CN215366876U - Bridge deck crack repairing device for bridge reinforcement - Google Patents

Bridge deck crack repairing device for bridge reinforcement Download PDF

Info

Publication number
CN215366876U
CN215366876U CN202120885024.5U CN202120885024U CN215366876U CN 215366876 U CN215366876 U CN 215366876U CN 202120885024 U CN202120885024 U CN 202120885024U CN 215366876 U CN215366876 U CN 215366876U
Authority
CN
China
Prior art keywords
base
fixedly connected
bridge
electric telescopic
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120885024.5U
Other languages
Chinese (zh)
Inventor
赵海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhishe Design Consulting Co ltd
Original Assignee
Jiangsu Huashe Design Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huashe Design Consulting Co ltd filed Critical Jiangsu Huashe Design Consulting Co ltd
Priority to CN202120885024.5U priority Critical patent/CN215366876U/en
Application granted granted Critical
Publication of CN215366876U publication Critical patent/CN215366876U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a bridge deck crack repairing device for bridge reinforcement, which relates to the technical field of bridge reinforcement equipment and comprises a base and a dust collection box, wherein the top of the base is fixedly connected with the dust collection box, a stepping motor is fixedly arranged at the top of the base and positioned at one side of the dust collection box, the output end of the stepping motor is fixedly connected with a first gear, and a second gear is rotatably connected at the top of the base and positioned at one side of the first gear, so that the bridge deck crack repairing device has the beneficial effects that: be provided with mill, sleeve, unloading pipeline and push away the fill, will accomplish through the push away fill and solidify the sleeve of mending the operation and clear up together, improved holistic work efficiency, be provided with dust collection box and dust collecting pipeline, the dust that produces when moving to the mill is collected with the crushed aggregates, avoids follow-up influence normally to fill the crack, has also made things convenient for the staff later stage simultaneously and has unified the clearance, and overall structure is simple easily operated, has reduced artifical intensity of labour.

