CN201828651U - Digital full function state monitoring and safety evaluation device of transformer substation direct current system - Google Patents

Digital full function state monitoring and safety evaluation device of transformer substation direct current system Download PDF

Info

Publication number
CN201828651U
CN201828651U CN2010205769084U CN201020576908U CN201828651U CN 201828651 U CN201828651 U CN 201828651U CN 2010205769084 U CN2010205769084 U CN 2010205769084U CN 201020576908 U CN201020576908 U CN 201020576908U CN 201828651 U CN201828651 U CN 201828651U
Authority
CN
China
Prior art keywords
direct current
current system
voltage
central processing
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205769084U
Other languages
Chinese (zh)
Inventor
兰海涛
陈为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TIANJING ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
SHANGHAI TIANJING ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TIANJING ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd filed Critical SHANGHAI TIANJING ELECTRIC POWER TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN2010205769084U priority Critical patent/CN201828651U/en
Application granted granted Critical
Publication of CN201828651U publication Critical patent/CN201828651U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to a digital full function state monitoring and safety evaluation device of a transformer substation direct current system, which is provided with a current measuring module, a voltage measuring module and an analog-to-digital (A/D) converter, wherein the current measuring module and the voltage measuring module respectively transmit measured analog signals converted through the A/D converter to a central processing unit, and after the analog signals are processed through the central processing unit, the relevant data of a storage battery pack of the transformer substation direct current system is displayed on a display unit. The set of device comprises all monitoring contents of the transformer substation direct current system and uses small equipment to replace a plurality of monitoring instruments in the prior art. The integration density is improved, the equipment cost is reduced, the fault point is reduced, the reliable operation time of the system is increased, the further deep analysis can be carried out on the data through personnel computer (CP) expert analysis software, the possibly occurring critical state is known, the safe pre-warning effect is realized, the occurrence of some safety problems is avoided, and large-area power failure accidents caused by direct current system failure are avoided.

Description

Transformer station direct current system digital full functional status monitoring and safety assessment device
Technical field
The utility model relates to battery condition monitoring and safety assessment device, particularly a kind of transformer station direct current system digital full functional status monitoring and safety assessment device.
Background technology
Battery pack has consequence at the continuous-current plant of transformer station, and in charging process, electric battery can produce thermal runaway phenomenon, is a hidden danger of substation safety work.Thermal runaway is a kind of fault that occurs when charge in batteries, and temperature rises and follows and causes that the abnormal charging current of accumulator increases, and electric current can be increased to the degree that battery is steamed and begin to dry up; When accumulator was dry, internal resistance increased, and produced more heat, and the softening fault of cell body can take place, or caused plumbous part fusing under extreme case.
The Chinese utility model patent that publication number is CN101004440A discloses a kind of accumulator internal resistance proving installation based on 485 bus modes, this device is provided with each test cell and monitoring means in described 485 bus structure, the test cell of each joint accumulator separate configurations and himself coupling, the built-in single-chip microcomputer of each test cell, and with single-chip microcomputer as in real time, the voltage measurement unit of repeated measurement this section accumulator voltage, for providing working power with the test cell that himself mates, single-chip microcomputer outputting communication signal is connected to the RS485 bus by optical coupling isolation circuit to each accumulator output voltage by voltage conversion circuit.This device can be monitored separately each battery in the battery pack, the degree of accuracy height, but each is saved accumulator all configuration testing unit and built-in single-chip microcomputer, the high-end devices that needs is more, make the cost of proving installation improve greatly, and each piece battery cell monitoring just needed a lot of bar lines of cloth, improved the installation and maintenance cost of supervising device like this.
The utility model content
The technical problems to be solved in the utility model has provided a kind of transformer station direct current system digital full functional status monitoring and safety assessment device.This device only need a monitoring equipment to cell voltage, charging and discharging currents, voltage ripple, current ripples, the loop of whole battery pack scurry into voltage, discharge and recharge power, parameters such as charge-discharge energy, the internal resistance of cell, voltage voltage stabilizing rate, conversion efficiency monitor and record, parameter according to these records, thermal runaway state by fuzzy Judgment and expert system prediction battery pack, under the prerequisite that does not influence the monitoring precision, greatly reduce the cost of equipment.
For solving the problems of the technologies described above, described transformer station direct current system digital full functional status monitoring and safety assessment device, mainly comprise shell, be arranged on the unit of display on the case surface, be located at central processing unit, FLASH data-carrier store, geocoding and power module in the shell, the unit of display, FLASH data-carrier store and geocoding are connected with central processing unit respectively, and power module provides power supply for device; It is characterized in that: in described shell, also be provided with current measurement module, voltage measurement module and A/D converter, current measurement module, voltage measurement module are transferred to central processing unit respectively with the simulating signal that measures after the A/D converter conversion, after central processing unit is handled voltage scurried in cell voltage, charging and discharging currents, voltage ripple, current ripples, the loop of the battery pack of transformer station direct current system, discharged and recharged power, related datas such as charge-discharge energy, the internal resistance of cell, voltage voltage stabilizing rate, conversion efficiency are presented on the unit of display.
Wherein, also be provided with on described shell and be used for RS485 PORT COM that this device is connected with host computer, the communication signal of central processing unit output is connected to the RS485 bus by optical coupling isolation circuit.On described shell, also be provided with usb connecting port.The described unit of display comprises a LCD display panel, two charactron and three LED light that are used to indicate three kinds of duties that are used for the display alarm numbering.
Compared with prior art, the utility model is provided with current measurement module, voltage measurement module and A/D converter, current measurement module, voltage measurement module are transferred to central processing unit respectively with the simulating signal that measures after the A/D converter conversion, after central processing unit is handled voltage scurried in cell voltage, charging and discharging currents, voltage ripple, current ripples, the loop of the battery pack of transformer station direct current system, discharged and recharged power, related datas such as charge-discharge energy, the internal resistance of cell, voltage voltage stabilizing rate, conversion efficiency are presented on the unit of display.This covering device has comprised whole monitoring contents of transformer station direct current system, the a plurality of measuring instruments that replaced prior art with a little equipment, improved integrated level, reduced equipment cost, reduce the fault point, increased system's reliability service time, and can preserve operating all data of accumulator back-up system, can further analyse in depth these data by PC analysis expert software, the critical conditions that understanding may occur, play the effect of safe early warning, avoid the appearance of some safety problems, avoid because the large area blackout that dc system fault causes.
Description of drawings
Fig. 1 is the annexation figure of the utility model transformer station direct current system digital full functional status monitoring and safety assessment device.
Fig. 2 is the structural representation of the utility model transformer station direct current system digital full functional status monitoring and safety assessment device.
Among the figure: 1, shell, 2, geocoding, 3, the RS485 PORT COM, 4, usb connecting port, 5, voltage measurement module, 6, current measurement module.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing:
Transformer station direct current system digital full functional status monitoring as depicted in figs. 1 and 2 and safety assessment device, mainly comprise shell 1, be arranged on the shell 1 lip-deep unit of display, be located at central processing unit, FLASH data-carrier store, geocoding 2 and power module in the shell 1, the unit of display, FLASH data-carrier store and geocoding 2 are connected with central processing unit respectively, and power module provides power supply for device; In described shell, also be provided with current measurement module 6, voltage measurement module 5 and A/D converter, current measurement module 6, voltage measurement module 5 are transferred to central processing unit respectively with the simulating signal that measures after the A/D converter conversion, after central processing unit is handled voltage scurried in cell voltage, charging and discharging currents, voltage ripple, current ripples, the loop of the battery pack of transformer station direct current system, discharged and recharged power, related datas such as charge-discharge energy, the internal resistance of cell, voltage voltage stabilizing rate, conversion efficiency are presented on the unit of display.
Simulation part has two independent AD converter and to scurry into simulating signal such as voltage with voltage, electric current, voltage ripple, current ripples to be converted into digital signal and to pass to central processing unit.
Central processing unit is with the chip of ARM chip as embedded system, periphery in embedded system, real-time clock is RX8025, F LASH data storage area, and the data of preserving character library and sampling are that AT45DB161, usb host mode controller are that CH376,485 serial communications are Max485.
Wherein, also be provided with on described shell and be used for RS485 PORT COM 3 that this device is connected with host computer, the communication signal of central processing unit output is connected to the RS485 bus by optical coupling isolation circuit.On described shell, also be provided with usb connecting port 4.The described unit of display comprises a LCD display panel, two charactron and three LED light that are used to indicate three kinds of duties that are used for the display alarm numbering.LCD is used for showing the data of sampling, the setting of real-time curve and each controlled variable.
The software of equipment uses the Embedded Operating System of multitask, judge the battery-operated state according to each parameter, whether each operational factor is in alarm condition, an enterprising step of these data bases is analyzed the data trend in one period again, utilizes fuzzy algorithm to judge whether battery pack has been in the thermal runaway state.
Compared with prior art, the utility model is provided with current measurement module, voltage measurement module and A/D converter, current measurement module, voltage measurement module are transferred to central processing unit respectively with the analog signal that measures after the A/D converter conversion, after central processing unit is processed voltage scurried in cell voltage, charging and discharging currents, voltage ripple, current ripples, the loop of the batteries of transformer station direct current system, discharged and recharged power, the related datas such as charge-discharge energy, the internal resistance of cell, voltage voltage stabilizing rate, conversion efficiency are presented on the unit of display. This covering device has comprised whole Contents for Monitorings of transformer station direct current system, the a plurality of measuring instruments that replaced prior art with a little equipment, improved integrated level, reduced equipment cost, reduce the fault point, increased system's reliability service time, and can preserve operating all data of battery back-up system, can further analyse in depth these data by PC analysis expert software, the critical condition that understanding may occur, play the effect of safe early warning, avoid the appearance of some safety problems, avoid because the large area blackout that dc system fault causes.
More than show and described basic principle of the present utility model and principal character and advantage thereof. The technology personage of the industry should understand; the utility model is not subjected to the restriction of above-mentioned implementing regulations; what describe in above-mentioned implementing regulations and the specification is to be used for illustrating principle of the present utility model; under the prerequisite that does not break away from the utility model principle and scope; the utility model also can have various changes and modifications, and these changes and improvements all belong in claimed the utility model scope.
The claimed scope of the utility model defines with appending claims and other equivalent.

Claims (4)

1. transformer station direct current system digital full functional status monitoring and safety assessment device, mainly comprise shell, be arranged on the unit of display on the case surface, be located at central processing unit, FLASH data-carrier store, geocoding and power module in the shell, the unit of display, FLASH data-carrier store and geocoding are connected with central processing unit respectively, and power module provides power supply for device; It is characterized in that: in described shell, also be provided with current measurement module, voltage measurement module and A/D converter, current measurement module, voltage measurement module are transferred to central processing unit respectively with the simulating signal that measures after the A/D converter conversion, after central processing unit is handled voltage scurried in cell voltage, charging and discharging currents, voltage ripple, current ripples, the loop of the battery pack of transformer station direct current system, discharged and recharged power, related datas such as charge-discharge energy, the internal resistance of cell, voltage voltage stabilizing rate, conversion efficiency are presented on the unit of display.
2. transformer station direct current system digital full functional status monitoring according to claim 1 and safety assessment device, it is characterized in that: also be provided with on described shell and be used for RS485 PORT COM that this device is connected with host computer, the communication signal of central processing unit output is connected to the RS485 bus by optical coupling isolation circuit.
3. transformer station direct current system digital full functional status monitoring according to claim 1 and 2 and safety assessment device is characterized in that: also be provided with usb connecting port on described shell.
4. transformer station direct current system digital full functional status monitoring according to claim 1 and safety assessment device is characterized in that: the described unit of display comprises a LCD display panel, two charactron and three LED light that are used to indicate three kinds of duties that are used for the display alarm numbering.
CN2010205769084U 2010-10-26 2010-10-26 Digital full function state monitoring and safety evaluation device of transformer substation direct current system Expired - Fee Related CN201828651U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205769084U CN201828651U (en) 2010-10-26 2010-10-26 Digital full function state monitoring and safety evaluation device of transformer substation direct current system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205769084U CN201828651U (en) 2010-10-26 2010-10-26 Digital full function state monitoring and safety evaluation device of transformer substation direct current system

Publications (1)

Publication Number Publication Date
CN201828651U true CN201828651U (en) 2011-05-11

Family

ID=43967177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205769084U Expired - Fee Related CN201828651U (en) 2010-10-26 2010-10-26 Digital full function state monitoring and safety evaluation device of transformer substation direct current system

Country Status (1)

Country Link
CN (1) CN201828651U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944779A (en) * 2010-10-26 2011-01-12 上海天晶电力科技发展有限公司 Digitalized full-function state monitoring and safety evaluation device of substation direct current system
CN103033759A (en) * 2012-12-11 2013-04-10 上海市电力公司 Storage battery thermal runway intelligent judgment method
CN107064807A (en) * 2012-05-03 2017-08-18 Avl里斯脱有限公司 Method for determining the critical operating state in fuel cell unit

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101944779A (en) * 2010-10-26 2011-01-12 上海天晶电力科技发展有限公司 Digitalized full-function state monitoring and safety evaluation device of substation direct current system
CN107064807A (en) * 2012-05-03 2017-08-18 Avl里斯脱有限公司 Method for determining the critical operating state in fuel cell unit
CN107064807B (en) * 2012-05-03 2019-06-21 Avl里斯脱有限公司 Method for determining the critical operating state in fuel cell unit
CN103033759A (en) * 2012-12-11 2013-04-10 上海市电力公司 Storage battery thermal runway intelligent judgment method
CN103033759B (en) * 2012-12-11 2015-02-18 上海市电力公司 Storage battery thermal runway intelligent judgment method

Similar Documents

Publication Publication Date Title
CN101894981A (en) Intelligent monitoring, repair and control method of lead-acid battery pack and system thereof
CN103064027A (en) On-line monitoring and maintaining system for 750-volt wireless intelligent storage battery
CN103453998B (en) A kind of self-energizing radio temperature sensor and its implementation
CN104518530A (en) Lithium battery pack management system
CN104852096B (en) Intelligent accummulator diagnosis prediction system
CN102539973B (en) Charge and discharge detecting system of electric automobile
CN103645443A (en) Storage battery measurement and control system
CN108614217A (en) A kind of battery management system full-automatic test system and implementation method
CN209311646U (en) A kind of battery group on-line monitoring system
CN201828651U (en) Digital full function state monitoring and safety evaluation device of transformer substation direct current system
CN207528886U (en) A kind of lead-acid accumulator on-line monitoring is safeguarded and early warning system
CN203587700U (en) Internal resistance online detection device for parallelly-connected storage battery
CN201589853U (en) Intelligent type device for testing battery capacity
CN105501455B (en) A kind of unmanned aerial vehicle comprehensive power integrated system and method
CN101944779A (en) Digitalized full-function state monitoring and safety evaluation device of substation direct current system
CN204156581U (en) A kind of collecting and distributing type lithium battery management system
CN203805716U (en) Detection and protection device for storage battery and mining dump vehicle
CN203084173U (en) Intelligent power grid storage battery status detecting system
CN204154877U (en) Accumulator cell charging and discharging test apparatus and accumulator cell charging and discharging Test Data Acquisition System
CN203224606U (en) Storage battery online monitoring device
CN208818331U (en) A kind of transformer online monitoring device based on vibration
CN203278320U (en) Combined rack lithium power supply
CN106443283A (en) Testing platform and testing method for power management system of inspection robot of transformer substation
CN202057720U (en) Current and temperature real-time monitoring device for transmission line
CN111812538A (en) Power battery evaluation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

Termination date: 20161026

CF01 Termination of patent right due to non-payment of annual fee