CN202009267U - Integrated intelligent transformer substation equipment state monitoring and analysis system - Google Patents

Integrated intelligent transformer substation equipment state monitoring and analysis system Download PDF

Info

Publication number
CN202009267U
CN202009267U CN2011201174290U CN201120117429U CN202009267U CN 202009267 U CN202009267 U CN 202009267U CN 2011201174290 U CN2011201174290 U CN 2011201174290U CN 201120117429 U CN201120117429 U CN 201120117429U CN 202009267 U CN202009267 U CN 202009267U
Authority
CN
China
Prior art keywords
data
server
real
substation
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201174290U
Other languages
Chinese (zh)
Inventor
侯凤岭
谈韵
江和顺
赵锋
孙庆生
傅浩
张谢
刘登兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Hefei Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN2011201174290U priority Critical patent/CN202009267U/en
Application granted granted Critical
Publication of CN202009267U publication Critical patent/CN202009267U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model discloses an integrated intelligent transformer substation equipment state monitoring and analysis system, which comprises a plurality of transformer substation monitoring systems, a monitoring center and a client; each transformer substation monitoring system comprises a transformer substation database server and a plurality of data acquisition terminals; each transformer substation database server is provided with a transformer substation database and transformer substation monitoring and analysis software; the monitoring center comprises an application server, a data management server, a relational database server and a real-time database server, and the data management server, the relational database server and the real-time database server are connected with the application server; and the client is connected with the transformer substation database servers of the transformer substation monitoring systems and the application server of the monitoring center. The monitoring and analysis system is particularly suitable for the monitoring of transformer substations, and has the advantage that the monitoring and analysis system realizes the real-time monitoring and analysis of equipment states and increases the working efficiency and quality of power transformation operation and equipment maintenance.

Description

Integrated monitoring of intelligent substation equipment state and analytical system
Technical field
The utility model relates to a kind of monitoring and analytical system, integrated monitoring of especially a kind of intelligent substation equipment state and analytical system.
Background technology
Intelligent work has proposed new requirement to high-tension apparatus in the intelligent grid development.Transformer, reactor, circuit breaker, GIS (Gas Insulated Switchgear, gas insulated combined electric appliance equipment), equipment such as power cable, bushing, higher relatively or fault effects is bigger because of failure rate, be the intelligentized main object of high-tension apparatus.
Domestic many units have carried out a large amount of substation equipment status monitorings and analytical work.Existing equipment condition monitoring system generally adopts the external transducer, self parameter and running state information of main high voltage equipment in online in real time or the nearly monitoring in real time, but these monitoring systems can't satisfy informationization, automation and the interactive requirement of intelligent substation development trend to monitoring system, have the problem of the following aspects: the unified standard that the communication interface that (1) each producer equipment adopts is not relevant causes the communication interface standard number, of a great variety of each monitoring system; (2) each acquisition system is relatively independent, and image data is disperseed, and informix utilizes degree not high; (3) data in each system are many from certain professional angle acquisition monitoring information, and the analyzing and processing of equipment state is disperseed, and there is limitation in the state analysis judgement; (4) data messages such as the device-dependent operation in production management system, the SCADA system, tour, maintenance, test less are applied to status monitoring and analysis; (5) system information transmissions is limited to internal system, does not form the unified station level or the condition monitoring system of enterprise-level, and the shared scope of data is less.
Quick growth along with area power grid power transformation scale; in existing monitoring system; the staff regularly makes an inspection tour, overhauls and test the equipment that unusual, fault or obstacle take place in service, and unusual or obstacle take place equipment in the running, then need to look the order of severity and handle.Like this then expend bigger human and material resources in the detection and tour work of normal device, some fault or unusual discovery even dependence are maked an inspection tour, maintainer's experience is judged, there is bigger inaccuracy, to a certain extent, greatly reduce the operating efficiency and the work quality of power transformation operation and overhaul of the equipments.
The utility model content
The utility model is the weak point that exists in the above-mentioned prior art for avoiding, and provides integrated monitoring of a kind of intelligent substation equipment state and analytical system, with real-time watch device state, the operating efficiency that has improved power transformation operation and overhaul of the equipments and quality.
The utility model be the technical solution problem by the following technical solutions.
Integrated monitoring of intelligent substation equipment state and analytical system, its design feature are to comprise a plurality of monitoring system of electric substation, Surveillance center and client; Described monitoring system of electric substation comprises substation data storehouse server and a plurality of data collection station; Be provided with substation data storehouse and supervisory control of substation analysis software in the server of substation data storehouse, and be connected with client with Surveillance center; Described data collection station is used for gathering in real time the real-time status data of the converting equipment in the transformer station and the real-time status data is sent to substation data storehouse server; Described substation data storehouse server is used to receive the real-time status data of data collection station transmission and be stored within the substation data storehouse, the real-time status data are sent to Surveillance center, also be used for carrying out the analyzing and processing of real-time status data by the supervisory control of substation analysis software, and analysis result is sent to client according to the request of client; Described Surveillance center comprises application server, data management server, relational database server and real-time data base server, and data management server, relational database server and real-time data base server all are connected with application server; Application server is used to transfer the real-time status data in data management server, relational database server and the real-time data base server, and according to the request of client the real-time status data is sent to client; Described data management server is used for the data of unified management Surveillance center; Described relational database server is used for memory device machine account, warning message, combined data, test data and tour overhaul data; Described real-time data base server is used to store the real-time status data of each transformer station; Described client, be connected with the substation data storehouse server of described monitoring system of electric substation and the application server of Surveillance center, be used for sending request the analysis result that obtains the real-time status data or make according to the real-time status data to substation data storehouse server and application server.
The design feature of integrated monitoring of intelligent substation equipment state of the present utility model and analytical system also is:
Also be connected with production management system and SCADA (Supervisory Control And Data Acquisition, data acquisition and supervision control) system on the described data management server.
Compared with the prior art, the utility model beneficial effect is embodied in:
At the converting equipment operation of transformer station and the characteristics of maintenance, set up smart machine state measurement data access real-time database standard, in each transformer station, set up the monitoring system of electric substation of station level, and a plurality of monitoring system of electric substation are connected with more higher leveled Surveillance center, by Surveillance center will certain zone in all monitoring system of electric substation centralized management; Each monitoring system of electric substation can provide the real-time status data of this transformer station to client by substation data storehouse server and a plurality of data collection station, and improves the analysis result of data; Surveillance center can integrated certain zone in the real-time status data of all transformer stations, and provide service to client, realized the real-time local analysis of equipment state, diagnosis, in conjunction with creation data, the SCADA data form integration apparatus Stateful Inspection and analytical system, improved the planned of converting equipment tour and maintenance greatly, efficient and quality that equipment is maked an inspection tour and overhauled have greatly been improved, and energy real-time watch device state, minimizing causes the generation of fault emergency case because of unit exception, improve the operating efficiency and the quality of power transformation operation and overhaul of the equipments, reached the effect that management becomes more meticulous.
Description of drawings
Fig. 1 is the structural framing figure of integrated monitoring of intelligent substation equipment state of the present utility model and analytical system.
Label in the accompanying drawing 1: 1 Surveillance center, 11 application servers, 12 data management servers, 13 relational database servers, 14 real-time data base servers, 2 monitoring system of electric substation, 21 substation data storehouse servers, 211 substation data storehouses, 212 supervisory control of substation analysis software, 22 data collection stations, 3 clients, 4 production management systems, the 5SCADA system.
Below pass through embodiment, and the utility model is described in further detail in conjunction with the accompanying drawings.
Embodiment
Referring to Fig. 1, integrated monitoring of intelligent substation equipment state and analytical system comprise a plurality of monitoring system of electric substation 2, Surveillance center 1 and client 3; Described monitoring system of electric substation 2 comprises substation data storehouse server 21 and a plurality of data collection station 22; Be provided with substation data storehouse 211 and supervisory control of substation analysis software 212 in the substation data storehouse server 21, and be connected with client 3 with Surveillance center 1; Described data collection station 22 is used for gathering in real time the real-time status data of the converting equipment in the transformer station and the real-time status data is sent to substation data storehouse server 21; Described substation data storehouse server 21 is used to receive the real-time status data of data collection station 22 transmission and be stored within the substation data storehouse 211, the real-time status data are sent to Surveillance center 1, also be used for carrying out the analyzing and processing of real-time status data by supervisory control of substation analysis software 212, and analysis result is sent to client 3 according to the request of client 3; Described Surveillance center 1 comprises application server 11, data management server 12, relational database server 13 and real-time data base server 14, and data management server 12, relational database server 13 and real-time data base server 14 all are connected with application server 11; Application server 11 is used to transfer the real-time status data in data management server 12, relational database server 13 and the real-time data base server 14, and according to the request of client 3 the real-time status data is sent to client 3; Described data management server 12 is used for the data of unified management Surveillance center 1; Described relational database server 13 is used for memory device machine account, warning message, combined data, test data and tour overhaul data; Described real-time data base server 14 is used to store the real-time status data of each transformer station; Described client 3, be connected with the substation data storehouse server 21 of described monitoring system of electric substation 2 and the application server 11 of Surveillance center 1, be used for sending request to substation data storehouse server 21 and application server 11, the analysis result that obtains the real-time status data or make according to the real-time status data.
Also be connected with production management system 4 and SCADA system 5 on the described data management server 12.By connecting production management system 4 and SCADA system 5, the data in production management system 4 and the SCADA system 5 also can be integrated in monitoring and the analytical system, help forming incorporate monitoring.Among Fig. 1, only draw out the detailed structure view of a monitoring system of electric substation, the structure of other each monitoring system of electric substation is the monitoring system of electric substation 1 among the figure roughly the same.
The utility model is at the characteristics of converting equipment operation and maintenance, set up smart machine state measurement data access real-time database standard, realized multistage panorama substation equipment state, make an inspection tour, maintenance, test, operation, alarm, early warning information is visual, realized the real-time local analysis of equipment state, diagnosis, in conjunction with creation data, the SCADA data form integration apparatus Stateful Inspection and analytical system, realization inserts fast to existing monitoring system data, analyze and external measurement assembly of intelligent grid transitional period and the unification of following integral intelligent equipment state measurement data are inserted and analyze, improved the planned of converting equipment tour and maintenance greatly, efficient and quality that equipment is maked an inspection tour and overhauled have greatly been improved, and energy real-time watch device state, reduce the generation that causes the fault emergency case because of unit exception.

Claims (2)

1. integrated monitoring of intelligent substation equipment state and analytical system is characterized in that, comprise a plurality of monitoring system of electric substation (2), Surveillance center (1) and client (3);
Described monitoring system of electric substation (2) comprises substation data storehouse server (21) and a plurality of data collection station (22); Be provided with substation data storehouse (211) and supervisory control of substation analysis software (212) in the substation data storehouse server (21), and be connected with client (3) with Surveillance center (1); Described data collection station (22) is used for gathering in real time the real-time status data of the converting equipment in the transformer station and the real-time status data is sent to substation data storehouse server (21); Described substation data storehouse server (21) is used to receive the real-time status data of data collection station (22) transmission and be stored within the substation data storehouse (211), the real-time status data are sent to Surveillance center (1), also be used for carrying out the analyzing and processing of real-time status data by supervisory control of substation analysis software (212), and analysis result is sent to client (3) according to the request of client (3);
Described Surveillance center (1) comprises application server (11), data management server (12), relational database server (13) and real-time data base server (14), and data management server (12), relational database server (13) and real-time data base server (14) all are connected with application server (11); Application server (11), be used to transfer the real-time status data in data management server (12), relational database server (13) and the real-time data base server (14), and the real-time status data sent to client (3) according to the request of client (3); Described data management server (12) is used for the data of unified management Surveillance center (1); Described relational database server (13) is used for memory device machine account, warning message, combined data, test data and tour overhaul data; Described real-time data base server (14) is used to store the real-time status data of each transformer station;
Described client (3), be connected with the substation data storehouse server (21) of described monitoring system of electric substation (2) and the application server (11) of Surveillance center (1), be used for sending request, the analysis result that obtains the real-time status data or make according to the real-time status data to substation data storehouse server (21) and application server (11).
2. integrated monitoring of intelligent substation equipment state according to claim 1 and analytical system is characterized in that, also are connected with production management system (4) and SCADA system (5) on the described data management server (12).
CN2011201174290U 2011-04-20 2011-04-20 Integrated intelligent transformer substation equipment state monitoring and analysis system Expired - Lifetime CN202009267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201174290U CN202009267U (en) 2011-04-20 2011-04-20 Integrated intelligent transformer substation equipment state monitoring and analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201174290U CN202009267U (en) 2011-04-20 2011-04-20 Integrated intelligent transformer substation equipment state monitoring and analysis system

Publications (1)

Publication Number Publication Date
CN202009267U true CN202009267U (en) 2011-10-12

Family

ID=44750922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201174290U Expired - Lifetime CN202009267U (en) 2011-04-20 2011-04-20 Integrated intelligent transformer substation equipment state monitoring and analysis system

Country Status (1)

Country Link
CN (1) CN202009267U (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102497019A (en) * 2011-12-02 2012-06-13 清华大学 Transformer substation-dispatching center two-stage state estimation multi-source data timing and splicing method
CN102903026A (en) * 2012-09-18 2013-01-30 中国电力科学研究院 Dynamic reconfiguration system and method of secondary equipment of intelligent substation
CN103559786A (en) * 2013-09-29 2014-02-05 西安祥泰软件设备系统有限责任公司 Monitoring method and system for transformer station
CN103825365A (en) * 2014-03-06 2014-05-28 国家电网公司 State monitoring management platform of direct current equipment of transformer substation based on real-time historical database
CN104079072A (en) * 2014-07-14 2014-10-01 国家电网公司 Method for monitoring humidity of control cubicles of intelligent substation
CN105045922A (en) * 2015-08-26 2015-11-11 山东鲁能软件技术有限公司 Electrical equipment monitoring method and device
CN105071541A (en) * 2015-09-09 2015-11-18 成都比善科技开发有限公司 High-reliability substation online monitoring system
CN105071542A (en) * 2015-09-09 2015-11-18 成都比善科技开发有限公司 Substation on-line monitoring system and on-line monitoring method thereof
CN105071543A (en) * 2015-09-09 2015-11-18 成都比善科技开发有限公司 Substation n on-line monitoring system
CN105093037A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 Transformer station on-line monitoring system with high safety and on-line monitoring method thereof
CN105091947A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 On-line monitoring method of multi-data transformer station on-line monitoring system
CN105093036A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 Multi-data transformer station on-line monitoring system and on-line monitoring method thereof
CN105093039A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 On-line monitoring system for transformer station
CN105093040A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 Transformer station on-line monitoring system with high safety
CN105158608A (en) * 2015-09-09 2015-12-16 成都比善科技开发有限公司 On-line monitoring method of on-line monitoring system in power station
CN105182128A (en) * 2015-09-09 2015-12-23 成都比善科技开发有限公司 Multiple-data substation online monitoring system
CN105181012A (en) * 2015-08-26 2015-12-23 山东鲁能软件技术有限公司 Power equipment monitoring device having intelligent heat-dissipation function and monitoring method thereof
CN105182127A (en) * 2015-09-09 2015-12-23 成都比善科技开发有限公司 Online monitoring method of substation online monitoring system
CN106329544A (en) * 2016-08-31 2017-01-11 南京易司拓电力科技股份有限公司 Power distribution network voltage reactive power compensation equipment management system
CN107220253A (en) * 2016-03-22 2017-09-29 上海宝信软件股份有限公司 Alarm redundancy approach and system based on real-time data base
CN108333449A (en) * 2018-01-12 2018-07-27 国家电网公司 Substation equipment on-line monitoring method and device
CN108599380A (en) * 2018-06-07 2018-09-28 国网山东省电力公司聊城供电公司 A kind of Substation Operating anti-error system and method
CN110429710A (en) * 2019-07-25 2019-11-08 深圳中物兴华科技发展有限公司 A kind of intelligent substation comprehensive control method and system
CN114977505A (en) * 2022-06-06 2022-08-30 南京阿贝斯信息科技有限公司 Integrated remote operation and maintenance management and control system and method for substation automation equipment

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102497019A (en) * 2011-12-02 2012-06-13 清华大学 Transformer substation-dispatching center two-stage state estimation multi-source data timing and splicing method
CN102903026A (en) * 2012-09-18 2013-01-30 中国电力科学研究院 Dynamic reconfiguration system and method of secondary equipment of intelligent substation
CN102903026B (en) * 2012-09-18 2016-04-20 中国电力科学研究院 Secondary equipment of intelligent converting station dynamic reconfiguration system and method
CN103559786A (en) * 2013-09-29 2014-02-05 西安祥泰软件设备系统有限责任公司 Monitoring method and system for transformer station
CN103825365A (en) * 2014-03-06 2014-05-28 国家电网公司 State monitoring management platform of direct current equipment of transformer substation based on real-time historical database
CN104079072A (en) * 2014-07-14 2014-10-01 国家电网公司 Method for monitoring humidity of control cubicles of intelligent substation
CN105181012A (en) * 2015-08-26 2015-12-23 山东鲁能软件技术有限公司 Power equipment monitoring device having intelligent heat-dissipation function and monitoring method thereof
CN105045922A (en) * 2015-08-26 2015-11-11 山东鲁能软件技术有限公司 Electrical equipment monitoring method and device
CN105071541A (en) * 2015-09-09 2015-11-18 成都比善科技开发有限公司 High-reliability substation online monitoring system
CN105182127A (en) * 2015-09-09 2015-12-23 成都比善科技开发有限公司 Online monitoring method of substation online monitoring system
CN105091947A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 On-line monitoring method of multi-data transformer station on-line monitoring system
CN105093036A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 Multi-data transformer station on-line monitoring system and on-line monitoring method thereof
CN105093039A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 On-line monitoring system for transformer station
CN105093040A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 Transformer station on-line monitoring system with high safety
CN105158608A (en) * 2015-09-09 2015-12-16 成都比善科技开发有限公司 On-line monitoring method of on-line monitoring system in power station
CN105182128A (en) * 2015-09-09 2015-12-23 成都比善科技开发有限公司 Multiple-data substation online monitoring system
CN105071543A (en) * 2015-09-09 2015-11-18 成都比善科技开发有限公司 Substation n on-line monitoring system
CN105093037A (en) * 2015-09-09 2015-11-25 成都比善科技开发有限公司 Transformer station on-line monitoring system with high safety and on-line monitoring method thereof
CN105071542A (en) * 2015-09-09 2015-11-18 成都比善科技开发有限公司 Substation on-line monitoring system and on-line monitoring method thereof
CN107220253A (en) * 2016-03-22 2017-09-29 上海宝信软件股份有限公司 Alarm redundancy approach and system based on real-time data base
CN106329544A (en) * 2016-08-31 2017-01-11 南京易司拓电力科技股份有限公司 Power distribution network voltage reactive power compensation equipment management system
CN108333449A (en) * 2018-01-12 2018-07-27 国家电网公司 Substation equipment on-line monitoring method and device
CN108599380A (en) * 2018-06-07 2018-09-28 国网山东省电力公司聊城供电公司 A kind of Substation Operating anti-error system and method
CN110429710A (en) * 2019-07-25 2019-11-08 深圳中物兴华科技发展有限公司 A kind of intelligent substation comprehensive control method and system
CN114977505A (en) * 2022-06-06 2022-08-30 南京阿贝斯信息科技有限公司 Integrated remote operation and maintenance management and control system and method for substation automation equipment

Similar Documents

Publication Publication Date Title
CN202009267U (en) Integrated intelligent transformer substation equipment state monitoring and analysis system
CN105187010B (en) The Intellectualized monitoring and operational system of a kind of photovoltaic plant
CN103618380B (en) Intelligent monitoring system based on photovoltaic micro-grid
CN103513167B (en) Based on the switch partial discharge state monitoring apparatus of Board of Distributed Network Constructed
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN104283321A (en) Intelligent distribution transformer
CN209267271U (en) A kind of electrical power distribution automatization system
CN203135591U (en) Micro-grid centralized monitoring system used for photovoltaic building integrated combination
CN202472920U (en) Automatic monitoring system for transformer station
CN113009212B (en) System and method for intelligently monitoring state of lightning arrester of power distribution network based on Internet of things
CN115293370A (en) Digital integrated operation and maintenance management system of distributed photovoltaic power station
CN112787404A (en) Regional monitoring system based on intelligent operation and network security deep fusion
CN102338835B (en) Power quality dynamic monitoring system
CN116505656A (en) Wind-light-storage multifunctional complementary intelligent power utilization system based on 5G Internet of things technology
CN109561155B (en) Remote centralized monitoring and operation and maintenance method for substation equipment
CN102355061B (en) Remote monitoring and diagnosing system for substation equipment
CN103545805B (en) Modeling-based railway power supply arm monitoring method
CN202231496U (en) Remote monitoring and diagnostic system of transformer substation device
CN115757569A (en) New energy multi-type data allocation method and system based on domestic structure
CN214407580U (en) Comprehensive energy system operation risk monitoring system
CN113659704A (en) Remote monitoring system for new energy power station
CN208188646U (en) The monitoring system and photovoltaic plant of photovoltaic plant
CN201903777U (en) Device for controlling communication interface of singlechip microcomputer and Ethernet
Yang et al. Research on Application of Distribution Automation Terminal Equipment Based on Smart Grid in Power Distribution Automation
CN111342990A (en) Power grid equipment quality tracing system based on block chain

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111012