CN213518156U - Track timing point master control equipment - Google Patents

Track timing point master control equipment Download PDF

Info

Publication number
CN213518156U
CN213518156U CN202023166205.7U CN202023166205U CN213518156U CN 213518156 U CN213518156 U CN 213518156U CN 202023166205 U CN202023166205 U CN 202023166205U CN 213518156 U CN213518156 U CN 213518156U
Authority
CN
China
Prior art keywords
control device
panel
heat dissipation
main part
controlgear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023166205.7U
Other languages
Chinese (zh)
Inventor
张向兵
毕文辉
陈诚
臧庆珊
胡世峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Racetiger Sports Technology Co ltd
Original Assignee
Shenzhen Racetiger Sports Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Racetiger Sports Technology Co ltd filed Critical Shenzhen Racetiger Sports Technology Co ltd
Priority to CN202023166205.7U priority Critical patent/CN213518156U/en
Application granted granted Critical
Publication of CN213518156U publication Critical patent/CN213518156U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Casings For Electric Apparatus (AREA)

Abstract

The utility model discloses a track timing point master control equipment, include: the control device comprises a control device main body, a panel assembly is arranged on the control device main body, a heat dissipation mechanism is arranged on the panel assembly, a bottom plate is arranged on the control device main body, and a router and a power supply assembly are arranged on the outer surface of the top end of the bottom plate; the control panel is installed on the controlgear main part, the control panel is installed in the below of power supply module, be provided with the RFID host computer on the controlgear main part, the RFID host computer is in one side of control panel. A track timing point master control equipment, through the controlgear main part that sets up, automatic identification RFID technique, network communication technique, battery technique etc. have been synthesized to the controlgear main part, integrate intelligent computer, RFID host computer into one body to do not need the staff to carry the computer just can time to the race, made things convenient for people to be equipped with, whole device simple structure, convenient operation has increased the practicality of whole device.

Description

Track timing point master control equipment
Technical Field
The utility model relates to a controlgear technical field, in particular to main control equipment is timed to track.
Background
In the marathon competition, timing equipment needs to be paved on a track in a segmented mode, the equipment is mobile and has a power supply, an RFID chip worn by a player can be read through RFID signal induction, then chip data are uploaded to a cloud server through a network, and the most core brain on the timing point on the track is a main control device (a control box or a host).
The prior track timing point master control equipment has certain disadvantages when in use, (1) when in use, the prior track timing point master control equipment needs to be provided with a computer to read the timing task of a chip on the track timing point, which is very inconvenient; (2) when the existing timing point master control equipment is used, the existing master control equipment is controlled by a single chip microcomputer, an operating system is not provided, a main board is not provided correspondingly, and some main control equipment can upload data to a server even if a notebook computer and a wireless network card are configured for each timing point.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a track timing point master control device, which can effectively solve the problems of the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a track timing point master control device, comprising:
the control device comprises a control device main body, a panel assembly is arranged on the control device main body, a heat dissipation mechanism is arranged on the panel assembly, a bottom plate is arranged on the control device main body, and a router and a power supply assembly are arranged on the outer surface of the top end of the bottom plate; and
the control panel, the control panel is installed on the controlgear main part, the below at power supply module is installed to the control panel, be provided with the RFID host computer in the controlgear main part, the RFID host computer is in one side of control panel.
Preferably, the heat dissipation mechanism comprises a heat dissipation fan and a plurality of groups of heat dissipation holes, the heat dissipation holes and the heat dissipation fan are both installed on the panel assembly, a plurality of groups of screws are arranged on the heat dissipation fan, and the heat dissipation fan is connected with the panel assembly through the screws.
Preferably, the panel assembly is provided with a display screen of a human-computer operation interface, the panel assembly is provided with a power switch and a plurality of groups of connecting terminals, the connecting terminals are arranged into two rows, the connecting terminals are arranged on one side of the display screen, and the panel assembly is provided with a plurality of groups of external interfaces.
Preferably, a plurality of groups of connecting lines are arranged on the RFID host, and one end, far away from the RFID host, of each connecting line is connected with the corresponding connecting terminal.
Preferably, the power supply assembly comprises a battery and a battery cover, the battery cover is provided with a plurality of groups of socket head cap screws, the battery cover is connected with the battery through the socket head cap screws, and the battery is provided with electric quantity detection equipment.
Preferably, be provided with the HUB equipment in the controlgear main part, be provided with two sets of curb plates in the controlgear main part, be provided with a plurality of groups of countersunk head socket head cap screw on the panel components, the panel components passes through countersunk head socket head cap screw and controlgear main part connection.
Preferably, the panel assembly is provided with a display lamp, the control device body is provided with an insulating wiring duct, and the insulating wiring duct is installed on one side of the RFID host.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. through the arranged control equipment main body, the control equipment main body integrates the automatic identification RFID technology, the network communication technology, the display technology, the battery technology and the like, and integrates an intelligent computer and an RFID host machine, so that the events can be timed without carrying a computer by workers, the arrangement of people is facilitated, the structure of the whole device is simple, the operation is convenient, and the practicability of the whole device is improved;
2. through the arranged control equipment main body, the control equipment main body integrates the functions of a 5G network, a display screen, electric quantity detection, heat dissipation and the like, forms a core brain of the track timing equipment, can independently complete data acquisition, and is provided with a loudspeaker and an indicator lamp as output to prompt field workers when recognizing a chip; chip data are uploaded to the cloud server through the network after being locally processed, so that the use of people is facilitated, the whole device is simple in structure and convenient to operate, and the practicability of the whole device is improved.
Drawings
Fig. 1 is an overall structure diagram of a track timing point master control device of the present invention;
fig. 2 is a partial structure diagram of a panel assembly in the track timing point master control device of the present invention;
fig. 3 is the utility model relates to a whole flow chart of controlgear main part in track timing point master control equipment.
In the figure: 1. a panel assembly; 2. a base plate; 3. a router; 4. a power supply component; 5. a control panel; 6. an RFID host; 7. a heat radiation fan; 8. a wiring terminal; 9. a display screen; 10. a battery; 11. a battery cover; 12. a power switch; 13. a side plate; 14. an insulating wiring duct.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1 to 3, a track timing point master control device includes:
the control device comprises a control device body, wherein a panel assembly 1 is arranged on the control device body, a heat dissipation mechanism is arranged on the panel assembly 1, a bottom plate 2 is arranged on the control device body, and a router 3 and a power supply assembly 4 are arranged on the outer surface of the top end of the bottom plate 2; and
the control panel 5, the control panel 5 is installed on the controlgear main part, and the control panel 5 is installed in the below of power supply module 4, is provided with RFID host computer 6 on the controlgear main part, and RFID host computer 6 is in one side of control panel 5.
An intelligent computer is arranged on the control equipment main body.
The heat dissipation mechanism comprises a heat dissipation fan 7 and a plurality of groups of heat dissipation holes, the heat dissipation holes and the heat dissipation fan 7 are both installed on the panel assembly 1, a plurality of groups of screws are arranged on the heat dissipation fan 7, and the heat dissipation fan 7 is connected with the panel assembly 1 through the screws.
The heat dissipation mechanism can ensure the quick exchange of air between the inside of the control equipment main body and the outside environment through the heat dissipation holes and the heat dissipation fan 7.
The panel component 1 is provided with a display screen 9 of a man-machine operation interface, the panel component 1 is provided with a power switch 12 and a plurality of group connecting terminals 8, the group connecting terminals 8 are arranged into two rows, the connecting terminals 8 are arranged on one side of the display screen 9, and the panel component 1 is provided with a plurality of group external interfaces.
A plurality of groups of connecting lines are arranged on the RFID host machine 6, and one end of each connecting line, which is far away from the RFID host machine 6, is connected with the wiring terminal 8.
The power supply assembly 4 comprises a battery 10 and a battery cover 11, a plurality of groups of socket head cap screws are arranged on the battery cover 11, the battery cover 11 is connected with the battery 10 through the socket head cap screws, and an electric quantity detection device is arranged on the battery 10.
The electric quantity detection equipment can display the electric quantity of the battery in real time.
Be provided with HUB equipment in the controlgear main part, be provided with two sets of curb plates 13 in the controlgear main part, be provided with a plurality of groups of countersunk head socket head cap screw on the panel components 1, panel components 1 passes through countersunk head socket head cap screw and controlgear main part and connects.
The HUB device can realize intelligent computer control of the two RFID hosts 6.
The panel component 1 is provided with a display lamp, the control equipment body is provided with an insulating wiring groove 14, and the insulating wiring groove 14 is installed on one side of the RFID host machine 6.
And the RFID host 6 is responsible for externally connecting an RFID feeder line and an RFID antenna and for the front end to acquire the chip data function.
The intelligent computer and the software part are responsible for data filtering and basic processing at a data acquisition point and storing the data into the main control equipment.
After the chip data are locally processed, the chip data are uploaded to a cloud server through a network, the cloud server can also issue an instruction to a control equipment main body, and the control equipment main body can also complete corresponding operation according to the instruction.
It should be noted that the utility model relates to a track timing point master control equipment, when in use, the main body of the control equipment is moved to the competition field, the chip is placed on the body of the athlete, when the athlete reaches the preset timing point, the main body of the control equipment starts to time;
through the arranged control equipment main body, the control equipment main body integrates the automatic identification RFID technology, the network communication technology, the display technology, the battery technology and the like, integrates the intelligent computer and the RFID host machine into a whole, and integrates the intelligent computer and the RFID host machine 6 into a whole, so that the competition can be timed without carrying a computer by a worker, the arrangement of people is facilitated, the whole device is simple in structure and convenient to operate, and the practicability of the whole device is improved;
through the arranged control equipment main body, the control equipment main body integrates the functions of a 5G network, a display screen 9, electric quantity detection, heat dissipation and the like, forms a core brain of the track timing equipment, can independently complete data acquisition, and is provided with a loudspeaker and an indicator lamp for outputting when recognizing a chip to prompt field workers; chip data are uploaded to the cloud server through the network after being locally processed, so that the use of people is facilitated, the whole device is simple in structure and convenient to operate, and the practicability of the whole device is improved.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. A track timing point master control device, comprising:
the control device comprises a control device main body, wherein a panel assembly (1) is arranged on the control device main body, a heat dissipation mechanism is arranged on the panel assembly (1), a bottom plate (2) is arranged on the control device main body, and a router (3) and a power supply assembly (4) are arranged on the outer surface of the top end of the bottom plate (2); and
control panel (5), install on the controlgear main part control panel (5), the below at power supply module (4) is installed in control panel (5), be provided with RFID host computer (6) on the controlgear main part, RFID host computer (6) are in one side of control panel (5).
2. The main control device for timing points of track according to claim 1, wherein: the heat dissipation mechanism comprises a heat dissipation fan (7) and a plurality of groups of heat dissipation holes, the heat dissipation holes and the heat dissipation fan (7) are both installed on the panel assembly (1), a plurality of groups of screws are arranged on the heat dissipation fan (7), and the heat dissipation fan (7) is connected with the panel assembly (1) through the screws.
3. The main control device for timing points of track according to claim 1, wherein: be provided with man-machine operation interface's display screen (9) on panel components (1), be provided with switch (12) and a plurality of montage binding post (8) on panel components (1), a plurality of groups binding post (8) set up to two rows, binding post (8) set up the one side at display screen (9), be provided with a plurality of external interfaces of group on panel components (1).
4. The main control device for timing points of track according to claim 1, wherein: a plurality of groups of connecting lines are arranged on the RFID host (6), and one end, far away from the RFID host (6), of each connecting line is connected with the wiring terminal (8).
5. The main control device for timing points of track according to claim 1, wherein: the power supply assembly (4) comprises a battery (10) and a battery cover (11), a plurality of groups of socket head cap screws are arranged on the battery cover (11), the battery cover (11) is connected with the battery (10) through the socket head cap screws, and electric quantity detection equipment is arranged on the battery (10).
6. The main control device for timing points of track according to claim 1, wherein: the control device is characterized in that the control device body is provided with HUB devices, the control device body is provided with two sets of side plates (13), a plurality of sets of countersunk head socket head cap screws are arranged on the panel assembly (1), and the panel assembly (1) is connected with the control device body through the countersunk head socket head cap screws.
7. The main control device for timing points of track according to claim 1, wherein: be provided with the display lamp on panel components (1), be provided with insulating wiring groove (14) on the controlgear main part, one side at RFID host computer (6) is installed in insulating wiring groove (14).
CN202023166205.7U 2020-12-23 2020-12-23 Track timing point master control equipment Active CN213518156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023166205.7U CN213518156U (en) 2020-12-23 2020-12-23 Track timing point master control equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023166205.7U CN213518156U (en) 2020-12-23 2020-12-23 Track timing point master control equipment

