CN209760245U - Multistage supporting construction of pier foundation ditch - Google Patents

Multistage supporting construction of pier foundation ditch Download PDF

Info

Publication number
CN209760245U
CN209760245U CN201821657431.5U CN201821657431U CN209760245U CN 209760245 U CN209760245 U CN 209760245U CN 201821657431 U CN201821657431 U CN 201821657431U CN 209760245 U CN209760245 U CN 209760245U
Authority
CN
China
Prior art keywords
foundation pit
steel sheet
pier
row
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821657431.5U
Other languages
Chinese (zh)
Inventor
程华强
陈军
冯晓腊
吴义
谢模红
严国齐
肖铭钊
高云
席艳
熊宗海
莫云
谢武军
冉秀峰
张晓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Funda Geological Engineering Co Ltd
Wuhan Municipal Construction Group Co Ltd
Original Assignee
Wuhan Funda Geological Engineering Co Ltd
Wuhan Municipal Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Funda Geological Engineering Co Ltd, Wuhan Municipal Construction Group Co Ltd filed Critical Wuhan Funda Geological Engineering Co Ltd
Priority to CN201821657431.5U priority Critical patent/CN209760245U/en
Application granted granted Critical
Publication of CN209760245U publication Critical patent/CN209760245U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

The utility model provides a pier foundation pit multistage supporting structure, which comprises a pier excavation deep foundation pit supporting structure positioned on the inner layer, a foundation pit slope top construction road reinforcing structure positioned on the middle layer, and a double-row steel sheet pile cofferdam structure positioned on the outer layer; the support structure for the deep foundation pit excavated by the pier adopts a support form of 'steel sheet piles, steel pipe supports and jet grouting piles', and is used for ensuring the safety of the construction of an underground structure and the construction environment around the foundation pit; the foundation pit slope top construction road reinforcing structure adopts the jet grouting pile to reinforce the foundation and is used for construction vehicle operation and passive soil body area reinforcement; the double-row steel sheet pile cofferdam structure is used for separating water and blocking sand; the utility model has the advantages that: the technical scheme provided by the utility model has reasonable structural design and high reliability; the anti-seepage effect is achieved, and the safety and the stability are high; easy to be carried out and applied, and high in practicability and applicability.

Description

Multistage supporting construction of pier foundation ditch
Technical Field
The utility model relates to a pier foundation ditch engineering field especially relates to a pier foundation ditch multistage supporting construction.
Background
with the rapid development of social economy and science and technology, the bridge construction in China is rapidly advanced, and many large-span bridges span large rivers and even straits, thereby becoming the life lines of Chinese transportation. The bridge pier is the foundation of the bridge, and the excavation of the foundation pit of the bridge pier is of great importance to the safety of the bridge. However, some pier foundation pits are positioned at the seabed or the river bottom or the river bank or the coast with complicated engineering geological conditions, which brings serious challenges to the construction of the pier foundation pits; with the continuous innovative development of the foundation construction of the bridge, people have higher and higher requirements on the seepage prevention, safety, stability and the like of the pier foundation pit support, and the new challenge is brought to the construction of the pier foundation pit. Therefore, the pier foundation pit supporting structure meeting the requirements has important significance.
disclosure of Invention
In order to solve the problem, the utility model provides a pier foundation ditch multistage supporting construction, include: the construction method comprises the following steps that a deep foundation pit supporting structure is excavated by piers located on the inner layer, a foundation pit slope top construction road reinforcing structure located on the middle layer and a double-row steel sheet pile cofferdam structure located on the outer layer are constructed;
The pier excavates a deep foundation pit supporting structure for ensuring the safety of underground structure construction and the construction environment around the foundation pit; the support structure for the deep foundation pit excavated by the pier comprises a single row of steel sheet piles, steel pipe supports and jet grouting piles; the steel pipe supports are positioned between the single-row steel sheet piles and used for supporting the single-row steel sheet piles on two sides, and the supporting points are positioned at the upper ends of the single-row steel sheet piles; a row of rotary spraying piles is attached to the upper end of the outer side of the single row of steel sheet piles; forming a support body on the outer side of the steel sheet pile by the jet grouting pile, and reinforcing and supporting the single-row steel sheet pile;
The foundation pit slope top construction road reinforcing structure is used for operation of construction vehicles and reinforcement of a passive soil area; the foundation pit slope top construction road reinforcing structure comprises a slope top construction road, a soil retaining platform slope and a pit top soil retaining platform; the slope top construction road comprises a rotary jet grouting pile and a hardened layer positioned on the top of the rotary jet grouting pile; the slope top construction road adopts the jet grouting pile to carry out foundation reinforcement treatment, and a composite foundation is formed by cement paste sprayed out of the jet grouting pile, a hardened layer and inter-pile soil of the jet grouting pile; the top of the slope of the soil retaining platform is connected with the top of the pit soil retaining platform, and the bottom of the slope of the soil retaining platform is connected with the top of the slope construction road;
The double-row steel sheet pile cofferdam structure surrounds the periphery of the foundation pit slope top construction road reinforcing structure in a double-row steel sheet pile mode, maintains the whole pier foundation pit and is used for water isolation and sand and soil blocking; the double-row steel sheet pile cofferdam structure comprises two rows of steel sheet piles, tie bars and transverse channel steel wales; and transverse channel steel wales are respectively arranged on the outer sides of the two rows of steel sheet piles, the two rows of steel sheet piles are connected through tie bars, two ends of each tie bar are anchored on the transverse channel steel wales, and the tie bars are locked by the transverse channel steel wales.
Further, in the deep foundation pit supporting structure excavated by the pier, double-spliced steel enclosing purlins are arranged on the single row of steel sheet piles; the steel pipe supports comprise angle braces and opposite braces and support single-row steel plate piles.
Furthermore, in the foundation pit slope top construction road reinforcing structure, when the foundation stabilization treatment is carried out on the slope top construction road by adopting the rotary jet piles, the rotary jet piles are arranged in a quincunx shape, and the distance between the rotary jet piles is suitable for reinforcing the pier foundation pit.
Further, in the road reinforced structure is under construction at foundation ditch hillside top, adopt the jet grouting stake to carry out full hall formula reinforcement to staying native platform slope.
Furthermore, in the foundation pit slope top construction road reinforcing structure, the soil platform remained at the top of the pit is reinforced in a grid mode by adopting the jet grouting piles, a passive region reinforcing body is formed after reinforcement, and the anti-overturning performance and the stability of the double-row steel sheet pile cofferdam structure are improved.
Furthermore, in the construction of the road reinforcing structure on the top of the foundation pit, bidirectional reinforcing bars are required to be added in the process of forming the composite foundation, and the composite foundation is used for reinforcing the pier foundation pit.
Further, in the double-row steel sheet pile cofferdam structure, the steel sheet piles comprise steel sheet piles at the water-facing side and steel sheet piles at the inner side; the single-row channel steel with the transverse through length is the transverse channel steel waist beam.
The utility model provides a beneficial effect that technical scheme brought is: the structure is reasonable in design and high in reliability; the anti-seepage effect is achieved, and the safety and the stability are high; easy to be carried out and applied, and high in practicability and applicability.
Drawings
The invention will be further explained with reference to the drawings and examples, wherein:
Fig. 1 is a plan view of a pier foundation pit multistage supporting structure in an embodiment of the present invention;
Fig. 2 is a sectional view of a pier foundation pit multistage supporting structure in the embodiment of the present invention;
Fig. 3 is a schematic view of the deep foundation pit supporting structure excavated by the pier located at the inner layer in the embodiment of the present invention;
FIG. 4 is a schematic view of a road reinforcing structure for construction of a slope top of a foundation pit located in an intermediate layer in the embodiment of the present invention;
fig. 5 is a schematic diagram of the double-row steel sheet pile cofferdam structure located on the outer layer in the embodiment of the present invention.
Detailed Description
In order to clearly understand the technical features, objects, and effects of the present invention, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
The embodiment of the utility model provides a pier foundation ditch multistage support method and structure.
referring to fig. 1 and fig. 2, fig. 1 is a plan view of a pier foundation pit multistage supporting structure in an embodiment of the present invention, fig. 2 is a sectional view of a pier foundation pit multistage supporting structure in an embodiment of the present invention, and as can be seen from fig. 1 and fig. 2, a pier foundation pit multistage supporting structure includes: the method comprises the following steps that a deep foundation pit supporting structure 1 is excavated by piers located on the inner layer, foundation pit slope top construction road reinforcing structures 2, 3-1 and 4-1 located on the middle layer, and a double-row steel sheet pile cofferdam structure 5 located on the outer layer; the support structure for the pier excavation deep foundation pit adopts a support form of 'steel sheet piles, steel pipe supports and jet grouting piles' and is used for ensuring the safety of underground structure construction and the construction environment around the foundation pit, and the specific structure is shown in figure 3; the foundation pit slope top construction road reinforcing structure adopts the jet grouting piles to reinforce the foundation, is used for reinforcing the operation of construction vehicles and passive soil body areas, and has the specific structure shown in figure 4; the double-row steel sheet pile cofferdam structure is used for separating water and blocking sand and soil, and the specific structure is shown in figure 5. The three-stage support structure system of the pier foundation pit is tightly connected to form a multi-stage support system.
Referring to fig. 3, fig. 3 is a schematic view of a deep foundation pit supporting structure excavated by piers located in an inner layer according to an embodiment of the present invention, and the deep foundation pit supporting structure excavated by piers is used for ensuring safety of underground structure construction and a construction environment around a foundation pit; the support structure for the deep foundation pit excavated by the pier comprises 1-2 rows of steel sheet piles, 1-1 steel pipe supports and 1-3 jet grouting piles; the steel pipe supports 1-1 are positioned between the single-row steel sheet piles 1-2 and used for supporting the single-row steel sheet piles 1-2 on two sides, and the supporting points are positioned at the upper ends of the single-row steel sheet piles; the single-row steel sheet pile 1-2 is used for supporting the whole pier foundation pit three-level supporting structure, and a row of jet grouting piles 1-3 are attached to the upper end of the outer side of the single-row steel sheet pile 1-2; the rotary jet grouting piles 1-3 form a steel sheet pile outer side support body, cement paste is sprayed into a soil body through nozzles of the rotary jet grouting piles, and a continuously lapped cement reinforcing body is formed with a slope top construction road 2 in the foundation pit slope top construction road reinforcing structure in the middle layer; the single-row steel sheet pile 1-2 is a foundation pit supporting structure, a double-spliced steel enclosing purlin is arranged on the single-row steel sheet pile 1-2, and the steel pipe support 1-1 comprises an angle support and a counter support and supports the single-row steel sheet pile; the steel sheet piles and the steel pipe supports meet the standard requirements of technical regulations for supporting foundation pits of buildings (JGJ 120-2012).
Referring to fig. 4, fig. 4 is a schematic view of a foundation pit slope top construction road reinforcing structure located in the middle layer in the embodiment of the present invention, and the foundation pit slope top construction road reinforcing structure is used for operation of construction vehicles and reinforcement of a passive soil area; the foundation pit slope top construction road reinforcing structure comprises a slope top construction road 2, a soil retaining platform slope 3-1 and a pit top soil retaining platform 4-1; the slope top construction road 2 comprises a rotary jet grouting pile 2-1 and a hardened layer 2-2 positioned at the pile top of the rotary jet grouting pile 2-1; the slope top construction road 2 is subjected to foundation reinforcement treatment by adopting the rotary jet grouting piles 2-1, the rotary jet grouting piles 2-1 are arranged in a quincunx shape, and the distances among the rotary jet grouting piles are proper and used for reinforcing pier foundation pits; through cement paste sprayed by the jet grouting pile 2-1, the hardened layer 2-2 and inter-pile soil of the jet grouting pile 2-1 form a composite foundation, so that the bearing capacity of a soil body is increased, safe passing of construction vehicles is facilitated, and the soil pressure of a deep foundation pit supporting structure excavated by a pier located at the inner layer is reduced; in the process of forming the composite foundation, bidirectional reinforcing bars are required to be added, and the composite foundation reinforces a pier foundation pit; the slope ratio of the soil remaining platform slope 3-1 is taken as 1:1 in the embodiment, the top of the soil remaining platform slope 3-1 is connected with the pit top soil remaining platform 4-1, the bottom of the soil remaining platform slope 3-1 is connected with the top construction road 2, and the soil remaining platform slope 3-1 is reinforced in a full-space manner by adopting the rotary jet grouting pile 2-1; carrying out grid type reinforcement on the pit top soil-retaining platform 4-1 by adopting the rotary jet grouting pile 2-1; after reinforcement, the soil remaining platform slope 3-1 and the pit top soil remaining platform 4-1 form a passive area reinforcement body, and the overturning resistance and the stability of the double-row steel sheet pile cofferdam structure positioned on the outer layer are improved.
Referring to fig. 5, fig. 5 is a schematic view of a double-row steel sheet pile cofferdam structure located at the outer layer in the embodiment of the present invention, the double-row steel sheet pile cofferdam structure surrounds the road reinforcing structure for the construction of the slope top of the foundation pit located at the middle layer in the form of double-row steel sheet piles, maintains the whole pier foundation pit, blocks water and sand, and increases the stability of the foundation pit; the double-row steel sheet pile cofferdam structure comprises 5-1 parts of steel sheet piles, 5-2 parts of tie bars and 5-3 parts of transverse channel steel wales; the outer sides of the two rows of steel sheet piles are respectively provided with a single row of transverse through long channel steel as transverse channel steel wales 5-3, the two rows of steel sheet piles are connected through tie bars 5-2, two ends of each tie bar 5-2 are anchored on the transverse channel steel wales 5-3, and the transverse channel steel wales lock the tie bars 5-2; the steel sheet piles 5-1 comprise steel sheet piles at the water-facing side and steel sheet piles at the inner side and are used for isolating water and blocking sand; wherein, the shape, the steel type, the length and the distance of the double rows of steel sheet piles all meet the requirements of the design guide rule of the cofferdam of the hydraulic and hydroelectric engineering.
The utility model has the advantages that: the technical scheme provided by the utility model has reasonable structural design and high reliability; the anti-seepage effect is achieved, and the safety and the stability are high; easy to be carried out and applied, and high in practicability and applicability.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (7)

1. the utility model provides a multistage supporting construction of pier foundation ditch which characterized in that: the method comprises the following steps: the construction method comprises the following steps that a deep foundation pit supporting structure is excavated by piers located on the inner layer, a foundation pit slope top construction road reinforcing structure located on the middle layer and a double-row steel sheet pile cofferdam structure located on the outer layer are constructed;
The pier excavates a deep foundation pit supporting structure for ensuring the safety of underground structure construction and the construction environment around the foundation pit; the support structure for the deep foundation pit excavated by the pier comprises a single row of steel sheet piles, steel pipe supports and jet grouting piles; the steel pipe supports are positioned between the single-row steel sheet piles and used for supporting the single-row steel sheet piles on two sides, and the supporting points are positioned at the upper ends of the single-row steel sheet piles; a row of rotary spraying piles is attached to the upper end of the outer side of the single row of steel sheet piles; forming a support body on the outer side of the steel sheet pile by the jet grouting pile, and reinforcing and supporting the single-row steel sheet pile;
the foundation pit slope top construction road reinforcing structure is used for operation of construction vehicles and reinforcement of a passive soil area; the foundation pit slope top construction road reinforcing structure comprises a slope top construction road, a soil retaining platform slope and a pit top soil retaining platform; the slope top construction road comprises a rotary jet grouting pile and a hardened layer positioned on the top of the rotary jet grouting pile; the hardened layer and the inter-pile soil of the jet grouting pile form a composite foundation through cement paste sprayed out of the jet grouting pile; the top of the slope of the soil retaining platform is connected with the top of the pit soil retaining platform, and the bottom of the slope of the soil retaining platform is connected with the top of the slope construction road;
the double-row steel sheet pile cofferdam structure surrounds the periphery of the foundation pit slope top construction road reinforcing structure in a double-row steel sheet pile mode, maintains the whole pier foundation pit and is used for water isolation and sand and soil blocking; the double-row steel sheet pile cofferdam structure comprises two rows of steel sheet piles, tie bars and transverse channel steel wales; and transverse channel steel wales are respectively arranged on the outer sides of the two rows of steel sheet piles, the two rows of steel sheet piles are connected through tie bars, two ends of each tie bar are anchored on the transverse channel steel wales, and the tie bars are locked by the transverse channel steel wales.
2. The pier foundation pit multistage supporting structure of claim 1, wherein: in the deep foundation pit supporting structure excavated by the pier, double-spliced steel enclosing purlins are arranged on the single-row steel sheet piles; the steel pipe supports comprise angle braces and opposite braces and support single-row steel plate piles.
3. The pier foundation pit multistage supporting structure of claim 1, wherein: in the foundation pit slope top construction road reinforced structure, when adopting the jet grouting pile to carry out foundation stabilization treatment to the slope top construction road, the jet grouting pile becomes the quincunx and arranges, and the interval between the jet grouting pile is suitable for reinforcing the pier foundation pit.
4. The pier foundation pit multistage supporting structure of claim 1, wherein: in the road reinforced structure of foundation ditch hillside top construction, adopt and spout the stake soon and carry out full hall formula reinforcement to staying native platform slope.
5. The pier foundation pit multistage supporting structure of claim 1, wherein: in the foundation pit slope top construction road reinforcing structure, the rotary jet grouting piles are adopted to carry out grid type reinforcement on the pit top soil retaining platform, a passive region reinforcing body is formed after reinforcement, and the anti-overturning performance and the stability of the double-row steel sheet pile cofferdam structure are improved.
6. The pier foundation pit multistage supporting structure of claim 1, wherein: in the construction of the road reinforcing structure on the top of the foundation pit, bidirectional reinforcing bars are required to be added in the process of forming the composite foundation, and the composite foundation is used for reinforcing the pier foundation pit.
7. The pier foundation pit multistage supporting structure of claim 1, wherein: in the double-row steel sheet pile cofferdam structure, the steel sheet piles comprise steel sheet piles at the water-facing side and steel sheet piles at the inner side; the single-row channel steel with the transverse through length is the transverse channel steel waist beam.
CN201821657431.5U 2018-10-12 2018-10-12 Multistage supporting construction of pier foundation ditch Expired - Fee Related CN209760245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821657431.5U CN209760245U (en) 2018-10-12 2018-10-12 Multistage supporting construction of pier foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821657431.5U CN209760245U (en) 2018-10-12 2018-10-12 Multistage supporting construction of pier foundation ditch

Publications (1)

Publication Number Publication Date
CN209760245U true CN209760245U (en) 2019-12-10

Family

ID=68743922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821657431.5U Expired - Fee Related CN209760245U (en) 2018-10-12 2018-10-12 Multistage supporting construction of pier foundation ditch

Country Status (1)

Country Link
CN (1) CN209760245U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706936A (en) * 2018-10-12 2019-05-03 武汉市市政建设集团有限公司 A kind of bridge pier foundation pit multistage support structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706936A (en) * 2018-10-12 2019-05-03 武汉市市政建设集团有限公司 A kind of bridge pier foundation pit multistage support structure

Similar Documents

Publication Publication Date Title
CN201132960Y (en) Composite batardeau of steel light structure
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN111778793B (en) Cavity collapse prevention and control structure and construction method
CN201762710U (en) Pile-wall combined enclosing structure for offshore deep foundation pit
CN103290847A (en) Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method
CN103898868A (en) Novel high-pile wharf
CN203834422U (en) Novel high-pile wharf
CN109706936A (en) A kind of bridge pier foundation pit multistage support structure
CN110387889B (en) Multi-arch foundation pit supporting method for strip-shaped deep foundation pit
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN209227507U (en) Punish the Rigid Flexible Piled Composite Foundation of superelevation embankment soft foundation
CN209760245U (en) Multistage supporting construction of pier foundation ditch
CN101565940B (en) Coupling structure of gravity dam and unfavorable geological bank slope and the construction method thereof
CN101705668B (en) Damming water conservancy project construction structure constructed in flowing water and construction method thereof
CN203429640U (en) Enclosure structure for large-range underground engineering foundation pit excavation project
CN201406678Y (en) Linkage structure of gravity dam and unfavorable geological bank slope
CN109162288A (en) Latch type steel pipe pile cofferdam construction device and construction method
CN105569055A (en) Structure for preventing mountain landslide
CN201485843U (en) Stream-guidance navigation pier structure
CN103485348A (en) Lateral-force-resisting pier body combined-type fender structure in large-area pit excavation
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN103981858A (en) Anti-tilt pipe piles protected by latticed cement-soil continuous walls and construction method thereof
CN208844593U (en) Latch type steel pipe pile cofferdam construction device
CN101644040A (en) Flow guide and navigation pier structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191210

CF01 Termination of patent right due to non-payment of annual fee