CN201024362Y - Conflict-free urban automobile road system - Google Patents

Conflict-free urban automobile road system Download PDF

Info

Publication number
CN201024362Y
CN201024362Y CNU2005200644397U CN200520064439U CN201024362Y CN 201024362 Y CN201024362 Y CN 201024362Y CN U2005200644397 U CNU2005200644397 U CN U2005200644397U CN 200520064439 U CN200520064439 U CN 200520064439U CN 201024362 Y CN201024362 Y CN 201024362Y
Authority
CN
China
Prior art keywords
road
city
traffic
urban
intersection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2005200644397U
Other languages
Chinese (zh)
Inventor
董国良
张桂淑
张亦周
董学义
董学健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2005200644397U priority Critical patent/CN201024362Y/en
Application granted granted Critical
Publication of CN201024362Y publication Critical patent/CN201024362Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Traffic Control Systems (AREA)

Abstract

The utility model relates to an integration technology which is used for integrally and fundamentally reconstructing the existing urban roads. The utility model takes the ground road as basis, and improves all the road crossings of driveway into road crossings without conflict points (grade separation without ramps are preferred), and the traditional urban road net comprising an express way, an arterial road, a sub arterial road and a feeder road is constructed into a road net entirely consisting of express ways, namely a road net has entirely continuous flow (continuous driving without stopping). By adopting the technical proposal of the utility model, the innate imperfection of inevitable traffic jam of the quaternary road net can be totally eliminated, the traffic supply of the unit acreage and the traffic ability of the whole road net can be improved by quadruplicates, and the problems of traffic jams, large gasoline consumption, serious pollution and unauthorized use of arable land, etc. in city can be completely solved.

