CN208903300U - A kind of construction risk automatic monitoring system based on BIM technology - Google Patents

A kind of construction risk automatic monitoring system based on BIM technology Download PDF

Info

Publication number
CN208903300U
CN208903300U CN201820823583.1U CN201820823583U CN208903300U CN 208903300 U CN208903300 U CN 208903300U CN 201820823583 U CN201820823583 U CN 201820823583U CN 208903300 U CN208903300 U CN 208903300U
Authority
CN
China
Prior art keywords
risk
computer system
bim
monitoring
information processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820823583.1U
Other languages
Chinese (zh)
Inventor
徐利
易敏
李海英
刘倩
任富芝
张彦栋
韩风光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201820823583.1U priority Critical patent/CN208903300U/en
Application granted granted Critical
Publication of CN208903300U publication Critical patent/CN208903300U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The construction risk automatic monitoring system based on BIM technology that the utility model discloses a kind of, including risk point level monitoring system;BIM information processing computer system, BIM information processing computer system is connected by wireless network with each sensor of risk point level monitoring system, for showing Risk Monitoring data in the BIM three-dimensional information model in BIM information processing computer system, and to data real-time update;Construction risk early warning computer system, construction risk early warning computer system are used to read the Risk Monitoring data of BIM information processing computer system output and issue signal when risky.Data high integration is realized, keeps monitoring and warning more accurate, rapid, intuitive visual, reduces the construction cost in terms of engineering risk.

Description

A kind of construction risk automatic monitoring system based on BIM technology
Technical field
The utility model relates to construction risk automatic monitoring systems, certainly more particularly to the construction risk based on BIM technology Dynamic monitoring system.
Background technique
The full name of BIM is " Building Information Modeling ", i.e. Building Information Model, it is to actually building The every terms of information for building object is integrated, and is had many advantages, such as visualization, harmony, simulation, is widely used in architectural design field. It, can intuitive, the detailed position for understanding the equipment installed in building, parameter information by BIM.
In the subway foundation pit construction stage, the monitoring of construction risk is extremely crucial, and traditional personal monitoring's early warning mechanism machine Dynamic property is not strong, and the real-time and specific aim of monitoring and warning be not strong.And various risks monitoring project is various in the construction process, wind Danger monitoring lacks a Visualization Platform and is integrated, and keeps all kinds of monitoring data more intuitive and is easy to use.Therefore how real The visualization integration of existing Risk Monitoring data and Real-time Feedback are current urgent problems to be solved.
Summary of the invention
The shortcomings that the purpose of the utility model is to overcome prior arts, construction can targetedly be handled by providing one kind The construction risk automatic monitoring system based on BIM technology that Risk Monitoring data and risk point intuitively embody.
A kind of construction risk automatic monitoring system based on BIM technology of the utility model, comprising:
Risk point level monitoring system, the risk point level monitoring system include the multiple sensings being arranged at risk point Device, multiple sensors are used to monitor the monitoring numerical value of each risk point automatically and monitoring numerical value are fed back to BIM information Handle computer system;
BIM information processing computer system, the BIM information processing computer system pass through wireless network and risk point Each sensor of level monitoring system is connected, for showing Risk Monitoring data in BIM information processing computer system In BIM three-dimensional information model, and to data real-time update;
Construction risk early warning computer system, the construction risk early warning computer system is for reading at BIM information The Risk Monitoring data of reason computer system output simultaneously issue signal when risky.
The beneficial effects of the utility model are:
Accurately controlled with BIM information model, according to monitoring system Real-time Feedback difference risk point monitoring data, BIM information model corresponds to and intuitively shows and update in real time at risk point, and realizes risk automatic early-warning.Reduce a large amount of people Power realizes data high integration, keeps monitoring and warning more accurate, rapid, intuitive visual, reduces applying in terms of engineering risk Work cost.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of construction risk automatic monitoring system based on BIM technology.
Specific embodiment
With reference to the accompanying drawing, specific embodiment of the present utility model is described in detail.
A kind of construction risk automatic monitoring system based on BIM technology of the utility model as shown in Figure 1, comprising:
Risk point level monitoring system, the risk point level monitoring system include the multiple sensings being arranged at risk point Device, multiple sensors are used to monitor the monitoring numerical value of each risk point automatically and monitoring numerical value are fed back to BIM information Handle computer system.Risk point level monitoring system may include that strain gauge at building enclosure support, setting is arranged in In the water level sensor of inspection well and drainage well, the inclination sensor being arranged on tower crane, it is arranged in mass concrete Temperature sensor etc.;
BIM information processing computer system, the BIM information processing computer system pass through wireless network and risk point Each sensor of level monitoring system is connected, for showing Risk Monitoring data in BIM information processing computer system In BIM three-dimensional information model, and to data real-time update.
Construction risk early warning computer system, the construction risk early warning computer system is for reading at BIM information The Risk Monitoring data of reason computer system output simultaneously issue signal when risky, method particularly includes: by Risk Monitoring data Whether in safe range to determine monitoring numerical value compared with predetermined value, the construction risk if monitoring numerical value is more than predetermined value Early warning computer system issues signal, and Risk Monitoring personnel learn information.
As a kind of embodiment of the utility model, BIM information processing computer system and bearing stress sensor are seen Water level sensor, tower crane inclination sensor, the mass concrete temperature sensor of well logging and drainage well are respectively connected with, for connecing Receive the water of the water level detecting sensor output of the bearing stress monitoring numerical value signal, inspection well and drainage well of strain gauge output Temperature in position monitoring numerical value signal and the inclination monitoring numerical value signal of tower crane inclination sensor output, mass concrete passes The monitoring numerical value signal of sensor output.
By BIM construction risk automatic monitoring system, unit in charge of construction realize Risk Monitoring data visualization integration and Real-time Feedback early warning has very big effect to construction risk control.