Publications (1)

Publication Number Publication Date
CN213518156U true CN213518156U (en) 2021-06-22

Family

ID=76429039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023166205.7U Active CN213518156U (en) 2020-12-23 2020-12-23 Track timing point master control equipment

Country Status (1)

Country Link
CN (1) CN213518156U (en)

Similar Documents

Publication Publication Date Title
CN103761880B (en) Based on the city automobile flux monitoring system of well lid
CN213518156U (en) Track timing point master control equipment
CN211372156U (en) Wisdom street lamp
CN206096469U (en) On -vehicle position terminal device of new forms of energy car
CN109978099A (en) A kind of pupilage reflexless terminal based on recognition of face and RFID
CN205120927U (en) Generating set remote monitoring device
CN202048013U (en) Manageable fan pull-and-plug board
CN201570901U (en) Electric power quality comprehensive monitoring protection device
CN108647755A (en) A kind of server in machine room orientation management system
CN206038941U (en) Meteorological soil moisture monitoring device of intelligence
CN112907888A (en) Intelligent alarm
CN208334968U (en) A kind of signal pickup assembly for dynamic environment monitoring system
CN202939663U (en) Highway toll station driveway controller
CN202650105U (en) Ultrasonic-assisted video passenger flow statistics terminal
CN206251257U (en) A kind of computer supervisory control system based on radio communication
CN206712826U (en) A kind of wireless router with network speed test function
CN205403857U (en) Environment monitoring instrument
CN205140045U (en) Stack fingerprint lock monitoring device
CN203554032U (en) Multifunctional mobile power supply
CN212064031U (en) Plug-in type Ethernet POE power supply device
CN216057375U (en) Wireless wisdom traffic response stereo set
CN209358786U (en) A kind of wifi probe unit
CN210072640U (en) People flow statistical system
CN210831513U (en) Solar energy response basketball lamp
CN213342541U (en) Cabinet of intelligent gateway device of power distribution station room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant