EP1238883B1 - Route management system for a railway vehicle - Google Patents

Route management system for a railway vehicle Download PDF

Info

Publication number
EP1238883B1
EP1238883B1 EP02290397A EP02290397A EP1238883B1 EP 1238883 B1 EP1238883 B1 EP 1238883B1 EP 02290397 A EP02290397 A EP 02290397A EP 02290397 A EP02290397 A EP 02290397A EP 1238883 B1 EP1238883 B1 EP 1238883B1
Authority
EP
European Patent Office
Prior art keywords
route
change
railway vehicle
management system
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP02290397A
Other languages
German (de)
French (fr)
Other versions
EP1238883A1 (en
Inventor
Mihai Chirescu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom Transport SA
Original Assignee
Alstom Transport SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alstom Transport SA filed Critical Alstom Transport SA
Publication of EP1238883A1 publication Critical patent/EP1238883A1/en
Application granted granted Critical
Publication of EP1238883B1 publication Critical patent/EP1238883B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/14Following schedules

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

La présente invention se rapporte à un système de gestion de l'itinéraire d'un véhicule ferroviaire circulant sur un réseau ferroviaire entre un point de départ et un point d'arrivée.The present invention relates to a system for managing the route of a rail vehicle traveling on a railway network between a starting point and an arrival point.

Comme cela est classique, les réseaux ferroviaires comportent généralement des moyens de détection de la position du véhicule sur le réseau raccordés à une unité centrale de traitement dans laquelle est chargé un algorithme permettant de commander une modification de l'itinéraire du véhicule ferroviaire entre le point de départ et le point d'arrivée, et, en particulier, entre un noeud de changement d'itinéraire et un noeud de convergence avec un itinéraire initial.As is conventional, railway networks generally comprise means for detecting the position of the vehicle on the network connected to a central processing unit in which is loaded an algorithm making it possible to control a modification of the route of the railway vehicle between the point departure and arrival point, and in particular between a route change node and a convergence node with an initial route.

L'unité centrale permet, au moyen d'une interface machine appropriée, à un opérateur d'entrer successivement la liste des points du réseau selon lesquels le véhicule doit circuler en fonction d'événements externes susceptibles de nécessiter une modification du trajet initialement prévu.The central unit makes it possible, by means of an appropriate machine interface, for an operator to successively enter the list of points of the network according to which the vehicle must circulate as a function of external events that may necessitate a modification of the initially planned path.

Par exemple, une modification du trajet peut être rendue nécessaire par le fait qu'un quai de départ ou un quai d'arrivée est indisponible ou par la présence d'un obstacle sur la voie ferrée.For example, a change in the trip may be necessary due to the fact that a departure platform or an arrival platform is unavailable or the presence of an obstacle on the railway.

Pour modifier le trajet, l'opérateur saisit manuellement tous les points de passage entre le noeud de changement d'itinéraire et le noeud de convergence avec l'intermédiaire initial puis assure, s'il y a lieu, le lien avec les missions suivantes.To modify the path, the operator manually enters all the waypoints between the route change node and the convergence node with the initial intermediary and then, if necessary, provides the link with the following missions.

Cette technique bien que relativement efficace et sûre, présente un certain nombre d'inconvénients, notamment en raison du fait que cette opération est longue et doit, à ce jour, être effectuée manuellement.This technique, although relatively efficient and safe, has a number of disadvantages, in particular because this operation is long and must, to date, be performed manually.

Un des buts de l'invention est de pallier cet inconvénient.One of the aims of the invention is to overcome this drawback.

L'invention a donc pour objet un système de gestion de l'itinéraire d'un véhicule ferroviaire circulant sur un réseau ferroviaire entre un point de départ et un point d'arrivée, le réseau comportant des moyens de détection de la position du véhicule sur le réseau et une unité centrale de traitement comportant des moyens pour commander une modification de l'itinéraire du véhicule ferroviaire entre un noeud de changement d'itinéraire et un noeud de convergence avec un itinéraire initial, caractérisé en ce que les moyens pour commander une modification de l'itinéraire comportent des moyens pour déterminer l'ensemble des itinéraires possibles entre le noeud de changement d'itinéraire et le noeud de convergence et des moyens pour comparer ledit ensemble d'itinéraires avec l'itinéraire initial de manière à commander le changement d'itinéraire selon l'itinéraire le plus proche de l'itinéraire initialement prévu.The subject of the invention is therefore a system for managing the route of a rail vehicle traveling on a railway network between a starting point and an arrival point, the network comprising means for detecting the position of the vehicle on the network and a central processing unit comprising means for controlling a modification of the rail vehicle route between a route change node and a convergence node with an initial route, characterized in that the means for controlling a modification of the route comprise means for determining all the possible routes between the route change node and the convergence node and means for comparing said set of routes with the initial route so as to control the change of route. itinerary according to the route closest to the itinerary initially planned.

Le système de gestion selon l'invention peut comporter une ou plusieurs des caractéristiques suivantes, prises isolément ou selon toutes les combinaisons techniquement possibles :

  • l'unité centrale comporte des moyens de calcul de la durée du trajet selon l'itinéraire modifié par les moyens pour commander une modification d'itinéraire.
  • les moyens de calcul comportent des moyens de calcul de la durée du trajet selon chaque canton de l'itinéraire modifié ;
  • l'unité centrale comporte des moyens pour modifier le temps de séjour du véhicule ferroviaire au point d'arrivée ;
  • l'unité centrale comporte des moyens pour modifier un itinéraire ou le point d'arrivée d'un véhicule ferroviaire, au moment même où celui-ci est parcouru par le véhicule ferroviaire ;
  • dans le cas où le véhicule ferroviaire est contraint de changer de quai de départ, le noeud de changement d'itinéraire est constitué par le point de départ du véhicule ferroviaire ; et
  • dans le cas où le véhicule ferroviaire est contraint de changer de quai d'arrivé, le noeud de convergence est un point virtuel situé en aval du point d'arrivé, le véhicule ferroviaire étant stoppé au niveau du quai d'arrivé se trouvant sur l'itinéraire modifié ;
The management system according to the invention may comprise one or more of the following characteristics, taken separately or in any technically possible combination:
  • the central unit comprises means for calculating the journey time according to the route modified by the means for controlling a route modification.
  • the calculation means comprise means for calculating the duration of the journey according to each block of the modified route;
  • the central unit comprises means for modifying the residence time of the railway vehicle at the arrival point;
  • the central unit comprises means for modifying a route or the point of arrival of a railway vehicle, at the very moment when it is traversed by the railway vehicle;
  • in the case where the rail vehicle is forced to change the departure platform, the route change node is constituted by the starting point of the rail vehicle; and
  • in the case where the railway vehicle is forced to change the arrival platform, the convergence node is a virtual point located downstream of the arrival point, the railway vehicle being stopped at the arrival platform located on the modified itinerary;

D'autres caractéristiques et avantages ressortiront de la description suivante, donnée uniquement à titre d'exemple, et faite en référence aux dessins annexés sur lesquels :

  • la figure 1 est une vue schématique d'une portion de réseau ferroviaire équipée d'un système de gestion conforme à l'invention ;
  • la figure 2 est un organigramme montrant les différentes phases de fonctionnement du système de gestion de la figure 1 ;
  • la figure 3 est une vue schématique illustrant le cas d'un changement de quai de départ ;
  • la figure 4 est vue schématique illustrant le cas d'un changement de quai d'arrivé.
Other features and advantages will become apparent from the following description, given solely by way of example, and with reference to the appended drawings, in which:
  • the figure 1 is a schematic view of a railway network portion equipped with a management system according to the invention;
  • the figure 2 is a flowchart showing the different phases of operation of the management system of the figure 1 ;
  • the figure 3 is a schematic view illustrating the case of a change of departure platform;
  • the figure 4 is a schematic view illustrating the case of a change of arrival platform.

Sur la figure 1, on a représenté de façon schématique une portion de réseau ferroviaire doté d'un système de gestion d'itinéraire capable de calculer, en temps réel, l'itinéraire selon lequel un train circule entre un point de départ et un point d'arrivée.On the figure 1 schematically shows a portion of railway network with a route management system capable of calculating, in real time, the route in which a train runs between a starting point and an arrival point.

La portion 10 de réseau ferroviaire représenté sur cette figure 1 s'étend entre des points de départ 12,14, constitués chacun d'un ensemble de quais de départ, tels que 16 et 18, et des points d'arrivée 20 et 22, constitués également de quais d'arrivée, tels que 24 et 26.The portion 10 of the railway network represented on this figure 1 extends between starting points 12,14, each consisting of a set of departure platforms, such as 16 and 18, and arrival points 20 and 22, also consisting of arrival platforms, such as 24 and 26.

Dans l'exemple de réalisation représentée sur cette figure, la portion 10 de réseau comporte deux voies ferrées 28 et 30. Comme cela est classique, ces voies ferrées sont subdivisées en cantons et sont munies d'un dispositif d'aiguillage, tel que 32, assurant un aiguillage du véhicule ferroviaire entre les voies ferrées 28 et 30.In the exemplary embodiment shown in this figure, the network portion 10 comprises two railway tracks 28 and 30. As is conventional, these railways are subdivided into blocks and are provided with a switching device, such as 32 , providing a referral of the railway vehicle between the tracks 28 and 30.

Par ailleurs, le réseau ferroviaire est doté de dispositifs de détection de passage, tels que 34, régulièrement répartis dans chaque canton, de manière à procéder à une détection, en temps réel, de la position du véhicule ferroviaire sur la voie ferrée le long de laquelle il circule.Furthermore, the rail network is provided with passage detection devices, such as 34, regularly distributed in each block, so as to perform a real-time detection of the position of the railway vehicle on the railway along the line. which it circulates.

L'ensemble des équipements du réseau ferroviaire 10, à savoir les dispositifs d'aiguillage 32 et les dispositifs de détection 34 sont raccordés à une interface 36 d'acquisition de données et de commande des dispositifs d'aiguillage assurant l'acquisition des données issues des dispositifs de détection 34 et la commande des dispositifs d'aiguillage 32 en fonction d'un itinéraire initial prédéterminé, stocké en mémoire, entre un point de départ, tel que 12, et un point d'arrivée, tel que 20.All the equipment of the rail network 10, namely the switching devices 32 and the detection devices 34 are connected to an interface 36 for data acquisition and control of the switching devices ensuring the acquisition of data from detecting devices 34 and controlling the switching devices 32 according to a predetermined initial route, stored in memory, between a starting point, such as 12, and an end point, such as 20.

Conformément à l'invention, l'unité 36 est raccordée à une unité centrale de traitement 38 assurant le contrôle du fonctionnement de l'interface 36. En particulier l'unité centrale de traitement 38 gère l'interface avec l'unité de commande 36 par l'envoi de commandes intermédiaires et par l'acquisition de données issues des dispositifs d'aiguillage 32 et des dispositifs de détection 34, de manière à suivre la formation d'un itinéraire modifié, puis sa destruction progressive, au passage d'un train. Toute modification d'un itinéraire donne lieu à l'envoi par l'unité centrale de traitement 38 vers l'interface 36 de nouveaux ordres de commande des dispositifs d'aiguillage 32.According to the invention, the unit 36 is connected to a central processing unit 38 ensuring the control of the operation of the interface 36. In particular the central processing unit 38 manages the interface with the control unit 36 by sending intermediate commands and by acquiring data from the switching devices 32 and the detection devices 34, so as to follow the formation of a modified route, then its gradual destruction, at the passage of a train. Any modification of a route gives rise to the sending by the central processing unit 38 to the interface 36 of new control commands of the switching devices 32.

L'unité centrale 38 est constituée par un ordinateur central dans lequel sont chargés tous les programmes nécessaires pour provoquer les modifications d'itinéraires.The central unit 38 is constituted by a central computer in which are loaded all the programs necessary to cause the modifications of routes.

Elle est raccordée à une interface homme/machine 40 permettant à un opérateur d'entrer des ordres de modifications d'itinéraires et dispose d'une base de données (non représentée) dans laquelle sont chargés l'ensemble des itinéraires possibles entre les points de départ 12,14 et les points d'arrivée 20,22 du réseau ferroviaire 10.It is connected to a man / machine interface 40 allowing an operator to enter route change orders and has a database (not shown) in which all the possible routes between the points of interest are loaded. departure 12,14 and arrival points 20,22 of the rail network 10.

Plus particulièrement, l'unité centrale de traitement 38 comporte des moyens logiciels permettant d'extraire, de la base de données, l'ensemble des itinéraires possibles entre un noeud de changement d'itinéraire et un noeud de convergence avec l'itinéraire initial et des moyens logiciels pour comparer l'ensemble d'itinéraires extraits de la base de données avec l'itinéraire initial de manière à ne conserver que l'itinéraire le plus proche de l'itinéraire initialement prévu en vue de provoquer une modification de l'itinéraire selon l'itinéraire le plus proche ainsi déterminé. L'itinéraire le plus proche est choisi comme étant l'itinéraire modifié ayant le plus de point de passage du véhicule ferroviaire commun avec l'itinéraire initialement prévu.More particularly, the central processing unit 38 comprises software means making it possible to extract from the database all the possible routes between a route change node and a convergence node with the initial route and software means for comparing the set of routes extracted from the database with the initial route so as to keep only the route closest to the initially planned route in order to cause a modification of the route according to the closest route thus determined. The nearest route is chosen as the modified route having the most crossing point of the common rail vehicle with the initially planned route.

Par ailleurs, l'unité centrale de traitement 38 incorpore des moyens logiciels de calcul de la durée du trajet selon l'itinéraire ainsi modifié de manière à, par extrapolation, déterminer l'instant auquel le véhicule ferroviaire atteindra le point d'arrivée et des moyens pour modifier, à partir de cette information, la durée de séjour du véhicule ferroviaire au point d'arrivée de manière à éviter un décalage du service ferroviaire.In addition, the central processing unit 38 incorporates software means for calculating the journey time according to the route thus modified so as to extrapolate the time at which the railway vehicle will reach the arrival point and means for modifying, based on this information, the length of stay of the railway vehicle at the point of arrival so as to avoid a shift in the railway service.

Selon une caractéristique de l'invention, les moyens de calcul de la durée du trajet procèdent à un calcul de la durée de l'itinéraire canton par canton de manière à prévoir, pour chacun de ceux-ci, l'instant de passage du véhicule ferroviaire.According to a characteristic of the invention, the means for calculating the duration of the journey proceed to a calculation of the duration of the route canton by canton so as to provide, for each of these, the moment of passage of the vehicle. rail.

Une modification de l'itinéraire peut intervenir en un point quelconque du trajet ou de manière plus courante au niveau d'un point de départ ou d'un point d'arrivée, ces deux derniers changements correspondant respectivement à un changement de quai de départ et/ou d'arrivée. De plus, une modification du point d'arrivée peut avoir lieu alors que le véhicule ferroviaire parcourt déjà son itinéraire.A modification of the route may take place at any point along the route or more commonly at a starting point or an arrival point, the latter two changes respectively corresponding to a change of departure point and / or arrival. In addition, a modification of the arrival point may take place while the railway vehicle is already traveling on its route.

Dans la suite de la description, on considérera que le noeud de changement d'itinéraire est constitué par le point de départ 12 lui-même, le noeud de convergence avec l'itinéraire initial, désigné par la référence numérique générale 42 sur la figure étant dès lors constitué par un point du réseau ferroviaire situé en aval du point de départ 12.In the remainder of the description, it will be considered that the route change node is constituted by the starting point 12 itself, the convergence node with the initial route, designated by the general reference numeral 42 in the figure being therefore constituted by a point of the railway network situated downstream of the starting point 12.

En référence auxfigures 2 et 3, on va maintenant décrire les principales phases de fonctionnement du système de gestion d'itinéraire qui vient d'être décrit.Referring to FIGS. 2 and 3, the main phases of operation of the route management system just described will now be described.

Au cours d'une première phase 44, qui correspond à une phase lors de laquelle un opérateur décide que l'itinéraire initialement prévu doit être modifié, le trajet initialement prévu, représenté en pointillé sur la figure 3, est récupéré.During a first phase 44, which corresponds to a phase during which an operator decides that the initially planned route is to be modified, the initially planned route, represented in dotted line on the figure 3 , is recovered.

Lors de l'étape 46 suivante, l'opérateur entre, au moyen de l'interface homme/machine 40, une information relative au nouveau quai de départ 16.In the following step 46, the operator enters, via the man / machine interface 40, information relating to the new departure platform 16.

Lors de la phase 48 suivante, cette information est récupérée par l'unité centrale de traitement 38. Cette dernière procède à une comparaison entre l'itinéraire modifié et l'itinéraire initialement prévu et extrait, de la base de données, l'ensemble des itinéraires possibles entre le quai de départ 16 et le noeud de convergence 42 avec l'itinéraire initial.In the following phase 48, this information is retrieved by the central processing unit 38. The latter makes a comparison between the modified route and the route initially planned and extracted, from the database, all possible routes between the departure platform 16 and the convergence node 42 with the initial route.

Lors de l'étape 50 suivante, l'unité centrale de traitement 38 procède à une comparaison de l'ensemble des itinéraires ainsi obtenus avec l'itinéraire initial et ne conserve que l'itinéraire le plus proche de l'itinéraire initialement prévu. L'itinéraire le plus proche est choisi comme étant l'itinéraire modifié ayant le plus de points de passage du véhicule ferroviaire communs avec l'itinéraire initialement prévu.In the next step 50, the central processing unit 38 compares all the routes thus obtained with the initial route and retains only the route closest to the initially planned route. The nearest route is chosen as the modified route with the most common rail vehicle crossing points with the originally planned route.

Elle procède alors à une programmation de l'unité de commande 36 de manière à ce que cette dernière commande les équipements ferroviaires de manière à faire circuler le véhicule ferroviaire selon l'itinéraire ainsi programmé (étape 52).It then proceeds to a programming of the control unit 36 so that the latter controls the railway equipment so as to circulate the railway vehicle according to the route thus programmed (step 52).

L'unité centrale de traitement procède ainsi, par extrapolation, à la détermination de la trajectoire du véhicule et pilote l'unité de commande 36 de telle sorte que les dispositifs d'aiguillage soient actionnés à des instants propices pour que le véhicule ferroviaire soit aiguillé selon l'itinéraire programmé.The central processing unit thus proceeds, by extrapolation, to the determination of the trajectory of the vehicle and controls the control unit 36 so that the switching devices are actuated at favorable times for the rail vehicle to be switched according to the programmed route.

Lors de cette étape 52, l'unité centrale de traitement 38 procède, canton par canton, à un calcul de la durée de trajet en vue du pilotage des équipements ferroviaires.In this step 52, the central processing unit 38 proceeds, canton by canton, to a calculation of the journey time for the control of the railway equipment.

Enfin, au cours de cette étape, et à partir des informations de durée calculées, l'unité centrale 28 procède à une modification du temps de séjour du véhicule ferroviaire au point d'arrivée, en fonction du retard pris dû au changement d'itinéraire, de manière à ne pas décaler le service ferroviaire.Finally, during this step, and from the calculated duration information, the central unit 28 proceeds to a modification of the residence time of the railway vehicle at the arrival point, according to the delay taken due to the change of route , so as not to shift the rail service.

On vient de décrire le cas où le véhicule ferroviaire était contraint à un changement de quai de départ. On conçoit cependant, conformément à la figure 4, que lorsque l'itinéraire doit être modifié en raison de l'indisponibilité d'un quai d'arrivé, le point d'arrivé du véhicule ferroviaire est alors constitué par le quai d'arrivé 24 se trouvant sur l'itinéraire modifié, le noeud de changement d'itinéraire étant alors constitué par un point 43 du réseau ferroviaire situé en amont du point d'arrivé, en considérant le sens de circulation du véhicule ferroviaire le long de la voie ferrée. Dans un tel cas, l'itinéraire modifié parcouru par le véhicule ferroviaire ne comporte pas de noeud de convergence avec l'itinéraire initial, le noeud de convergence étant un point virtuel disposé en aval du point d'arrivé.We have just described the case where the railway vehicle was forced to change the starting platform. It is conceivable, however, in accordance with figure 4 , that when the route is to be changed due to the unavailability of an arrival platform, the arrival point of the railway vehicle is then constituted by the arrival platform 24 located on the modified route, the route change node then being constituted by a point 43 of the railway network located upstream of the arrival point, considering the direction of circulation of the railway vehicle along the railway. In such a case, the modified route traveled by the rail vehicle does not include a convergence node with the initial route, the convergence node being a virtual point disposed downstream of the arrival point.

Le système décrit ici est particulièrement utile, puisqu'il est adapté à une modification de l'itinéraire d'un véhicule ferroviaire alors même que le véhicule parcourt déjà cet itinéraire. Cette facilité permet de gérer facilement et rapidement les aléas imprévus pouvant survenir sur le réseau, notamment en cas d'indisponibilité du quai initialement prévu pour la réception d'un train.The system described here is particularly useful, since it is adapted to a modification of the route of a railway vehicle even though the vehicle is already traveling this route. This facility makes it possible to easily and quickly manage unforeseen hazards that may occur on the network, particularly in the event of unavailability of the wharf initially planned for receiving a train.

Claims (7)

  1. A system for managing the route of a railway vehicle travelling on a railway system (10) between a departure point (12, 14) and a destination point (20, 22), the system comprising means (34) for detecting the position of the vehicle in the system and a central processing unit (38) comprising means for commanding a change in the route of the railway vehicle between a change-of-route node and a convergence-with-initial-route node, characterised in that the means for commanding a change in route comprise means for determining all possible routes between the change-of-route node and the convergence node and means for comparing the said set of routes with the initial route in such a way as to command the change of route on the basis of the route closest to the initially intended route.
  2. A management system according to Claim 1, characterised in that the central unit (38) comprises means for calculating the travel time along the route amended by the means for commanding a change of route.
  3. A management system according to Claim 2, characterised in that the calculation means comprise means for calculating the travel time along each section of the amended route.
  4. A management system according to either of Claims 2 and 3, characterised in that the central unit comprises means to change the standing time of the railway vehicle at the destination point.
  5. A management system according to any one of the preceding claims, characterised in that the central unit (38) comprises means for changing a route or the destination point of a railway vehicle at the same time as the railway vehicle is travelling along it.
  6. A management system according to any one of Claims 1 to 5, characterised in that in the situation where the railway vehicle has to change departure platform, the change-of-route node comprises the departure point (12, 14) for the railway vehicle.
  7. A management system according to any one of Claims 1 to 5, characterised in that in the situation where the railway vehicle has to change arrival platform, the convergence node is a virtual point located before the destination point (20, 22), the railway vehicle being stopped at the arrival platform included in the amended route.
EP02290397A 2001-03-09 2002-02-19 Route management system for a railway vehicle Expired - Lifetime EP1238883B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR0103263A FR2821812B1 (en) 2001-03-09 2001-03-09 RAIL VEHICLE ROUTE MANAGEMENT SYSTEM
FR0103263 2001-03-09

Publications (2)

Publication Number Publication Date
EP1238883A1 EP1238883A1 (en) 2002-09-11
EP1238883B1 true EP1238883B1 (en) 2009-02-18

Family

ID=8860953

Family Applications (1)

Application Number Title Priority Date Filing Date
EP02290397A Expired - Lifetime EP1238883B1 (en) 2001-03-09 2002-02-19 Route management system for a railway vehicle

Country Status (9)

Country Link
US (1) US6766228B2 (en)
EP (1) EP1238883B1 (en)
JP (1) JP4294251B2 (en)
BR (2) BRPI0200670B1 (en)
CA (1) CA2374166C (en)
DE (1) DE60231162D1 (en)
ES (1) ES2321380T3 (en)
FR (1) FR2821812B1 (en)
MX (1) MXPA02002499A (en)

Families Citing this family (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6873191B2 (en) * 2002-12-31 2005-03-29 Intersil Americas Inc. Mechanism for providing over-voltage protection during power up of DC-DC converter
US7797087B2 (en) * 2003-02-27 2010-09-14 General Electric Company Method and apparatus for selectively disabling train location reports
US7512481B2 (en) * 2003-02-27 2009-03-31 General Electric Company System and method for computer aided dispatching using a coordinating agent
US20060212187A1 (en) * 2003-02-27 2006-09-21 Wills Mitchell S Scheduler and method for managing unpredictable local trains
US7937193B2 (en) * 2003-02-27 2011-05-03 General Electric Company Method and apparatus for coordinating railway line of road and yard planners
US7725249B2 (en) * 2003-02-27 2010-05-25 General Electric Company Method and apparatus for congestion management
US20060212188A1 (en) * 2003-02-27 2006-09-21 Joel Kickbusch Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
US8292172B2 (en) * 2003-07-29 2012-10-23 General Electric Company Enhanced recordation device for rail car inspections
US7908047B2 (en) * 2004-06-29 2011-03-15 General Electric Company Method and apparatus for run-time incorporation of domain data configuration changes
EP1861302A4 (en) * 2005-03-14 2010-05-05 Gen Electric A system and method for railyard planning
US20070106434A1 (en) * 2005-11-07 2007-05-10 Galbraith Robert E Ii User interface for railroad dispatch monitoring of a geographic region and display system employing a common data format for displaying information from different and diverse railroad CAD systems
US7596433B2 (en) 2005-12-30 2009-09-29 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard with partially occupied classification track selection logic
US20070179688A1 (en) * 2005-12-30 2007-08-02 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard
US7792616B2 (en) * 2005-12-30 2010-09-07 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block size
US8060263B2 (en) 2005-12-30 2011-11-15 Canadian National Railway Company System and method for forecasting the composition of an outbound train in a switchyard
US7457691B2 (en) 2005-12-30 2008-11-25 Canadian National Railway Company Method and system for computing rail car switching solutions in a switchyard based on expected switching time
US7742848B2 (en) * 2005-12-30 2010-06-22 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for block pull time
US7657348B2 (en) 2005-12-30 2010-02-02 Canadian National Railway Company System and method for computing rail car switching solutions using dynamic classification track allocation
US20070156298A1 (en) * 2005-12-30 2007-07-05 Canadian National Railway Company System and method for computing rail car switching solutions by assessing space availability in a classification track on the basis of arrival profile
US7747362B2 (en) 2005-12-30 2010-06-29 Canadian National Railway Company System and method for computing rail car switching solutions by assessing space availability in a classification track on the basis of block pull time
US8055397B2 (en) * 2005-12-30 2011-11-08 Canadian National Railway Company System and method for computing rail car switching sequence in a switchyard
US7546185B2 (en) * 2005-12-30 2009-06-09 Canadian National Railway Company System and method for computing railcar switching solutions using an available space search logic assigning different orders of preference to classification tracks
US7742849B2 (en) * 2005-12-30 2010-06-22 Canadian National Railway Company System and method for computing car switching solutions in a switchyard using car ETA as a factor
US7565228B2 (en) 2005-12-30 2009-07-21 Canadian National Railway Company System and method for computing railcar switching solutions in a switchyard using empty car substitution logic
US7818101B2 (en) * 2005-12-30 2010-10-19 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard using an iterative method
US7751952B2 (en) * 2005-12-30 2010-07-06 Canadian National Railway Company System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for arrival rate
US7797088B2 (en) * 2006-05-02 2010-09-14 General Electric Company Method and apparatus for planning linked train movements
US8498762B2 (en) * 2006-05-02 2013-07-30 General Electric Company Method of planning the movement of trains using route protection
US20070260497A1 (en) * 2006-05-02 2007-11-08 Wolfgang Daum Method of planning train movement using a front end cost function
US7734383B2 (en) * 2006-05-02 2010-06-08 General Electric Company Method and apparatus for planning the movement of trains using dynamic analysis
US7680750B2 (en) * 2006-06-29 2010-03-16 General Electric Company Method of planning train movement using a three step optimization engine
US8082071B2 (en) * 2006-09-11 2011-12-20 General Electric Company System and method of multi-generation positive train control system
US8433461B2 (en) * 2006-11-02 2013-04-30 General Electric Company Method of planning the movement of trains using pre-allocation of resources
JP6298664B2 (en) * 2014-03-13 2018-03-20 株式会社日立製作所 Diamond data proposing device and diamond data proposing method
US10279823B2 (en) * 2016-08-08 2019-05-07 General Electric Company System for controlling or monitoring a vehicle system along a route
CN109532956B (en) * 2017-09-22 2020-10-23 交控科技股份有限公司 Driving control method and device suitable for VBTC (visual basic control) system

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07106704B2 (en) * 1982-04-09 1995-11-15 株式会社日立製作所 Train control method
JPH085089Y2 (en) * 1989-08-01 1996-02-14 三菱電機株式会社 Train operation management device
JP2782135B2 (en) * 1991-12-18 1998-07-30 本田技研工業株式会社 Vehicle travel guidance device
CA2101158A1 (en) * 1991-12-23 1993-06-24 Bernard C. Smith, Jr. Vehicle navigation apparatus
EP1058222B1 (en) * 1992-08-19 2005-12-07 Aisin Aw Co., Ltd. Navigation system for vehicles
JP2703730B2 (en) * 1994-10-06 1998-01-26 東海旅客鉄道株式会社 Route setting method for rail transportation
JP3384172B2 (en) * 1995-02-28 2003-03-10 株式会社デンソー Travel guide device for vehicles
JPH08244615A (en) * 1995-03-08 1996-09-24 Hitachi Ltd Operation adjusting device
GB9508681D0 (en) * 1995-04-28 1995-06-14 Westinghouse Brake & Signal Vehicle control system
FR2765374B1 (en) * 1997-06-12 2001-02-23 Thierry Pierre Jean Hallier METHOD AND DEVICE FOR CONTROLLING THE MOVEMENT OF MOBILE OBJECTS BETWEEN TWO DETERMINED POINTS
JP4130027B2 (en) * 1998-12-16 2008-08-06 財団法人鉄道総合技術研究所 Station premises replacement plan creation device
JP2001106076A (en) * 1999-10-08 2001-04-17 Toyota Motor Corp Route searching device
GB2361545A (en) * 2000-01-27 2001-10-24 Trafficmaster Developments Ltd Traffic monitoring

Also Published As

Publication number Publication date
BR0200670A (en) 2002-12-10
FR2821812B1 (en) 2003-12-19
US6766228B2 (en) 2004-07-20
DE60231162D1 (en) 2009-04-02
CA2374166A1 (en) 2002-09-09
EP1238883A1 (en) 2002-09-11
ES2321380T3 (en) 2009-06-05
US20020128757A1 (en) 2002-09-12
CA2374166C (en) 2009-08-18
MXPA02002499A (en) 2004-06-22
JP2002308102A (en) 2002-10-23
JP4294251B2 (en) 2009-07-08
BRPI0200670B1 (en) 2019-09-03
FR2821812A1 (en) 2002-09-13

Similar Documents

Publication Publication Date Title
EP1238883B1 (en) Route management system for a railway vehicle
FR2692542A1 (en) System for control of railway traffic - uses details of train itinerary and time tables together with decision rules to aid preparation of route diagram
FR2921152A1 (en) AIRCRAFT FLIGHT PLAN JOINT ASSISTANCE METHOD BY INTERCEPTING A FLIGHT SEGMENT CLOSE TO THE AIRCRAFT
JP4158439B2 (en) Method, apparatus, system and program for providing route determination support information
EP2600108B1 (en) Device for interactive dialogue between an aircraft operator and a system for guiding said aircraft
FR2833698A1 (en) Method for determining route data for navigation equipment, comprises decomposition of route into stages and transmission of main and subsidiary data for each stage just before it is commenced
EP0576641A1 (en) Vehicle navigation apparatus
EP1834875B1 (en) Method of managing the braking of an aircraft by predicting its movement on the airport platform
WO2006000590A1 (en) Method of changing the approach procedure of an aircraft
EP2428426B1 (en) Method and device for generating and editing a railway signal diagram
EP3406503A1 (en) Optimised method for managing the circulation of a train and associated cbtc signalling system
FR3075742A1 (en) METHOD FOR RESETTING A ZONE CONTROLLER AND ASSOCIATED SYSTEM FOR AUTOMATIC CONTROL OF TRAINS
FR2749933A1 (en) PROCESS FOR THE MANAGEMENT OF AIR SPEED WITH A VIEW TO COMPLIANCE WITH THE TIME CONSTRAINTS OF AN AERODYNE IN A CHANGING WEATHER ENVIRONMENT
FR2973765A1 (en) METHOD FOR MANAGING A MOTOR VEHICLE WITH ENERGY SAVING
FR2921151A1 (en) Flight plan rejoining assistance method for aircraft, involves automatically deactivating sequencing of waypoints of flight plan located in upstream of LEG during engagement of managed mode, where mode is engaged when aircraft crosses limit
FR2941794A1 (en) Method for managing optional route at initial route of aircraft, involves determining point of vertical divergence on lateral profile in upstream of point of lateral divergence, and displaying point of vertical divergence
EP3882096B1 (en) Method for automated management of the longitudinal speed of a vehicle
EP1038283B1 (en) Navigation aid method in a motor vehicle onboard system
EP1002308B1 (en) Motor vehicle navigation system
WO2022017734A1 (en) Driver assistance system
EP1355130A1 (en) Navigation system using telecommunications
FR2892506A1 (en) Transit facilities optimal itinerary e.g. home-work path, selection assisting system for traveler, has central server comprising calculation unit that calculates optimal itinerary based on set time of transport unit and line breaks
WO2022238497A1 (en) Method for managing the longitudinal speed of an autonomous vehicle
FR3109922A1 (en) A method of managing a state of a guidance system of a motor vehicle.
WO2024008682A1 (en) Method for optimising the energy consumption of a vehicle

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20030311

AKX Designation fees paid

Designated state(s): DE ES GB IT SE

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ALSTOM

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ALSTOM TRANSPORT SA

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE ES GB IT SE

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REF Corresponds to:

Ref document number: 60231162

Country of ref document: DE

Date of ref document: 20090402

Kind code of ref document: P

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2321380

Country of ref document: ES

Kind code of ref document: T3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20091119

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 60231162

Country of ref document: DE

Owner name: ALSTOM TRANSPORT TECHNOLOGIES, FR

Free format text: FORMER OWNER: ALSTOM TRANSPORT S.A., LEVALLOIS-PERRET, FR

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20151119 AND 20151125

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 60231162

Country of ref document: DE

Owner name: ALSTOM TRANSPORT TECHNOLOGIES, FR

Free format text: FORMER OWNER: ALSTOM TRANSPORT TECHNOLOGIES, LEVALLOIS-PERRET, FR

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20200219

Year of fee payment: 19

Ref country code: IT

Payment date: 20200225

Year of fee payment: 19

Ref country code: SE

Payment date: 20200220

Year of fee payment: 19

Ref country code: ES

Payment date: 20200322

Year of fee payment: 19

Ref country code: DE

Payment date: 20200219

Year of fee payment: 19

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60231162

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210220

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210901

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210219

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20220513

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210220