CN207956023U - Floating load carrier - Google Patents

Floating load carrier Download PDF

Info

Publication number
CN207956023U
CN207956023U CN201820305721.7U CN201820305721U CN207956023U CN 207956023 U CN207956023 U CN 207956023U CN 201820305721 U CN201820305721 U CN 201820305721U CN 207956023 U CN207956023 U CN 207956023U
Authority
CN
China
Prior art keywords
platform
load carrier
floating load
aerostatics
carrier according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820305721.7U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Dongguan Institute Of Science And Technology Innovation
Original Assignee
Dongguan Frontier Technology Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Frontier Technology Institute filed Critical Dongguan Frontier Technology Institute
Priority to CN201820305721.7U priority Critical patent/CN207956023U/en
Application granted granted Critical
Publication of CN207956023U publication Critical patent/CN207956023U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model provides a kind of floating load carrier, is erected at the top of earth's surface, and has default mounting height between earth's surface, and floating load carrier includes:Platform has default mounting height between platform and earth's surface;The lower end of aerostatics, aerostatics is connect with platform;Connection structure, platform are connect by connection structure with the building structure or massif being located in earth's surface.The utility model solves the problems, such as that hanging garden in the prior art exists and builds difficulty.

Description

Floating load carrier
Technical field
The utility model is related to equipment technical fields of going sightseeing, in particular to a kind of floating load carrier.
Background technology
It goes sightseeing with the improvement of living standards, people have no longer met simple ground, more and more people wish A kind of existing hanging garden, can appreciate scenery in the air, presently, there are the aerial form that watches be mainly fire balloon, but hot gas Ball-joint loading capability is limited, while professional being needed to instruct operation, very inconvenient, in addition, the area of hanging garden is larger, applies Work is difficult.
It follows that hanging garden in the prior art there is a problem of building difficulty.
Utility model content
The main purpose of the utility model is to provide a kind of floating load carriers, to solve aerial sight in the prior art The problem of light inconvenience.
To achieve the goals above, one side according to the present utility model provides a kind of floating load carrier, sets up In the top of earth's surface, and there is default mounting height between earth's surface, floating load carrier includes:Platform, platform and earth's surface it Between there is default mounting height;The lower end of aerostatics, aerostatics is connect with platform;Connection structure, platform by connection structure with Building structure in earth's surface or massif connection.
Further, the loaded area of platform is more than or equal to 3000 square metres and is less than or equal to 4000 square metres.
Further, aerostatics includes:There is gas, the density of gas to be less than the density of air for utricule, inside;Gondola, Gondola is mounted below utricule or is set up directly on utricule, and gondola has accommodating chamber to provide accommodation space, utricule and/or hangs Cabin is adjustably connect with position of platform.
Further, there is platform inside guardrail, inside guardrail to be arranged around aerostatics, and the area that inside guardrail surrounds is big In frontal projected area of the aerostatics on platform.
Further, also there is outside guardrail, inside guardrail to be located in the region that outside guardrail surrounds for the edge of platform.
Further, aerostatics further includes windproof structure, and the first end of windproof structure is connect with utricule, and the of windproof structure Two ends are detachably connected with inside guardrail.
Further, aerostatics further includes lifting structure, and the first end of lifting structure and the bottom of gondola connect, lifting knot The second end of structure is connect with platform.
Further, aerostatics further includes hitch structure, and the first end of hitch structure is connect with utricule, and the of hitch structure Two ends are detachably connected with platform.
Further, floating load carrier further includes transport structure, transport structure be erected at platform and building structure and/or Between massif.
Further, transport structure is one or more in plank road, cableway, transmission ladder, climbing rope.
Further, floating load carrier further includes at least one bungee jumping platform, and bungee jumping platform is arranged in flat edge of table Place, and being provided at circumferentially spaced around platform when bungee jumping platform is multiple.
Further, bungee jumping platform is located at below platform.
Further, floating load carrier further includes multiple mounting brackets, and multiple mounting brackets are arranged at intervals on platform week In the building structure enclosed and/or massif, platform is connect by connection structure with mounting bracket, so that floating load carrier is erected at In earth's surface.
Using the technical solution of the utility model, floating load carrier is erected at the top of earth's surface, and has between earth's surface It includes platform, aerostatics and connection structure to have default mounting height, floating load carrier, has default peace between platform and earth's surface Dress height;The lower end of aerostatics is connect with platform;Platform is connected by connection structure with the building structure or massif being located in earth's surface It connects.
Floating load carrier is set up in the air to carry tourist, facilitates tourist to go sightseeing in the air, wherein platform passes through Connection structure is connect with the building structure or massif being located in earth's surface, and connection structure plays draw to platform, by platform It fixes in the air, while ensure that the stability of platform, aerostatics has buoyancy, floats in the air, tourist can be in aerostatics In carry out the activity of going sightseeing etc., the lower end of aerostatics is connect with platform, prevent aerostatics be detached from control and fly away.
Description of the drawings
The accompanying drawings which form a part of this application are used to provide a further understanding of the present invention, this practicality Novel illustrative embodiments and their description are not constituted improper limits to the present invention for explaining the utility model. In the accompanying drawings:
Fig. 1 shows the structural schematic diagram of the floating load carrier of an optional embodiment of the utility model;
Fig. 2 shows the part-structure schematic diagrams of the floating load carrier in Fig. 1;
Fig. 3 shows the part-structure schematic diagram of the floating load carrier in Fig. 1;And
Fig. 4 shows the structural schematic diagram of the floating load carrier of another optional embodiment of the utility model.
Wherein, above-mentioned attached drawing includes the following drawings label:
10, platform;11, inside guardrail;12, outside guardrail;20, aerostatics;21, utricule;22, gondola;23, windproof knot Structure;24, lifting structure;25, hitch structure;30, connection structure;40, transport structure;50, bungee jumping platform;60, mounting bracket.
Specific implementation mode
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
It should be pointed out that unless otherwise specified, all technical and scientific terms used in this application have and the application The normally understood identical meanings of person of an ordinary skill in the technical field.
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, top, bottom " is usually It is for direction shown in the drawings, or for component itself is on vertical, vertical or gravity direction;Together Sample, it for ease of understanding and describes, " inside and outside " refers to the inside and outside of the profile relative to each component itself, but the above-mentioned noun of locality is simultaneously It is not used in limitation the utility model.
Difficulty is built in order to solve the problems, such as that hanging garden in the prior art exists, the utility model provides a kind of floating Empty load carrier.
As Figure 1 and Figure 4, floating load carrier is erected at the top of earth's surface, and has default installation high between earth's surface Degree, floating load carrier includes platform 10, aerostatics 20 and connection structure 30, has default installation high between platform 10 and earth's surface Degree;The lower end of aerostatics 20 is connect with platform 10;Platform 10 passes through connection structure 30 and the building structure in earth's surface or mountain Body connects.
Floating load carrier is set up in the air to carry tourist, and tourist is facilitated to go sightseeing in the air, and wherein platform 10 is logical It crosses connection structure 30 to connect with the building structure or massif being located in earth's surface, connection structure 30 plays traction to platform 10 and makees With platform 10 is fixed in the air, while ensure that the stability of platform 10, aerostatics 20 has buoyancy, floats in the air, trip Visitor can carry out the activity of going sightseeing etc. in aerostatics 20, and the lower end of aerostatics 20 is connect with platform 10, and aerostatics 20 is prevented to be detached from It controls and flies away.
Preferably, connection structure 30 is steel wire cable.The structure of steel wire cable is simple, and bearing capacity is strong, and disclosure satisfy that makes With requiring.
Specifically, the loaded area of platform 10 is more than or equal to 3000 square metres and is less than or equal to 4000 square metres.
It should be noted that the maximum load-carrying capacity of platform 10 is 50T, 300 people can be carried, the wind of 30 meter per seconds can be resisted Speed, service life are 30 years.
Preferably, the face of platform 10 be circular configuration, a diameter of 80 meters.
As shown in figure 3, aerostatics 20 includes utricule 21 and gondola 22,21 inside of utricule has gas, the density of gas small In the density of air;Gondola 22 is mounted on 21 lower section of utricule or is set up directly on utricule 21, and gondola 22 has accommodating chamber to carry For accommodation space, utricule 21 and/or gondola 22 are connect with 10 position-adjustable of platform.
Since the density of the gas inside utricule 21 is less than the density of air, thus utricule 21 can float in the air, together When can be that gondola 22 provide upward pulling force, in addition gondola 22 has accommodating chamber, and tourist can go sightseeing in accommodating chamber Equal activities, experience effect more preferably, and since utricule 21 and/or gondola 22 are connect with 10 position-adjustable of platform, thus can It is adjusted with the position to utricule 21 and/or gondola 22, to meet the needs of different situations.
It should be noted that the service life of utricule 21 be 5 years, utricule 21 be sphere, a diameter of 22.3 meters, volume 5806.5 Cubic meter carries out a tonifying Qi in every 3 months, and payload capacity 3T can resist the wind-force of 6 meter per seconds, the service life of gondola 22 It is 10 years.
As shown in Fig. 2, there is platform 10 inside guardrail 11, inside guardrail 11 to be arranged around aerostatics 20, inside guardrail 11 The area surrounded is more than the frontal projected area of aerostatics 20 on platform 10.Inside guardrail 11 is centered around 20 periphery of aerostatics, resistance Only tourist arbitrarily enters the region where aerostatics 20, to avoid danger, plays the role of protection.
It should be noted that the diameter in the region that inside guardrail 11 surrounds is 60 meters.
As shown in Fig. 2, also there is outside guardrail 12, inside guardrail 11 to be located at outside guardrail 12 and surround for the edge of platform 10 Region in.Outside guardrail 12 fences up the edge of platform 10, prevents tourist from being fallen down from platform 10, plays protection Effect.
As shown in Fig. 2, aerostatics 20 further includes windproof structure 23, the first end of windproof structure 23 is connect with utricule 21, is prevented The second end of wind structure 23 is detachably connected with inside guardrail 11.Since utricule 21 floats in the air, thus in the effect of wind-force Under can occur arbitrarily to swing, be easy to cause danger, and windproof structure 23 links together utricule 21 with inside guardrail 11, has The effect of fixed protection, in addition, since windproof structure 23 and inside guardrail 11 are detachably connected, thus can carry out as needed Dismounting, it is easy to operate.
It should be noted that since the area that inside guardrail 11 surrounds is more than the frontal plane of projection of aerostatics 20 on platform 10 Product, thus when the connection utricule 21 of windproof structure 23 and inside guardrail 11, windproof structure 23 has outside drawing relative to utricule 21 Power, fixed effect are more preferable.
Preferably, windproof structure 23 is rope.The structure of rope is simple, and cost is relatively low, easy to use.
As shown in figure 3, aerostatics 20 further includes lifting structure 24, the first end of lifting structure 24 connects with the bottom of gondola 22 It connects, the second end of lifting structure 24 is connect with platform 10.Utricule 21 may be implemented under the action of lifting structure 24 in aerostatics 20 150 meters of movement up and down, meet different requirements, to reach better sightseeing effect.
Preferably, lifting structure 24 is rope.The structure of rope is simple, and cost is relatively low, easy to operation.
As shown in figure 3, aerostatics 20 further includes hitch structure 25, the first end of hitch structure 25 is connect with utricule 21, is led The second end of guiding structure 25 is detachably connected with platform 10.Utricule 21 is connected and fixed on platform 10 by hitch structure 25, is prevented Utricule 21 is detached from constraint and flies away and cause danger, has ensured the safety of tourist, in addition, due to hitch structure 25 second end with it is flat Platform 10 is detachably connected, thus can be disassembled and installed according to requirements.
Preferably, hitch structure 25 is rope.The structure of rope is simple, and cost is relatively low, easy to use.
As shown in Figure 1, floating load carrier further includes transport structure 40, transport structure 40 is erected at platform 10 and is tied with building Between structure and/or massif.Transport structure 40 is the channel into platform 10, and entering platform 10 for tourist provides a convenient, and realizes Platform 10 and external communication.
Optionally, transport structure 40 is one or more in plank road, cableway, transmission ladder, climbing rope.
As shown in Fig. 2, floating load carrier further includes at least one bungee jumping platform 50, bungee jumping platform 50 is arranged in platform 10 Edge, and when bungee jumping platform 50 be it is multiple when being provided at circumferentially spaced around platform 10.Due to being provided with bungee jumping platform 50, The use function of thus increasing floating bearing structure facilitates tourist to carry out a variety of experience, in addition, since bungee jumping platform 50 is spaced Setting, thus can crash in bungee jumping to avoid the tourist of different bungee jumping platforms 50, it ensure that the safety of tourist.
Preferably, bungee jumping platform 50 is four, and is symmetrically set.
As shown in Fig. 2, bungee jumping platform 50 is located at 10 lower section of platform.More convenient, safety.
As shown in Figure 1, floating load carrier further includes multiple mounting brackets 60, multiple mounting brackets 60 are arranged at intervals on flat In building structure and/or massif around platform 10, platform 10 is connect by connection structure 30 with mounting bracket 60, so that floating is held Mounted mechanism is erected in earth's surface.
Mounting bracket 60 provides supporting point for floating load carrier, under the action of connection structure 30, to 10 shape of platform It is fixed in the air at pulling force, and then by platform 10, realizes the effect of hanging garden.
Embodiment one
As shown in Figure 1, mounting bracket 60 is three, three mounting brackets 60 are separately positioned on three mountains around platform 10 On, platform 10 is connect by connection structure 30 with mounting bracket 60, under the action of connection structure 30, from different directions to flat Platform 10 forms pulling force and realizes the effect of hanging garden so that floating load carrier is erected in earth's surface.
Preferably, mounting bracket 60 is evenly distributed on the massif of surrounding, can allow so each mounting bracket 60 by Power is uniform, improves safety and reliability.
Embodiment two
Difference lies in the number of mounting bracket 60 is different with embodiment one.
In the present embodiment, as shown in figure 4, mounting bracket 60 is four, four mounting brackets 60 are uniformly arranged on platform On four mountains around 10, by increasing stress supporting point, and then the stress size of each mounting bracket 60 is reduced, to carry High safety and reliability, while increasing the service life of mounting bracket 60.
It can be seen from the above description that the above embodiments of the present invention achieve the following technical effects:
1, platform 10 is set up in the air by connection structure 30, multiple mounting brackets 60 are arranged at intervals on around platform 10 Building structure and/or massif on, platform 10 is connect by connection structure 30 with mounting bracket 60, so that floating load carrier frame It is located in earth's surface, realizes the effect of hanging garden;
2, aerostatics 20 floats in the air, can highly adjust, and better experience effect is increased for tourist.
Obviously, above-mentioned described embodiment is only the embodiment of the utility model part, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work The every other embodiment obtained should all belong to the range of the utility model protection.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, work, device, component and/or combination thereof.
It should be noted that term " first " in the description and claims of this application and above-mentioned attached drawing, " Two " etc. be for distinguishing similar object, without being used to describe specific sequence or precedence.It should be appreciated that using in this way Data can be interchanged in the appropriate case, so that presently filed embodiment described herein can be in addition to illustrating herein Or the sequence other than those of description is implemented.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (13)

1. a kind of floating load carrier, which is characterized in that be erected at the top of earth's surface, and there is default peace between the earth's surface Dress height, the floating load carrier include:
Platform (10) has the default mounting height between the platform (10) and the earth's surface;
The lower end of aerostatics (20), the aerostatics (20) is connect with the platform (10);
Connection structure (30), the platform (10) by the connection structure (30) in the earth's surface building structure or Massif connects.
2. floating load carrier according to claim 1, which is characterized in that the loaded area of the platform (10) be more than etc. In 3000 square metres and it is less than or equal to 4000 square metres.
3. floating load carrier according to claim 1, which is characterized in that the aerostatics (20) includes:
There is gas, the density of the gas to be less than the density of air for utricule (21), inside;
Gondola (22), the gondola (22) are mounted below the utricule (21) or are set up directly on the utricule (21), institute Gondola (22) is stated with accommodating chamber to provide accommodation space, the utricule (21) and/or the gondola (22) and the platform (10) it connects to position-adjustable.
4. floating load carrier according to claim 3, which is characterized in that the platform (10) has inside guardrail (11), the inside guardrail (11) is arranged around the aerostatics (20), and the area that the inside guardrail (11) surrounds is more than institute State frontal projected area of the aerostatics (20) on the platform (10).
5. floating load carrier according to claim 4, which is characterized in that the edge of the platform (10) also has outer Side guardrail (12), the inside guardrail (11) are located in the region that the outside guardrail (12) surrounds.
6. floating load carrier according to claim 4, which is characterized in that the aerostatics (20) further includes windproof structure (23), the first end of the windproof structure (23) is connect with the utricule (21), the second end of the windproof structure (23) and institute Inside guardrail (11) is stated to be detachably connected.
7. floating load carrier according to claim 3, which is characterized in that the aerostatics (20) further includes lifting structure (24), the first end of the lifting structure (24) is connect with the bottom of the gondola (22), and the second of the lifting structure (24) End is connect with the platform (10).
8. floating load carrier according to claim 3, which is characterized in that the aerostatics (20) further includes hitch structure (25), the first end of the hitch structure (25) is connect with the utricule (21), the second end of the hitch structure (25) and institute Platform (10) is stated to be detachably connected.
9. floating load carrier according to any one of claim 1 to 8, which is characterized in that the floating load carrier Further include transport structure (40), the transport structure (40) is erected at the platform (10) and the building structure and/or described Between massif.
10. floating load carrier according to claim 9, which is characterized in that the transport structure (40) is plank road, rope It is one or more in road, transmission ladder, climbing rope.
11. floating load carrier according to any one of claim 1 to 8, which is characterized in that the floating load carrier Further include at least one bungee jumping platform (50), the bungee jumping platform (50) is arranged in the edge of the platform (10), and works as institute When to state bungee jumping platform (50) be multiple, it is provided at circumferentially spaced around the platform (10).
12. floating load carrier according to claim 11, which is characterized in that the bungee jumping platform (50) is located at described flat Below platform (10).
13. floating load carrier according to any one of claim 1 to 8, which is characterized in that the floating load carrier Further include multiple mounting brackets (60), multiple mounting brackets (60) are arranged at intervals on the described of the platform (10) surrounding and build On building structure and/or the massif, the platform (10) is connect by the connection structure (30) with the mounting bracket (60), So that the floating load carrier is erected in the earth's surface.
CN201820305721.7U 2018-03-05 2018-03-05 Floating load carrier Expired - Fee Related CN207956023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820305721.7U CN207956023U (en) 2018-03-05 2018-03-05 Floating load carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820305721.7U CN207956023U (en) 2018-03-05 2018-03-05 Floating load carrier

Publications (1)

Publication Number Publication Date
CN207956023U true CN207956023U (en) 2018-10-12

Family

ID=63741123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820305721.7U Expired - Fee Related CN207956023U (en) 2018-03-05 2018-03-05 Floating load carrier

Country Status (1)

Country Link
CN (1) CN207956023U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685472A (en) * 2019-09-30 2020-01-14 深圳市万景纪旅游发展有限公司 Artificial floating island

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685472A (en) * 2019-09-30 2020-01-14 深圳市万景纪旅游发展有限公司 Artificial floating island

Similar Documents

Publication Publication Date Title
CN104890851A (en) Near space balloon system safety release method
EP3841012A1 (en) Systems, methods, and devices for improving safety and functionality of craft having one or more rotors
CA2755046A1 (en) Method and arrangement for transporting elongated, bulky loads
US6116538A (en) Accessible utility space comprising a carrier balloon
CN207956023U (en) Floating load carrier
WO2000066424A1 (en) Balloon lifting system
CN109107058B (en) Fire rescue system for high-rise building
KR101276168B1 (en) Apparatus for Take-off and Climb a Fixed wing Aircraft without a Runway
US11618589B2 (en) Anchoring platform for captive lighter-than-air aircraft
CN105539806B (en) A kind of belpharoedema cableway conveyor
CN105457207B (en) Ultra-large combined fire-fighting equipment special for super high-rise building
CN109703730B (en) High-altitude captive balloon and control method thereof
CN104343251A (en) Sky plaza
CN201972442U (en) Spiral lifting observation tower
CN212637909U (en) Fire control unmanned aerial vehicle cable draw gear
CN207955636U (en) Sight seeing system
CA2713257A1 (en) Airship hoist for hang gliding, parasailing, gliding.
RU85147U1 (en) HYBRID TAPED AEROSTAT
CN106902482A (en) A kind of lifesaving appliance
CN215051982U (en) Suspension bridge deck high-altitude recreation equipment
US1945785A (en) Aerial advertising device
RU2214346C2 (en) Captive balloon
CN218563182U (en) Floating sightseeing amusement facility
CN111845791A (en) Floating type climbing cableway for electric power equipment
CN204619207U (en) Rail mounted escape device for high-rise buildings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230724

Address after: Room 501, Building D2, Songshan Lake International Innovation and Entrepreneurship Community, Songshan Lake High tech Industrial Development Zone, Dongguan City, Guangdong Province, 523000

Patentee after: Dongguan Dongguan Institute of Science and Technology Innovation

Address before: 523000 Room 502, 5th floor, building 1, innovation and Technology Park, Songshanhu high tech Industrial Development Zone, Dongguan City, Guangdong Province

Patentee before: DONGGUAN FRONTIER TECHNOLOGY INSTITUTE

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181012