CN205397953U - Tower crane offset monitoring devices - Google Patents
Tower crane offset monitoring devices Download PDFInfo
- Publication number
- CN205397953U CN205397953U CN201620174769.XU CN201620174769U CN205397953U CN 205397953 U CN205397953 U CN 205397953U CN 201620174769 U CN201620174769 U CN 201620174769U CN 205397953 U CN205397953 U CN 205397953U
- Authority
- CN
- China
- Prior art keywords
- infrared
- tower crane
- play amount
- alarm
- circle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a tower crane offset monitoring devices, the device include infrared emitter, infrared receiver, offset display and alarm, infrared emitter installs on the chassis of tower crane, and infrared receiver sets up in horizontal cantilever crane and the standard intersection of festival, and the infrared ray is transmitted to infrared receiver by infrared emitter, the offset display sets up on the chassis, and the alarm is connected with the offset display, be provided with infrared circle and cordon on the offset display, when infrared circle on the offset display exceedes the cordon or infrared circle when disappearing, the alarm starts, sends safety alarm. The utility model provides a tower crane offset monitoring devices, it is rational in infrastructure, in the use, need not to adjust repeatedly, calibrate, the simple operation, realize the real -time supervision of tower crane offset, in time eliminated the potential safety hazard, improved the security of tower crane operation.
Description
Technical field
This utility model relates to engineering equipment monitoring field, particularly relates to a kind of tower crane side-play amount monitoring device.
Background technology
Tower crane, due to the feature such as its lifting altitude, lifting capacity are big and work range is big, is use more hoisting machinery in current construction.
Due to tower crane huge structure, and with work high above the ground, it is easy to great human casualty accident occurs, once have an accident, bring huge economic loss will to construction enterprises and individual.Therefore, tower crane at fixing link and rises joint link, it is necessary to measure the side-play amount of tower crane, to ensure the safety of tower crane.
The side-play amount measurement of current tower crane is installed and is risen joint link at tower crane and completes, and it needs to prepare many detecting instruments, needs framework calibration instrument, then measure before measurement.It in use there is problems in that
(1) can not monitoring the change of tower crane side-play amount in real time, if occurring, skew quantitative change is big, it is impossible to and alarm, there is potential safety hazard;
(2) when measuring every time, it is required for framework calibration instrument, is calibrated operation, complex operation, wastes time and energy.
Summary of the invention
The purpose of this utility model is for above-mentioned technical problem, it is provided that a kind of rational in infrastructure, easy to operate tower crane side-play amount monitoring device, in use, it is not necessary to repeatedly adjust, calibrate, simple operation;Achieve the real-time monitoring of tower crane side-play amount, eliminate potential safety hazard in time, improve the safety of tower crane operation.
The technical solution of the utility model:
For solving above-mentioned technical problem, this utility model provides a kind of tower crane side-play amount monitoring device, and it includes RF transmitter, infrared receiver, side-play amount display and alarm.
Wherein, RF transmitter is arranged on the underframe of tower crane, and infrared receiver is arranged on the intersection of horizontal arm support and standard knot, and infrared ray is by RF transmitter transmission to infrared receiver;Side-play amount display is arranged on underframe, and alarm is connected with side-play amount display;Being provided with infrared circle and cordon on side-play amount display, when the infrared circle on side-play amount display exceedes cordon or when infrared circle disappears, alarm starts, and sends safety alarm.
Further, the installation site of described RF transmitter and infrared receiver is equipped with, and the installation site of RF transmitter overlaps with the projected position of infrared receiver.
Further, the cordon on described side-play amount display is multiple concentric circular, and it changes along with increasing of the tower crane scope of operation, to improve the grade of tower crane side-play amount monitoring, it is ensured that the safety of tower crane operation.
Further, the infrared circle on described side-play amount display and cordon are concentric circular when initial adjustment, so can monitor the side-play amount of tower crane to greatest extent in all directions.
Further, when the infrared ray between described RF transmitter and infrared receiver is blocked by an external matter, the infrared circle on side-play amount display disappears, and to prevent infrared ray from receiving stop, and loses the monitoring to tower crane side-play amount.
Further, the chimes of doom of chimes of doom and infrared circle disappearance alarm device that described infrared circle exceedes cordon alarm device there are differences, occur that deviation and infrared ray are blocked the identification of both of these case improving tower crane side-play amount, improve operator's convenience to the eliminating of fault.
This utility model beneficial effect:
The tower crane side-play amount monitoring device that this utility model provides, rational in infrastructure, in use, it is not necessary to repeatedly adjust, calibrate, simple operation;Achieve the real-time monitoring of tower crane side-play amount, eliminate potential safety hazard in time, improve the safety of tower crane operation.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is the side-play amount display schematic diagram of this utility model.
Wherein:
1. RF transmitter;2. infrared receiver;3. side-play amount display;4. alarm;5. horizontal arm support;6. underframe;7. infrared ray;8. infrared circle;9. cordon.
