CN85103861A - Semi-submerged type multi-function recreation boat - Google Patents

Semi-submerged type multi-function recreation boat Download PDF

Info

Publication number
CN85103861A
CN85103861A CN 85103861 CN85103861A CN85103861A CN 85103861 A CN85103861 A CN 85103861A CN 85103861 CN85103861 CN 85103861 CN 85103861 A CN85103861 A CN 85103861A CN 85103861 A CN85103861 A CN 85103861A
Authority
CN
China
Prior art keywords
amusement
tube
ship
ladder
buoyancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 85103861
Other languages
Chinese (zh)
Other versions
CN85103861B (en
Inventor
古飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN85103861A priority Critical patent/CN85103861B/en
Publication of CN85103861A publication Critical patent/CN85103861A/en
Publication of CN85103861B publication Critical patent/CN85103861B/en
Expired legal-status Critical Current

Links

Images

Landscapes

  • Farming Of Fish And Shellfish (AREA)
  • Sewage (AREA)

Abstract

A kind of semi-submerged type multi-function recreation boat that relates to recreational vessel, be a part of recreation facility under water, a part of recreation facility on the water surface based on tourist recreation, having that teaching is visited and the recreational vessel of multiple functions such as aquaculture.It can be divided into three layers, and there is buoyant cabin in lower floor, drinking water surge bunker and the underway that has picture window, and the outside is connected with illuminating lamp and promotes submersible machine.The middle level is the swimming pool and the canoe parking pool of the safety that directly communicates with the waters.The upper strata is provided with the ascend a height building and the service work hall of artistic profile, has between three layers to strengthen supporting and the tube ladder.