Claims (2)

1. a kind of construction risk automatic monitoring system based on BIM technology, characterized by comprising:
Risk point level monitoring system, the risk point level monitoring system include the multiple sensors being arranged at risk point, Multiple sensors are used to monitor the monitoring numerical value of each risk point automatically and monitoring numerical value are fed back to BIM information processing Computer system;
BIM information processing computer system, the BIM information processing computer system are supervised by wireless network and risk point Each sensor of examining system is connected, for Risk Monitoring data to be shown to the BIM tri- in BIM information processing computer system It ties up in information model, and to data real-time update;
Construction risk early warning computer system, the construction risk early warning computer system is by reading based on BIM information processing The Risk Monitoring data of calculation machine system output simultaneously issue signal when risky.
2. the construction risk automatic monitoring system according to claim 1 based on BIM technology, it is characterised in that: described Multiple sensors include that strain gauge at building enclosure support is arranged in, inspection well is arranged in and the water level of drainage well passes Sensor, the inclination sensor being arranged on tower crane and the temperature sensor being arranged in mass concrete.
CN201820823583.1U 2018-05-30 2018-05-30 A kind of construction risk automatic monitoring system based on BIM technology Active CN208903300U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820823583.1U CN208903300U (en) 2018-05-30 2018-05-30 A kind of construction risk automatic monitoring system based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820823583.1U CN208903300U (en) 2018-05-30 2018-05-30 A kind of construction risk automatic monitoring system based on BIM technology

Publications (1)

Publication Number Publication Date
CN208903300U true CN208903300U (en) 2019-05-24

Family

ID=66566386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820823583.1U Active CN208903300U (en) 2018-05-30 2018-05-30 A kind of construction risk automatic monitoring system based on BIM technology

Country Status (1)

Country Link
CN (1) CN208903300U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113051649A (en) * 2021-03-31 2021-06-29 中煤科工集团重庆研究院有限公司 Risk assessment model based on concrete stress strain
CN113487212A (en) * 2021-06-07 2021-10-08 广联达科技股份有限公司 Risk monitoring method and device
CN114997703A (en) * 2022-06-23 2022-09-02 广州高新工程顾问有限公司 BIM and wireless communication technology-based construction site safety risk management and control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113051649A (en) * 2021-03-31 2021-06-29 中煤科工集团重庆研究院有限公司 Risk assessment model based on concrete stress strain
CN113487212A (en) * 2021-06-07 2021-10-08 广联达科技股份有限公司 Risk monitoring method and device
CN114997703A (en) * 2022-06-23 2022-09-02 广州高新工程顾问有限公司 BIM and wireless communication technology-based construction site safety risk management and control method

Similar Documents

Publication Publication Date Title
CN110263460A (en) A kind of assembled 4D construction simulation safety monitoring system based on BIM
CN106227977B (en) A kind of method of the steel structure net rack hydraulic pressure lift time-varying finite element analysis based on BIM
CN208903300U (en) A kind of construction risk automatic monitoring system based on BIM technology
CN110263461B (en) Bridge safety monitoring and early warning system based on BIM
CN111335186A (en) Safety monitoring and early warning method and system for swivel bridge, storage medium and early warning platform
CN106768432A (en) A kind of mass concrete real time temperature monitoring, method for early warning based on BIM
CN108385691A (en) Pit retaining monitoring, early warning and the construction management D-BIM platforms of integrated Big Dipper high-accuracy position system
CN105631154A (en) Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN111945796A (en) Foundation pit deformation monitoring synchronous simulation analysis and real-time early warning system based on BIM technology
Liu et al. Study on real-time construction quality monitoring of storehouse surfaces for RCC dams
CN103669366A (en) Remote monitoring early warning system for deep foundation pit support structure deformation
CN103309325A (en) Three-dimension-visualization dynamic monitoring system and monitoring method for prestressed steel structures
CN103899357A (en) System and method for real-time visual monitoring and early warning of mine floor water disasters
CN110672154A (en) Civil engineering building monitoring system
CN113776593A (en) Intelligent monitoring system for deep and large foundation pit based on Internet of things + and BIM three-dimensional modeling
CN203132755U (en) Wireless intelligent online pull-monitoring system
CN104326360B (en) High pedestal jib crane holographic measuring method
CN205634668U (en) Virtual command system of large -scale hoist and mount operation
CN114693114A (en) Monitoring method and device for underground space structure, computer equipment and storage medium
CN110631683A (en) Building rigid part strain safety monitoring method
CN203982150U (en) For the three-dimensional visualization dynamic monitoring system of prestressed steel structure
CN205644892U (en) Underground works safe risk perceptual arrangement that is under construction based on BIM
CN205332998U (en) A health monitoring system for building structure
CN206638272U (en) A kind of reservoir dam monitoring system
CN115482650A (en) Concrete pouring auxiliary system based on BIM

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant