DE202011105791U1 - Holder for the measurement of building corners - Google Patents

Holder for the measurement of building corners Download PDF

Info

Publication number
DE202011105791U1
DE202011105791U1 DE201120105791 DE202011105791U DE202011105791U1 DE 202011105791 U1 DE202011105791 U1 DE 202011105791U1 DE 201120105791 DE201120105791 DE 201120105791 DE 202011105791 U DE202011105791 U DE 202011105791U DE 202011105791 U1 DE202011105791 U1 DE 202011105791U1
Authority
DE
Germany
Prior art keywords
holder
hinge
base plates
guide pins
measurement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE201120105791
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE201120105791 priority Critical patent/DE202011105791U1/en
Publication of DE202011105791U1 publication Critical patent/DE202011105791U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points
    • G01C15/06Surveyors' staffs; Movable markers

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Length-Measuring Instruments Using Mechanical Means (AREA)

Abstract

Halter für die Aufmessung von Bauwerksecken, dadurch gekennzeichnet, dass ein Winkelhalter aus zwei Grundplatten (1) besteht, die jeweils an einem Ende mit einem Scharnier (3) vertikal versetzt miteinander drehbar verbunden sind, dass an einem Ende des Scharniers (3) eine Aufnahme (4) für ein Reflektorprisma angebracht ist, dass die Grundplatten (1) je eine rechtwinklig auf diesen stehende Aufnahme (2) für verschiebbare Führungsstifte (6) besitzen und dass an den Enden der Führungsstifte (6) jeweils eine Anlegeplatte (5) rechtwinklig befestigt ist.Holder for the measurement of building corners, characterized in that an angle holder consists of two base plates (1), each of which is rotatably connected to one another at one end with a hinge (3), and that at one end of the hinge (3) a receptacle (4) is attached for a reflector prism, that the base plates (1) each have a receptacle (2) standing on them at right angles for displaceable guide pins (6) and that at the ends of the guide pins (6) each has a contact plate (5) attached at right angles is.

Description

Die Neuerung betrifft einen Halter zur Simulation und Aufmessung von Bauwerksecken von Gebäuden.The innovation concerns a holder for simulation and measurement of building corners of buildings.

Stand der TechnikState of the art

Neu errichtete Bauwerke, wie zum Beispiel Gebäude, werden noch in der Bauphase durch Vermessung kontrolliert (Sockelabnahme). Die Ergebnisse dieser Vermessung geben der Baubehörde Aufschluss, ob das Bauwerk nach Lage und Höhe entsprechend der Baugenehmigung entsteht. Die Bauwerksecken befinden sich in dieser Phase noch im Rohbauzustand. Es fehlt demnach die Außenhaut, wie Dämmung, Putz oder Klinker.Newly built structures, such as buildings, are still under construction during construction (pedestal acceptance). The results of this survey provide information to the building authority as to whether the building will be constructed according to location and height in accordance with the building permit. The building corners are still in their shell during this phase. It therefore lacks the outer skin, such as insulation, plaster or clinker.

Nach der Fertigstellung des Bauwerkes mit der Außenhaut ist eine zweite Vermessung notwendig (Gebäudeeinmessung). Die Ergebnisse dieser Vermessung werden im zuständigen Katasteramt eingereicht, und führen zur Übernahme des Bauwerkes in die automatisierte Liegenschaftskarte (ALK).After the completion of the building with the outer skin, a second measurement is necessary (building survey). The results of this survey are submitted to the responsible land registry office and lead to the takeover of the building into the automated real estate map (ALK).

Die Aufmessung der Bauwerksecken erfolgt mit elektrooptischen Tachymetern deren Messstrahl in einem Prisma reflektiert wird. Das Prisma wird dazu im rechten Winkel zum Tachymeter zeigend an die Bauwerksecke gehalten.The measurement of the building corners is done with electro-optical tachymeters whose measuring beam is reflected in a prism. The prism is held at a right angle to the tachymeter pointing to the building corner.

Die obige Vorgehensweise erfordert mindestens eine zweifache Vermessung und ist deshalb aufwendig. Außerdem ist eine exakte Halterung des Prismas an der Bauwerksecke bisher nicht gegeben.The above procedure requires at least a double measurement and is therefore expensive. In addition, an exact support of the prism on the building corner is not given.

In der DE 10119884A1 wird zur Vermessung von Kanalschächten der Einsatz eines Messhutes vorgeschlagen, der auf einem Kanalschacht absetzbar ist. Damit kann die genaue Position des Kanalschachtes bestimmt werden. Weiterhin wird ein Bezugspunkt zur weiteren Vermessung des Kanals geschaffen. Der Messhut ist für die Vermessung von Bauwerken nicht geeignet.In the DE 10119884A1 For the measurement of manhole shafts the use of a measuring hat is proposed, which is deductible on a manhole. Thus, the exact position of the manhole can be determined. Furthermore, a reference point for further measurement of the channel is created. The measuring hat is not suitable for the measurement of buildings.

Aufgabe der NeuerungTask of innovation

Aufgabe der Neuerung ist es, eine Halterung zu schaffen, die das Simulieren von Bauwerksecken ermöglicht, um die beiden Vermessungsvorgänge (Sockelabnahme und Gebäudeeinmessung) zusammenzufassen. Eine weitere Aufgabe ist die Anpassung des Halters an unterschiedliche Eckenausbildungen und Außenhautdicken zu ermöglichen.The object of the innovation is to create a fixture that allows the simulation of building corners to summarize the two surveying operations (base acceptance and building survey). A further object is the adaptation of the holder to different corner configurations and outer skin thicknesses.

Gelöst wird diese Aufgabe durch die Merkmale des Anspruchs eins.This object is achieved by the features of claim one.

Danach ist ein Halter als Winkelhalter ausgebildet und besteht aus zwei Grundplatten (1), die jeweils an einem Ende mit einem Scharnier (3) vertikal versetzt, miteinander drehbar verbunden sind. An einem Ende des Scharniers (3) ist eine Aufnahme (4) für ein Reflektorprisma angebracht. Die Grundplatten (1) besitzen je eine rechtwinklig auf diesen stehende Aufnahme (2) für verschiebbare Führungsstifte (6). An den Enden der Führungsstifte (6) ist jeweils eine Anlegeplatte (5) rechtwinklig befestigt.Thereafter, a holder is formed as an angle holder and consists of two base plates ( 1 ), each at one end with a hinge ( 3 ) Vertically offset, are rotatably connected to each other. At one end of the hinge ( 3 ) is a recording ( 4 ) for a reflector prism. The base plates ( 1 ) each have a perpendicular to this standing recording ( 2 ) for displaceable guide pins ( 6 ). At the ends of the guide pins ( 6 ) is in each case an attachment plate ( 5 ) fixed at right angles.

Die Vorrichtung ermöglicht, alle Abstandsmaße zwischen Rohbauwand (7) und Fertigwand (8) zu simulieren und kann dabei auch auf unterschiedliche Außenhautmaße zweier aufeinander treffender Wände eingestellt werden. Durch die gegeneinander drehbare Lagerung der beiden Grundplatten (1) können auch Bauwerksecken die nicht rechtwinklig sind, simuliert werden.The device makes it possible to measure all distances between shell wall ( 7 ) and finished wall ( 8th ) and can also be adjusted to different outer skin dimensions of two walls meeting each other. Due to the mutually rotatable mounting of the two base plates ( 1 ) can also be simulated building corners that are not rectangular.

Gemäß Anspruch 2 sind die Führungsstifte (6) mit einer Skala versehen, und stufenlos feststellbar oder einrastbar in den Führungen (2) gelagert.According to claim 2, the guide pins ( 6 ) with a scale, and infinitely lockable or latched in the guides ( 2 ) stored.

Durch die auf den verschiebbaren Führungsstiften (6) aufgebrachte Skala sind die Abstandsmaße exakt einstellbar.By the on the sliding guide pins ( 6 ) applied scale, the distance dimensions are precisely adjustable.

Nach Anspruch 3 sind die Grundplatten (1), die Führungen (2), die Führungsstifte (6) und die Anlegeplatten (5) unterschiedlich groß und bestehen aus Metall oder Kunststoff. Die Kombination verschiedener Größen und Materialien ermöglicht eine Anpassung des Winkelhalters an die zu vermessenden Gebäude.According to claim 3, the base plates ( 1 ), the guides ( 2 ), the guide pins ( 6 ) and the mounting plates ( 5 ) of different sizes and made of metal or plastic. The combination of different sizes and materials allows the angle bracket to be adapted to the buildings to be measured.

Gemäß einer bevorzugten Ausführung nach den Ansprüchen 4 und 5 ist das Scharnier (3) mit den beiden Grundplatten (1) mittig im Schnittpunkt der beiden Außenseiten verbunden. Die Halterung für ein Reflektorprisma ist zentrisch auf einem Ende des Scharniers angebracht.According to a preferred embodiment according to claims 4 and 5, the hinge ( 3 ) with the two base plates ( 1 ) connected in the middle of the intersection of the two outer sides. The holder for a reflector prism is mounted centrally on one end of the hinge.

Durch diesen Aufbau verläuft die Winkelhalbierende der Bauwerksecke beim Anhalten immer durch den Mittelpunkt des Reflektorprismas, so dass die simulierte Bauwerksecke immer an der richtigen Stelle angemessen wird.By this construction, the bisecting line of the building corner always runs through the center of the reflector prism when stopping, so that the simulated building corner is always in the right place appropriate.

BeispieleExamples

Nachfolgend soll die Neuerung an einem Ausführungsbeispiel näher erläutert werden.The novelty of an embodiment will be explained in more detail below.

1 zeigt eine räumliche Ansicht des Winkelhalters, 1 shows a spatial view of the angle holder,

2 zeigt in der Draufsicht die Anordnung von zwei Winkelhaltern zum Einmessen. 2 shows in plan view the arrangement of two angle holders for measuring.

Der Winkelhalter besteht aus zwei rechteckigen Grundplatten 1 aus Metall. Diese sind an jeweils einer kurzen Außenkante der Grundplatte 1 mit einem Scharnier 3 unabhängig voneinander fest verbunden. Dabei sind diese übereinander angeordnet. Das ermöglicht einen Schwenkradius der Grundplatten 1 zueinander von 0° bis 360°. Die Ausbildung des Scharniers 3 ist nicht näher dargestellt. Es kann z. B. aus zwei Rohre mit einer darin durchgehenden Achse bestehen. In dieser Ausführung ist je eine Kante der Grundplatten 1 mit je einem Rohr verschweißt. Dabei liegt die Mittellinie der Achse in einer Ebene mit einer Außenfläche der Grundplatte 1.The angle holder consists of two rectangular base plates 1 made of metal. These are on each a short outer edge of the base plate 1 with a hinge 3 independently connected. They are arranged one above the other. This allows a swing radius of the base plates 1 to each other from 0 ° to 360 °. The training of the hinge 3 is not shown in detail. It can, for. B. consist of two tubes with a continuous axis. In this embodiment, one edge of each of the base plates 1 welded with one pipe each. In this case, the center line of the axis lies in a plane with an outer surface of the base plate 1 ,

Die Aufnahme 4 für einen Reflektor ist auf dem oberen Ende der Achse befestigt. Die simulierte Ecke des fertigen Bauwerkes endet dadurch in der Mittellinie der Achse. Der Reflektor ist damit genau der simulierten Ecke zugeordnet.The recording 4 for a reflector is mounted on the upper end of the axle. The simulated corner of the finished structure ends up in the center line of the axle. The reflector is thus assigned exactly to the simulated corner.

In den Grundplatten 1 ist jeweils rechtwinklig zur großen Fläche ein Rohr als Führung 2 für einen Führungsstift 6 befestigt. Der Führungsstift 6 trägt am Ende eine Anlageplatte 5. Mit einer nicht dargestellten Klemmeinrichtung kann die Position des Führungsstiftes 6 in der Führung 2 nach der Einstellung des Abstandes festgesetzt werden.In the base plates 1 is perpendicular to the large area a pipe as a guide 2 for a guide pin 6 attached. The guide pin 6 carries at the end of an investment plate 5 , With a clamping device, not shown, the position of the guide pin 6 in the lead 2 be set after setting the distance.

Den Einsatz des Winkelhalters zeigt 2. Ein erster Winkelhalter ist an einer Außenecke der Rohbauwand 7 angebracht. Der zweite Winkelhalter ist durch Verschwenken der Grundplatten 1 einer Innenecke zugeordnet. Die Verbindungslinie zwischen den Mittellinien der Achsen, bzw. der auf diesen angeordneten Reflektorprismen liegt dann auf der Ebene der zukünftigen Fertigwand 8.The use of the angle holder shows 2 , A first angle holder is at an outer corner of the shell wall 7 appropriate. The second angle holder is by pivoting the base plates 1 assigned to an inner corner. The connecting line between the center lines of the axes, or the reflector prisms arranged on these then lies on the level of the future finished wall 8th ,

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Grundplattebaseplate
22
Führungguide
33
Scharnierhinge
44
Aufnahmeadmission
55
Anlageplattebearing plate
66
Führungsstifteguide pins
77
Rohbauwandinternal construction
88th
FertigwandPrefabricated wall

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 10119884 A1 [0006] DE 10119884 A1 [0006]

Claims (5)

Halter für die Aufmessung von Bauwerksecken, dadurch gekennzeichnet, dass ein Winkelhalter aus zwei Grundplatten (1) besteht, die jeweils an einem Ende mit einem Scharnier (3) vertikal versetzt miteinander drehbar verbunden sind, dass an einem Ende des Scharniers (3) eine Aufnahme (4) für ein Reflektorprisma angebracht ist, dass die Grundplatten (1) je eine rechtwinklig auf diesen stehende Aufnahme (2) für verschiebbare Führungsstifte (6) besitzen und dass an den Enden der Führungsstifte (6) jeweils eine Anlegeplatte (5) rechtwinklig befestigt ist.Holder for the measurement of building corners, characterized in that an angle holder consists of two base plates ( 1 ), each at one end with a hinge ( 3 ) are vertically offset with each other rotatably connected to each other at one end of the hinge ( 3 ) a recording ( 4 ) is mounted for a reflector prism that the base plates ( 1 ) one at a time perpendicular to this recording ( 2 ) for displaceable guide pins ( 6 ) and that at the ends of the guide pins ( 6 ) each a landing plate ( 5 ) is fixed at right angles. Halter nach Anspruch 1, dadurch gekennzeichnet, dass die Führungsstifte (6) mit einer Skala versehen sind, und stufenlos feststellbar oder einrastbar in den Führungen (2) gelagert sind.Holder according to claim 1, characterized in that the guide pins ( 6 ) are provided with a scale, and continuously lockable or latched in the guides ( 2 ) are stored. Halter nach Anspruch 1, dadurch gekennzeichnet, dass die Grundplatten (2), die Führungen (2), die Führungsstifte (6) und die Anlegeplatten (5) unterschiedlich groß und aus Metall oder Kunststoff bestehen.Holder according to claim 1, characterized in that the base plates ( 2 ), the guides ( 2 ), the guide pins ( 6 ) and the mounting plates ( 5 ) of different sizes and made of metal or plastic. Halter nach Anspruch 1, dadurch gekennzeichnet, dass das Scharnier (3) mit den beiden Grundplatten (1) mittig im Schnittpunkt der beiden Außenseiten verbunden ist.Holder according to claim 1, characterized in that the hinge ( 3 ) with the two base plates ( 1 ) is centrally connected at the intersection of the two outer sides. Halter nach Anspruch 1, dadurch gekennzeichnet, dass eine Halterung für ein Reflektorprisma zentrisch auf einem Ende des Scharniers angebracht ist.Holder according to claim 1, characterized in that a holder for a reflector prism is mounted centrally on one end of the hinge.
DE201120105791 2011-09-16 2011-09-16 Holder for the measurement of building corners Expired - Lifetime DE202011105791U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE201120105791 DE202011105791U1 (en) 2011-09-16 2011-09-16 Holder for the measurement of building corners

