CN1621656A - Method for configuring and maintaining long section barefoot drilling fluid - Google Patents

Method for configuring and maintaining long section barefoot drilling fluid Download PDF

Info

Publication number
CN1621656A
CN1621656A CNA2003101110176A CN200310111017A CN1621656A CN 1621656 A CN1621656 A CN 1621656A CN A2003101110176 A CNA2003101110176 A CN A2003101110176A CN 200310111017 A CN200310111017 A CN 200310111017A CN 1621656 A CN1621656 A CN 1621656A
Authority
CN
China
Prior art keywords
drilling fluid
well
agent
section
dosage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2003101110176A
Other languages
Chinese (zh)
Inventor
邓仕奎
陈俊斌
吴先忠
吴忠国
陈平
李华坤
熊明勇
杨国懿
古天星
禹松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Petroleum Administration Bureau
Original Assignee
Sichuan Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Petroleum Administration Bureau filed Critical Sichuan Petroleum Administration Bureau
Priority to CNA2003101110176A priority Critical patent/CN1621656A/en
Publication of CN1621656A publication Critical patent/CN1621656A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/141Feedstock

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The present invention is the compounding and maintaining method of well drilling fluid for long open hole drilling in exploiting petroleum and natural gas. The present invention provides long open hole drilling fluid including mud inhibiting polynary polymer system for upper open hole, polynary sulfonate polymer system for lower open hole and oil mixture-sulfonate polymer system for horizontal section, and the long open hole drilling fluid may be used in open hole drilling up to 5000 m. The drilling fluid for the upper section use has proper higher soil content and two kinds of polymer and is favorable to carrying sand, suspending, preventing leakage and preventing collapse; and that for the lower section use has sufficient high molecular weight polymer as coating agent and detergent and no dispersant for fast drilling, dispersing, pulping, preventing jamming, preventing balling and utilizing hydraulic horsepower.

Description

The configuration and the maintaining method of long section bore hole drilling fluid
Technical field: a kind of configuration and maintaining method of the section of length bore hole drilling fluid, the long section bore hole that is used for petroleum gas is crept into, and belongs to the formula technique field of drilling fluid system.
Background technology: in the prior art, the oil or the natural gas well that the dark 5000m that bung down are above, for the borehole wall is collapsed, generally all in drilling process, be lowered to three layers of casing cementing, in order to save drilling cost, the research work of carrying out long bore hole section is also arranged, but present bore hole section is between 4000~4500 meters, have only 500 meters bore hole section, can reach the above bore hole drilling well of 5000m does not have precedent as yet, does not see the research of this respect according to data abroad yet, utilize sleeve pipe fixedly the technology of the borehole wall used for many years, it has the advantage that the borehole wall is collapsed, and its shortcoming is: be not suitable for the oil drilling low cost development strategy of current enforcement, simultaneously, because intermediate demand setting of casing, need stop to bore, the speed that this creeps into influence has bigger influence to the competitiveness in market.
Summary of the invention: the present invention will design a kind of top well to adopt multipolymer inhibition system, bottom to adopt polynary poly-sulphur system, adopt poly-sulphur oil emulsion drilling fluid at directed net horizontal section, can be used for reaching the configuration and the maintaining method of the long section bore hole drilling fluid that the 5000m bore hole creeps into.
The present invention is achieved in that in top layer well section and bores being mainly drifting sand layer and becoming the relatively poor argillic horizon of lithology of meeting, the main problem of considering anti-collapse, antiseep, taking sand and suspension, therefore to guarantee the strong wave making machine and the suitable high shearing force of drilling fluid, in this well section, suitably height is a bit for native content in the mud, two kinds of polymer composite uses simultaneously, configuration base slurry and aquation+other polymer are made into glue, adjust processing, carry out performance maintenance with large and small Molecularly Imprinted Polymer composite glue and base slurry in the drilling process; Open and three spud sections two, this well Duan Weichang barefoot interval, main contradiction is to suppress and rheological characteristic, adopt low solid phase to wrap by force by the polynary sulphonated polymer mud system of dispersed polymeres not, on drilling fluid is safeguarded, at first fill up the heavy polymer coating agent and be used in combination cleaning agent, do not use dispersing agent, run into exceptional well Duan Shike and use polymeric alcohol.
Advantage of the present invention is: the native content that top layer well section is suitably high and two kinds of polymer composite uses simultaneously help taking sand, suspension, antiseep and anti-collapse, open to use when opening two and fill up the high molecular weight polymers coating agent and be used in combination cleaning agent with three, can play fast creep into, the effect of dispersion, pulping, anti-blocked portion, anti-mud drum and performance water horse power, do not use dispersing agent can solve the problem of blocked portion, anti-mud drum and reaming.
The specific embodiment: following is that example provides most preferred embodiment of the present invention with the HD1-22H well: 5600 meters of this well finishing drilling well depths, bore hole segment length reaches 5080 meters, 661.59 meters of horizontal movements, well section 0~500 meter well depth in top layer, top adopts multipolymer to suppress mud system, and drilling fluid The field prescription is as follows: the first step is configuration swell soil magma 120~150m earlier 3, prescription is: fresh water+0.2~0.3%NaOH+0.3~0.6%Na 2CO 3+ 5~8% swell soil carries out in proper order by prescription during dosing, after fully stirring, and hydration time 〉=16 hour; Second step was disposed glue again, prescription is: the well site water+little molecule 0.5~0.8% of caustic soda 0.1%+ polymer macromolecule 0.5~0.8%+ polymer, then the swell soil magma for preparing is mixed with glue and be made into top layer, top drilling fluid, the maintenance program of top layer, top drilling fluid is: check the salinity of measuring well site water earlier, when salinity is high, improve the dosage of soda ash and caustic soda, in drilling process, add a spot of glue and additional prehydration swell soil magma slowly, adopt the level Four well control, be lowered to the preceding well of thoroughly cleaning of surface pipe; The lower well section adopts polynary poly-sulphur system formulation from 500~5100 meters well sections, and filling a prescription is: base slurry+KPAM0.1~0.2%+SMP -12~3%+SPNH (PSC -1) 2~3%+ sulfonated gilsonite or mulseal 2~5%+ sliding agent 0.5~2%+ agstone or blanc fixe be made into the drilling fluid of lower well section; The maintaining method of lower well section drilling fluid is: clean earlier thoroughly mud settling tank before spudding in, before boring the boiling water bod, prevent that with soda ash preliminary treatment drilling fluid cement from invading, have stronger encapsulating ability for making drilling fluid, alleviate blocked portion, macromolecule polyalcohol is pressed 2~3kg/m 3Sized molecules dosage ratio is (2~3): 1, for guaranteeing the lubricity of drilling fluid, the sliding agent dosage is 1.0~1.5%, add 0.5~1% Pluronic polyols SYP-1 and an amount of cleaning agent RH-4 simultaneously, for preventing seepage, in drilling fluid, add 1~3% YL-80 and drill-feeding plugging agent, the each addition of drill-feeding plugging agent is controlled at 0.5%; Net horizontal section is from 4815.79~5128.27 meters, the drilling fluid mud maintaining method of this well section is: thoroughly clean mud settling tank at horizontal well drilling Duan Qianxian, use soda ash preliminary treatment drilling fluid before the drilling out, invade to prevent water mud, the drilling fluid of this well section is based on the polynary poly-sulphur system of top well section, the dosage of CMP-3 is controlled at 0.1~0.2%, and the polymer macromolecule dosage is 2~3kg/m 3Sized molecules dosage ratio is (2~3): 1, to guarantee that drilling fluid has stronger encapsulating ability, prevent blocked portion, sliding agent dosage 0.5~1%, crude oil dosage are 3~5%, and the SP-80 dosage is 0.5~1.5%, and an amount of RH-4 cleaning agent and Pluronic polyols SYP-1, for preventing seepage, in drilling fluid, add an amount of YL-80 and 1~3% drill-feeding plugging agent, the each addition of drill-feeding plugging agent is controlled at 0.5%, adopt CMP-3, KPAM, sulfonation inorganic agent etc. is made into glue, so that safeguard and the adjustment mud property, adjusts flow pattern with PSC, but, can not use strong dispersing agent; During 100m, drilling fluid adds 2~3% TYZ-8 in well before entering oil-gas Layer, 2~3% thick TQS-3 and thin TQS-3; Before electrical measurement, thoroughly clean well, adjust rheological characteristic, smooth to guarantee electrical measurement, setting of casing.

