック項目763へそれぞれ登録
する(図28ステップS32)。
In the basic design process, it is a component of the basic design process pertinent / project individual check item 723 which is a component of the relevant / project basic design process checklist 72, and in the function design process, it is a component of the relevant / project function design process checklist 73. The function design process pertinent / project individual check item 733, the detailed design process pertinent / project individual check item 743 which is a component of the relevant project pertinent project detailed design process checklist 74, 75, a coding step pertaining to the coding process pertaining to the project individual check item 753; Respectively registers the check item 763 (FIG. 28 step S32).

【0072】クライアント・コンピュータ2−1〜2−
nの当該・プロジェクト情報データベース26の当該・
プロジェクト情報テーブル26aの各工程毎のチェック
リストに、これまで登録した全ての個別チェック項目に
関してグループ内でレビューを実施する(図28ステッ
プS33)。
Client computers 2-1 to 2-
n of the project information database 26
In the check list for each process in the project information table 26a, all the individual check items registered so far are reviewed in the group (step S33 in FIG. 28).

【0073】レビューの結果、チェック項目に修正・追
加がある場合(図28ステップS34)、チェック項目
を再検討し、内容の修正、過不足分の追加を行う(図2
8ステップS35)。
As a result of the review, if there is a correction / addition to the check item (step S34 in FIG. 28), the check item is reexamined, and the content is corrected and excess / short is added (FIG. 2).
8 steps S35).

【0074】レビュー完了後、チェック項目の修正・追
加を行った場合、クライアント・コンピュータ2−1〜
2−nの当該・プロジェクト情報データベース26の当
該・プロジェクト情報テーブル26aの各工程毎の個別
チェック項目に関して、該当するチェック項目を修正・
追加して更新する(図28ステップS36)。
When the check items are corrected or added after the review is completed, the client computers 2-1 to 2-1
2-n, the individual check items for each process in the relevant project information table 26a of the relevant project information database 26 are corrected.
It is updated by adding (step S36 in FIG. 28).

【0075】上記のステップS4、ステップS5、ステ
ップS6、ステップS7の各処理は、図29に示すよう
に、まずクライアント・コンピュータ2−1〜2−nの
当該・プロジェクト情報データベース26の当該・プロ
ジェクト情報テーブル26aに登録した各工程のチェッ
クリスト、当該・プロジェクト基本設計工程チェックリ
スト72、当該・プロジェクト機能設計工程チェックリ
スト73、当該・プロジェクト詳細設計工程チェックリ
スト74、当該・プロジェクトコーディング工程チェッ
クリスト75、当該・プロジェクトテスト工程チェック
リスト76を基に各工程毎に計画されたレビューを実施
する(図29ステップS41)。
As shown in FIG. 29, each of the above-described steps S4, S5, S6, and S7 is performed by first executing the relevant project in the relevant project information database 26 of the client computers 2-1 to 2-n. Checklist of each process registered in the information table 26a, the relevant project basic design process checklist 72, the relevant project function design process checklist 73, the relevant project detailed design process checklist 74, the relevant project coding process checklist 75 Then, based on the project test process checklist 76, a review planned for each process is performed (step S41 in FIG. 29).

【0076】レビュー後、レビュー対象者はレビュー結
果(合否判定等を含む)を、クライアント・コンピュー
タ2−1〜2−nの当該・プロジェクト情報データベー
ス26の当該・プロジェクト情報テーブル26aに登録
する。
After the review, the reviewer registers the review result (including the pass / fail judgment) in the project information table 26a of the project information database 26 of the client computers 2-1 to 2-n.

【0077】例えば、基本設計工程では、当該・プロジ
ェクト基本設計工程チェックリスト72の構成要素であ
る基本設計工程当該・プロジェクトの全てのチェック項
目に関して、各チェック項目724の項目の[合否判定
結果]、[問題点]について登録する。
For example, in the basic design process, with respect to all the check items of the basic design process pertaining to the project, which are components of the pertinent / project basic design process check list 72, [pass / fail judgment result] of each check item 724, Register [Problem].

【0078】機能設計工程では、当該・プロジェクト機
能設計工程チェックリスト73の構成要素である機能設
計工程当該・プロジェクトの全てのチェック項目に関し
て、各チェック項目734の項目の[合否判定結果]、
[問題点]について登録する。
In the function design process, regarding all the check items of the function design process pertaining to the project, which are constituent elements of the relevant project function design process checklist 73, [pass / fail judgment result] of each check item 734,
Register [Problem].

【0079】詳細設計工程では、当該・プロジェクト詳
細設計工程チェックリスト74の構成要素である詳細設
計工程当該・プロジェクトの全てのチェック項目に関し
て、各チェック項目744の項目の[合否判定結果]、
[問題点]について登録する。
In the detailed design process, regarding all check items of the detailed design process pertaining to the project, which are constituent elements of the pertinent project detailed design process checklist 74, [pass / fail judgment result] of each check item 744,
Register [Problem].

【0080】コーディング工程では、当該・プロジェク
トコーディング工程チェックリスト75の構成要素であ
るコーディング工程当該・プロジェクトの全てのチェッ
ク項目に関して、各チェック項目754の項目の[合否
判定結果]、[問題点]について登録する。
In the coding process, regarding all the check items of the coding process pertaining to the project, which are constituent elements of the relevant project coding process checklist 75, the “pass / fail judgment result” and “problem” of each check item 754 are described. register.

【0081】テスト工程では、当該・プロジェクトテス
ト工程チェックリスト76の構成要素であるテスト工程
当該・プロジェクトの全てのチェック項目に関して、各
チェック項目764の項目[合否判定結果]、[問題
点]について登録する(図29ステップS42)。
In the test process, with respect to all check items of the test process pertaining to the project, which are components of the relevant project test process checklist 76, the items [pass / fail judgment result] and [problem] of each check item 764 are registered. (Step S42 in FIG. 29).

【0082】ここで問題点がある場合(図29ステップ
S43)、クライアント・コンピュータ2−1〜2−n
の類似・プロジェクト情報データベース25の類似・プ
ロジェクト情報テーブル25aから過去に同様の問題点
が発生していないかどうかを検索する(図29ステップ
S44)。
If there is a problem (step S43 in FIG. 29), the client computers 2-1 to 2-n
The similarity / project information table 25a of the similarity / project information database 25 is searched for a similar problem in the past (step S44 in FIG. 29).

【0083】そして、検索した問題点の修正・処置方法
を参考に当該・プロジェクトで発生した問題点の処置方
法を検討し、さらにその内容をレビューした結果、処置
方法を決定し、処置を実施する(図29ステップS4
5)。
Then, with reference to the searched correction / correction method of the problem, a method of processing the problem that occurred in the project concerned is examined, and as a result of reviewing the contents, a processing method is determined, and the processing is performed. (Step S4 in FIG. 29)
5).

【0084】また、ここで問題点がなければ(図29ス
テップS46)、最後にクライアント・コンピュータ2
−1〜2−nの当該・プロジェクト情報データベース2
6の当該・プロジェクト情報テーブル26aに修正・処
置方法、修正確認を登録する。
If there is no problem here (step S46 in FIG. 29), finally, the client computer 2
-1 to 2-n of the relevant project information database 2
6, the correction / treatment method and correction confirmation are registered in the relevant / project information table 26a.

【0085】例えば、基本設計工程では、当該・プロジ
ェクト基本設計工程チェックリスト72の構成要素であ
る基本設計工程当該・プロジェクトの全てのチェック項
目に関して、各チェック項目724の[修正・処置方
法]、[修正確認]について登録する。
For example, in the basic design process, regarding all check items of the basic design process pertaining to the project, which are components of the relevant project basic design process checklist 72, [correction / treatment method], [ Correction] is registered.

【0086】機能設計工程では、当該・プロジェクト機
能設計工程チェックリスト73の構成要素である機能設
計工程当該・プロジェクトの全てのチェック項目に関し
て、各チェック項目734の[修正・処置方法]、[修
正確認]について登録する。
In the functional design process, regarding all check items of the function design process pertaining to the project, which are constituent elements of the relevant project / functional design process check list 73, [correction / treatment method] and [correction confirmation] of each check item 734 ] Is registered.

【0087】詳細設計工程では、当該・プロジェクト詳
細設計工程チェックリスト74の構成要素である詳細設
計工程当該・プロジェクトの全てのチェック項目に関し
て、各チェック項目744の[修正・処置方法]、[修
正確認]について登録する。
In the detailed design process, regarding all check items of the detailed design process pertinent / project which are components of the pertinent / project detailed design process checklist 74, [correction / treatment method] and [correction confirmation] of each check item 744 are described. ] Is registered.

【0088】コーディング工程では、当該・プロジェク
トコーディング工程チェックリスト75の構成要素であ
るコーディング工程当該・プロジェクトの全てのチェッ
ク項目に関して、各チェック項目754の[修正・処置
方法]、[修正確認]について登録する。
In the coding process, [correction / treatment method] and [correction confirmation] of each check item 754 are registered for all check items of the coding process pertaining to the project, which are components of the relevant project coding process checklist 75. I do.

【0089】テスト工程では、当該・プロジェクトテス
ト工程チェックリスト76の構成要素であるテスト工程
当該・プロジェクトの全てのチェック項目に関して、各
チェック項目764の[修正・処置方法]、[修正確
認]について登録する。この後に、次工程の作業へと進
む(図29ステップS47)。
In the test process, “correction / treatment method” and “correction confirmation” of each check item 764 are registered for all the check items of the relevant test process / project which are constituent elements of the relevant / project test process checklist 76. I do. Thereafter, the process proceeds to the next process (step S47 in FIG. 29).

【0090】上記のステップS8の処理は、図30に示
すように、開発の最後に、全ての工程が完了した段階
で、それまでに摘出した全ての問題点を分析し、その結
果から各工程に対して新たなチェック項目を決定する
(図30ステップS51)。
As shown in FIG. 30, at the stage of completion of all the processes at the end of the development, all the problems extracted up to that point are analyzed as shown in FIG. A new check item is determined for (step S51 in FIG. 30).

【0091】ここで、各工程の共通チェック項目・種別
共通チェック項目・個別チェック項目のそれぞれで、修
正・追加が発生した場合にはサーバ・コンピュータ1の
チェックリスト情報データベース15のマスタ・チェッ
クリスト情報テーブル15a及びクライアント・コンピ
ュータ2−1〜2−nの当該・プロジェクト情報データ
ベース26の当該・プロジェクト情報テーブル26aの
各工程のチェックリストを修正・追加する(図30ステ
ップS52)。
Here, when correction / addition occurs in each of the common check item, the type common check item, and the individual check item of each process, the master check list information of the check list information database 15 of the server computer 1 is used. The checklist of each process of the project information table 26a of the project information database 26 of the table 15a and the project information database 26 of the client computers 2-1 to 2-n is corrected and added (step S52 in FIG. 30).

【0092】最後に、クライアント・コンピュータ2−
1〜2−nの当該・プロジェクト情報データベース26
の当該・プロジェクト情報テーブル26aの全情報を、
サーバ・コンピュータ1のプロジェクト情報データベー
ス14に登録し、次期開発プロジェクトのために活用す
る(図30ステップS53)。
Finally, the client computer 2-
The relevant project information database 26 for 1-2-n
Of the project information table 26a of
It is registered in the project information database 14 of the server computer 1 and used for the next development project (step S53 in FIG. 30).

【0093】このように、クライアント/サーバシステ
ムを構成する複数のクライアント・コンピュータ2−1
〜2−n及びサーバ・コンピュータ1のそれぞれにプロ
ジェクトのレビュー情報を格納するデータベースを備え
ることによって、プロジェクトのレビュー情報を一元的
に管理することができる。
As described above, a plurality of client computers 2-1 constituting the client / server system
By providing a database for storing project review information in each of .about.2-n and the server computer 1, project review information can be centrally managed.

【0094】また、それらのデータベースには過去の情
報やデータも蓄積されるので、チェックリストの検討/
作成時に、データの流用による作業の効率化とチェック
項目漏れの防止とを図ることができ、レビュー後の問題
点の修正時に、過去の修正事例を速やかに参照すること
で、修正/処置方法の決定を迅速に行うことができると
いう効果がある。
Further, since past information and data are also stored in these databases, checklists should be considered.
At the time of creation, it is possible to improve the efficiency of work by diverting data and prevent omission of check items, and when correcting problems after review, promptly refer to past correction cases, so that correction / The effect is that the decision can be made quickly.

【0095】よって、本実施例によれば、チェック項目
漏れを防止することができ、レビューの設計/準備段階
から問題点等の後処理までを効率良くかつ精度良くサポ
ートすることができる。尚、本発明は上述した実施例の
記載内容に限定されず、本発明の技術思想の範囲内にお
いて、本実施例が適宜変更され得ることは明らかであ
る。
Therefore, according to the present embodiment, it is possible to prevent omission of check items, and it is possible to efficiently and accurately support from a review design / preparation stage to post-processing such as problems. It should be noted that the present invention is not limited to the description of the above-described embodiment, and it is apparent that the present embodiment can be appropriately modified within the scope of the technical idea of the present invention.

【0096】[0096]