Description

Bridge deck crack repairing device for bridge reinforcement
Technical Field
The utility model relates to the technical field of bridge reinforcing equipment, in particular to a bridge deck crack repairing device for bridge reinforcing.
Background
Bridge refers to a building constructed for a road to cross natural or artificial obstacles. The bridge generally comprises five large parts and five small parts, wherein the five large parts refer to bridge span upper structures and lower structures of the bridge for bearing transportation loads of automobiles or other vehicles, and are used for ensuring the safety of the bridge structure, and the five small parts refer to parts directly related to bridge service functions and are called bridge deck structures in the past. Present bridge is along with the lapse of time, the life of bridge reduces, and some cracks still can appear on the road surface of bridge, therefore the bridge need consolidate in the later stage and restore, prior art is comparatively the slabby, when present bridge reinforcement repaiies the crack, mostly all the manual work is carried out the rubber coating or is filled the concrete, make staff's intensity of labour increased, and whole effect is low, make the cost consumption increase, consequently need design a bridge deck crack patching device for bridge reinforcement to solve the above-mentioned problem that appears.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a bridge deck crack repairing device for bridge reinforcement, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a bridge deck crack repairing device for bridge reinforcement comprises a base and a dust collection box, wherein a dust collection box is fixedly connected to the top of the base, a stepping motor is fixedly mounted at the top of the base and positioned at one side of the dust collection box, a first gear is fixedly connected to the output end of the stepping motor, a second gear is rotatably connected to the top of the base and positioned at one side of the first gear, the second gear is meshed with the first gear and connected with the first gear, a rotating rod extending to the bottom of the base is fixedly mounted at the axis of the second gear, a grinding disc is fixedly mounted at the bottom of the rotating rod, a first electric telescopic rod is fixedly mounted at the top of the base and positioned at one side of the stepping motor, the output end of the first electric telescopic rod penetrates through the base and is provided with a fixing component, a second electric telescopic rod is fixedly mounted at the top of the base and positioned at one side of the first electric telescopic rod, the output end of the second electric telescopic rod penetrates through the base and the fixedly connected with diverter plate, the bottom of the diverter plate is fixedly connected with a discharging pipeline, a control valve is fixedly mounted on the outer side of the discharging pipeline, and the top of the base is located on one side of a stirring box fixedly connected with the second electric telescopic rod.
Preferably, fixed subassembly includes spliced pole and two-way lead screw, base and fixedly connected with spliced pole are run through to first electric telescopic handle's output, two connecting blocks of the inside fixedly connected with of spliced pole, two rotate between the connecting block and be connected with two-way lead screw, the one end of two-way lead screw is passed through the connecting block and is rotated with the spliced pole and be connected, the outside threaded connection of two-way lead screw has first slider, the first dead lever of bottom fixedly connected with of first slider, the first fixed clamp of bottom fixedly connected with of first dead lever, one side threaded connection who just keeps away from first slider in the outside of two-way lead screw has the second slider, the bottom fixedly connected with second dead lever of second slider, the fixed clamp of bottom fixedly connected with second of second dead lever.
Preferably, a feed inlet is formed in one side of the stirring box, a diaphragm pump is fixedly mounted on one side, far away from the feed inlet, of the stirring box, the output end of the diaphragm pump is connected with the flow distribution disc through a conveying pipeline, the input end of the diaphragm pump is connected with the stirring box through a conveying pipeline, a pull rod is fixedly connected to the top of the base and located on one side of the dust collection box, and an exhaust pipeline is formed in one side, close to the pull rod, of the dust collection box.
Preferably, universal wheels are installed around the bottom of the base, a dust collecting pipeline is fixedly connected to the bottom of the base and located on one side of the grinding disc, and one end of the dust collecting pipeline is connected with a dust collecting box.
Preferably, the bottom of base and the one side fixed mounting that is located the unloading pipeline have the pushing hopper, the bottom of spliced pole just is located and installs the sleeve between the fixed clamp of first fixed clamp and second, the equal fixed mounting in one side that the fixed clamp of first fixed clamp and second is close to mutually has the rubber slab, the inside fixed mounting of first fixed clamp has pressure sensor, one side fixed mounting of spliced pole has the rotation motor, two-way lead screw extends to the one end in the spliced pole outside and the output fixed connection who rotates the motor.
Preferably, the top of base fixed mounting has the protection casing that cooperation step motor used, the louvre that the equidistance distributes is seted up at the top of protection casing.
