CN207887852U - Tooling is preheated under liquid-state forging die line - Google Patents

Tooling is preheated under liquid-state forging die line Download PDF

Info

Publication number
CN207887852U
CN207887852U CN201721863798.8U CN201721863798U CN207887852U CN 207887852 U CN207887852 U CN 207887852U CN 201721863798 U CN201721863798 U CN 201721863798U CN 207887852 U CN207887852 U CN 207887852U
Authority
CN
China
Prior art keywords
tooling
preheating
mould
upper mold
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721863798.8U
Other languages
Chinese (zh)
Inventor
张明新
刘杰
黄海军
孟另柱
韩旭
殷晓琼
刘利辉
谢春明
于兴德
杨洪泽
辛建朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Lizhong Light Alloy Forging Co ltd
Original Assignee
TIANJIN NANUO MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN NANUO MACHINERY MANUFACTURING Co Ltd filed Critical TIANJIN NANUO MACHINERY MANUFACTURING Co Ltd
Priority to CN201721863798.8U priority Critical patent/CN207887852U/en
Application granted granted Critical
Publication of CN207887852U publication Critical patent/CN207887852U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

Tooling is preheated under a kind of liquid-state forging die line, it is characterised in that it includes preheating tooling on the inside of mould placing rack, upper mold preheating tooling, side mould outer ring preheating tooling, Bian Mo and bed die;The mould placing rack bottom is Bian Mo and bed die rack, and top is upper mold rack;Mould and the bed die when being placed on mould and bed die rack, when mould periphery is placed, mould outer ring preheats tooling, and Bian Mo and bed die inside place and preheat tooling on the inside of side mould and bed die;Upper mold is placed on the upper mold rack, upper mold periphery places upper mold and preheats tooling.Superiority:Mold is targetedly preheated, preheating energy consumption can be effectively saved;Local preheating is carried out for cavity body of mould part, avoids liftout spring etc. that from can not working under the long-time condition of high temperature.

Description

Tooling is preheated under liquid-state forging die line
Technical field
The utility model is related to a kind of liquid-state forging die tooling, pre- thermal technology under especially a kind of liquid-state forging die line Dress.
Background technology
Liquid forging preheats mold of reaching the standard grade in advance using die preheating furnace with mould structure complexity from great, preheats Time is long, and mold placement is a bigger problem in mold warm, therefore is at present to be preheated on line, but preheated on line During mold, forging machine can be caused to be in end-of-life state, had a great impact to production capacity.
Utility model content
The purpose of this utility model is to provide tooling is preheated under a kind of liquid-state forging die line, it can solve existing skill The deficiency of art can targetedly preheat mold, effectively save preheating energy consumption, and can improve production effect Rate.
The technical solution of the utility model:Tooling is preheated under a kind of liquid-state forging die line, it is characterised in that it includes mould Have and preheats tooling on the inside of rack, upper mold preheating tooling, side mould outer ring preheating tooling, Bian Mo and bed die;The mould placing rack Bottom is Bian Mo and bed die rack, and top is upper mold rack;Mould and the bed die when being placed on mould and bed die rack, When mould periphery is placed, mould outer ring preheats tooling, and preheating tooling on the inside of side mould and bed die is placed on the inside of Bian Mo and bed die;On described Upper mold is placed on mould rack, upper mold periphery places upper mold and preheats tooling.
The mould placing rack includes three facades, and the bottom connection side mould of three facades and bed die rack, top are Upper mold rack.
Three facades are double-layer steel plate structure, and heat preservation rock is filled between double-layer plate.
On the inside of upper mold preheating tooling, side mould outer ring preheating tooling, Bian Mo and bed die preheating tooling bent by pipe and At the pipe is connect with air inlet pipe, and venthole is provided on the pipe.
On the inside of upper mold preheating tooling, side mould outer ring preheating tooling, Bian Mo and bed die preheating tooling by heating collar and Holder is constituted;The heating collar is hollow circular tube, has air inlet and venthole, the air inlet and air inlet pipe of heating collar on heating collar Connection;The air inlet pipe is stretched out outside mould placing rack.
The heating collar that side mould outer ring preheats tooling is upper layer and lower layer.
The air inlet pipe is separately connected the air inlet on heating collar by two branches.
The part that the air inlet pipe is stretched out outside mould placing rack is connected with supporting rack.
The heating collar of preheating tooling is straight on the inside of the upper mold preheating tooling, side mould outer ring preheating tooling, Bian Mo and bed die Diameter is corresponding with the size of mold.
Preheating tooling uses propane or day on the inside of the upper mold preheating tooling, side mould outer ring preheating tooling, Bian Mo and bed die Right gas is as fuel.
The superiority of the utility model:(1)Mold is targetedly preheated, preheating can be effectively saved and be disappeared with the energy Consumption;Local preheating is carried out for cavity body of mould part, avoids liftout spring etc. that from can not working under the long-time condition of high temperature;(2)Mould Have that preheating time is short, and pre-heat effect has specific aim, it is ensured that mold is reached the standard grade progress;(3)After the completion of mold preheating, reach the standard grade Installation can be produced normally after installation is complete by producing 1-3 part tune machine workpiece, and forging machine working efficiency is improved.
Description of the drawings
Fig. 1 is the structural schematic diagram that tooling is preheated under liquid-state forging die line involved by the utility model.
Fig. 2 is the schematic diagram for placing mold under liquid-state forging die line involved by the utility model in preheating tooling.
Fig. 3-1, Fig. 3-2 are the schematic diagram that upper mold preheats tooling.
Fig. 4-1, Fig. 4-2, Fig. 4-3 are the schematic diagram that side mould outer ring preheats tooling.
Fig. 5-1, Fig. 5-2 are the schematic diagram of preheating tooling on the inside of Bian Mo and bed die.
Wherein, 1 is upper mold, and 2 be side mould, and 3 be bed die, and 4 be mould placing rack, and 5 preheat tooling for upper mold, 6 for Bian Mo and Tooling is preheated on the inside of bed die, 7 preheat tooling for side mould outer ring, and 8 be heat preservation rock, and 9 be Bian Mo and bed die rack, and 10 be upper mold Rack, 11 be heating collar, and 12 be holder, and 13 be venthole, and 14 be air inlet pipe, and 15 be supporting rack.
Specific implementation mode
The utility model is described in further detail below in conjunction with specific embodiment.It should be appreciated that described herein Specific embodiment is only used to explain the utility model, is not used to limit the utility model.
Embodiment:As shown in Fig. 1 to Fig. 5-2, tooling is preheated under a kind of liquid-state forging die line, it is characterised in that it includes Tooling 6 is preheated on the inside of mould placing rack 4, upper mold preheating tooling 5, side mould outer ring preheating tooling 7, Bian Mo and bed die;The mold 4 bottom of rack is Bian Mo and bed die rack 9, and top is upper mold rack 10;It is placed on the side mould and bed die rack 9 Side mould 2 and bed die 3, when 2 periphery of mould is placed, mould outer ring preheats tooling 7, when mould 2 and the inside of bed die 3 are placed in mould and bed die Side preheats tooling 6;Upper mold 1 is placed on the upper mold rack, 1 periphery of upper mold places upper mold and preheats tooling 5, and upper mold preheats tooling 5 are placed on side mould 2.
The mould placing rack 4 includes three facades, the bottom connection side mould and bed die rack 9 of three facades, top For upper mold rack 10.
Three facades are double-layer steel plate structure, and heat preservation rock 8 is filled between double-layer plate.
Preheating tooling 6 is bent by pipe on the inside of the upper mold preheating tooling 5, side mould outer ring preheating tooling 7, Bian Mo and bed die It forms, the pipe is connect with air inlet pipe, and venthole is provided on the pipe.
Preheating tooling 6 is by heating collar on the inside of the upper mold preheating tooling 5, side mould outer ring preheating tooling 7, Bian Mo and bed die 11 and holder 12 constitute;The heating collar 11 is hollow circular tube, there is air inlet and venthole 13 on heating collar 11, heating collar into Gas port is connect with air inlet pipe 14;The air inlet pipe 14 is stretched out outside mould placing rack 4.
The heating collar 11 that side mould outer ring preheats tooling 7 is upper layer and lower layer.
The air inlet pipe 14 is separately connected the air inlet on heating collar 11 by two branches.
The part that the air inlet pipe 14 is stretched out outside mould placing rack 4 is connected with supporting rack 15.
The heating collar 11 of preheating tooling 6 on the inside of the upper mold preheating tooling 5, side mould outer ring preheating tooling 7, Bian Mo and bed die Diameter it is corresponding with the size of mold.
On the inside of upper mold preheating tooling 5, side mould outer ring preheating tooling 7, Bian Mo and bed die preheating tooling 6 using propane or Natural gas is as fuel.
The bottom connection side mould and bed die rack 9 can effectively avoid ejection connecting rod protrusion bed die and contacted with ground. It is that antirust round steel designs corresponding crooked process radius by bending machine according to die size, and is designed according to blowing direction to preheat tooling Outlet orifice angle;Air inlet is one-to-two structure, avoids the unstable of air pressure in the domain.

Claims (10)

1. preheating tooling under a kind of liquid-state forging die line, it is characterised in that it includes mould placing rack, upper mold preheating tooling, side Mould outer ring, which preheats, preheats tooling on the inside of tooling, Bian Mo and bed die;The mould placing rack bottom is Bian Mo and bed die rack, top Portion is upper mold rack;Mould and the bed die when being placed on mould and bed die rack, when mould periphery is placed, mould outer ring preheats It is placed on the inside of tooling, Bian Mo and bed die and preheats tooling on the inside of side mould and bed die;Upper mold is placed on the upper mold rack, outside upper mold Zhou Anfang upper molds preheat tooling.
2. preheating tooling under a kind of liquid-state forging die line according to claim 1, it is characterised in that the mould placing rack Including three facades, the bottom connection side mould and bed die rack of three facades, top is upper mold rack.
3. preheating tooling under a kind of liquid-state forging die line according to claim 2, it is characterised in that three facades are equal For double-layer steel plate structure, heat preservation rock is filled between double-layer plate.
4. preheating tooling under a kind of liquid-state forging die line according to claim 1, it is characterised in that the pre- thermal technology of upper mold Preheating tooling is bent by pipe on the inside of dress, side mould outer ring preheating tooling, Bian Mo and bed die, and the pipe connects with air inlet pipe It connects, venthole is provided on the pipe.
5. preheating tooling under a kind of liquid-state forging die line according to claim 1, it is characterised in that the pre- thermal technology of upper mold Preheating tooling is made of heating collar and holder on the inside of dress, side mould outer ring preheating tooling, Bian Mo and bed die;During the heating collar is Empty pipe has air inlet and venthole, the air inlet of heating collar to be connect with air inlet pipe on heating collar;The air inlet pipe stretches out mold Outside rack.
6. preheating tooling under a kind of liquid-state forging die line according to claim 5, it is characterised in that side mould outer ring is pre- The heating collar of thermal technology's dress is upper layer and lower layer.
7. preheating tooling under a kind of liquid-state forging die line according to claim 5, it is characterised in that the air inlet pipe passes through Two branches are separately connected the air inlet on heating collar.
8. preheating tooling under a kind of liquid-state forging die line according to claim 5, it is characterised in that the air inlet pipe is stretched out Part outside mould placing rack is connected with supporting rack.
9. preheating tooling under a kind of liquid-state forging die line according to claim 1, it is characterised in that the pre- thermal technology of upper mold The diameter of the heating collar of preheating tooling is corresponding with the size of mold on the inside of dress, side mould outer ring preheating tooling, Bian Mo and bed die.
10. preheating tooling under a kind of liquid-state forging die line according to claim 1, it is characterised in that the pre- thermal technology of upper mold Preheating tooling uses propane or natural gas as fuel on the inside of dress, side mould outer ring preheating tooling, Bian Mo and bed die.
CN201721863798.8U 2017-12-27 2017-12-27 Tooling is preheated under liquid-state forging die line Active CN207887852U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721863798.8U CN207887852U (en) 2017-12-27 2017-12-27 Tooling is preheated under liquid-state forging die line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721863798.8U CN207887852U (en) 2017-12-27 2017-12-27 Tooling is preheated under liquid-state forging die line

Publications (1)

Publication Number Publication Date
CN207887852U true CN207887852U (en) 2018-09-21

Family

ID=63550374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721863798.8U Active CN207887852U (en) 2017-12-27 2017-12-27 Tooling is preheated under liquid-state forging die line

Country Status (1)

Country Link
CN (1) CN207887852U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111299987A (en) * 2020-03-19 2020-06-19 马鞍山市申力特重工机械股份有限公司 Preparation method of large-diameter medium plate disc blade
CN114425614A (en) * 2022-04-02 2022-05-03 秦皇岛信能能源设备有限公司 Mold preheating system and preheating method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111299987A (en) * 2020-03-19 2020-06-19 马鞍山市申力特重工机械股份有限公司 Preparation method of large-diameter medium plate disc blade
CN114425614A (en) * 2022-04-02 2022-05-03 秦皇岛信能能源设备有限公司 Mold preheating system and preheating method
CN114425614B (en) * 2022-04-02 2022-06-28 秦皇岛信能能源设备有限公司 Mold preheating system and preheating method

Similar Documents

Publication Publication Date Title
CN207887852U (en) Tooling is preheated under liquid-state forging die line
CN104364066B (en) Blow molding apparatus
CN106180346A (en) A kind of low pressure thermal forming device
CN103447364B (en) Manufacturing technology of car-carried refrigerator heat exchange tube
CN206902021U (en) A kind of narrow neck press glass-blowing mold and punching head component
CN105328126A (en) Electric heating casting head
CN208215992U (en) Efficient tetrafluoro conical bottom integral forming device
CN102172690A (en) Method for manufacturing bent pipe
CN205763591U (en) A kind of shaped device forging blower fan main shaft
CN207077697U (en) A kind of high temperature plastics mould for having thermal insulation board
CN207128340U (en) Annular knurl outer patch machine
CN105667900A (en) Electric heating shrinking oven
CN205482386U (en) Medicine stove is forged to electric heat
CN104724640B (en) A kind of threeway transporting device and its have bad luck method
CN107661826A (en) A kind of spraying coating process storage glue tank
CN107008769A (en) The preparation method of crystallizer copper pipe
CN208392703U (en) A kind of molding die of quickly porous compression manufacturing process
CN206678408U (en) Infusion bottle embryonic tube head presses fusing device
CN207256672U (en) A kind of polytetrafluoroethylene (PTFE) molding die
CN203754644U (en) Melting tank for melting asphalt
CN205650169U (en) A pyrophyllite former for diamond shaping is handled
CN207874838U (en) A kind of forming plastic pipe hydraulic press
CN207243438U (en) A kind of lotion auxiliary agents for producing automatic dripping device
CN206783521U (en) One kind is segmented pre-heated arc glass door of elevator shaped device
CN101623813B (en) Production method of container and mould and rolling device used by same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 300301 Area D, No. 58 Guanghua Street, West District, Economic and Technological Development Zone, Binhai New Area, Tianjin

Patentee after: Tianjin Lizhong Light Alloy Forging Co.,Ltd.

Address before: 300457 Zone D, No. 58 Guanghua Street, West District, Economic and Technological Development Zone, Binhai New Area, Tianjin

Patentee before: TIANJIN NANUO MACHINERY MANUFACTURING Co.,Ltd.

CP03 Change of name, title or address