CN206940275U - A kind of steel-structure factory building steel frame roof boarding handling apparatus - Google Patents
A kind of steel-structure factory building steel frame roof boarding handling apparatus Download PDFInfo
- Publication number
- CN206940275U CN206940275U CN201720571502.9U CN201720571502U CN206940275U CN 206940275 U CN206940275 U CN 206940275U CN 201720571502 U CN201720571502 U CN 201720571502U CN 206940275 U CN206940275 U CN 206940275U
- Authority
- CN
- China
- Prior art keywords
- steel
- roof boarding
- steel frame
- frame roof
- factory building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of steel-structure factory building steel frame roof boarding handling apparatus, it is related to building field, including track, conveying arrangement and hanging apparatus, installation direction of the track along roof boarding is laid on roof girder or roof grid structure top boom upper surface, the conveying arrangement includes support body and the roller that can be rolled along the track, roller is located at support body bottom, the hanging apparatus includes chain block and suspender, chain block is connected with support body, suspender one end connects chain block, the support body, hanging apparatus is above steel frame roof boarding installation site, steel frame roof boarding can be hung to the position of neighbouring support body bottom by the hanging apparatus;The utility model not only can be lifted and transported to steel frame roof boarding, also with it is simple in construction the advantages of.
Description
Technical field
It the utility model is related to building field, more particularly to a kind of steel-structure factory building steel frame roof boarding handling apparatus.
Background technology
Nowadays, some steel structural plant roofs can use light section frame roof boarding, close due to the steel frame roof boarding
Spend relatively large, steel frame roof boarding weight is larger, therefore, it is difficult to by the way of traditional artificial horizontal transportation by lighter to steel frame
Roof boarding is installed.
Utility model content
The utility model aims to provide a kind of steel-structure factory building steel frame roof boarding handling apparatus, to solve steel frame room
Panel is difficult to the problem of installation.
To reach above-mentioned purpose, the technical solution adopted in the utility model is as follows:A kind of steel-structure factory building steel frame roofing
Plate handling apparatus, including track, conveying arrangement and hanging apparatus, the track are laid on roofing along the installation direction of roof boarding
Beam or roof grid structure top boom upper surface, the conveying arrangement include support body and the roller that can be rolled along the track, roller
Located at support body bottom, the hanging apparatus includes chain block and suspender, and chain block is connected with support body, suspender one end connects chain
Bar cucurbit, the support body, hanging apparatus are above steel frame roof boarding installation site.
Preferably, the track has two, and two tracks are parallel to each other, and steel frame roof boarding installation site is located at two rails
Between road.
Further, the track is channel-section steel.
Preferably, the support body of the conveying arrangement is rectangular frame, and rectangular frame includes two vertical beams and connected respectively
Two vertical beam top upper beam and be connected to the lower beams of two vertical beam bottoms, lower beam is higher than steel frame roofing
Plate installation site, the roller are respectively arranged on two vertical beam bottoms, and roller can roll along two tracks.
Further, the support body includes two rectangular frames, and two rectangular frames are located on same track
The top of wherein one vertical beam of two vertical beams connects the top of another vertical beam by connecting rod, and two rectangular frames are positioned at same
The bottom for another vertical beam of connection that the top of wherein one vertical beam of two vertical beams on one track passes through the first bracing piece,
The top that two rectangular frames are located at another vertical beam of two vertical beams on same track connects it by the first bracing piece
In a vertical beam bottom;The top line of four vertical beams of described two rectangular frames forms rectangle, in the rectangle pair
The top of the vertical beam of Angle Position is connected by the second bracing piece.
Preferably, the hanging apparatus has two, and two chain blocks are connected to the upper lateral of two rectangular frames
In the middle part of beam.
Preferably, the chain block is electric block.
Preferably, the suspender is the steel plate with three holes, and two of which hole level is located at steel plate bottom, separately
One hole is located at steel plate top, and another described hole is centrally located on the line of symmetry of two of which hole.
The beneficial effects of the utility model are:
1st, the setting of track, the conveying arrangement that can be moved in orbit, hanging apparatus on conveying arrangement, makes steel
Frame roof boarding is easy to lift and transported;
2nd, the track laid along steel frame roof boarding installation site, further it is easy to the hoisting transportation of steel frame roof boarding;
3rd, the setting of two rectangular frames and two hanging apparatus being connected with two rectangular frames, it is easy to steel frame room
Balance is kept during panel hoisting transportation;
4th, the setting of the first bracing piece and the second bracing piece and connecting rod, conveying arrangement can be made more firm;
5th, the setting of roller is moved, relatively small force of rolling friction, is advantageous to conveying arrangement shifting;
6th, the chain block of upper beam medium position is connected to, keeps balancing beneficial to handling apparatus;
7th, lower beam is higher than steel frame roof boarding installation site, is easy to steel frame roof boarding being arranged on correct position
Put.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
In figure:1- tracks, 2- conveying arrangements, 3- hanging apparatus, 4- steel frames roof boarding, 5- rollers, 20- support bodys, 21- are stood
Beam, 22- upper beams, 23- lower beams, 31- chain blocks, 32- suspenders, the bracing pieces of 61- first, the bracing pieces of 62- second,
63- connecting rods.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing, to this reality
It is further elaborated with new.
A kind of as shown in figure 1, steel-structure factory building steel frame roof boarding handling apparatus:Including groove steel rail 1, conveying arrangement 2
With hanging apparatus 3, the track 1 it is parallel be provided with two, two tracks 1 are laid on roof girder along the installation direction of roof boarding
Or roof grid structure top boom upper surface, the conveying arrangement 2 include support body 20 and the roller that can be rolled along the groove steel rail 1
5, roller 5 is located at the bottom of support body 20, and the support body 20 of the conveying arrangement 2 is rectangular frame, and rectangular frame includes two vertical beams 21
And the upper beam 22 for being connected to two top of vertical beam 21 and the lower beam 23 for being connected to two bottoms of vertical beam 21, under
Portion's crossbeam 23 installs 4 positions higher than steel frame roof boarding, and the roller 5 is respectively arranged on two bottoms of vertical beam 21, and roller 5 can be along institute
Two groove steel rails 1 are stated to roll;Certainly, to ensure the stability of conveying arrangement 2, the support body 20 can also be mutually equal by two
The rectangle frame framework composition that row is set, now, two rectangular frames are located at two vertical beams 21 on same groove steel rail 1
The top of wherein one vertical beam 21 top of another vertical beam 21 is connected by connecting rod 63, two rectangular frames are positioned at same
The top of wherein one vertical beam 21 of two vertical beams 21 on bar groove steel rail 1 connects another respectively by the first bracing piece 61
The bottom of vertical beam 21, two rectangular frames are located at the top of another vertical beam 21 of two vertical beams 21 on same groove steel rail 1
Portion connects the bottom of wherein one vertical beam 21 by the first bracing piece 61;The top of four vertical beams 21 of described two rectangular frames
Line forms rectangle, and the top of the vertical beam 21 in the rectangle diagonal position is connected by the second bracing piece 62;First strengthens
The bracing piece 62 of bar 61 and second is provided to be further ensured that the stability of support body 20.The hanging apparatus 3 includes electric chain
Cucurbit 31 and suspender 32, the suspender 32 are the steel plate with three holes, and two of which hole level is located at steel plate bottom,
Another hole is located at steel plate top, and another described hole is centrally located on the line of symmetry of two of which hole, electric chain
Cucurbit 31 is connected by another hole of steel plate top with steel plate, and steel wire rope connects steel by the two of which hole of steel plate bottom
Plate and the steel frame roof boarding 4 for needing handling, electric chain cucurbit 31 is connected with upper beam 22, the support body 20, lifting dress
Put 3 and be above the installation site of steel frame roof boarding 4, steel frame roof boarding 4 can be hung to the neighbouring bottom of support body 20 by hanging apparatus 3
Position.When support body 20 has a rectangular frame, it is preferred that electric chain cucurbit 31 is connected to the upper beam 22 of rectangular frame
Middle part, when support body 20 has two rectangular frames, it is preferred that hanging apparatus 3 also has two, and two electric chain cucurbits 31 are distinguished
It is connected to the middle part of two rectangular frame upper beams 22.
Certainly, the utility model can also have other various embodiments, without departing substantially from the utility model spirit and its essence
In the case of, those skilled in the art can make various corresponding changes and deformation, but these phases according to the utility model
The change and deformation answered should all belong to the scope of the claims appended by the utility model.
Claims (8)
- A kind of 1. steel-structure factory building steel frame roof boarding handling apparatus, it is characterised in that:Including track (1), conveying arrangement (2) and Hanging apparatus (3), installation direction of the track (1) along roof boarding are laid on roof girder or roof grid structure top boom upper table Face, the conveying arrangement (2) include support body (20) and the roller (5) that can be rolled along the track (1), and roller (5) is located at frame Body (20) bottom, the hanging apparatus (3) include chain block (31) and suspender (32), and chain block (31) connects with support body (20) Connect, suspender (32) one end connection chain block (31), the support body (20), hanging apparatus (3) are above steel frame roof boarding (4) Installation site.
- A kind of 2. steel-structure factory building steel frame roof boarding handling apparatus according to claim 1, it is characterised in that:The rail Road (1) has two, and two tracks (1) are parallel to each other, and steel frame roof boarding (4) installation site is between two tracks (1).
- A kind of 3. steel-structure factory building steel frame roof boarding handling apparatus according to claim 2, it is characterised in that:The fortune The support body (20) of defeated device (2) is rectangular frame, and rectangular frame includes two vertical beams (21) and is connected to two vertical beams (21) upper beam (22) on top and the lower beams (23) of two vertical beam (21) bottoms is connected to, lower beam (23) is higher than Steel frame roof boarding (4) installation site, the roller (5) are respectively arranged on two vertical beam (21) bottoms, and roller (5) can be along described two Bar track (1) rolls.
