CN203801127U - City street lamp illumination control system - Google Patents

City street lamp illumination control system Download PDF

Info

Publication number
CN203801127U
CN203801127U CN201420165161.1U CN201420165161U CN203801127U CN 203801127 U CN203801127 U CN 203801127U CN 201420165161 U CN201420165161 U CN 201420165161U CN 203801127 U CN203801127 U CN 203801127U
Authority
CN
China
Prior art keywords
communication
power
street lamp
video
management platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420165161.1U
Other languages
Chinese (zh)
Inventor
朱毅
汪明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Medium Cloud Photon City Intelligent Science And Technology Ltd
Original Assignee
Wuxi Medium Cloud Photon City Intelligent Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Medium Cloud Photon City Intelligent Science And Technology Ltd filed Critical Wuxi Medium Cloud Photon City Intelligent Science And Technology Ltd
Priority to CN201420165161.1U priority Critical patent/CN203801127U/en
Application granted granted Critical
Publication of CN203801127U publication Critical patent/CN203801127U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)

Abstract

The utility model relates to a city street lamp illumination control system connected with a city street lamp illumination unit. A 3G communication module carries out communication with a city illumination management platform by a 3G network. A plurality of power communication intelligent service terminals respectively carry out communication with the 3G communication module and are respectively connected with an electric power acquisition module by communication and are connected with a plurality of illumination units. A plurality of video conversion servers are respectively connected with the city illumination management platform by communication through the 3G network; a plurality of video camera units are respectively connected with the video conversion servers by video transmission lines; and each video conversion server is respectively connected with the plurality of video camera units. According to the scheme, the power line carrier communication is used and the sunrise and sunset time each day can be measured by using a GPS positioning system; the on and off of street lamps can be controlled automatically according to changing of the sunrise and sunset time and the brightness of the street lamps can be adjusted based on time, so that the running states of the street lamps can be monitored in real time. Moreover, mutual switching of automatic controlling and manual controlling can be realized.

Description

A kind of the street lamp control system
Technical field
The utility model relates to city illumination technical field, particularly a kind of the street lamp control system.
Background technology
Energy problem is the subject matter of society, and how improving energy-saving efficiency is the dominant ideas of modern product development.For this novel street lamp of Non-polarized lamp, energy-saving efficiency is one of key parameter of product, improve to greatest extent energy-saving efficiency, and the introducing of electrodeless lamp road lamp intelligent control system becomes main developing direction.
Now traditional road lamp switch is the control of employing time or Artificial Control mostly, and this can bring a lot of inconveniences in actual management process.Due to the uncertainty of external environment, by the time, to control and often can form that night upper street lamp and open, sky does not but also have black, or early heaven is bright, and street lamp is but also leaving, and causes serious waste of energy.Hours of daylight in winter is short, can form again street lamp day black still not open, and early heaven does not also have bright street lamp but to extinguish, and affects the trip of pedestrian and vehicle.And traditional street lamp be owing to cannot regulating lamplight brightness, when the late into the night, pedestrian is less, and street lamp brightness is still very high.Also cause unnecessary waste of energy, if turn off part street lamp, can on road, form shadow again, have potential safety hazard.If by Artificial Control, need staff to be patrolled in street lamp scene every day, the workload of safeguarding for urban transportation is too large.
The public security problem of road is also day by day serious, and often some large traffic, public security problem, owing to there is no real video data, cause these problems to be difficult to solve.Solving road traffic, public security problem, introducing video monitoring is a very important developing direction.
Utility model content
The purpose of this utility model, for most of street lamp in prior art, can only control or Artificial Control by the time exactly, can not open according to the variation adjustment of environment, the time of turning off the light and brightness, cause waste of energy, and cannot detect in real time the deficiency of street lamp running status, a kind of employing power line carrier, PLC is provided, can utilize GPS navigation system to calculate the sun set/raise time of every day, according to the variation of sun set/raise time, automatically control road lamp switch, can be according to Timing street lamp brightness, monitor in real time the running status of street lamp, and can realize and automatically and manually control the street lamp control system mutually switching.
To achieve these goals, the utility model has adopted following technical scheme:
A kind of the street lamp control system, be connected with city street lamp lighting unit, comprise city illumination management platform, 3G communication module, electrical power acquisition module, a plurality of power communication Intelligent service terminal, a plurality of video change server and a plurality of video image pickup unit, 3G communication module is connected by communication by 3G network and city illumination management platform; A plurality of power communication Intelligent service terminals are connected by communication with 3G communication module respectively, and are connected by communication with electrical power acquisition module respectively, also connect respectively a plurality of lighting units; A plurality of video change server are connected by communication by 3G network and city illumination management platform respectively; A plurality of video image pickup units are connected with video change server by video transmission line respectively, and each video change server connects respectively a plurality of video image pickup units.
Further, lighting unit comprises power carrier ballast and Non-polarized lamp, and one end of power carrier ballast is connected with Non-polarized lamp, and the other end is connected with power communication Intelligent service terminal by power line.
Further, power carrier ballast comprises microprocessor, IO control circuit, power carrier communication coupling circuit, AC/DC power supply and failure detector circuit, microprocessor is connected with IO control circuit respectively, power carrier communication coupling circuit, AC/DC power supply and failure detector circuit connect, AC/DC power supply is also connected with power line, and IO control circuit is also connected with Non-polarized lamp.
A kind of the street lamp control system of the present utility model, owing to having adopted above technical scheme, has following advantage and good effect:
1, adopt power line carrier, PLC mode, various information exchanges are crossed existing power line transmission, without building special communication network, greatly reduce cost, have improved reliability;
2, according to the grade of road and feature, can be to the setting of classifying of the street lamp of different roads by management platform, when external environment brightness reaches the value of turning on light of setting or the value of turning off the light, street lamp opens or cuts out.The brightness value of switch lamp also can reset as required, and the variation that street lamp can be conformed has reduced the waste of electric energy, has extended the useful life of street lamp;
3, by light modulation time point and the light modulation ratio set, automatically regulate brightness and the operating power of street lamp, not only guarantee the illumination of street lamp but also reduced the consumption of electric energy, and can reset light modulation time point and light modulation ratio according to environmental change, improved greatly the energy-saving efficiency of electrodeless lamp road lamp;
4, can monitor in real time the service condition of street lamp and circuit, once street lamp goes wrong, to in time the particular location of problematic street lamp or circuit be shown in management platform, facilitate staff to monitor and finishing in time or conversion, accelerate the speed that Road lamp failure is processed, reduced maintenance cost;
5, under special circumstances, control personnel can skip controlling organization, manually control at any time the switch of street lamp by the button on main control system, realize automatically and the switching of manually controlling, and have improved adaptability to changes, have reduced the potential safety hazard that may exist;
6, the video information of street lighting can be detected by video monitoring, so that staff's maintenance;
7, can monitor by video monitoring traffic, the public security problem of road, when having major traffic accidents and road public security accident to occur, can provide favourable evidence to corresponding public security department, improve the efficiency of public security department processing accident;
8, can avoid by video monitoring the pilferage of cable and road equipment.
Accompanying drawing explanation
Accompanying drawing is used to provide further understanding of the present utility model, and forms a part for specification, is used from explanation the utility model with embodiment mono-of the present utility model, does not form restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the structural framing figure of a kind of the street lamp control system of the utility model;
Fig. 2 is the structural representation of the lighting unit in the utility model;
Fig. 3 is the functional framework figure of the power carrier ballast in the utility model.
Embodiment
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein is only for description and interpretation the utility model, and be not used in restriction the utility model.
Referring to Fig. 1, a kind of the street lamp control system of the present utility model, be connected with city street lamp lighting unit, comprise city illumination management platform 100 (being arranged in host computer), 3G communication module 200, electrical power acquisition module 400, a plurality of power communication Intelligent service terminals 300 (being arranged in the power distribution cabinet of various places), a plurality of lighting units 500 (being arranged on roadside), a plurality of video change server 20 and a plurality of video image pickup unit 40 (corresponding to lighting unit subregion, arranging), in 3G communication module 200, insert the 3G of China Mobile card, 3G communication module 200 is connected by communication by 3G network and city illumination management platform 100.
A plurality of power communication Intelligent service terminals 300 are connected with 3G communication module 200 by RJ45 interface 800 respectively, and by RS485 interface 700, are connected with electrical power acquisition module 400 respectively.
A plurality of lighting units 500 are connected with power communication Intelligent service terminal 300 by power line 600 respectively; Each power communication Intelligent service terminal 300 connects respectively a plurality of lighting units 500.
A plurality of video change server 20 are connected by communication by 3G network 10 and city illumination management platform 100 respectively.
A plurality of video image pickup units 40 are connected with video change server 20 by video transmission line 30 respectively, and each video change server 20 connects respectively a plurality of video image pickup units 40.
Cooperation is referring to Fig. 2, lighting unit 500 comprises power carrier ballast 520 and Non-polarized lamp 510, power carrier ballast 520 is connected with Non-polarized lamp 510, power carrier ballast 520 communication channel and power communication Intelligent service terminal 300 by first carrier frequency range 132KHZ and the second carrier wave frequency range 115KHZ in power line 600 is connected by communication, accept and carry out the various instructions of power communication Intelligent service terminal, and execution result and real time data are fed back to power communication Intelligent service terminal 300.
Cooperation is referring to Fig. 3, power carrier ballast 520 comprises microprocessor 521, IO control circuit 522, power carrier communication coupling circuit 523, AC/DC power supply 524 and failure detector circuit 525, microprocessor 521 is connected with IO control circuit respectively, power carrier communication coupling circuit, AC/DC power supply and failure detector circuit connect, AC/DC power supply 524 is also connected with power line 600, and IO control circuit 522 is also connected with Non-polarized lamp 510.
Power carrier ballast 520 in the utility model passes through binary phase shift keying modulation-demodulation technique with power communication Intelligent service terminal 300, carry out power line carrier communication, microprocessor 521 in power carrier ballast is by 524 power supplies of AC/DC power supply, by IO control circuit 522, send the switch that control command is controlled illuminating lamp, produce the brightness of pulse-width signal adjusting light, whether by failure detector circuit 525, detect lamp normally works, if undesired, can send warning message, microprocessor 521 passes to power communication Intelligent service terminal 300 by power carrier communication coupling circuit 523 by all information of the operating state of power carrier ballast.
Power communication Intelligent service terminal 300 in the utility model is connected with electrical power acquisition module 400 by RS485 interface 700, electrical power acquisition module 400 gathers operating voltage, operating current, electrical work power and the information that always consumes energy of power supply grids, and by MODBUS agreement by these communications to power communication Intelligent service terminal 300.
Power communication Intelligent service terminal 300 in the utility model is connected with 3G communication module 200 by RJ45 interface 800, in 3G communication module 200, insert after the 3G of China Mobile card, power communication Intelligent service terminal 300 just can utilize 200 dialing of 3G communication module to enter 3G network, power communication Intelligent service terminal 300 just can be by network and 100 communications of city illumination management platform like this, thereby can in city illumination management platform 100, operate, all information and the instruction of monitoring power electric communication intelligent service terminal 300.
City illumination management platform 100 in the utility model is carried out Long-distance Control and data access to each power communication Intelligent service terminal 300, power communication Intelligent service terminal is sent to various control commands, comprised switch and adjusting illuminating lamp tool brightness, realize sequential scheduling event, reads data log, warning is replied and energy saving calculation; City illumination management platform 100 can show the real-time working information of power carrier ballast 520, comprises lighting temperature, electric current, voltage, power, power factor and brightness.
The user interface of the city illumination management platform in the utility model adopts the client/server architecture based on .net platform, the computer that city illumination management platform is installed can be used as server, can support so a plurality of remote computers to monitor simultaneously; On user interface, be provided with manual button and automatic keying, can by button, realize the switching of automatically controlling and manually controlling at any time.
City illumination management platform 100 in the utility model can long-rangely arrange the relevant configuration of power communication Intelligent service terminal 300, and embedded electronic chart and the longitude and latitude of the lighting unit of actual field can have been configured in management platform, by electronic chart, clearly illustrate position and the real-time working state of on-the-spot lighting unit, city illumination management platform can also need to arrange many cover sequential illumination schemes according to user, also can add at any time, removes, deletes and change the setting of controlled device and target device.
Video change server 20 in the utility model is connected with video image pickup unit 40 by video transmission line 30.Video image pickup unit 40 is transferred to video change server 20 by the video information collecting by video transmission line 30, video change server by the signal gathering after the respective handling of controller, output display video information is stored in video information in video change server 20 simultaneously.
Video change server 20 in the utility model by 3G network by the video information transmission collecting to city illumination management platform 100.Like this, the video information that city illumination management platform just can transmit from a distant place by network real-time monitoring.
City illumination management platform 100 in the utility model is embedded in video Web server, the multiple images in real time of realization based on Web browsed, playback and control, and support the long-range Real-time Obtaining of video change server operating state, video image pickup unit operating state, All Alerts, extremely can immediately trigger Email function, allow user obtain relevant information, deal carefully with fast, shorten the event response time, ensure guarded region safety.
A kind of the street lamp control system of the present utility model, owing to having adopted above technical scheme, has following advantage and good effect:
1, adopt power line carrier, PLC mode, various information exchanges are crossed existing power line transmission, without building special communication network, greatly reduce cost, have improved reliability;
2, according to the grade of road and feature, can be to the setting of classifying of the street lamp of different roads by management platform, when external environment brightness reaches the value of turning on light of setting or the value of turning off the light, street lamp opens or cuts out.The brightness value of switch lamp also can reset as required, and the variation that street lamp can be conformed has reduced the waste of electric energy, has extended the useful life of street lamp;
3, by light modulation time point and the light modulation ratio set, automatically regulate brightness and the operating power of street lamp, not only guarantee the illumination of street lamp but also reduced the consumption of electric energy, and can reset light modulation time point and light modulation ratio according to environmental change, improved greatly the energy-saving efficiency of electrodeless lamp road lamp;
4, can monitor in real time the service condition of street lamp and circuit, once street lamp goes wrong, to in time the particular location of problematic street lamp or circuit be shown in management platform, facilitate staff to monitor and finishing in time or conversion, accelerate the speed that Road lamp failure is processed, reduced maintenance cost;
5, under special circumstances, control personnel can skip controlling organization, manually control at any time the switch of street lamp by the button on main control system, realize automatically and the switching of manually controlling, and have improved adaptability to changes, have reduced the potential safety hazard that may exist;
6, the video information of street lighting can be detected by video monitoring, so that staff's maintenance;
7, can monitor by video monitoring traffic, the public security problem of road, when having major traffic accidents and road public security accident to occur, can provide favourable evidence to corresponding public security department, improve the efficiency of public security department processing accident;
8, can avoid by video monitoring the pilferage of cable and road equipment.
Finally it should be noted that: the foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, although the utility model is had been described in detail with reference to previous embodiment, for a person skilled in the art, its technical scheme that still can record aforementioned each embodiment is modified, or part technical characterictic is wherein equal to replacement.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection range of the present utility model.

Claims (3)

1. a street lamp control system, be connected with city street lamp lighting unit, it is characterized in that: comprise city illumination management platform, 3G communication module, electrical power acquisition module, a plurality of power communication Intelligent service terminal, a plurality of video change server and a plurality of video image pickup unit, described 3G communication module is connected by communication by 3G network and described city illumination management platform; Described a plurality of power communication Intelligent service terminals are connected by communication with described 3G communication module respectively, and are connected by communication with described electrical power acquisition module respectively, also connect respectively described a plurality of lighting units; Described a plurality of video change server are connected by communication by 3G network and described city illumination management platform respectively; Described a plurality of video image pickup units are connected with video change server by video transmission line respectively, and each video change server connects respectively described a plurality of video image pickup units.
2. a kind of the street lamp control system according to claim 1, it is characterized in that: described lighting unit comprises power carrier ballast and Non-polarized lamp, one end of power carrier ballast is connected with Non-polarized lamp, and the other end is connected with power communication Intelligent service terminal by power line.
3. the street lamp control system according to claim 2, it is characterized in that: described power carrier ballast comprises microprocessor, IO control circuit, power carrier communication coupling circuit, AC/DC power supply and failure detector circuit, microprocessor is connected with IO control circuit respectively, power carrier communication coupling circuit, AC/DC power supply and failure detector circuit connect, AC/DC power supply is also connected with power line, and IO control circuit is also connected with Non-polarized lamp.
CN201420165161.1U 2014-03-30 2014-03-30 City street lamp illumination control system Expired - Fee Related CN203801127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420165161.1U CN203801127U (en) 2014-03-30 2014-03-30 City street lamp illumination control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420165161.1U CN203801127U (en) 2014-03-30 2014-03-30 City street lamp illumination control system

Publications (1)

Publication Number Publication Date
CN203801127U true CN203801127U (en) 2014-08-27

Family

ID=51383310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420165161.1U Expired - Fee Related CN203801127U (en) 2014-03-30 2014-03-30 City street lamp illumination control system

Country Status (1)

Country Link
CN (1) CN203801127U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104470136A (en) * 2014-12-09 2015-03-25 深圳福凯半导体照明有限公司 Tunnel lamp control system
CN104714461A (en) * 2015-02-05 2015-06-17 智联国际物联网(江苏)有限公司 Intelligent monitoring system for outdoor advertising board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104470136A (en) * 2014-12-09 2015-03-25 深圳福凯半导体照明有限公司 Tunnel lamp control system
CN104714461A (en) * 2015-02-05 2015-06-17 智联国际物联网(江苏)有限公司 Intelligent monitoring system for outdoor advertising board

Similar Documents

Publication Publication Date Title
CN102427651A (en) Internet of things LVD (Low Voltage Detector) road lamp urban illumination control system
CN104955207A (en) Internet-of-things-based electrodeless-lamp urban lighting control system
CN202145690U (en) Urban illumination intelligent monitoring system
CN104394636A (en) Intelligent light streetlamp centralized control system
CN102933006B (en) Digital illumination control system
CN105554980A (en) Solar street lamp-based intelligent management system for urban illumination
CN105792446A (en) Intelligent street lamp control system
CN101511144A (en) LED automatic control system
CN107734760A (en) Internet of things illumination control system
CN201374845Y (en) Intelligent LED road lamp control system
CN113133160A (en) Wisdom illumination management system
CN204291533U (en) LED street lamp management system for internet of things
CN204466007U (en) A kind of wisdom new intelligent remote sensing controller
CN105554945A (en) Solar street lamp-based control system, single-lamp controllers and centralized controller
CN205305199U (en) Long -range monitor control ware in city
CN202617459U (en) Comprehensive monitoring system capable of realizing city street lamp effective management and energy conservation
CN203801127U (en) City street lamp illumination control system
CN202385372U (en) Urban streetlamp lighting control system
CN112074041A (en) Street lamp intelligence management and control system
CN104302078A (en) Intelligent street lamp bidirectional control system based on ZigBee
CN104902624A (en) Large-power light adjustment control system
CN203951647U (en) A kind of road lighting control system based on zigbee communication
CN201700070U (en) Remote control electrodeless lamp lighting system
CN204272435U (en) A kind of city illumination intelligent monitoring device
CN211152288U (en) Intelligent controller of wisdom lamp pole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Wuxi medium cloud Photon city intelligent Science and Technology Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Wuxi medium cloud Photon city intelligent Science and Technology Ltd.

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140827

Termination date: 20160330