Preferably, a control panel is fixedly mounted on the outer side of the dust collection box, and the stepping motor, the first electric telescopic rod, the second electric telescopic rod, the rotating motor and the pressure sensor are all electrically connected with the control panel.
Compared with the prior art, the utility model has the beneficial effects that: the bridge leveling and cleaning device is provided with a grinding disc, a sleeve, a blanking pipeline and a push hopper, when in use, a stepping motor operates to drive a first gear to rotate, a second gear connected with the first gear in a meshed mode is driven to rotate, a rotating rod is driven to rotate, the grinding disc at the bottom is driven to rotate, the bridge leveling and cleaning are realized, a connecting column is driven to move towards the bottom through a first electric telescopic rod, the sleeve is driven to move towards a crack needing to be repaired at the bottom of the bridge through an output end, when the blanking pipeline moves to the top of the sleeve, glue or concrete is normally supplemented into the sleeve, the solidification operation is completed after a period of time, the push hopper is installed at the bottom of a base, the sleeve completing the solidification and repair operation is cleaned together through pulling a pull rod to normally operate, the whole working efficiency is improved, the dust collection box and the dust collection pipeline are arranged, and the dust and the crushed aggregates generated when the grinding disc operates are collected, avoid follow-up influence normally to fill the crack, also made things convenient for the staff later stage simultaneously and unified the clearance, overall structure is simple easily to operate, has reduced artifical intensity of labour.
Drawings
FIG. 1 is an overall structural view of the present invention;
FIG. 2 is an enlarged view of the fixing member according to the present invention;
FIG. 3 is an enlarged view of the first mounting clip configuration of the present invention.
In the figure: 1. a base; 2. a pull rod; 3. a universal wheel; 4. a stirring box; 5. a feed inlet; 6. a diaphragm pump; 7. a delivery conduit; 8. a protective cover; 9. a stepping motor; 10. a first electric telescopic rod; 11. a second electric telescopic rod; 12. a sleeve; 13. a fixing assembly; 14. rotating the rod; 15. a grinding disc; 16. a dust collecting duct; 17. a diverter tray; 18. a blanking pipeline; 19. a dust collection box; 20. a control panel; 21. an exhaust duct; 22. connecting columns; 23. a bidirectional screw rod; 24. a rotation motor; 25. a first slider; 26. a second slider; 27. a first fixing lever; 28. a second fixing bar; 29. a first fixed clamp; 30. a second fixed clamp; 31. a rubber plate; 32. a pressure sensor; 33. a push bucket; 34. a first gear; 35. a second gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, fig. 2 and fig. 3, the present invention provides a technical solution: a bridge deck crack repairing device for bridge reinforcement comprises a base 1 and a dust collection box 19, wherein the top of the base 1 is fixedly connected with the dust collection box 19, the top of the base 1 and one side of the dust collection box 19 are fixedly provided with a stepping motor 9, the output end of the stepping motor 9 is fixedly connected with a first gear 34, the top of the base 1 and one side of the first gear 14 are rotatably connected with a second gear 35, the second gear 35 is meshed with the first gear 34, the axis of the second gear 35 is fixedly provided with a rotating rod 14 extending to the bottom of the base 1, the bottom of the rotating rod 14 is fixedly provided with a grinding disc 15, so that bridge leveling and cleaning are realized, the top of the base 1 and one side of the stepping motor 9 are fixedly provided with a first electric telescopic rod 10, the output end of the first electric telescopic rod 10 penetrates through the base 1 and is provided with a fixing component 13, the top of the base 1 and one side of the first electric telescopic rod 10 are fixedly provided with a second electric telescopic rod 11, the output of second electric telescopic handle 11 runs through base 1 and fixedly connected with flow distribution plate 17, and flow distribution plate 17's bottom fixedly connected with unloading pipeline 18 has realized normally going on the unloading, and the outside fixed mounting of unloading pipeline 18 has control flap, and base 1's top just is located one side fixedly connected with agitator tank 4 of second electric telescopic handle 11, has realized the intensive mixing to solid fixed glue or concrete, has improved follow-up efficiency and the quality of filling the operation.
Further, fixed subassembly 13 includes spliced pole 22 and two-way lead screw 23, base 1 and fixedly connected with spliced pole 22 are run through to the output of first electric telescopic handle 10, two connecting blocks of the inside fixedly connected with of spliced pole 22, it is connected with two-way lead screw 23 to rotate between two connecting blocks, connecting block and spliced pole 22 are passed through to the one end of two-way lead screw 23 and are rotated and be connected, the outside threaded connection of two-way lead screw 23 has first slider 25, the first dead lever 27 of bottom fixedly connected with of first slider 25, the first fixed clamp 29 of bottom fixedly connected with of first dead lever 27, one side threaded connection that the outside of two-way lead screw 23 just kept away from first slider 25 has second slider 26, the bottom fixedly connected with second dead lever 28 of second slider 26, the fixed clamp 30 of bottom fixedly connected with second of second dead lever 28, the normal fixed to sleeve 12 has been realized.
