CN202542641U - Elevator cage top wheel device - Google Patents

Elevator cage top wheel device Download PDF

Info

Publication number
CN202542641U
CN202542641U CN2012201032792U CN201220103279U CN202542641U CN 202542641 U CN202542641 U CN 202542641U CN 2012201032792 U CN2012201032792 U CN 2012201032792U CN 201220103279 U CN201220103279 U CN 201220103279U CN 202542641 U CN202542641 U CN 202542641U
Authority
CN
China
Prior art keywords
elevator
plate
crosshead sheave
rotating shaft
top wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201032792U
Other languages
Chinese (zh)
Inventor
张晓燕
沈严良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SYMAX LIFT (HOLDING)CO Ltd
Original Assignee
SYMAX LIFT (HOLDING)CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SYMAX LIFT (HOLDING)CO Ltd filed Critical SYMAX LIFT (HOLDING)CO Ltd
Priority to CN2012201032792U priority Critical patent/CN202542641U/en
Application granted granted Critical
Publication of CN202542641U publication Critical patent/CN202542641U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

The utility model relates to an elevator cage top wheel device which comprises a cage top wheel, wherein a cage top wheel rotating shaft mounting hole is formed in the center of the cage top wheel, a cage top wheel rotating shaft is arranged in the cage top wheel rotating shaft mounting hole, a side plate is arranged at each of two ends of the cage top wheel rotating shaft, and a baffle, a rope baffle and a bottom plate are sequentially arranged on each of two side plates; and channel steel is fixedly connected between the lower parts of the two side plates, and a shock absorbing device is arranged on the channel steel. By adding shock absorbing rubber, the problems of jitter and noise in the operation of an elevator during movement can be effectively solved, vibration produced when the elevator is stopped after moving is reduced, and the elevator taking comfort of passengers is improved. Through a protective cover, the problem that hands of elevator overhauling personnel and other foreign matters are easily clamped into a steel wire rope is solved, and the overhauling safety of the elevator is improved.

Description

A kind of elevator crosshead sheave device
Technical field
The utility model relates to the elevator field, relates in particular to a kind of elevator crosshead sheave device.
Background technology
Traditional lift car is that the crosshead sheave axle directly passes through anchor ear; The direct connection of rigidity is at the upper beam of car; Because relevant glissando, lift car turns to when stopping from motion, can be because the inertia of car produces bigger vibrations; And in running process of elevator, be prone to produce shake and noise, reduced passenger's comfort.And owing to have the gap and be exposed to the outside between elevator wire rope and the crosshead sheave; When the elevator service personnel operates an elevator at the elevator top when moving up and down; The hand of service personnel snaps in the middle of steel rope and the crosshead sheave easily; Foreign matter gets in the grooving of steel rope easily, makes the steel rope grooving of scurrying out, and causes elevator faults and danger.
The utility model content
The applicant provides another kind of elevator crosshead sheave device simple in structure, easy for installation to the shortcoming that above-mentioned elevator crosshead sheave exists.
The technical scheme that the utility model adopted is following:
A kind of elevator crosshead sheave device; Comprise crosshead sheave, the center of crosshead sheave has crosshead sheave rotating shaft mounting hole, and the crosshead sheave rotating shaft is installed in crosshead sheave rotating shaft mounting hole; Side plate is installed at the two ends of crosshead sheave rotating shaft respectively, and order is installed baffle plate, rope blocking plate, base plate on biside plate; In the bottom of biside plate, between biside plate, also be connected with channel-section steel, install shock absorption device on the channel-section steel.
It is further characterized in that:
Shield plate also is installed on the said side plate, and said shield plate is two;
Said side plate is " T " shape;
Said base plate is two pairs, totally four, is fixed in the right and left of side plate respectively;
Said channel-section steel is " U " shape;
Said shock absorption device adopts elastomeric material to process.
The beneficial effect of the utility model is following:
Through increasing yielding rubber, actv. has solved the shake that elevator is in operation and the problem of noise, reduces elevator preferably and transfers the vibrations that produce when stopping to from motion, has improved the comfort that the passenger takes elevator.Hand and other foreign matter that the layout of while protective cover has solved the elevator service personnel snap onto the problem in the steel rope easily, have improved the safety of elevator maintenance.
Description of drawings
Fig. 1 is the front view of the utility model.
Fig. 2 is the perspective view of the utility model.
Fig. 3 is the structural representation of base plate.
Fig. 4 is the structural representation of side plate.
Fig. 5 is two shield plate bonded assembly structural representations.
Fig. 6 is the local structure scheme drawing of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the utility model is described.
Like Fig. 1, shown in Figure 2; The utility model comprises a crosshead sheave 2; The center of crosshead sheave 2 has crosshead sheave rotating shaft mounting hole, and crosshead sheave rotating shaft 2-1 is installed in crosshead sheave rotating shaft mounting hole, and side plate 9 is installed at the two ends of crosshead sheave rotating shaft 2-1 respectively; Side plate 9 is " T " shape, and order is installed baffle plate 3, rope blocking plate 4, base plate 5 on biside plate 9; Shield plate 1 also is installed on the side plate 9, and shield plate 1 is two.In biside plate 9 bottoms, between biside plate 9, be connected with channel-section steel 8, channel-section steel 8 is " U " shape, device shock absorption device 7 on channel-section steel 8, shock absorption device 7 adopts elastomeric material to process.
In installation process; As shown in Figure 4; On side plate 9, have baffle plate mounting hole 901, shield plate mounting hole 902, rope blocking plate mounting hole 903, base plate mounting hole 904, channel-section steel mounting hole 905 and crosshead sheave rotating shaft mounting hole 906; The crosshead sheave 2 that has crosshead sheave rotating shaft 2-1 is installed in crosshead sheave rotating shaft mounting hole 906; In baffle plate mounting hole 901, through fastener baffle plate 3 is installed, in rope blocking plate mounting hole 903, through fastener rope blocking plate 4 is installed, being provided with of rope blocking plate 4 can prevent that foreign matter from getting into grooving; And retaining reel for rope 6 also is installed on rope blocking plate 4, and being provided with of retaining reel for rope 6 solved that foreign matter gets into the grooving of crosshead sheave and problem that the steel rope that causes is outwards scurried out; Like Fig. 3, shown in Figure 6, because base plate 5 is two pairs, totally four, respectively base plate 5 is installed on the right and left of side plate 9 through base plate mounting hole 904, through the channel-section steel mounting hole 905 of side plate 9 bottoms, channel-section steel 8 is installed between the biside plate through fastener then; On channel-section steel 8, through fastener yielding rubber 7 is installed, actv. has solved the shake that elevator is in operation and the problem of noise, reduces elevator preferably and transfers the vibrations that produce when stopping to from motion, has improved the comfort that the passenger takes elevator.Shield plate 1 is installed at last; As shown in Figure 5, shield plate 1 is two, through upper junction plate 101 and side connecting plate 102 two shield plates is connected as one respectively; With protective cover mounting hole 902 correspondences on mounting hole 103 and the side plate; Through fastener shield plate 1 is installed on the side plate 9, thereby the hand and other foreign matter that have solved the elevator service personnel snap onto the problem in the steel rope easily, improved the safety of elevator maintenance.
More than describing is the explanation to the utility model, is not the qualification to utility model, and the utility model institute restricted portion is referring to claim, and under the situation of the basic structure of the utility model, the utility model can be done any type of modification.

Claims (6)

1. elevator crosshead sheave device; Comprise crosshead sheave (2); The center of crosshead sheave (2) has crosshead sheave rotating shaft mounting hole; Crosshead sheave rotating shaft (2-1) is installed in crosshead sheave rotating shaft mounting hole, and it is characterized in that: side plate (9) is installed at the two ends of crosshead sheave rotating shaft (2-1) respectively, goes up order in biside plate (9) baffle plate (3), rope blocking plate (4), base plate (5) are installed; Bottom in biside plate (9) also is connected with channel-section steel (8) between biside plate, channel-section steel (8) is gone up device shock absorption device (7).
2. elevator crosshead sheave device as claimed in claim 1 is characterized in that: shield plate (1) also is installed on the said side plate (9), and said shield plate (1) is two.
3. elevator crosshead sheave device as claimed in claim 1 is characterized in that: said side plate (9) is " T " shape.
4. elevator crosshead sheave device as claimed in claim 1 is characterized in that: said base plate (5) is two pairs, totally four, is fixed in the right and lefts of side plate (9) respectively.
5. elevator crosshead sheave device as claimed in claim 1 is characterized in that: said channel-section steel (8) is " U " shape.
6. elevator crosshead sheave device as claimed in claim 1 is characterized in that: said shock absorption device (7) adopts elastomeric material to process.
CN2012201032792U 2012-03-20 2012-03-20 Elevator cage top wheel device Expired - Fee Related CN202542641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201032792U CN202542641U (en) 2012-03-20 2012-03-20 Elevator cage top wheel device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201032792U CN202542641U (en) 2012-03-20 2012-03-20 Elevator cage top wheel device

Publications (1)

Publication Number Publication Date
CN202542641U true CN202542641U (en) 2012-11-21

Family

ID=47163307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201032792U Expired - Fee Related CN202542641U (en) 2012-03-20 2012-03-20 Elevator cage top wheel device

Country Status (1)

Country Link
CN (1) CN202542641U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583132A (en) * 2012-03-20 2012-07-18 希姆斯电梯(中国)有限公司 Crosshead sheave device for elevator
CN103991779A (en) * 2013-12-31 2014-08-20 西子奥的斯电梯有限公司 Mobile crosshead sheave protective cover

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583132A (en) * 2012-03-20 2012-07-18 希姆斯电梯(中国)有限公司 Crosshead sheave device for elevator
CN103991779A (en) * 2013-12-31 2014-08-20 西子奥的斯电梯有限公司 Mobile crosshead sheave protective cover

Similar Documents

Publication Publication Date Title
CN202379552U (en) Elevator safety protection device
CN102583132A (en) Crosshead sheave device for elevator
CN203294992U (en) Elevator traction machine and fixing rack thereof
CN202542641U (en) Elevator cage top wheel device
CN204079194U (en) Home lift tractor stand device
CN203998542U (en) A kind of elevator cage device
CN202912533U (en) Single-winding complex shock absorbing device of high-speed elevator traction main engine load-bearing component
CN202953658U (en) Cant beam and bearing beam arrangement structure of elevator without machine room
CN203903727U (en) Tightening device for compensation rope of high-speed elevator
CN203938309U (en) Elevator list car top wheel suspending device
CN204751822U (en) No computer lab elevator tows structure
CN106892309A (en) Device is prevented under a kind of home lift
CN201722031U (en) Elevator with shock-absorbing and noise-reducing device
CN205998801U (en) A kind of elevator car top wheel mounting structure
CN202272604U (en) Rotatable crosshead sheave device
CN201864409U (en) Novel suspension device for elevator car
CN203781576U (en) Single wrap type guide wheel device for traction type elevator
CN203568641U (en) Super-shallow pit machine-roomless elevator car frame
CN204549738U (en) A kind of arrangement structure of machine-roomless lift
CN204079190U (en) The damping installation structure of towing machine
CN203715021U (en) Car roof wheel assembly of machine roomless elevator
CN103449279A (en) Elevator guide rail
CN201746201U (en) Elevator car frame
CN205328418U (en) Easy anti - damping device of rope of elevator cab that more remodels
CN205602985U (en) No computer lab hauler fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20200320