CN204479995U - The field integrated supervisory system of building engineering construction - Google Patents

The field integrated supervisory system of building engineering construction Download PDF

Info

Publication number
CN204479995U
CN204479995U CN201520161091.7U CN201520161091U CN204479995U CN 204479995 U CN204479995 U CN 204479995U CN 201520161091 U CN201520161091 U CN 201520161091U CN 204479995 U CN204479995 U CN 204479995U
Authority
CN
China
Prior art keywords
unit
switch
secondary battery
switch element
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520161091.7U
Other languages
Chinese (zh)
Inventor
周超
吴家祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Chao Ding Power Tech Corp Inc
Original Assignee
Nanjing Chao Ding Power Tech Corp Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Chao Ding Power Tech Corp Inc filed Critical Nanjing Chao Ding Power Tech Corp Inc
Priority to CN201520161091.7U priority Critical patent/CN204479995U/en
Application granted granted Critical
Publication of CN204479995U publication Critical patent/CN204479995U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses the field integrated supervisory system of a kind of building engineering construction, comprise video acquisition unit, temperature sensor unit, pressure sensor unit, verticality sensor unit, controller unit, background computer unit, cloud storage unit, far-end smart mobile phone unit; First secondary battery unit, the second secondary battery unit, the first switch element, second switch unit, an AD unit, the 2nd AD unit; The utility model achieves the monitoring of on-the-spot material, the monitoring of on-the-spot dangerous matter sources, the monitoring of construction safety quality.

Description

The field integrated supervisory system of building engineering construction
Technical field
The utility model relates to a kind of construction work Field Monitoring System.
Background technology
In recent years, along with the development of technology of Internet of things, wireless networking becomes easy realization, and the charge is small, set up at the very start at the construction field (site) wireless supervisory control system completely may, and can going deep into along with engineering, new node is added to system.Utilize advanced Internet of Things and cloud computing technology, set up wireless composite supervisory system at the beginning in project construction in building site, by building site video monitoring, dangerous matter sources is monitored, and the function i ntegration such as construction safety quality monitoring are to together; Effectively can serve as the scientific and technological assistant of on-the-spot project manager and Executive Team, the security implementation of Guarantee item and quality.
Working-yard monitoring mainly comes from following several situation:
Working-yard video monitoring: to entrance guard, placing of material ground, important construction operation scene and dangerous matter sources position are uninterruptedly monitored.Staff just can scan the overall situation and material particular in office, carries out background monitoring to building site.Video image is sent to daemon software, can and operate against regulations carry out alarm to uninvited guest, pilferage behavior by the method for large data analysis.This is with being manually not easy to realize.
On-the-spot dangerous matter sources monitoring: place special sensor in dangerous matter sources position, sensor detects danger signal, the mobile phone that can send signals to background monitoring and/or keeper carries out early warning.For example in transformer or switch cubicle, radio temperature sensor being installed, when there being fault to occur, sending alarm signal.Also for example at fire sensitive position, special detector is installed, when having smog or Mars to occur, produces alarm.
Construction safety quality monitoring: after the video image of working-yard passes to background computer, the software on background computer can identify the personnel violating security regulations, such as does not wear a safety helmet.At critical construction point, verticality or pressure transducer etc. are installed, construction quality is monitored.
Utility model content
The purpose of this utility model is to provide the field integrated supervisory system of a kind of building engineering construction, achieves the monitoring of on-the-spot material, the monitoring of on-the-spot dangerous matter sources, the monitoring of construction safety quality.
In order to realize above object, the technical solution adopted in the utility model is as follows:
The field integrated supervisory system of building engineering construction, comprises video acquisition unit, temperature sensor unit, pressure sensor unit, verticality sensor unit, controller unit, background computer unit, cloud storage unit, far-end smart mobile phone unit; First secondary battery unit, the second secondary battery unit, the first switch element, second switch unit, an AD unit, the 2nd AD unit; Described video acquisition unit, temperature sensor unit, pressure sensor unit, verticality sensor unit are connected with the IO port of controller unit respectively; Described controller unit is by communication port and background computer unit communication;
Described background computer unit communicates with cloud storage unit, far-end smart mobile phone unit wireless respectively;
The output terminal of the first described secondary battery unit connects the input end of the first switch element, and the output terminal of the first switch element is that unit is powered;
The output terminal of the second described secondary battery unit connects the input end of second switch unit, and the output terminal of second switch unit is also for unit is powered;
The output voltage of the first secondary battery unit is converted to digital signal and is input to controller unit by a described AD unit;
The output voltage of the second secondary battery unit is converted to digital signal and is input to controller unit by the 2nd described AD unit;
Described controller unit connects the control end of the first switch element, second switch unit respectively by two IO ports.
Further, the first described switch element, second switch unit adopt relay to realize.
Further, the first described switch element, second switch unit adopt controlled thyristor to realize.
Further, described controller unit is communicated by GPRS with far-end smart mobile phone unit.
Compared with prior art, the beneficial effects of the utility model are: the utility model achieves the monitoring of on-the-spot material, the monitoring of on-the-spot dangerous matter sources, the monitoring of construction safety quality.The two storage battery power supply of the utility model can realize non-stop run, and the whole control system sensor that there will not be single storage battery power supply to cause due to electric power deficiency detects the problem of interrupting.
Accompanying drawing explanation
Fig. 1 is the utility model principle block diagram.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described further, but it is not represented as unique embodiment of the present utility model.
Fig. 1 please be read, the field integrated supervisory system of building engineering construction, comprises video acquisition unit, temperature sensor unit, pressure sensor unit, verticality sensor unit, controller unit, background computer unit, cloud storage unit, far-end smart mobile phone unit; First secondary battery unit, the second secondary battery unit, the first switch element, second switch unit, an AD unit, the 2nd AD unit; Video acquisition unit, temperature sensor unit, pressure sensor unit, verticality sensor unit are connected with the IO port of controller unit respectively;
Described controller unit is by communication port and background computer unit communication; Background computer unit communicates with cloud storage unit, far-end smart mobile phone unit wireless respectively; The output terminal of the first secondary battery unit connects the input end of the first switch element, and the output terminal of the first switch element is that unit is powered; The output terminal of the second secondary battery unit connects the input end of second switch unit, and the output terminal of second switch unit is also for unit is powered; The output voltage of the first secondary battery unit is converted to digital signal and is input to controller unit by the one AD unit; The output voltage of the second secondary battery unit is converted to digital signal and is input to controller unit by the 2nd AD unit; Controller unit connects the control end of the first switch element, second switch unit respectively by two IO ports.
Wherein, the first described switch element, second switch unit adopt relay to realize.Described controller unit is communicated by GPRS with far-end smart mobile phone unit.
Wherein, cloud storage unit adopts Ali's cloud storage server to realize, and far-end smart mobile phone unit adopts iPhone6plus.Controller unit adopts MSP430 single-chip microcomputer.
The utility model effectively achieves following functions: working-yard video monitoring: to entrance guard, placing of material ground, and important construction operation scene and dangerous matter sources position are uninterruptedly monitored.Staff just can scan the overall situation and material particular in office, carries out background monitoring to building site.Video image is sent to daemon software, can and operate against regulations carry out alarm to uninvited guest, pilferage behavior by the method for large data analysis.This is with being manually not easy to realize.On-the-spot dangerous matter sources monitoring: place special sensor in dangerous matter sources position, sensor detects danger signal, the mobile phone that can send signals to background monitoring and/or keeper carries out early warning.For example in transformer or switch cubicle, radio temperature sensor being installed, when there being fault to occur, sending alarm signal.Also for example at fire sensitive position, special detector is installed, when having smog or Mars to occur, produces alarm.Construction safety quality monitoring: after the video image of working-yard passes to background computer, the software on background computer can identify the personnel violating security regulations, such as does not wear a safety helmet.At critical construction point, verticality or pressure transducer etc. are installed, construction quality is monitored.
Adopt storage battery power supply, instead of AC-powered, because AC-powered there will be power-off condition; And adopt two storage battery power supplies, once a storage battery quantity not sufficient, controller unit immediately detects and sends control information and switches another storage battery power supply, thus achieve whole day uninterruptedly monitoring in 24 hours.