Further, feed inlet 5 has been seted up to one side of agitator tank 4, one side fixed mounting that feed inlet 5 was kept away from to agitator tank 4 has diaphragm pump 6, the output of diaphragm pump 6 is connected with flow distribution disc 17 through pipeline 7, the input of diaphragm pump 6 is connected with agitator tank 4 through pipeline 7, base 1's top and the one side fixedly connected with pull rod 2 that is located dust collection box 19, exhaust duct 21 has been seted up to one side that dust collection box 19 is close to pull rod 2, the dust that produces when moving to mill 15 is collected with the crushed aggregates, avoid follow-up influence normally to fill the crack, the while has also made things convenient for the staff later stage to unify the clearance.
Furthermore, universal wheels 3 are installed around the bottom of the base 1, a dust collecting pipeline 16 is fixedly connected to the bottom of the base 1 and one side of the grinding disc 15, and one end of the dust collecting pipeline 16 is connected with a dust collecting box 19.
Further, base 1's bottom and the one side fixed mounting that is located unloading pipeline 18 have a pushing hopper 33, the bottom of spliced pole 22 just is located and installs sleeve 12 between the fixed clamp 30 of first fixed clamp 29 and second, the equal fixed mounting in one side that first fixed clamp 29 and the fixed clamp 30 of second are close to has a rubber slab 31, the inside fixed mounting of first fixed clamp 29 has pressure sensor 32, one side fixed mounting of spliced pole 22 has rotation motor 24, two-way lead screw 23 extends to the one end in the spliced pole 22 outside and rotation motor 24's output fixed connection, it fixes to have realized the cooperation.
Further, the top fixed mounting of base 1 has the protection casing 8 that cooperation step motor 9 used, and the louvre that the equidistance distributes has been seted up at the top of protection casing 8, has realized the radiating effect of during operation, has prolonged holistic life.
Further, a control panel 20 is fixedly mounted on the outer side of the dust collection box 19, and the stepping motor 9, the first electric telescopic rod 10, the second electric telescopic rod 11, the rotating motor 24 and the pressure sensor 32 are all electrically connected with the control panel 20, so that the whole normal operation is realized.
Specifically, when the utility model is used: when the bridge repairing device is used, the control panel 20 is opened, the whole body is moved to a required working place through the pull rod 2 and the universal wheel 3 and normally moves along the direction of a crack, when the bridge repairing device moves, the first gear 34 is driven to rotate through the operation of the stepping motor 9, the second gear 35 meshed with the first gear is driven to rotate, the rotating rod 14 is driven to rotate, the grinding disc 15 at the bottom is driven to rotate, the bridge is leveled and cleaned, the connecting column 22 is driven to move towards the bottom through the operation of the first electric telescopic rod 10, the sleeve 12 is driven to move towards the crack to be repaired at the bottom of the bridge, the whole device continues to move, when the blanking pipeline 18 moves to the top of the sleeve 12, the height during blanking is adjusted through the operation of the second electric telescopic rod 11, the diaphragm pump 6 operates, the conveying pipeline 7 is timely conveyed into the blanking pipeline 18, and the normal glue or concrete filling into the bridge is realized, the solidification operation is completed after a period of time, the push hopper 33 is arranged at the bottom of the base 1, the sleeve 12 which completes the solidification mending operation is cleaned together by pulling the pull rod 2 to normally operate, the integral working efficiency is improved, dust and crushed aggregates generated when the millstone 15 operates are collected, the subsequent influence on normally filling cracks is avoided, meanwhile, the uniform cleaning in the later period of workers is facilitated, the integral structure is simple and easy to operate, the manual labor intensity is reduced, the bidirectional screw 23 is driven to rotate by operating the rotating motor 24, the first sliding block 25 and the second sliding block 26 are driven to be close to the middle, the first fixing rod 27 and the second fixing rod 28 are driven to be close to the middle, the first fixing clamp 29 and the second fixing clamp 30 are driven to be close to the middle, the buffer protection effect is realized by the rubber plate 31, and the fixation of the sleeve 12 is realized, daily dustproof effect of protection has been realized through protection casing 8.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