- A kind of 4. steel-structure factory building steel frame roof boarding handling apparatus according to claim 3, it is characterised in that:The chain Bar cucurbit (31) is connected to the middle part of rectangular frame upper beam (22).
- A kind of 5. steel-structure factory building steel frame roof boarding handling apparatus according to claim 3, it is characterised in that:The frame Body (20) includes two rectangular frames, and two rectangular frames are parallel to each other;Two rectangular frames are located at same track (1) On two vertical beams (21) wherein one vertical beam (21) top pass through connecting rod (63) connect another vertical beam (21) top Portion, two rectangular frames are located at wherein passing through at the top of a vertical beam (21) for two vertical beams (21) on same track (1) First bracing piece (61) connects the bottom of another vertical beam (21), and two rectangular frames are located at two on same track (1) The top of another vertical beam (21) of vertical beam (21) connects the bottom of wherein one vertical beam (21) by the first bracing piece (61);Institute The top line for stating four vertical beams (21) of two rectangular frames forms rectangle, the vertical beam (21) in the rectangle diagonal position Top pass through the second bracing piece (62) connect.
- A kind of 6. steel-structure factory building steel frame roof boarding handling apparatus according to claim 5, it is characterised in that:It is described to hang Assembling device (3) has two, and two chain blocks (31) are connected in the middle part of the upper beam (22) of two rectangular frames.
- A kind of 7. steel-structure factory building steel frame roof boarding handling apparatus according to claim 1 or 2, it is characterised in that:Institute It is channel-section steel to state track (1).
- A kind of 8. steel-structure factory building steel frame roof boarding handling apparatus according to claim 1, it is characterised in that:It is described to hang Tool (32) is the steel plate with three holes, and two of which hole level is located at steel plate bottom, and another hole is located at steel plate Top, another described hole are centrally located on the line of symmetry of two of which hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720571502.9U CN206940275U (en) | 2017-05-22 | 2017-05-22 | A kind of steel-structure factory building steel frame roof boarding handling apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720571502.9U CN206940275U (en) | 2017-05-22 | 2017-05-22 | A kind of steel-structure factory building steel frame roof boarding handling apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206940275U true CN206940275U (en) | 2018-01-30 |
Family
ID=61361223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720571502.9U Expired - Fee Related CN206940275U (en) | 2017-05-22 | 2017-05-22 | A kind of steel-structure factory building steel frame roof boarding handling apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206940275U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616842A (en) * | 2019-08-20 | 2019-12-27 | 上海宝冶冶金工程有限公司 | Construction method of purline assembly in steel structure coal shed |
CN112390156A (en) * | 2020-11-09 | 2021-02-23 | 中国建筑土木建设有限公司 | Be used for large-scale precision equipment hoist device of no ramp basement |
-
2017
- 2017-05-22 CN CN201720571502.9U patent/CN206940275U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616842A (en) * | 2019-08-20 | 2019-12-27 | 上海宝冶冶金工程有限公司 | Construction method of purline assembly in steel structure coal shed |
CN110616842B (en) * | 2019-08-20 | 2021-05-14 | 上海宝冶冶金工程有限公司 | Construction method of purline assembly in steel structure coal shed |
CN112390156A (en) * | 2020-11-09 | 2021-02-23 | 中国建筑土木建设有限公司 | Be used for large-scale precision equipment hoist device of no ramp basement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106939707B (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN202810173U (en) | Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant | |
CN206940275U (en) | A kind of steel-structure factory building steel frame roof boarding handling apparatus | |
CN106948604A (en) | The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method | |
CN203866654U (en) | Mobile assembly platform used for ballastless track laying construction | |
CN204754160U (en) | Rail mounted removes work platform | |
CN207160223U (en) | A kind of fulcrum-variable pin joint formula steel girder platform | |
CN206753085U (en) | A kind of sliding platform for being used to install high-altitude wire frame steel construction | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN106400700A (en) | Double-line cantilever type bridge formation machine | |
CN101440660B (en) | Guiding-rail attached lifting scaffold | |
CN211173157U (en) | Bracket for mounting ultrahigh steel beam | |
CN206088905U (en) | Guide tracked lift | |
CN205709467U (en) | Turnover plate type is jettisoninged suspender | |
CN210529487U (en) | Bridge and box-shaped bridge inspection device with flange plates | |
CN107604825A (en) | The bridging method of T-shaped beam bridge | |
CN204400502U (en) | Bottle gouard moved by hands support | |
CN106800245B (en) | A kind of floorings lifting hanger, hanging apparatus and hanging method | |
CN114525846B (en) | Mounting method of unequal-elevation steel truss structure | |
CN206693641U (en) | The irregular alien invasion glass curtain wall positioning apparatus of high-rise building | |
CN105947877B (en) | Turnover plate type is jettisoninged suspender | |
CN203257106U (en) | Multifunctional power-driven walking type walking system | |
CN206267519U (en) | A kind of light engine position hydraulic climbing die block system | |
CN204873491U (en) | Self -supporting does not have crossbeam hoist system | |
CN201141203Y (en) | Guiding-rail attached lifting scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180130 |