Claims (4)

1. the field integrated supervisory system of building engineering construction, it is characterized in that, comprise video acquisition unit, temperature sensor unit, pressure sensor unit, verticality sensor unit, controller unit, background computer unit, cloud storage unit, far-end smart mobile phone unit;
First secondary battery unit, the second secondary battery unit, the first switch element, second switch unit, an AD unit, the 2nd AD unit;
Described video acquisition unit, temperature sensor unit, pressure sensor unit, verticality sensor unit are connected with the IO port of controller unit respectively;
Described controller unit is by communication port and background computer unit communication;
Described background computer unit communicates with cloud storage unit, far-end smart mobile phone unit wireless respectively;
The output terminal of the first described secondary battery unit connects the input end of the first switch element, and the output terminal of the first switch element is that unit is powered;
The output terminal of the second described secondary battery unit connects the input end of second switch unit, and the output terminal of second switch unit is also for unit is powered;
The output voltage of the first secondary battery unit is converted to digital signal and is input to controller unit by a described AD unit;
The output voltage of the second secondary battery unit is converted to digital signal and is input to controller unit by the 2nd described AD unit;
Described controller unit connects the control end of the first switch element, second switch unit respectively by two IO ports.
2. the field integrated supervisory system of building engineering construction according to claim 1, is characterized in that, the first described switch element, second switch unit adopt relay to realize.
3. the field integrated supervisory system of building engineering construction according to claim 1, is characterized in that, the first described switch element, second switch unit adopt controlled thyristor to realize.
4. the field integrated supervisory system of building engineering construction according to claim 1, is characterized in that, described controller unit is communicated by GPRS with far-end smart mobile phone unit.
CN201520161091.7U 2015-03-20 2015-03-20 The field integrated supervisory system of building engineering construction Expired - Fee Related CN204479995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520161091.7U CN204479995U (en) 2015-03-20 2015-03-20 The field integrated supervisory system of building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520161091.7U CN204479995U (en) 2015-03-20 2015-03-20 The field integrated supervisory system of building engineering construction

Publications (1)

Publication Number Publication Date
CN204479995U true CN204479995U (en) 2015-07-15

Family

ID=53635775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520161091.7U Expired - Fee Related CN204479995U (en) 2015-03-20 2015-03-20 The field integrated supervisory system of building engineering construction

Country Status (1)

Country Link
CN (1) CN204479995U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106973116A (en) * 2017-05-04 2017-07-21 绵阳市川交公路规划勘察设计有限公司 A kind of construction Supervision system of the remote real-time monitoring based on cloud
CN107272530A (en) * 2017-06-23 2017-10-20 深圳市盛路物联通讯技术有限公司 A kind of construction site long-distance monitoring method and system based on Internet of Things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106973116A (en) * 2017-05-04 2017-07-21 绵阳市川交公路规划勘察设计有限公司 A kind of construction Supervision system of the remote real-time monitoring based on cloud
CN107272530A (en) * 2017-06-23 2017-10-20 深圳市盛路物联通讯技术有限公司 A kind of construction site long-distance monitoring method and system based on Internet of Things

Similar Documents

Publication Publication Date Title
CN205015693U (en) Storage safety monitoring system
CN104658163A (en) Electric energy metering terminal and electrical fire monitoring method
CN204390383U (en) A kind of silo remote real-time monitoring warning system
CN204719917U (en) There is the machine room monitoring system of remote alarming function
CN204479995U (en) The field integrated supervisory system of building engineering construction
CN204858743U (en) Intelligent terminal of intelligent power distribution platform district distribution transformer side -mounting
CN204965697U (en) Clamp plate state is kept watch on and is prevented mistake management system
CN203653085U (en) Tower crane monitoring system capable of recognizing identity of driver
CN203081508U (en) Safety monitoring system for coal mine
CN205941681U (en) ESD's direct current voltage detecting system in field of gas transmission station
CN205450682U (en) Comprehensive monitoring system for building construction site
CN203606919U (en) Multipath digital transmission electrical fire hazard monitoring system
CN204270387U (en) A kind of unlock key management machine
CN204244382U (en) A kind of long distance control system
CN204480014U (en) A kind of Safe Production Supervision and dynamic supervision system
CN203931087U (en) The anti-outside destroy monitoring system of a kind of circuit
CN106685076A (en) Low voltage power failure alarm management system and chopping signal acquisition equipment
CN105427558A (en) Security control system and security control method
CN203069651U (en) Voltage change remote monitoring system
CN204203753U (en) Power system monitor dispatching system
CN213457755U (en) Intelligent equipment operation control system
CN103903107A (en) Intelligent real-time alarming method for energy management system
CN104158288A (en) Power monitoring device for ultra-capacity customers
CN204552832U (en) Coal mine safety monitoring management platform
An et al. Design of power cable grounding wire anti-theft monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20160320