Furthermore, the terms "first", "second", "third", "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby the features defined as "first", "second", "third", "fourth" may explicitly or implicitly include at least one such feature.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a bridge deck crack patching device for bridge reinforcement, includes base (1) and dust collection box (19), its characterized in that: the dust collection box (19) is fixedly connected to the top of the base (1), the stepping motor (9) is fixedly mounted at the top of the base (1) and located at one side of the dust collection box (19), the first gear (34) is fixedly connected to the output end of the stepping motor (9), the second gear (35) is rotatably connected to the top of the base (1) and located at one side of the first gear (34), the second gear (35) is meshed with the first gear (34) and is connected to the first gear, the rotating rod (14) extending to the bottom of the base (1) is fixedly mounted at the axis center of the second gear (35), the grinding disc (15) is fixedly mounted at the bottom of the rotating rod (14), the first electric telescopic rod (10) is fixedly mounted at the top of the base (1) and located at one side of the stepping motor (9), the output end of the first electric telescopic rod (10) penetrates through the base (1) and is provided with the fixing component (13), the utility model discloses a novel electric telescopic handle, including base (1), one side fixed connection that just is located first electric telescopic handle (10) at the top of base (1) has second electric telescopic handle (11), the output of second electric telescopic handle (11) runs through base (1) and fixedly connected with flow distribution disc (17), the bottom fixedly connected with unloading pipeline (18) of flow distribution disc (17), the outside fixed mounting of unloading pipeline (18) has control flap, the top of base (1) just is located one side fixedly connected with agitator tank (4) of second electric telescopic handle (11).
2. The bridge deck crack repairing apparatus for bridge reinforcement according to claim 1, wherein: the fixing component (13) comprises a connecting column (22) and a bidirectional screw rod (23), the output end of the first electric telescopic rod (10) penetrates through the base (1) and is fixedly connected with the connecting column (22), two connecting blocks are fixedly connected to the inside of the connecting column (22), a bidirectional screw rod (23) is rotatably connected between the two connecting blocks, one end of the bidirectional screw rod (23) is rotatably connected with the connecting column (22) through the connecting blocks, a first slider (25) is in threaded connection with the outer side of the bidirectional screw rod (23), a first fixing rod (27) is fixedly connected to the bottom of the first slider (25), a first fixing clamp (29) is fixedly connected to the bottom of the first fixing rod (27), a second slider (26) is in threaded connection with the outer side of the bidirectional screw rod (23) and one side far away from the first slider (25), and a second fixing rod (28) is fixedly connected to the bottom of the second slider (26), the bottom of the second fixing rod (28) is fixedly connected with a second fixing clamp (30).
3. The bridge deck crack repairing apparatus for bridge reinforcement according to claim 1, wherein: feed inlet (5) have been seted up to one side of agitator tank (4), one side fixed mounting that feed inlet (5) were kept away from in agitator tank (4) has diaphragm pump (6), the output of diaphragm pump (6) is connected with flow distribution plate (17) through pipeline (7), the input of diaphragm pump (6) is connected with agitator tank (4) through pipeline (7), the top of base (1) just is located one side fixedly connected with pull rod (2) of dust collection box (19), exhaust duct (21) have been seted up to one side that dust collection box (19) are close to pull rod (2).
4. The bridge deck crack repairing apparatus for bridge reinforcement according to claim 1, wherein: the universal wheels (3) are installed around the bottom of the base (1), a dust collecting pipeline (16) is fixedly connected to one side, located on the grinding disc (15), of the bottom of the base (1), and one end of the dust collecting pipeline (16) is connected with a dust collecting box (19).
5. The bridge deck crack repairing apparatus for bridge reinforcement according to claim 2, wherein: the bottom of base (1) and the one side fixed mounting that is located unloading pipeline (18) have a push-type bucket (33), the bottom of spliced pole (22) just is located and installs sleeve (12) between the fixed clamp (30) of first fixed clamp (29) and second, the equal fixed mounting in one side that first fixed clamp (29) and the fixed clamp (30) of second are close to mutually has rubber slab (31), the inside fixed mounting of first fixed clamp (29) has pressure sensor (32), one side fixed mounting of spliced pole (22) has rotation motor (24), the one end that two-way lead screw (23) extend to spliced pole (22) outside and the output fixed connection who rotates motor (24).
6. The bridge deck crack repairing apparatus for bridge reinforcement according to claim 1, wherein: the top fixed mounting of base (1) has protection casing (8) that cooperation step motor (9) used, the louvre that the equidistance distributed is seted up at the top of protection casing (8).
7. The bridge deck crack repairing apparatus for bridge reinforcement according to claim 5, wherein: the outer side of the dust collection box (19) is fixedly provided with a control panel (20), and the stepping motor (9), the first electric telescopic rod (10), the second electric telescopic rod (11), the rotating motor (24) and the pressure sensor (32) are all electrically connected with the control panel (20).
CN202120885024.5U 2021-04-27 2021-04-27 Bridge deck crack repairing device for bridge reinforcement Expired - Fee Related CN215366876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120885024.5U CN215366876U (en) 2021-04-27 2021-04-27 Bridge deck crack repairing device for bridge reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120885024.5U CN215366876U (en) 2021-04-27 2021-04-27 Bridge deck crack repairing device for bridge reinforcement

