DE102019004932A1 - Process for the control and regulation of electrical energy flows - Google Patents
Process for the control and regulation of electrical energy flows Download PDFInfo
- Publication number
- DE102019004932A1 DE102019004932A1 DE102019004932.2A DE102019004932A DE102019004932A1 DE 102019004932 A1 DE102019004932 A1 DE 102019004932A1 DE 102019004932 A DE102019004932 A DE 102019004932A DE 102019004932 A1 DE102019004932 A1 DE 102019004932A1
- Authority
- DE
- Germany
- Prior art keywords
- energy
- rechargeable
- consumer
- consumers
- consumer group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/35—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J4/00—Circuit arrangements for mains or distribution networks not specified as ac or dc
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/30—The power source being a fuel cell
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/40—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation wherein a plurality of decentralised, dispersed or local energy generation technologies are operated simultaneously
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/58—The condition being electrical
- H02J2310/60—Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Vorgeschlagen wird ein Verfahren zur Steuerung und Regelung von elektrischen Energieströmen bei dem eine Soll-Energieanforderung sekundärseitiger Verbraucher ermittelt wird, ein Ist-Energieangebot primärseitiger Energielieferanten mit zumindest einer Motor-Generatoreinheit (1) sowie einem wiederaufladbaren Energiespeicher (3) erfasst wird und von einem Energiemanager (6) die primärseitigen Energielieferanten zur Soll-Istanpassung freigeschaltet werden. Die Erfindung ist dadurch gekennzeichnet, dass die sekundärseitigen Verbraucher entsprechend ihres Energiebedarfs in Verbrauchergruppen eingeteilt werden, bei einer Soll-Energieanforderung in Abhängigkeit der Verbrauchergruppenzugehörigkeit vom Energiemanager (6) ein Singulärbetrieb, ein Mischbetrieb und/oder ein Staffelbetrieb gesetzt werden, wobei im Singulärbetrieb der wiederaufladbarer Energiespeicher (3) als alleiniger Energielieferant für eine erste Verbrauchergruppe gesetzt wird, im Mischbetrieb der wiederaufladbare Energiespeicher (3) und eine weitere Energiequelle als Energielieferanten für eine zweite Verbrauchergruppe gesetzt werden und im Staffelbetrieb der wiederaufladbare Energiespeicher (3) und eine weitere Energiequelle als Energielieferanten bei zeitversetzten Einschalten der Verbraucher einer dritten Verbrauchergruppe gesetzt werden.The proposal is for a method for controlling and regulating electrical energy flows in which a target energy requirement from secondary consumers is determined, an actual energy supply from primary energy suppliers with at least one motor generator unit (1) and a rechargeable energy store (3) is recorded and by an energy manager (6) the primary-side energy suppliers are activated for the target / actual adjustment. The invention is characterized in that the consumers on the secondary side are divided into consumer groups according to their energy requirements, with a target energy request depending on the consumer group affiliation by the energy manager (6), a single operation, a mixed operation and / or a staggered operation are set, with the rechargeable in single operation Energy storage (3) is set as the sole energy supplier for a first consumer group, in mixed operation the rechargeable energy storage (3) and another energy source are used as energy suppliers for a second consumer group, and in staggered operation the rechargeable energy storage (3) and another energy source are used as energy suppliers delayed switching on of the consumers of a third consumer group can be set.
Description
Die Erfindung betrifft ein Verfahren zur Steuerung und Regelung von elektrischen Energieströmen, bei dem eine Soll-Energieanforderung sekundärseitiger Verbraucher ermittelt wird, ein Ist-Energieangebot primärseitiger Energielieferanten erfasst wird und von einem Energiemanager die primärseitigen Energielieferanten zur Soll-Istanpassung freigeschaltet werden.The invention relates to a method for controlling and regulating electrical energy flows, in which a target energy requirement from secondary consumers is determined, an actual energy supply from primary energy suppliers is recorded, and the primary energy suppliers are activated by an energy manager for the target actual adjustment.
Aus der
Der Erfindung liegt daher die Aufgabe zugrunde, ein Verfahren zur Steuerung und Regelung von elektrischen Energieströmen hinsichtlich einer Berücksichtigung von sekundärseitigen Verbrauchern zu entwickeln.The invention is therefore based on the object of developing a method for controlling and regulating electrical energy flows with regard to taking into account consumers on the secondary side.
Gelöst wird diese Aufgabe durch die Merkmale von Anspruch 1. Die Ausgestaltungen sind in den Unteransprüchen dargestellt.This object is achieved by the features of
Das Verfahren nach der Erfindung besteht darin, dass die sekundärseitigen Verbraucher entsprechend ihres Energiebedarfs in Verbrauchergruppen eingeteilt werden und bei einer Soll-Energieanforderung vom Energiemanager in Abhängigkeit der Verbrauchergruppenzugehörigkeit ein Singulär-, ein Misch- und/oder ein Staffelbetrieb gesetzt wird. Beim Singulärbetrieb wird der wiederaufladbare Energiespeicher als alleiniger Energielieferant für eine erste Verbrauchergruppe gesetzt. In der ersten Verbrauchergruppe sind daher die Einrichtungen zusammengefasst, welche permanent elektrische Energie benötigen. Beispielsweise bei einer Schiffsanwendung sind dies die Schiffs- und Propellerautomation. Beim Mischbetrieb werden der wiederaufladbare Energiespeicher und eine weitere Energiequelle, beispielsweise eine Motor-Generatoreinheit oder Windkraftanlage, als Energielieferanten für eine zweite Verbrauchergruppe gesetzt. Beim Staffelbetrieb werden der wiederaufladbare Energiespeicher und eine weitere Energiequelle als Energielieferanten bei zeitversetztem Einschalten der Verbraucher einer dritten Verbrauchergruppe gesetzt. Zentrales Element der Erfindung ist die vorrangige Verwendung des wiederaufladbaren Energiespeichers als Energiequelle. Von Vorteil ist eine nochmals verringerte Anzahl von Motor-Generatoreinheiten mit einer entsprechenden Kraftstoffreduktion. In ruhigeren Lastzeiten übernimmt die Motor-Generatoreinheit das Nachladen des wiederaufladbaren Energiespeichers zur Vorbereitung auf höherer Lastzeiten.The method according to the invention consists in that the secondary-side consumers are divided into consumer groups according to their energy requirements and, when a target energy request is made, the energy manager sets a single, mixed and / or staggered operation depending on the consumer group affiliation. In the case of single operation, the rechargeable energy store is set as the sole energy supplier for a first consumer group. The first consumer group therefore includes the devices that permanently require electrical energy. For example, in a ship application, these are ship and propeller automation. In mixed operation, the rechargeable energy store and another energy source, for example a motor-generator unit or wind turbine, are set as energy suppliers for a second consumer group. In staggered operation, the rechargeable energy store and a further energy source are set as energy suppliers when the consumers of a third consumer group are switched on with a delay. The central element of the invention is the primary use of the rechargeable energy store as an energy source. A further reduced number of motor-generator units with a corresponding reduction in fuel is advantageous. In quieter load times, the motor-generator unit takes over the reloading of the rechargeable energy store in preparation for higher load times.
Zur Verhinderung einer Tiefentladung des wiederaufladbaren Energiespeichers wird dessen Ist-Energieangebot mit einem Grenzwert verglichen. So wird im Singulärbetrieb bei einer Grenzwertunterschreitung der wiederaufladbare Energiespeicher von der Motor-Generatoreinheit nachgeladen. Im Mischbetrieb wird bei einer Grenzwertunterschreitung auf eine weitere Energiequelle, beispielsweise eine Brennstoffzelle, umgeschaltet. Im Staffelbetrieb erhalten bei einer Grenzwertunterschreitung die Verbraucher der dritten Verbrauchergruppe zeitlich nacheinander die Energie. Der Grenzwert wiederum kann variabel ausgestaltet sein, so kann beispielsweise aufgrund der Wetterdaten und einer Schönwetterperiode eine Photovoltaik-Anlage einen höheren Energiebeitrag zum Wiederaufladen des wiederaufladbaren Energiespeichers beitragen.To prevent deep discharge of the rechargeable energy store, its actual energy supply is compared with a limit value. In single mode, the rechargeable energy store is recharged by the motor-generator unit if the value falls below the limit. In mixed operation, if the value falls below the limit, a switch is made to a further energy source, for example a fuel cell. In staggered operation, the consumers of the third consumer group receive the energy one after the other when the limit value is undershot. The limit value, in turn, can be designed to be variable, for example, based on the weather data and a period of good weather, a photovoltaic system can make a higher energy contribution to recharging the rechargeable energy store.
In einer Ergänzung ist vorgesehen, dass die geräteindividuellen Leistungsdaten der Verbraucher im Neuzustand eingelesen werden und deren zeitliche Veränderungen erfasst werden, wodurch eine vorausschauende Wartung ermöglich wird.In an addition, it is provided that the device-specific performance data of the consumers are read in when they are new and their changes over time are recorded, which enables predictive maintenance.
Im wiederaufladbaren Energiespeicher wird die Energie aller primärseitigen Energiequellen gesammelt, insofern regelt sich das System über den Energiehaushalt des wiederaufladbaren Energiespeichers selbst. Über den Energiemanager wiederum wird die so gesammelt Energie in Abhängigkeit der Verbrauchergruppenzugehörigkeit bei Anforderung verteilt. Hieraus resultieren ein harmonisches Energiebild und eine hohe Transparenz der Energieströme. Bei einem bereits bestehenden System kann der Energiemanager als softwarebasierte Lösung nachträglich appliziert werden. Bei sicherheitskritischen Anlagen kann der Energiemanager auch als deterministische Komponente, beispielsweise als speicherprogrammierbare Steuerung, ausgeführt sein.The energy from all primary-side energy sources is collected in the rechargeable energy store, so the system regulates itself via the energy balance of the rechargeable energy store. The energy manager in turn distributes the energy collected in this way depending on the consumer group when requested. This results in a harmonious energy image and a high degree of transparency in the energy flows. In an already existing system, the energy manager can be applied as a software-based solution at a later date. At For safety-critical systems, the energy manager can also be designed as a deterministic component, for example as a programmable logic controller.
In den Figuren ist ein bevorzugtes Ausführungsbeispiel dargestellt. Es zeigen:
-
1 ein Systemschaubild, -
2 einen Programm-Ablaufplan des Hauptprogramms und -
3A, B ,C Unterprogramme
-
1 a system diagram, -
2 a program flow chart of the main program and -
3A, B ,C. Subroutines
Die
Die
Die weitere Beschreibung erfolgt zunächst für den Fall, dass eine Energieanforderung aus der Verbrauchergruppe
In der
In der
In der
Bei S1 wird der Staffelbetrieb gesetzt, danach bei S2 der Ladezustand E(IST) des wiederaufladbaren Energiespeichers eingelesen und bei S3 mit einem Grenzwert GW verglichen. Ist dieser größer als der Grenzwert GW, so wird der Programmteil mit den Schritten S8 und S9 durchlaufen. Wurde hingegen bei S3 festgestellt, dass der Ladezustand E(IST) des wiederaufladbaren Energiespeichers nicht ausreicht, so wird bei S4 eine Wartezeit t1 abgefragt. Die Wartezeit t1 entspricht einer maximalen Wartezeit, nach deren Ablauf der Verbraucher zwingend aktiviert werden muss, beispielsweise nach fünf Minuten. Ist diese Wartezeit t1 abgelaufen, Abfrageergebnis S4: ja, und wurde bei S3 festgestellt, dass der Ladezustand E(IST) des wiederaufladbaren Energiespeichers kleiner als der Grenzwert GW ist, so wird bei S5 auf eine andere Energiequelle umgeschaltet und bei S6 die Energie an den Verbraucher freigeschaltet. Wurde bei S4 festgestellt, dass die Wartezeit t1 noch nicht abgelaufen ist, Abfrageergebnis S4: nein, wird bei S7 auf Zustimmung geprüft. Zustimmung bedeutet folgendes: Stellt ein Verbraucher aufgrund seiner eigenen Sensorik einen unmittelbaren Handlungsbedarf fest, so kann er die Zustimmung zum Warten oder zum zeitversetzten Betrieb entziehen. In diesem Fall wird vom Energiemanager der Verbraucher sofort freigeschaltet. Stellt der Verbraucher hingegen keinen unmittelbaren Handlungsbedarf fest, so erteilt er seine Zustimmung zum Staffelbetrieb. Ergänzend verhindert die Abfrage S7, dass der wiederaufladbare Energiespeicher aufgrund einer parallelen Energieversorgung tiefentladen werden kann. Erfolgt die Zustimmung zum Warten, Abfrageergebnis S7: ja, so verzweigt der Programm-Ablaufplan zum Punkt E zurück. Anderenfalls wird zum Punkt F verzweigt und bei S5 auf eine andere Energiequelle umgeschaltet. Danach wird bei S6 die Energie für den Verbraucher freigegeben und in das Haupt-Programm der
Wurde bei S3 festgestellt, dass der Ladezustand E(IST) des wiederaufladbaren Energiespeichers größer als der Grenzwert GW ist, wird bei S8 eine Zeitstufe t2 als Wartezeit abgefragt. Die Zeitstufe t2 dient zur Vermeidung von Lastspitzen, das heißt, wenn mehrere Verbraucher gleichzeitig eine Soll-Energieanforderung setzen. Ist die Zeitstufe t2 abgelaufen, so wird der anfordernde Verbraucher bei S6 mit Energie versorgt. Läuft hingegen die Zeitstufe t2 noch, Abfrageergebnis S8: nein, so wird bei S9 auf Zustimmung geprüft. Inhaltlich entspricht der Schritt S9 dem Schritt S7, so dass die vorherige Beschreibung auch hier gilt. Bei einer Zustimmung zum Warten, Abfrageergebnis S9: ja, verzweigt der Programm-Ablaufplan zurück zum Punkt E. Anderenfalls wird bei S6 die Energie für den Verbraucher freigeschaltet und in das Haupt-Programm der
BezugszeichenlisteList of reference symbols
- 11
- Motor-GeneratoreinheitMotor generator unit
- 22
- WindkraftanlageWind turbine
- 33
- wiederaufladbarer Energiespeicherrechargeable energy storage
- 44th
- PhotovoltaikanlagePhotovoltaic system
- 55
- BrennstoffzelleFuel cell
- 66th
- EnergiemanagerEnergy manager
- 77th
- Datenbus (CAN)Data bus (CAN)
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDED IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant was generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.
Zitierte PatentliteraturPatent literature cited
- US 2015/0097437 A1 [0002]US 2015/0097437 A1 [0002]
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102019004932.2A DE102019004932A1 (en) | 2019-07-15 | 2019-07-15 | Process for the control and regulation of electrical energy flows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102019004932.2A DE102019004932A1 (en) | 2019-07-15 | 2019-07-15 | Process for the control and regulation of electrical energy flows |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102019004932A1 true DE102019004932A1 (en) | 2021-01-21 |
Family
ID=74093827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102019004932.2A Pending DE102019004932A1 (en) | 2019-07-15 | 2019-07-15 | Process for the control and regulation of electrical energy flows |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102019004932A1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19838248A1 (en) * | 1998-08-22 | 2000-03-02 | Volkswagen Ag | Process for controlling electrical consumers |
DE10104892A1 (en) * | 2001-02-01 | 2002-08-14 | Siemens Ag | Ship Electric System |
DE202009015027U1 (en) * | 2009-11-04 | 2010-02-18 | Fischer Panda Gmbh | Device for controlling a vehicle |
US20150097437A1 (en) * | 2013-10-03 | 2015-04-09 | Caterpillar Inc. | System and Method for Increasing Efficiency of Gensets in Micro-Grid Systems |
-
2019
- 2019-07-15 DE DE102019004932.2A patent/DE102019004932A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19838248A1 (en) * | 1998-08-22 | 2000-03-02 | Volkswagen Ag | Process for controlling electrical consumers |
DE10104892A1 (en) * | 2001-02-01 | 2002-08-14 | Siemens Ag | Ship Electric System |
DE202009015027U1 (en) * | 2009-11-04 | 2010-02-18 | Fischer Panda Gmbh | Device for controlling a vehicle |
US20150097437A1 (en) * | 2013-10-03 | 2015-04-09 | Caterpillar Inc. | System and Method for Increasing Efficiency of Gensets in Micro-Grid Systems |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102005029081B4 (en) | Vehicle electrical system for a motor vehicle and method for operating such a vehicle electrical system | |
DE102019206186A1 (en) | Electric vehicle reservation charging system and method | |
DE102012216729A1 (en) | System and method for managing electrical loads in a vehicle | |
DE102011089085A1 (en) | Method and device for power management of an electric drive for a hybrid vehicle | |
DE102004044646A1 (en) | Fuel cell system for aircraft power supply has fuel cell module connected to electrical energy distributor and with engine starter generator without further generators | |
DE202015009281U1 (en) | Electric load management | |
WO2005028258A1 (en) | Method for energy management | |
DE102017212320A1 (en) | Electrical wiring system for motor vehicles with a converter and a high load consumer | |
EP1929607A2 (en) | Energy management system for a motor vehicle | |
DE102019219111A1 (en) | Method for operating a data center on an electrical network and data center for carrying out such a method | |
DE102005002401A1 (en) | Arrangement and method for regulating power in a motor vehicle electrical system | |
DE102018213862A1 (en) | Methods of controlling an exchange of energy between energy subsystems on equal terms; Control center; Energy system; Computer program and storage medium | |
DE102021100213A1 (en) | System and method for managing the energy supply of a transport vehicle and the corresponding transport vehicle | |
WO2013131556A1 (en) | Method and device for the energy-efficient control of a plant | |
DE102019004932A1 (en) | Process for the control and regulation of electrical energy flows | |
DE102008019683A1 (en) | Rail vehicle and method for reducing the fuel consumption of a rail vehicle | |
DE102011080598B4 (en) | Method for adjusting the power consumption of a plurality of electrical consumers in an on-board power system of a motor vehicle | |
DE102012101586A1 (en) | Vehicle device for supplying electric power and system for supplying electric power | |
EP3506028A1 (en) | System and method for energy supply to a comsumer | |
DE10145514A1 (en) | Operating vehicle with energy storage device, involves regulating energy source and/or charging of energy storage device depending on journey stage(s), e.g. to provide required energy | |
DE102017212659A1 (en) | Method for operating an electrical overall on-board network, control unit and motor vehicle | |
DE102008040696A1 (en) | Generator output voltage regulating method for motor vehicle, involves regulating charge condition value of battery of motor vehicle to preset charge condition value by battery regulator | |
DE102020203853A1 (en) | Method for controlling an energy system and associated device | |
DE102019212762A1 (en) | Method for determining a power share, operating method, control unit, energy storage arrangement and power grid | |
DE102019103416A1 (en) | Method and control device for controlling power electronics for peak shaving control as well as electrical energy storage system and electrical installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R079 | Amendment of ipc main class |
Free format text: PREVIOUS MAIN CLASS: H02J0003000000 Ipc: H02J0004000000 |
|
R016 | Response to examination communication | ||
R081 | Change of applicant/patentee |
Owner name: ROLLS-ROYCE SOLUTIONS GMBH, DE Free format text: FORMER OWNER: MTU FRIEDRICHSHAFEN GMBH, 88045 FRIEDRICHSHAFEN, DE |