【発明の効果】以上説明したように本発明によれば、ソ
フトウェアシステム/製品を開発するためのプロジェク
トの各工程の区切りでプロジェクトの設計品質の向上を
図るために実施されるレビュー工程の支援を行うレビュ
ー支援システムにおいて、開発中及び過去の開発プロジ
ェクトの情報を全て管理するサーバ・コンピュータと開
発中の開発プロジェクトの情報のみを管理する複数のク
ライアント・コンピュータとを相互に通信回線で接続し
てクライアント/サーバシステムを構成し、過去の開発
プロジェクトの情報をプロジェクト単位に保管/管理す
る第1のデータベースとレビュー工程で使用するチェッ
クリストの中でプロジェクトに関係なく共通に使用可能
なチェック項目を保管/管理する第2のデータベースと
をサーバ・コンピュータに設け、開発計画完了時に第1
のデータベースから検索される開発プロジェクトに類似
のプロジェクトの情報を保管する第3のデータベース
と、開発計画完了時に入力される開発プロジェクトの固
有情報を保管する第4のデータベースとを複数のクライ
アント・コンピュータ各々に設けることによって、チェ
ック項目漏れを防止することができ、レビューの設計/
準備段階から問題点等の後処理までを効率良くかつ精度
良くサポートすることができるという効果がある。
As described above, according to the present invention, it is possible to support a review process performed to improve the design quality of a project at each step of a project for developing a software system / product. In a review support system to be implemented, a server computer that manages all information on development projects in the past and past and a plurality of client computers that manage only information on development projects under development are connected to each other by a communication line A first database that configures a server system and stores and manages information on past development projects on a project basis and stores check items that can be commonly used regardless of the project in a checklist used in the review process / Server database with the second database to be managed Provided on the over data, the first at the time of the development plan completed
A third database for storing information on a project similar to a development project retrieved from the database of the first and a fourth database for storing information specific to the development project input upon completion of the development plan; , It is possible to prevent omission of check items, and review design /
There is an effect that the process from the preparation stage to post-processing such as a problem can be efficiently and accurately supported.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例によるクライアント/サーバ
システムの構成を示すブロック図である。
FIG. 1 is a block diagram showing a configuration of a client / server system according to an embodiment of the present invention.

【図2】図1のサーバ・コンピュータの構成を示すブロ
ック図である。
FIG. 2 is a block diagram showing a configuration of a server computer of FIG.

【図3】図2のマスタ・プロジェクト情報テーブルの構
成例を示す図である。
FIG. 3 is a diagram showing a configuration example of a master project information table of FIG. 2;

【図4】図3のAプロジェクト固有情報の構成例を示す
図である。
FIG. 4 is a diagram showing a configuration example of A project specific information of FIG. 3;

【図5】図3のAプロジェクト基本設計工程チェックリ
ストの構成例を示す図である。
FIG. 5 is a diagram showing a configuration example of an A project basic design process check list in FIG. 3;

【図6】図3のAプロジェクト機能設計工程チェックリ
ストの構成例を示す図である。
FIG. 6 is a diagram showing a configuration example of an A project function design process check list in FIG. 3;

【図7】図3のAプロジェクト詳細設計工程チェックリ
ストの構成例を示す図である。
FIG. 7 is a diagram showing a configuration example of an A project detailed design process check list in FIG. 3;

【図8】図3のAプロジェクトコーディング工程チェッ
クリストの構成例を示す図である。
8 is a diagram illustrating a configuration example of an A project coding process check list in FIG. 3;

【図9】図3のAプロジェクトテスト工程チェックリス
トの構成例を示す図である。
FIG. 9 is a diagram showing a configuration example of an A project test process check list in FIG. 3;

【図10】図2のマスタ・チェックリスト情報テーブル
の構成を示す図である。
FIG. 10 is a diagram showing a configuration of a master checklist information table in FIG. 2;

【図11】図10の基本設計工程マスタ・チェックリス
トの構成を示す図である。
11 is a diagram showing a configuration of a basic design process master check list in FIG.

【図12】図10の機能設計工程マスタ・チェックリス
トの構成を示す図である。
FIG. 12 is a diagram showing a configuration of a functional design process master check list of FIG. 10;

【図13】図10の詳細設計工程マスタ・チェックリス
トの構成を示す図である。
FIG. 13 is a diagram showing a configuration of a detailed design process master checklist of FIG. 10;

【図14】図10のコーディング工程マスタ・チェック
リストの構成を示す図である。
FIG. 14 is a diagram showing a configuration of a coding process master checklist of FIG. 10;

【図15】図10のテスト工程マスタ・チェックリスト
の構成を示す図である。
FIG. 15 is a diagram showing a configuration of a test process master check list in FIG. 10;

【図16】図1のクライアント・コンピュータの構成を
示すブロック図である。
FIG. 16 is a block diagram showing a configuration of a client computer of FIG.

【図17】図16の類似・プロジェクト情報テーブルの
構成を示す図である。
FIG. 17 is a diagram showing a configuration of a similarity / project information table of FIG. 16;

【図18】図16の当該・プロジェクト情報テーブルの
構成を示す図である。
18 is a diagram showing the configuration of the project information table of FIG.

【図19】図18の当該・プロジェクト固有情報の構成
を示す図である。
19 is a diagram showing a configuration of the project-specific information in FIG. 18;

【図20】図18の当該・プロジェクト基本設計工程チ
ェックリストの構成を示す図である。
20 is a diagram showing a configuration of a relevant / project basic design process check list in FIG. 18.

【図21】図18の当該・プロジェクト機能設計工程チ
ェックリストの構成を示す図である。
FIG. 21 is a diagram showing a configuration of a project function design process check list in FIG. 18;

【図22】図18の当該・プロジェクト詳細設計工程チ
ェックリストの構成を示す図である。
FIG. 22 is a diagram showing a configuration of a relevant / project detailed design process check list in FIG. 18.

【図23】図18の当該・プロジェクトコーディング工
程チェックリストの構成を示す図である。
FIG. 23 is a diagram showing a configuration of the project coding process check list of FIG. 18.

【図24】図18の当該・プロジェクトテスト工程チェ
ックリストの構成を示す図である。
FIG. 24 is a diagram showing a configuration of the project test process check list in FIG. 18.

【図25】本発明の一実施例によるレビュー支援システ
ムの動作を示すフローチャートである。
FIG. 25 is a flowchart showing the operation of the review support system according to one embodiment of the present invention.

【図26】本発明の一実施例によるレビュー支援システ
ムの類似プロジェクト決定動作を示すフローチャートで
ある。
FIG. 26 is a flowchart showing a similar project determining operation of the review support system according to an embodiment of the present invention.

【図27】本発明の一実施例によるレビュー支援システ
ムの各工程のチェック項目の決定動作を示すフローチャ
ートである。
FIG. 27 is a flowchart showing an operation of determining a check item in each step of the review support system according to an embodiment of the present invention.

【図28】本発明の一実施例によるレビュー支援システ
ムの各工程のチェック項目の選出/決定動作を示すフロ
ーチャートである。
FIG. 28 is a flowchart showing a check item selection / determination operation of each step of the review support system according to an embodiment of the present invention.

【図29】本発明の一実施例によるレビュー支援システ
ムのレビューによって摘出した問題点の修正/処置方法
の決定動作を示すフローチャートである。
FIG. 29 is a flowchart showing an operation of determining a method of correcting / treating a problem extracted by a review of the review support system according to an embodiment of the present invention.

【図30】図2のサーバ・コンピュータの各データベー
スの更新動作を示すフローチャートである。
FIG. 30 is a flowchart showing an update operation of each database of the server computer of FIG. 2;

【符号の説明】[Explanation of symbols]

1 サーバ・コンピュータ 2−1〜2−n クライアント・コンピュータ 11 サーバ・コンピュータ本体 12,22 キーボード 13,23 ディスプレイ 14 プロジェクト情報データベース 14a マスタ・プロジェクト情報テーブル 15 チェックリスト情報データベース 15a マスタ・チェックリスト情報テーブル 21 クライアント・コンピュータ本体 24 プリンタ 25 類似・プロジェクト情報データベース 25a 類似・プロジェクト情報テーブル 26 当該・プロジェクト情報データベース 26a 当該・プロジェクト情報テーブル 41 Aプロジェクト固有情報 42 Aプロジェクト基本設計工程チェックリスト 43 Aプロジェクト機能設計工程チェックリスト 44 Aプロジェクト詳細設計工程チェックリスト 45 Aプロジェクトコーディング工程チェックリスト 46 Aプロジェクトテスト工程チェックリスト 51 基本設計工程マスタ・チェックリスト 52 機能設計工程マスタ・チェックリスト 53 詳細設計工程マスタ・チェックリスト 54 コーディング工程マスタ・チェックリスト 55 テスト設計工程マスターチェックリスト 71 当該・プロジェクト固有情報 72 当該・プロジェクト基本設計工程チェックリスト 73 当該・プロジェクト機能設計工程チェックリスト 74 当該・プロジェクト詳細設計工程チェックリスト 75 当該・プロジェクトコーディング工程チェックリ
スト 76 当該・プロジェクトテスト工程チェックリスト 100 LAN回線
1 server computer 2-1 to 2-n client computer 11 server computer body 12, 22 keyboard 13, 23 display 14 project information database 14a master project information table 15 checklist information database 15a master checklist information table 21 Client computer body 24 Printer 25 Similar / project information database 25a Similar / project information table 26 Related / project information database 26a Related / project information table 41 A project specific information 42 A project basic design process check list 43 A project function design process check List 44 A Project Detailed Design Process Checklist 45 A Project Project coding process checklist 46 A project test process checklist 51 basic design process master checklist 52 functional design process master checklist 53 detailed design process master checklist 54 coding process master checklist 55 test design process master checklist 71 Applicable / project specific information 72 Applicable / project basic design process checklist 73 Applicable / project function design process checklist 74 Applicable / project detailed design process checklist 75 Applicable / project coding process checklist 76 Applicable / project test process checklist 100 LAN line

───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 5B042 HH11 5B049 AA06 BB07 CC23 DD01 DD05 EE05 FF09 GG02 GG04 GG07 5B075 ND03 ND04 ND23 NK04 NK06 PP12 PP22 PP28 PQ05 PQ32 UU40 5B076 EC09 EC10  ──────────────────────────────────────────────────続 き Continued on the front page F term (reference) 5B042 HH11 5B049 AA06 BB07 CC23 DD01 DD05 EE05 FF09 GG02 GG04 GG07 5B075 ND03 ND04 ND23 NK04 NK06 PP12 PP22 PP28 PQ05 PQ32 UU40 5B076 EC09 EC10

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 ソフトウェアシステム/製品を開発する
ためのプロジェクトの各工程の区切りで前記プロジェク
トの設計品質の向上を図るために実施されるレビュー工
程の支援を行うレビュー支援システムであって、 開発中及び過去の開発プロジェクトの情報を全て管理す
るサーバ・コンピュータと、 開発中の開発プロジェクトの情報のみを管理する複数の
クライアント・コンピュータと、 前記サーバ・コンピュータに設けられかつ前記過去の開
発プロジェクトの情報をプロジェクト単位に保管/管理
する第1のデータベースと、 前記サーバ・コンピュータに設けられかつ前記レビュー
工程で使用するチェックリストの中で前記プロジェクト
に関係なく共通に使用可能なチェック項目を保管/管理
する第2のデータベースと、 前記複数のクライアント・コンピュータ各々に設けられ
かつ開発計画完了時に前記第1のデータベースから検索
される前記開発プロジェクトに類似のプロジェクトの情
報を保管する第3のデータベースと、 前記複数のクライアント・コンピュータ各々に設けられ
かつ前記開発計画完了時に入力される開発プロジェクト
の固有情報を保管する第4のデータベースとを有するこ
とを特徴とするレビュー支援システム。
1. A review support system for supporting a review process performed to improve the design quality of a project at each step of a project for developing a software system / product, which is under development. A server computer that manages all the information of the past development projects, and a plurality of client computers that manage only the information of the development project under development; and A first database for storing / managing on a project basis; and a second database for storing / managing check items provided in the server computer and commonly usable regardless of the project in a check list used in the review process. Two databases and the plurality of A third database provided on each client computer and storing information on a project similar to the development project retrieved from the first database upon completion of the development plan; and provided on each of the plurality of client computers; A review support system comprising: a fourth database for storing information specific to the development project input when the development plan is completed.
【請求項2】 前記サーバ・コンピュータ及び前記複数
のクライアント・コンピュータを相互に通信回線で接続
してクライアント/サーバシステムを構成したことを特
徴とする請求項1記載のレビュー支援システム。
2. The review support system according to claim 1, wherein said server computer and said plurality of client computers are mutually connected by a communication line to constitute a client / server system.
【請求項3】 前記開発プロジェクトの固有情報は、少
なくともプロジェクト名称、開発目的、開発項目と機能
概要、システム/製品の種別、開発規模、動作環境、開
発工数からなることを特徴とする請求項1または請求項
2記載のレビュー支援システム。
3. The unique information of the development project includes at least a project name, a development purpose, a development item and a function outline, a system / product type, a development scale, an operation environment, and a development man-hour. Or the review support system according to claim 2.
【請求項4】 前記第1から第4のデータベースを用い
て、前記ソフトウェア製品開発の工程の区切りにおいて
実施する設計アウトプットのレビューに必要なチェック
項目を決定し、チェックリストを作成し、それにしたが
ってレビューを実施し、摘出した問題点の修正方法を過
去の事例を参照して決定し、処置を施すようにしたこと
を特徴とする請求項1から請求項3のいずれか記載のレ
ビュー支援システム。
4. Using the first to fourth databases, determine check items necessary for reviewing design outputs to be implemented at the breaks in the software product development process, create a checklist, and create a checklist accordingly. The review support system according to any one of claims 1 to 3, wherein a review is performed, a method of correcting the extracted problem is determined with reference to past cases, and a measure is taken.
【請求項5】 前記開発プロジェクトの固有情報を前記
第4のデータベースに入力する手段と、 前記固有情報を基に前記第1のデータベースに登録され
ている前記過去の開発プロジェクトの情報から類似プロ
ジェクトを検索する手段と、 前記固有情報を基に前記第2のデータベースから前記共
通に使用可能なチェック項目を検索する手段と、 検索された類似プロジェクトの情報からシステムや製品
種別に関するチェック項目を決定する手段と、 前記開発プロジェクトの各工程単位でインプットに対す
るアウトプットの整合性等をチェックする固有のチェッ
ク項目を決定しかつこれまで決定した全チェック項目を
統合して前記第3のデータベースに入力する手段と、 その統合したチェック項目のチェックリストを使用して
レビューした結果を前記第4のデータベースに入力する
手段と、 前記レビューの結果から摘出した問題点を前記類似プロ
ジェクトの情報から検索して前記開発プロジェクトの修
正/処置方法を決定する手段と、 前記問題点を解決した最終的な情報を前記第4のデータ
ベースと前記第1のデータベースとに登録する手段とを
含むことを特徴とする請求項1から請求項4のいずれか
記載のレビュー支援システム。
5. A means for inputting the unique information of the development project into the fourth database, and a similar project is identified from the information of the past development project registered in the first database based on the unique information. Means for searching; means for searching for the commonly usable check item from the second database based on the unique information; means for determining a check item relating to a system or a product type from information of the searched similar project. Means for determining a unique check item for checking the consistency of the output with respect to the input in each process unit of the development project, integrating all the check items determined so far, and inputting them to the third database. , Using the checklist of the integrated check items Means for inputting into the fourth database, means for searching for the problem extracted from the result of the review from the information on the similar project, and determining a correction / treatment method for the development project, and solving the problem The review support system according to any one of claims 1 to 4, further comprising: means for registering final information in the fourth database and the first database.
【請求項6】 ソフトウェアシステム/製品を開発する
ためのプロジェクトの各工程の区切りで前記プロジェク
トの設計品質の向上を図るために実施されるレビュー工
程の支援を行うレビュー支援方法であって、 開発中及び過去の開発プロジェクトの情報を全て管理す
るサーバ・コンピュータと、開発中の開発プロジェクト
の情報のみを管理する複数のクライアント・コンピュー
タとを相互に通信回線で接続してクライアント/サーバ
システムを構成し、 前記過去の開発プロジェクトの情報をプロジェクト単位
に保管/管理する第1のデータベースと、前記レビュー
工程で使用するチェックリストの中で前記プロジェクト
に関係なく共通に使用可能なチェック項目を保管/管理
する第2のデータベースとを前記サーバ・コンピュータ
に設け、 開発計画完了時に前記第1のデータベースから検索され
る前記開発プロジェクトに類似のプロジェクトの情報を
保管する第3のデータベースと、前記開発計画完了時に
入力される開発プロジェクトの固有情報を保管する第4
のデータベースとを前記複数のクライアント・コンピュ
ータ各々に設けるようにしたことを特徴とするレビュー
支援方法。
6. A review support method for supporting a review process performed to improve the design quality of a project at each step of a project for developing a software system / product, which is under development. And a client / server system comprising a server computer that manages all information of past development projects and a plurality of client computers that manage only information of development projects under development via a communication line. A first database for storing / managing the past development project information on a project basis and a second database for storing / managing check items that can be commonly used regardless of the project in a check list used in the review process; 2 is provided on the server computer, A third database for storing information on a project similar to the development project retrieved from the first database when the development plan is completed, and a fourth database for storing development project specific information input upon completion of the development plan
A review support method, wherein the database is provided in each of the plurality of client computers.
【請求項7】 前記開発プロジェクトの固有情報は、少
なくともプロジェクト名称、開発目的、開発項目と機能
概要、システム/製品の種別、開発規模、動作環境、開
発工数からなることを特徴とする請求項6記載のレビュ
ー支援方法。
7. The development project specific information comprises at least a project name, a development purpose, a development item and a function outline, a system / product type, a development scale, an operation environment, and a development man-hour. The described review support method.
【請求項8】 前記第1から第4のデータベースを用い
て、前記ソフトウェア製品開発の工程の区切りにおいて
実施する設計アウトプットのレビューに必要なチェック
項目を決定し、チェックリストを作成し、それにしたが
ってレビューを実施し、摘出した問題点の修正方法を過
去の事例を参照して決定し、処置を施すようにしたこと
を特徴とする請求項6または請求項7記載のレビュー支
援方法。
8. Using the first to fourth databases, determine check items required for review of design output to be executed at the break of the software product development process, create a checklist, and create a checklist accordingly. 8. The review support method according to claim 6, wherein a review is performed, a method of correcting the extracted problem is determined with reference to past cases, and a measure is taken.
【請求項9】 前記開発プロジェクトの固有情報を前記
第4のデータベースに入力するステップと、 前記固有情報を基に前記第1のデータベースに登録され
ている前記過去の開発プロジェクトの情報から類似プロ
ジェクトを検索するステップと、 前記固有情報を基に前記第2のデータベースから前記共
通に使用可能なチェック項目を検索するステップと、 検索された類似プロジェクトの情報からシステムや製品
種別に関するチェック項目を決定するステップと、 前記開発プロジェクトの各工程単位でインプットに対す
るアウトプットの整合性等をチェックする固有のチェッ
ク項目を決定しかつこれまで決定した全チェック項目を
統合して前記第3のデータベースに入力するステップ
と、 その統合したチェック項目のチェックリストを使用して
レビューした結果を前記第4のデータベースに入力する
ステップと、 前記レビューの結果から摘出した問題点を前記類似プロ
ジェクトの情報から検索して前記開発プロジェクトの修
正/処置方法を決定するステップと、 前記問題点を解決した最終的な情報を前記第4のデータ
ベースと前記第1のデータベースとに登録するステップ
とを含むことを特徴とする請求項6から請求項8のいず
れか記載のレビュー支援方法。
9. A step of inputting the unique information of the development project into the fourth database; and a step of inputting a similar project from the information of the past development project registered in the first database based on the unique information. A step of searching; a step of searching for the commonly usable check item from the second database based on the unique information; and a step of determining a check item relating to a system or a product type from information of the searched similar project. Determining a unique check item for checking the consistency of the output with respect to the input in each process unit of the development project, and integrating all the check items determined so far and inputting them to the third database; , Use that integrated checklist checklist Inputting the result of the review into the fourth database; searching for a problem extracted from the result of the review from the information on the similar project to determine a correction / treatment method for the development project; 9. The review support method according to claim 6, further comprising a step of registering final information having solved points in the fourth database and the first database.
JP2000073239A 2000-03-16 2000-03-16 Review supporting system and review supporting method used for it Pending JP2001265580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000073239A JP2001265580A (en) 2000-03-16 2000-03-16 Review supporting system and review supporting method used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000073239A JP2001265580A (en) 2000-03-16 2000-03-16 Review supporting system and review supporting method used for it

Publications (1)

Publication Number Publication Date
JP2001265580A true JP2001265580A (en) 2001-09-28

Family

ID=18591511

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000073239A Pending JP2001265580A (en) 2000-03-16 2000-03-16 Review supporting system and review supporting method used for it

Country Status (1)

Country Link
JP (1) JP2001265580A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003271628A (en) * 2002-03-14 2003-09-26 Toshiba Corp Method and program for supporting accumulation and retrieval of project know-how
JP2006268568A (en) * 2005-03-24 2006-10-05 Fujitsu Ltd Method and system for claim management
JP2007207276A (en) * 2007-04-28 2007-08-16 Fujitsu Ltd Design support system
US9268500B2 (en) 2012-08-27 2016-02-23 Samsung Electronics Co., Ltd. Host device and system including the same
JP2017520842A (en) * 2014-06-13 2017-07-27 ザ・チャールズ・スターク・ドレイパー・ラボラトリー・インコーポレイテッド System and method for software analysis
CN113627004A (en) * 2021-07-31 2021-11-09 国网福建省电力有限公司 Evaluation method and system for power transmission and transformation three-dimensional model design

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003271628A (en) * 2002-03-14 2003-09-26 Toshiba Corp Method and program for supporting accumulation and retrieval of project know-how
JP2006268568A (en) * 2005-03-24 2006-10-05 Fujitsu Ltd Method and system for claim management
JP4604786B2 (en) * 2005-03-24 2011-01-05 富士通株式会社 Claim management method and complaint management system
JP2007207276A (en) * 2007-04-28 2007-08-16 Fujitsu Ltd Design support system
US9268500B2 (en) 2012-08-27 2016-02-23 Samsung Electronics Co., Ltd. Host device and system including the same
JP2017520842A (en) * 2014-06-13 2017-07-27 ザ・チャールズ・スターク・ドレイパー・ラボラトリー・インコーポレイテッド System and method for software analysis
CN113627004A (en) * 2021-07-31 2021-11-09 国网福建省电力有限公司 Evaluation method and system for power transmission and transformation three-dimensional model design
CN113627004B (en) * 2021-07-31 2023-07-28 国网福建省电力有限公司 Evaluation method and system for three-dimensional model design of power transmission and transformation

Similar Documents

Publication Publication Date Title
Langer Analysis and design of information systems
US9195952B2 (en) Systems and methods for contextual mapping utilized in business process controls
US7203695B2 (en) Method and system for using a framework to implement an audit process
US9195936B1 (en) System and method for updating or modifying an application without manual coding
US20020198750A1 (en) Risk management application and method
US7613641B1 (en) System and method for developing a defined pension plan logic and framework
US20150006491A1 (en) Just-in-Time Data Quality Assessment for Best Record Creation
CN101110021A (en) Method for visually programming instruction set for process
US11580096B2 (en) System for uploading information into a metadata repository
US7895240B2 (en) Systems and methods for managing information
AU2006202888A1 (en) Opportunity management, tracking and reporting system
US20060026595A1 (en) Workflow management apparatus, workflow management program, and workflow management method
JP2001265580A (en) Review supporting system and review supporting method used for it
US7716230B2 (en) Multi-dimensional serial containment process
US20130332403A1 (en) Leveraging analytics to propose context sensitive workflows for case management solutions
JP6655582B2 (en) Data integration support system and data integration support method
US20040172318A1 (en) System and method for capital depreciation simulation
US11500909B1 (en) Non-structured data oriented communication with a database
US20090024507A1 (en) Unique versatile axpert executor engine which can interpret and execute transaction structures and information views to build information systems
Cherdsakulwong et al. Impact Analysis of Test Cases for Changing Inputs or Outputs of Functional Requirements
JP2005284888A (en) Management consulting report generating device
JPH1091706A (en) Business processing system
Dakay et al. Improving Integration of Databases and Data Sets Supporting Quality Management in a Higher Education Institution: A Project Post Mortem Analysis