Publications (1)

Publication Number Publication Date
CN215366876U true CN215366876U (en) 2021-12-31

Family

ID=79628555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120885024.5U Expired - Fee Related CN215366876U (en) 2021-04-27 2021-04-27 Bridge deck crack repairing device for bridge reinforcement

Country Status (1)

Country Link
CN (1) CN215366876U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114604426A (en) * 2022-02-28 2022-06-10 广州大学 Be used for concrete building crack healing to restore unmanned aerial vehicle system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114604426A (en) * 2022-02-28 2022-06-10 广州大学 Be used for concrete building crack healing to restore unmanned aerial vehicle system
CN114604426B (en) * 2022-02-28 2023-11-03 广州大学 Be used for concrete building crack healing restoration unmanned aerial vehicle system

Similar Documents

Publication Publication Date Title
CN215366876U (en) Bridge deck crack repairing device for bridge reinforcement
CN105840214A (en) Concrete guniting set
CN210113309U (en) Road and bridge crack reinforcing and repairing device
CN210946427U (en) Device for repairing highway bridge cracks
CN215758452U (en) Highway crack processing apparatus that highway engineering was used
CN215482190U (en) Civil engineering construction road surface flattening maintenance device
CN213709236U (en) Crack filling type reinforcing device for highway bridge
CN209308070U (en) A kind of sleiding form support frame
CN209702909U (en) Reaction kettle is used in a kind of production of calcium sulfate crystal whiskers
CN211849216U (en) Electric multifunctional ice-making machine
CN218969727U (en) Crack pouring machine with trowelling structure
CN218233092U (en) Quick patching device of bituminous paving gap
CN109811622B (en) Vertical double-shaft cement leveling robot
CN112431103A (en) Road crack pouring sealant equipment for maintenance
CN219826273U (en) Building crack grouter
CN112048982A (en) Road and bridge crack repairing and reinforcing device
CN220685733U (en) Crack filling device for expressway maintenance
CN217678516U (en) Cement injection device for pavement repair
CN217948733U (en) Highway crack shakeouts robot
CN220665916U (en) Crack pouring device for highway maintenance
CN219240231U (en) Novel crack repair device for highway maintenance
CN211228022U (en) Asphalt pavement repairing device
CN215104550U (en) Road surface joint cleaning and pouring all-in-one machine
CN214219316U (en) Bridge tunnel road maintenance reinforcing apparatus
CN213267447U (en) Crack repairing device for pavement maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 210000 room 1008, block B, west side, No. 100, yunlongshan Road, Jianye District, Nanjing, Jiangsu Province

Patentee after: Jiangsu zhishe Design Consulting Co.,Ltd.

Address before: 210000 room 1008, block B, west side, No. 100, yunlongshan Road, Jianye District, Nanjing, Jiangsu Province

Patentee before: Jiangsu Huashe Design Consulting Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211231