Detailed description of the invention
Below in conjunction with specific embodiments and the drawings, this utility model one tower crane side-play amount is monitored device to be described in detail:
Fig. 1 is this utility model structural representation, and it includes RF transmitter 1, infrared receiver 2, side-play amount display 3 and alarm 4.
RF transmitter 1 is arranged on the underframe 6 of tower crane, and infrared receiver 2 is arranged on the intersection of horizontal arm support 5 and standard knot, and side-play amount display 3 is arranged on underframe 6, and alarm 4 is connected with side-play amount display 3.
The installation site of RF transmitter 1 and infrared receiver 2 is equipped with, and the installation site of RF transmitter 1 overlaps with the projected position of infrared receiver 2, and infrared ray 7 is transmitted to infrared receiver 2 by RF transmitter 1.
Fig. 2 is the side-play amount display schematic diagram of this utility model, being provided with infrared circle 8 and cordon 9, the cordon 9 on side-play amount display 3 is multiple concentric circular, and it changes along with increasing of the tower crane scope of operation, to improve the grade of tower crane side-play amount monitoring, it is ensured that the safety of tower crane operation;When initially adjusting, the infrared circle 8 on side-play amount display 3 is concentric circular with cordon 9, to monitor the side-play amount of tower crane to greatest extent in all directions.
When the infrared circle 8 on side-play amount display 3 exceedes cordon 9, alarm 4 starts, and sends safety alarm;When infrared ray 7 between RF transmitter 1 and infrared receiver 2 is blocked by an external matter, the infrared circle 8 on side-play amount display 3 disappears, and alarm 4 starts, and sends safety alarm.
Described infrared circle 8 exceedes the disappear chimes of doom of alarm device 4 of the chimes of doom of cordon 9 alarm device 4 and infrared circle 8 and there are differences, occur that deviation and infrared ray are blocked the identification of both of these case improving tower crane side-play amount, improve operator's convenience to the eliminating of fault.
Using the tower crane side-play amount monitoring device that this utility model provides, concrete operation step is as follows:
First, installation infrared line receiver 2, it is installed in the intersection of horizontal arm support 5 and standard knot, when later tower crane rises joint, infrared receiver 2 rises with tower crane, it is ensured that the availability of measurement and accuracy;
Then, installation infrared line emitter 1, its installation site overlaps with the projected position of infrared receiver 2;
Then, side-play amount display 3 and alarm 4 are installed;
After RF transmitter 1 and infrared receiver 2 install, adjust calibration instrument, it is ensured that the infrared ray 7 that RF transmitter 1 is launched transmits to infrared receiver 2, and the infrared circle 8 on side-play amount display 3 is concentric with cordon 9;
Finally, RF transmitter 1 launches infrared ray 7, infrared receiver 2 receiving infrared-ray 7, monitors the side-play amount of tower crane in real time;When side-play amount reaches particular value, when namely infrared circle 8 exceedes cordon 9, alarm 4 starts, and starts to report to the police;Site operation personnel need to search reason in time and repair, it is ensured that safety of tower crane runs.
The tower crane side-play amount monitoring device that this utility model provides, rational in infrastructure, in use, it is not necessary to repeatedly adjust, calibrate, simple operation;Achieve the real-time monitoring of tower crane side-play amount, eliminate potential safety hazard in time, improve the safety of tower crane operation.
Claims (6)
1. a tower crane side-play amount monitoring device, it is characterised in that include RF transmitter (1), infrared receiver (2), side-play amount display (3) and alarm (4);RF transmitter (1) is arranged on the underframe (6) of tower crane, and infrared receiver (2) is arranged on the intersection of horizontal arm support (5) and standard knot, and infrared ray (7) is by RF transmitter (1) transmission to infrared receiver (2);Side-play amount display (3) is arranged on underframe (6), and alarm (4) is connected with side-play amount display (3);Being provided with infrared circle (8) and cordon (9) on side-play amount display (3), when the infrared circle (8) on side-play amount display (3) exceedes cordon (9) or when infrared circle (8) disappears, alarm (4) starts, and sends safety alarm.
2. tower crane side-play amount according to claim 1 monitoring device, it is characterized in that, the installation site of described RF transmitter (1) and infrared receiver (2) is equipped with, and the installation site of RF transmitter (1) overlaps with the projected position of infrared receiver (2).
3. tower crane side-play amount according to claim 1 monitoring device, it is characterised in that the cordon (9) on described side-play amount display (3) is multiple concentric circulars, and it changes along with increasing of the tower crane scope of operation.
4. tower crane side-play amount according to claim 1 monitoring device, it is characterised in that the infrared circle (8) on described side-play amount display (3) and cordon (9) are concentric circular when initial adjustment.
5. tower crane side-play amount according to claim 1 monitoring device, it is characterised in that when the infrared ray (7) between described RF transmitter (1) and infrared receiver (2) is blocked by an external matter, the infrared circle (8) on side-play amount display (3) disappears.