Claims (2)

1. the configuration of a long section bore hole drilling fluid and maintaining method, it is characterized in that: top layer, top well section adopts multipolymer to suppress mud system, the bottom adopts polynary poly-sulphur system, directed net horizontal section to adopt poly-sulphur oil emulsion drilling fluid, and the collocation method of this drilling fluid is:
A. the multipolymer of stating the well section employing of top layer, top suppresses mud system and is: dispose swell soil magma 120~150m earlier 3, prescription is: talk water+0.2~0.3%NaOH+0.3~0.6%Na 2CO 3+ 5~8% swell soil, carry out in proper order by prescription during dosing, fully stir, hydration time 〉=16 hour, dispose glue again, prescription is: the well site water+little molecule 0.5~0.8% of caustic soda 0.1%+ polymer macromolecule 0.5~0.8%+ polymer, mix the drilling fluid that is made into top layer, top well section with swell soil magma then with glue;
B. the polynary poly-sulphur system that described lower well section adopts is: base slurry+KPAM0.1~0.2%+SMP -12~3%+SPNH (PSC -1) 2~3%+ sulfonated gilsonite or mulseal 2~5%+ sliding agent 0.5~2%+ agstone or blanc fixe;
C. the poly-sulphur oil emulsion drilling fluid that described directed net horizontal section adopts is the polynary poly-sulphur system based on top well section, and the dosage of CMP-3 is controlled at 0.1~0.2%, and the polymer macromolecule dosage is 2~3kg/m 3, sized molecules dosage ratio is (2~3): 1, and sliding agent dosage 0.5~1%, crude oil dosage are 3~5%, the SP-80 dosage is 0.5~1.5%, and adds RH-4 cleaning agent and Pluronic polyols SYP-1.
2. according to the configuration and the maintaining method of the described a kind of section of length bore hole drilling fluid of claim 1, it is characterized in that: the maintaining method of described drilling fluid is:
A. the maintaining method of the multipolymer inhibition mud system of top layer, top well section employing is: check the salinity of measuring well site water earlier, in drilling process, add glue, replenish prehydration swell soil magma, adopt the level Four well control, be lowered to the preceding well of cleaning of surface pipe;
B. the maintaining method of the polynary poly-sulphur system of lower well section employing is: clean mud settling tank before spudding in earlier, before boring the boiling water bod, use soda ash preliminary treatment drilling fluid, by 2~3kg/m 3Amount add macromolecule polyalcohol, add 1.0~1.5% sliding agents again, add 0.5~1% Pluronic polyols SYP-1 and cleaning agent RH-4 simultaneously, in drilling fluid, add 1~3% YL-80 and drill-feeding plugging agent, the each addition of drill-feeding plugging agent is 0.5%;
The maintaining method of the poly-sulphur oil emulsion drilling fluid that c. directed net horizontal section adopts is: clean mud settling tank at horizontal well drilling Duan Qianxian, use soda ash preliminary treatment drilling fluid before the drilling out, the drill-feeding plugging agent that in drilling fluid, adds YL-80 and 1~3%, the each addition of drill-feeding plugging agent is 0.5%, adopt CMP-3, KPAM, the sulfonation inorganic agent is made into glue, adjust rheological characteristic with PSC, ban use of strong dispersing agent, before entering oil-gas Layer during 100m, drilling fluid adds 2~3% TYZ-8 in well again, 2~3% thick TQS-3 and thin TQS-3 clean well and adjust rheological characteristic before electrical measurement.
CNA2003101110176A 2003-11-26 2003-11-26 Method for configuring and maintaining long section barefoot drilling fluid Pending CN1621656A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2003101110176A CN1621656A (en) 2003-11-26 2003-11-26 Method for configuring and maintaining long section barefoot drilling fluid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2003101110176A CN1621656A (en) 2003-11-26 2003-11-26 Method for configuring and maintaining long section barefoot drilling fluid

Publications (1)

Publication Number Publication Date
CN1621656A true CN1621656A (en) 2005-06-01

Family

ID=34759302

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2003101110176A Pending CN1621656A (en) 2003-11-26 2003-11-26 Method for configuring and maintaining long section barefoot drilling fluid

Country Status (1)