Description

A kind of city motor vehicle road system with no conflicting point
Technical field
The utility model relates to a kind of City road traffic system, particularly relates to a kind of improvement to the urban automobile approach system.
Background technology
Since over half a century, all in the world medium above cities, its urban road is the road network for being made up of the level Four road all.This level Four road is: through street, arterial road, secondary trunk road and branch road.Regulation in the China " Code for planning design of transport on urban road ": urban road should be divided into through street, arterial road, secondary trunk road and branch road four classes.
The Traffic Development history of over half a century proves, serious traffic congestion must appear in this method that urban road is divided into level Four, the transformation of the road traffic system in city can't the be jumped out vicious circle of " block up---improvement---blocks up again ".Be divided in the method for level Four at urban road, when city automobile quantity more for a long time, serious traffic congestion has just appearred, show as through street traffic capacity deficiency, must cause building or increasing the through street, to improve the ratio of through street.After the through street is built up, a lot of vehicles are in order to save time, can detour and travel on the through street, this has not only brought out a lot of new traffic volume, and the jam that the through street is imported and exported can appear, " do not increase ", " being unable to come down ", show as other road passage capability deficiency beyond the through street, this just causes improving the ratio of other road.After other road passage capability increased, the problem of " not increasing ", " being unable to come down " had solved, and the vehicle that pours in the through street further increases, and makes the through street also become road at a slow speed, and this will cause again increasing building the through street, improve the ratio of through street again ...Circulation is gone down like this, and Lu Yuexiu is many more, and car is more and more stifled, and the urban size is increasing, so-called " stand large flat bread " phenomenon must occur.Not only a large amount of soils are taken by the city, and the land supply deficiency, seriously restrict the development in city, and this has constituted the severe challenge to national sustainable development.As seen, urban road is divided into the method for level Four, and the improvement that makes urban road system is entered one " endless loop ", and not only urban traffic blocking can't solve forever, and is difficult to possess the necessary The coast is clear condition of realization " public traffic in priority ".
Because the existing road network of forming by the level Four road, the traffic quantity delivered that on every square kilometre of soil, forms, be that traffic supply density is very low, do not satisfy the transport need that takes place on every square kilometre of soil, bustling urban district far away, i.e. traffic is supplied with density well below transport need density.Therefore, in the road network that the level Four road is constituted, the traffic congestion in bustling urban district may not solve.The misery of bustling traffic congestion problems in the city is all being born in nearly all metropolis, all taking certain restricting vehicle policy current in bustling urban district, this policy is a kind of helpless selection, cause very big inconvenience to urban life, also caused being discontented with in the society, and produced negative influence for the development auto industry of letting go.
The method that existing City road traffic system is made up of the level Four road has generally caused building large-scale overpass bridge and viaduct in the metropolis, is even Underground Transportation Engineering.This has not only caused traffic investment demand huge, that be difficult to pay, and City road traffic system is complicated day by day, and the traffic situation is blocked up day by day, and the urban space is cut apart day by day, and city human settlements condition constantly worsens, and forms the situation that bad old practices die hard.This is one of important root that causes the unsustainable development in city.
In prior art and the existing patent, problem to the existence of urban automobile road traffic system, various schemes were arranged, but owing to all fail to change the quaternary structure of road network, can not on the whole, fundamentally eliminate the birth defects of forming by level Four road (through street, arterial road, secondary trunk road, branch road) that road network had, so all can not really solve problems such as the very big and tail gas severe contamination of problem, the motor vehicle fuel consumption of urban traffic blocking problem, a large amount of land occupations in city effectively.
Application (patent) number is the patent document that 03223555.0 name is called the through-flow intersection of a kind of vehicle, the design scheme of the through-flow intersection of a kind of vehicle is disclosed, be to utilize turn around passage and thread-changing distance, can reach all vehicles of saying major trunk roads can only turn right, leave the opposite by-path or the vehicle of left-hand bend from by-path, ahead running flows to rolls the offside A-road away from.But in this design scheme, the place ahead that goes out the ahead running flow path direction on the by-path right side will be provided with the passage that turns around of band " second " type protective guard, the vehicle line complexity, and the intertwined point is many and intensive, only is applicable to the highway section that vehicle flowrate is very little.
Application (patent) number is the patent document of 88101742.6 name neotectonics of being called the crossroad and uses thereof, a kind of neotectonics of crossroad is disclosed, it is characterized in that being provided with on the arterial highway at the parting of the ways one with arterial highway equality and divide the safety island that the arterial highway becomes the car lines equally, mat double-ring slalom course is connected with the arterial highway, makes each by-path and the driving of arterial highway have no to intersect interference.But this structure floor space is big, and the motorway complexity also will be built safety island, the cost height.
Application (patent) number is the patent document that 93119501.2 name is called stereo urban traffic system, a kind of three-dimensional construction system engineering of urban traffic is disclosed, illustrated a kind of modern city approach system, but this technology can not effectively be used, and road formation heaving of the sea is difficult to carry out the requirement of solution modern city to traffic.
Application (patent) number is the patent document that 98117567.8 name is called building and traffic system, a kind of building and traffic system design scheme that is used for city or centralized residence district or speedway disclosed, this kind building and traffic system are that the top with building links together, and above-mentioned two class highways can communicate with ground highway network or MTR network simultaneously.Building and highway are combined into one, can also be provided with the elevated trains passage in the top-side of building.Should clearly demarcated compare to have and can utilize fully on the ground and straight space, ground with the existing building general layout, but cost height, poor operability.
Summary of the invention
The purpose of this utility model is by the essence transformation to existing City road traffic system, thoroughly to get rid of the traffic congestion in city, the economic loss that the elimination traffic congestion causes, the travel speed of raising motor vehicle, the travel time of minimizing motor vehicle.According to the ride characteristic of existing automobile, automobile under the transport condition that do not stop, its hundred kilometers oil consumptions only be equivalent to that present city proper travels 50%~60%.Adopt the utility model, automobile can travel without a break, thus can reduce the gasoline consumption of motor vehicle significantly, and reduce the tail gas pollution of motor vehicle.
The purpose of this utility model also is to save urban land in a large number, this is because the automobile pollution that allows on existing every square kilometre of soil, city is very low, so, along with the increase of automobile quantity, the inevitable expansion rapidly of scope is taken up an area of in the city, has taken a large amount of soils.The utility model can make the automobile pollution on every square kilometre of soil improve about 4 times, this has just been avoided the increase along with automobile quantity, recoverable amount is very low owing to get on the car in every square kilometre of soil, and the city that must occur " stand large flat bread " phenomenon, thereby reach the purpose of a large amount of saving city land occupation.
The utility model can transform the road traffic system that motor vehicle travels continuously as with having City road traffic system now, can cancel the traffic lights of intersection, automobile need not to the intersection to pause and wait for, in the traffic peak period, the average overall travel speed of automobile is increased to about four times, from per hour 10~20 kilometers, bring up to per hour about 60 kilometers.
The technical scheme that its technical problem that solves the utility model adopts is a kind of conformability technology, adopt the technical solution of the utility model, existing ground level road is main body, is the basis in can the city, by step by step the intersection being transformed, make all intersections in the net of part urban road, city all realize not having the conflict point traffic, existing urban road network is transform as the urban road network that adapts to fully with mechanical transport.This is improved one's methods and is characterised in that, with in the motor road in the part urban area in each block scope the motor road intersection path and the indivedual highway sections all set up no conflict point intersection, no conflict point intersection be flyover crossing or wherein part be the crossing of non-clover leaf other patterns, with progressively will be by the through street, arterial road, the urban automobile road that the urban road network in the part urban district that level Four such as secondary trunk road and branch road road is formed transform as except that path in each block scope and indivedual highway section all is the urban road network of through street.
Motor road of the present utility model system is transformation globality, essence to urban road.Along with intersection transformation quantity increases to whole crossings, this has just finished a process by quantitative change to qualitative change, the brand-new road network of traffic characteristics has occurred---and all be the road network of continuous stream (need not in travelling to pause) mode of transportation to be interrupted the road network of traffic flow (needing in travelling constantly to pause) mode of transportation, to be changed to originally.Qualitative leap has appearred in mode of transportation, coordinates mutually with the ride characteristic of automobile, has given full play to automobile and has transported advantage fast.
Motor road of the present utility model system, be that the intersection of existing urban road is transformed selectively one by one, each improvement project is confined to the scope at a crossing, therefore, daily traffic impact to the city is less, compare with building viaduct, big grade separation and underground construction, much smaller to the influence of the daily traffic in city.
The part urban district of improving one's methods and to be used for the city of urban automobile approach system of the present utility model, can be used to take place the localized road net of traffic congestion or location or the area that traffic congestion takes place, can be used for traffic congestion takes place in the city proper all locations or area, the urban centre or the sub-center that can be used for the city proper also can be used for all urban built-up area, city proper.
The utility model can be used for the road reformation in larger area part urban district, and the area in this part urban district is not less than 10 square kilometres.
The utility model if desired, also can be used for the intersection transformation of path in the scope of block to the improvement of City road traffic system.
Can transform flyover crossing as to the transformation of intersection in the utility model or transform the non-flyover crossing of no conflict point at the less part crossing of the traffic volume as.In the transformation of intersection, also can all transform flyover crossing as.Flyover crossing need be transform as, separated interchange bridge can be preferably established.
Motorway can be established People's Bank of China's overpass or cross the tunnel, street in the utility model, walks motorway to avoid the pedestrian.
In the utility model in each block the pattern of path intersection can be conventional type formula or preferred (referring to Fig. 5): can only keep straight on and each travel direction can only be turned right when keeping to the right along a direction, when keeping left, can only turn left; Or can not keep straight on (referring to Fig. 6), and can only turn right when keeping to the right, can only turn left when keeping left.
The utlity model has outstanding advantage and effect, motor road of the present utility model system is adopted in the transformation of existing urban road system, and road passage capability can be increased to about four times.This is because the traffic capacity in every track can be brought up to 1800 (when pause in no crossing) from per hour 450 (when need pause in the crossing).If the delay that traffic congestion causes is taken into account, the existing urban road traffic capacity can be lower.
Adopt motor road of the present utility model system, can make on the land area of one unit of city traffic in large supply in the transport need amount, be that traffic is supplied density greater than transport need density, this just can fundamentally eliminate the traffic congestion in bustling urban district, need not to take the restricted driving measure of automobile.
Adopt motor road of the present utility model system, will make the city average speed improve about four times.Automobile runs same distance, and institute's time spent is original 1/4th, and this has just greatly improved the operational paradigm in city.
Adopt motor road of the present utility model system, can make the automobile pollution on every square kilometre of land area improve about four times, so can build up the compact city.This compact city is compared with " the stand large flat bread " in existing city, and the former city floor space is the latter's 1/4th, and the diameter in city reduces half.If take all factors into consideration, average speed is increased to about four times, and the city diameter reduces half, and so, all transfer efficients of the city stream of people, logistics will have great raising.Therefore, with the optimal city size that half an hour, operating range was delimited, will be increased to from 2,000,000 present people more than 2,000 ten thousand people, this development to urban economy is very important.
Adopt motor road of the present utility model system, reduce to original 1/4th as the trip distance of above-mentioned automobile, and can travel continuously.These two combined factors are got up, and the average fuel consumption of automobile will be reduced to original sixth to eight/one, and this energy policy to country is very favourable.
Be not difficult to find out from above analysis, adopt motor road of the present utility model system, in the city, can also form " public traffic in priority " naturally, and can save the investment of public transit system in a large number.
Adopting outstanding effect of motor road system of the present utility model is " bringing order out of chaos ", can pull back the urban highway traffic transformation from a passless the opposite way round.This opposite way round is, only pays attention to the large-engineering of some road constructions and ignores and improve traffic supply capacity on the land area of one unit, ignore the traffic capacity that improves each bar road in the whole road network.Simultaneously, thinking of the present utility model, can correct one is wrong conclusion---" it is impossible blocking up by the transport solution of repairing the roads " that a lot of people accepted.Do not need to build again cost height such as viaduct, big grade separation, occupations of land is many, the traffic capacity is limited means of transportation in the transformation of mature city, avoided building the means of transportation of dismounting possibly in these future.
Adopt motor road of the present utility model system, only transform the intersection, just can excavate the potentiality that are equivalent to about four times of original road passage capabilities, therefore with less investment, the road investment is reduced significantly, is a kind of small investment, easily enforcement, the high technical scheme of repayment.
Urban district described in this patent file, city proper, urban centre, sub-center, urban built-up area are meant alleged urban district, city proper, urban centre, sub-center, urban built-up area during " China's city planning basic terms standard " (GB/T50280-98).
Urban road described in this patent file is meant, the road network of being made up of level Four roads such as existing through street, arterial road, secondary trunk road and branch roads, and this level Four road formed urban road network after transforming.
Block described in this patent file is meant, each plot that urban road surrounded.
Conflict point described in this patent file is meant, with than the cross one another place of wide-angle, promptly the crosspoint is called conflict point from the different directions route or travel by vehicle.
Description of drawings
Fig. 1: sheet (or claiming lumps) city does not have conflict point motor road system embodiment schematic diagram
This figure is that sheet (or claiming lumps) city does not have the embodiment schematic diagram of conflict point motor road system.
Fig. 2: banded (horizontal direction is a long axis direction) city does not have the embodiment schematic diagram of conflict point motor road system
This figure does not have the embodiment schematic diagram of conflict point motor road system for banded (horizontal direction is a long axis direction) city.
Fig. 3: banded (horizontal direction is a long axis direction) city does not have the embodiment schematic diagram of conflict point motor road system
This figure does not have the embodiment schematic diagram of conflict point motor road system for banded (horizontal direction is a long axis direction) city.
Fig. 4: banded (horizontal direction is a long axis direction) city does not have the embodiment schematic diagram of conflict point motor road system
This figure does not have the embodiment schematic diagram of conflict point motor road system for banded (horizontal direction is a long axis direction) city.
Fig. 5: no conflict point grade crossing
This figure is a kind of pattern of no conflict point grade crossing.Mainly be applicable in the mutual cross way crossing that straight-going traffic can be forbidden on the road, perhaps be used for the intersection of path in each block scope.
Arrow represents to allow travel direction among this figure.
Fig. 6: no conflict point grade crossing
This figure is a kind of pattern of no conflict point grade crossing.Mainly be applicable to the crossing that the traffic of craspedodrome direction can be forbidden, perhaps be used for the intersection of path in each block scope.
Arrow represents to allow travel direction among this figure.
Among each figure 2. horizontal through streets, 1. vertical through streets, 3. no conflict point grade crossings 4. transversely straddle type separated interchange bridge 5. vertically go up straddle type separated interchange bridge 6. lateral routes
Fig. 7: underpass type separated interchange bridge
This figure is the separated interchange bridge stereogram of underpass type.
Fig. 8: go up the straddle type separated interchange bridge
This figure is the separated interchange bridge stereogram of last straddle type.
The specific embodiment
Below by embodiment, the utility model is further elaborated:
Embodiment one,
As shown in Figure 1, be one to be applicable to the embodiment (path among the figure in each block scope slightly) of the no conflict point motor road system in sheet (or claim lumps) city.Flyover crossing is all set up in the intersection of the urban road among the figure, to satisfy in direction in length and breadth bigger traffic volume demand is arranged all.In this road network,, can use no conflict point grade crossing if there is certain or some crossing traffic amounts hour.At the crossing of this road network external road,, also can use grade crossing if the traffic volume is less.
In this embodiment, whole road network is the checkerboard type road network, and belt road and vertical road are the through street, form the urban automobile approach system of all being made up of the through street.Can be preferably about 700 meters along the distance of road direction in length and breadth between each intersection, the through street is more than the two-way six-lane.Separated interchange bridge (as shown in Figure 7 and Figure 8, separated interchange bridge can adopt straddle type or underpass type or both combinations, and present embodiment is last straddle type) is all adopted in each intersection.Belt road 2 and vertically all crosspoints of road 1 all establish separated interchange bridge 4,5, overpass bridge 4 passes through on bridge floor for belt road, the vehicle level on the ground level road under overpass bridge 4 bridges on vertical road 1 travel by; Overpass bridge 5 passes through on bridge floor for vertical road, the level on the ground level road under overpass bridge 5 bridges of the vehicle on the belt road 2 travel by.
Traffic lights all can not established in all intersections at road network, and vehicle can travel continuously without a break, thereby have formed the rapid of whole road network.
For the turning driving road of intersection, the Shi Zeshe right-hand bend road that travels of turning right, the vehicle of left-hand bend also will travel at first to the right, and then realizes by turning right continuously.
As shown in Figure 1, establish certain motor vehicle and need the F that reaches home, then have two kinds of travels to select from starting point A.First kind of selection be, from the A point, turn right by block path C in the B point back of keeping straight on, and the back of turning right again arrives D, and longitudinally the E back of turning right again of keeping straight on, road arrives the F point.The 2nd selection be, from the A point, turns right along the through street successively by G → H → I, and the J that keeps straight on again turns right successively by K → E again, and F reaches home.
When the pedestrian passes road, need by pedestrian overcrossing or the underground street passage of crossing.Pedestrian overcrossing and the underground street passage of crossing omit in the diagram.
Embodiment two,
As shown in Figure 2, be an embodiment who is applicable to the city motor vehicle road system with no conflicting point of strip city (path among the figure in each block scope slightly).Horizontal direction is the extending direction of strip city among the figure, claims that also vertically vertical direction claims laterally among the figure.The structure of present embodiment and embodiment one is basic identical, and different is to suppose that the traffic volume is far longer than the horizontal traffic volume longitudinally, so the vertical road 1 of each bar all changes the through street that can keep straight on in the road network transformation; The horizontal traffic volume is less, so belt road 2 can be established the through street that can keep straight on every one, 6 of the belt roads of its interbody spacer can not be along laterally keeping straight on continuously, can barricade along the longitudinal direction or forbidden sign at the belt road 6 and the grade crossing 3 of vertical road 1, make vehicle along laterally not passing through, can only turn right or longitudinally keep straight on.More after a little while, need to keep straight on when striding across the crossing at the traffic volume, can when sailing, turn right earlier, travel to the jube opening part and turn around, turn right again to vertical intersection along belt road 6.
The floor map of no conflict point grade crossing 3 also as shown in Figure 5, vertically road allows to keep straight on, but then no through traffic to belt road, is provided with traffic barrier in the crosspoint of belt road and vertical road, serves as no conflict point intersection to realize this intersection.
Embodiment three,
As shown in Figure 3, be an embodiment who is applicable to the city motor vehicle road system with no conflicting point of strip city (path among the figure in each block scope slightly).Horizontal direction is the extending direction of strip city among the figure, claims that also vertically vertical direction claims laterally among the figure.Present embodiment and embodiment two are basic identical, different is: when belt road passes through overpass bridge, be that belt road 2 passes through overpass bridge on bridge floor, and be that vertical road 1 passes through overpass bridge on bridge floor that belt road 2 level under overpass bridge is passed through overpass bridge in embodiment three in embodiment two.
Embodiment four,
As shown in Figure 4, be an embodiment who is applicable to the city motor vehicle road system with no conflicting point of strip city (path among the figure in each block scope slightly).Horizontal direction is the extending direction of strip city among the figure, claims that also vertically vertical direction claims laterally among the figure.Present embodiment and embodiment two, three are the strip city, but the traffic volume and the horizontal traffic volume are all bigger longitudinally the strip city in the present embodiment, and therefore, the scheme that present embodiment adopts is similar to the scheme of embodiment one, no longer detailed description.

Claims (4)

1. city motor vehicle road system with no conflicting point, be to existing city by the through street, arterial road, the urban road network that level Four such as secondary trunk road and branch road road is formed, improvement becomes novel motorway road network, it is characterized in that, motor road in the part urban area, except that path in each block scope and indivedual highway section, two kinds of structures such as no conflict point intersection of flyover crossing and non-clover leaf other patterns are only adopted in the motor road intersection, and the motor road that the motorway road network is become except that path in each block scope and indivedual highway section all is the road network that the through street is formed.
2. a kind of city motor vehicle road system with no conflicting point according to claim 1 is characterized in that described flyover crossing preferably establishes separated interchange bridge.
3. a kind of city motor vehicle road system with no conflicting point according to claim 1, the structural shape that it is characterized in that path intersection in each block scope is can only be along a two-way craspedodrome of road, each travel direction can only be turned right when keeping to the right, and can only turn left when keeping left.
4. a kind of city motor vehicle road system with no conflicting point according to claim 1 is characterized in that the structural shape of path intersection in each block scope is kept straight on, only allowed to turn right for not allowing when keeping to the right, turn left when keeping left.
CNU2005200644397U 2005-09-09 2005-09-09 Conflict-free urban automobile road system Expired - Lifetime CN201024362Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2005200644397U CN201024362Y (en) 2005-09-09 2005-09-09 Conflict-free urban automobile road system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2005200644397U CN201024362Y (en) 2005-09-09 2005-09-09 Conflict-free urban automobile road system

Publications (1)

Publication Number Publication Date
CN201024362Y true CN201024362Y (en) 2008-02-20

Family

ID=39098216

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2005200644397U Expired - Lifetime CN201024362Y (en) 2005-09-09 2005-09-09 Conflict-free urban automobile road system

Country Status (1)

Country Link
CN (1) CN201024362Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103194944A (en) * 2013-04-10 2013-07-10 李江平 Network type intersection traffic system
CN105735069A (en) * 2014-12-06 2016-07-06 郭小源 Large surrounding type urban traffic method with #-shaped one-way straight artery
CN107217561A (en) * 2017-07-10 2017-09-29 王敬 The existing road in downtown area dredges the stifled system design scheme that passes unimpeded

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103194944A (en) * 2013-04-10 2013-07-10 李江平 Network type intersection traffic system
CN105735069A (en) * 2014-12-06 2016-07-06 郭小源 Large surrounding type urban traffic method with #-shaped one-way straight artery
CN107217561A (en) * 2017-07-10 2017-09-29 王敬 The existing road in downtown area dredges the stifled system design scheme that passes unimpeded

Similar Documents

Publication Publication Date Title
CN1888312A (en) City motor vehicle road system with no conflicting point
CN102425090B (en) Urban three-dimensional road for aggregating and utilizing land and avoiding traffic jam
CN1249302C (en) Full spatial urban road system and traffic method using same
CN2921085Y (en) Double-X shape left turning overpass
CN204608534U (en) A kind of layout structure of interchange
CN101008171A (en) Obstacle-free crossover for city road crossing
CN202671992U (en) Downtown flyover
CN100351468C (en) Full stereoscopic city road system and traffic method using said system
CN103643607B (en) Totally-enclosed full-overpass bus rapid transit approach system
CN100415993C (en) Urban road network structure unit without signal lamp
WO2016165637A1 (en) Optimized development of multi-dimensional traffic road network
CN201024362Y (en) Conflict-free urban automobile road system
CN204530358U (en) Track, crossroad is without intersection current traffic system continuously
CN1534138A (en) Road surface running vehicle management method by setting second stop line
CN203049395U (en) Road system for achieving quasi-rail transit
CN102234965B (en) Right-hand rotation is full unblocked cross composite bridge in the crossroad in outside
CN203639771U (en) Totally-enclosed all-interchange rapid bus road system
CN1213205C (en) Road system for vehicles to pass through road cross safely and smoothly
CN102191733A (en) Urban traffic system without traffic lights
CN208649818U (en) A kind of crossroad Wheelchair Accessible structure
CN202194042U (en) Traffic junction utilizing lane changing way
CN202688814U (en) Traffic light-free fast transportation system arranged on city crossroad
CN201459557U (en) Completely interchanging flyover
CN104612012A (en) Cross-free continuous traffic system for crossroad lane and control method of cross-free continuous traffic system
WO2016172809A1 (en) One-stop-transfer direct public transportation type multi-dimensional traffic network

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Expiration termination date: 20150909

Granted publication date: 20080220

EXPY Termination of patent right or utility model