6. tower crane side-play amount according to claim 1 monitoring device, it is characterised in that the chimes of doom of chimes of doom and infrared circle (8) disappearance alarm device (4) that described infrared circle (8) exceedes cordon (9) alarm device (4) there are differences.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620174769.XU CN205397953U (en) | 2016-03-08 | 2016-03-08 | Tower crane offset monitoring devices |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620174769.XU CN205397953U (en) | 2016-03-08 | 2016-03-08 | Tower crane offset monitoring devices |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205397953U true CN205397953U (en) | 2016-07-27 |
Family
ID=56441739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620174769.XU Expired - Fee Related CN205397953U (en) | 2016-03-08 | 2016-03-08 | Tower crane offset monitoring devices |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205397953U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106744325A (en) * | 2017-03-29 | 2017-05-31 | 太原科技大学 | A kind of method and apparatus measured with forecast crane arm support head sidesway |
CN107311053A (en) * | 2017-07-07 | 2017-11-03 | 荆门创佳机械科技有限公司 | A kind of tower crane tower body perpendicularity automatic monitoring alarm |
CN107352401A (en) * | 2017-07-10 | 2017-11-17 | 荆门创佳机械科技有限公司 | Hang position and monitor the tower crane monitoring system of tower body perpendicularity in energy Automatic-searching blind area |
CN111025039A (en) * | 2019-10-24 | 2020-04-17 | 广州视源电子科技股份有限公司 | Method, device, equipment and medium for testing accuracy of touch display screen |
CN114604769A (en) * | 2022-01-24 | 2022-06-10 | 杭州大杰智能传动科技有限公司 | Detection method and device for tower crane mechanism installation position calibration |
-
2016
- 2016-03-08 CN CN201620174769.XU patent/CN205397953U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106744325A (en) * | 2017-03-29 | 2017-05-31 | 太原科技大学 | A kind of method and apparatus measured with forecast crane arm support head sidesway |
CN107311053A (en) * | 2017-07-07 | 2017-11-03 | 荆门创佳机械科技有限公司 | A kind of tower crane tower body perpendicularity automatic monitoring alarm |
CN107352401A (en) * | 2017-07-10 | 2017-11-17 | 荆门创佳机械科技有限公司 | Hang position and monitor the tower crane monitoring system of tower body perpendicularity in energy Automatic-searching blind area |
CN111025039A (en) * | 2019-10-24 | 2020-04-17 | 广州视源电子科技股份有限公司 | Method, device, equipment and medium for testing accuracy of touch display screen |
CN114604769A (en) * | 2022-01-24 | 2022-06-10 | 杭州大杰智能传动科技有限公司 | Detection method and device for tower crane mechanism installation position calibration |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205397953U (en) | Tower crane offset monitoring devices | |
CN104296803A (en) | Digital nuclear facility environmental radiation monitoring system | |
CN105819339A (en) | Virtual command module for large lifting operations and working method of virtual command module | |
CN204080880U (en) | A kind of prior-warning device of monitoring foundation pit deformation | |
CN205177077U (en) | Crane operation real -time monitoring system | |
CN106957019A (en) | Tower crane lifting platform monitoring system | |
CN204881592U (en) | Construction equipment and safe distance monitoring alarm device | |
CN105070107A (en) | Airborne collision avoidance system, ACAS transmit-receive host digital signal loop self-detection system and method | |
CN105070106A (en) | Airborne collision avoidance system, ACAS transmit-receive host self-detection system and method | |
CN112924061A (en) | Wireless real-time monitoring system and method for non-uniform settlement stress of natural gas pipeline | |
CN204569242U (en) | A kind of remote control security tower crane based on position coordinate | |
CN204226347U (en) | Scalable shear leg telescopic hydraulic oil cylinder amount of recovery measuring device | |
CN110579179A (en) | Infrared monitoring device and deformation detection method for information machine room floor structure deformation | |
CN104374466A (en) | Optical fiber vibration real-time monitoring and alarming system for roadbed collapse | |
CN104005795B (en) | A kind of tunnel clearance monitoring security alarm instrument | |
CN112378341A (en) | Real-time monitoring system for deformation of construction support | |
CN115367644A (en) | Crane monitoring method and system based on simulation | |
CN109319671A (en) | Safe distance warning device | |
CN203324425U (en) | Temporary ground wire assembling and disassembling state signal extraction device | |
CN206546154U (en) | A kind of penetration pipe displacement monitor | |
CN102865855A (en) | Intelligent test monitoring console for inclination angle of safety lock locking ropes | |
CN203199902U (en) | Monitoring system suitable for crane | |
CN204346572U (en) | Subgrade Subsidence fiber-optic vibration Real-Time Monitoring and warning system | |
CN105070108A (en) | Airborne collision avoidance system, ACAS transmit-receive host reception loop self-detection system and method | |
CN211081114U (en) | Support equipment and alarm system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160727 Termination date: 20170308 |
|
CF01 | Termination of patent right due to non-payment of annual fee |