Description

Semi-submerged type multi-function recreation boat
The present invention relates to a kind of recreational vessel, relate more specifically to a kind of semi-submerged type multi-function recreation boat of the swimming pool that is provided with view passage under water and is communicated with extraneous waters.
At existing amusement and exercising ship, also have between film, television room, refreshment room, bar in the cabin of promenade deck, recreational facilities such as ball room, dance hall, indoor and outdoor swimming pool.But these recreational facilities and land recreational facilities it makes no odds make the people feel dry as dust, and river, river, lake, the Hiroad with the scenic spot is not one, makes the people produce sensation on the spot in person.The original amusement and exercising ship of this class, be a kind of transportation passenger boat of slightly setting up several amusement cabins in fact, its main purpose is the landscape of the visitor being delivered to the scenic spot or observing riverine and coastal, and some dullnesses are during the journey just removed in the amusement cabin on the ship, only help out, it is little being worth with regard to travelling of its amusement ship itself.
Purpose of the present invention is sought a kind of novel amusement and exercising ship of greatly travelling and being worth that just itself has with regard to being, even also can satisfy visitor's psychology under the not high situation of land landscape value, attracts vast visitor effectively.
The present invention is like this design: amusement and exercising ship comprises the hull recreation ground in the life ﹠ amusement facility with Chinese classical architecture style of member and promenade deck and the water that combines together in the waters partly that produces buoyancy under water.The hull structural member that lower floor produces buoyancy is designed to an annular component, its middle part does not have base plate, and directly communicate with the waters, this annular component is regulated the drinking water surge bunker that has induction opening of full ship draft and is had the underway composition of picture window under water by making whole ship keep the buoyancy tank of essential buoyancy.The buoyancy that buoyancy tank produces has been born the weight of full ship, make ship can swim on the water surface, the draft that the drinking water surge bunker can be regulated amusement and exercising ship at any time, even other recreation facilities of the variation of passengers on touring boats' number and promenade deck, daily necessities, the variation of working equipment can not cause the inappropriate variation of ship drinking water yet, make the draft of ship remain on appropriate position, and the underway of picture window is under water arranged, the people can inside freely be walked about, can explore secret in the water of river, lake and sea by picture window, observe various fish and biology, as if place oneself in the midst of kingdom in the water, bring infinite enjoyment to the visitor, can be used as the on-the-spot classroom of study organism in water again, enlarge one's knowledge, illuminating lamp is equipped with in the outside of underway, improve the visibility of view under water, the propelling thrust of the submersible machine of band screw propeller as amusement and exercising ship also can be housed.The middle level is the parking pool of swimming pool and aquatic sports utensils such as canoe and windsurfing in the water that is surrounded by the iron railings railing, this swimming pool directly communicates with the waters, also need not change the attendant equipment of water, Chi Shui is flowing all the time, make the people that direct swim in rivers,lakes and seas happy be arranged, can prevent the infringement of violent aquatic organisms such as shark again, the people also is unlikely floating going out, so compare safety, canoe is arranged again, gymnastic apparatuss such as windsurfing, the people can leave and travel mother ship carrier and in the happy motion in water surface upstream, infinite enjoyment is arranged, regulate the adjusting of sump by lower floor, make swimming pool remain certain under water degree of depth, but the water surface does not exceed the railing of swimming pool again, to guarantee safety.The promenade deck is the member building of life, amusement, work; comprise the building of ascending a height with artistic profile; it can be the pagoda moulding of Chinese classical; also can be other forms; the people goes on the building of ascending a height; feel immediately and have a wide sphere of vision; relaxed and joyful, the marvellous scenery at the considerable scenic spot of keeping watch has dining room, teahouse, hotel, playroom in the service work hall; handle operating room etc.; also have the rainproof booth of going up the doffing ladder, the protection of iron railings bar is arranged, bondsman's safety around the promenade deck; the promenade deck possesses the amusement that makes the people complete, the facility of enjoying and having a rest.Have for three layers of upper, middle and lowers and to strengthen support and connection and fixing, play supporting and transmit the effect of load, guarantee two layers between due strength and stiffness.Also having the tube ladder to connect between the upper, middle and lower-ranking communicates; the terraced upper end open of tube is in the promenade deck; there is the inlet pad to guarantee safety all around; the coaming plate of tube ladder is a leak free; the water in following middle level can not infiltrate; the interior ladder of tube ladder can make the people about the freedom between promenade deck and the lower layer of water lower channel, and the outer ladder of tube ladder makes the people about freedom between promenade deck and the middle level swimming pool, and ladder railing protection people's safety is arranged.
The present invention also can take multiple scheme, also lower floor's member can be made by the foamed materials filling in order to reduce cost, and the solid buoyancy aid of the ring-type of outsourcing synthetic material only plays the generation buoyancy function; Also can not establish swimming pool, and by simple the combining of promenade deck with lower floor's buoyancy aid; Can make low speed by the submersible machine of band screw propeller promotes; Also can not be with propelling thrust, drag by towboat when need are mobile, suit measures to local conditions, select.Also can not establish the upper strata, have only lower floor's buoyancy aid and middle level swimming pool.