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE201120105791 DE202011105791U1 (en) 2011-09-16 2011-09-16 Holder for the measurement of building corners

Publications (1)

Publication Number Publication Date
DE202011105791U1 true DE202011105791U1 (en) 2011-12-01

Family

ID=45443953

Family Applications (1)

Application Number Title Priority Date Filing Date
DE201120105791 Expired - Lifetime DE202011105791U1 (en) 2011-09-16 2011-09-16 Holder for the measurement of building corners

Country Status (1)

Country Link
DE (1) DE202011105791U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116907460A (en) * 2023-09-14 2023-10-20 普檩建筑装饰工程设计(北京)有限公司 Fabricated building corner positioning monitoring device and application method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10119884A1 (en) 2001-04-24 2002-10-31 Mueller Umwelttechnik Surveying cap for surveying sewer/drain shafts/gully holes moves over a shaft/shaft cover using a position-recording system to record position coordinates for the surveying cap

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10119884A1 (en) 2001-04-24 2002-10-31 Mueller Umwelttechnik Surveying cap for surveying sewer/drain shafts/gully holes moves over a shaft/shaft cover using a position-recording system to record position coordinates for the surveying cap

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116907460A (en) * 2023-09-14 2023-10-20 普檩建筑装饰工程设计(北京)有限公司 Fabricated building corner positioning monitoring device and application method thereof
CN116907460B (en) * 2023-09-14 2023-11-14 普檩建筑装饰工程设计(北京)有限公司 Fabricated building corner positioning monitoring device and application method thereof

Similar Documents

Publication Publication Date Title
DE19545589C2 (en) Method and device for measuring and marking
DE102009002756B3 (en) Laser instrument mounting, at walls/ceilings for leveling/marking applications, has magnetic and tube adapter and wall fasteners each with two positions for the laser
DE202016103584U1 (en) Device for calibrating an environmental sensor integrated into the windshield of a vehicle
DE202015008954U1 (en) Device for calibrating vehicle assistance systems
DE202011105791U1 (en) Holder for the measurement of building corners
DE202015102237U1 (en) Measuring device for measuring the consistency of mortar
DE102010000552A1 (en) Optical measuring device for checking vertical position of e.g. tower of wind-power plant, of building, has camera including image sensor that lies in pivoting plane for receiving images of portion of building or strobe arrangement
DE102017007008A1 (en) Test device and method for testing and / or setting a proper installation position of a control arm in a vehicle
CH544361A (en) Method for producing a full-scale model of a roadway and attachment support for carrying out the method
DE102008062348A1 (en) Circular drill guidance device for installation of hollow wall box in building site for electrical installation, has support frame with perforations for guidance of circle drill, and holes for receiving fixing screws
DE102007050996A1 (en) Marking and / or leveling device, system and method
DE202015102236U1 (en) Measuring device for measuring the consistency of mortar
DE102014015442B4 (en) Method for setting guide wire carriers and setting device
DE3147772A1 (en) Transportable measuring device for the optical measurement of pipe bends
DE10343118B4 (en) Device as target plate and method for geodetic measurement
DE102016211618A1 (en) A surface flatness display method and apparatus
DE2717559A1 (en) TOPOMETRIC REFERENCE MARK
DE2517609A1 (en) Holder for geodetic instruments for railway surveying - can be adjusted vertically and horizontally on masts and mast foundations
DE102010014523A1 (en) Measuring device for controlling hinged-type alignment between hinges of door hinge pairs of e.g. motor vehicle, has light source emitting light to be directed along hinge axle of hinge in direction of another hinge
DE424040C (en) Sighting device
DE202015105834U1 (en) Device for connecting a mast to a mast base
DE818428C (en) Device for performing geometric constructions on the spherical surface
DE102017201387A1 (en) Marking device and method for marking
CH327775A (en) Measuring device
DE102019122433A1 (en) Cover device

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20120126

R156 Lapse of ip right after 3 years
R156 Lapse of ip right after 3 years

Effective date: 20150401