Country Link
CN (1) CN1621656A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101868513A (en) * 2007-09-25 2010-10-20 哈利伯顿能源服务公司 Relate to the minimized method and composition of the particulate migration on the long interval
CN101531889B (en) * 2009-04-13 2010-12-29 中国石油集团川庆钻探工程有限公司 Oil-based stuck freeing fluid for well drilling
CN104762070A (en) * 2015-03-31 2015-07-08 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Drilling liquid capable of passing through coal bed or carbonaceous mudstone for slant interval of horizontal well
CN105219363A (en) * 2014-06-20 2016-01-06 成都棕通石油配件有限公司 Fast drilling mud
CN114605971A (en) * 2020-12-08 2022-06-10 中石化石油工程技术服务有限公司 Drilling fluid and drilling fluid performance maintenance method based on wellbore temperature

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101868513A (en) * 2007-09-25 2010-10-20 哈利伯顿能源服务公司 Relate to the minimized method and composition of the particulate migration on the long interval
CN101868513B (en) * 2007-09-25 2015-05-06 哈利伯顿能源服务公司 Methods and compositions relating to minimizing particulate migration over long intervals
CN101531889B (en) * 2009-04-13 2010-12-29 中国石油集团川庆钻探工程有限公司 Oil-based stuck freeing fluid for well drilling
CN105219363A (en) * 2014-06-20 2016-01-06 成都棕通石油配件有限公司 Fast drilling mud
CN104762070A (en) * 2015-03-31 2015-07-08 中国石油集团川庆钻探工程有限公司长庆钻井总公司 Drilling liquid capable of passing through coal bed or carbonaceous mudstone for slant interval of horizontal well
CN114605971A (en) * 2020-12-08 2022-06-10 中石化石油工程技术服务有限公司 Drilling fluid and drilling fluid performance maintenance method based on wellbore temperature
CN114605971B (en) * 2020-12-08 2023-07-21 中石化石油工程技术服务有限公司 Drilling fluid and drilling fluid performance maintenance method based on shaft temperature

Similar Documents

Publication Publication Date Title
CN102002350B (en) Superhigh temperature water base drilling fluid
CN101851491B (en) Method for preparing fluid loss additive for drilling fluid
CA2258363A1 (en) Method and cement-drilling fluid cement composition for cementing a wellbore
CN105199685B (en) A kind of water-base drilling fluid of inductivity crack leak-proof leak-stopping
CN102504775A (en) Large temperature difference cement slurry for cementing of deep well long isolation section and preparation method thereof
CN105295872A (en) Drilling fluid suitable for compact sandstone reservoir
CN108822811A (en) A kind of gas well horizontal well slim-hole polyamines high inhibition caving-preventing drilling fluid and preparation method
CN107541195A (en) Filming water-base drilling fluid and preparation method thereof
CN105969323B (en) A kind of shale gas horizontal well high-density water-based drilling fluid
CN106433586A (en) Organic slurry used for hole-boring cast-in place pile wall protection, and production method thereof
CN108774504A (en) A kind of water-base drilling fluid and preparation method thereof suitable for saline bed
CN101089114A (en) Salt-containing separating liquid system and its prepn process
CN113863894A (en) Reversible gel consolidation leakage plugging method
CN106285524B (en) To drilling macromolecular mud dreg removing system, method and macromolecular mud under coal mine
CN113004879A (en) Well wall pressure-bearing plugging agent and preparation method thereof
CN109575889A (en) A kind of rotary digging drilled as holes solid phase free flushing liquid and preparation method thereof
CN1621656A (en) Method for configuring and maintaining long section barefoot drilling fluid
CN105505343A (en) Filtrate-loss reducer, filtrate-loss reducer composition and preparation method thereof
CN109679597A (en) A kind of closure film forming high inhibition drilling fluid and preparation method
CN106121568B (en) A kind of in-situ processing technique of environment-friendly type polyethers hydramine drilling fluid
CN101818053A (en) Composite wall-protecting well-drilling slurry material
CN108005610A (en) Deep drilling retaining wall leak-stopping technique
CN112196493A (en) Improved well completion process method suitable for water-saturated thick-layer fine sand layer
CN103015927A (en) Method for optimizing and recycling waste drilling fluid
CN102807846B (en) Anti-collapse drilling fluid for coal bed methane horizontal well and method for preparing anti-collapse drilling fluid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication