CN201514489U - Short message type no-cable seismograph - Google Patents

Short message type no-cable seismograph Download PDF

Info

Publication number
CN201514489U
CN201514489U CN2009201760181U CN200920176018U CN201514489U CN 201514489 U CN201514489 U CN 201514489U CN 2009201760181 U CN2009201760181 U CN 2009201760181U CN 200920176018 U CN200920176018 U CN 200920176018U CN 201514489 U CN201514489 U CN 201514489U
Authority
CN
China
Prior art keywords
unit
cable
control unit
gps
acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201760181U
Other languages
Chinese (zh)
Inventor
郭建
刘光鼎
宋祁真
罗维炳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING GEOPHYSICS TECHNOLOGY CO LTD
Institute of Geology and Geophysics of CAS
Original Assignee
BEIJING GEOPHYSICS TECHNOLOGY CO LTD
Institute of Geology and Geophysics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GEOPHYSICS TECHNOLOGY CO LTD, Institute of Geology and Geophysics of CAS filed Critical BEIJING GEOPHYSICS TECHNOLOGY CO LTD
Priority to CN2009201760181U priority Critical patent/CN201514489U/en
Application granted granted Critical
Publication of CN201514489U publication Critical patent/CN201514489U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model relates to a short message type no-cable seismograph in order to solve the problem that the existing no-cable seismography can not carry out real-time quality control. An acquisition station of the seismograph comprises a main control unit, an acquisition unit, a storage unit, a GPS unit and a power source management control unit and is characterized by also comprising a cell phone unit, wherein the main control unit is respectively connected with the acquisition unit, the storage unit, the GPS unit, the power source management control unit and the cell phone unit. The utility model has the advantages that the workload for measuring can be reduced, acquisition devices are distributed more flexibly and easily, a timed blasting synchronous acquisition mode is adopted conveniently so as to be favorable for increasing the construction efficiency, data is recovered flexibly, SPS files can be generated automatically, coordinates of centimeter-level accuracy are calculated automatically, the difficulty that the no-cable seismograph has no real-time quality control is solved in a simple and cheap mode, and the application range and the construction efficiency are greatly increased.

Description

The note type does not have the cable seismograph
Technical field
The utility model relates to a kind of seismograph, and particularly relating to a kind of note type does not have the cable seismograph.
Background technology
1, seismic instrument present situation
The high accuracy number seismograph is to be used for the artificial or earthquake signal of record, seek the exploration instrument for geology of oil, gas, coal and other mineral resources then according to the record of these seismic signals, and can be used for surveying earth ' s internal structure, carry out engineering and geological hazards prediction etc.
Method of seismic exploration remains the main means at land and seafari oil and natural gas at present, also be the important method of exploration of other mineral resources simultaneously, and be widely used in studying earth ' s internal structure, engineering exploration and aspects such as detection, geological hazards prediction.Its basic skills is to bury to put thousands of and even up to ten thousand seismic event sensors (being seismoreceiver) on the ground of exploration target area, at sea then be to float cable (floating cable), excite artificial earthquake with explosive or vibroseis (on land) or high-pressure airgun (at sea) then every seismoreceiver of tens of meters parcels with the long sea of the several 1-2km of sea exploration vessel drag and drop.Seismic event is propagated to deep under ground, the interphase that runs into the heterogeneity stratum will produce reflection, seismoreceiver picks up reflection wave and converts thereof into analog electrical signal, by high-precision digital seismograph these analog electrical signals is converted to digital signal record then and gets off.The mass data that ground observation receives is carried out complicated signal Processing and Inversion Calculation by indoor high-speed computer, just can obtain clear reliable underground structure image, finally determines the position and the degree of depth of mineral resources.
Digital seismograph with the mineral resources geophysical survey can be divided three classes according to data transfer mode: wire-link telemetry seismograph, wireless telemetering seismograph, no cable memory-type seismograph.
The seismographic feature of wire-link telemetry is to be sent instruction and transmitted image data by wired system fully.In present open-air practical application, occupy leading position, occupy most shares in seismograph market, the world, 408/428 series that Sercel company is arranged commonly used, System IV, the Scorpion of ION company and Aries II system, the Summit system of German DMT company, Uni Q system of U.S. WesternGeco company etc.Present instrument in China's oil and the use of gas prospecting industry greatly partly is the wire-link telemetry seismograph from external import.
The instrument that utilizes wireless system to send instruction and transmission image data is called the wireless telemetering seismograph, generally is used for surface condition construction down distinguishingly, also occupies certain market.The Wireless Seismic system of the BOX system of Fairfield company and Wireless Seismic company is the wireless telemetering digital seismograph.
Britain Vibtech company (by Sercel corporate buyout, developing into the Unite system) releases a kind of novel telseis instrument system---IT system first, called after " honeycomb earthquake " acquisition system.The wireless system that it is different from the past, IT system adopts the patented technology of cellular radio.Communicating by letter between remote control acquisition component (Remote Acquisition Unit-RAU) and their " local node " (local node) adopted the 2.4GHz ISM band that need not licence.When blowing out, IT system adopts cellular radio to come the remotely monitored sensor data to recording-member, and then by cable line geological data is delivered to central recording unit.
No cable memory-type seismograph is a kind of seismograph of specific type, it is characterized in that: do not have big line, do not have transmission of seismic data; Each acquisition station receives blows out storage automatically after the data, with special data recovery system all is blown out data again and takes out from acquisition station; There is the part instrument to utilize wireless system, but do not receive data, do not monitor the duty of acquisition station the order such as fire of used acquisition station.
No cable formula register system (directly writing down with the paper section in early days) is all adopted in the observation of the earthquake station, in field of seismic exploration, no cable system the earliest is the SGR (Seismic Group Recorder) of the seventies by the development of Amoco company, early stage SRG system is " blind putting (shoot blind) ", be in the surface units of SGR magnetic tape station to be installed, in case after surface units was laid, seismic data recording can't know whether surface units is working properly on tape.Though this method is not accepted by a lot of people, because he can obviously enhance productivity, at noontide, once has 20 field parties to equip this instrument.When " blind putting ", nearly 1% seismic trace had problem at that time, and this also allows in present wired system.
American I N company (former I/O company) released the long-range earthquake signal recorder of RSR (Remote Seismic Recorder) in 1999, can realize the earthquake data acquisition of 6 analog detector passages.The RSR system can with the IMAGE system compatible of ION company, the two can be formed wire and wireless and mix acquisition system.ION company 2002 with the remote logging instrument of RSR system upgrade to VectorSeis SYSTEM IV system, be called VRSR2.VectorSeis SYSTEM IV central control system has control module (being called V2), radio-frequency antenna, central transceiver and central transceiver controller to constitute.V2 by the data acquisition of acquisition instructions startup VRSR2 acquisition station, detects the state of VRSR2 by radio-frequency antenna and all VRSR2 formation radio-frequency (RF) telemetry system.Basic identical with function and the structure of RSR, but no longer support analog detector, but adopted three-component MEMS digital geophone.
No cable memory-type earthquake-capturing station is not owing to have real time monitoring record and on-the-spot quality monitoring means commonly used, so can't generally be accepted by industry member, using in China, existence does not meet problems such as Seismic Operation standard yet, up to the present, also not having cable memory-type earthquake-capturing stands in China and carries out actual seismic exploration.But because the accuracy requirement of seismic prospecting makes that the road number of seismic instrument is more and more, according to expert's estimation both at home and abroad, along with the demand of seismic prospecting precision, oil and gas industry circle needs the instrument of 30000 roads to 50000 roads soon, by 2025, perhaps we needed the earthquake-capturing instrument in 250,000 roads.And for the wired acquisition instrument more than 50000 roads, administering and maintaining of cable is very difficult, also needs to spend a large amount of costs.So it will be the developing direction of next step seismic prospecting instrument that at present a lot of scholarly forecasts do not have cable memory-type earthquake-capturing station.
Because the development of no cable memory-type seismic instrument is relatively easy, has many universities, research institution and company to carry out the development work at this kind earthquake-capturing station both at home and abroad at present.Domestic have the GPS time service seismograph of east geophysics company, the submarine seismograph and the metallic ore of Inst of Geology and Geophysics, Chinese Academy of Sciences to explore the no cable telemetric seismic instrument of no cable memory-type seismograph, Jilin University.There is the FireFly of American I N company not have cable seismic acquisition configuration, the Unite system of French Sercel company, the Ultra of U.S. Ascend Geo company abroad and do not have GSR (the Geospace Seismic Recorder) system of cable land seismic acquisition configuration, U.S. OYO Geospace company, the Z system of U.S. Firfield company, the Sigma system of U.S. Seismic Source company.
At present, all large-scale seismic prospecting instruments of China all depend on from developed country's imports such as the U.S., France.Because no cable memory-type earthquake-capturing station is not also accepted by China's geophysical survey circle, also there is not this seismograph of domestic enterprise procurement at present.Homemade no cable memory-type seismic instrument also is in the development stage, does not also have formal product to come out.
2, the weak point of not having cable memory-type seismic instrument now
Conventional no cable memory-type seismograph mainly is made up of control module, collecting unit, storage unit, time synchronized unit and power supply management control unit etc.Current no cable memory-type seismograph has following three big problems:
1. the seismographic acquisition station of most of no cable memory-type can not receive the control of steering order realization duty and duty is turned back to central station: as the GPS time service seismograph of east geophysics company, the submarine seismograph of Inst of Geology and Geophysics, Chinese Academy of Sciences and the no cable memory-type seismograph of metallic ore exploration, the no cable telemetric seismic instrument of Jilin University, the Unite system of France Sercel company (autonomous memory module), the GSR system of U.S. OYO Geospace company, the Z system of U.S. Firfield company, the Sigma system of U.S. Seismic Source company (autonomous type drainage pattern), and the FireFly of American I N company does not have the cable seismic acquisition configuration, the Sigma system (wireless network mode) that the Ultra of U.S. Ascend Geo company does not have cable land seismic acquisition configuration and U.S. Seismic Source company then adopts special-purpose wireless network to realize exciting synchronously and return the status information of acquisition station.
2. have or not the seismographic acquisition station of cable memory-type can not send data to the real-time quality control that central station is realized data: this is the difficult problem that up to the present can't solve.Do not have the real-time quality control of data, just can not know the quality of earthquake data acquisition at the scene, comprise whether the power, acquisition station work of excitation energy be normal, wave detector work is whether normal etc.In the construction in the open air, can excite hundreds of big gun record every day at present,, mend big gun again and will spend a large amount of man power and materials if after indoor playback, find that a large amount of malfunction data are arranged.So the construction method of this instrument is not also accepted by seismic prospecting circle of China.
3. it is synchronous that the GPS of acquisition station only is used for time service, most of conventional memory-type does not have that cable earthquake-capturing station does not position or bearing accuracy is not enough: because each acquisition station will carry out synchronous data collection, time service type GPS receiver can provide the output of 1pps time signal, can reach the precision of RMS20nS, be enough to satisfy the synchronization accuracy of instrument requirement.But because GPS single-point bearing accuracy is lower, be generally ± 10m, when having SA to influence be ± 100m, the accuracy requirement of seismic exploration contentedly.
Summary of the invention
The purpose of this utility model is to overcome the above-mentioned defective of prior art, provides a kind of note type that can utilize SMS to control and transmit with data not have the cable seismograph.
For achieving the above object, it is that no cable seismograph acquisition station comprises main control unit, collecting unit, storage unit, GPS unit and power supply management control unit that the utility model note type does not have the cable seismograph, its special feature is also to comprise mobile phone unit, and main control unit connects collecting unit, storage unit, GPS unit, power supply management control unit and mobile phone unit respectively.There are not the three big problems that cable memory-type seismograph exists at routine, we introduce and to utilize SMS that the seismographic memory-type of no cable is not had the cable acquisition station to carry out State Control and data transmission, utilize many GPS station co-located technology to realize cm level location, make no cable memory-type seismograph have the positioning function of State Control function, data transport functions and cm level, a new generation that becomes telotism does not have cable memory-type seismograph---and utilize SMS to control the no cable seismograph (abbreviate the note type as and do not have the cable seismograph) that transmits with data.Though single GPS location, bearing accuracy is lower, is generally ± 10m, contentedly the positioning accuracy request of seismic exploration (decimeter grade).And the seismographic advantage of the utility model is by SMS control and transmitting function, can be implemented in tens or the scope of hundreds of square kilometre in, laying hundreds of even several ten thousand GPS websites measures, thereby form large-scale GPS station network, after utilizing this large-scale GPS network to carry out the measuring error elimination, can reach the bearing accuracy of centimetre-sized, thus the positioning accuracy request of seismic exploration contentedly.The utility model utilizes SMS to control the technical solution that transmits with data, be to have solved no cable seismograph in the unusual mode of cheap and simple not have this difficult problem of real-time quality control, improved seismographic usable range of no cable and operating efficiency greatly.
As optimization, described collecting unit is made up of multi-way switch, prime amplifier, delta sigma modulator-demodular unit, digital filter and measuring signal generator; The digital filter that connects main control unit connects the multi-way switch of multichannel delta sigma modulator-demodular unit, prime amplifier and tie geophone arranged side by side successively; Digital filter connects multi-way switch by measuring signal generator again.
As optimization, No. one modulator-demodular unit support connects the multi-way switch of two-way prime amplifier and tie geophone; Described prime amplifier is the preamplification gain type that program is provided with 0dB, 6dB, 12dB, 18dB, 24dB, 30dB or 36dB.
As optimization, described main control unit is connected with the GPS unit with mobile phone unit respectively by serial ports, connects collecting unit by the FIFO memory interface, and connects storage unit; Power supply management control unit connects and the power supply support is provided and carries out power supply management for mobile phone unit, GPS unit, collecting unit, main control unit and storage unit.
As optimization, described mobile phone unit uses GSM, CDMA or 3G mobile chip, and is connected with main control unit with serial ports; The GPS unit adopts OEM GPS receiver module; Storage unit adopts the SD card of 8G.
It is made up of six big units: main control unit, collecting unit, mobile phone unit, GPS unit, power supply management control unit and storage unit.With the seismographic difference of domestic and international no cable be to have introduced mobile phone unit, seismographic usable range of no cable and operating efficiency have been improved greatly, main advantage shows: (1) utilizes SMS that no cable seismograph is carried out data and transmits, thereby can satisfy the requirement of monitoring in real time of earthquake image data quality, this is the difficult problem that other no cable seismographs all do not have solution.It has solved this difficult problem in the unusual mode of cheap and simple; (2) utilize SMS to finish the conversion of no cable earthquake-capturing station start, shutdown and dormant state, and can understand the power work state at any time, the loss that this greatly reduces power supply has prolonged working time of acquisition station; (3) utilize SMS to finish the synchronous acquisition of geological data, improve the dirigibility and the efficient of gathering greatly; (4) utilize SMS to finish the synchronous acquisition of gps data, be convenient to handle, and can know the position of acquisition station at any time, be convenient to search in indoor many GPS station co-located of carrying out; (5) utilize SMS to carry out acquisition station working state monitoring and setting, understand the duty of acquisition station at any time; (6) utilize SMS can utilize commercial network to carry out work, at this moment, can be arranged on controlling Anywhere and operating in the world to central station in principle.The special mobile base station that also can rent the vehicle-mounted mobile base station of commercial department or set up oneself is conveniently to manage, to raise the efficiency and to save cost.
Utilize the control of SMS reception steering order realization duty and duty is turned back to central station and be: utilize the mobile module on the no cable seismograph, accept and send note, thereby realize receiving command function and returning the work state information function, steering order commonly used and duty return message have:
(1) start-up command, return open state: central station sends start-up command, acquisition station makes the acquisition station that is in dormant state enter recording status after receiving start-up command, the preparation for acquiring data, and return open state to central station, illustrate and start shooting successfully, and return information such as power supply status, storer remaining space.
(2) dormancy instruction: except that keeping CPU to be in minimum state under and keeping closing other all circuit, the wait start-up command mobile phone is under the holding state.
(3) shutdown command: the free parameter T of shutdown command, expression is closed other all circuit except that maintenance CPU is under the holding state, initiatively transferred dormant state after T minute to, waits for start-up command.
(4) acquisition parameter is provided with instruction: this instruction is provided with acquisition parameter to acquisition station, comprises sampling rate, record length, pregain, deposit data form etc.
(5) regularly synchronous acquisition instruction of data: this instruction has parameter T1, T2 and dT, and the order acquisition station carries out data acquisition by time interval dT, till the T2 time in the T1 time.T1, T2 are the time of Hour Minute Second form on days, and the unit of dT is second, when dT=0, continuously every continuous acquisition; When T1=T2, only gather once.
(6) power state indication, return power supply status: central station sends the power supply status query statement, and acquisition station returns power supply status.Find power supply when power management module and can only work XXX minute the time that will send power supply status automatically to central station, wherein XXX can be in advance with the instruction setting.
(7) memory state instruction, return memory state: central station sends the memory state query statement, and acquisition station returns storer remaining space state.
(8) GPS acquisition instructions, return gps coordinate: central station sends the gps coordinate acquisition instructions, and all acquisition stations are convenient to the synchronous acquisition gps coordinate to handle in indoor many GPS station co-located of carrying out.
(9) collecting unit detects instruction, returns the collecting unit state: central station sends collecting unit and detects instruction, finishes collecting unit after acquisition station is received and detects, and return the collecting unit status information.
We utilize SMS to finish data transport functions and are based on a SMS and can send 160 bytes, so can utilize SMS to realize the data or the wherein transmission and the transmission of partial data of whole trace record.At this moment exciting and when receiving the parameter test, need be sent to central station to the data of whole trace record before formal production can put in order the transmission of track data with a plurality of notes realizations.When formal production, in order to carry out quality monitoring, then can be only with note translator unit data or only the delivery quality monitor message get final product.Can realize the transmission and the transmission of data with following instruction.
(10) data movement instruction:
This instruction has parameter: F (sign), Data_Format_F (data layout sign), Trace_No1 (initial Taoist monastic name), Trace_No2 (end of a period Taoist monastic name), dNo (Taoist monastic name at interval), T1 (zero-time), T2 (finish-time), dT (sampling interval).
F (sign) is the data movement instruction identification code, (uses F by 2 1F 2Expression) form:
F 1=0 expression transmits the data of having gathered;
F 1=1 expression is provided with acquisition station, transmits the data that are about to collection;
F 2=0 expression transmits the data of whole trace record, and this moment, T1 and T2 can not fill out;
F 2=1 expression transmits the data from T1 to T2 in the record data;
F 2=2 expressions transmit the primary wave partial data in the record data, and this moment, T1 and T2 can not fill out.
F 2=9 expressions do not need that data are sent to central station and carry out quality monitoring, at this moment carry out quality control as long as transmit the energy value of per pass record, use this instruction, every note can transmit the energy value of 40 big guns record, can use this instruction when ordinary production and when very well.
The data layout identification code of Data_Format_F (data layout sign) for transmitting:
Data_Format_F=0 represents symbolization position transmission data, and this moment, a note can transmit 1280 data at most.
Data_Format_F=1 represents to adopt 1 byte to transmit data, and this moment, a note can transmit 160 data at most.
Data_Format_F=2 represents to adopt 2 bytes to transmit data, and this moment, a note can transmit 80 data at most.
Data_Format_F=3 represents to adopt 3 bytes to transmit data, and this moment, a note can transmit 53 data at most.
Data_Format_F=4 represents to adopt 4 bytes to transmit data, and this moment, a note can transmit 40 data at most.
Trace_No1 and Trace_No2 represent that respectively needs transmit the home record Taoist monastic name and the end of a period Taoist monastic name of data, and dNo represents that Taoist monastic name at interval.
T1, T2 are zero-time and the finish-times of representing respectively with number of samples, transmit data since T1 sampling point, and till T2 sampling point, dT represents to resample at interval.
Another big characteristics of the utility model are: utilize many GPS station co-located technology to realize the centimetre-sized bearing accuracy.It is synchronous that acquisition station needs GPS to be used for time service, and time service type GPS receiver can provide the output of 1pps time signal, can reach the precision of RMS20nS, is enough to satisfy the synchronization accuracy of instrument requirement.Because GPS single-point bearing accuracy is lower, be generally ± 10m, when having SA to influence be ± 100m, and the positioning accuracy request of seismic prospecting is at decimeter grade, so can not meet the demands with single GPS location.And the seismographic advantage of the utility model be tens or the scope of hundreds of square kilometre in, can lay hundreds of even several ten thousand GPS websites are measured, thereby form large-scale GPS station network, utilize this large-scale GPS network to carry out after measuring error eliminates, can reach the bearing accuracy of centimetre-sized.
The utility model note type does not have the cable seismograph and compares with existing no cable seismograph and have significant seismic prospecting construction process advantage, can be suitable for recording geometry method for designing more flexibly, can transmit all or part image data in experimental stage, carry out the real time data analysis; Have and to reduce the surveying work amount, lay collecting device flexible and convenient more, the convenient synchronous acquisition pattern of regularly blowing out that adopts, help improving operating efficiency, data collection is flexible, can generate the SPS file automatically, calculates the coordinate of centimetre-sized precision automatically, having solved no cable seismograph in unusual cheap and simple mode does not have a real-time quality control difficult problem, has improved the advantage of seismographic usable range of no cable and operating efficiency greatly.
Description of drawings
Fig. 1 is the circuit theory diagrams that the utility model note type does not have cable seismograph acquisition station;
Fig. 2 is the former block diagram of circuit that the utility model note type does not have collecting unit in the cable seismograph acquisition station.
Embodiment
Illustrate further below in conjunction with accompanying drawing and instantiation
It is that no cable seismograph acquisition station is made up of main control unit 4, collecting unit 3, mobile phone unit 1, GPS unit 2, power supply management control unit 5 and storage unit 6 six parts that the utility model note type does not have the cable seismograph.Main control unit 4 connects collecting unit 3, storage unit 6, GPS unit 2, power supply management control unit 5 and mobile phone unit 1 respectively.
Described collecting unit provides the analog detector signal of 1~8 passage to import by multi-way switch, can the preamplification gain of 0dB, 6dB, 12dB, 18dB, 24dB, 30dB or 36dB be set program, and realize 4,2,1,0.5 or 0.25 sampling rate.Described collecting unit is made up of multi-way switch 31, prime amplifier 32 (CS3301A or CS3302A), delta sigma modulator-demodular unit 33 (CS5371A or CS5372A), digital filter 34 (CS5376A) and measuring signal generator 35 (CS4373A); The digital filter 34 that connects main control unit 4 connects the multi-way switch 31 of multichannel delta sigma modulator-demodular unit 33 arranged side by side, prime amplifier 32 and tie geophone 7 successively; Digital filter 34 connects multi-way switch 31 by measuring signal generator 35 again.Each road modulator-demodular unit 33 supports to connect the multi-way switch 31 of two-way prime amplifier 32 and tie geophone 7.Multi-way switch is selected input test signal or analog detector signal.Prime amplifier is applicable to moving-coil geophone when adopting the CS3301A of Cirrus Logic company, be applicable to nautical receiving set when adopting with CS3302A, and the preamplification gain of 0dB, 6dB, 12dB, 18dB, 24dB, 30dB or 36dB can program be set.
The delta sigma modulator-demodular unit adopts the CS5371A (single channel) or the CS5372A (binary channels) of Cirrus Logic company, and digital filter is then selected CS5376A for use.CS5371A/CS5372A and CS5376A are that Cirrus Logic company aims at geophysical survey and the AD that designs conversion nest plate, and the two combination can realize 24 analog to digital conversion, and 4,2,1,0.5 or 0.25 sampling rate is provided.2 CS5372A or 4 CS5371A and 1 CS5376 can realize the simulated earthquake signal data acquisition of 4 passages.
Main control unit can (adopt the model of difference in functionality by ARM series CPU according to different road numbers, when the single track of single station, can use C51CPU, principle is enough just to reduce power consumption), compositions such as SDRAM storer, USB interface and Ethernet interface, also provide serial ports to be connected with the GPS unit with mobile phone unit respectively, provide the FIFO memory interface to connect collecting unit, and connect storage unit.
Power supply management control unit connects and the power supply support is provided and carries out power supply management for mobile phone unit, GPS unit, collecting unit, main control unit and storage unit.The function of Power Management Unit: the cell voltage of 12V is converted to 5V, 3.3V, 2.7V, 1.8V etc. supply with main control unit, collecting unit, GPS unit, mobile phone unit and storage unit; At any time close and open the power supply of each unit according to the instruction of main control module; Detect power supply residual capacity and warning in time.
Described mobile phone unit can be selected GSM, CDMA or 3G mobile chip for use, and is connected with main control unit with serial ports.By closing all functions except that SMS, can reduce operating cost and energy consumption.
The GPS unit can be selected the IT03 OEM GPS of Fastrax company receiver module for use, characteristics be size little (22x23x2.7mm), power consumption ultralow (<95mW@2.7V), sensitivity very high (156dBm (tracking)), the output of accurate 1PPS time signal can reach the precision of RMS20nS and cheap.
Storage unit is selected the SD card of 8G for use.
It is to have introduced mobile phone unit with having the seismographic difference of no cable now both at home and abroad, solve no cable seismograph in the unusual mode of cheap and simple and do not had this difficult problem of real-time quality control, make that essential variation has taken place no cable seismograph, improved seismographic usable range of no cable and operating efficiency greatly.
Introduce below, the utility model note type does not have cable seismograph construction process (exciting seismic prospecting with explosive is example):
After a certain block of decision need carry out seismic prospecting, old process was: 1. carry out the recording geometry design earlier according to geologic requirements; 2. test exciting, determine preferred plan with receiving factor; 3. carry out surveying work, all wave detectors and sp location are carried out mark with timber and penoncel; 4. lay collecting device; 5. blow out and excite image data; 6. data processing and analysis.Construction process is as follows:
(1) carry out the recording geometry design earlier according to geologic requirements: because no cable earthquake-capturing station does not have heavy cable, overall weight alleviates greatly, and does not have the restriction of cable length, makes that the design of seismic prospecting recording geometry is more flexible.
(2) test exciting, determine preferred plan: in practice of construction, need excite dozens or even hundreds of big gun to determine to excite dose, excitation well depth equal excitation factor and receiving factors such as seismometer pattern layout and embedding mode with receiving factor.Characteristics are to excite the interval bigger at every turn, have the abundant time to carry out data aggregation.At this moment can send to central station to all or part image data on demand with note, be convenient to carry out the real time data analysis.
(3) surveying work: with seismic exploration difference routinely be to need not all wave detectors and sp location are made marks with timber and penoncel, only need make marks to the reference mark, most of point can position by common GPS, or utilize the reference mark to estimate positioning instant can, precise coordinates can be determined by the GPS in the acquisition station, this will reduce the measurement cost greatly, reduce workload, increase work efficiency.
(4) lay collecting device: because no cable earthquake-capturing station does not have the restriction of heavy cable, the laying of acquisition station is just very simple.Lay the back and press the starting switch opening power; Acquisition station carries out self check and GPS location; Send self-detection result and coordinate information (reporting for work) to central station to central station; Central station is sent out shutdown command makes acquisition station enter off-mode, and the shutdown concluding time is set in the time that all acquisition stations have been laid in expectation; All acquisition stations enter dormant state simultaneously in the time of setting, and wait for start-up command.
(5) blow out and excite image data: finish back (explosive excites and waits other preliminary works all ready certainly) in case all acquisition stations are laid, transmission data movement instruction earlier, setting data load mode; Send then data regularly the synchronous acquisition instruction carry out timing and start and blow out, press record data lock in time, improve operating efficiency greatly.
(6) data collection: after storer is full of data, need be put into central station to acquisition station and carry out the data recovery, can adopt USB interface or network interface to be connected and finish the data recovery, carry out the data layout then with the central station server, calculate GPS network system high-precision coordinate, generate the SPS file.
(7) data processing and analysis: adopt data processing and the analytical approach the same with conventional processing.
Utilizes SMS to receive steering order and realize the control of duty and duty is turned back to central station, and when realizing the transmission of image data, the steering order of use there are following ten:
The instruction set abridged table
The instruction sequence number Instruction Function description
1 Start-up command Open acquisition station, enter recording status, return open state
2 The dormancy instruction Acquisition station enters dormant state, waits for start-up command
3 Shutdown command Acquisition station enters off-mode, enters dormant state behind certain hour automatically
4 Acquisition parameter is provided with instruction Acquisition station is provided with acquisition parameter
5 Regularly synchronous acquisition instruction of data Notice acquisition station and blaster enter regularly synchronous acquisition state
6 Power state indication Acquisition station detects power supply status, and return results
7 The memory state instruction Acquisition station detection of stored device state, and return results
8 The GPS acquisition instructions Acquisition station synchronous acquisition gps coordinate, and return coordinate
9 Collecting unit detects instruction Acquisition station is finished collecting unit and is detected, return results
10 Data movement instruction Data layout is set and transmits data
It has been by having introduced mobile phone unit, and having solved existing no cable seismograph in the unusual mode of cheap and simple does not have this difficult problem of real-time quality control, makes that essential variation has taken place no cable seismograph, has improved seismographic usable range of no cable and operating efficiency greatly.Utilizing SMS that the existing seismographic memory-type of no cable is not had the cable acquisition station controls and data transmission, utilize many GPS station co-located technology to realize the centimetre-sized location, having solved conventional memory-type does not have the problem that the cable seismograph exists: promptly 1. acquisition station can not receive the control that steering order realizes duty; 2. acquisition station can not send data to the real-time quality control that central station is realized data; 3. it is synchronous that the GPS of acquisition station only is used for time service, and most of conventional memory-type does not have that cable earthquake-capturing station does not position or bearing accuracy is not enough.

Claims (5)

1. a note type does not have the cable seismograph, no cable seismograph acquisition station comprises main control unit, collecting unit, storage unit, GPS unit and power supply management control unit, it is characterized in that also comprising mobile phone unit, main control unit connects collecting unit, storage unit, GPS unit, power supply management control unit and mobile phone unit respectively.
2. do not have the cable seismograph according to the described note type of claim 1, it is characterized in that described collecting unit is made up of multi-way switch, prime amplifier, delta sigma modulator-demodular unit, digital filter and measuring signal generator; The digital filter that connects main control unit connects the multi-way switch of multichannel delta sigma modulator-demodular unit, prime amplifier and tie geophone arranged side by side successively; Digital filter connects multi-way switch by measuring signal generator again.
3. do not have the cable seismograph according to the described note type of claim 2, it is characterized in that No. one modulator-demodular unit support connects the multi-way switch of two-way prime amplifier and tie geophone; Described prime amplifier is the preamplification gain type that program is provided with 0dB, 6dB, 12dB, 18dB, 24dB, 30dB or 36dB.
4. do not have the cable seismograph according to the described note type of claim 1, it is characterized in that described main control unit is connected with the GPS unit with mobile phone unit respectively by serial ports, connect collecting unit, and connect storage unit by the FIFO memory interface; Power supply management control unit connects and the power supply support is provided and carries out power supply management for mobile phone unit, GPS unit, collecting unit, main control unit and storage unit.
5. do not have the cable seismograph according to claim 1 or 2 or 3 or 4 described note types, it is characterized in that described mobile phone unit uses GSM, CDMA or 3G mobile chip, and be connected with main control unit with serial ports; The GPS unit adopts OEM GPS receiver module; Storage unit adopts the SD card of 8G.
CN2009201760181U 2009-09-09 2009-09-09 Short message type no-cable seismograph Expired - Fee Related CN201514489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201760181U CN201514489U (en) 2009-09-09 2009-09-09 Short message type no-cable seismograph

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201760181U CN201514489U (en) 2009-09-09 2009-09-09 Short message type no-cable seismograph

Publications (1)

Publication Number Publication Date
CN201514489U true CN201514489U (en) 2010-06-23

Family

ID=42485902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201760181U Expired - Fee Related CN201514489U (en) 2009-09-09 2009-09-09 Short message type no-cable seismograph

Country Status (1)

Country Link
CN (1) CN201514489U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353983A (en) * 2011-06-30 2012-02-15 石家庄经济学院 Portable mountain wireless earthquake surveying system
CN102520728A (en) * 2011-11-22 2012-06-27 北京空间机电研究所 Method for realizing accurate assigned spot recovery of controllable parafoil by adopting double-antenna GPS (global positioning system)
CN102565850A (en) * 2012-01-01 2012-07-11 成都理工大学 Wireless telemetry seismic signal acquisition system
CN102628958A (en) * 2011-10-17 2012-08-08 中国科学院地质与地球物理研究所 Digital seismic instrument with integration of wired, wireless and cable-less modes into one
CN103163544A (en) * 2013-03-20 2013-06-19 中国海洋石油总公司 Method and system for positioning shot point
CN104502958A (en) * 2014-12-17 2015-04-08 程露杨 Novel seismic prospecting instrument and method for prospecting by adopting same
CN104391321B (en) * 2014-12-16 2017-05-24 吉林大学 Low-power-consumption power supply management system and management method for cable-less storage type seismograph

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353983A (en) * 2011-06-30 2012-02-15 石家庄经济学院 Portable mountain wireless earthquake surveying system
CN102628958A (en) * 2011-10-17 2012-08-08 中国科学院地质与地球物理研究所 Digital seismic instrument with integration of wired, wireless and cable-less modes into one
CN102628958B (en) * 2011-10-17 2014-05-07 中国科学院地质与地球物理研究所 Digital seismic instrument with integration of wired, wireless and cable-less modes into one
CN102520728A (en) * 2011-11-22 2012-06-27 北京空间机电研究所 Method for realizing accurate assigned spot recovery of controllable parafoil by adopting double-antenna GPS (global positioning system)
CN102565850A (en) * 2012-01-01 2012-07-11 成都理工大学 Wireless telemetry seismic signal acquisition system
CN103163544A (en) * 2013-03-20 2013-06-19 中国海洋石油总公司 Method and system for positioning shot point
CN104391321B (en) * 2014-12-16 2017-05-24 吉林大学 Low-power-consumption power supply management system and management method for cable-less storage type seismograph
CN104502958A (en) * 2014-12-17 2015-04-08 程露杨 Novel seismic prospecting instrument and method for prospecting by adopting same

Similar Documents

Publication Publication Date Title
CN101661111B (en) Method for performing seismograph control and data transmission by using short message and short message control and transmission type cableless seismograph
CN102466813B (en) Wireless remote sensing storage type seismograph system
CN101639539B (en) Storage type earthquake signal continuous collecting system
CN201514489U (en) Short message type no-cable seismograph
CN104597506B (en) The air-ground electromagnetic exploration method of frequency domain
CN102523621B (en) A kind of Mine Personnel Positioning System and method
CN1151383C (en) Seismic acquisition system using wireless telemeter
CN102628959B (en) Captive balloon-carried type wireless telemetric seismic instrument system
CN102353996B (en) Directional transient electromagnetic device in drill hole
CN104237970A (en) Earthquake electromagnetism joint exploration system and data collecting devices and method thereof
CN103499843A (en) Vehicle-mounted type transient electromagnetic quick exploration device and measurement method
CN102681017B (en) Amplitude-frequency electric perspective detection method
CN102073061B (en) Ground microphone information high-density recording system using digital ground microphone
CN105137477A (en) Multifunctional wireless data transmission seismic wave exploration instrument
CN102768364B (en) Combine wireless and without the earthquake-capturing station of cable function
CN107346032A (en) A kind of wireless controlled passes the Tunnel prediction system and method for acceleration transducer
CN103499841A (en) Roadway-hole transient electromagnetic device and measuring method
CN104407392A (en) One-transmitting and three-receiving type detection device for water filling goaf, and detection method
CN103499844B (en) Omnidistance total space transient electromagnetic device and measuring method
CN101100940B (en) Arrayed sound signal detection system and its engineering uses
CN202256703U (en) Directional transient electromagnetic device in drilled hole
CN102466814B (en) Wireless remote sensing seismograph system
CN110308482A (en) The AD conversion and data-storage system and method for seismic exploration data wireless acquisition node
CN102628958B (en) Digital seismic instrument with integration of wired, wireless and cable-less modes into one
CN112505787B (en) Coal seam roof water electromagnetic method perspective exploration system and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100623

Termination date: 20120909