Advantage of the present invention is, designed the brand new semi-submersible playing ship of the swimming pool that view passage is under water arranged and be communicated with extraneous waters, with regard to itself being to have the multi-functional amusement and exercising ship that can become independent recreation facility of greatly travelling and being worth, can satisfy the psychological requirement of numerous visitors to the rivers,lakes and seas water surface and amusement under water and exploration.Swimming pool of the present invention directly communicates with extraneous waters, make the visitor have the sense of reality of in rivers,lakes and seas the Nature, swimming, can guarantee safety again, the present invention has multiple waterborne, recreational facilities in the water, not only can swim but also have utensils such as canoe windsurfing can carry out aquatic sports, passage view under water also can carry out recreation in the promenade deck again.This amusement and exercising ship is again multi-functional, can travel, and also passage carries out aquatic organism and on-the-spot teaching directly perceived to the student under water, and to spring, winter, autumn, swimming pool can be used as senior aquaculture pond again, and very high economic benefit is arranged.The ascend a height building and the service work hall etc. of promenade deck of the present invention itself just have higher value of art appreciation, can combine together with the scenic spot, play the effect of interspersing.Lower floor's hull of this amusement and exercising ship does not have the line style of general ship, and is easy to manufacture, do not need the high speed of a ship or plane, and manufacturing cost was implemented easily the end of than, and three layers of upper, middle and lowers and a plurality of tubular ladder accesses all have safety facilities, and sound construction is reliable, is enough to guarantee visitor's life security.
The complete layout of accompanying drawing 1, the embodiment of the invention.
The exploded view of accompanying drawing 2, the embodiment of the invention.
Be specific embodiments of the invention below, as depicted in figs. 1 and 2, present embodiment comprises that lower floor produces the hull structural member (1) of buoyancy, can be used as the middle level member (2) of the parking pool of swimming pool and canoe and windsurfing, has promenade deck (3) three major parts of life, amusement, work facility.The annular underway (4) that is communicated with around lower floor's hull structural member (1) has one, picture window (8) is equipped with in the level outside of underway (4), the inboard is leak free drinking water surge bunker (7) and the leak free buoyant cabin (5) that has induction opening (6), a tube terraced butt flange (9) is arranged at the top of underway (4), and the middle part of hull structural member (1) is not have base plate and directly communicate with the waters.The level outside of underway (4) is equipped with illuminating lamp (10) and is had the submersible machine (11) of screw propeller (12), and submersible machine (11) is fixed with the outside of screw and underway (4) by pressing plate (13).The height of underway (4) has about 2 meters, guarantees the comfortable activity of visitor inside.
Middle level member (2) is by middle level base plate (14), fence (15) is formed all around, in order to guarantee the enough strength and stiffness of middle level base plate (14), base plate (14) includes longitudinal rein forcement (21), limit reinforced rib (18) and transverse stiffener rib (20), also have tube terraced via hole (19), and separate mesh (16) is divided into swimming pool and canoe parking pool with the middle level member, amusement utensils such as canoe and windsurfing are then passed in and out by canoe parking pool door (17).
The promenade deck comprises base plate (39), upper strata fence (29), connecting bore (33) with the tube ladder is arranged on the base plate (39), ladder inlet (32) and tube terraced rainproof booth (36) to the tube in middle level, the building (37) of ascending a height with the classic pagoda shape of China is connected with the promenade deck with bolt and nut by assembly opening (31) outside basic reinforced rib (30), and the building of ascending a height (37) has external spiral ladder access and inside spin ladder access, the stream of people is unimpeded about making, and is convenient to view.Service work hall (38) with China's national style is not connected with the promenade deck with the bolt spiral shell by assembly opening (35) outside basic reinforced rib (34).Three layers of member of upper, middle and lower are by strengthening supporting (22) connection and fixing; strengthen supporting (22) and have the effect that enough strength and stiffness play support promenade deck (3) and middle level member (2) and transmit load; the top of tube ladder (24) links to each other with promenade deck (3) by connecting bore (33); the bottom is connected with a tin terraced butt flange (9) on the underway (4) by the terraced via hole of tube (19) the terraced flange of tube (28) of middle level member (2); tube ladder (24) by around leak free tubular coaming plate (27) surround; there is the last lower channel between interior ladder (a 23) formation promenade deck (3) and the lower layer of water lower channel (4) inside, and tube outer ladder (25) and protection handrail (26) form the last lower channel between promenade deck (3) and the middle level member (2).
The condition of service of present embodiment is as follows:
Can fast this amusement and exercising ship be dragged to the prostitution place by tugboat.Also can arrive from boat by this ship, can this amusement and exercising ship be dragged to the landscape zone by tugboat behind the reception visitor is promoted to arrive the scenic spot from boat by submersible machine, view and admire scene on the way, in the service work hall of promenade deck the dining room is arranged, the teahouse, the hotel, playroom etc., guarantee the enough amusements of visitor, enjoy, have a rest and various needs in life, and the manipulation operating room arranged, indoor be furnished with electrical generator, storage battery, air compressor, the mechanical equipment that air bottle etc. are essential, and can handle the speed of a ship or plane course of full ship, the people goes on the building of ascending a height is looked far into the distance considerable reward scenic spot with height marvellous scene, railing has also guaranteed visitor's safety around the promenade deck, and the visitor can enter underway, fancy fishes and all kinds of aquatic animal from the promenade deck by ladder in the tube of tube ladder, torus section is strolled just as enjoying a trip to palace under water under water, and bringing to the visitor does not have the enjoyment of wearing.Also can be by the outer ladder of tube, the visitor from the promenade deck to the middle level swimming pool in swimming or enter the canoe parking pool, take advantage of canoe and windsurfing, go out from the parking pool door, freely travel and move to the waters, recreation facility on passengers on touring boats' increase and promenade deck, daily necessities, when working equipment increases, in order to improve the buoyancy of ship, make the drinking water of ship be no more than around the middle level height of railing on the fence, then can handle air compressor and air bottle in the operating room, pressurized air is injected the drinking water surge bunker by induction opening (16), water in the storehouse is displaced the drinking water surge bunker from deflation hole, guarantee the essential buoyancy of full ship and suitable drinking water, when the season in spring autumn and winter is not suitable for swimming, swimming pool can be used as high-grade aquaculture pond, and very high economic benefit is arranged.If the aquatic products of wanting the little bodily form such as cultured prawn then easily temporarily the middle level base plate and on every side the fence place load onto the pore silk screen.Assurance corpusculum shape aquatic products is not understood outer trip, and the underway of lower floor can also make amusement and exercising ship have multiple function as the place of the student being carried out the on-the-spot teaching directly perceived of aquatic organism.

Claims (7)

1, the invention belongs to a kind of amusement and exercising ship, it comprises the hull structural member that produces buoyancy under water and life, amusement, the operating cabin member on deck, the hull structural member that it is characterized in that producing buoyancy is an annular component [1], and the position, intermediate portion does not have base plate directly to communicate with the waters.Promenade deck [3] have various life ﹠ amusement facilities with Chinese classical architecture style and and the water that combines together of waters in recreation ground.
2, amusement and exercising ship as claimed in claim 1, the hull annular component (1) that it is characterized in that lower floor's generation buoyancy comprises the buoyant cabin (5) that makes whole ship keep essential buoyancy, regulate the drinking water surge bunker (7) that has induction opening (6) of full ship draft, have the underway (4) of picture window (8) under water, the visitor freely walks about in the passage under water, travel and view and admire various aquatic organisms, with tube ladder butt flange (9), illuminating lamp (10) is connected the outside of underway (4).
3, amusement and exercising ship as claimed in claim 2 is characterized in that underway (4) outside then has the submersible machine (11) of screw propeller (12) as propelling unit.
4, amusement and exercising ship as claimed in claim 1 is characterized in that the ring-type hull structural member of lower floor's generation buoyancy is to be filled the solid buoyancy aid of the ring-type of outsourcing synthetic material by foamed materials.
5, as claim 1 or 2 or 3 or 4 described amusement and exercising ships, it is characterized in that, the promenade deck comprises the building (37) of ascending a height with artistic profile, this building is located to be connected with (39) at the bottom of the promenade deck with bolt and nut by assembly opening (31) at basic reinforced rib (30), service work hall (38) is also located to be connected with the promenade deck base plate with bolt and nut by assembly opening (35) at basic reinforced rib (34), promenade deck and the terraced connecting bore (33) of tube, ladder inlet (32) to the tube in middle level, tube terraced rainproof booth (36), fence (29) is arranged, to guarantee visitor's safety around the promenade deck.
6, amusement and exercising ship as claimed in claim 5, it is characterized in that having described and the water that combines together in the waters in recreation ground be a middle level member (2), can be used as swimming pool and park aquatic sports utensils such as canoe and windsurfing in summer, autumn, winter-spring season can be used as aquaculture pond.It is by middle level base plate (14), fence (15) all around, and longitudinal rein forcement (21), limit reinforced rib (18), transverse stiffener rib (20), tube terraced via hole (19), canoe parking pool door (17), separate mesh (16) is formed.Separate mesh (16) separates canoe parking pool and swimming pool, and canoe is come in and gone out by door (17).
7, amusement and exercising ship as claimed in claim 6; it is characterized in that strengthen supporting (22) connects and fixing upper, middle and lower-ranking; play the effect of supporting and transmitting load; tube ladder (24) forms the up and down passage of people between the upper, middle and lower-ranking; in the tube ladder (28) around in the leak free tubular coaming plate (27); form the last lower channel between upper strata and the lower floor; the outer ladder of tube (25) forms the last lower channel between upper strata and the middle level; and ladder protection handrail (26) is arranged, protect people's safety.
CN85103861A 1985-05-04 1985-05-04 Semi-submerged type multi-function recreation boat Expired CN85103861B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN85103861A CN85103861B (en) 1985-05-04 1985-05-04 Semi-submerged type multi-function recreation boat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN85103861A CN85103861B (en) 1985-05-04 1985-05-04 Semi-submerged type multi-function recreation boat

Publications (2)

Publication Number Publication Date
CN85103861A true CN85103861A (en) 1987-01-07
CN85103861B CN85103861B (en) 1988-09-21

Family

ID=4793487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN85103861A Expired CN85103861B (en) 1985-05-04 1985-05-04 Semi-submerged type multi-function recreation boat

Country Status (1)

Country Link
CN (1) CN85103861B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561741A (en) * 2012-02-21 2012-07-11 张洪达 Semi-submersible play platform
CN102849186A (en) * 2012-09-27 2013-01-02 耿秀 Overwater floating island
CN111411619A (en) * 2020-04-27 2020-07-14 北部湾大学 Self-elevating multifunctional ocean platform and operation method thereof
CN111411620A (en) * 2020-04-27 2020-07-14 北部湾大学 Liftable composite multifunctional aquaculture net cage for self-elevating ocean platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561741A (en) * 2012-02-21 2012-07-11 张洪达 Semi-submersible play platform
CN102849186A (en) * 2012-09-27 2013-01-02 耿秀 Overwater floating island
CN102849186B (en) * 2012-09-27 2014-12-03 耿秀 Overwater floating island
CN111411619A (en) * 2020-04-27 2020-07-14 北部湾大学 Self-elevating multifunctional ocean platform and operation method thereof
CN111411620A (en) * 2020-04-27 2020-07-14 北部湾大学 Liftable composite multifunctional aquaculture net cage for self-elevating ocean platform

Also Published As

Publication number Publication date
CN85103861B (en) 1988-09-21

Similar Documents

Publication Publication Date Title
US7036449B2 (en) Man-made island resort complex with surface and underwater entertainment, educational and lodging facilities
CN102561741A (en) Semi-submersible play platform
US20050150175A1 (en) Modular accomodation system (bmas)
CN203228918U (en) Device for underwater activities
CN113047672B (en) Construction method of floating and diving type intelligent control safe swimming pool suitable for natural water area
CN105752286B (en) A kind of aquatic building for entertaining, lying fallow or living
CN85103861A (en) Semi-submerged type multi-function recreation boat
WO2007027170A1 (en) Man-made island resort complex with surface and underwater entertainment, educational and lodging facilities
JPH04102670A (en) Diving pool
CN1435353A (en) Deep sea amusement park far away from coast
CN2681994Y (en) Multifunctional semi-submerged underwater flying saucer for sight seeing
CN204822018U (en) Amusement yacht
KR101367806B1 (en) A Water Train for Leisure
CN220054090U (en) Large-scale marine floating travel platform
JPH01215693A (en) Catamaran type foot-power thrust boat
CN203255348U (en) Cruise ship with multi-functional top storey
CN202645059U (en) Natatorium
Ireland Voyages and Visits
CN2317168Y (en) Leakage ship
FERRIES Ultimate
CN2598856Y (en) Golf course on water
KR20080000658U (en) A private barge for only leisure
WO2004005128A1 (en) Floating amusement park
Goldsbury Travel: Sunday sen sation
CN116834909A (en) Large-scale marine floating travel platform

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee